Loading...
HomeMy WebLinkAbout2508 GATEWAY RD; ; CB152364; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 12-28-2015 Commercial/Industrial Permit Permit No: CB152364 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: 2508 GATEWAY RD CBAD Tl Sub Type: INDUST Lot#: 0 Construction Type: 38 Reference# Status: ISSUED Applied: 07/27/2015 Entered By: RMA Parcel No: Valuation: Occupancy Group: Project Title: 2132612300 $3,487,356.00 VIASAT-65, 700 SF Tl-BLDG # 11 Plan Approved: 09/16/2015 Issued: 09/16/2015 Inspect Area PB Plan Check #: 58,629 SF Tl-SHELL TO OFFICE & 7,071 SF SHELL TO MANUFACTURING)-W/ PLUMB, ELECT & ME;CHANICAL Applicant: SMITH CONSUL TING ARCHITECTS STE 125 13280 EVENING CREEK DR SAN DIEGO CA 92128 858 793-4777 Building Permit Add'I Building Permit Fee Plan Check Add'I Building Permit Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Fire Expedidted Plan Review $8,484.63 $0.00 $5,939.24 $0.00 $0.00 $976.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $25,182.00 02 $0.00 $0.00 $140.00 $452.50 Total Fees: · $286,910.95 Total Payments To Date: Owner: Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFO Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee ( 4305541) PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Master Drainage Fee Sewer Fee Redev Parking Fee Additional Fees HMP Fee Green Bldg Standards Plan Chk TOTAL PERMIT FEES $286,910.95 Balance Due: $0.00 $823.00 $24,960.00 $18,509.17 $56,638.89 $0.00 $0.00 $0.00 $100,366.00 $0.00 $832.00 $4,035.00 $747.14 $0.00 $38,824.92 $0.00 $0.00 ?? ?? $286,910.95 $0.00 Clearance: -'------ NOTICE: Rease ta<e i:wroval of ya.ir ptject includes tre "lrrpJSition" of i , dedications, reservations, or cther exa::tions hereafter rolectively referred to as "fees'exa::ti ." Yi have 00 days from the date tHs pemit WcS issued to protest irrµ)Sition of thase fees'exa::tions. If yru µotest thern yru rrust fdlONtre µotest fXOOl(Jures set forth in GNerrrrent O:x:le Section ffiJ20(a), ardfilethe µotest aid a,yctherreq..ired infoomtion'lllth the0tyfV'Enag9rfor pucessing in acrodance Vllth Calsboo M.uidpal O:x:le Section 3.32.030. Falue to tirrely fdlONthat fXOOl(Jure Villi bar any subsequent legal action to attack, review, set aside, vdd, or am.d their irrµ)Sition. You are rereby FLJRTI-ERNOTIFIEDthat yrur rig,! to protest thespadfiedfees'exactions cx::ES NCJr .APR...Ytowateraid SEMeramectionfees ard capacity dianges, nor plrnng, zaing, gading or cther sirrila-application pucessing or servioe fees in oonnecti01 Vllth this ptject. I'm cx::ES IT .APR.. Y to any fees'exactims of Wlidi have "ousi been Ven a NOTICE sirrilar to tHs or as to Wlidi tre statute of !irritations has "ousi otherwse ·red. THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 0PLANNING 0ENGINEERING 0BUILDING 0FIRE 0HEALTH 0HAZMAT/APCD «1JJ, ~ CITY OF CARLSBAD Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov SUITEf/SPACEf/UNIT# JOBADDRESS 2508 Gateway Road Est. Value Plan Ck. Deposit CT/PROJECT It LOT# PHASE# It OF UNITS It BEDROOMS It BATHROOMS CONSTR. lYPE OCC, GROUP ViaSat Iii -5 ~ F--1 DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) 65,700 sq. ft. of office and manufacturing tenant improvements in an existing three-story concrete tilt-up cold shell building all related mechanical, electrical, and plumbing systems. [ttL PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING FIRE SPRINKLERS N/A YESO. No[!] YEs[ZjNoD YES[ZjNoO APPLICANT NAME (Primary Contact) Milos Makaric APPLICANT NAME (Secondary Contact) Mark Langan ADDRESS ADDRESS 13280 Evening Creek Orv South, Suite 125 13280 Evening Creek Orv South, Suite 125 CITY STATE ZIP CITY STATE ZIP San Diego CA 92128 San Diego CA 92128 PHONE FAX PHONE FAX 858. 793.4777 858.793.4787 858. 793.4777 858. 793.4787 EMAIL EMAIL milosm@sca-sd.com markl@sca-sd.com PROPERTY OWNER NAME Pivotal 650 California ST, LLC CONTRACTOR BUS. NAME ADDRESS 2201 E. Camelback Rd., Suite 650 CITY STATE ZIP CITY ZIP Phoenix AZ 85016 San Diego CA 92121 PHONE FAX PHONE 602.248.8181 858. 792.0600 EMAIL EMAIL tony levinbeinvestments.com ARCH/DESIGNER NAME & ADDRESS STATE LIC. It Smith Consulting Architects C-11701 (Sec. 7031.5 Business and Professions Code: Any Ci!-Y or County which requires a permit to construqtl alter, improve, demolish or repair an~ structure, prior to its issuance, also requires the applicant for such permit to file a signed statement tnat he is licensed pursuant to the provisions ohne Contractor's License Law {Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he is exemP.t therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500)}. · ey0rom@m~0 @@Ci)(;)@Q)~.Q1?O0Q) - Workers' Compensation Declaration: / hereby affirm under penalty of perjury one of the following declarations: D I have and will maintain a certificate of consent to self-Insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permitis issued. D I have and wlll maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance canier and policy number are: Insurance Co. Policy No. Expiration Date This section need not be completed if the permit is for one hundred dollars ($100) or less. 0 Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage Is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), In addition to the cost of compensation, damages as provided for In Section 3706 of the Labor code, interest and attorney's fees, ,Ji$ C0NTRACTORSIGNATURE OAGENT DATE 0Wro@@e0©OC!.0@m 0@<5 CY.:.i 0 ~ 1? 00 W '. "' I hereby affirm that I am exempt from Contractor's Ucense Law for the following reason: D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure Is not inlended or offered for sale (Sec. 7044, Business and Professions Code: The Contracto(s License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not Intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contracto(s License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contracto(s License Law). D I am exempt under Section Business and Professions Code for this reason: 1. I personally plan to provide the major labor and matertals for construction of the proposed property improvement Oves 0No 2. I (have / have nol) signed an application for a building permit for the proposed work. 3. I have contracted with the following person (firm) to provide the proposed construction Qnclude name address/ phone/ contractors' license number): 4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone/ contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work): ,Ji$ PROPERTY OWNER SIGNATURE OAGENT DATE Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? Yes ./' No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? Yes ./' No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? Yes ./' "No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height EXPIRATION: Eveiy permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or authorized by such permit is spended or abandoned at any time after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code). Jlf APPLICANT'S SIGNATURE DATE STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE. Complete the following ONLY if a Certificate of Occupancy will be requested at final inspection. CERTIFICATE OF OCCUPANCY fCommercial Projects Only) Fax (760) 602-8560, Email building@carlsbadca.gov or Mail the completed form to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, California 92008. CO#: (Office Use Only) CONTACT NAME OCCUPANT NAME ADDRESS BUILDING ADDRESS CITY STATE ZIP CITY STATE ZIP Carlsbad CA PHONE I FAX EMAIL OCCUPANT'S BUS. LIC. No. DELIVERY OPTIONS PICKUP: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) ASSOCIATED CB# MAIL TO: CONTACT (Listed above) OCCUPANT (Listed above) CONTRACTOR (On Pg. 1) NO CHANGE IN USE/ NO CONSTRUCTION MAIL/ FAX TO OTHER: CHANGE OF USE/ NO CONSTRUCTION ..@S' APPLICANT'S SIGNATURE DATE Inspection List Permit#: CB152364 Type: Tl INDUST VIASAT-65,700 SF Tl-BLDG# 11 58,629 SF Tl-SHELL TO OFFICE & 7,071 S Date Inspection Item Inspector _ Act Comments -------· 10/20/2016 89 Final Combo PY AP 10/20/2016 89 Final Combo RI NRR 09/20/2016 89 Final Combo PB PA 09/08/2016 85 T-Bar PB AP 07/14/2016 17 Interior Lath/Drywall PB AP 07/12/2016 84 Rough Combo PB CA 02/16/2016 89 Final Combo PB PA 02/04/2016 85 T-Bar PB AP 02/01/2016 29 Final Plumbing PB CA 01/29/2016 85 T-Bar PY PA 01/19/2016 89 Final Combo PB NR 01/14/2016 21 Underground/Under Floor PB PA 01/07/2016 85 T-Bar PD PA 3rd floor 01/06/2016 85 T-Bar PB PA 12/31/2015 85 T-Bar PB PA 12/30/2015 85 T-Bar PB NR 12/21/2015 39 Final Electrical PB AP 12/17/2015 12 Steel/Bond Beam PB AP 12/17/2015 29 Final Plumbing PB AP - 12/16/2015 12 Steel/Bond Beam PB NR 12/11/2015 44 Rough/Ducts/Dampers PB CA 11/25/2015 85 T-Bar PY NR 11/20/2015 14 Frame/Steel/Bolting/Weldin PB PA 11/19/2015 85 T-Bar PB NR 11/17/2015 23 Gas/Test/Repairs PB AP 11/16/2015 14 Frame/Steel/Bolting/Weldin PB PA 11/13/2015 14 Frame/Steel/Bolting/Weldin PB PA 11/12/2015 14 Frame/Steel/Bolting/Weldin PB NS 11/05/2015 24 Rough/Topout PB AP 10/28/2015 84 Rough Combo PB PA 10/27/2015 24 Rough/Topout PB PA 10/27/2015 34 Rough Electric PB PA 10/20/2015 84 Rough Combo PB PA 10/16/2015 84 Rough Combo PB PA 10/15/2015 84 Rough Combo PB PA 10/14/2015 84 Rough Combo PB PA 10/08/2015 14 Frame/Steel/Bolting/Weldin PB PA 10/08/2015 16 Insulation PB PA 10/08/2015 -17 Interior Lath/Drywall PB PA 10/06/2015 84 Rough Combo 17 AP 10/06/2015 84 Rough Combo 17 AP Friday, October 21, 2016 Page 1 of 2 10/05/2015 84 Rough Combo PB PA 10/02/2015 14 Frame/Steel/Bolting/Weldin PB AP 10/02/2015 17 Interior Lath/Drywall PB AP 09/30/2015 14 Frame/Steel/Bolting/Weldin PB PA 09/30/2015 17 Interior Lath/Drywall PB PA 09/29/2015 17 Interior Lath/Drywall PB AP 09/25/2015 14 Frame/Steel/Bolting/Weldin PB PA 09/25/2015 17 Interior Lath/Drywall PB PA 09/24/2015 17 Interior Lath/Drywall PB PA 09/22/2015 14 Frame/Steel/Bolting/Weldin PB PA 09/22/2015 17 Interior Lath/Drywall PB PA 09/21/2015 14 Frame/Steel/Bolting/Weldin PB PA 09/21/2015 17 Interior Lath/Drywall PB PA 09/17/2015 14 Frame/Steel/Bolting/Weldin PY CA Friday, October 21, 2016 Page 2 of2 ,,-------------· ---·-----------·-· --~ . «~>Jb ~ Cl-TY OF CARLSBAD CB152364 2508 GATEWAY RD VIASAT-65,700 SF Tl-BLOG# 11 Building Division 58,629 SF Tl-SHELL TO OFFICE & 7,071 SF SHELL TO MANUFACTURING)-W/ PLUMB, ELECT & MECHANICAL Tl INDUST 0 INSPECTION RECORD CARD WITHAPPROV'ED Pi.ANS MU$-T l;Ji; KEPT ON THE JOB Lot#: SMITH CONSULTING ARCHITECTS @ Q\LL J3EFORE 3:30 pm .FOR NEXT\IVORK DAY JNSPE«;TION @ FOR BUJLDJNG INSPECTION CAU-: 760-602~2725 OR GO TO:-www.Carisbadca.gov/Building AND (LlC:K ON RECORD COPY "~eques/n:S ction= · · · · · · DATE:· · . ,, ' -, Reqµ:irecf Prie>.r to Requesting Build in~ Fincil If Cbeclced YES Pf?nnirig/1.andscape · · 760-944'8463· · · Allow 48 hours · CM&:I (Engineerlng'llµpections} 76o-438-389t call,befqre 2-pm ----- Fire Prevention 760-60;2-4(?60 Allow48 hours CODE# BUILDlNG Date Inspector CODE# ELECTRICAL Date Inspector #11 FOUNDATION #31 I;J E~ECTRIC:U_NDERGROUNi> b UFE!t #12 . REINF0nCED mEL #34 ROUGH ELJ;:CfRIC #66 MJ)SONJ_lY PRE GROUT . ft33 _ tJ ELECTRIC SERVICE O J!:MP0RARY D G!l.Q!JT OY/ALLD~NS P35 -~HOTO\'OLTAIC #10 TILT PANELS #39 FINAL -------------1----'-,--+--'-----'---# 11 POV.R~,IPS CODE# MECHANICAL #1i C~~UMN FQOTIN.~$ lf41 UNDE!tGROU.ND DUCT$ & PIPING #14 SUBFRAME D-FL0OR 0-CEILING #44 0 DUCT & P~UM D ~~f .. PIP!~G . #1& Rll()F SHEATHING #43 !jEAT~AIR COND. SYSTEMS _#l~?_EXT_. S_H_EA_R __ P ___ {\_NE_LS ___ --'--+----'---'-~-+----'---i #_49 .flNAL #16 INSl,lµTION CODI!!# COMBO INSPECTION #18 EXTERIOR LATH #Si UNDERGROUND (11,12,21,31) #.fl · IN~RIOR LATH 8c DRYWALL _#82 DRYWALL,EXTLATH,,GASTES (17,18,23) #51 POOL EXCA/STEEL/BOND/FENCE #83 "100FSHEATING, EXJSHEAR (13,15) #55 PR~_pl:J)STER/FINAL. #84 fRI.\MERQUGJf.COIV!BP (14,24,34,44) #:J.9 FINAL #85 T~Bar(14;24,}4,44J CODI';# PLUMBlNG Date Fl NAL OCCUPANCv'f 19,i!i,39,49) #22 tJ ~~E!J & BL/co . .b PL/C.0 . Date Ins ec;t9r #2t' UNi>~RGRQUND-l;JW.ASTE D .Wm. #24 TOPOUT PJVASTE tti-WTR A/S IJNP,E.RG~QUN!) VISUAL #27 TUB l!! SHOW~R PAN A/S UNDERGROUND.HYDRO #23 DGASr£~T d·GAS PIPING_ • . A/5 UNDERGROUND FLUS~ . #?-5 WA-mI HEATER A/S OV!:RHEAD VISUAL #28 solARWATER A/S OVERH~ HYDROSTATIC #29 Fll'iAL • A/SflNAL CODE# STORM WATER f/AEINA~ ¥/'603 FQLL0V{UP iNSP~C'IJQN FIXED EXTINGUISHING SYSTEM ROUGH-IN #~O~ N0TICEt!) CLEAN #607 WRITTENW!WHN.G .FIXED EXTIN~~ISHIN~ SYSJE!Vf FINAL #609 N0UCEOF\/l01:ATION . #61!) VERIJAL WARNIN . .G IV!EDl~AL GAS.FINAL REV10/2012 SEE BACK FOR SPECIAL NOTES ~ <,(.Wl.,, .¥. CliY Of CARLSBAD INSPECTION RECORD CB152364 2508 GATEWAY RD VIASAT-65,700 SF Tl (58,,629 SF Building Division SHELL TO OFFICE & 7,071 SF SHELL TO MANUFACTURING)-W/ PLUMB, ELECT & MECHANICAL Tl INDUST @ INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB Lot#: SMITH CONSULTING ARCHITECTS @ CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION @ FOR BUILDING iNSPECTION CALL: 760-602-2725 OR GO TO: www.Carlsbadca.gov/Building ANO CLICK ()N "Request·fnspection" DATE: NO YES Required Prior to Requesting Building Final If Checked YES Date Inspector Notes Planning/Landscape 760-9448.4~3 Allow48'hours CM&l (Engineering Inspections) 760-438-3891 Cail before 2 pm Fire Prevention 760-602-4660 Allow 48 hours Type of l11sp~ction CODE# ELECTRICAL #66 MASONRY PRE GROµT #33 0 ELECTijlC.SERVICE O TEMPORARY D GROUT DWALL DRAINS #3,5 PHOTQ VOLTAIC _#_1_0----'T!_LT_P'"""AN_E_LS _______ +---,------,----,-1 #39 FINAL #11. POUR STRIPS CODE# MECHANICAL . #11 COLUMN FOOilN~S #41 UNDERGROl,IND DUCTS & PiPING #14 SUBFitAME D FLOOR D CEILIN~ #44 ODUCT&PLENUM O_REf.PIPING #15 ROO~ SHEATHING #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS -----------i-----'----1------------1 #49 FINAL #16 INSULATION #18 EXTERIOR LATH #17 INTERIOR.LATH & DRYWALL #51 POOL EXCA/~Tl;EL/~OND/FENCE . #55_ PREP~E_R/FINAL #19 FINAL #2-1 UNDERGROUND'OWASTE O WTR #24 TOP OUT .:a'.WA,STI; Jzf.WTR _ #27 TjJB & SHOWER PAN #23 GAS TEST OGAS PIPING • #2~ WATER HEATER #28 SOLAJI WAlE.R #29 FINAL ' CODE# STORM WATER #690 PRE,-CONSTRUCTION ME~ING #603 FOLLOW UP INSPECTION #605 .NOTICE.TO CLEAN #607 WR!TTE~ WARNING #~Q9 NOTICE OF VIOLATION #610 VERBAL WARNING REV 10/2012 , COOE4F COMBO. INSPE'.CTION #81 UNDERGRPUND (11,12,21,31) #82 DRYWALL,EXTI.ATH, GAST,E~(17,18,~3) #83 RQOFSHEATING, EXT ~HEAR(13,15) 4184. .FRAME ROUGH COMBO (14,24,34,44) #85 T-~ar (14,24,34,441 #8,9. FINAL OCCUPANCY (19,29,39,49) A/S UNDEl.lGROU~D VISUA'- A/S UNDl;RGROUND HYDRO . _A/S UNDERGROUND FLUSH A/S OVERHEAD VISUAL A/~ PVERH~D tlYDROST/\TIC . A/SFINAL _ F/A~OUGH-IN F/Afl~AL . F!XEQ EXTINGUISHING SYSTEM ROUG.H-IN FIXED EXTING SYSTEM tlY!ll.lOSTATIC T~T flXED EXTINGUISHING SYSTEM Flt{AL MEDICAL~S PRE$SURETES'r MEDICAL GAS FINAL Date Inspector Da:te Ins ector SEE BAClffOA SPECIAL NOTES Section 5416. Health and Safety Code, State of California (a) There shall be not less than one water closet for each 20 employees or fractional part thereof working at a construction job site. The water closet shall consist of a patented chemical type toilet. (b} For the purpose of this section the term construction site shall· mean the locatiqn on which actual construction of a building is in progress. (c) A violation of this section shall constitute a misdemeanor. All construction or work for which a permit is required shall be subject to inspection and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the inspector. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the inspector. DAT!; ADDJTIONAL NOTES w CHRISTIAN WHEELER ENGINEER.ING February 4, 2016 Pivotal c/ o PCG Construction 1121 W. Warner Road #109 Tempe, Arizona 85284 Attention: Ryan Hatch Reference: Subject: Dear Mr. Hatch, ViaSat Building 11 2508 Gateway Road, Carlsbad, California Building Shell -Permit #CB15-0850 Tenant Improvements -Permit #CB15-2364 Final Testing and Inspection Report CWE 2150314.01 Christian Wheeler Engineering has provided testing and special inspection of reinforced concrete, reinforcing steel, bolts in concrete, field welding, non-destructive testing, high-strength bolting, epoxy anchors, and mechanical anchors on the above referenced project as described in reports dated May 26, 2015 through December 28, 2015. The work requiring testing and special inspection was, to the best of my knowledge, in conformance to the approved plans, specifications, other construction documents, and applicable workmanship provisions of the California Building Code. If you have any questions, please do not hesitate to call me at 619-550-1700. Sincerely, ~RENGINEERING Charlie G. Carter Jr., R.C.E. 61968 cc: i::yan@pcgconstructioninc.com john.connolly@whiting-tumer.com City of Carlsbad 3980 Home Avenue+ San Diego, CA 92105 + 619-550-1700 + FAX 619-550-1701 January 29, 2016 JAMES M. WISEMAN, S.E. PRINCIPAL STEVEN D. ROHY, S.E. PRINCIPAL BRANDON J. DEEMS, S.E. ASSOCIATE PRINCIPAL Building Official City Of Carlsbad STEVEN R. CROOK, S.E. RE: ViaSat Building 11 -T.I. Construction Phase Final Observation Letter 2508 Gateway Road Carlsbad, CA W+RJob No. 14-143 Permit# CBl 52364 Dear Building Official, This is to certify that, as defined in Section 1704.5 of the California Building Code (CBCL we have provided structural observations for the construction phase of this project. The observations were performed by the undersigned Registered Structural Engineer. Based upon observations performed to the best of our knowledge the observed work was performed in accordance with the approved plans/specifications and supplemental details issued to the contractor. If you have any questions, or if we may assist you further, please call us. Sincerely, WISEMAN + ROHY Structural Engineers 9915MIRA MESA BLVD., SUITE 200 -SAN DIEGO, CA92131 • TEL 858 536 5166• FAX858 536 5163•WWW.WRENGINEERS.COM ASSOCIATE DATE: SEPT.03,2015 JURISDICTION: CARLSBAD PLAN CHECK NO.: 15-2364 EsGil Corporation In <Partnersfiip witli government for <.Bui{aing Safety SET: II PROJECT ADDRESS: 2508 GATEWAY ROAD PROJECT NAME: VIA SAT BUILDING #11 (T.I. PACKAGE) l:l ABPLICANT ~-'JURIS. l:l PLAN REVIEWER l:l FILE ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: MILOS MAKARIC ~ EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: MILOS Telephone#: 858-793-4777 Date contacted: (by: ) Email: milosm@sca-sd.com Mail Telephone Fax In Person ~ REMARKS: *[SHELL PACKAGE WAS UNDER A SEPARATE PERMIT]. By: Ali Sadre, S.E. Enclosures: EsGil Corporation 0 GA ~ EJ ~ MB O PC 8/21 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 DATE: AUG. 10, 2015 JURISDICTION: CARLSBAD PLAN CHECK NO.: 15-2364 EsGil Corporation In (l'artnersli.ip witli. government for (Bui{ding Safety SET: I PROJECT ADDRESS: 2508 GATEWAY ROAD PROJECT NAME: VIA SAT BUILDING #11 (T.I. PACKAGE) ~_P.PLICANT / JURIS. D PLAN REVIEWER D FILE D The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. · D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. [ZI The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. [ZI The applicant's copy of the check list has been sent to: MILOS MAKARIC D EsGil Corporation staff did not advise the applicant that the plan check has been completed. [ZI EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: MILOS Telephone#: 858-793-4777 Date contacted: e> ( 'lO (by: ~ Email: milosm@sca-sd.com ~ail ~phone Fax In Person [ZI REMARKS: SHELL PACKAGE WAS UNDER A SEPARATE PERMIT. By: Ali Sadre, S.E. Enclosures: EsGil Corporation 0 GA [XI EJ [XI MB O PC 7/28 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 CARLSBAD 15-2364 AUG. 10, 2015 GENERAL PLAN CORRECTION LIST JURISDICTION: CARLSBAD PLAN CHECK NO.: 15-2364 PROJECT ADDRESS: 2508 GATEWAY ROAD OCCUPANCY= B/F-1; CONSTRUCTION = III-B; STORIES= 3; HEIGHT= 52'; AREA= 21,900 PER LEVEL; TOTAL= 65,700 (T.I. IS UNDER THIS PERMIT) DATE PLAN RECEIVED BY ESGIL CORPORATION: 7/28 REVIEWED BY: Ali Sadre, S.E. FOREWORD (PLEASE READ): DATE REVIEW COMPLETED: AUG. 10, 2015 This plan review is limited to the technical requirements contained in the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. The approval of the plans does not permit the violation of any state, county or city law. • Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. • To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. CARLSBAD 15-2364 AUG. 10,2015 • Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? D Yes D No • ARCHITECTURAL 1. Please add door #1215 to the door schedule on Sheet A6.0. 2. Please remove door 22508, on Sheet A 1.2, near grid point 7-A.5. • MISCELLANEOUS 3. Please see attached for P/M/E corrections. 4. The jurisdiction has contracted with EsGil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Ali Sadre, S.E. at EsGil Corporation. Thank you. ELECTRICAL, and ENERGY COMMENTS PLAN REVIEWER: Morteza Beheshti ELECTRICAL (2013 CALIFORNIA ELECTRICAL CODE) 1. Provide a single line diagram for the new service. Include the following information: • Each 1000 amps or more disconnect should be GFCI rated. CEC215.10. • Number of meters. • Grounding and bonding details. • The Utility fault current available, the equipment labeled (complete with date) with the fault current specification, and the AIC rating for all service overcurrent devices. • Specify whether the system design is fully-rated, series rated, or engineered (fault current levels shown throughout the system). • Note on the single line diagram that all service disconnect devices shall be labeled as a "Service Disconnecting Means". NEC(CEC) 230.70(8)). 2. Pis. include design for the mechanical yard equipment or building 11. 3. If an information technology room then, the MDF rooms require a remote disconnect switch outside for emergency shutdown. Also, for the dedicated HVAC equipment serving the room. CEC 645.10. CARLSBAD 15-2364 AUG. 10, 2015 4. Receptacle outlets in the MDF room or other similar rooms with sensitive electronics may require to be GFCI. CEC 647.7. 5. Pis. include design for the underground conduit and wire to other buildings (building 11) or mechanical yard. 6. Where the dimensions of equipment rated 1200 amps or more and equipment exceeds 6ft in width then 2 entrances are required for access to the equipment room and panic hardware are to be specified for those doors. NEC(CEC) 110.26(C)(2). 7. Provide GFI protected receptacle(s) within 25 feet of HVAC equipment. NEC(CEC) 210.8(8)(3) & 210.63. 8. If utilizing a series-rated system, note on plans: "Overcurrent device enclosures will be identified as series-rated and labeled in accordance with NEC(CEC) 110- 22(8) and "The overcurrent devices shall be AIC rated per manufacturer's labeling of the electrical equipment". 9. Please specify the secondary ground system for the transformer. NEC(CEC) 250.30. 10. Show the "nearest electrode" used for each transformer secondary ground system (i.e., building steel, cold water pipe). NEC(CEC) 250.30(A) (7). 11. Provide required transformer ventilation. NEC(CEC) 450.9. 12. Show exit signs on the lighting plan(s) at all required exits and specify power source as self-luminous or having a second source of power (battery or generator). This is required when two exits are required per CBC Section 1011 & 1011.5.3. 13. Show on the lighting plans the required emergency illumination at the "Means of Egress" per CBC Section 1006. The emergency illumination for the means of egress shall provide a min. of 1 foot-candle of emergency illumination at the floor level. Specify a second source of power for the emergency illumination (battery or generator). Emergency illumination is required at corridors, stair enclosures, exit passageways and at exit doors and exterior exit door landings where the building is required to have two or more exits. CBC Section 1006.3. 14. Detail the non-residential solar photovoltaic module placement clearances required by CBC 3111.4.3 on the roof layout. (6' clear perimeter around the edge of the roof, reducable to 4' if the roof axis is 250' or less) and the pathway locations. CARLSBAD 15-2364 AUG. 10,2015 ENERGY CONSERVATION (2013 CALIFORNIA BUILDING ENERGY STANDARDS) ENERGY (2013 CALIFORNIA BUILDING ENERGY STANDARDS) 1. Pis. include all mechanical units shown on schedules on the energy forms. RF- 11 not included for instance. 2. Imprinted forms must be signed by the responsible person in charge. 3. On the plans clearly show the wall and roof insulation locations, thickness, and R-values, as per the energy design. 4. Hot water piping is required to be insulated as follows: 1" pipe size or less: 1" thick insulation, larger pipe sizes require 1-½" thick insulation. See Table 120.3- A. ES 120.3. 5. Demising wall insulation: The insulation installed at demising walls of non- residential buildings shall have an R-13 value. ES 110.8(f). 6. The corrected, completed and signed Certificate of Compliance forms must be imprinted on the plans. Note: New forms include "Design Review Kickoff Certificate" and "Construction Document Review Checklist Certificate forms." 7. Buildings that exceed 10,000 square feet in habitable space shall have "demand response" lighting reduction capability. Please show how this building remote control is integral with your lighting design. EM 130.1 (e). 8. The electrical service metering capability must comply with Table 130.5-A in the Energy Standards. Describe on the electrical plans how these requirements will be satisfied. 9. The disaggregation of electrical loads (separation of panelboards by branch circuit load types) per Table 130.5-B energy standards is required. Review and submit a revised electrical system design. 10. Voltage drop is limited to 2% on feeders and 3% on branch circuits. Provide worst case voltage drop calculations (feeders<2% and branch circuits<3%) per ES 130.5(c). 11. All exterior lighting must be controlled by a photocell and an automatic scheduling control device. EM 130.2(c). 12. Economizers are required to be installed for units 4.5 tons and greater unless efficiency is increased per Table 140.4-A. Prescriptive Requirement. Please address. Note: If you have any questions regarding this Electrical and Energy plan review list please contact Morteza Beheshti at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. CARLSBAD 15-2364 AUG. 10,2015 PLUMBING & MECHANICAL COMMENTS PLAN REVIEWER: Eric Jensen PLUMBING (2013 CALIFORNIA PLUMBING CODE) 1. Clarify the existing utilities: Size of the water main serving the building and the 6" to 4" building drain transition location. 2. The roof plan boiler stubs ups are in the wrong locations. 3. Provide the water heater vent installation instructions. 4. All water supply systems that have quick closing valves installed therein (washing machines, flush valve fixtures, etc.) shall have devices installed to control the effects of water hammer. Please detail. CPC 609.10 5. Detail the gas regulator requirements: An accessible shut-off valve installed upstream of the regulator and vented to the exterior. CPC 1208. 7 .5.1 & 1208.10. 6. Drinking fountains are required by CPC Table 422.1 for this occupancy type (if the occupant load exceeds 30. CPC 415.2). Review the requirements of this Table and provide as necessary. Note: If food is consumed indoors, water stations may be substituted for drinking fountains. CPC 415.2 MECHANICAL (2013 CALIFORNIA MECHANICAL CODE) 7. Detail the approved eye wash and shower facilities per CMG 1130.0 for the cooling tower(s). 8. The relief air duct and outside air ducts are inconsistent with penetrations through the shaft at different levels for fire/smoke dampers. Please review. 9. Provide the independent ventilation or the air conditioning system required for the elevator equipment room to prevent the overheating of the electrical equipment. CBC 3006.2 Note: Fire dampers may be required, please review this Code section (CBC 3006.4) for applicability. 10. Detail compliance with CMG 1105.3 for the piping located in the various room served by CU-11-1. Note: If you have any questions regarding this Plumbing and Mechanical plan review list please contact Eric Jensen at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. CARLSBAD 15-2364 AUG. 10, 2015 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PREPARED BY: Ali Sadre, S.E. PLAN CHECK NO.: 15-2364 DATE: AUG. 10,2015 BUILDING ADDRESS: 2508 GATEWAY ROAD BUILDING OCCUPANCY: B/F-1; 111-B/SPR. BUILDING AREA Valuation PORTION ( Sq. Ft.) Multiplier OFFICE/ 65700 MANUFACT. Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: Complete Review Reg. VALUE Mod. o Structural Only D Repetitive Fee ~ Repeats o Other 0 Hourly EsGil Fee -----IHr. @ • ($) 3,487,356 $8,484.631 $s,s1s.011 $4,751.391 Comments: In addition to the above fee, an additional fee of $86 is due (1-hour@ $86/hr.) for the CalGreen review. Sheet 1 of 1 macvalue.doc + «~)> ~ CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK REVIEW CHECKLIST P-28 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.i;i:ov DATE: 8/4/15 PROJECT NAME: ViaSat,Building 11 Tl's PROJECT ID: SUP 13-03 PLAN CHECK NO: CB 15-2364 SET#: 1 ADDRESS: 2508 Gateway Road APN: 213-261- 20,21,22,23 This plan check review is ·complete and has been APPROVED by the Planning Division. By: Greg Fisher A Final Inspection by the Planning Division is required C8J Yes D No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. · ffl This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: Milos Makaric For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING E-N-GINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 .. D Chris Sexton D Kathleen Lawrence D Greg Ryan 760-602-4624 760-602-27 41 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov D Gina Ruiz D Linda Ontiveros D Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov ~ D D Dominic Fieri Greg Fisher 760-602-4664 760-602-4629 Dominic.Fieri@carlsbadca.gov ,, Remarks: REVIEW#: 1 2 3 lZl D D lZl DD [g]00 [g] D D [g] D D Plan Check No. CB 15-2364 Address 2508 Gateway Road Date 8/4/15 Review# 1 Planner Greg fisher Phone (760) 602-4629 APN: 213-261-20,21,22,23 Type of Project & Use: Office Building Net Project Density: DU/AC Zoning: PC General Plan: l:! Facilities Management Zone: 17 CFD (in/out) #_Date of participation: __ . Remaining net dev acres: __ (For non-residential development: Type of land use created by this permit: __ ) Legend: [ZJ Item Complete Environmental Review Required: DATE OF COMPLETION: D Item Incomplete -Needs your action YES O NO O TYPE Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Discretionary Action Required: YES O NO O TYPE __ APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: MCUP 11-07 Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: __ Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES O NO 0 CA Coastal Commission Authority? YES O NO 0 If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Habitat Management Plan Data Entry Completed? YES D NO D If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) lnclusionary Housing Fee required: YES D NO D (Effective date of lnclusionary Housing Ordinance -May 21, 1993.) Data Entry Completed? YES D NO D (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing YIN, Enter Fee, UPDATE!) [ZJ D D Housing Tracking Form (form P-20) completed: YES D NO D N/A D P-28 Page 2 of 3 07/11 ., Site Plan: ~DD ~DD ~DD ~DD ~DD ~DD ~DD P-28 Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. City Council Policy 44 -Neighborhood Architectural Design Guidelines 1. Applicability: YES D NO D 2. Project complies: YES D NOD Zoning: 1. Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Required __ Shown __ Required __ Shown __ Required __ Shown __ Required __ Shown __ Required __ Shown __ 2. Accessory structure setbacks: Front: Required __ Shown __ Interior Side: Required __ Shown __ Street Side: Required __ Shown __ Rear: Required __ Shown __ Structure separation: Required __ Shown __ 3. Lot Coverage: Required __ Shown __ 4. Height: Required __ Shown __ 5. Parking: Spaces Required __ Shown _· _ (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required __ Shown __ uest is under review Page 3 of 3 07/11 ,o & {{1 ~ CITY OF CARLSBAD PLAN CHECK REVIEW TRANS'MITTAL DATE:07-31-2015 PROJECT NAME: VIASATBUILDING 11 T.I. PLAN CHECK NO: CB15-2364 SET#: 1 ADDR,ESS: 2508 GATEWAY RD. VALUATION: $3,487,356 Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov PROJECT ID: MS 13-07 APN: 231-261-20THRU23 This plan check review is complete and has been APPROVED by the ENGINEERING Division. By: CG 7/31/15 A Final Inspection by the Division is required Yes ./ No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: MILOSM@SCA-SD.COM You may a/so have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should includ~ corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGIN'EERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton 4 Chris Glassen ,. ~-Greg Ryan 760-602-4624 760-602-2784 .. 760-602-4663 Chris.Sexton@carlsbadca.gov Christogher.Glassen@carlsbadca.gov Gregory.Ryan@carlsbadca.gov ----- Gina Ruiz Linda Ontiveros Cindy Wong 760-602-4675 76·0-602-2773 -·-· 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov . ·--~ Dominic Fieri -~-. 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: >~ ~--( ~ CITY OF CARLSBAD BUILDIN;G PLANCHECK CHECKLIST QUICK-CHECK/APPROVAL Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov ENGINEERING Plan Check for MS 13-07 Date:07-31-2015 Project Address: 2508 GATEWAY RD. APN: 231-261-20THRU23 Project Description: TENANT IMPROVEMENT: 58,629 SQ. FT. TO OFFICE, Valuation: $3,487,356 7,071 SQ. FT. TO MANUFACTURING. SHELL BUILDING FEE'D AT 65,700 SQ. FT. MANUFACTURING. ENGINEERING Contact : CHRIS GLASSEN Phone: 760-602-2784 Email: Christopher.Glassen@carlsbadca.gov Fax: 760-602-1052 :,.:~1 RESIDENTIAL INTERIOR Gl] TENANT IMPROVEMEN1 : ____ -_: RESIDENTIAL ADDITION MINOR 0 PLAZA CAMINO REAL (<$20,000.00) C] CARLSBAD PREMIER OUTLETS 0 COMPLETE OFFICE BUILDING ; ..... : OTHER: GYM r .. -.. --··-··-··-··-··-··--··-···-··-··-: ··-··-··-··-··-··-.. , OFflCIAL USE ONLY · ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY: CG 7/31/15 DATE:07-31-2015 REMARKS: FEES ENTERED IN TO BUILDING PERMIT. Notification of En9ineering APPROVAL has been sent to MILOSM@SCA-SD.COM via EMAIL on 07-31-2015 -··-··-··-··-··-··-··-··-··-··----·-··-·-·--··---··-··-··-··--· E-36 · Page 1 of 1 REV 4/30/11 .. . 213-261-20THRU23 Fee Calculation Worksheet ENGINEERING DIVISION Prepared by: CG Date: 07-31-2015 GEO DATA: LFMZ: / B&T: Address: 2508 GATEWAY RD. Fees Update by: LO Date: 09/01/2015 Fees Update by: EDU CALCULATIONS: List types and square footages for all uses. Bldg. Permit#: MS 13-07 Date: Types of Use: OFFICE Sq.Ft./Units 58,629 EDU's: 20.84 (W/ CREDIT) Types of Use: MANUFACTURING Sq.Ft./Units SHELL FEE'D AS MAN EDU's: Types of Use: Sq.Ft./Units EDU's: Types of Use: Sq.Ft./Units EDU's: ADT CALCULATIONS: List types and square footages for all uses. Types of Use: OFFICE Sq.Ft./Units 20/1000 * 58,629 Types of Use: Sq.Ft./Units rcREDIT 4/10001 Types of Use: Types of Use: FEES REQUIRED: Sq.Ft./Units Sq.Ft./Units ADT's: 938 ADT's: [2351 ADT's: 938 Current charge ADT's: Within CFD:OYES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) ONO 1. PARK-IN-LIEU FEE:0NW QUADRANT ONE QUADRANT 0SE QUADARANT 0SW QUADRANT ADT'S/UNITS: I X FEE/ADT: I =$ D 2.TRAFFIC IMPACT FEE: ADT'S/UNITS: 938 I X FEE/ADT: $107 3. BRIDGE & THOROUGHFARE FEE: 0 DIST. #1 ADT'S/UNITS: ~ FEE/ADT: ZONE: 4. FACILITIES MANAGEMENT FEE ADT'S/UNITS: I X FEE/SQ.FT./UNIT: 5. SEWER FEE EDU's 20.84 (W/ di I X BENEFIT AREA: H EDU's 20.84 {W/ di j X FEE/EDU: $881 I =$ 100,366 DDIST.#2 1=$ I=$ I =$ 18,360.04 [Z] DDIST.#3 D D [Z] [l] 6. DRAINAGE FEES: PLDA: FEE/EDU: $982 OHIGH FEE/AC: I =$ 20,464.88 0MEDIUM 0LOW ACRES: IX I=$ D 7. POTABLE WATER FEES: UNITS CODE CONN. FEE METER FEE SDCWA FEE TOTAL 1( «~~ ~ CITY OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type( s) of construction permit: )a Building Permit O Right-of-Way Permit J( My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Electrical.. Fire Additional Fire Alarm Fixed Systemsq Mechanical Mobile Home Plumbing Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria Patio/Deck Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler, Water Discharge X My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threat" assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier 1 • Low Threat Assessment Criteria D My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 • Moderate Threat Assessment Criteria D My project does not meet any of the Significant Threat assessment Criteria described below an_d meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 • Significant Threat Assessment Criteria D My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or D My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, D My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and correct I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. Project Address: Assessor Parcel No. "The City Engineer may authorize minor variances from the Storm Water Threat Assessment Crfteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. B-24 OWner/Owner's Authorized Agent Name: Page 1 of 1 Title: Date:?/~ ~/,s;- Rev.03/09 & ~ CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL DATE: 09/01/2015 PROJECT NAME: VIASAT 11 PLAN CK NO: SET#: 2/1 ADDRESS: 2508 GATEWAY RD BUILDING Dt:.r a~ Comr&.Qf ~conomic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov PROJECTID:CB152364 APN: ~ This plan check review is complete and has been APPROVED by the FIRE Division. By: GR A Final Inspection by the FIRE Division is required ~ Yes D No D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan check comments have been sent to: mmakaric@sca-sd.com You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: - PLANNING ENGINEERING FIRE PREVENTIO'N 760-602-4610 760-602-2750 760-602-4665 D Chris Sexton D ~ Greg Ryan 760-602-4624 760-602-4663 Chris.Sexton@carlsbadca.gov Gregory.Ryan@carlsbadca.gov D Gina Ruiz D Linda Ontiveros D Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov D D D Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov ' . m . Carlsbad Fire Department · Plan Review Date of Report: Name: Address: Permit#: Job Name: Job Address: Requirements Category: TI , INDUST 09-01-2015 SMITH CONSULTING ARCHITECTS 13280 EVENING CREEK DR -STE 125 SAN DIEGO, CA ATTN: MILOS MAKARIC 92128 CB152364 VIASAT-65,700 SF TI-BLDG# 11 2508 GATEWAY RD CBAD Please review carefully all comments attached. Conditions: CITY OF CARLSBAD FIRE DEPARTMENT -APPROVED: BUILDING DEP'lf"Q COPY Reviewed by: q ,{}Cilf THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. At or prior to Final Fire and Building inspection an Emergency lighting facilities test shall be conducted by CFD personnel during pre-dawn or dusk hours when ambient light is at 0.00 Lux or 0.0 Foot-candle. This test shall be conducted to test the initial loss of power reading of illumination that is at least an average of 1 foot candle (11 lux) and a minimum of 0.1 foot-candle (1 lux) measured along the path of egress at the floor level. And tested after 60-minutes to 0.6 fc (6 lux). Failure to provide sufficient lighting in egress aisles, corridors, exit enclosures, exit passageways and stair enclosures is the AOR's responsibility. CFC Ch. 10, Sec. 1006. Entry: 09/01/2015 By: GR Action: AP CONDITIONAL RECOMMENDATION FOR APPROVAL CONDITION OVER THE COUNTER REQUIRED REVISIONSTO REMAINING COMMENTS WRITTEN IN BLUE FONT Daryl K. James &.Associates, Inc. 205 Colina Terrace Vista, CA 92084 T. (760} 724-7001 Email: kitfire@sbcglobal.net APPLICANT: Milos Makaric -SCA PROJECT NAME: ViaSat Bldg 11 Checked by: Daryl Kit James Date: 8/24/2015 JURISDICTION: Carlsbad Fire Department PROJECT ADDRESS: 2508 Gateway Road PROJECT DESCRIPTION: CB152364 65,700[1] of office and manufacturing tenant improvements in an existing three-story concrete ·tilt-up cold shell building with all related mechanical, electrical and plumbing systems. 58,629m Shell to Office 7,071 m Shell to Manufacturing COMMENTS v'TSI Sheet Index Rearrange mechanical sheets M2.2, M2.3 & M2.4 within the plan check set in the order of the sheet index. Scope of Work Manufacturing [1211] is included in scope of work yet noted as "Future" on floor plans throughout the plan check set. Clarify whether manufacturing will be submitted under a separate permit. Office [3227] is noted as future on Sheet A4.0 but not shown on A 1.3. Please clarify. TS2 v'Fire Notes (2013) Fire Note 5. Replace reference to Chapter 14 with Chapter 33 TS4 v'Egress Plans Justify occupant load factor of 500 in Copy Rooms Coordinate MOE with E2.1 v'Third Floor Egress Plan Apply an occupant load factor of 15 in Break Room 3247 Occupancy Classification Revise occupancy classification. E occupancies are limited to educational purposed through the 12th grade. v'AS1 Site Key Note 31 Verify that pedestrian gate complies with CBC Section 1008. ,/ ! ' l I .' t1'·A1 .1 ' . Verify-Manufactl,Jring [1211] is ~uture. Se~TS1 Scope.of Work plan check.comment.· . A1.2 . / E>enote location c1nd1 ·describe purpose of drop down emoke ¢L!rtain. See A4.0 Key Note· 27. 'Provide· i ·Manufacturer Cut Sh~et. vA1.3 floor Plan Denote the location, of roof acce$s. Eleva~or Shaft Enclosure General:Note 6. Address the requirement .for fire-resistive construction qf sh~fts sµch as elevators and stairways. Sp~cify ·. whether the elevator lopby is ~he .rnethdd· of completing the :protection c;,fthe. elevator shaft. Provide ri;ited waJI: detafls and inciude JCC evalu.ation report #, UL 'Listing: or ·referenc;;e to the lt$1m Number li·sted· in ~013 1 CBC Table 721.1(2). · · ti' A2~ 1', 2.2 & 2.3 Provide a ·reference to E2.2 for means of egres~ exit signs and .egress illumination . . A3.0 Ele'lator -Medical. Emergency · Address medical emergency service elevator to all l~ndings in buildings and structures with one or more passenger.:ser:\tice elevators. CBC Se'Ction ~002:.4.a · Show· compliance vyith:the following,requfremehts: An :elevator able to a~commpdate·the loading and tr"nsport of a·n ~mbulance gurney .or stretcher maximun, sjze, 24 inches by 84 i.n.che·s w_ith not leS$ :th~n. _5qi)_ch rt:ldiU$ corners .in the horizon~! p·o$ition." Show ·detail on plan. C8C Section ,3Q02A.1a .84 inches not provided as per Detail 5. Coor.din.ate with .petaU. 5~ . . , · , __ A key switch to -recall the elevat9r nonstop to tJ'te. ma;'n floor. Not provided as per t>etail 15. Coo.rdiriate with Detail 15. vNote 2. IIIUstra_te the shunt trip in Detail 3. Reference applicable· eleGtricc:)I sheet. See·E7.2 plar-1 ·check comments. OK Deferred.to.Fire Alarm G.ontractor. A4~0· ~N~s . . ·Key Note 27 Provide drop,,down .smoke curtain manufacturer'.s cut sheet. See. A1 .2 plan chec;:k comment. vAs~o . Doo'r Schedule . . . _ . _ _ . Qenote hardware groups in Hardware Group c;:olumn. Provide Door Hardware Specifications ~nd Harc;lwa·re Groaps in order to v~rify that hardware is readily -dpenable from the egress $ide ·without the, use . of a key or special knowl~gge or effort from au· occupied areas from improved areas within the p_ath of egress to all 0a)(it dischqrges. · Door ,General Notes . . . Note 9. Remove ,_note. Ver:b1age and code section reference is inaccurate. " 'i· ' /_ __ Page 3 of3 vAF1.1, AF1.2 & AF1.3 . Finish Plans Provide manufacturer's specifications and California State Fire Marshal listings or other acceptance criteria for flame spread and smoke developed index for new carpet, padding and carpet base. CFC 804 , Provide manufacturer's specifications and California State Fire Marshal listings or other acceptance criteria for flame spread and smoke developed index for ¾" fire rated plywood and reclaimed wood planks. vM0.1 Fire Control Notes Note 4. Revise reference to detail. Access-Controlled Egress Doors. Refer to 2013 CBC, Sections 1008.1.9.8, and 1014.2, item #2. Please clarify the criteria, as outlined in section 1008.1.9.8. Items 1-6, and add notes and details onto the plans to illustrate how the exit doors will unlock during fire emergencies. Refer to the electrical drawings, Enlarged Power Plans. Deferred to Fire Alarm Plans v E3.1, E3.2 & E3.3 Illustrate power to card reader locations and provide enlarged details. vE7.2 Detail 3 Elevator Shunt Trip A shunt trip where smoke detection devices at the top of the elevator shaft are required when the top of the shaft is sprinklered. Consult with the Sprinkler Contractor and alarm designer to verify shunt-trip requirements. OK Deferred to Fire Alarm Plans. Refer to CFC, Sections 907.4.3 and 907.4.4. Show electrical equipment and control wiring for shunt-trip operations (relays, breakers, etc.) END OF COMMENTS Shay Even From: Sent: To: Subject: Milos, Christina Wilson Wednesday, October 21, 2015 5:29 PM . milosm@sca-sd.com; Building PCR15106 Via Sat Bldg. 11 does not need Carlsbad fire review PCR15106 Via Sat Bldg. 11 does not need Carlsbad Fire Department plan review. Thank you, Chris (city of Carlsbad Christina Wilson Fire Prevention Secretary City of Carlsbad 1635 Faraday Ave. Carlsbad, CA 92008-7314 www.carlsbadca.gov P 760-602-4665 phone I F 760-602-8561 1 (. '.I: COMMISSIONING PLAN Specification: Title-24 Part 6 & CALGreen 5.410.2 HVAC, DOMESTIC HOT WATER, INTERIOR LIGHTING SYSTEM CONTROLS (C&S / T.I. Phases) VIASAT-Building 11 Bressi Ranch ~~c~ ,Iv~ JUL .I ~() c17y 'io,s 8u11. Of:' C DttvG ~l?L.s DtV/. S,.qD StOtv Prepared For: Smith Consulting Architects Prepared By: MBO, Inc. Version Date: 2015-07-08 Project No.: MBO .1613 1 Commissioning Plan -Table of Contents · Section Section Title Cx Plan.Page Number Number 1 Common Abbreviations & Definitions 4 1.1 CommissioninQ Plan Overview 5 1.2 Purpose of the CommissioninQ Plan 5 1.3 Commissioning Plan Content Requirements {Per Title-24) 5 2 Commissioning Authority Responsibilities {Per ACG Standards) 6 3 List of Equipment & Systems to be Commissioned 7 4 Commissioning Team 8 4.1 Commissioning Team member Contact Information Appendix "I" 4.2 Reporting Lines of Communication 8 4.3 CommissioninQ Team Member Responsibilities 9 5 CommissioninQ Process 11 5.1 Flow Charts 11 5.2 DesiQn Phase Meetings 14 5.3 Commissioning Scope Meeting 14 5.4 Commissioning Progress Meetings 15 5.5 Miscellaneous Management Protocols 16 5.6 Site Observation Reports 16 5.7 Commissioning Issues Logs 16 5.8 DALT (Duct Air LeakaQe TestinQ) 17 5.9 Execution of Contractor Pre-start & Startup checklists 17 5.10 HVAC & Plumbing Systems Start-up 17 5.11 Development of FPT Documentation and Verification Procedures 17 5.12 Functional Performance Test Sheet development process 18 5.13 Execution of FPT procedures 18 5.14 SamplinQ Strateav for Functional TestinQ 18 5.15 DDC Svstem Point to Point, Calibration & ProgramminQ 18 5.16 Development of the Sequence of Operations Test Script 18 5.17 Initial TAB work 19 5.18 TAB Verification 19 5.19 Trending {DDC) 19 5.20 Lighting Systems Verification 19 5.21 DHW Svstem Performance Verification 20 5.22 Deficiencies & Re-testinQ 20 6 Standard O&M's 21 7 TraininQ & Orientation of O&M personnel 21 8 Svstems Manual 21 9 Final Commissioning Report {Post Cx Field activities) 21 Appendix Sections - -Appendix "A": CommissioninA Authority Qualifications & Experience - -Appendix "B": Owners Project Requirements --Appendix "C": Not Used -Appendix "D": QPR & BOD Review - -Appendix "E": Commissionino Activity List --Appendix "F": Not Used -Aooendix "G": Title 24 Criteria for Commissioning - -Appendix "H": Not Used -Aooendix "I": Commissionino Team Member Contact Information - 1. Common Abbreviations & Definitions The terminology listed below will be common usage during the commissioning process. It is recommended that all team members become familiar with them for easy reference. Abrev. Definition Abrev. Definition A/E Architect Enaineer MC Mechanical Contractor BOD Basis of Design LEED Leadership in Energy & Environmental Desian Commissioning Authority: The CxA CxA is the primary lead for the Cx Maint. Maintenance process. Commissioning Agent: Commissioning Agents are the CA representatives of each trade in the MQCS Mechanical Quality Control Cx process who are responsible for Specialist carrying out initial verifications prior to the CxA witnessing. cc Controls Contractor OPR Owners Proiect Requirements Cx Commissioning O&M Operations & Maintenance CxT Commissioning Team PFT Pre Functional Testing CQM Construction Quality Manager PC Plumbing Contractor DD Design Documentation PM Project Manager DOC Direct Digital Controls PVT Performance Verification Testing DHW Domestic Hot Water PV Photovoltaic DOR Designer of Record QCM Quality Control Manaaer EC Electrical Contractor QCS Qualitv Control Specialist FM Field Maintenance SOO Sequence of Operations GC General Contractor SOR Site Observation Report HVAC Heating, Ventilation & Air SUBS Sub-Contractors to General Conditionina IFC Issued For Construction RFP Request for Proposal LC Lighting Control TAB or Test and Balance TB LCP Lighting Control Panel TBD To be determined 4 'J 1.1 Commissioning Plan Overview 1.2 Purpose of the Commissioning Plan Commissioning is a systematic process of ensuring that commissioned building systems perform interactively according to the design intent and the user's operational needs. This is achieved by beginning in the design phase, documenting the design intent through the creation of the Basis of Design & Owners project requirements and continuing through construction, acceptance and the warranty period with actual verification of performance. The Commissioning plan is to be used as a guide throughout the Cx process. 1.3 Commissioning Plan Content Requirements-per Title 24 Part 6-120.S(a): 1. General project information 2. Commissioning goals 3. Systems to be commissioned 4. Plans to test systems and components, which shall include: • An explanation of the original design intent (See Appendix "B'? • Equipment and systems to be tested, including the extent of tests • Functions to be tested • Conditions under which the test shall be performed • Measurable criteria for acceptable performance • Commissioning team information • Commissioning process activities, schedules and responsibilities. Plans for the completion of commissioning requirements listed in Sections 120.8(9) through 120.8(i) shall be included. 5 2. Commissioning Authority Responsibilities (per ACG procedural standards) • Development the Commissioning Plan • Generate Meeting agendas & follow up meeting minutes from each commissioning meeting. • Participate in the Post Award Kick-Off, all design planning meetings, design presentations, partnering, and QC meetings. {Electronic means is acceptable for CxA participation in these types of meetings; the GC is to provide all meeting invitations & call in information to the CxA). The CxA must be invited in order to schedule time to attend. • Acquire, Review & become familiar with the project specific QPR requirements • Provide a comparative review of the OPR & BOD to ensure compliance between the two • Ensure commissioning requirements are incorporated into the construction documents through means of design & submittal reviews • Update the Commissioning plan as information is acquired throughout the Cx process • Develop/ adapt project specific Functional Performance Testing documentation to be used during the FPT phase of Commissioning. • Oversee the contractors' documentation process of documenting the Pre-startup and Startup checklists. • Verify system performance through the FPT process • Maintain an issues log for tracking items related to project/ Cx scope of work. • Assist the GC in the coordination of training and the acquisition of training documentation / sign in sheets. • Compile a Final Commissioning report including all observations, testing results & recommendations from the Cx process. 6 3. List of Equipment & Systems to be commissioned (Per design documentation provided to the CxA at the time of this plans creation) C&S PHASE EQUIPMENT QUANTITY Interior Lighting System (Scheduling, Time clock operation, general performance) 1 T.I. PHASE EQUIPMENT QUANTITY Mechanical Modular Indoor Air Handler 1 Air Cooled Chiller 1 Primary Chilled Water Pumps 2 Primary Hot Water Pumps 2 Chilled Beam Pump (CHW) 1 Chilled Beam Pump (HHW) 1 Split System Air Conditioners 5 Exhaust Fans 3 Return Fan (SeNes AHU)) 1 First Floor Fan Coils (4-pipe) 18 Second Floor Fan Coils (4-pipe) 23 Third Floor Fan Coils (4-pipe) 22 Active Chilled Beams 36 Plumbing Domestic Water Heater (With Storage tank) 1 Domestic Hot Water Circulation Pump 1 Master Mixing Valve (DHW) 1 Electrical Interior Lighting System (Scheduling, Occupancy Sensors & Daylighting Controls) Sampled Jrrigation & Water Re-use Existing Controller & related components Sampled 7 4. Commissioning Team 4.1 Commissioning Team member Contact Information For a complete list of Cx Team members; refer to Appendix Section "I': The general contractor is to keep the CxA informed of all updates with team member contact information. 4.2 Reporting Lines of Communication The structure below is the preferred method of commissioning communication and mentality. Owner Commissiong Authority General Contractor & Quality Control *Line Descriptions- Solid Line: Reporting to Dashed Line: Communicating with Sub-Contractors **MBO has an open communication policy where in the CxA shall report all findings directly to the entire CxT including the owner unless otherwise instructed by the owner. ***Refer to section named "miscellaneous management protocols" as related to the CxA. The CxA has no authority to make changes; only recommendations & observations will be made throughout the course of the Cx process. The owner and general contractor will need to enforce any changes. 8 4.3 Commissioning Team Member Responsibilities General Contractor's QC Manager a. Supports the CxA to achieve the level of commissioning required for the project. b. Provides Final plans, BOD and specifications to CxA for review. c. Coordinates construction efforts and schedules the site activities to ensure the successful project progress. Ensures that all trades are supporting the commissioning process. d. Provides verification of resolved issues (providing a photo of the resolved item is acceptable is possible to do so). e. Present with the sub-contractors during all initial setup & testing to ensure Cx process is being followed. f. Provide the CxA with construction progress information that may affect commissioning process. g. Tracks the contractor startup process prior to Functional Performance testing and provides final resolution of the Site Observation Reports and Issue Log. h. Supervises the trades in the training of the Facility Operating staff. Mechanical Engineer (MOOR) a. Provide consultation for the CxA when a clarification or design decision is required. b. Attend construction and Commissioning meetings. (As needed) c. Accepts Final TAB Report (post CxA verification) d. Accepts Final Trend Report (coordinated review with CxA) e. Accepts the results of Domestic hot water Performance Verification f. Accepts Final As-build / Red-line drawings Electrical Engineer (EDOR) a. Provide consultation for the CxA when a clarification or design decision is required. b. Attend construction and Commissioning meetings. (As needed) c. Accepts any Electrical Contractor's Performance Verification Testing Procedures as well as CxA verification results if issues are encountered. Sub-Contractors (MC. PC. EC) I (Mechanical. Plumbing. Electrical) -*Also referred to as Commissioning Agents a. Attend all Cx progress meetings b. Provide equipment submittals and O&M information. c. Address and Cx site observations listed in the Site Observation Reports associated with their trade and scope of work d. Address and resolve issues listed in the Issue Log associated with their trade and scope of work. e. Provides the CxA with equipment, system information, test records, and official start-up sheets. f. Reports and records the progress of equipment readiness for start-up. g. Conducts the Functional Testing along with the CxA. h. Provides Systems Syllabus and training to the Facility Operating staff. 9 Controls Contractor (CC} a. Attend all Cx progress meetings b. Provide equipment submittals and O&M information. c. Address and Cx site observations listed in the Site Observation Reports associated with their trade and scope of work d. Address and resolve issues listed in the Issue Log associated with their trade and scope of work. e. Reports progress of installation, programming and testing. f. Create DDC Sequence of Operations test Script to include programmed Testing procedures and results for submission to the CxA & MDOR for approval. g. Verifies and documents all DDC control points h. Demonstrates all DDC control points to the CxA i. Performs DDC systems Functional Performance Testing under the direction of the CxA. j. Provides 48 -72 hour trend of all systems points in graph & data form to CxA & MDOR. k. Provides DDC Systems Syllabus and training to the Facility Operating staff. Testing and Balancing Contractor (TAB} a. Attend all Cx progress meetings once in the startup phase b. Address and Cx site observations listed in the Site Observation Reports associated with their trade and scope of work c. Reports to the MC and GC about identified deficiencies (keep CxA informed) d. Generates deficiency reports as required. e. Works with CxA during FPT to collect data for Functional Testing & overall system performance f. Assist CxA in verifying 10% (minimum) of each system to demonstrate repeatability of balance {based on a Preliminary TAB report). g. Provide Final TAB report to the DOR for review and approval {post CxA verification) 10 5. Commissioning Process 5.1 Flow Charts Acquire OPR & Specifications Document and Submit Design Development Cx ... Review l Establish Design Phase Issues Log Ill Ill Design Phase Commissioning Process Establish Contractual Requirements ReviewOPR, Specifications, Basis of Designs and Design Development Plans Resolve Design Phase Issues Log Create and Submit Ill Qualifications Cx ,-Plan ._ t Acquire Mechanical, Plumbing, Electrical ... Basis of Designs and Design Development Plans Cx Scope Ill Meeting 11 CxScope Meetina Point to Point Testing (CC) Test, Adjusting & Balance (TB) 72 hr. Systems Trend (CC) _. +- Designer Approval of Final Docs (TAB Report & DOC Trends) (DOR) Equipment Start Up (MC) No Building Activitv (GC) HVAC & DDC Commissioning Process Pre Startup Docs (MC & PC) _. r I.. New Filters (MC) Test& Balance ex Verification (TB & CX) _. DOC Sequence Test (CC/ CxA) +-+- '- Mechanical Systems Acceptance Utilities Available (EC/PC) Clean Building (GC) Equipment and DDC Functional ! Equipment Functional Testing (CxT) 12 CxScope Meetina Set & Adjust Lighting System (EC) l Interior Lighting Controls Functional Testing Cx Binder& Contractor Sign Off (CxT) Lighting Controls Commissioning Process ..... I- Prestart up docs (EC) Utilities Available (EC) LCP Start Up (EC) Exterior Lighting Controls Functional Testing 13 5.2 Design Phase Meetings The CxA reserves the right to attend any selected design meetings in order to remain informed on design progress (electronic means for attending early design & construction phase meetings is adequate for CxA involvement at this time. Call in information to be provided from the GC). The CxA may review construction meeting minutes, change orders or ASl's to keep informed of changes made from the original design. Invitations to these meetings must be provided the MBO at least 72 hours prior to the scheduled gathering of the team. 5.3 Commissioning Scope Meeting Conducted by the CxA, the general contractor will send out official meeting invitations to the entire team to ensure their presence. In attendance are representatives of the user/owner, GC, Mechanical, Plumbing, Electrical, Controls, and TAB Contractors at a minimum. In this meeting, the following topics are discussed: • Commissioning parties are introduced. • Commissioning process reviewed. • Flow of documents and how much submittal data the CxA will receive. • Management and reporting lines determined. • The Cx Plan is briefly reviewed. • Process questions are addressed. • Review List of Commissioned Systems • A general list of each party's responsibilities • Review of the Commissioning Activity List The outcome of the Scope meeting will be increased understanding by all parties of the commissioning process and their responsibilities to the success of commissioning. The meeting also provides the CxA with additional information needed to finalize the Cx Plan, including the final update to the commissioning activity list and further contact information of team members previously unknown. *This meeting should not occur until the entire Cx team is assembled as there will only a single scope meeting and a single opportunity to hear the scope in its entirety from the CxA. 14 5.4 Commissioning Progress Meetings Conducted by the CxA, the general contractor will send out official meeting invitations to the entire team to ensure their presence. These meetings will be held on an as needed basis as determined by the CxA (with input from the owner). In most cases, these meetings will be held on a monthly basis. The frequency of the official meeting held by the CxA may increase as Functional Testing approaches. It is recommended that the General contractor hold weekly meetings with the sub-contractors regarding the lasts commissioning progress meeting to ensure the team is following up on their assigned action items. In attendance for these meetings will be representatives of the user/owner, GC, Mechanical, Plumbing, Electrical, Controls, and TAB Contractors at a minimum. In this meeting, the following topics are generally discussed: • Review of Open Commissioning Issues Log & any other established lists which relate to Cx progress. • Review of the latest Site Observation report (focus on specific items) • General progress updates regarding the installation and initial setup by the contractors for the following trades (HVAC, Domestic Hot Water, Lighting controls, Direct Digital Controls and Test & Balance) • Action items are reviewed from the last meeting and updates are provided by the team. • Review of the main construction schedule which is created by the general contractor. The line items included in the Commissioning Activity list should be incorporated into this main schedule for ease of tracking by the general contractors' quality control team. • General reminders are provided for team members to provided their O&M documentation as well as the documentation required for training the end user (training syllabus) Note regarding the quantity of Official Commissioning Meetings: The number of official meetings where the CxA is present is not unlimited. It is recommended that official meetings only be held when significant progress has been made since the last meeting. As stated above; these meetings will be held on an as needed basis as determined by the CxA (with input from the owner) Note regarding any regularly scheduled Onsite Foreman,s meetings: The CxA is not required to attend weekly onsite foreman's meetings. If meeting minutes are generated by an attending party such as the general contractor; the CxA may request this documentation for reference. CxA attendance at these meetings can be discussed further between the owner and the CxA. 15 5.5 Miscellaneous Management Protocols The following protocols will be used on this project: adjustments can be made at the request of the Owner. Issue Protocol For requests for information (RFI) or The CxA will request all RFl's to be provided formal documentation reauests: throuoh the oeneral contractor. Any deficiencies or important observations made will be included in the Site Observation For notifying contractors of deficiencies: reports and issues logs which will be reviewed with the team in the Cx progress meetings. The CxA may provide input for and do some coordination of training and testing. The MC For scheduling functional tests or will facilitate training and testing. The GC will training: be responsible for scheduling/gathering the appropriate team members for all testing and training activities The CxA proposes a date at the Cx meetings. Once a date is agreed upon, the GC will send out official meeting invitations to the team to For scheduling commissioning meetings: ensure attendance. If an alternate date is requested after the agreed upon date, the CxA must be informed so it can be re-scheduled for the next available window in the CxA's schedule. The CxA has no authority to issue change For making a request for significant orders however recommendations may be changes: provided. The owner & general contractor will follow up with direction. 5.6 Site Observation Reports Throughout the construction process, CxA will perform job walks to look at progress of installation and make comparative comments from the installation to the Design & contract requirements. These observations generally occur just prior to or just after the normal Commissioning progress meetings (usually on a monthly basis). The observations made in the reports will be reviewed in the Cx meetings to acquire updates from the responsible parties. The frequency of the progress reports may increase as needed, until startup is completed. 5. 7 Commissioning Issues Logs The CxA will compile all known issues (which are related to commissioning) into a single log for ease of tracking. During the Cx progress meetings, the CxA will request information on any issues which are not yet included in the log. These issues can be provided by any team member including the owner. Once the TAB process begins any issues found by the TAB technicians will also be included in this log to ensure they're resolved prior to TAB verification. 16 5.8 DALT (Duct Air Leakage Testing) ff DALT testing is required on the project; a DALT plan needs to be generated with collaboration between the following Cx Team members: • Mechanical Design of Record (MDOR) • Mechanical Contractor (MC) • Test and Balance Contractor {TB) The engineer will indicate which systems need to be tested and the performance criteria to test to. The mechanical contractor will provide the actual installed duct dimensions to the TAB contractor who will perform the testing and document the results. The CxA authority is not responsible for the implementation of this plan. The CxA & owner reserve the right to witness all DALT activities. Absence of the CxA will not delay startup activities. 5.9 Execution of Contractor Pre-start and Startup Checklists Prior to startup, the Subs and vendors will complete the initial checkout documentation. The startup and initial checkout are directed and executed by the Sub or vendor. The CxA reserves the right to observe a sample of the procedures on primary equipment. To document the process of proper startup, the installing contractors shall complete any and all documentation provided in the manufacturers O&M's for each piece of equipment; this will be in addition to any "in-house" startup documentation the contractors will already be providing. Only individuals having direct knowledge of the systems startup procedures shall complete this documentation. *The CxA does not witness all startup procedures, except for "larger or more critical" pieces of equipment (pumps, boilers & main air handlers). MBO needs to be informed a minimum of 72 hours before the startup of this equipment for scheduling purposes. Absence of the CxA will not delay startup activities. 5.10 HVAC-& Plumbing Systems Start-up HVAC Equipment is not started until air handling units are clean, filters are installed and the building has been verified clean by the quality control team. HVAC & Plumbing equipment start up is witnessed by the general contractors' quality control team. Manufacturer startup must be witnessed by quality control team and Mechanical Contractor's Start up Technician to ensure startup was performed thoroughly and components are communicating / operating properly for the next phase of the equipment setup. All hydronic systems must be filled, flushed and treated prior to TAB work beginning. This procedure needs to be done on both process and domestic hydronic lines. All results of these tests must be provided to the CxA to be included in the Final Cx report. 5.11 Development of FPT Documentation and Verification Procedures Functional testing is the dynamic testing of equipment and systems under full operation. With the assistance of the Mechanical, Controls and TAB contractors, equipment and systems are tested under various modes, low and high cooling or heating loads, high demand scenarios, component failures, occupied & unoccupied schedules, varying outside air temperatures, power failure, etc. The systems are run through all of the control system's sequences of operation and components are verified to be respond as the sequences were designed by the MDOR and implemented by the controls contractor. Most of the testing procedures are created by the DDC contractor in the DDC Sequence of Operations Test Script however a few additional field verifications will be added by the CxA as determined necessary. 17 5.12 Functional Performance Test sheet development process The CxA will generate project specific Functional Performance Test sheets from DOR approved mechanical, plumbing and electrical submittals as well as Issued for Construction drawings (IFC). Completed test sheets will be included in the Final Commissioning Report which will be submitted to the owner once all field verifications are considered complete. 5.13 Execution of FPT Procedures Once the Cx team is confident in their readiness for official verification by the CxA, the general contractors QCM will work with the sub-contractors and the CxA to schedule functional testing activities. For any given system, prior to performing functional testing, the CxA waits until the contractors pre-startup and startup checklists have been submitted with the necessary signatures which confirms the system is ready for official verification through the functional testing process. The CxA witnesses and documents the functional testing of all equipment and systems according to the Specifications and the Cx Plan. The Subs will execute the tests with the CxA acting as an observer while providing direction for testing. ***The DOC control system must be fully tested, calibrated and documented as such before it is used to verify performance of other components or systems. The air and water balancing must be completed, debugged and documented as such before functional testing of any HVAC equipment or systems. 5.14 Sampling Strategy for Functional Testing Multiple, identical pieces of non-life-safety or otherwise non-critical equipment (occupancy sensors, lavatories & showers) may be functionally tested using a sampling strategy of 10% (minimum). Failed testing will result in re-verifying original selected sample once all issues are resolved and then verifying an additional 10% at contractor cost. Failure of the second selected sample can result in a potential 100% verification at contractor cost. 5.15 DDC System Point to Point, Calibration & Programming All control points are verified to be operational and calibrated by the installing contractor. It may be necessary for the Tab contractor to assist the CC in calibrating certain controlling components as their tools will be needed. Once all testing is completed and completed checklists have been provided to the CxA for review, the Controls Contractor will coordinate testing through the GC and CxA to verify repeatability. There will be no verifications made by the CxA until this documentation is considered complete. Note: Failed inspections or verification requiring an additional visit will result in additional services. 5.16 Development of the Sequence of Operations Test Script The CC develops and submits a written step-by-step testing script which describes the process they intend to follow in checking out the control system and the forms on which they will document the process. The CC will also meet with the TAB contractor prior to the start of TAB and review the TAB plan to determine the capabilities of the control system for use in TAB. The controls contractor will provide the TAB with any necessary unique instruments needed for applying settings to various components (laptop, hand-held device) *Note: The CC shall also provide a technician qualified to operate the controls to assist the CxA in testing as well as the TAB contractor in performing test and balance. 18 5.17 Initial TAB work-TAB work is not performed until the envelope is 100% complete, including doors, door sweeps, windows and ceiling tiles. There will be no interior painting, grinding or any other construction where dust, dirt or other debris can affect the HVAC systems. The correct filters will be verified clean and installed properly by the TAB technicians prior to the start of any balancing work (during their initial setup of the systems). All hydronic systems have been finalized and cleaned. Controls work shall be finalized to allow the systems to be ran in overridden modes as well as automatic operation. *All point to point activities and programming should be complete prior to this activity occurring to ensure the systems are ready for the TAB contractor. 5.18 TAB Verification: Using a "Preliminary-Final TAB Report" the CxA will work with the TAB representatives in verifying a sampled percentage of balance work completed for this project. A 1 O % minimum sample size will be increased as failures are encountered. If too many issues are being encountered, the CxA will cancel verification activities and re-schedule once all systems are corrected. Activities which may be included in this verification will include the verification of proportional balancing of air distribution, outside air quantities and total air and water flows on various pieces of equipment. The TAB contractor will need to keep accurate descriptions of their system setup procedures so verification of the system will reflect how they balanced the system. If the TAB report is found to be accurate by the CxA (minimal discrepancies), it will be recommended for submission to the DOR for final approval and acceptance. There may be a need for the report to be revised based on the results of official verification with the CxA. Once updates are made, the DOR may receive the report for final review and acceptance. 5.19 Trending {DOC) The 48 -72 Hour trend serves as a final verification that all building systems are functioning properly (this is the final step in the Functional testing process with the CxA). The DDC Contractor shall provide graphed trends of agreed upon points typically those proving major sequence functionality. The CC is to review the trends prior to submitting to the CxA for review to identify obvious issues with the data. Ensure building is ready for trending by verify all units are on and in auto control and proper set points established during the TAB & Cx process are in place. Double check that filters are clean. Building should remain as undisturbed as possible. Close all windows, blinds and doors. It is recommended that the general contractor apply "signage" to all doors to inform the various construction personnel that trending is occurring. 5.20 Lighting Systems Verification -The verification of interior lighting control systems in particular will consist of checking time delays and other functions of the occupancy sensors, operation of daylighting controls with dimming capabilities and main building occupied and un- occupied scheduled for lighting. Schedules and general operation of the exterior lighting systems may also be included (if in the projects scope). Depending on the complexity of the lighting systems, the CxA may choose to provide the electrical contractor with additional documentation to assist with their initial setup and programming of the system. If this is the case, the contractor must complete the documentation of the system prior to any official verification by the CxA. The EC will consult with the CxA and end user regarding any desired parameters for the occupancy sensors and various lighting controls. 19 5.21 DHW System Performance Verification -The performance of the Domestic Hot Water system will be verified by checking the time it takes for hot water to reach the various discharge locations as well as the minimum and maximum temperatures observed. A capacity test may also be utilized which will determine the systems capability of maintaining hot water while being discharged in a high demand scenario. Depending on the complexity of the Domestic hot water system, the CxA may choose to provide the plumbing contractor additional documentation to assist with their initial setup and "balancing" of the system. If this is the case, the plumbing contractor must complete the setup and documentation of the system prior to official verification by the CxA. It may be necessary for the TAB contractor to assist the plumbing contractor with the setting / adjusting of "balancing devices" in the DHW recirculation lines. Ensure that any TAB tools used in Domestic lines are treated for use in these chlorinated systems; not doing so could result in having to re-sterilize the system sue to contamination. Common Parameters for these systems are as follows: • DHW Stored at 140°F • Mix@ TMV to: 110°F -115°F (120°F absolute max) • Minimum temp required at the discharge locations: 105°F • Minimum Time required to reach temp at discharge locations: <30 seconds • Temperature setting of the Aquastat: 110°F • Operation schedule of the re-circulation pump: Demand Based (temperature) • 30 minute capacity test ***Exact parameters for DHW verification will be determined at a later date between the CxA, DOR and plumbing contractor. 5.22 Deficiencies & Re-testing Regardless of the systems or components being verified, corrections of minor deficiencies identified during the FPT process are noted and reported to the GC and the owner. Subs will then correct deficiencies and notify the CxA when the correction is completed (photo evidence is acceptable; if available). The QCM and CxA shall discuss the scheduling of any retesting. The CxA recommends acceptance of each test to the owner once satisfied with overall system performance per the design intent and end users operational needs. *Note: A system or component shall not fail more than once during Final Functional Testing or costs will be incurred when re-verification by the CxA is needed. 20 6. Standard O&M Manuals The CxA reviews the O&M manuals which are collected by the general contractor. Redlines and as-built drawings for systems that were commissioned will also be provided to the CxA for review. The CxA may recommend approval and acceptance of these sections of the O&M manuals to the GC. 7. Training & Orientation of O&M personnel Training is a comprehensive, project-specific program for the systems of the facility with a focus on the manufacturer's recommendations and the operation and maintenance documentation. Owner's training and orientation on equipment and systems are provided by the appropriate representative of each trade involved in the Cx process and who are knowledgeable with this specific application. The installing contractors shall provide a detailed syllabus which will be reviewed and approved by CxA and/or End User. If requested by the Owner, each training session will need to be videotaped by the general contractor for future reference. It is not required that the CxA be present at the end user training sessions however it is recommended that official invitations be sent to the CxA for scheduling purposes and possibly observing training activities to ensure occurrence. The general contractor will gather sign in sheets for each training session and provided to the CxA to be included in the Final Commissioning Report. 8. Systems Manual The systems manual will be created by the general contractor that gives future operating staff the information needed to understand and optimally operate the commissioned systems. The CxA will review systems manual in addition to the O&M manuals submitted by the contractor. This manual will be submitted with the Final Commissioning report once all field activities are considered complete and initial. end user training has occurred. The systems manual must include the following for each commissioned system: • Final version of the basis of design. • System single-line diagrams. • As-built sequences of operations, control drawings, and original set points. • General operating instructions for integrated building systems. • Recommended schedule of maintenance requirements and frequency • Recommended schedule for retesting of commissioned systems with blank test forms • Recommended schedule for calibrating sensors and actuators. 9. Final Commissioning Report (Post Cx Field activities) The Summary Commissioning report which will be finalized at the end of the Cx process after all field work has been completed. This report will include the following items at a minimum: • Executive summary of the commissioning process including results and observations of the commissioning program. This will include as-operating systems descriptions of all of the commissioned systems. • History of deficiencies / issues discover~d and tracked along with their resolution. List and outstanding items to be resolved. • Commissioned systems performance testing results such as Functional Performance Testing and Sequence of Operations Verification. 21 Appendix "A" Appendix "A": Commissioning Authority Qualifications & Experience Andrew S. Day Commissioning Authority-CxA Experience 8 years HVAC Industry 3 years Testing & Balance 5 years Commissioning (Standard Cx) 5 years LEED Commissioning (EApl & EAc3) 5 years Commissioning (Government) Andy is a Certified Commissioning Authority holding a certification for LEED as a Green Associate (GA) and has a background in testing and verification of various types and sizes of HVAC systems, Domestic Hot Water Systems, Photovoltaic, Irrigation Controls and Lighting Control systems. The experiences acquired throughout his involvement in these projects has enabled him to become an emerging player in the ever growing commissioning industry constantly troubleshooting, analyzing and optimizing the operation and performance of various building systems under all modes of operation. Education, Certifications & Training • ACG CxA-AABC Commissioning Group (2014) • LEED GA-Leadership in Energy and Environmental Design Green Associate (2012) • OSHA 10 Hours of Safety Training (2011) • Carrier's Certificated Technical Development Program (2010) • UCSD HVAC Design (2009) • San Diego City College Fluid Flow Dynamics {2008) Commissioning Authority (CxA) Experience • P495 MAWTS Applied Instructional Facility -Yuma (LEED EApl / EAc3) • BEQ Package 9 -29 Palms {LEED EApl / EAc3) (PV) • P447A, P460, ISMT -Yuma (LEED EApl / EAc3) • P-1019 Counter Battery Radar Facility -Camp Pendleton (LEED EApl) • SD County Operations Building -San Diego {LEED EApl / EAc3) • Army Reserve Center -Los Alamitos (LEED EApl) • Navy Lodge -Naval Air Station Coronado (LEED EApl / EAc3) • P1029 Weapons & Field Training -Camp Pendleton (LEED EApl / EAc3) (PV) • P293, P294, P316 Recruit BEQ -MCRD (LEED EApl / EAc3) (PV) • Plll / P1037 Warehouses -Camp Pendleton (LEED EApl / EAc3) (PV) • STONE Brewery-San Diego (LEED EApl) (PV) • Quality of Life Package 4 BEQ's & DFAC -29 Palms (LEED EApl / EAc3) (PV) • P126 Station Communication & Infrastructure -29 Palms (LEED EApl / EAc3) ,,_:30 ,,-: :: ;"'I t :: 5 S · 7 3 t -Si CJ 2 := 3 , 1, :· 3 :} ; 7 3 I -:~ ~1 ~ ~ 3d3; f·tr.l:,:il (C»T1 ,;,"' :, ,,,;,:',Gl ,:_, ·., AABC Commissioning -- Group hereby certifies that _Jlndrew S. {J)ay MBOinc. has demonstrated the requisite knowledge and understanding of the building commissioning process as presented in the ACG Commissioning Guideline and passed the necessary examination to be awarded this certificate in recognition of his qualifications as an A CG This registration number 414-1136 and this certificate, valid only for the year 2015, are renewable on an annual basis after examination of the agency's record for the preceding year. Ray Bert, Executive Director 10729167-GREEN-ASSOCIATE CREDENTIAL ID 19 AUG 2014 ISSUED 19AUG 2016 VALID THROUGH GREEN BUILDING CERTIFICATION INSTITUTE CERTIFIES THAT .·1\' . ' ' :_r -...... __... -, . \ ' I HAS ATTAINED THE DESIGNATION OF ..., --1 ' ,, ... __ ',--, ,-; ~? _;_-;,,/ .;.-J \ -, \ ;' '. '\ by demonstrating the knowledge and understanding of green building practices and principles needed to support the use of the LEED® Green Building Rating System™. GAIL Vrrroru, GBCI CHAIRPERSON MAHESH RAMANUJAM, GBCI PRESIDENT Juan Serna Commissioning Authority -CxA Experience: 19 years HVAC Industry ACG Certified Commissioning Authority Juan L. Senza .WIO,mt. /1.is d.mt01:str,1reJ the ,cq:11siu km,1t1l(J61' aml 1111:!e~twJm:; <'Jf ti:!~ bmldm;: c,nw,1iSJim1illJ {Jmass ,u 1,rr:smtnl m tl't' JCG (Q11w1is<Juning GmJcluu: .t•id pas:$eJ :l1t ,:.:ce.$$.Jry rxi11~1rr..rt11Jt11,1 f,~a:M"li,•J Um ~-m,fi,Jre m rc:ogu:11m1 of his qu.:!lfi.:-Jtiw:s .tt .z1t .4.CG INs rtg/Sfr.Jriur r.:,m/ier 315-1300 ,m1( !N:scmific.zu. :.-.r!id IHLv fur t/Jc )'<'dr 201 S, JU w:,•m1bit rn, Jn .mmkll {r.utS a[u, a,nmr.Jf:mt 11{ zbt .igr:111:y's rc,·Qrd for :hi: preudmg )'t.Jr. NEBB Certified TAB Technician NATIONAL ENVIRONMENTAL BALANCING BUREAU e,eit,tilicaU o.? !lecfirucian euti/kti¾ Juan Serna • -· :. :"" ,) \ Juan has been working in the HVAC industry since 1996; his background is primarily in BAS controls. Juan is well versed in the installation, troubleshooting and test, adjusting and balance processes associated with today's control systems and control strategies. He has worked with Eschelon LON based systems for over 5 years now and is a valuable asset in the operational performance testing and functional performance testing phases of the commissioning process. Juan has been a Certified NEBB TAB Technician since 2010 and a Certified Commissioning Authority as of 2015. Education, Certifications & Training • NEBB Certified Technician Phoenix, AZ (2010) • San Diego City College-AIRE Program (2002-2003) • EPA Universal Certification (2000) • ACG Certified Commissioning Authority (2015) Commissioning Authority (Cx) Experience • P-545 Yuma North & South Hangers, Yuma, AZ • YMCA Copley-Price Family, San Diego, CA • Mt. Miguel Covenant Village, Spring Valley, CA • San Diego Private Office Building (FBI), San Diego CA • Sempra Energy Towers Headquarters, San Diego CA • Torrey Pines High School, San Diego CA • Petco Headquarters, San Diego CA • Viejas Tower Expansion, San Diego CA • Department of Veterans Affairs, Sepulveda, CA (RCx -Cx) • St. Paul's Sr. Housing, San Diego, CA Testing, Adjusting, and Balancing (TAB) Experience Government • BEQ4, BEQ.5 and BEQ 7 -Camp Pendleton, CA • Mendota Federal Correctional Institute, Mendota, CA • China Lake NAS-VAVfume hood commissioning Ridgecrest, CA • Navy Seal Operations Facility, Coronado, CA • Area 41 Dining Facility, Camp Pendleton, CA • Satellite Control Facility, Vandenberg, CA • Lemoore Naval Air Station Hangar 1, Lemoore, CA • SNCO Club -Camp Pendleton, CA Laboratories • Abbott Labs Phase 1 and 2-Temecula, CA • Burnham Bldg 1 Vivarium -San Diego, CA • Pharmatek -Tl San Diego, CA • Genzyme -Tl San Diego, CA • Sydney Kimmel Vivarium San Diego, CA • Burnham Institute -Campus Tl San Diego, CA • NEO MPS-GMP Vivarium Validation San Diego, CA AABC ~ Commissioning -- Group hereby certifies that Juan L. Serna MBO, Inc. has demonstrated the requisite knowledge and understanding of the building commissioning process as presented in the ACG Commissioning Guideline and passed the necessary examination to be awarded this certificate in recognition of his qualifications as an A CG This registration number 315-1300 and this certificate, valid only for the year 2015, are renewable on an annual basis after exaniination of the agency's record for the preceding year. Ray Bert, Executiue Director NATIONAL ENVIRONMENTAL BALANCING BUREAU ti" icate ~, g ecftnician ee1tti,t/c,,, 6 •· ~e~ r ~£ta~ March 31, 2QJ6 Expiration Date Juan Serna 1 ;,, f'1 NEBB President Date Certified Professional's Stamp Appendix 11B11 Appendix "B": Owners Project Requirements *The development of this document is underway at this time. It is being created by MBO with consulting input from the end user/ owner. The Final Commissioning Report will include this document in its final edited state. Appendix "D11 Appendix "D": OPR & BOD Review *The development of the OPR document is underway at this time. It is being created by MBO with consulting input from the end user/ owner. Basis of Design Information has been provided to the CxA for the Mechanical, Plumbing and electrical disciplines. The Final Commissioning Report will include this document in its fmal edited state. Appendix "E 11 Appendix "E": Commissioning Activity List Note: The CxA will create an initial Cx Schedule from Start Up to Performance Verification Testing produced from information provided by the General Contractor at the time of this pre-submittal. This schedule is provided to assist the GC in understanding the time required to commission these facilities. This schedule will be provided to the CxT wherein they will be requested to provide their knowledge and experiences as well as input on their manpower needs to produce a schedule that all can agree is achievable. MBO will then use this information to produce a 2nd and Final Cx schedule for the GC to insert into the construction schedule. At this point, the GC will maintain and manipulate the schedule as needed. At a minimum the CxA scheduling requirements for Point to Point, Functional and Performance Verification testing must not be adjusted. 1 . ·:·~~·---.--"" -,,,.,. ..... ,. [~'.'f" ........ ,~-..-J.,a•,fllii Commissioning Activity Duration Expected Project: Viasatt Building 11 Date Created: 6/10/2015 (v.1) CxA: A. Day -_,.. -..... tr:..i .. C:Itllll llllr,l11tJII,; Responsibility Note or Expected Date of Completion Installation Phase 2 Mechanical Systems Installation MC 3 Domestic Hot Water System Installation PC 4 Lighting System Installation EC 5 Irrigation System Installation IR 6 Availability of Site Utilities 7 Power available to eauioment -EC 8 Gas Available to eauioment -PC 9 Water ready to circulate (Domestic Hot Water) -PC 1 0 Building readiness for Startup Activities 1 1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Readiness for "Air moving equipment" Start-up Keep IAQ in mind. No dust creating -GC activities or painting once the air moving (Building Clean) equipment is started up. Start-up Filters Installed in air moving equipment MC (Verify MERV requirements) - Installation Complete & Building Clean -Ready for Startup Mechanical Systems Start-up MC Document all results. (Complete Start-up reports. Provide copies to MBO) DHW System -start up & set up PC Results of initial testing I set up; must be Contractor Testing (per DOR's parameters) repeatable. (Complete Start-up reports. Provide copies to MBO) Lighting System -start up & set up EC Test all sensors for porper settings and (Complete Start-up reports. Provide copies to MBO) operation. Irrigation System -start up & set up IR Pressure testing I over-spray adjustments. (Complete Start-up reports. Provide copies to MBO} Start up Complete -Ready for Test and Balance Activities Final Filters Installed (MERV requirements) -MC Test and Balance (Air Side) TB Test and Balance (Hvdronic Side) TB Submit Final TAB Report to Cx for verification -TB/DOR/Cx TAB Report Review DOR/Cx · TAB Verification Complete -Ready for MBO FPT Functional Performance Testing (HVAC) MC/CC/Cx TAB Verification (sample%) 3 Days TB/Cx Domestic Hot Water System Verification PC/Cx Liahtina Systems Verification EC/Cx . Testing Complete -Ready for Building Turnover All Eauipment, Wiring and Pioina is labeled -CxT As Builts Complete I Accurate I DOR Aooroved -CxT 32 33 34 35 36 37 38 39 40 41 42 43 C Project: Viasatt Building 11 Date Created: 6/10/2015 (v.1) CxA: A. Day ···.,.·. \~iif~~[i©'.~~ ~ ~tI:JN(:Jtl~ Commissioning Activity Duration Responsibility Note or Expected Date of Completion Expected Facilities Training (All trades) 1 Day GC/CxT Provide Syllabus & Sign in sheets to MBO Building Turnover -GC ABBREVIATIONS: Additional Notes: MC -Mechanical Contractor 1. Any future updates to this schedule are to be provided by the PC -PlumbinQ Contractor General contractor. EC -Electrical Contractor 2. Commissioning meetings will be held on an as needed basis TB -Test and Balance Contractor determined by the CxA and GC. CC -Controls Contractor CxT -Commissionim:i Team GC -General Contractor DOR -Designer of Record Appendix 11G11 Appendix "G": Title-24 Criteria for Commissioning Page 134 2013 Building Energy Efficiency Standards SECTION 120.8 -BUILDING COMMISSIONING For all new nonresidential buildings, the Subsections of 120.8 (a) through (i) for building commissioning shall be included in the design and construction processes of the building project to verify that the building energy systems and components meet the owner's or owner representative's project requirements. All building systems and components covered by Sections 110.0, 120.0, 130.0, and 140.0 shall be included in the scope of the commissioning requirements in this Section, excluding covered processes. For buildings less than 10,000 ff, only the design review requirements in Sections 120.8(d) and 120.8(e) shall be completed. (a) Summary of Commissioning Requirements. The following items shall be completed: 1. Owner's or owner representative's project requirements; 2. Basis of design; 3. Design phase design review; 4. Commissioning measures shown in the construction documents; 5. Commissioning plan; 6. Functional performance testing; 7. Documentation and training; and 8. Commissioning report. (b) Owner's or Owner Representative's Project Requirements (OPR). The energy-related expectations and requirements of the building shall be documented before the design phase of the project begins. This documentation shall include the following: 1. Energy efficiency goals; 3. Ventilation requirements; 4. Project program, including facility functions and hours of operation, and need for after hours operation; and 5. Equipment and systems expectations. EXCEPTION to Section 120.S(b): Buildings less than 10,000 ft2. (c) Basis of Design (BOD). A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project, and updated as necessary during the design and construction phases. The Basis of Design document shall cover the following systems: 1. Heating, ventilation, air conditioning (HV AC) systems and controls; 2. Indoor lighting system and controls; and 3. Water heating systems and controls; and 4. Covered processes. EXCEPTION to Section 120.S(c): Buildings less than 10,000 ft2. ( d) Design Phase Design Review. 1. Design Reviewer Requirements. For buildings less than 10,000 ft2, design phase design review may be completed by the design engineer. Buildings between 10,000 and 50,000 ft2 require completion of the Design Review Checklist by either an engineer in-house to the design firm but not associated with the building project, or a third party design engineer. For buildings larger than 50,000 ft2 or for buildings with complex mechanical systems, an independent, review of these documents by a third party design engineer is required. 2. Design Review. During the schematic design phase of the building project, the owner or owner's representative, design team and design reviewer must meet to discuss the project scope, schedule and how the design reviewer will coordinate with the project team. The building owner or owner's representative SECTION 120.8 -BUILDING COMMISSIONING 2013 Building Energy Efficiency Standards Page 135 shall include the Design Review Checklist compliance form in the Certificate of Compliance documentation (see Section 10-103). 3. Construction Documents Design Review. The Construction Documents Design Review compliance form lists the items that shall be checked by the design reviewer during the construction document review. The completed form shall be returned to the owner and design team for review and sign-off. The building owner or owner's representative shall include this Construction Documents Design Review compliance form in the Certificate of Compliance documentation (see Section 10-103). ( e) Commissioning measures shown in the construction documents. Include commissioning measures or requirements in the construction documents (plans and specifications). Commissioning measures or requirements should be clear, detailed and complete to clarify the commissioning process. These requirements should include the list of systems and assemblies commissioned, testing scope, roles and responsibilities of contractors, requirements for meetings, management of issues, the commissioning schedule, operations and maintenance manual development and of training, and checklist and test form development, execution and documentation. Include, for information only, roles of non-contractor parties. (f) Commissioning Plan. Prior to permit issuance a commissioning plan shall be completed to document how the project will be commissioned and shall be started during the design phase of the building project. The Commissioning Plan shall include the following: 1. General project information; and 2. Commissioning goals; and 3 Systems to be commissioned; and 4. Plans to test systems and components, which shall include: A. An explanation of the original design intent; and B. Equipment and systems to be tested, including the extent of tests; and C. Functions to be tested; and D. Conditions under which the test shall be performed; and E. Measurable criteria for acceptable performance; and F. Commissioning team information; and G. Commissioning process activities, schedules and responsibilities. Plans for the completion of commissioning requirements listed in Sections 120.8(g) through 120.8(i) shall be included. EXCEPTION to Section 120.S(t): Buildings less than 10,000 ff. (g) Functional performance testing. Functional performance tests shall demonstrate the correct installation and operation of each component, system and system-to-system interface in accordance with the acceptance test requirements in Sections 120.5, 120.6, 130.4 and 140.9. Functional performance testing reports shall contain information addressing each of the building components tested, the testing methods utilized, and include any readings and adjustments made. EXCEPTION to Section 120.S(g): Buildings less than 10,000 ff. (h) Documentation and training. A Systems Manual and Systems Operations Training shall be completed. 1. Systems manual. Documentation of the operational aspects of the building shall be completed within the Systems Manual and delivered to the building owner or representative and facilities operator. The Systems Manual shall include the following: A. Site information, including facility description, history and current requirements; and B. Site contact information; and C. Instructions for basic operations and maintenance, including general site operating procedures, basic troubleshooting, recommended maintenance requirements, and a site events log; and D. Description of major systems; and SECTION 120.8 -BUILDING COMMISSIONING Page 136 2013 Building Energy Efficiency Standards E. Site equipment inventory and maintenance notes; and F. A copy of all special inspection verifications required by the enforcing agency or the Standards. 2. Systems operations training. The training of the appropriate maintenance staff for each equipment type or system shall be documented in the commissioning report. Training materials shall include the following: A. System and equipment overview (i.e., what the equipment is, what it does and with what other systems or equipment it interfaces) B. Review and demonstration of operation, servicing and preventive maintenance procedures C. Review of the information in the Systems Manual D. Review of the record drawings on the systems and equipment EXCEPTION to Section 120.S(h): Buildings less than 10,000 fi:2. (i) Commissioning report. A complete report of commissioning process activities undertaken through the design, construction and reporting recommendations for post-construction phases of the building project shall be completed and provided to the owner or representative. EXCEPTION to Section 120.S(i): Buildings less than 10,000 fl:2. SECTION 120.8 -BUILDING COMMISSIONING Appendix "I" Appendix "I": Commissioning Team Member Contact Information * Note -This document will be constantly updated throughout the project. The final Cx Plan included in the Cx Report will include the complete list. The General contractor needs to keep the CxA informed of any new team members brought to the team who should be included in this list of Office & Field Personnel. ***Contact info. needed for ALL members of the Design & Construction teams. PROJECT DIRECTORY ViaSat -Building 11 CLIENT ViaSat 6155 El Camino Real Carlsbad, CA 92009 Ph: 760-476-2200 Fax: Bob Rota, V.P. Facilities and Security Cell: 760-420-9500 Ph: 760-476-2468 Email: bob.rota@viasat.com Bart Caruso, Construction Program Mgr. 349 Inverness Drive South Englewood, CO 80112 Cell: 303-570-5600 Ph: 720-493-6417 Email: bart.caruso@viasat.com Chelise Smith, FSS Administrator Ph: 760-795-6455 Email: chelise.smith@viasat.com Dan Cancelleri, Facilities Director Cell: 760-519-5397 Ph: 760-476-2351 Email: daniel.cancelleri@viasat.com Mark Elledge, Facilities Engineering Mgr. Cell: 951-265-9301 Ph: 760-983-3718 Email: david.elledge@viasat.com Sylvia Ziegler, Finishes Cell: 858-735-4496 Ph: 760-602-5688 Email: sylvia.ziegler@viasat.com W. Rachel Huber, ViaSat Facilities / Systems Furniture Cell: 760-802-5678 Ph: 760-893-1815 Email: rachel.huber@viasat.com SCA Project No. 12085.S12 Updated: December 4, 2014 Mary Wurch, AV/ IT Ph: 760-893-1544 Email: mary.wurch@viasat.com Josh Simons, Security Cell: 760-331-8797 Ph: 760-476-4293 Email: josh.simons@viasat.com PROJECT MANAGER PCG Construction, Inc. 4455 E. Camelback Road. Suite E-280 Phoenix, AZ 85018 Ph: 602-840-7600 Fx: 602-840-7601 Ryan Hatch, Project Manager Cell: 480-239-9586 Email: ryan@pcgconstructioninc.com ARCHITECT Smith Consulting Architects 13280 Evening Creek Drive S., Suite 125 San Diego, CA 92128 Ph: 858-793-4777 Fax: 858-793-4787 Mark Langan, Project Executive Cell: 619-985-9881 Email: markl@sca-sd.com Milos Makaric, Project Architect Email: milosm@sca-sd.com Katie Hale, Interior Design Email: katieh@sca-sd.com PROJECT DIRECTORY ViaSat -Building 11 CITY OF CARLSBAD 1635 Faraday Avenue Carlsbad, CA 92008 Mike Peterson, Development Services Mgr. Ph: 760-602-2721 Email: mike.peterson@carlsbadca.gov Greg Fisher, Planning Department Ph: 760-602-4629 Email: greg.fisher@carlsbadca.gov David Rick, Engineering Department Ph: 760-602-2781 Email: david.rick@carlsbadca.gov Greg Ryan, Deputy Fire Marshall Ph: 760-602-4663 Email: gregory.ryan@carlsbadca.gov CIVIL ENGINEER O'Day Consultants 2710 Loker Avenue West Suite 100 Carlsbad, CA 92008-6604 Phone: 760-931-7700 Fax: 760-931-8680 Keith Hansen, Project Manager Phone: 760-931-7700 Ex. 203 Email: keithh@odayconsultants.com SCA Project No. 12085.S12 Updated: December 4, 2014 STRUCTURAL ENGINEER Wiseman + Rohy Structural Engineers 9915 Mira Mesa Blvd., Suite 210 San Diego, CA 92121 Ph: 858-536-5166 ext. 313 Fx: 858-536-5163 Steve Rohy, Principal / Project Manager Cell: 760-708-8058 Email: srohy@wrengineers.com MECHANICAL ENGINEER Syska Hennessy 9665 Granite Ridge Drive, Suite 110 San Diego, CA 92123 Ph: 858-300-1962 Fx: Travis Wagner, Project Manager Cell: 858-220-9189 Email: twagner@syska.com ELECTRICAL ENGINEER Michael Wall Engineering 4115 Sorrento Valley Blvd. San Diego, CA 92121 Ph: 858-638-0600 Fx: 858-638-0640 Guy Carpino, Principal Cell: (858) 967-8071 Email: gcarpino@mwalleng.com LANDSCAPE ARCHITECT KTUA Planning & Landscape Architecture 3916 Normal Street San Diego, CA 92103 Ph: 619-294-4477 Fx: 619-294-9965 Sharon Singleton, Project Manager Cell: Email: -l COMMISSIONING AGENT MBO, Inc. 4830 Viewridge Avenue Suite A San Diego, CA 92123 Ph: 858-751-5702 Fx: 858-751-0937 ENERGY MODELING Brummitt Energy Associates India Street Design Center 2171 India Street Suite B San Diego, CA 92101 Ph: 619-531-1126 Fx: 619-531-1101 GEOTECHNICAL Southern California Geotechnical 22885 E. Savi Ranch Parkway Suite E Yorba Linda, CA 92887 Ph: 714-685-1115 Fx: 714-685-1118 Robert Trazo, Principal Engineer Cell: 714-225-1011 Email: PROJECT DIRECTORY ViaSat -Building 11 SCA Project No. 12085.S12 Updated: December 4, 2014 CONTRACTOR (TBD) SPECIAL INSPECTION Christian Wheeler Engineering 3980 Home Avenue San Diego, CA 92105 Ph: 619-550-1700 Fx: 619-550-1701 VIASAT COMMISSIONING COMPANY Hood Patterson & Dewar K:\12 Projects\12085.S12 Viasat Bldg 11 Bart\Project Directory.doc & '¥ CITY OF CARLSBAD COMMUNITY FACILITIES DISTRICT NO. 1 NON-RESIDENTIAL B-32 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov NON-RESIDENTIAL CERTIFICATE: Non-Residential land owner, please read this option carefully and be sure you thoroughly understand before signing. The option you chose will affect your payment of the developed Special Tax assessed on your property. This option is available only at the time of the first building permit issuance. Property owner signature is required before signing. Your signature is confirming the accuracy of all information shown. Pivotal 650 California ST, LLC Name of Owner 2201 E Camelback Rd, Ste 650 Address Phoenix AZ 85016 City, State 213-261-23-00 Zip 602 248-8181 Telephone 2508 Gateway Rd Project Address Carlsbad, CA City, State Assessor Parcel Number(s) or APN(s) and Lot Numbers(s) if not yet subdivided by County Assessor CB152364 Building Permit Number(s) 920 Zip As cited by Ordinance No. NS-155 and adopted by the City of Carlsbad, California, the City is authorized to levy a Special Tax in Community Facilities District No. 1. All non-residential property, upon the issuance of a building permit, shall have the option to (1) pay the SPECIAL DEVELOPMENT TAX ONE TIME or (2) assume the ANNUAL SPECIAL TAX -DEVELOPED PROPERTY for a period not to exceed twenty-five (25) years. Please indicate your choice by initializing the appropriate line below: OPTION {1}: I elect to pay the SPECIAL TAX-ONE TIME now, as a one-time payment. ~IJ Amount of One-Time Special Tax:$ 18,509.17'. Owner's lnitials~-- OPTION {2}: I elect to pay the SPECIAL DEVELOPMENT TAX ANNUALLY for a period not to exceed twenty-five (25) years. Maximum annual Special Tax: $ N/A Owner's Initials _NIA._ __ . NDER PENALTY OF PERJURY THAT THE UNDERSIGNED IS THE PROPERTY OWNER OF THE THAT I UNDERSTAND AND WILL COMPLY WITH THE PROVISION AS STATED ABOVE. A-~~,~~ Ktf . Titie j-' 10 J, ( Date The City of Carlsbad has not Independently verified the information shown above. Therefore, we accept no responsibility as to the accuracy or completeness of this information. Land Use Office/Comm Imp.Area 1 FY 2015/2016 Annex date 3/11/03 Factor ,9616 {factor today) -.6459 (factor used at shell}= .3157 X Square Ft. 58,629 = $18,509.17 B-32 Page 1 of1 Rev. 07/09 21iJ 261 20 00 ., PLANNING GR Remarks: I~ Per Project 1=PerUnit i; Housing $ N/~ Habitat Mgmt. Plan (HMP) $ N/U1i Village Parking $ N/U1i BUILDING SLE VALUATION: $3,487,356.00 Building Permit $ 8,465.00 Remarks: ; v_j Per Project 1--:p u. 1 __ , er nrt Plan Check $ A CFD credit of $42,435.63 paid at shell was calculated into the estimated CFD fee as follows: Strong Motion $ 732.00 65,700 x .7943 = $52,185.51 (Office/Lab) Green Building $ 136.00 65,700 x .6459 = -$42,435.63 (Cold Shell) $9,749.88 (Estimated CFD) Community Facilities Dist. (CFO) $ 9,749.88 Public Facilities (PFF) $ 63,469.88 (Pl~w.) Plumbing $ 748.02] 5//39 + //?; = IG,09/ Electrical $ 4,035.0fffl --- Mechanical $ 1s1.oai Stormwater Permit $ N/U1i School District N/~ Fire Sprinklers: Call 760-602-4665 ENGINEERING CG 7/20/15 :7=1 Per Project -Remarks: '_ .Per Unit Bridge & Thoroughfare $ 65,700 SQ. FT. BUILDING INITIALLY FEE'D AS Local Facilities Mgmt. (LFMZ) $ MANUFACTURING SHELL. VALUES SHOWN REPRESENT CHANGING USE TO OFFICE (49,545 Park in Lieu $ SQ. FT.) WITH CREDIT GIVEN FOR Drainage $ MANUFACTURING SHELL. Water Meter Size (Potable) $ Includes meter, connection, SDCWA fees Meter (Irrigation) Size $ Sewer Connection $ 14,836.04 Sewer Benefit $ 16,897.58 Traffic Impact $ 82,368.00 B-40 Page 3 of 3 Rev. 09/12 City of Carlsbad Valuation Worksheet Building Division Permit No: [-_" ____ ------·····--·-· . Address :Date Assessor Par.eel l\lo. --- 2508 Gateway Road 213-261-20, 21, 22, 23 07/07/2015 SLE Type of Work Area of Work .. Multiplier VAlU_E SFD and Duplexes $132.05 $0.00 Residential Additions $157.88 $0.00 Remodels/ Lofts* $68.98 $0.00 Apartments & Multi-family $117.70 $0.00 Garages/Sunrooms/Solariums $34.45 $0.00 Patio/Porch $11.48 $0.00 Enclosed Patio* $18.66 $0.00 Decks/Ba Icon ies/Sta i rs $18.66 $0.00 Retaining Walls, concrete,masonry $22.96 $0.00 Pools/Spas-Gunite $48.80 $0.00 Tl/Stores, Offices 65,700 $43.32 $2,846,124.00 TI/Me_dical, restaurant, H occupancies $60.29 $0.00 Photovoltaic Systems/# of panels $400.00 $0.00 2 story office building $97.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fire Sprinkler System 65,700 $3.73 $245,061.00 Air Conditioning -commercial 65,700 $6.03 $396,171.00 Air Conditioning -residential $5.02 $0.00 Fireplace/ concrete, masonry $4,621.70 $0.00 Fireplace/ prefabricated Metal $3,141.89 $0.00 $0.00 $0.00 TOTAL $3,487,356.00 Valuation: $3,487,356 CFD Comm/Res (C/R): C @ Yes {PFF=l.82%) @ No (PFF = 3.5%) Building Fee $8,484.63 Land Use: . Plan Check Fee $5,939.24 Density: Strong Motion Fee $732.00 Improve. Area: Green Bldg. Stand. Fee $136.00 Fiscal Year: Green Bldg PC Fee $150.00 Annex. Year: Factor: License Tax/PFF $122,057.46 ~icense Tax/PFF (in CFO) $63,469.88 CREDITS PFF and/or CFO CFO Explanation: 1st hour of Plan CheckFire Expedite Plumbing TBO Mechanical TBO Electrical TBO OFFICE USE ONLY SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE UPFP# ______ _ HV# ________ _ BP DATE __ / __ .._/ __ Business Name Business Contact Telephone# ViaSat, Inc. Bob Roat (760 \ 476.2202 Project Address City State Zip Code APN# 2508 Gateway Road Carlsbad CA 92009 213-261-20,21,22,23 Mailing Address City State Zip Code Plan File# 6155 El Camino Real Carlsbad CA 92009 Project Contact Telephone# Bob Roat (760 \ 476.2202 The following questions represent the facility's activities, NOT the specific project description. PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled, applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Facility's Square Footage (including proposed project): 65,700 Occupancy Rating: _B_&_F-_1 _____ _ 1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards 3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials @ None of These. 4. Flammable Solids 8. Unstable Reactives 12. Radioactives PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISIONS (HMO): If the answer to any of the questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Ave., Suite 110, San Diego, CA 92123. Call (858) 505-6700 prior to the issuance of a building permit. FEES ARE REQUIRED. Project Completion Date: _1_/_8_/2Q.1.§_ Expected Date of Occupancy: _2_/--1L}.2Q.15. YES NO (for new construction or remodeling projects) 1. D 1X1 Is your business listed on the reverse side of this form? (check all that apply). 2. D lXI Will your business dispose of Hazardous Substances or Medical Waste in any amount? 3. D !XI Will your business store or handle Hazardous Substances in quantities equal to or greater than 55 gallons, 500 pounds 200 cubic feet, or carcinogens/reproductive toxins in any quantity? 4. 5. 6. 7. D D D D 00 Will your business use an existing or install an underground storage tank? lXI Will your business store or handle Regulated Substances (CalARP)? IZ] Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? IX] Will your business store petroleum in tanks or containers at your facility with a total storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). 0 CalARP Exempt I Date Initials 0 CalARP Required I Date Initials 0 CalARP Complete I Date Initials PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the questions below is yes, applicant must contact the Air Pollution Control District (APCD), 10124 Old Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 prior to the issuance of a building or demolition permit. Note: if the answer to questions 4 or 5 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 working days prior to commencing demolition or renovation, except demolition or renovation of residential structures of four units or less. Contact the APCD for more information. YES NO 1. D 00 Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD factsheet at http://www.sdapcd.org/info/facts/permits.pdf, and the list of typical equipment requiring an APCD permit on the reverse side of this from. Contact APCD if you have any questions). 2. D D (ANSWER ONLY IF QUESTION 1 IS YES) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)? (Search the California School Directory at http://www.cde.ca.gov/re/sd/ for public and private schools or contact the appropriate school district). 3. D !XI Has a survey been performed to determine the presence of Asbestos Containing Materials? 4. D IZ] Will there be renovation that involves handling of any friable asbestos materials, or disturbing any material that contains non-friable asbestos? 5. D 00 Will there be demolition involving the removal of a load supporting structural member? Briefly describe business activities: Briefly describe proposed project: Telecommunication T nant Improvements in the existing three story tilt-up concrete cold shell building I declare under penalty of perjury that to the best of my knowledge and belief th resi:ionse made h 11ect. Milos Makaric ......,,4~~~~......,,-4~~~~~:'."L.--7 I 24 / 2015 Name of Owner or Authorized Agent Si Date FOR OFFICIAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: _____________________________ _ BY: __________________________ _ DATE: __ _,_/ __ ....,/ __ _ EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMO* APCD COUNTY-HMD APCD COUNTY-HMO APCD .. *A stamp 1n this box only exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply. HM:-9171 (02/11) County of San Diego -DEH-Hazardous Materials Division ,, INDUSTRIAL WASTEWATER D~SCHARGE PERM~T SCREENING SURVEY Date f ffe'li1o/(;' Busin ss ame V { ASA:r Street Address 6 /5!;; l:3L CAt{/NO Email Address. __________________________ _ PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) ~ Check all below that are present at your facility: Acid Cleaning Ink-Manufacturing Nutritional Supplement/ Assembly Laboratory Vitamin Manufacturing Automotive Repair Machining/ Milling Painting/ Finishing Battery Manufacturing Manufacturing Paint Manufacturing Biofuel Manufacturing Membrane Manufacturing Personal Care Products Biotech Laboratory (i.e. water filter membranes) Manufacturing Bulk Chemical Storage Metal Casting / Forming Pesticide Manufacturing / Car Wash Metal Fabrication Packaging Chemical Manufacturing Metal Finishing Pharmaceutical Manufacturing Chemical Purification Electroplating (including precursors) Dry Cleaning Electroless plating Porcelain Enameling Electrical Component Anodizing Power Generation Manufacturing Coating (i.e. phosphating) Print Shop Fertilizer Manufacturing Chemical Etching / Milling Research and Development Film / X-ray Processing Printed Circuit Board Rubber Manufacturing Food Processing Manufacturing Semiconductor Manufacturing Glass Manufacturing Metal Powders Forming Soap/ Detergent Manufacturing Industrial Laundry Waste Treatment/ Storage SIC Code(s) (if known): ______________________ _ iption of business activities (Production/ Manufacturing Operations): _____ _ Description of operations generating wastewater ( discharged to sewer, hauled or evaporated): Estimated volume of industrial wastewater to be discharged (gal/ day): _______ _ List hazardous wastes generated (type/ volume): ______________ _ Date operation began/or will begin at this location: _______________ _ Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes No If yes, when: ____________________ _ Site Contact. ______________ Title ____________ _ Signature ______________ Phone No .. ___________ _ ENCINA WASTEWATER AUTHORITY, 6200 Avenida Encinas Carlsbad, CA 92011 (760) 438-3941 FAX: (760) 476-9852 ~? Jy CJ/ 0i!;-r,7/414-,~ -/4 iw_ 0/Jr}k---{(!£~ /» lf;:/t_ w/ t~fl ~ 7 / 31/ l S-~ ~ . (/ / ~/4/15' ~/2J/~- <f/J1 /JS V\~ -¾D f\s~'b'_";=,~ Rp~Lico.nt &Jorn~ c0ucl\'--l to f{,n_e__ ~~\ I "ID ~L \) ~+"-I JI @__ PC, lJ11du}~~~J /vL(L/JS 1· 'l(h--ff ,;J -pa,i,'tv'f vi· lOE.. (}~s 1! rl1 J / fri/;J 1161r, I I Final_' Inspection required by: OPlan OCM&I SW DISSUED Approved BUILDING PIANNING ENGINEERING FIRE Expec;lite7 N DIGITAL FILES Required7 y N HazMat I APCD --Health Forms/Fees Sent Encina Fire HazHealthAPCD PE&M School --- Sewer ---Stormwater Building i-11)-\~ Planning £}/4/15" Engineering Fire 7/?:,D(i5 Need? /,} ,.-,----::::;F A-.,/.,. -_7'""-- --------- O Fire D I ocv. Date By q.3. .s-0 ~ -\'?) -\.'6 F 7/-:31 ,5 Cb- C\-\-\5 IZ._, 2/J.i/12 ~--~I-a,4- Rec'd Due? By y N y N . y N y N DDone ODone --- DDone --- ODone City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 11-04-2015 Plan Check Revision Permit No:PCR15083 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: 2508 GATEWAY RD CBAD PCR Parcel No: 2132612300 $0.00 Lot#: 0 Valuation: Construction Type: 3B Reference #: PC#: Project Title: Applicant: CB152364 VIASAT-BLDG #11-REVISIONS PER ATTACHED TRANSMITTAL SMITH CONSUL TING ARCHITECTS STE 125 13280 EVENING CREEK DRIVE SOUTH SAN DIEGO CA 92128 858 793-4777 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees Owner: Total Fees: $1,160.00 Total Payments To Date: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: $1,160.00 $0.00 $0.00 $1,160.00 Balance Due: ISSUED 09/21/2015 RMA 10/21/2015 10/21/2015 Inspector: FINAL APPROVAL Date: ------Clearance: _____ _ $0.00 NOTICE: Please take NOTICE that approval of yOUr project includes the "lrrposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this pemit was issued to protest irrposition of these fees/exactions. If you protest ttiem, yOU rrust follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required inforrratlon wth the City l'v'anagerfor prooessing in acrordanoe wth Carlsbad Municipal Code Section 3.32.030. Failure to tirrely follow that procedure wll bar any subsequent legal action to attack, review, set aside, void, or annul their irrposition. You are hereby FURTI-IER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and S€11\er connection fees and capacity changes, nor planning, zoning, grading or other sinilar application processing or servioe fees in connection Vvith this project. NOR DOES IT APPLY to any fees/exactions of Midi vou have nreviouslv been aiven a NOTICE sinilar to this or as ta Midi the statute of llnitations has nreviouslv other\Mse <>Yl"lired. · CCityof Carlsbad PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No. p c1 [ 5 0 f J Project Address 2508 Gateway Road Original Plan Check No. CB 15-2364 Date 9/21 /15 Contact Milos Makaric Ph 858. 793.4 777 Fax 858. 793.4 787 Email milosm@sca-sd.com Contact Address 13280 Evening Creek Orv South St[ / J:.5· City San Diego Zip 92128 General Scope of Work Minor plan changes, Lighting changes Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: 0 Plans 0 Calculations D Soils D Energy D Other 2. 3. Describe revisions in detail List page(s) where each revision is shown See attached 5. 6. 7. 8. Does this revision, in any way, alter the exterior of the project? 0 Yes Does this revision add ANY new floor area(sJ? D Yes Does this revision affect any fire related issues? D Yes Is this a complete set? 0 Yes 0 No 0 No 0 No 4. List revised sheets that replace existing sheets 0No ..@'.$'Signature __________________________ _ 1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov DATE: OCT. 06, 20l5 JURISDICTION: CARLSBAD EsGil Corporation In (}!artnersliip witli qovemment for (Bui{aing Safety PLAN CHECK NO.: 15-2364 (REV. #1) -NEW PCR #15-083 PROJECT ADDRESS: 2508 GATEWAY ROAD PROJECT NAME: VIA SAT BUILDING #11 (T.I. PACKAGE) l:::JftPLICANT ~ JURIS. CJ PLAN REVIEWER D FILE SET: I cg] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's cages when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: MILOS MAKARIC cg] EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: MILOS Telephone#: 858-793-4777 Date contacted: (by: ) Email: milosm@sca-sd.com Mail Telephone Fax In Person cg] REMARKS: Miscellaneous plan revisions are under this permit. Selected sheets are revised and resubmitted along with updated structural calc's. All disciplines are impacted. By: Ali Sadre, S.E. Enclosures: EsGil Corporation D GA D EJ D MB D PC 9/25 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 CARLSBAD 15-2364 (REV. #1) -NEW PCR #15-083 OCT.06,2015 [DO NOT PAY-THIS JS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD #1) -NEW PCR #15-083 PLAN CHECK NO.: 15-2364 (REV. PREPARED BY: Ali Sadre, S.E. BUILDING ADDRESS: 2508 GATEWAY ROAD BUILDING OCCUPANCY: B/F-1; 11I-B/SPR. BUILDING AREA Valuation PORTION ( Sq. Ft.) Multiplier OFFICE/ 65700 MANUFACT. Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: D Complete Review o Other ---.... H ..... o_u ___ rl ..... v DATE: OCT.06,2015 Reg. VALUE ($) Mod. $1,160.001 o Structural Only D Repetitive Fee ~ Repeats 0· EsGil Fee 81 Hrs.@* =====$=11=6=.0=~ $92a.001 * Based on hourly rate Comments: Sheet 1 of 1 macvalue.doc + ViaSat Building #11 Tenant Improvements Plan Change Submittal Project Address: 2508 Gateway Road Original Plan Check No. CBlS-2364 Delta #2 dated 9/4/2015 No. Description of Change Sheet Number{s) ARCHITECURAL 1 -Revised Sheet index TSl -Revised Parking Calculations -Revised allowable area calculations 2 Revised 1st floor egress plan TS4 3 -Revised Copy Center area Al.1 -Deleted Game Room 4 -Revised location of the Juice Joint #2201 isle countertop Al.2 and demising wall w/ millwork to provide required clearance for the balcony overhead door -Revised wall at the Janitor's closet #2103 from 3-5/8" stud to 611 stud wall to allow for plumbing piping to the mop sink 5 Revised RCP A2.1-A2.3 6 Added details A3.5 7 Added interior elevations A5.1-A5.2 8 -Revised door schedule AG.0-AG.1 -Revised/added details 9 Revised finish plan to reflect floor plan changes AFl.1 STRUCTURAL 1 Added structural sheets and calculations Sl.0-1.1, S2.0-2.2, S3.0 MECHANICAL 1 Changed tag number of fan powered terminal units M0.2 2 Updated location for FC-1-17 and FC-1-18 M0.3 3 Revised chilled beam schedule M0.4 4 Updated note for future connection of chilled water system Ml.1 5 Updated zoning plan due to the deletion of the game center Ml.2 6 Updated zoning of chilled beams Ml.3 7 Changed duct distribution for FC-1-17, FC-1-18 and FC-1-11 M2.1 8 Changed the numbers of some of the chilled beam tags M2.2 9 Updated piping layout due to the relocation of FC-1-16 and M3.1 FC-1-18 10 Changed the numbers of some of the chilled beam tags M3.2 11 Revised note 3 M3.3 12 Revised heating hot water schematic flow diagram M4.1 13 Revised control diagrams as per CxA comments MG.1 to MG.3 PLUMBING 1 Removed heat trace equipment from schedule P0.2 Added WC-1A, and WC-2A to plumbing fixture schedule to reflect trap primer connection Added FS-2 for floor sink in janitor room. 2 Removed grease waste notes and piping (no clouds) Pl.0 3 Revised condensate drain to reflect FCU 18 re-location P2.1 4 Revised plans to show trap primers. P3.1 Removed FD-1 in showers and relocated shower drain 5 Revised waste riser to reflect FD-1 removal in shower P4.1 6 Added detail 16 for trap primer. PS.1 ELECTRICAL 1 -Added building 10 singleline sheet, to show a panel we are El.1 circuiting from to the mechanical yard. -Modified our cable tray to specify B-line 9" cable tray. -Modified our digital meter to specify shark 200 meter by Electro lndustries/Gaugetech. 2 Revised the fixture schedule to specify bug eye emergency El.2 fixture being used on plans. 3 Updated Title 24. El.3-El.6 4 Added a J-box for mechanical controller. El.8 5 -Updated lighting layout to coordinate with Architect. E2.1-E2.3 -Revised circuits per new lighting layout. 6 -Added power for equipment in copy center. E3.1 -Revised office and conference rooms to coordinate AV and TV locations with the owner. 7 -Revised office and conference rooms to coordinate AV and E3.2 TV locations with the owner. 8 -Revised office and conference rooms to coordinate AV and E3.3 TV locations with the owner. -Revised training room to coordinate AV boxes and receptacles. 9 -Revised homeruns to match panel schedules. E4.3 10 -Revised homeruns to match panel schedules. E4.4 -Added a J-box for mechanical controller. 11 -Revised cable tray layouts. ES.1 -Revised TV and telecomm locations in offices and conferences to coordinate with the owner. -Added telecomm connections to the new Office and copy center. 12 -Revised cable tray layouts. ES.2 -Revised TV and telecomm locations in offices and conferences to coordinate with the owner. 13 -Revised cable tray layouts. ES.3 -Revised TV and telecomm locations in offices and conferences to coordinate with the owner. -Revised telecom and AV box locations to coordinate with the owner. 14 -Added digital meters per owner request. 15 -Revised panel schedules to show updated loads. -Revised load summaries. 15 -Added Building 10 singleline to show a panel we are circuiting from. -Added panel schedule and load summaries of modified equipment on the singleline. 16 -Revised circuits in MPOE, and MDF rooms. -Added a j-box for connection to FM-200 system. 17 -Revised and updated the elevator detail. Prepared by: Milos Makaric Project Architect Date: 9-4-2015 E6.1 E6.2-E6.3 E6.4 E7.1 E7.2 Raenette Abbey To: Subject: Attachments: Hello Milos, Milos Makaric Viasat revisions Remote Desktop Redirected Printer Doc The plan check revisions to the original permit at 2508 Gateway Rd have been approved and are ready to issue. Attached is a copy of the permit, showing the balance due. Since complete sets were not submitted, you will need to slip sheet the approved revised pages in to both our City set and the job site owner's set. Raenette 1 SmithConsu tingArchitects TRANSMITTAL To: Building Department Company: City of Carlsbad 1635 Faraday Avenue Carlsbad, CA 92008 ATTACHED: No. Copies Date Description Date: 9/21/2015 Project No: CB15-2364 Change Project: ViaSat Building 11 T.I. Lots 10-13 4 9/21/15 30x42 1st Plan Change Submittal Drawing Sets 2 9/21/15 8 1/2x11 Structural Calculations 1 9/21/15 8 1/2x11 Plan Check Revision Application Forms 2 9/21/15 8 1/2x11 Plan Change Narrative TRANSMITTED VIA: D FAX (Sheet 1 of __ ) Fax No. D Mail D Messenger D Overnight Delivery l8l Other Hand Delivered by MM REMARKS: DISTRIBUTION: SCA File 13280 Evening Creek Drive South Suite 125 San Diego, CA 92128 P:858.793.4777 I F:858.793.4787 ACTION l8l For your approval l8l For your review and comment D As requested D For your use / files D Reviewed as noted D No exceptions taken D Revise / Resubmit With Encl. D D D BY: Milos Makaric 858.793.4777 W/O Encl. D D D 9915 Mira Mesa Blvd. TEL {858) 536-5166 WISEMAN+ROHY STRUCTURAL ENGINEERS STRUCTURAL CALCULATIONS FOR VIASAT BUILDING 11 T.I. -DELTA 2 CONSTRUCTION CHANGE CARLSBAD, CA SEPTEMBER 4, 2015 W + R JOB #14-143.01 Suite 200 WRENGINEERS.COM San Diego, CA 92131 FAX. (858) 536-5163fe,,j5fJ!j Cf"U1 CIJI S J-J~'-1 WISEMAN + ROHY STRUCTURAL ENGINEERS BY ___ DATE __ PROJECT V:r;.A SA r ~i...r:::-.. c. l \ T, I. SHEET NO. __ OF __ _ JOB NO. / tj -/ ~ 3 . O \ 30~~fsf-t-3tsF -s2, .. (oP.sF- WISEMAN+ROHY Structural Engineers SEISMIC BASE SHEAR (ASCE 7-10 11.4) (2012 IBC / 2013 CBC/ ASCE 7-10) PROJECT: ViaSat Bldg 11 LOCATION: Carlsbad, CA JOB NO: 14-143 8/24/2015 08:42:21 2012 IBC SEISMIC EQUATIONS -fsR-A c..e'b.. S ,Ax...R._. Base Shear: Occupancy Category = Importance Factor (IE)= Site Class= TL= Ss= ii 2012 IBC Table 1604.5 (i,ii,iii,or iv) 1.00 ASCE 7-10 Table 1.5-2 D (From Soils Engineer or 'D' if not known) 8 sec ASCE 7-10 Figure 22-12 1.052 g S1 = 0.408 g R= 3.25 Maximum Height = 7.5 Number of Stories = 1 Fa= 1.08 F = V 1.59 SMs:::: 1.135 SM1= 0.650 Sos= 0.757 So1:::: 0.433 Short Period Seismic Design Category = I Sec Period Seismic Design Category= Cu= 1.4 Cr= 0.020 Ta= 0.09 T = a Vu= 0.233 xW Vu= 1.470 xW Vu= xW Vu= xW feet D D Sec Sec (basic) (Used) ASCE 7-10 Table 12.2-1 ASCE 7-010 Table 11.4-1 ASCE 7-10 Table 11.4-2 ASCE 7-10 Eq 11.4-1 ASCE 7-10 Eq 11.4-2 ASCE 7-10 Eq 11.4-3 ASCE 7-10 Eq 11.4-4 ASCE 7-10 Table 11.6-1 ASCE 7-10 Table 11.6-2 X = 0.75 ASCE 7-10 Eq 12.8-7 ASCE 7-10 Eq 12.8-8 (Not Used) (for S1 >= 0.6g only) Vu= 0.233 xW V=Vu/1.4= 0.1663 xW Structural Wall Out-Of-Plane and Anchorage Forces: Out-of-Plane Wall Forces (ASCE 7-1 O Sect 12.11.1) 0 Steel Moment Frame 0 Concrete Moment Frame 0 Eccentrically Braced Steel Frame @ All Other Structural Systems Use Category: D ASCE 7-10 Table 12.8-2 USE Ta= 0.09 sec Eq 12.8-2 Eq 12.8-3 & 5 Eq 12.8-4 & 5 Eq 12.8-6 Fpu= 0.303 xWµ(LRFD) Fµ::::Fpu/1.4= 0.216 xWµ(ASD) Anchorage Force for Walls at Flexible & Rigid Diaphragms (ASCE 7-10 Eq 12.11-1) Total Flexible Diaphragm Spans: Level: Height: Rigid 50 ft 75 ft > 100 ft Roof 44 ft 0.303 0.454 0.530 0.606 xW0 (LRFD) 5th Floor xW0 (LRFD) 4th Floor xW0 (LRFD) 3rd Floor 29ft 0.234 xW0 (LRFD) 2nd Floor 15 ft 0.167 xW0 (LRFD) , . • Z X Envelope Only Solution Wiseman + Rohy Structur ... OM 14-143.01 I ~ I I ! I SK-1 I I ViaSat Building 11 -Lobby Stair / Aug 24, 2015 at 8:35 AM j ViaSat Lobby Stair_Hany.r3d '"' rl yff-laoRr:_~ A Ll [J ti~ u~M TECHNOLOGIES Global Company Designer Job Number Model Name : Wiseman+ Rohy Structural Engineers : DM : 14-143.01 : ViaSat Building 11 -Lobby Stair Disolav Sections for Member Cales 5 Max Internal Sections for Member Cales 197 Include Shear Deformation? I Yes Include Waroino? !Yes Trans Load Btwn lntersectina Wood Wall? Yes :increase Nailin!i!Caoacitv for Wind? Yes Area Load Mesh (inA2) 144 , Merae. Tolerance (jn) .12 P-Delta Analvsis Tolerance 0.50% 'Include P-Delta for w:alls? Yes Automaticlv Iterate Stiffness for Walls? Yes Maximum Jteration Number .for Waif Stiffne~ Gravitv Acceleration (ft/secA2) 32.2 iWall Mesh Size (in) l 12 : Eiqensolution Converoence Toi. (1. E-) 4 Vertical Axis y !Global Member Orientation Plane xz ;Static Solver ! Soarse Accelerated : Dvnamic Solver Accelerated Solver Hot Rolled Steel Code AISC 14th(360-10): LRFD Adiust Stiffness? Yes{IIerative} RISAConnection Code AJSC 14th(360-10): ASD Cold Formed Steel. Code AIS! S100-10: ASD I Wood Code ! AF&PA NOS 12 ASD - :Wood. Temoer,ature '<100F !Concrete Code AC! 318-11 1 Masonrv Code ACI 530-11: ASD !Aluminum Code AA ADM1-10: ASD -Buildino 4 4 Exact Int ration oncre e ress QC 'Rt ec anau ar • Ure Cracked S.ectfotis2· Yes Use Cracked Sections Slab? Yes 1 Bad Framina Wamincts? iNo )Unused Force Warninos? Yes : Min 1; Bar Diam. Soacina? !No Concrete Rebar Set REBAR SET ASTMA615 Mrn % Steef for Column 1 Max% Steel for Column 8 I I ! I I I ! I I 1 RISA-3O Version 12.0.0 [\. .. \ ... \. .. \ ... \ ... \ ... \Calcs\Stairs\ViaSat Lobby Stair_Hany.r3dJ Aug 24, 2015 Checked By: __ Page 1 ' ' Uoo~ost'\ Company Designer Job Number Model Name TECHNOLOGIES Global Continued 1s .. Cd I eIsmIc o e 1Seismic Base Elevation (ft) !Add Base W eioht? iCtZ CtX T Z (sec} TX (sec) RZ RX Ct Ex~. Z let Exo. X 'SD1 iSDS iS1 TL (sec) 1Riskcat /Seismic Detailino Code :omz OmX /RhciZ [RhoX Hot Rolled Steel Properties Label E lks0 : 1 . ; A36 Gr 36 I 29000 2 ! A572Gr.50 I 29000 i 3 i A9Cl? I 29000 4 l A500 Gr.42 ! 29000 I I l I I I 5 I ASOO Gr.46 : 29000 I : Wiseman+ Rohy Structural Engineers : OM : 14-143.01 : ViaSat Building 11 -Lobby Stair iASCE 710 - Not Entered !Yes i.02 ! .02 ; Not Entered ; Not Entered l3 3 !.75 .75 1 1 11 5 ; r orU IASCE 7-05 11 G fksil Nu Therm f\1E .. Densitvrk/ft ... Yieldfksil 11154 .3 .65 I .49 I 36 I I 11·1,54 .3 .65 j .49 ' 50 I 11154 3 65 j 49 I 50 11154 .3 .65 I ,49 ! 42 ) 11154 .3 I .65 I .49 l 46 ' Joint Coordinates and Temperatures Label X fftl y fftl Zfftl 1 I N1 ! 0 I 0 ! 0 I ' 2 I N2 t 5 ! 0 0 ; I 3 : N3 0 7.25 : -11.5 I A. I N4 5 i 7.25 ,-115 I I 5 I N6 5 7.25 -21.83 I I 6 i N7 : 0 f 7.25 -16.5 I I ) 7 i NB l 5 7.25 -16.5 I r 8 ' -NS -6.5 7.25 ' ,. -21.83 I I 9 I N10 -6.5 7.25 I -16.5 I 10 l NH l -1.5 7.25 l -16.5 ' I ! 11 I N12 I -6 5 14 5 I -5 ?5 I I 12 : N13 : -1.5 I 14.5 ·i -525 i 13 I N14 5 0 : -16 5 i 14 1 N15 -6.5 l 0 I -16.5 I I I ; ; i I RISA-30 Version 12.0.0 [\ ... \ ... \ ... \ ... \ ... \ ... \Calcs\Stairs\ViaSat Lobby Stair_Hany.r3d] Rv 1.5 1.1 1.1 1.4 1.4 TemnfFl 0 0 0 0 0 0 0 ,. 0 0 0 0 0 0 0 Aug 24, 2015 Checked By: __ Fulksil Rt 58 1 2 65 f;i I I 65 1.1, 58 1.3- 58 1.3 I Detach From Diao ... I ' I I ' I ! i j I l I I ' I I I , Page2 ,, Ooo~nsA TECHNOLOGIES Company Designer Job Number Model Name Joint Boundary Conditions : Wiseman + Rohy Structural Engineers : OM : 14-143.01 : ViaSat Building 11 -Lobby Stair X Rot. k-ft/ra Reaction Member Primary Data • 2 I 3 4 5 6 I 7 8 9 N6 10 I N14 11 N10 12 N4 13 N15 Brace_2 Member Advanced Data Label TIC On! M 2 M2 I 3 M3 4 M4 BeriP N 5 MS BenPIN 6 7 8 I 9 1-0 11 12 : 13 Hot Rolled Steel Design Parameters 1 2 3 Ph sical TOM Yes Yes es Yes Yes es Yes y Yes s Yes Ye Yes Aug 24, 2015 Checked By: __ Z Rot. k-ft'rad Fcotin f Reaction Inactive Seismic Desi n ... None None No~ None None o e None e None 0 None 0 None Kzz Cb Function Lateral I lateral 1 Lateral RISA-3D Version 12.0.0 [\ ... \ ... \ ... \ ... \ ... \ ... \Calcs\Stairs\ViaSat Lobby Stair_Hany.r3d] Page 3 TECHNOLOGIES Company Designer Job Number Model Name : Wiseman + Rohy Structural Engineers : OM : 14-143.01 : ViaSat Building 11 -Lobby stair Hot Rolled Steel Design Parameters (Continued) Label Shaoe Lenathfftl Lbwfffl Lb;g[fll Lco!TI.Q to!l{f!;] LcomQ bot[fll l-torau. Kw 4 M4 Stnnaers 5 I l I 5 MS Strinqers I 533 I 6 i M6 Strinaer:s 13.384 7 M7 Strinaers 13.384 ! a: l\i'IR Beam 11 5 I l 9 M9 Strinaers 11.5 I I I I l 10 M10 Column 2 7?Fi r ! I 11 M11 Column 2 7.25 I I I U2/ M12 8P.;::im .5 f ! 13 M13 Brace 2 13.595 i Member Area Loads (BLC 1 : Dead) Join Joint Joi C Jo·nt D 1 N4 N2 N1 N3 2 N3 N7 N8 N4 I 3 10 N9 6 N8 .4 N10 N11 N13 N12 Member Area Loads (BLC 2: Live} Joint B Joint D Direction Distribution N2 N3 y B-C N4 N1 y A-B N N8 y -B N7 N4 y A-B N 1 2 y A-B Member Area Loads (BLC 3: EQ X} Join A oi t C o· ection Dist ibutio 1 N6 N10 X A-8 2 N7 N4 X B-C I 3 1 X 8-C 4 N11 N12 X B-C Member Area Loads (BLC 4: EQ Z) Joint A Joint B Joint C Joint D Direction Distribution I 1 I N6 NB l N10 I N9 z I A-B 2 ! N7 NB . ! N4 I N3 z -s.,c l I 3 I N4 N2 i N1 I N3 z B-C i 4 N1'1 N13 I N12 i N10 z B-C Basic Load Cases BLC Desc i ion C te or Joi t Point Distribu eel 1 Dead DL 2 Live LL 3 E EL -1 4 I EQ Z ELZ -1 5 !BLC 1 Transient..j Noe 8 RJSA-3O Version 12.0.0 [\ ... \ ... \ ... \ ... \ ... \ ... \Calcs\Stairs\ViaSat Lobby Stair_Hany.r3d] I Aug 24, 2015 Checked By: __ Kzz Cb Functior I ! Lateral I i lateral i ! Lateral i I Lateral' \ i Lateral ' I Lateral I I 1 Lateral I I I Lateral I ! Lateral I I 1 Lateral · -33.6 -33.6 ·a . de OS -33.6 -33.6 -33.6 -33.6 Maani1udefosfl -33.6 -33.6 -33.6 -33.6 Page4 n Company uD~RBSA ~::~~:ber : Wiseman+ Rohy Structural Engineers : DM Aug 24, 2015 Checked By. __ : 14-143.01 T E C H N O L O G I E S Model Name : ViaSat Building 11 -Lobby stair Basic Load Cases (Continued} X GravLY Gravi. Point Di Surface Plate/Wal 6 7 8 ;BLC 4 Transient.. Load Combinations D . f escno1on ove ea ac or a ... a ... ·-a ... a ... ... a ... a ... ... S I PD It SRSS BLC F t BLC F BLC F B F B F B F B F B F a ... 1 IRC 16-1 I Yes y I 1 I 1.4 l I I I ' ' I i 2 I IBC 16-2 (a), Yes y ' 1 12 l 2 1.6'LLS 1.6 ' l ' ; i I : i 3 I IBC 16-5 (a) Yes y 1 I 12 I 3 :.606 2 5 L... 1 i 4 i Yes y ; I 1 I 1.2 I 3 :-.fL 2 I .5 L..1 1 i i l I I 5 IBC 16-~ (b) 1 Yes y l I 1 I 12 4 i.6061 2 .5 L... 1 j I I I I I I 6 Yes y i l 1 ! 12 I 4 '-.6 .• 2 .5 tL.. 1 . I . 7 IRC 16-7 /a) Yes y 1 I 9 3 .606) I 8 Yes! y i 1 .9 ' 3. :-.6..1 I I l ! I i i f ' I 9 I IBC 16-7 fb) Yes y I 1 I .9 i 4 .606 i I I I I I ; 10 : Yes y l 1 ! .9 ' 4 '-.6 •• I i 11 I Dead Load y 1 i 1 I I : ' I 12 I Uveload l y 2 ! 1 I I I ; 13 i Dead + Live Load y 1 l 1 I i I I 14 , El X <NP11) 1 I y 3 I -MRI I I l I I 1s I ELX(Pos) ! I i I ' l i y ! 3 .606 I I 1 16 I ELZ<Nen\ : I y ! 4 I -.606 l ! i I I j I l I 17 I ELZ (Pas) i y i I 4 l .606 l I I i j I i I Envelope A/SC 14th(360-10): LRFD Steel Code Checks Member Shage Code Check Locfft1 LC Shea ... LocL.DirLC nhi*Pn ... nhi*Pnt.. nhi*Mn ... ohi*Mn .. Cb Eon I 1 I M:1 ~SS12x3x4J ,312 IZ,64ZI 2 .048 I 0 ivl2 93908 ... )274482 21464 ... ; 79005i1 .. '.H1-1b 2 l M2 lHSS'l2x3x4l .335 14.95 3 [ .052 14.951vf2 13725 ___ 214482 121464 ••. 79005/1,.;H1-1b 3 M3 JHSS12x3x4} .433 19.063! 2 l .056 I 0 vi? 93908 ... )274482 21464 ... 790Q5!1..lH1-1 bl 4 I M4 1HSS'12x3x4 . . 340 l 0 2 l .0451 5 v!4 20416 •.• 274482 21464 ... 79005:1.J.H-1-1b l--Ji_J_.M5 ,HSS12x3x4J .222 5.33 ? .026 jS.33 vl2 20080 ... 274482 21464 ... l 79005 1)H1-1 b 6 I M6 HSS12x3x4i .188 l 0 2 .0311 0 v!2 96540 ... 274482 •21464 .•. 179005 ;z .. K1-1b i i 7 I M7 }ISS12x3x4/ .128 16.413 2 1.023 I 0 vJ2 96540 ... 27 4482 )21464 ... 790051 .. /H1-1b ' 8 i MR lHSS8x6x6· .587 :6-469. 6 1 141., 0 vl2 29591 371358 683. 1'0 83145.1 .. H-Hb 9 I M9 'HSS12x3x4] .117 5.75 2 i .02s !11.5 v 12 12123 ... 27 4482 !21464 ... 79005!1.. H1-1b I ; 10 I M1.0 J HSS4X4X4 l .090 0 2 ! .001 i o 7:n n 196 .•• 139518 1s-1aQ.~ 1R180.;i 1 H1-1b 11 I M11 HSS4x4x41 .073 7.25 2 I .00117.25iv14 11196 ... 1139518 16180.5 16180.5 1 iH1-1b . 12 l M12 HSS8x6x6' 020 25 2 .0·1a 0 lv/6 35575 __ 371358 sa31;ola31.1;:; 1.JH1-1b1 13 i M13 L5x5x5 I .222 6.372! 3 .002 :13.5 .. Lv i 4 125541...! 127098 7495.9 .. !11058 ... :1 .. ; H2-1 Envelope Joint Displacements Joi t 1n C Y ,n LC in LC Rotatio Rotation . . LC 1 N1 0 8 ! 0 I 10 .979 I 2 , 0 7.023e-3 3 2 0 t7 0 2 -.138 jg 0 ! 1 .,.5.488e-3 i 8 I 3 0 Is 0 10 118 6 0 3.224e-2 8 0 3 [ 0 7 0 12 -.632 9 0 1 -3.475e-2 3 0 8 ' 4 5 ax 488 la -.019 I g i .391 6 5.49e-3 2 I 6.552e-3 8 .53e-3 3 RISA-30 Version 12.0.0 [\ ... \ ... \ ... \ ... \ ... \ ... \Calcs\Stairs\ViaSat Lobby Stair_Hany.r3d] Pages : Wiseman+ Rohy Structural Engineers : OM : 14-143.01 Aug 24, 2015 Checked By: __ TECHNOLOGIES Company Designer Job Number Model Name : ViaSat Building 11 -Lobby Stair I Envelope Joint Disp/acemen-ts {Continued) Joint 6 l I 7 N4 8 9 N6 ; 10 t ! 11 I N7 : 1? i 13 N8 14 i 15 ; N9 16 ' 17 ! N10 · 1a I : 19 N11 : 20 l i 21 : 22 23 N13 I 24 25 N14 26 l 27 N15 ! ?8 ! lmin I max min 1 maxi min maxi min maxi 1 mint max I min max min max ·mini Ima)( 1min I max • • I ,mrn1 maxi !mini xr,nl -.514 .488 -.514 .1 .02 -.011 .019 ,. 01 .1 -.057 .02 -.011 02 -.011 0 0 0 ti 0 0 0 0 LC 3 8 3 4 1 4 7 4 7 4 7 4 7 4 7 8 7 8 7 8 I 7 4 I 31 Y fin1 -.952 -026 -.373 .124 -033 .064 -455 0 -.0?? -.04 -.219 -.002 -.018 069 -.45 0 0 0 0 0 0 0 0 lC 2! 9 2 2 1 9 2 7 2 10 2 I 9 12 lg 1 2 I 9 2 10 15 7 l? 8 f2_ 7 finl -.15 1.094 -.648 1.093 -hd-8 .39 -.149 1.093 .012 .001 .012 .001 .29 -.053 0 0 0 0 0 0 0 0 LC x Rotation r Lr. Y Rotation r .. LC 7 Rotation r .. LC 9 -7.775e-5 10 -7.126e-3 3 .-1.357e-3 8 6 5.569e-3 2 9.849e-3 8 1.533e-2 3 9 4.018e-4 10 -1.043e-2 3 -1.411.e-2 8 6 o I 1 ; o 1 1.533e-2 1 3 9 o I 1 I o 1 -1 .411 e-2 t 8 6 1.856e-3 I 2 I 6.326e-3 9 1.864e-3 ! 2 9 -2.394e-4; 9 -9.587e-3 6 ~5.437e-4 9 6 4.217e-3 i 2 : 3.564e-3 8 1.533e-2' 3 9 4:044e-6 9 -4.14.<1:e-3 3 !-1.411e-2 8 · 2 0 I 1 0 1 1 7. 737 e-3 7 i to o 1 o 1 -8.469e~3 4 2 -1.798e-4 10 7.613e-4 7 7.737e-3 7 1 ro -1.213e-3 2 -1.299e-3 4 -'8.469e-3 4 2 1 148e-3 2 4 042e-3 ' 9 1.838e-4 I 9 9 -3124e-4 9 -7.155e-3 6 -2.321e-3 · 2 I 5 O 1 i O 7 R 227 e-3 i 7 : ! 6 0 1 1 0 4 -,9.306e-,3 4 i 6 0 1 0 9 2.789e-3 i 9 : 5 o I 1 o 1 2 l-6.226e-3 6 I 5 o ! 1 I 3.564e-3 8 o I 1 ;? 0 1 -4144.e~:3 0 l 1 · 10 4.299e-3 4 7.613e-4 7 ! 0 I 1 I t 5 -? 812e-3 7 -1 ?99P--3 i 4 ! O 1 Envelope Joint Reactions Joint Xflbl LC Y nbl LC Zflbl LC MX flb-ftl LC MY flb-ftl LC MZ flb-ftl LC 1 I N1 lmax 5.:..1623 7 8646 2..:1.a. 2 0 I 1 ! 0 I 1 I 0 1 ! 0 1 2 ! i min i -554.633 i3 795.355 I ·-w 0 I 1 ' I 0 1 Q 1 i 0 1 3 I N2 lma)(1 438.829 7 7350.3911 2 0 J 1 I 0 1 1 j 0 1 l 0 8 : 4 l I min -438'.829 8 485.654 10 0 i 1' l 0 1 l 0 i 1 : 0 3 I 5 ! N13 lmax 432.132 i 7 6331.948 5 7624.967 : s I 0 1 ' 0 i 2 : 0 1 I 6 ' 'min ..Lt~.131 8. -4m9_231 10 -7877:526; 6. l 0 1 0 1 9 r· 0 1 7 I N12 max 432.122 7 2428.134 2 1650.032 i 6 i 0 i 1 I 0 I 4 I 0 1 ! 8 i min .A.":!? 1·19 8 ~M225 j 9 1-1M8 305l 5 1 0 1 l 0 1 7 1 0 1 9 I N14 max 25.119 '7 20259.21 2 i 160.476 I 2 I 0 ! 1 I 0 i 1 I 0 1 I 10 i min -74.138 8 Ei41.726 I 7 -12 33· i 5 l 0 1 0 : 1 ' 0 ! 1 11 ! N15 max 4291.885 3 15s12.600 I 2 68.761 Is ; 0 1 0 I 1 I 0 ! 1 I 12 I l min 1-4294.018 4 387.21 a l -68.172 1 1 o I 0· 1 l 0 I 1 i 0 i 1 13 I N6 !maxi 0 1 i 0 I 1 I 0 I 1 I 0 1 0 1 I 0 1 I 14 i I • I 1mm, 0 1 0 / 1 l 0 : t 1 0 1 0 1 ; 0 1 I Iot§ls· maxi 6173.092 i 7 sa4as.4 74 I 2 6173.0921 s I i 15 I I ! ; I I , min 1-0173.0921 4 ! 9167.959-l 9· -6173.092110 I f 16 I ; l RISA-3D Version 12.0.0 [\ ... \ ... \. .. \ ... \ ... \ ... \Calcs\Stairs\ViaSat Lobby Stair_Hany.r3d] Page6 A I I I I I D I I Company : Wiseman + Rohy Structural Engineers August20,2015 Checked By: __ Designer Job Number : ViaSat Lobby Stair Footing Sketch .5 ft I~ X AH :T 4, in ~I . I H i:: _,,,r-1-o-a:c·n ---z ~ D 4 ft Details B ;;ry-- I~ #6 @20.5 in I ! .µ 4-l in B . :c l~X ~ z ~-'l~ D C N C") D C <:I' t I j I i #6 ,-L @16 in Footing Elevation IC 4 ft Bottom Rebar Plan Geometry, Materials and Criteria Length : 4 ft eX : o in Width : 4.25 ft eZ : 16 in Thickness : 15 in pX : 4 in Height :0 in pZ :4 in Footing Top Bar Cover :3.5 in Footing Bottom Bar Cover : 3.5 in Pedestal Longitudinal Bar Cover : 1.5 in Loads DL LL ELX I I I I p (k) 3.75 9.8 2.8 Vx (k) 4.3 +-.+Vx t'~ 1 A D I : : Gross Allow. Bearing Concrete Weight Concrete fc :3325 psf : 150 pcf :3 ksi Design Code :ACI 318-02 Overturning Safety Factor : 1 Coefficient of Friction : 0.3 Passive Resistance of Soil : 0 k Vz (k) Mx (k-ft) I I i I +,;;;;; +Vz 1,,.11 ! ~+Mx c!:'1 1 D C D C Steel fy : 60 ksi Minimum Steel : .0018 Maximum Steel : .0075 Phi for Flexure : 0.9 Phi for Shear : 0. 75 Phi for Bearing : 0.65 Mz (k-ft) ~+Mz tP I A D Overburden (psf) 150 : RISAFoot Version 2.0 [\\WRESERVER\Engineering\Projects\ 14\ 14-143 Via Sat Bldg #11 \Calcs\Stairs\Col@ai~Jfooting.rf Company : Wiseman + Rohy Structural Engineers Designer Job Number : ViaSat Lobby Stair Footing Soil Bearing · Description ASCE 2.4.1-1 ASCE 2.4.1-2 ASCE 2.4.1-3b ASCE 2.4.1-3b ASCE 2.4.1-3c ASCE 2.4.1-3d ASCE 2.4.1-3d ASCE 2.4.1-5 ASCE 2.4.1-5 A[]·'·.·,, . B w; , D . . C 1DL QA: 996.324 psf QB: 117 .892 psf QC: 117 .892 psf QD: 996.324 psf NAZ: 54.442 in NAX:-1 in A[]:._ B .. j . I D .· .. ·. . C 1DL+.75LL+.75WL QA: 2352. 79 psf QB: 0 psf QC: 0 psf QD: 2352.79 psf NAZ: 40.373 in NAX:-1 in :IJ: .6DL+.7ELZ QA: 597. 794 psf QB: 70. 735 psf QC: 70.735 psf QD: 597.794 psf NAZ: 54.442 in NAX:-1 in Categories and Factors 1DL 1 DL+1LL 1DL+.7ELX 1DL+.7ELZ 1DL+.75LL+.75WL 1DL+.75LL+.7ELX 1 DL+.75LL+.7ELZ .6DL+.7ELX .6DL+.7ELZ :[]: 1DL+1LL QA: 2842.01 psf QB: 0 psf QC: 0 psf QD: 2842.01 psf NAZ: 38.291 in NAX:-1 in :[]: 1DL+.75LL+.7ELX QA: 3154.31 psf QB: 0 psf QC: O psf QD: 2368.09 psf NAZ: 43.583 in NAX:204.611 in Gross Allow.(psf) Max Bearing (psf) 3325 3325 3325 3325 3325 3325 3325 3325 3325 B o ___ -'--'c 1DL+.7ELX QA: 1686.53 psf QB: 303.106 psf QC: 0 psf QD: 1024.92 psf NAZ: 58.517 in NAX:130.005 in :u: 1DL+.75LL+.7ELZ QA: 2352. 79 psf QB: 0 psf QC: 0 psf QD: 2352.79 psf NAZ: 40.373 in NAX:-1 in 996.324 A 2842.01 A 1686.53 A 996.324 A 2352.79 A 3154.31 A) 2352.79 A 1335.84 A 597.794 A 1DL+.7ELZ QA: 996.324 psf QB: 117.892 psf QC: 117.892 psf QD: 996.324 psf NAZ: 54.442 in NAX:-1 in Ao· .. B ../-'' ' ·a · · 1 . . . . I D, . ic .6DL+.7ELX QA: 1335.84 psf QB: 235.619 psf QC: 0 psf QD: 615.628 psf NAZ: 58.28 in NAX:94.594 in I August 20, 2015 Checked By: __ Max/ Allowable Ratio .3 .855 I .507 .3 .708 .949 .708 .402 .18 RISAFoot Version 2.0 [\\WRESERVER\Engineering\Projects\ 14\11-143 ViaSat Bldg #11 \Calcs\Stairs\Co1Era~J2ooting.rft Company : Wiseman + Rohy Structural Engineers Designer Job Number : ViaSat Lobby Stair Footing Footing Flexure Design (Bottom Bars) August 20, 2015 Checked By: __ Description Categories and Factors Mu-XX (k-ft) Z Dir As (in2 ) Mu-ZZ (k-ft) X Dir As (in2 ) Note: Overburden and footing self weight are included in the DL load case. Footing Shear Check Two Way (Punching) Ve: 112.728 k One Way (X Dir. Cut) Ve 62.153 k One Way (Z Dir. Cut) Ve: 58.497 k Punching X Dir. Cut Z Dir. Cut Description Categories and Factors Vu(k) Vu/jZ5\/c Vu(k) Vu/0Vc Vu(k) Vu/ x5Vc Note: Overburden and footing self weight are included in the DL load case. Overturning Check (Service) Description Categories and Factors Mo-XX (k-ft) Ms-XX (k-ft) Mo-ZZ (k-ft) Ms-ZZ (k-ft) OSF-XX OSF-ZZ : ASCE 2.4.1-1 1DL I .056 ; ASCE 2.4.1-2 1DL+1LL I .056 ASCE 2.4.1-3b 1DL+.7ELX .056 ASCE 2.4.1-3b 1DL+.7ELZ .056 ASCE 2.4.1-3c 1DL+.75LL+.75WL .056 ASCE 2.4.1-3d 1DL+.75LL+.7ELX I .056 ASCE 2.4.1-3d 1DL+.75LL+.7ELZ i .056 ASCE 2.4.1-5 I .6DL+.7ELX .033 I ASCE 2.4.1-5 I .6DL+.7ELZ .033 i Mo-XX: Governing Overturning Moment about AD or BC Ms-XX: Governing Stablizing Moment about AD or BC OSF-XX: Ratio of Ms-XX to Mo-XX Sliding Check (Service) Description Categories and Factors Va-XX (k) ASCE 2.4.1-1 1DL I 0 ! ASCE 2.4.1-2 1DL+1LL I 0 I ASCE 2.4.1-3b 1DL+.7ELX 3.01 ASCE 2.4.1-3b 1DL+.7ELZ 0 I ASCE 2.4.1-3c i 1 DL+.75LL+.75WL 0 ASCE 2.4.1-3d i 1DL+.75LL+.7ELX 3.01 I ASCE 2.4.1-3d 1 DL+.75LL+.7ELZ 0 ASCE 2.4.1-5 I .6DL+.7ELX 3.01 ! : ASCE 2.4.1-5 I .6DL+.7ELZ 0 I Va-XX: Applied Lateral Force to Cause Sliding Along XX Axis Vr-XX: Resisting Lateral Force Against Sliding Along XX Axis SR-XX: Ratio of Vr-XX to Va-XX 23.975 56.642 i 30.508 ; i 23.975 I 48.475 I 55.008 48.475 20.918 14.385 Vr-XX (k) 2.841 5.781 3.429 2.841 5.046 5.634 5.046 2.293 1.705 .035 20.161 ;431.55 569.25 .035 40.986 i NA NA 3.798 24.326 549.15 6.405 I .035 20.161 431.55 569.25 .035 35.78 872.55 NA 3.798 39.945 990.15 10.518 .035 35.78 872.55 NA 3.784 16.262 627.55 4.298 .021 12.097 431.55 569.25 Va-ZZ (k) Vr-ZZ (k) SR-XX SR-ZZ 0 I 2.841 NA NA 0 I 5.781 NA NA 0 l 3.429 1.139 NA 0 I 2.841 NA NA 0 5.046 NA I NA I 0 5.634 1.872 l NA 0 i 5.046 I NA NA 0 I 2.293 I .762 i NA I 0 i 1.705 I NA i NA I ! ' RISAFoot Version 2.0 [\\WRESERVER\Engineering\Projects\14\14-143 ViaSat Bldg #11\Calcs\Stairs\Col~_13ooting.rf WISEMAN+ROHY Structural Engineers SEISMIC BASE SHEAR {ASCE 7-10 11.4) (2012 IBC / 2013 CBC/ ASCE 7-10) PROJECT: ViaSat Bldg 11 LOCATION: Carlsbad, CA JOB NO: 14-143 8/24/2015 08:48:42 2012 IBC SEISMIC EQUATIONS .:.. SIA/2..& P.:::,oA/U.:;). 5TAb.:t:.--,._ 5 e-A--rz-,.:) ~ Base Shear: Occupancy Category = Importance Factor (IE)= Site Class= TL= Ss= S1= R= Maximum Height = Number of Stories = Fa= Fv= SMs= S~11= Sos= So1= ii 2012 !BC Table 1604.5 (i,ii,iii,or iv) 1.00 ASCE 7-10 Table 1.5-2 D (From Soils Engineer or 'D' if not known} 8 sec ASCE 7-1 O Figure 22-12 1.052 g 0.408 g 6.5 9 feet 1 1.08 1.59 1.135 0.650 0.757 0.433 ASCE 7-10 Table 12.2-1 ASCE 7-010 Table 11.4-1 ASCE 7-10 Table 11.4-2 ASCE 7-10 Eq 11.4-1 ASCE 7-10 Eq 11.4-2 ASCE 7-10 Eq 11.4-3 ASCE 7-10 Eq 11.4-4 Short Period Seismic Design Category = D ASCE 7-10 Table 11.6-1 ASCE 7-10 Table 11.6-2 I Sec Period Seismic Design Category= D Cu= CT= T = a T = a Vu= 0.116 Vu= 0.641 Vu= Vu= 1.4 0.020 0.10 xW xW xW Sec Sec (basic) (Used) (Not Used) X = 0.75 ASCE 7-10 Eq 12.8-7 ASCE 7-10 Eq 12.8-8 xW (for S1 >= 0.6g only) Vu= 0.116 xW V=Vu/1.4= 0.0832 xW Structural Wall Out-Of-Plane and Anchorage Forces: Out-of-Plane Wall Forces (ASCE 7-10 Sect 12.11.1) 0 Steel Moment Frame 0 Concrete Moment Frame 0 Eccentrically Braced Steel Frame @ All Other Structuraf Systems Use Category: D ASCE 7-10 Table 12.8-2 USE Ta= 0.10 sec Eq 12.8-2 Eq 12.8-3 & 5 Eq 12.8-4 & 5 Eq 12.8-6 Fµu= 0.303 xWp(LRFD) Fµ=Fpu/1.4= 0.216 xWµ(ASD) Anchorage Force for Walls at Flexible & Rigid Diaphragms (ASCE 7-10 Eq 12.11-1) Total Flexible Diaphragm Spans: Level: Height: Rigid 50ft 75ft > 100 ft Roof 44ft 0.303 0.454 0.530 0.606 xW0 (LRFD) 5th Floor xWP {LRFD) 4th Floor xWP {LRFD) 3rd Floor 29ft 0.234 xWP {LRFD) 2nd Floor 15 ft 0.167 xW0 (LRFD) WISEMAN + ROHY STRUCTURAL ENGINEERS BY___ DATE__ PROJECT \/..:r A 5A 1 5t.-~ (,, I\ .D e'-At::. Lo A~ S : '1" CaA.)C.. S i...Ab ::.. S-0 PsF C €. 0 f-D AM.._ ""-[ q f 5 F f X 'J;-$I. F 1-0~12--=-S-7 f'S F- loTA-'--=-1-z-& fSF SHEET NO. __ OF __ _ JOB NO. f '1-I 113, of 0 D~1 L 2 S-PS F Fo IL ~'O t-::S::h GP Ne. .5 1£f>S,) · L:z.vt..-~AD. ::::. lOO PsF- V::. O, D8 ~ "2.-\A} 1 V:.. 0. OCbl'"L (. S-0 (>SF-) ( li) SQ1 f-r.) (ll') V. ::. _3--O 60 ~ /,..., -=-2--S-tjo #-F' ~;t_ WA-L. L t . '-1 .--------------IA$ G t--::>At.. L ryP£ @ \/4.1..1..ow~ L{~L{ r'LF- . L::... C/-9/;t h.Je:.-:c.. Cso ts F i-s-t--,;Y.. l ( 1' ) ::: s-es; f Lr J..--..?1--a.. CJ QO f~ r=-) f...1'') ::. Joo ~ L 7' fo/\v--.-::. I. 2G. 12.--F-< V\ SE # 11 er~--~ f:..:A, 0 ft. i ,,, RAM I RAM Steel 14.07 .00.05 DataBase: ViaSat Bldg 12 -05 with mechancial loads Building Code: IBC Floor Type: 2nd Floor D " Floor Map 08/05/15 14:12:12 Steel Code: AISC 360-10 LRFD .. rl1 RAM RAM Steel 14.07.00.05 DataBase: ViaSat Bldg 12 -05 with mechancial loads Building Code: IBC Surface Loads Label DL psf Typ Floor 57.0 Balcony 115.0 Stadium Seating 126.0 Stadium Steps 151.0 Floor Map CDL LL Reduction psf psf Type 47.8 100.0 Reducible 47.8 100.0 Reducible 47.8 100.0 Unreducible 47.8 100.0 Unreducible Page 2/2 08/05/15 14:12:12 Steel Code: AISC 360-10 LRFD PLL CLL MassDL psf psf psf 0.0 10.0 65.0 0.0 10.0 117.0 0.0 10.0 126.0 0.0 10.0 151.0 .. I • EVALUATION REPORT Report Number: 0126 Issued: 1/2010 Expires: 2/2012 Revised: 02/08/2011 TABLE 1 -NOMINAL AND ALLOWABLE SHEAR RESISTANCE TO WIND OR SEISMIC FORCES AND DISPLACEMENT {inches) FOR SHEAR WALLS WITH SURE-BOARD® SERIES 200 STRUCTURAL PANELS ATTACHED TO LIGHT GAGE STEEL C-STUDS AT 24" o.c. WITH SCREWS (pounds per foot) 1 STEEL FRAMING FASTENER SPACING AT PANEL EDGES INCHES ON CENTER 6 lTI 4 3 Minimum Vn Vasd J.Vasd Vn Vasd ,.Wasd Vn Vasd .6.Vasd Vn Gage5 2,3,4,7 2,3,8 9 2,3,4,7 2,3,8 9 2,3,4,7 2,3,8 9 2,3,4,7 (pit) (pit) (inch) (pit) (plf) (inch) (plf) (plf) (inch) (plf) 1,085 [§1 0.21 1,545 618 0.21 1,730 692 0.24 1,915 ~(0.033 inch) 1,543 617 0.17 2,211 885 0.22 2,486 977 0.22 2,537 10 10 10 10 18 (0.043 inch) 1,405 562 0.24 1,925 770 0.23 2,821 1,126 0.25 2,989 10 10 10 10 16 (0.054 inch) 1,697 678 0.25 2,306 922 0.25 2,957 1,092 0.26 3,647 10 10 14 {0.071 inch) ·-------------------------------3,292 14 {0.071 inch) 2-Sided *Fasteners 6" 4,635* O.C. into ------------------------------- intermediate framin!'.I For SI: 1 inch = 25.4 mm, 1 lb/hnear = 0.0146 N/mm. 1 These values are for short-term loads due to wind or earthquake. 2The screws are described in Section 2.2.2 and are installed in accordance with Section 2.4 of IAPMO ES ER-0126. 3 Tabulated values listed in tables are for panels applied to one side or two sides of a wall. 2 Vasd 2,3,8 (plf) 766 906 1,196 1,253 1,257 1,700 4 For load and resistance factor design (LRFD) loads, the tabulated Vn load values must be multiplied by the resistance factor <I> = 0.55 for Seismic/ 0.60 for Wind. 5 Section 2.2.3 in lAPMO ES ER-0126, describes minimum base metal thickness associated with gages. 6 All panel edges must be blocked. Panels can be installed vertically or horizontally. Fasteners must be spaced a maximum of 12 inches on center along intermediate framing members, except as noted in Table 1 above, 7 Vn = Nominal Strength. 8 Vasd = ASD Design Load. 9 a Vasd= Deflection at Vasd design Load. 10 Nominal strength is based on double c-stud collector to be designed using one gage thicker than the framing material used in shear wall. Page 5 of 9 L.\Vasd 9 (inch) 0.26 0.16 0.21 0.28 0.24 0.22 ----~ City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 11-05-2015 Plan Check Revision Permit No:PCR15106 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: 2508 GATEWAY RD CBAD PCR Parcel No: 2132612300 $0.00 Lot#: 0 Valuation: Construction Type: 3B Reference #: PC#: Project Title: Applicant: CB152364 VIASAT-BLDG #11-MINOR REVISION TO SECOND FLOOR EGRESS SMITH CONSUL TING ARCHITECTS STE 125 13280 EVENING CREEK DRIVE SOUTH SAN DIEGO CA 92128 858 793-4 777 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees Owner: Total Fees: $435.00 Total Payments To Date: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: $435.00 $0.00 $0.00 $435.00 Balance Due: ISSUED 10/21/2015 JMA 11/05/2015 11/05/2015 Inspector: FINAL APPROVAL Date: ------Clearance: ------ $0.00 NOTICE Please take NOTICE that approval of your project includes the "hrposition" ri fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 00 days from the date this permt was issued to protest irrposition of these fees/exactions. If you protest them, you rrust follow the protest procedures set forth in C:ovemment Code Section 66020(a), and file the protest and any other required inforrration wth the Qty rvlanagerfor processing in a=rdanoe wth Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure 'Alli bar any subsequent legal action to attack, review, set aside, void, or annul their irrposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions OOES NOT APPLY to water and seAer ronnection fees and capacity changes, nor planning, zoning, grading or other sinilar application processing or service fees in ronnection wth this project. NOR OOES IT APPLY to any fees/exactions of v,t,ich vou have oreviouslv been oiven a NOTICE sinilar to this or as to v,t,ich the statute of linitations has oreviouslv other'Mse ,,,m;red. CCityof Carlsbad PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No. Project Address 2508 Gateway Road Contact Milos Makaric Original Plan Check No. CB 15-2364 Date 10/21 /15 Ph 858.793.4777 Fax 858.793.4787 Email milosm@sca-sd.com Contact Address 13280 Evening Creek Orv South City San Diego Zip 92128 General Scope of Work Minor changes to the 2nd floor egress Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: 0 Plans D Calculations O Soils D Energy O Other 2. Describe revisions in detail -Revised 2nd floor egress plan, per discussion with Gregory Ryan (City of Carlsbad Fire Department), to take some of the 2nd floor occupants to the Stair #2202 -Revised door #2203 and 2204 to swing in the direction of the revised path of travel -Revised drop down smoke curtain egress door @ Juice Joint #2201 to swing in the direction of the revised path of travel -Revised door #3202A & 3202B swing side -Revised exit sign locations to match revised path of travel at Hall #2204 -Revised Door schedule to match plan changes 5. Does this revision, in any way, alter the exterior of the project? 6. Does this revision add ANY new floor area(s}? D Yes 7. Does this revision affect any fire related issues? 0 Yes 8. Is this a complete set? 0 Yes 0 No 3. List page(s) where each revision is shown TS4 A1 .2, A1 .3 A2.2 A6.1 0Yes 0 No 0No 4. List revised sheets that replace existinq sheets TS4 A1.2, A1.3 A2.2 A6.1 0No .£$'Signature __________________________ _ J 635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-27 J 9 Fax: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov DATE: OCT. 30, 2015 JURISDICTION: CARLSBAD EsGil Corporation In (Partnersliip witli (}ovemment for (}Jui{aing Safety PLAN CHECK NO.: 15-2364 (REV. #2) -NEW PCR #15-106 PROJECT ADDRESS: 2508 GATEWAY ROAD PROJECT NAME: VIA SAT BUILDING #11 (T.I. PACKAGE) D~NT /~~~!~~-(J PLAN REVIEWER CJ FILE SET: I ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: MILOS MAKARIC ~ EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: MILOS Telephone#: 858-793-4777 Date contacted: -(by~ Email: milosm@sca-sd.com Mail Telephone Fax I~ ~~n ~ REMARKS: Miscellaneous architectural plan revisions are under this permit. Selected sheets are revised and resubmitted. By: Ali Sadre, S.E. Enclosures: EsGil Corporation D GA D EJ D MB D PC 10/26 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 CARLSBAD 15-2364 (REV. #2) -NEW PCR #15-106 OCT.30,2015 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD #2) -NEW PCR #15-106 PLAN CHECK NO.: 15-2364 (REV. PREPARED BY: Ali Sadre, S.E. BUILDING ADDRESS: 2508 GATEWAY ROAD BUILDING OCCUPANCY: B/F-1; 111-B/SPR. BUILDING AREA Valuation PORTION ( Sq. Ft.) Multiplier OFFICE/ 65700 MANUFACT. Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check fee by Ordinance Type of Review: D Complete Review o Other DATE: OCT.30,2015 Reg. VALUE ($) Mod. $43s.001 o Structural Only D Repetitive fee ~ Repeats 0 Hourly EsGil Fee 31 Hrs.@* =====$=1=1=6 ·=o:o $348.00j * Based on hourly rate Comments: Sheet 1 of 1 macvalue.doc + ID· Z-f-IS--TO PI irrJ (J.-r1/1 Ft izE ~/~§CC /f. 3 -( s- t{ ( ~/cS krx-J/ ~ ~c2 I-re - fa lfo'f jj C)Jf .. 0.:J/'f 11 /5/< I 5f {; LJJ ct-[.>6--i'L w/ Ct3!S. 231,;,q ~i4Jll~ Final Inspection required by: 0 Plan O CM&I O Fire 0 SW DISSUED Approved Date BUILDING 10 ,30 .(S PLANNING Iii/A- ENGINEERING ' FIRE Expedite? y N I\ IQ f<.__,. DIGITAL FILES Required? y N HazMat APCD Health . Forms/Fees Sent Rec'd Encina Fire HazHealthAPCD PE&M School Sewer Stormwater Special lnspect;on CFD: y N LandUse: Density: lmpArea: FY: Annex: PFF: y N Comments Date Date Date Building Planning Engineering Fire Need? V/fl) S~Jlf'PT \./ I (/ V I Dev. By /1_-S.' {~j-- Due? By y N y N y N y N y N y N y N y N Factor: Date DDone DDone DDone DDone City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-08-2016 Plan Check Revision Permit No:PCR16015 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: 2508 GATEWAY RD CBAD PCR Parcel No: 2132612300 $0.00 Lot#: 0 Valuation: Construction Type: 58 Reference #: PC#: G.e>l':5 d~ Project Title: VIASAT: ADD EV CHARGERS/ EXIT STAIR EXHAUST Applicant: MILOS MAKARIC STE 125 13280 EVENING CREEK DRS SAN DIEGO CA 92128-4696 858-793-4777 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees Total Fees: $107.50 Owner: Total Payments To Date: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: $107.50 $0.00 $0.00 $107.50 Balance Due: ISSUED 01/27/2016 SLE 07/08/2016 07/08/2016 Inspector: FINAL APPROVAL Date: Clearance: ------ $0.00 NOTICE: Please take NOTICE that approval of your project includes the "In-position" of fees, dedications, reservations, or other exactions hereafter collectively referred to as ''fees/exactions." You have 90 days from the date this perrrit was issued to protest in-position of these fees/exactions. If you protest them, you rrust follow the protest procedures set forth in G'.lvemment Code Section 66020(a), and file the protest and any other required information wth the City Manager for processing in accordance 1Mth Carlsbad M.Jnidpal Code Section 3.32.030. Failure to timely foll cm that procedure wll bar any subsequent legal action to attack, review, set aside, void, or annul their in-position .• You are hereby FURTHER NOTIFIED that your right to protest the specified fees1exactions DOES NOT APPLY to water and sev;er o:,nnection fees and capacity changes, nor planning, zoning, grading or other sinilar application processing or service fees in o:,nnection wth this project. NOR DOES IT APPLY to any fees1exactions of 1M1idi \/f'\I, have oreviouslv been aiven a NOTICE sinilar to this or as to 1M1idi the statute of linitations has oreviouslv othelwise F>imired. Ccityof Carlsbad PLAN CHECK REVISION APPLICATION 8-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Checl< Revision No. PCAZ I lo O I S Project Address 2508 Gateway Road Original Plan Check No. CB 15-2364 Date 1 /27 /16 Contact Milos Makaric Ph 858.793.4777 Fax 858. 793.4 787 Email milosm@sca-sd.com Contact Address 13280 Evening Creek Drv South \ ZS City San Diego Zip 92128 General Scope of Work Added: EV Chargers, Exit Stair Exhaust Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: 0 Plans D Calculations D Soils D Energy D Other 2. ,•' ' 3. 4. Describe revisions irl detail List page(s) where List revised sheets each revision is that replace shown existing sheets See attached ,- 5. Does this revision, in any way, alter the exterior of the project? 0 Yes ONo 6. Does this revision add ANY new floor area{s)7 D Yes 0 No 7. Does this revision affect any fire related issues? D Yes 0 No 8. Is this a complete set7 D Yes £S'Signature_..,....e:::::;~1LLJ~~4,:.~~~~::::::__ _______________ _ 1635 Faraday Aven Email: building@carlsbadca.gov www.carlsbadca.gov ViaSat Building #11 Tenant Improvements Plan Change Submittal Project Address: 2508 Gateway Road Original Plan Check No. CBlS-2364 Delta #7 Noted as Field Bulletin #1004 dated 1/2016 No. Description of Change Sheet Number(s) ARCHITECURAL 1 Added drawing A4.1 to the sheet index 2 Added exhaust fans 3 Added louvers to the South and North stair curtain wall system 4 Added detail #25 MECHANICAL 5 Added exhaust fans EF-11-4 and EF-11-5 to the schedules 6 Added thermostats for the newly added fans in the staircase enclosures 7 Added intake louvers with motorized dampers for ventilating the staircase enclosures 8 Added exhaust fans EF-11-4 and EF-11-5 on the roof 9 Added control diagram for exhaust fans EF-11-4 and EF-11-5 ELECTRICAL 10 Revised site electrical to show routing and circuiting to electrical vehicle chargers 11 Revised plan to coordinate with mechanical and circuit the motorized dampers 12 Revised the roof to show exhaust fans and circuiting for coordination 13 -Revised Singleline for coordination. -New 1200 Amp breaker added for future power filter -New transformer for connections to EVC panel to circuit electrical vehicle chargers 14 Revised panel schedules 15 Revised panel schedules to show new panel EVC 16 Revised electrical room to show new electrical gears for coordination Prepared by: Milos Makaric Project Architect Date: 1-27-2016 TS1 Al.4 A4.1 AD4 M0.2 Ml.4 M2.1 M2.4 M6.2 El.7 E4.1 E4.4 E6.1 E6.2 E6.3 E7.1 ViaSat Building #11 Tenant Improvements Plan Change Submittal Project Address: 2508 Gateway Road Original Plan Check No. CBlS-2364 Delta #7 Noted as Field Bulletin #1004 dated 1/2016 No. Description of Change Sheet Number(s) ARCHITECURAL 1 Added drawing A4.1 to the sheet index 2 Added exhaust fans 3 Added louvers to the South and North stair curtain wall system 4 Added detail #25 MECHANICAL 5 Added exhaust fans EF-11-4 and EF-11-5 to the schedules 6 Added thermostats for the newly added fans in the staircase enclosures 7 Added intake louvers with motorized dampers for ventilating the staircase enclosures 8 Added exhaust fans EF-11-4 and EF-11-5 on the roof 9 Added control diagram for exhaust fans EF-11-4 and EF-11-5 ELECTRICAL 10 Revised site electrical to show routing and circuiting to electrical vehicle chargers 11 Revised plan to coordinate with mechanical and circuit the motorized dampers 12 Revised the roof to show exhaust fans and circuiting for coordination 13 -Revised Single line for coordination. -New 1200 Amp breaker added for future power filter -New transformer for connections to EVC panel to circuit electrical vehicle chargers 14 Revised panel schedules 15 · Revised panel schedules to show new panel EVC 16 Revised electrical room to show new electrical gears for coordination Prepared by: Milos Makaric Project Architect Date: 1-27-2016 TS1 Al.4 A4.1 AD4 M0.2 Ml.4 M2.1 M2.4 M6.2 El.7 E4.1 E4.4 E6.1 E6.2 E6.3 E7.1 Shay Even From: Sent: To: Cc: Subject: Hello Milos, Amber Ressmer Wednesday, February 03, 2016 11:39 AM milosm@sca-sd.com Building PCR16015 VIA SAT BLDG #11 PCR 16015 Via Sat bldg. #11 plan does not require Carlsbad Fire Department fire plan review. Thank you, Amber Ci-tyof. Carlsbad Amber Ressmer Fire Prevention Office Specialist City of Carlsbad 1635 Faraday Ave Carlsbad, CA 92008-7314 www.carlsbadca.gov P 760-602-4665 I F 760-602-8561 1 EsGil Corporation In (}?artnersnip witn (]overnment for (}Jui(aing Safety DATE: February 5, 2016 JURISDICTION: Carlsbad PLAN CHECK NO.: cb15-2364/PCR16-015 PROJECT ADDRESS: 2508 Gateway Road SET: I 11:J ~PPLICANT \0/.IURIS. CJ PLAN REVIEWER a FILE PROJECT NAME: ViaSat EV Charging Rough-In and Stairway Exhaust Fans [gj The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: [gj EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted~ _ \ '( Telephone#: Date contacted:· -(b~) Email: Mail Telephone Fax In Person D REMARKS: By: Eric Jensen Enclosures: EsGil Corporation D GA D EJ D MB D PC 02/01 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 Carlsbad cb15-2364/PCR16-015 February 5, 2016 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad 2364/PCR16-015 PLAN CHECK NO.: cb15- PREPARED BY: Eric Jensen DATE: February 5, 2016 BUILDING ADDRESS: 2508 Gateway Road BUILDING OCCUPANCY: BUILDING AREA PORTION ( Sq. Ft.) Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code cb j Bldg. Permit Fee by Ordinance iJ j Plan Check Fee by Ordinance 3 Valuation Multiplier By Ordinance Type of Review: r Complete Review r Repetitive Fee i:J Repeats * Based on hourly rate Comments: 2 hours plan review. r Other w Hourly EsGil Fee r Reg. VALUE Mod. r Structural Only r--------12] Hrs. @ • . $86.ooJ Sheet 1 of 1 macvalue.doc + :1 1/2,;,v -,0 E>~,e1 ~ f{~_, ~ @ ~ W/ Cb 152 3Lo.t.-\' Fe__ i-{ g/, (p - JJ\7/f h (s) { 95)/lLO 7/'6/ll{? /!2.i7/N uMr, M CJJ 1;-M1 If M fa fJ{ 1'-fiN f~I J DNJ) ~ .f ~ i,J/(,,8 ISLJt'j ~ ~ ~cL to ~u fuv~ILP\~.- ~-~ =L Final Inspection required by: 0 Plan O CM&I O Fire 0 SW OtSSUED Approved Date, BUILDING '2.,fr::; /fr__ PLANNING ENGINEERING FIRE Expedite? . Y N i. \R ~ DIGITAL FILES Required? y N HazMat APCD Health Forms/Fees Sent Rec'd Encina Fire HazHealthAPCD PE&M School Sewer . Stormwater Special Inspection CFD: y N LandUse: Density: lmpArea: FY: Annex: PFF: y N Comments Date Date Date Building Planning Engineering Fire Need? -~J?~H-£,CJ I I Dev. By ST .- Due? By y N y N y N y N y N y N y N y N Factor: Date DPone ~r:ie. ODone ODone City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-08-2016 Plan Check Revision Permit No:PCR16020 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Reference #: PC#: Project Title: Applicant: MILOS MAKARIC 858-793-4777 2508 GATEWAY RD CBAD PCR 2132612300 $0.00 CB152364 Lot#: 0 Construction Type: 5B VIASAT: VARIOUS REVISIONS TO CB152364 Owner: Plan Check Revision Fee Fire Expedited Plan Review Additional Fees Total Fees: $580.00 Total Payments To Date: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: $580.00 $0.00 $0.00 $580.00 Balance Due: ISSUED 02/05/2016 JMA 07/08/2016 07/08/2016 Inspector: FINAL APPROVAL Date: Clearance:------ $0.00 NOTICE: Please take NOTICE that approval of yOUr project indudes the "lrrposition'' of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this penrit was issued to protest irrposition of these fees/exactions. If you protest them, yOU rrust fdlowthe protest procedures set forth in <?ovemment Code Section 66020(a), and file the protest and any other required infonration v.ith the City rvlanager for prooessing in acoordance wth Carlsbad Municipal Code Section 3.32.030. Failure to tirrely fdlow that prooedure wll bar any subsequent legal action to attack, review, set aside, void, or annul their irrposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT /IPPL Y to water and &Mer oonnection fees and capacity changes, nor planning, zoning, grading or other sinilar application prooessing or servioe fees in connection wth this project. NOR DOES IT /IPPL Y to any fees/exactions of IM'lich vou have =iiouslv been aiven a NOTICE sinilar to this or as to IM'lich the statute of linitations has oreviouslv otherwse Plmired. Raenette Abbey To: Subject: Milos, Milos Makaric Viasat revisions I received your voice message concerning PCR16020. Si_nce there are no Engineering Department issues-and ESGIL has approved the plans-this revision permit is ready to issue. I put the revised sheets with the original set of plans, CB152364-along with the revision sheets PCR16015-so that you can slip sheet both of them in to CB152364 at the same time. Raenette (City of Carlsbad Raenette Abbey City of Carlsbad Building Technician 1635 Faraday Avenue Carlsbad, CA 92008 www.carlsbadca.gov 760-602-2718 I 760-602-8558 fax I Raenette.abbey@carlsbadca.gov Conn<:ct-wfth us Facebookl Twitter! You Tube I Flickrl Pinterest I Enews 1 ('Cityof Carlsbad PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Check Revision No. Project Address 2508 Gateway Road Contact Milos Makaric Original Plan Check No. CB 15-2364 Date 2/5/16 Ph 858.793.4777 Fax 858.793.4787 Email milosm@sca-sd.com Contact Address 13280 Evening Creek Drive South, #125 City San Diego Zip 92128 General Scope of Work Re-designed 1st Floor Manufacturing Space Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: 0 Plans D Calculations D Soils 0 Energy D Other 2. 3. 4. Describe revisions in detail List page(s) where List revised sheets each revision is that replace shown existing sheets See attached 5. 6. 7. 8. Does this revision, in any way, alter the exterior of the project? 0 Yes Does this revision add ANY new floor area(s}? D Yes Does this revision affect any fire related issues? 0 Yes Is this a complete s7)? D Yes 0 No @No ONo @No Fax: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov • ? EsGil Corporation In (J!artnersliip witli (}overnment for (}3ui(aing Safety DATE: FEB. 16, 2016 JURISDICTION: CARLSBAD PLAN CHECK NO.: 15-2364 (REV. #3) -NEW PCR #16-020 PROJECT ADDRESS: 2508 GATEWAY ROAD PROJECT NAME: VIA SAT BUILDING # 11 (T.I. PACKAGE) D APPLICANT D JURIS. D PLAN REVIEWER D FILE SET: I IZ] The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. D The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. D The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. D The applicant's copy of the check list has been sent to: MILOS MAKARIC IZ] EsGil Corporation staff did not advise the applicant that the plan check has been completed. D EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone#: Date contacted: (by: ) Email: Mail Telephone Fax In Person IZ] REMARKS: Miscellaneous revisions are under this permit. Selected sheets are revised and resubmitted. By: Ali Sadre, S.E. Enclosures: EsGil Corporation D GA D EJ D MB D PC 2/09 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 . ,. CARLSBAD 15-2364 (REV. #3) -NEW PCR #16-020 FEB. 16,2016 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD #3) -NEW PCR #16-020 PLAN CHECK NO.: 15-2364 (REV. PREPARED BY: Ali Sadre, S.E. DATE: FEB. 16,2016 BUILDING ADDRESS: 2508 GATEWAY ROAD BUILDING OCCUPANCY: B/F-1; 111-B/SPR. BUILDING PORTION OFFICE/ MANUFACT. Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: D Repetitive Fee /3 Repeats • Based on hourly rate Comments: D AREA Valuation ( Sq. Ft.) Multiplier 65700 By Ordinance Complete Review o Other -___ H ..... o ___ u __ rl_._y 0 EsGil Fee Reg. VALUE Mod. o Structural Only 41 Hrs.@* =====$=11=6=.o:o ($) $sso.001 $464.00j Sheet 1 of 1 macvalue.doc + «~~ ~ CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK REVIEW CHECKLIST P-28 Development Services Planning Division 1635 Faraday Avenue (760) 60~-4610 www.carlsbadca.12:ov DATE:, 2/8/16 PROJECT NAME: ViaSat Building 11 Tl's PROJECT ID: SUP 13-03 PLAN CHECK NO: PCR 16-20 SET#: 1 ADDRESS: 2508 Gateway Road APN: 213-261-20,21,22,23 ~ This plan check review is complete and has been APPROVED by the Planning Division. By: Greg Fisher A Final Inspection by the Planning Division is required D Yes [g] No You may a/so have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: For questions or clarifications on the attached checklist please contact the following reviewer as marked: .. ., ---- Pb.ANNING ENGINEER·ING FIRE ~REVENTION 760.-602-4610 760-602~2750. 760-602-4665 - D Chris Sexton D Kathleen Lawrence D Greg Ryan 760-602-4624 760-602-27 41 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov D Gina Ruiz D Linda Ontiveros D Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov ~ D D Dominic Fieri Greg Fisher 760-602-4664 760-602-4629 Dominic.Fieri@carlsbadca.gov Remarks: '. - «~ ~ CITY OF CARLSBAD PLAN.CHECK REVIEW TRANS MITT AL DATE: 02-09-2016 PROJECT NAME: ViaSat Building 11 Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 BLDG. DEPTw~f6'frclca.gov PROJECT ID: PLAN CHECK NO: PCR16-20 SET#: I ADDRESS: 2508 Gateway APN: ~ This plan check review is complete and has been APPROVED by the Fire Division. By: R. Metz A Final Inspection by the Fire Division is required ~ Yes D No D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: ----. . PLANNING ENGINEERING· • FIR:E PRE,VENTION 760-6024610 760-602-2750 . . 7:60,602-466f$ D Chris Sexton D Kathleen Lawrence ~ Randy Metz 760-602-4624 760-602-27 41 760-602-4661 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Randy.Metz@carlsbadca.gov D Gina Ruiz D Linda Ontiveros D Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynthia.Wong@carlsbadca.gov D D D Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: **APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Page 1 of 1 Iii· Carlsbad Fire Department Plan.Review Requirements Category: PCR, Date of Report: 02-09-2016 -# Reviewed by: __ /_<,~ le-"'--+----- Name: MILOS MAKARIC Address: Permit #: PCRI 6020 Job Name: VIASAT: VARIOUS REVISIONS TO Job Address: 2508 GATEWAY RD CBAD ! Conditions: Cond: ·cON0008734 [NOT MET] ** APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. TIDS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. 2 fr ~ b -77> P ( 1w -l0/3: f1-t<.E [ I~,::;, 61 L /I I / I -ce Is-~3;, eo 1 (2J5~6; t I &f It/lb ~~ VJ bJ-~ /J ~ J/J /CA !Jtff _,;,,Jp C/)IJ,Vlf M J,J,,1/-,# J)kJ cl-/;h,1;_ 2-2Y-\l..D Q,ct:-L\ -~ ~G.-{)-~a -@ mc.L ~ <;'ti tDCJL -to ½(,\ teJ,( ~(_]2-ilp\C\"5. lD -3()-!U> -~ ~ I 7/%/'Lv :$ Final inspection required by: 0 Plan O CM&I O Fire 0 SW 01SSUED !Dev. Approved Date By BUILDING )./fblll /J---("" PLANNING 2.-'e)-IL!I /"..;,F ENGINEERING A//~~ JWrtJ.11,-,IJ. JU-- FIRE Expedite? y N .,, \'v _,, ?l-1/(~ I?~ 1~ -- DIGITAL FILES Reauired7 y N HazMat . -- APCD . Health FormsjFees Sent Rec'd Due? By Encina y N Fire y N HazHealthAPCD y N" PE&M y N School y N Sewer . y N Stormwater ; y N Special Inspection y N CFO: y N LandUse: Density: lmpArea: FY: -Annex: Factor: PFF: y N Comments Date Date ·Date· Date Building ·-Planning Engineering Are .- Need? I I '\. ( a1-1. l].:~ ~one 1· = ·-· CJ Done CJ Done CJ Done City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 07-08-2016 Plan Check Revision Permit No:PCR16108 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: 2508 GATEWAY RD CBAD PCR Parcel No: 2132612300 $0.00 CB152364 Lot#: 0 Valuation: Construction Type: 38 Reference #: PC#: Project Title: Applicant: SMITH CONSUL TING MILOS MAKARIC VIASAT: RECONFIGURE MANUFACT SPACE 13280 EVENING CREEK DR SOUTH #125 SAN DIEGO CA 92128 858-793-4777 Plan Check Revision Fee Fire Expedited Plan Review Additional Fees Owner: Total Fees: $580.00 Total Payments To Date: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: $580.00 $0.00 $0.00 $580.00 Balance Due: ISSUED 06/02/2016 SLE 07/08/2016 07/08/2016 Inspector: FINAL APPROVAL Date: ------Clearance: ------ $0.00 NOllCE: Please take NOTICE that approval of y00r project indudes the "In-position'' of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 00 days from the date this perrrit 1/'-/aS issued to protest in-position of these fees/exactions. If you protest them, y00 mist followthe protest procedures set forth in C?ovemment Code Section 66020(a), and file the protest and any other required infonration v,ith the Qty Manager for processing in acx:ordance v,ith Carlsbad Mmicipal Code Section 3.32.030. Failure to timely follow that procedure v,ill bar any subsequent legal action to attack, review, set aside, void, or annul their in-position. You are herebY FURTHER NOTIFIED that your right to protest the specified fees/exactions OOES NOT .APPLY to water and sEMer oonnection fees and capacity changes, nor planning, zoning, grading or other sirrilar application processing or service fees in oonnection wth this project. NOR OOES IT .APPLY to any fees/exactions of 'Mlich vou have nreviouslv been aiven a NOllCE sirrilar to this or as to 'Mlich the statute of !irritations has oreviouslv other'Mse Pimired. Ccityof Carlsbad PLAN CHECK REVISION APPLICATION B-15 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Plan Checl< Revision No. 'R:R \ l.2-\ 03 Project Address 2508 Gateway Road Original Plan Check No. CB 15-2364 Date 5/31/16 Contact Milos Makaric Ph 858. 793.4 777 Fax 858.793.4787 Email milosm@sca-sd.com Contact Address 13280 Evening Creek Drive South, #125 City San Diego Zip 92128 General Scope of Work Reconfigured 1st Floor Manufacturing Space Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: 0 Plans D Calculations D Soils 0 Energy D Other 2. 3. Describe revisions in detail List page(s) where each revision is shown See attached 5. Does this revision, in any way, alter the exterior of the project? 0 Yes 6. Does this revision add ANY new floor area{sJ7 7. Does this revision affect any fire related issues? 0Yes 0Yes 0 No 0 No 4. List revised sheets that replace existinq sheets 0No 8. Is this a co~? D '6 0 No ..!:S'Signature~~ 1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 7 60-602-2719 Fax: 7 60-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov ViaSat Building #11 Tenant Improvements Plan Change Submittal Project Address: 2508 Gateway Road Original Plan Check No. CBlS-2364 Delta #9 Noted as Field Bulletin #1006 dated 5/31/2016 No. Description of Change Sheet Number(s) ARCHITECURAL 1 Added drawing A4.2, ADS and E7.6 to the sheet index TS1 2 Added concrete pad and utility trench on the south-east side AS1 of the building 3 Revised south side of the 1st floor. Deleted Rooms #1219, Al.1 1220, 1221 and relocated room #1222 4 Revised south side of the 1st floor. Deleted Rooms #1219, A2.1 1220, 1221 and relocated room #1222 5 Added exterior elevation sheet to depict changes to the A4.2 storefront on the east side of the building 6 Revised interior elevations to reflect floor plan changes A5.3 7 Revised door schedule to reflect floor plan changes. Added AGO &AG.1 storefront door to the door legend 8 Revised south side of the 1st floor. Deleted Rooms #1219, AF1.1 1220, 1221 and relocated room #1222 9 Added sheet with enlarged site plan and details ADS MECHANICAL 10 Added schedule of newly added FCs M0.3 11 Revised Title 24 compliance tables due to the addition of M0.5 & M0.6 three new FCs and two IRCs 12 Added schedule of newly added IRCs M0.7 13 Added zoning for new FCs in labs Ml.2 14 Added HVAC layout in newly added labs M2.1 15 Added piping to newly added FCs and IRCs M3.1 PLUMBING 16 Revised size of BP-2 backflow device for water supply to IRCs P0.2 17 Added IW and condensate piping for new FCs and IRCs P2.1 ELECTRICAL 18 -Added new enlarged plan sheet El.1 -Updated sheet list per new sheet added 19 Updated Title 24 sheets El.3-El.6 20 Added work to site per owner request El.7 21 Update lighting layout to coordinate with architectural plans E2.1 22 Revised power for coordination E3.1 23 Revised mechanical equipment and circuiting in lab area E4.1 24 -Added new 5-30R receptacles on the roof E4.4 -New conduit provided to the roof • 25 -Revised cable tray layouts -Revised telecorn layouts for coordination 26 Removed panels 'LPC' and 'LPD' 27 -Revised panel schedules to show updated loads -Revised load summaries 28 New detail added for strain relief cord 29 -Revised lab equipment layout for coordination -Revised lab cable tray layouts -Revised panel locations -Revised circuiting 30 -New sheet added -New work shown in elevation view for lab area on first floor -New site work by first floor area Prepared by: Milos Makaric Project Architect Date: 5-31-2016 ES.1 E6.1 E6.2-6.3 E7.4 E7.5 E7.6 EsGil Corporation In <Partners/Up witn government for <Bui{aing Safety DATE: JUNE 10, 2016 JURISDICTION: CARLSBAD _CJ f)PPLICANT g/.JURIS. · . Cl PLAN REVIEWER Cl FILE PLAN CHECK NO.: 15-2364 (REV. #4) -NEW PCR #16-108 PROJECT ADDRESS: 2508 GATEWAY ROAD SET: I PROJECT NAME: VIA SAT BUILDING #11 (T.I. PACKAGE) ~ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. D D D D D The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: MILOS MAKARIC EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted·---Telephone #: -(~) Date contacted: Email: Mail Telephone Fax ~rson REMARKS: Miscellaneous plan revisions are under this permit; selected sheets are revised and resubmitted. BY: ALI SADRE, S.E. ENCLOSURES: EsGil Corporation D GA D EJ D MB D PC 6/7 9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (858) 560-1468 + Fax (858) 560-1576 CARLSBAD 15-2364 (REV. #4) -NEW PCR #16-108 JUNE 10, 2016 [DO NOT PAY -THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PLAN CHECK NO.: 15-2364 (REV. #4) -NEW PCR #16-108 PREPARED BY: ALI SADRE, S.E. BUILDING ADDRESS: 2508 GATEWAY ROAD BUILDING OCCUPANCY: B/F-1; 111-B/SPR. BUILDING AREA Valuation PORTION ( Sq. Ft.) Multiplier OFFICE/ 65700 MANUFACT. Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance Bldg. Permit Fee by Ordinance ..-1 Plan Check Fee by Ordinance Type of Review: D Complete Review DATE: JUNE 10, 2016 Reg. VALUE ($) Mod. $sso.001 o Structural Only D Repetitive Fee /3 Repeats o Other 0 ....._...;.H __ o.....:;u;.;..;rl,.._y EsGil Fee 41 Hrs.@* =====$=11=6~.0_0--1 $464.001 • Based on hourly rate Comments: Sheet 1 of 1 macvalue.doc + «,w ~ CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-29 DATE: 6-3-16 PROJECT NAME: PROJECT ID: Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.1wv PLAN CHECK NO: PCR 16-108 SET#: 1 ADDRESS: 2508 Gateway Rd APN: tzl This plan check review is complete anct has been APPROVED by the Planning Division. By: Chris Sexton/Greg Fisher A Final Inspection by the Planning Division is required D Yes ~ No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: milosm@sca-sd.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINSERIN.G . FIRE PREVENTION · 760-602-4610 760-602-275(;) 76();.602-4665 · -. .. [Z] Chris Sexton D Chris Glassen D Greg Ryan 760-602-4624 760-602-2784 760-602-4663 Chris.Sexton@carlsbadca.gov Christogher.Glassen@carlsbadca.gov Gregoi:y.Ryan@carlsbadca.gov D Gina Ruiz D ValRay Marshall D Cindy Wong 760-602-4675 760-602-2741 760-602-4662 Gina.Ruiz@carlsbadca.gov Va1Ray.Marshal1@carlsbadca.gov Cynthia.Wong@carlsbadca.gov D Veronica Morones D Linda Ontiveros D Dominic Fieri 760-602-4619 760-602-2773 760-602-4664 Veronica.Morones@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Dominic.Fieri@carlsbadca.gov Remarks: . --~ ¥ CITY OF CARLSBAD PLAN CHECK Community & Economic REVIEW Development Department B 1635 Faraday Avenue TRANSMITTAL LDG. DEPT C@.Fs¥d CA 92008 www.carlsbadca.gov DATE: 6/21/16 PROJECT NAME: Viasat PROJECT ID: PLAN CHECK NO: PCR16108 (CB152364) SET#: ADDRESS: 2508 gateway road APN: IZj This plan check review is complete and has been APPROVED by the Fire Division. By: CWong A Final Inspection by the Division is required IX! Yes D No D This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. · For questions or clarifications on the attached checklist please contact the following reviewer as marked: -·· ... -·-· . ., . -~----. -· -... 'PLANNING ENGINEERING· . FiRE ,PREVE.f~TION. · 760~602-4610· '760-602-2750 160~602-4665 D Chris Sexton D Kathleen Lawrence D Greg Ryan 760-602-4624 760-602-27 41. 760-602-4663 Chris.Sexton@carlsbadca.gov Kathleen.Lawrence@carlsbadca.gov Gregory.Ryan@carlsbadca.gov D Gina Ruiz D Linda Ontiveros ~ Cindy Wong 760-602-4675 760-602-2773 760-602-4662 Gina.Ruiz@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov Cynth ia.Wong@carlsbadca.gov D D D Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov 6/21/16 ** APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. : ' ' . .' ·' T:W:S A:J,> PROV AL IS Si:JBJECT TO ·FIELD IN$:PECTIONS, ANY REQUIRED Tl~STS, . 'FI~.DEPARTM~NTNOT{\.TIONS, CONiHTIONS IN CORRESPONDENCE AND COMPLIANCE WI:J'H ALL APPLICABLE' CO])ES AND REGULATIONS. THIS APPROVAL -~IµLL NOT BE HE~b TO'PERMIT OR APPROVE ANY VIOLATION OF THE LAW. ,· I] . . Carlsbad Fire Department BLDG. DEPT COPY Plan Review Requirements Category: PCR , Date ofReport:06-21-2016 Reviewed by: / Name: Address: Permit#: PCR16108 SMITH CONSULTING MILOS MAKARIC 13280 EVENING CREEK DR SOUTH #125 SANDIEGO CA 92128 Job Name: VIASAT: RECONFIGURE MANUFACT Job Address: 2508 GATEWAYRD CBAD INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot . adequately co~i&w tg de~ermi~~~'iJ'ffi'e~~~m-0s·.~..-,R.le~~e review carefully all comments a . ~1'&se'f&:eremi ·· eGessary plans and/or specifications, with changes "clouded", to this offi 1ew and approval. Conditions: Cond: CON0008988 [MET] ** APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL rs SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, . CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Entry: 06/21/2016 By: cwong Action: AP ~ _J c;-~~ b -.......... -'N -I ~ ~ ~ 0-, ~ -;_ ~(3---b f; r;; ~ ( J, M~ q \J l :D I 2. -~· I ~" 5 i ~ ~~~ ~ :J:>u' r \'J. cf Cl, ~ \~ ~ct r'- "O f d -0 -~ '- i1 ~- c1 Tl ~, -0