Loading...
HomeMy WebLinkAbout2515 CHESTNUT AVE; ; CB152651; Permit08-21-2015 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Pool Permit Permit No: CB152651 Building Inspection Request Line (760) 602-2725 Job Address: 2515 CHESTNUT AV CBAD Permit Type: POOL Status: ISSUED Parcel No: 1672704000 Lot #: 0 Applied: 08/17/2015 Valuation: $34,160.00 Construction Type: NEW Entered By: JMA Reference #: Plan Approved: 08/21/2015 PC #: Issued: 08/21/2015 Project Title: MCCREARY: 700 SF POOL/SPA Inspect Area: Applicant: Owner: SUNDANCER POOLS INC MCCREARY STE 104 197 WOODLAND PKWY 2515 CHESTNUT AVE SAN MARCOS CA 92069-3021 CARLSBAD CA 92010 760-802-8842 Building Permit $310.09 Add'I Building Permit Fee $0.00 Plan Check $217.06 Add'I Plan Check Fee $0.00 Electrical Fee $33.00 Plumbing Fee $33.00 Strong Motion Fee $4.44 Green Bldg Standards (SB1473) Fee $2.00 Renewal Fee $0.00 Add'I Renewal Fee $0.00 Other Building Fee $0.00 Additional Fees $0.00 TOTAL PERMIT FEES $599.59 Total Fees: $599.59 Total Payments To Date: $599.59 Balance Due: $0.00 FINAL APP g0 L Inspector: /�— Date: 14 Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030, Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 08-21-2015 Permit No:SW150320 Job Address: 2515 CHESTNUT AV CBAD Permit Type: SWPPP Parcel No: 1672704000 Reference #: CB#: CB 152651 Project Title: MCCREARY: 700 SF POOL/SPA Applicant: SUNDANCER POOLS INC STE 104 197 WOODLAND PKWY SAN MARCOS CA 92069-3021 760-802-8842 Emergency Contact: DAVID WILLIAMS 760-801-8842 Status: ISSUED Lot #: 0 Applied: 08/17/2015 Entered By: JMA Issued: 08/21 /2015 Inspect Area: Tier: 1 Priority: L Owner: SOTO DANIEL C FAMILY TRUST 10-02-01 2515 CHESTNUT AVE CARLSBAD CA 92010 SWPPP Plan Check $48.00 SWPPP Inspections $58.00 Additional Fees $0.00 TOTAL PERMIT FEES $106.00 Total Fees: $106.00 Total Payments To Date: $106.00 Balance Due * E 1G. $0.00 r THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: CIPLANNING ENGINEERING E3BUILDING El FIRE HEALTH ) HAZMATAPCD City of Carlsbad Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carisbadca.gov Plan Check No. C Est. Value 1 ' (� plan Ck. Deposit" Date ____ €€€SWPPP S- ?�v JOB ADDRESS �� SUITEN/SPACE*/UNIT;r APN/j �j CT/PROJECT # n Cerolorinu ne wnov. I....I..Ae LOT # e......... 110 -..t w 1 PHASE # 1#OFUNITS 1#BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE I OCC. GROUP &t/t'r,-Ji"1 •-�••••� ��� L�/Ja V YDC UAItAUt Iari FAl Iw (sr( 1L)tUK6(,bF) rIHEPLAGE AIR CONDITIONING IFIRESPRINKLERS YES NOD YE YES[] YES❑N0E-1 APPLICANT NAME /^, I PROPERTY OW R NAME '� �� Prtna Contact Y [ is V-0 Vie-/ V C c"Wc ADDRESS ��fh�/i/ � � / /7�� / ADDRESS 4� c CITY / l ,1 ,, STA 0 CITY ST TE Pz� PHONF�.. � 0 FAX / PHONE1� f FAX EMAIL ! ' • / �^l �O r EMAIL I DESIGN PROFESSIONAL n , r�l tWt f CONTRACTOR BUS. NAME IV( ADDRESS /�L( � , r� A ADDRESS i q 9 1A)Dhigi n d�, ��1 •� ID CITY STATE V^ IP ri) CITY ` f -bTATE �� PHONE FAX r r!7/rOY�L PHONE S ;J� ��°� FAX EMAIL l /Vrf 1/ EMAIL (/ 0 - ��T`� (', )L�iT/vi Isrc�U�A�� IsrATEuc.# g95�[J�1 cAs�0 CITY BUS. (Sec, 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he's licensed pursuant to the provisions of the Contractor's License Law `Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley -Tanner Hazardous Substance Account Act? ❑ Yes ❑ No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? ❑ Yes ❑ No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? ❑ Yes ❑ No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address I certifythatl have read the application and state thatthe above information is comMand thatthe information on the plans is accurate. I agree to complywIM all Cityordinances and State laws relating to building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: An OSHA permit is required for excavations over 5'0' deep and demolition or construction of structures over 3 stories in height. EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code). .CSAPPLICANT'S SIGNATURE 7j Q- VfM�� DATE Inspection List Permit#: CB152651 Type: POOL MCCREARY: 700 SF POOL/SPA Date Inspection Item Inspector Act Comments 12/08/2015 55 Fence/Pre-Plaster - RI 12/08/2015 55 Fence/Pre-Plaster PD AP 12/08/2015 59 Final Pool - RI 12/08/2015 59 Final Pool PD AP 10/27/2015 51 Excav/Steel/Bonding/Fence PD AP 09/21/2015 23 Gas[Test/Repairs PD AP 09/21/2015 31 Underground/Conduit-Wirin PD AP 09/21/2015 51 Excav/Steel/Bonding/Fence PD AP 09/17/2015 51 Excav/Steel/Bonding/Fence PD CO 09/15/2015 51 Excav/Steel/Bonding/Fence PD CO 08/27/2015 54 Pre -Site PD AP Tuesday, December 08, 2015 Page 1 of 1 CITY OF C 44L PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 08/19/2015 PROJECT NAME: MCCREARY POOL AND SPA PROJECT ID: CB15-2651 PLAN CHECK NO: 1 SET#:1 ADDRESS: 2515 CHESTNUT AVE APN: 1672704000 VALUATION/SCOPE OF WORK: POOLANDSPA This plan check review is complete and has been APPROVED by the ENGINEERING Division. By: VALRAY NELSON A Final Inspection by the ENGINEERING Division is required Yes V No This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. NOTE: ONLY ITEMS THAT NEED CORR ECTION/C LAR IF ICATION ARE MARKED X. Plan Check Comments have been sent to: SUM0223@COX.NET You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should Include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 C h�, i4, Chris.Sexton@car1sbadca.0ov ky G i na. Ru 1 z@ca rlsbadca Oov Remarks: Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov Linda.Ontiveros@carlsbadca.gov n 4 3 - 3 Gregory.Ryan@carisbadca.gov V VNI v Cynthia.Wono—@carisbadca.gov V( ValRay Marshall R 0 760-602-2741 VaIRay.MarshaII@carIsbadca.gov Dominic.Fieri@carisbadca.gov APPROVAL CONTINGENT UPON SIGNATURE ON E-29 FORM 1 Any outstunrlin0 is, uvill be marked with. rrn ® Make the necessary corrections for compliance -with applicable codes and standards. Submit corrected plans andlor specifications to the Building division for re -submittal to the Engineering divisions. Items that conform to permit requirements are markers with ED 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: ✓ North arrow ✓ Existing & proposed structures ✓ Property line dimensions Easements Show on site plan: ✓ Drainage patterns Existing & proposed slopes Existing topography ✓ Retaining Walls (location and height) ✓ Indicate what will happen with soil excavated from pool area. Include on title sheet: ✓ Site address ✓ Assessor's parcel number ✓ Legal description/lot number Grading: Quantities of Cut Fill Import Export Project does not comply with the following engineering conditions of approval for project no: Conditions were complies with by: Date: LOT NO, 40 MAP NO.6693 REF. NO. EL CAMINO MESA UNIT 5 E-37 Page 2 of 4 REV 6/2012 1 2. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 11.06.030 of the Municipal Code. Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" Grading Permit required. NOTE The aradina permit must be issued and rough aradina approval obtained prior to issuance of a building permit. A separate grading plan prepared a registered civil engineer must be submitted together with the completed application form attached. V No grading permit required. 3. MISCELLANEOUS PERMITS RIGHT OF WAY X RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work PERMIT adjacent to the public right-of-way. REQUIRED IF THERE I5 TO BE A separate right-of-way issued by the engineering division is required for the following: WORK DONE WITHIN THE PUBLIC RIGHT OF Please complete attached right-of-way application form and return to the engineering WAY department together with the requirements on the attached right-of-way checklist, at the time of resubmittal. Right-of-way permit and pool permit will be issued simultaneously. E-37 Page 3 of 4 REV 6/2012 0 1 4. STORM WATER Construction Compliance NEED SIGNATURE ON E-29 FORM ✓ Project Threat Assessment Form complete ✓ incomplete Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW 15-320 ) Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post -Development (SUSMP) Compliance ✓ Storm Water Standards Questionnaire complete ✓ incomplete Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http /twww carlsbadca gov/business/building/Documents/EngStandsw stds-vo14-ch2.pdf Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) Vegetated Roof Bio-retentions cell/rain garden Pervious pavement/pavers Flow -through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales Downspouts disconnect and discharge over landscape Other: 5. ADDITIONAL COMMENTS E-37 Page 4 of 4 REV 6/2012 • 1 ` STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov am applying to the City of Carlsbad for the following type(s) of construction permit: Building Permit ❑ My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Right -of -Way Permit Electrical Patio/Deck Fire Additional Photo Voltaic Fire Alarm Re -Roofing Fixed Systems Sign Mechanical Spa -Factory Mobile Home Sprinkler Plumbing Water Discharge Project Storm Water Threat Assessment Criteria* No Threat Assessment Criteria ❑ My project qualifies as NO THREAT and is exempt from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier Level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Tier 1 - Low Threat Assessment Criteria My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 - Moderate Threat Assessment Criteria My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 - Significant Threat Assessment Criteria ❑ My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or ❑ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, ❑ My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non -storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and correct. I understand and acknowledge that even though this project does not require preparation of a construction SWPP, I must still adhere to, and at all times during construction activities for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standards. 'The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. Project Address: Assessor Parcel No. -ZolS L� cl I Z�c?--Yo Owner/Owners Authorized AgentName]: Dr penw6Vk_� Title: AY�r OwnerlOwn 's Authorid Agent Si atur� Date: l city concurrence: *YES ❑ NO Date: 815 1 Project ID: 1 5- a U 5 B-24 Page 1 of 1 Rev.03/09 I V CITY OF CARLSBAD CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Develo meet Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Construction Perceived SWPPP Tier Construction Threat Assessment Criteria* Threat to Level Storm Water Quali Tier 3 —High Construction Threat Assessment Criteria ❑ Protect site is 50 acres or more and grading will occur during the rainy season ❑ Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA ❑ Soil at site is moderately to highly erosive (defined as having a predominance of soils with High Tier 3 USDA-NRCS Erosion factors kf greater than or equal to 0.4) ❑ Site slope is 5 to 1 or steeper ❑ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). ❑ Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 — Medium Construction Threat Assessment Criteria ❑ All projects not meeting Tier 3 High Construction Threat Assessment Criteria Medium Tier 2 High Construction Threat Assessment Criteria ❑ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA ❑ Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) High Tier 2 ❑ Site slope is 5 to 1 or steeper ❑ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). ❑ Owner/contractor received a Storm Water Notice of Violation within past two years ❑ Site results in one half acre or more of soil disturbance Tier 2 — Medium Construction Threat Assessment Criteria ❑ All projects not meeting Tier 2 High Construction Threat Assessment Criteria Medium Tier 1 - Medium Inspection Threat Assessment Criteria ❑ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA ❑ Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors kf greater than or equal to 0.4) Tier 1 ❑ Site slope is 5 to 1 or steeper ❑ Medium Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). ❑ Owner/contractor received a Storm Water Notice of Violation within past two years ❑ Site results in one half acre or more of soil disturbance ier 1 - Low Inspection Threat Assessment Criteria All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Low Exempt - Not Applicable - Exempt `The city en ineer ma th g y au orize minor variances from the construction threat assessment criteria in special circumstances where it can be shown that a lesser or higher amount of storm water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 CITY OFAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov y777777777777 To address post -development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carisbadca.gov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non -erodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streetsguidance? 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant information. answered "no" to both questions, then go to Step 2, E-34 Page 1 of 3 Effective 6/27/13 CaLl 'ILL STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov To determine if your project is a priority development project, please answer the following questions: YES NO 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed -use, and public development projects on Public or private land. k 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed -use, and public development projects on Dublic or private land. 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption. 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorcycles, and other vehicles. ((( 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive "Discharging Area (ESA)? Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the ro'ect to the ESA i.e. not commingles with flows from ad scent lands). 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles per day. 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11.Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Storm Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Storm Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box information. and complete applicant E-34 Page 2 of 3 Effective 6/27/13 r CITY OF XA NMI iAt STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carisbadca.gov Complete the questions below regarding our redevelopmentproject: YES NO Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previouslyexistingdevelopment? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no," the structural BMP's required for Priority Development Projects apply to the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. ❑ My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stormwater criteria per the SUSMP and I understand I must prepare a Storm Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Address: .2L � ,, ,d„ J� Acceor,svP cel Numpgr(s Applicant Nam 7ei,,�L( i I ,�Ir Applica/n' i la L( ' Applicant Signatur : /V Date: City Concurrence: I YES NO By: Date: g , 1 r5- Project ID: els 5 . p-�LuzS Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 r �. CITY OF ARLStBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 STORM WATER COMPLIANCE CERTIFICATE ✓ My project is not in a category of permit types exempt from the Construction SWPPP requirements ✓ My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non -storm water discharge(s). ✓ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) ✓ My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria: • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). 1 CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. OWNER(S)/OWNER'S AGENT NAME (PRINT) OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov PROJECT INFORMATION Site Address: �7 Wt Assessor's Parcel Number: Project ID: Construction Permit No.: Estimated Construction Start Date Project Duration _ Months Emergency Contact: (, Name: 24 hour Phone: Perceived Threat to Storm Water Quality ❑l Medium (�J Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPS For City Use Only CITY OF CARLSBAD STANDARD TIER 1 SWPPP Approved By:,639r, QJ A ,� Date: E-29 Page 1 of 3 REV 4/30/10 Erosion Control Sediment Control BMPs Tracking Control Non -Storm Water Waste Management and Materials BMPs BMPs Management BMPs Pollution Control BMPs 0 o 2 ° w c c o, M 5 Best Management Practice c' H a E cc rn c °' y `� y 2: Cr Z aEi CU c (BMP) Description v� 5 E E y o, °' o, m U U o m a d y g c a� 'a O r2 Y Q�cc t` Q N Q O fC CO C V) C Q 'O N 'O N V C C Q Q N �� N O 7 E N N _ C •� O O C N O. LL °i7 N N N U C m ,p N N C N U N N a N U cD wQ` U) v—� in v LL 0 in> u) v)a in G in0r �a a a >— � � C in = cn 0 CASQA Designation '- 7 C? v co r` ao o N M n ao r N M a m ao U w U w U w w CO w cn w U w cn w cn U) v) LU cn w Q: �- Q: U) z (n z u) z v) z g 3 g g Construction Activity w U) Grading/Soil Disturbance Trench in/Excavation Stock ilin Drilling/Boring Concrete/Asphalt Saw cutting Concrete flatwork Paving Conduit/Pipe Installation Stucco/Mortar Work Waste Disposal Staging/Lay Down Area Equipment Maintenance and Fueling Hazardous Substance Use/Storage Dewaterin Site Access Across Dirt Other (list): Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example — If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 PLANNING DIVISION Development Services BUILDING PLAN CHECK Planning Division ✓� C I T Y O F APPROVAL 1635 Faraday Avenue �" /� [') ( `BAD P_29 (760) 602 4610 1w,,,, j� jl, (_,,,,j(,� (_,} 7 www.carlsbadca.eov DATE: 8-19-15 PROJECT NAME: PROJECT ID: PLAN CHECK NO: CB 15-2651 SET#: 1 ADDRESS: 2515 Chestnut Av APN: 167-270-40-00 ® This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required [:] Yes ® No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check APPROVAL has been sent to: For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton j Chris Giessen � Greg Ryan 760-602-4624 760-602-2734 7 60-602-4663 Chris.Sexton@carlsbadca.gov c hristoph �s Gina Ruiz filly Marshall Cindy Wong 760-602-4675 760-602-2741 760-602.4662 Gina.Ruiz@carlsbadca.gov Val Gynth a,Wong.5lop„ .g� ,,,lov,,, Linda Ontiveros er Dominic Fi ri 760-G02-27 73 760-602-4664 Lin j.OntiverCa�. carl^.badc i.,Co on1jini,..Fieri4carl5�?a cc�. o Remarks: