HomeMy WebLinkAbout2519 Wellspring St; ; CBRA2017-0272; PermitPrint Date: 08/09/2018
Job Address: 2519 Wellspring St
Permit
(city of
Carlsbad
Permit No: CBRA2017-0272
Permit Type: BLDG-Associated Permit Residentia Work Class: Single Family Detached Status: Closed -Finaled
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
2081915100 Lot#:
$612,974.82 Reference #:
1
4.00
Construction Type:
Bathrooms:
Orig. Plan Check#:
201 Applied: 10/26/2017
DEV2016-D039 Issued: 12/12/2017
VB Permit
C;,i" 1,;-03 Finaled:
4.50 Inspector: CRenf
PC150042 Final
Plan Check#: PC2D16-0066 Inspection: 8/9/2018 3:10:33PM
Project Title: THE VISTAS
Description: THE VISTAS: PHASE 9 / LOT 201 / PLAN 4 / 3,897 SF LIV/ 432 SF GARAGE/ 229 SF PATIO
Applicant: Owner:
TOLL BROS INC
JOANN EPSTINE
INACTIVE-RANCHO COSTERA LLC -2483
725 W Town And Country Rd, 200
ORANGE, CA 92868-4709
760-720-5485
725 W Town And Country Rd, 200
ORANGE, CA 92868-4723
714-347-1300
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
COMMUNITY FACILITIES DISTRICT (CFD) FEE -RES
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES -inside CFO
SB1473 GREEN BUILDING STATE STANDARDS FEE
SOCWA SYSTEM CAPACITY CHARGE 3/4" Displacement
SEWER BENEFIT AREA FEES -B
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
SWPPP INSPECTION FEE TIER 1-Medium BLOG
TRAFFIC IMPACT Residential Single Family w/in CFO
TRAFFIC IMPACT Residential Single Family w/in CFO
WATER METER FEE 1" Displacement
WATER SERVICE CONNECTION FEE 3/4" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 3/4" Displacement
Tota\ Fees: $37,019.07 Total Payments To Date: $34,219.07
Contractor:
TOLL BROS INC
725 W Town And Country Rd, 200
ORANGE, CA 92868-4709
760-720-5485
Balance Due: $2,800.00
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
$2,376.00
$1,530.14
$1,723.10
$96.00
$170.00
$110.00
$224.00
$11,156.14
$25.00
$5,029.00
$1,3D4.00
$934.00
$79.69
$238.00
$2,800.00
$2,800.00
$352.00
$5,944.00
$128.00
PERMIT INSPECTION HISTORY REPORT (CBRA2017-0272)
Permit Type; BLDG-Associated Permit Residential Application Date: 10/26/2017 Owner:
Work Class: Single Family Detached Issue Date: 12/12/2017 Subdivision:
Status: Closed -Finaled Expiration Date: Address:
IVR Number: 7253
Scheduled
Date
Actual
Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
06/07/2018 05/07/2018
05108/2018 06/08/2018
08/09/2018 08/08/2018
August 09, 2018
Checklist Item
BLDG-Building Deficiency
BLDG-Electric Meter 067231-2018
Release
Checklist Item
BLDG-Building Deficiency
BLDG-Fire Final 067428-2018
BLDG-Final
Inspection
Checklist Item
FIRE-Building Final
066286-2018
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
COMMENTS
Passed Chris Renfro
COMMENTS
Passed Carisa Workman
COMMENTS
Passed Chris Renfro
COMMENTS
INACTIVE -RANCHO COSTERA
LLC -2483
2519 Wellspring St
Carlsbad, CA 92010-5604
Relnspection Complete
Passed
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Complete
Passed
Yes
Yes
Yes
Yes
Yes
Page 2 of 2
PERMIT INSPECTION HISTORY REPORT (CBRA2017-0272)
Permit Type: BLDG-Associated Pennit Residential Application Date: 10/26/2017 Owner: INACTIVE -RANCHO COSTERA
LLC -2483
Work Class: Single Family Detached Issue Date: 12/12/2017 Subdivision:
Status: Closed -Finaled Expiration Date: Address: 2519 Wellspring St
Carlsbad, CA 92010-5604
IVR Number: 7253
Scheduled Actual Complete Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection
01,06/2018 BLDG-11 045302-2018 Passed Chris Renfro Complete
Foundatlon/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
01/06/2018 01/06/2018 BLDG-11 045155-2018 Failed Chris Renfro Reinspection Complete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLOG-12 Steel/Bond 045156-2018 Passed Chris Renfro Complete
Beam
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
02/28/2018 02/28/2018 BLOG-15 049990-2018 Passed Chris Renfro Complete
Roof/ReRoof (Patio)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03/12/2018 03/12/2018 BLOG-13 Shear 051334-2018 Passed Chris Renfro Complete
Panels/HD (ok to
wrap)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
03/19/2018 03/19/2018 BLOG-84 Rough 051936-2018 Passed Chris Renfro Complete
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
03127/2018 0312712018 BLOG-18 Exterior 053023-2018 Passed Chris Renfro Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-23 062808-2018 Passed Chris Renfro Complete
Gas/TestfRepalni.
August 09, 2018 Page 1 of 2
,<~'))
~· CITY OF CBRA2017-0272 \€C-h:,Jo \
CARLSBAD
Building Division INSPECTION RECORD. 2519 WELLSPRING ST
THE VISTAS: PHASE 9/LOT 201 /PLAN 4 / 3.897 SF UV/
432 SF GARAGE / 229 SF PATIO
(?' "'IJSPECTION RECORD CARD WITH APPROVED ' SANS MUST BE KEPT ON THE JOB
DEV2016-0039 0 CALL BEFORE 3:00 pm FOR NEXT WORI< DAY INSPECTION
0 FOR BUILDING INSPECTION CALL: 760-602-2725 PC2016-0066
ORGOTO:www.~arlsbadca.gov/BuildinqANirll!'~oRD CQP1ZRA2017 0272
"Request Inspection" I'{ C'-'' 'f' •
2081915100
10/27/2017
DATE: -( -"\
If "YES" is checked below that Division's approval is required m..ior to rg_gtJ~~ting a Final Building Inspection. If you have any questions
please call the applicable divisions at the phone numbers provided below. After all required approvals are signed off-fax to
760-602-8560, email to .bJdgim;nections@carlsbadca. <ov or bring in a COPY of this card to: 1635 Faraday Ave., Carlsbad.
m!'.!I 'Ii■-
IF MARl<ED 'YES", IT IS REQUIRED PRIOR TO ANY CONSTRUCTION
STORM WATER PRECON MEETING REQUIRED 760-602-2725 Allow 24 hours ---IF MARKED 'YES", APPROVAL REQUIRED PRIOR TO REQUESTING BUILDING
Fire Prevention 760-602-4660 Allow 48 hours
Planning/Landscape 760-944-8463 Allow 48 hours
CM&l (Engineering Inspections) 760-438-3891 Call before 2 pm
CODE ~t BUILDING
#12 REINFORCED STEEL
#66 MASONRY PRE GROUT #33 Q,E EC SERVICE #32□TEMPORARY
l l □ GROUT □ WALL DRAINS #35 PHOTO VOLTAIC
#10 TILT PANELS #38 SIGNS
#11 POUR STRIPS
#11 COLUMN FOOTINGS
==:__------+----f------l BLDG-FINAL
CODE" MECHANICAL
#14 SUBFRAME □ FLOOR □ CEILING #41 UNDERGROUND DUCTS & PIPING
#15 ROOF SHEATHING #44 □ DUCT & PLENUM □ REF. PIPING
#13 EXT. SHEARJ'ANELS #43 HEAT-AIR COND. SYSTEMS
#16 INSULATION BLDG-FINAL
#18
#17 #81 UNDERGROUND (11,12,21,31)
Date
Date
Date
Notes
COPY OF CARD
REOUJ!'l:ED
Inspector
Ins ector
Ins ector
#82 DRYWALL,EXTLATH, GAS TES (17,18,23) '3 Z.1"
#24 TOP OUT □ WASTE □WTR
#27 TUB & SHOWER PAN
#23 □GAS TEST □GAS PIPING
#25 WATER HEATER
#28 SOLAR WATER
BLDG-FINAL
coos it POOLS
#51 POOL EXCAV / STEEL
#52 PLUMBING
#53 ELEC /CONDUIT/WIRING J :1 EQUIPOTENTIAL BOND
#Si{ PREPLASTER/ FENCE/ ALARMS
#57 GUNITE
BLDG-FINAL
REV 9117
Date
Date Ins ector
#83 ROOF SH EATING, EXT SHEAR (13,15)
#84 FRAME ROUGH COMBO (14,24,34,44)
#85 T-Bar (14,24,34,44)
BLDG· FINAL OCCUPANCY
A/5 UNDERGROUND VISUAL
A/S UNDERGROUND HYDRO
A/S UNDERGROUND FLUSH
A/S OVERHEAD VISUAL
A/S OVERHEAD HYDROSTATIC
A/S FINAL
F / A ROUGH•IN
F/AFINAL
FIXED EXTINGUISHING SYSTEM ROUGH-IN
FIXED EXTING SYSTEM HYDROSTATIC TEST
FIXED EXTINGUISHING SYSTEM FINAL
MEDICAL GAS PRESSURE TEST
MEDICAL GAS FINAL
Date Ins ector
SEE BACK FOR SPECIAL NOTES
Michael Baker
INTERNATIONAL
January 2, 2018
City of Carlsbad
Building Department
1635 Faraday Avenue
Carlsbad, CA 92008
Subject:
Inspector:
Vistas -Lots 175,176,177,178,199,200, & 201
City of Carlsbad Tract No. CT 13-03
JN 143824
Michael Baker International has performed a field survey on December 29, 2017 to field check the
building footing forms for Lots 175-178 & 199-201 on Wellspring Street. The results of the field
survey reveal the footing forms to be within substantial conformance, both horizohtally (0.1 O'±) and
vertically (0.05'_±) with the City of Carlsbad approved precise grade plans DWG 480-3C, dated
February 9, 2016.
Sincerely,
Tim Thiele, P.E.
Project Manager
H:\PDAT A\ 143824._ROBERTSON RANCH\ADMJN\CORRESPNDNC\FORM CERTS\TOLL BRO _FORM _PA6_ CERT1 3 _ 175-178_ 199-201.DOC
PLANNING ■ DESIGN ■ CONSTRUCTION
5050 Avenida Encinas, Suite 260, Carlsbad, California 92008 # 760.476.9193 # FAX 760.476.9198
Offices located throughout the Country ■ www.mbakerlntl.com
0 -o··.· . .
Project Name: .. Project No.: Date: Report No.:
QI}~ (4'-"ll ~c.. \l1s\-...) 13302-3 -. 2.018 -QI-O 2:.-,ff..
Location: Author: Day: (circle one)
( "'(\~\, .. ,{ r"' Ii ( oiri i'" "'"").,, ~,k.r M(YWT F s s
Client: Superintendent: Contractor:\ -Foreman:
To\\ Br .. the-0 j11MU s fr.,"'·her
Soil Engineer: Geologist: · ~ Weather: (circle one)
\2_;, ~A~"r"' ~ WPiy.Vf-Sunn~ Overcast Rainy Other:
Unit/Phase/Lots: \J Plan File No. Permit No. (..~\l-1\,')..Cl\1 Wf$ I 15 -Ill Glv,J I qq -2-0 I -~'U>'\-,-04bs -o~~o
-o--:in -0-..,1 •1 -0l..l"l.
Footina Observation Summary:
Initials: 'P-KW A representative of LGC Valley, Inc. observed the on-site soil conditions. The soil conditions at
Date: ~\c-,.\J the site are substantially in conformance with those assumed in the geotechnical report
Initials: ~\<-.W A representative of LGC Valley, Inc. observed the footing excavation(s). The footing
Date: ~ excavation(s) extend into the proper bearing strata and are in general conformance with the
recommendations of the geotechnical report
Initials:
Date: , --·--... :' ··10·
Notes:
1. Footing excavations should be cleaned of loose soil and debris and thoroughly moistened just prior to placing the concrete.
2. Line and grade of the footing excavation(s) are not part of the purview of LGC Valley, Inc.
3, In the event of a site change subsequent to our observation of footing excavations and prior to concrete placement (Le. heavy rain, a
construction/placement delay, etc.), LGC should be contacted to perform a recheck of footing excavations and site observations,
as necessary.
'
e~J .. \\ w .. ir<f Jc,,-v,;~ 1 1,.0,g 1.,0
For LGC Valley, Inc. -Date I Technician Hours
FOOTING OBSERVATION
Received by:
LGC VALLEY, INC ... ·
SUMMARY Print: Geotechnical Consulting
White -File Copy Yellow -Client Copy Pink -Field Copy Gold -Client/Agency Copy
0 0
'· Project No.: Date: Report No.: Project Name:
Q ow~ '4.\1\,l 71c.. \l1s\-,..) 13302.J-2.018 -(}(-O 2:-· >'" ~-... •
Location: Author: Day: ( circle one)
( <?\(,~\:, .. ,{ {,,.,\I \oo"\ i'"-'2-.,.,_k l,.,.,Pl,kr M Cf) WT F s s
Client: Superintendent: Contractor1 ..., Foreman:
To\\ Bt --the-0 j " l"Y\.(._.( s fni'At\.ev-
Soil Engineer: Geologist: Weather: (circle one)
~ ~e\~--r-"' v,J,,,~ Sunn~ Overcast Rainy Other:
Unit/Phase/Lots: V Plan File No. Permit No. C..l!!~"'-. ').tl\l
\,J-s. 115' -177 ci.,,t I '1~ · z._o I -<::, 1£,'\--0¼5 -0 ~1,,tt -o-"""' '-oac,1 ,1 -01.., ..
Footina Observation Summarv:
Initials: ~l,J A representative of LGC Valley, Inc. observed the on-site soil conditions. The soil conditions at
Date: f..-'f...\,J the site are substantially in conformance with those assumed in the geotechnical report.
Initials: ~"w A representative of LGC Valley, Inc. observed the fooling excavation(s). The footing
Date: ~ excavation(s) extend into the proper bearing strata and are in general conformance with the
recommendations of the geotechnical report.
Initials:
Date: ' '
Notes:
1. Footing excavations should be cleaned of loose soil and debris and thoroughly moistened just prior to placing the concrete.
2. Line and grade of the footing excavation(s) are not part of the purview of LGC Valley, Inc.
3 .. In the event of a site change subsequent to our observation of footing excavations and prior to concrete placement (i.e. heavy rain, a
construction/placement delay, etc.), LGC should be contacted to perform a recheck of footing excavations and site observations,
as necessary.
'
e:~ .. ,L\\ \f'.J,.lHC Jc. w,, ""7 1 1,,.018 1..0
I For LGC Valley, Inc. -Date Technician Hours
FOOTING OBSERVATION
Received by:
LGC VALLEY, INC .... ,.
SUMMARY Print: Geotechnical Consulting ..
White -File Copy Yellow -Client Copy Pink -Field Copy Gold -Client/Agency Copy
Southwest Inspection and Testing, Inc.
441 Commercial Way, La Habra, Ca 90631
(562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026
REGISTERED INSPECTOR'S DAILY REPORT
I SWIT Job No.
I <"c,t3'--f
Dat1 /,
I o'-1 ,er
TYPE OF □ Reinforced Concrete □ Welding □ DIN~poxy •
INSPECTION ~ Post Tensioned Concrete □ Fireproofing □ Wood Framing
REQUIRED I Reinforced Masonry □ Asphalt □ Other
Job Address -Jt_ .,__,,,,_ ~ rz,.,,, o..,J Tract No. Lot No. a.c. 7 _1 I .-0
Job Name · l/1, <..'f'_,A ,.. P~o. ~ ~ .... !SS;!e<! ~.1 --_ . -. ,
Type of Structure ~ -.I" Architect --Z:,
...v
f-1a~_!.al D1;scri@~n ~typ~ grade, ~u,::e)A , .~ Engineer ~-A.,. _ .... . 7"
~-,,,...__ . .., , ,Vz,_.,,..,..( -~= / ,4.-L,'u Contractor I r>t , -. -,, I , I
Inspector's Name ~ ,>J'i), . ' Subcontractor .,, .... ,._,. . -.r --TESTS PERFORMED
SAMPLE AIR CONC WATER TIME
SET# TRUCK# TICKET# LOCATION SLUMP TEMP TEMP ADDED CAST MIX# REMARKS
INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS,
REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF
TEST SAMPLES TAKEN: STRUCT. CONNECTIONS !WELD MADE H,T. BOLTS TORQUED\ CHECKED, ETC.
-A'"'b --1_,,. --------<..,o-r-->1f.1t::t°l-~-? 01
--~---.__ .. -I ,11. .-./_ ~ • ...-) 01 A• -• -. -7-rrtF" -• -£lh ., ..L °Z"-c..) I e:;, _ • ,, ,,.,,,.___,,.,,,,,
• A~ ~"Tr:: -. ,_ _,
~ ----., '
.I • /?/) ... --,L' --/'_ '---<:,h~ (.QQ ~ fF-Z.0·1 . C. -~ --"C"cA~r-,.,,.., -·-""' ~~ .. .(?__ .,...__ -'I • c.. ' " • •
.,,;,i 7.-# s. -A .n,_,, <'...-<..--• .n • . , , .,.,,, "' .
'1--, ='T" # 1-=ta 7.<"?'7 l ~,£,.. , ---. , -sr. # .,, ---7 ~,r? c,'Z~'-('
~ 1(----7--;?,7--..; .. " N=-c.. ,~ -• ,..,,-1'7 ,..,,~
., * -z..,o 1 "Z....5'1 or .,,. • 'flt -_,, -• Z,.or-7 c,?(;,C-, .
CERTIFICATION OF COMPLIANCE CONTINUED ON NEXT PAGE 0 PAGE OF
TIMEIN TIMEOUT SAMPLES
Approved By k ~
Project Superintendent
White -Office Copy o Canary-Accounting Copy • Pink -Inspector's Copy • Goldenrod -Jobsite Copy
Southwest Inspection and Testing, Inc.
441 Commercial Way, La Habra, Ca 90631
(562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026 .
REGISTERED INSPECTOR'S DAILY REPORT
I SWIT Job No.
,<.---,r3~ I Oat/. Ii f o'-1 ,a
TYPE OF □ Reinforced Concrete □ Welding □ DINllpoxy
INSPECTION f'J" Post Tensioned Concrete □ Fireproofing □ Wood Framing
REQUIRED I Reinforced Masonry □ Asphalt □ Other
Job Address -...J{... ...,_..:; --= r:z;_., o..,J Tract No. LotNo ___ ?.
1 /. .-0
Job Name . \ /1, <,_ T'/-1. .... P~O-,tZ.,,,_ , -lss~eq ~.1 _. _ ..... ,
Type of Structure ~ ,,,,..-r .I"-~ Architect ..,., {,.,.__
~I Descri@~n (1YP.J!,. grade, source) '---· • '. _,, -:.a. i' -.-c:-Engineer ~-A, -A .-
~ . ~ -. -s. -Yz...,. ,,( ""-=<'-/ .,,_.,u Contractor l r ,..,. -" ----I ' •. '
Inspector's Name i,s Mt~ ' Subcontractor , . ~ "',,. . ' --TESTS PERFORMED
SAMPLE AIR CONC WATER TIME
SET# TRUCK# TICKET# LOCATION SLUMP TEMP TEMP ADDED CAST MIX# REMARKS
INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS,
REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF
TEST SAMPLES TAKEN: STRUCT. CONNECTIONS IWELD MADE H.T. BOLTS TORQUED\ CHECKED. ETC. --,,_ ,,, --tu -. .----,,,. JrVO._A <...,Or ,;• l&f""T -~-? 01
-~ ~ . . I Ll , y _ ..-,,j _, ,r ) D, A ~ J/l!!!J: • • -~. -~ m" -, ,
.~AS. /t.!z ., ~ -z: ...,._, c:.. . ) ..::,n;: _. , I ~ ,,, . ---... /. . / -• ,'
<,iL , ,,.,__6 -• .I • /'?r) •A --c:::.. ~r .. L-c,-...tl= (&;&; FZot, . ,
--T""vi~~--.. ,., --.......,., -~ -r?.. ....... -, ,, • u ., -c
~t ?--6S, " • "'le:: <=-<.....-•o A •I_&..:.. .
.., e:, T" 4 I "i '°' '7.~77 1 A ,Lao, , ---. -sr. # ,, ---7 ~,'7 ozc.. V
1f---7~ ..
~ "7',7.~ ..
., ;t z...o 1 <-S1°1 .,,. .
CERTIFICATION OF COMPLIANCE
I HEREBY CERTIFY THAT I HAVE OBSERVED TO THE BEST OF MY KNOWLEDGE
ALL OF THE ABOVE REPO WORK U LESS OTHERWISE NOTED. l HAVE
FOUND THIS WORK T,...,._..,LY WITH TH A ROVED PLANS, SPECIFICATION,
AND APPLICABLE LDING LAWS.
" 'f/1:.. C. f'" · -,..,17 c,~
• 'lit -" -• Zor7 o,.c.e,_
CONTINUED ON NEXT PAGE 0 PAGE OF
TIMEIN TIMEOUT SAMPLES
Approved By K ~
Project Superintendent
White -Office Copy • Canary-Accounting Copy • Pink -Inspector's Copy • Goldenrod -Jobsite Copy