HomeMy WebLinkAbout2519 PALOMAR AIRPORT RD; ; CB120787; Permit02-14-2013
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No
Building Inspection Request Line (760) 602-2725
CBI 20787
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
2519 PALOMAR AIRPORT RD CBAD
COMMIND Sub Type COMM
2130201800 Lot# 0
$300,999 00 Construction Type 5B
Reference # SDP09005
PALOMAR COMMONS- BLDG #5
4587 SF GOLD SHELL
Status
Applied
Entered By
Plan Approved
Issued
Inspect Area
Plan Ctieck #
ISSUED
04/13/2012
RMA
02/12/2013
02/12/2013
PC120016
Applicant
ANDREW STEVENSON ARCHITECT
STE 260
5465 MOREHOUSE DR
SAN DIEGO CA 92121
858 220-7224
Owner
COUNTY OF SAN DIEGO
PUBLIC AGENCY OOOOO
Building Permit $1,483 54 Meter Size
Add'l Building Permit Fee $0 00 Add'l Red Water Con Fee $0 00
Plan Check $1,038 48 Meter Fee $628 00
Add'l Building Permit Fee ($848 75) SDCWA Fee $13,476 00
Plan Check Discount $0 00 CFD Payoff Fee $0 00
Strong Motion Fee $63 21 PFF (3105540) $5,478 18
Park Fee $1,834 80 PFF (4305540) $5,056 78
LFM Fee $0 00 License Tax (3104193) $0 00
Bndge Fee $8,025 00 License Tax (4304193) $0 00
BTD #2 Fee $0 00 Traffic Impact Fee (3105541) $0 00
BTD #3 Fee $0 00 Traffic Impact Fee (4305541) $0 00
Renewal Fee $0 00 PLUMBING TOTAL $136 00
Add'l Renewal Fee $0 00 ELECTRICAL TOTAL $630 00
Other Building Fee $0 00 MECHANICAL TOTAL $55 50
Pot Water Con Fee $15,088 00 Master Drainage Fee $2,326 30
Meter Size Dl 5 Sewer Fee $0 00
Add'l Pot Water Con Fee $0 00 Redev Parking Fee $0 00
Reel Water Con Fee $0 00 Additional Fees $188 34
Green Bldg Stands (SB1473) Fee $12 00 HMP Fee $0 00
Fire Expedidted Plan Review $0 00 Green Bldg Standards Plan Chk
TOTAL PERMIT FEES $54,671 38
Total Fees $54,671 38 Total Payments To Date $54,671 38 Balance Due. $0 00
Inspector
_ APPROVM. FINAL APPRO\//.
Date Clearance
NOTICE Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions" You have 90 days from the date this permit was issued to protest imposition of these fees/exactions If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carisbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your nght to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any
fees/exactions of which vou have previouslv been given a NOTICE similar to this, or as to which the statute of limitations has previously othenwise expired
02-14-2013
Job Address
Permit Type
Parcel No
Reference #
CB#
Project Title
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No SW120201
2519 PALOMAR AIRPORT RD CBAD
SWPPP
2130201800 Lot#
CBI20787
PALOMAR COMMONS - BUILDING # 5
Status
Applied
Entered By
Issued
Inspect Area
Tier
Priority
Applicant
SUDBERRY PROPERTIES
ATTN MARKRADELOW
STE 260
5465 MOREHOUSE DR 92121-4714
858 546-3000
Emergency Contact
MARK RADELOW
Owner
COUNTY OF SAN DIEGO
PUBLIC AGENCY OOOOO
ISSUED
05/23/2012
RMA
02/14/2013
1
M
858 546-3000 XT526
SWPPP Plan Check
SWPPP Inspections
Additional Fees
$50 00
$210 00
$0 00
TOTAL PERMIT FEES $260 00
Total Fees $260 00 Total Payments To Date $260 00 Balance Due: $0 00
FINAL APPROVAL
HATE IX- 1%
SIGNATURE^
Inspection List
Permit* CB120787 Type COMMIND COMM
Date
09/18/2013
09/18/2013
09/12/2013
09/12/2013
09/09/2013
09/09/2013
08/01/2013
07/25/2013
07/16/2013
07/11/2013
06/10/2013
05/20/2013
05/17/2013
04/04/2013
03/22/2013
03/22/2013
03/21/2013
03/21/2013
Inspection Item
19 Final Structural
Final Combo
Gas/T est/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
Gas/Test/Repairs
Final Electncal
Gas/Test/Repairs
Intenor Lath/Drywall
Insulation
Exterior Lath/Drywall
Shear Panels/HD's
Roof/Reroof
Ftg/Foundation/Piers
Underground/Under Floor
Sewer/Water Sen/ice
Underground/Under Floor
Sewer/Water Service
Inspector
PD
PD
PD
PD
PB
PD
PD
PD
PD
PB
PD
PB
PB
PB
PB
Act
Rl
AP
Rl
AP
Rl
AP
CO
AP
AP
AP
AP
AP
AP
AP
AP
AP
CA
CA
PALOMAR COMMONS- BLDG #5
4587 SF COLD SHELL
Comments
GMR
Friday, September 20, 2013 Page 1 of 1
CITV OF
CARLSBAD
Building Division INSPECTION RECORD
B INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
B CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION
IZ FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Carlsbadca.qov/Buildina AND CLICK ON
"Request Inspection"
DATE:
CB120787 2519 PALOMAR AIRPORT RD
PALOMAR COMMONS-BLDG #5 ,
4587 SF COLD SHELL
COMMIND COMM
Lot# ANDREW STEVENSON ARCHiTECT
RECORD COPY
THE FOLLOWING (CHECKED) APPROVALS ARE REQUIRED PRIOR TO REOUESTIMG A FINAL BUILDING INSPECTION
If you have any questions please call the applicable divisions at the phone numbers provided below. After all required approvals are
signed off- fax to 760-602-8560, email to bldqinspections(a>carlsbadca.qov or bring in a COPY of this card to. 1635 Faraday Ave.,
Carlsbad, CA 92008. Building Inspectors can be reached at 760-602-2700 between 7:30 am - 8:00 am the day of your inspection.
Requfred for Final If Checked Date Inspector Notes
[3^^nning/Landscape 760-944-8463 Allow 48 hours
Q^pM&l (Engineenng Inspections) 760-438-389! Call before 2 pm
BTpire Prevention 760-602-4660 A"ow 48 hours qW 1^
• 11 t 1 r
•
Type of Inspection | Date inspector Type of Inspection | Date Inspector
BUILDING ELECTRICAL
FOUNDATION r/ /"^ • ELECTRIC UNDERGROUND • UFER
REINFORCED STEEL r f '-^ ROUGH ELECTRIC WALLS ^ J>X n /err
MASONRY ROUGH ELECntlC CEILING
• GROUT • WALL DRAINS • ELECTRIC SERVICE • TEMPORARY
TILT PANELS • BONDING • POOL
POUR STRIPS PHOTOVOLTAIC
COLUMN FOOTINGS FINAL
SUBFRAME • FLOOR • CEILING MECHANICAL
ROOFSHEATHING ?B UNDERGROUND DUCTS & PIPING
EXT. SHEAR PANELS r 3 • DUCT & PLENUM • REF. PIPING
FRAME HEAT-AIR COND. SYSTEMS
INSULATION 7-//-/3 VENTILATION SYSTEMS
EXTERIOR LATH FINAL
INTERIOR LATH & DRYWALL
FINAL OCCUPANCY
PLUMBING Date Inspector FIRE Date /^Inspector
^SEWER & BL/CO DPI/CO A/S UNDERGROUND VISUAL
UNDERGROUND DWASTE • WATER X A/S UNDERGROUND HYDRO
TOPOUT • WASTE • WATER A/S UNDERGROUND HUSH
TUB & SHOWER PAN r "" • A/S OVERHEAD VISUAL
• GASTEST • GAS PIPING H A/S OVERHEAD HYDROSTATIC
• WATER HEATER • SOLAR WATER 1—^. A/S HNAL
FINAL F/A ROUGH-IN
STORM WATER F/A FINAL
600 - PRE-CONSTRUCTION MEETING FIXED EXTINGUISHING SYSTEM ROUGH-IN
603-FOLLOW UP FIXED EXTING SYSTEM HYDROSTATIC TEST ' T 605-NOTICE TO CLEAN FIXED EXTINGUISHING SYSTEM FINAL
607-WRrrTEN WARNING MEDICALGAS PRESSURE TEST
609-NOTICE OFVIOLATION MEDICAL GAS FINAL
610- VERBALWARNING /
FINAL Hi
REV6«012 SEE BACK FOR SPECIAL NOTES
Field Summary Report
2195 Faraday Ave, Suite K, Carlsbad, CA, 92008 Phone 760-431-3747 Fax 760-431-3748
Client: /'^,£H„rr) Date: ^licJj'K (7Xu^X
Site Location: Project No.: ^uyj- 'AJ9S&X'
Tech. Name: I v. i^//M<£rX Project Name: X/?/£^^jn/ j^/X^^/r ^c,v.^>tAi<c
Contractor: Superintendent: yr)i:?^a^& t^Jx^/j,.^
/
Type of Observation/Testing:
Grading • Storm Dram • Water • Sewer • /^Y^TJM'^-^^^X^/'^-^f
Gas / Electric • Retaining Wall • Subgrade • Base • Other y^^t ^/pf^X/S"
Field Summary: c^^i <c nf X^Ap/>»<y/.o -^/j> y^y<^^r / ^^oi^/Ar X^^/Xy j
/ ' X' '
Equipment Working:
Technician Signature: I .1 /// j X/Af*
Hours Sat Sun Mon Tues Wed Thur 3/f) Fn.
Client X
RepresentativeA/erified by j „ ; . /7 / *^
Pnnt Sigh /
SEE
PC120016
FOR
MORE
INFO