Loading...
HomeMy WebLinkAbout2519 Wellspring St; ; CBRA2017-0272; PermitPrint Date: 08/09/2018 Job Address: 2519 Wellspring St Permit (city of Carlsbad Permit No: CBRA2017-0272 Permit Type: BLDG-Associated Permit Residentia Work Class: Single Family Detached Status: Closed -Finaled Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: 2081915100 Lot#: $612,974.82 Reference #: 1 4.00 Construction Type: Bathrooms: Orig. Plan Check#: 201 Applied: 10/26/2017 DEV2016-D039 Issued: 12/12/2017 VB Permit C;,i" 1,;-03 Finaled: 4.50 Inspector: CRenf PC150042 Final Plan Check#: PC2D16-0066 Inspection: 8/9/2018 3:10:33PM Project Title: THE VISTAS Description: THE VISTAS: PHASE 9 / LOT 201 / PLAN 4 / 3,897 SF LIV/ 432 SF GARAGE/ 229 SF PATIO Applicant: Owner: TOLL BROS INC JOANN EPSTINE INACTIVE-RANCHO COSTERA LLC -2483 725 W Town And Country Rd, 200 ORANGE, CA 92868-4709 760-720-5485 725 W Town And Country Rd, 200 ORANGE, CA 92868-4723 714-347-1300 BUILDING PERMIT FEE ($2000+) BUILDING PLAN CHECK FEE (BLDG) COMMUNITY FACILITIES DISTRICT (CFD) FEE -RES ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES -inside CFO SB1473 GREEN BUILDING STATE STANDARDS FEE SOCWA SYSTEM CAPACITY CHARGE 3/4" Displacement SEWER BENEFIT AREA FEES -B SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL SWPPP INSPECTION FEE TIER 1-Medium BLOG TRAFFIC IMPACT Residential Single Family w/in CFO TRAFFIC IMPACT Residential Single Family w/in CFO WATER METER FEE 1" Displacement WATER SERVICE CONNECTION FEE 3/4" DISPLACEMENT (P) WATER TREATMENT CAPACITY CHARGE 3/4" Displacement Tota\ Fees: $37,019.07 Total Payments To Date: $34,219.07 Contractor: TOLL BROS INC 725 W Town And Country Rd, 200 ORANGE, CA 92868-4709 760-720-5485 Balance Due: $2,800.00 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov $2,376.00 $1,530.14 $1,723.10 $96.00 $170.00 $110.00 $224.00 $11,156.14 $25.00 $5,029.00 $1,3D4.00 $934.00 $79.69 $238.00 $2,800.00 $2,800.00 $352.00 $5,944.00 $128.00 PERMIT INSPECTION HISTORY REPORT (CBRA2017-0272) Permit Type; BLDG-Associated Permit Residential Application Date: 10/26/2017 Owner: Work Class: Single Family Detached Issue Date: 12/12/2017 Subdivision: Status: Closed -Finaled Expiration Date: Address: IVR Number: 7253 Scheduled Date Actual Start Date Inspection Type Inspection No. Inspection Status Primary Inspector 06/07/2018 05/07/2018 05108/2018 06/08/2018 08/09/2018 08/08/2018 August 09, 2018 Checklist Item BLDG-Building Deficiency BLDG-Electric Meter 067231-2018 Release Checklist Item BLDG-Building Deficiency BLDG-Fire Final 067428-2018 BLDG-Final Inspection Checklist Item FIRE-Building Final 066286-2018 Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final COMMENTS Passed Chris Renfro COMMENTS Passed Carisa Workman COMMENTS Passed Chris Renfro COMMENTS INACTIVE -RANCHO COSTERA LLC -2483 2519 Wellspring St Carlsbad, CA 92010-5604 Relnspection Complete Passed Yes Complete Passed Yes Complete Passed Yes Complete Passed Yes Yes Yes Yes Yes Page 2 of 2 PERMIT INSPECTION HISTORY REPORT (CBRA2017-0272) Permit Type: BLDG-Associated Pennit Residential Application Date: 10/26/2017 Owner: INACTIVE -RANCHO COSTERA LLC -2483 Work Class: Single Family Detached Issue Date: 12/12/2017 Subdivision: Status: Closed -Finaled Expiration Date: Address: 2519 Wellspring St Carlsbad, CA 92010-5604 IVR Number: 7253 Scheduled Actual Complete Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection 01,06/2018 BLDG-11 045302-2018 Passed Chris Renfro Complete Foundatlon/Ftg/Pier s (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 01/06/2018 01/06/2018 BLDG-11 045155-2018 Failed Chris Renfro Reinspection Complete Foundation/Ftg/Pier s (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency No BLOG-12 Steel/Bond 045156-2018 Passed Chris Renfro Complete Beam Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 02/28/2018 02/28/2018 BLOG-15 049990-2018 Passed Chris Renfro Complete Roof/ReRoof (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 03/12/2018 03/12/2018 BLOG-13 Shear 051334-2018 Passed Chris Renfro Complete Panels/HD (ok to wrap) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 03/19/2018 03/19/2018 BLOG-84 Rough 051936-2018 Passed Chris Renfro Complete Combo(14,24,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout Yes BLDG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers 03127/2018 0312712018 BLOG-18 Exterior 053023-2018 Passed Chris Renfro Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-23 062808-2018 Passed Chris Renfro Complete Gas/TestfRepalni. August 09, 2018 Page 1 of 2 ,<~')) ~· CITY OF CBRA2017-0272 \€C-h:,Jo \ CARLSBAD Building Division INSPECTION RECORD. 2519 WELLSPRING ST THE VISTAS: PHASE 9/LOT 201 /PLAN 4 / 3.897 SF UV/ 432 SF GARAGE / 229 SF PATIO (?' "'IJSPECTION RECORD CARD WITH APPROVED ' SANS MUST BE KEPT ON THE JOB DEV2016-0039 0 CALL BEFORE 3:00 pm FOR NEXT WORI< DAY INSPECTION 0 FOR BUILDING INSPECTION CALL: 760-602-2725 PC2016-0066 ORGOTO:www.~arlsbadca.gov/BuildinqANirll!'~oRD CQP1ZRA2017 0272 "Request Inspection" I'{ C'-'' 'f' • 2081915100 10/27/2017 DATE: -( -"\ If "YES" is checked below that Division's approval is required m..ior to rg_gtJ~~ting a Final Building Inspection. If you have any questions please call the applicable divisions at the phone numbers provided below. After all required approvals are signed off-fax to 760-602-8560, email to .bJdgim;nections@carlsbadca. <ov or bring in a COPY of this card to: 1635 Faraday Ave., Carlsbad. m!'.!I 'Ii■- IF MARl<ED 'YES", IT IS REQUIRED PRIOR TO ANY CONSTRUCTION STORM WATER PRECON MEETING REQUIRED 760-602-2725 Allow 24 hours ---IF MARKED 'YES", APPROVAL REQUIRED PRIOR TO REQUESTING BUILDING Fire Prevention 760-602-4660 Allow 48 hours Planning/Landscape 760-944-8463 Allow 48 hours CM&l (Engineering Inspections) 760-438-3891 Call before 2 pm CODE ~t BUILDING #12 REINFORCED STEEL #66 MASONRY PRE GROUT #33 Q,E EC SERVICE #32□TEMPORARY l l □ GROUT □ WALL DRAINS #35 PHOTO VOLTAIC #10 TILT PANELS #38 SIGNS #11 POUR STRIPS #11 COLUMN FOOTINGS ==:__------+----f------l BLDG-FINAL CODE" MECHANICAL #14 SUBFRAME □ FLOOR □ CEILING #41 UNDERGROUND DUCTS & PIPING #15 ROOF SHEATHING #44 □ DUCT & PLENUM □ REF. PIPING #13 EXT. SHEARJ'ANELS #43 HEAT-AIR COND. SYSTEMS #16 INSULATION BLDG-FINAL #18 #17 #81 UNDERGROUND (11,12,21,31) Date Date Date Notes COPY OF CARD REOUJ!'l:ED Inspector Ins ector Ins ector #82 DRYWALL,EXTLATH, GAS TES (17,18,23) '3 Z.1" #24 TOP OUT □ WASTE □WTR #27 TUB & SHOWER PAN #23 □GAS TEST □GAS PIPING #25 WATER HEATER #28 SOLAR WATER BLDG-FINAL coos it POOLS #51 POOL EXCAV / STEEL #52 PLUMBING #53 ELEC /CONDUIT/WIRING J :1 EQUIPOTENTIAL BOND #Si{ PREPLASTER/ FENCE/ ALARMS #57 GUNITE BLDG-FINAL REV 9117 Date Date Ins ector #83 ROOF SH EATING, EXT SHEAR (13,15) #84 FRAME ROUGH COMBO (14,24,34,44) #85 T-Bar (14,24,34,44) BLDG· FINAL OCCUPANCY A/5 UNDERGROUND VISUAL A/S UNDERGROUND HYDRO A/S UNDERGROUND FLUSH A/S OVERHEAD VISUAL A/S OVERHEAD HYDROSTATIC A/S FINAL F / A ROUGH•IN F/AFINAL FIXED EXTINGUISHING SYSTEM ROUGH-IN FIXED EXTING SYSTEM HYDROSTATIC TEST FIXED EXTINGUISHING SYSTEM FINAL MEDICAL GAS PRESSURE TEST MEDICAL GAS FINAL Date Ins ector SEE BACK FOR SPECIAL NOTES Michael Baker INTERNATIONAL January 2, 2018 City of Carlsbad Building Department 1635 Faraday Avenue Carlsbad, CA 92008 Subject: Inspector: Vistas -Lots 175,176,177,178,199,200, & 201 City of Carlsbad Tract No. CT 13-03 JN 143824 Michael Baker International has performed a field survey on December 29, 2017 to field check the building footing forms for Lots 175-178 & 199-201 on Wellspring Street. The results of the field survey reveal the footing forms to be within substantial conformance, both horizohtally (0.1 O'±) and vertically (0.05'_±) with the City of Carlsbad approved precise grade plans DWG 480-3C, dated February 9, 2016. Sincerely, Tim Thiele, P.E. Project Manager H:\PDAT A\ 143824._ROBERTSON RANCH\ADMJN\CORRESPNDNC\FORM CERTS\TOLL BRO _FORM _PA6_ CERT1 3 _ 175-178_ 199-201.DOC PLANNING ■ DESIGN ■ CONSTRUCTION 5050 Avenida Encinas, Suite 260, Carlsbad, California 92008 # 760.476.9193 # FAX 760.476.9198 Offices located throughout the Country ■ www.mbakerlntl.com 0 -o··.· . . Project Name: .. Project No.: Date: Report No.: QI}~ (4'-"ll ~c.. \l1s\-...) 13302-3 -. 2.018 -QI-O 2:.-,ff.. Location: Author: Day: (circle one) ( "'(\~\, .. ,{ r"' Ii ( oiri i'" "'"").,, ~,k.r M(YWT F s s Client: Superintendent: Contractor:\ -Foreman: To\\ Br .. the-0 j11MU s fr.,"'·her Soil Engineer: Geologist: · ~ Weather: (circle one) \2_;, ~A~"r"' ~ WPiy.Vf-Sunn~ Overcast Rainy Other: Unit/Phase/Lots: \J Plan File No. Permit No. (..~\l-1\,')..Cl\1 Wf$ I 15 -Ill Glv,J I qq -2-0 I -~'U>'\-,-04bs -o~~o -o--:in -0-..,1 •1 -0l..l"l. Footina Observation Summary: Initials: 'P-KW A representative of LGC Valley, Inc. observed the on-site soil conditions. The soil conditions at Date: ~\c-,.\J the site are substantially in conformance with those assumed in the geotechnical report Initials: ~\<-.W A representative of LGC Valley, Inc. observed the footing excavation(s). The footing Date: ~ excavation(s) extend into the proper bearing strata and are in general conformance with the recommendations of the geotechnical report Initials: Date: , --·--... :' ··10· Notes: 1. Footing excavations should be cleaned of loose soil and debris and thoroughly moistened just prior to placing the concrete. 2. Line and grade of the footing excavation(s) are not part of the purview of LGC Valley, Inc. 3, In the event of a site change subsequent to our observation of footing excavations and prior to concrete placement (Le. heavy rain, a construction/placement delay, etc.), LGC should be contacted to perform a recheck of footing excavations and site observations, as necessary. ' e~J .. \\ w .. ir<f Jc,,-v,;~ 1 1,.0,g 1.,0 For LGC Valley, Inc. -Date I Technician Hours FOOTING OBSERVATION Received by: LGC VALLEY, INC ... · SUMMARY Print: Geotechnical Consulting White -File Copy Yellow -Client Copy Pink -Field Copy Gold -Client/Agency Copy 0 0 '· Project No.: Date: Report No.: Project Name: Q ow~ '4.\1\,l 71c.. \l1s\-,..) 13302.J-2.018 -(}(-O 2:-· >'" ~-... • Location: Author: Day: ( circle one) ( <?\(,~\:, .. ,{ {,,.,\I \oo"\ i'"-'2-.,.,_k l,.,.,Pl,kr M Cf) WT F s s Client: Superintendent: Contractor1 ..., Foreman: To\\ Bt --the-0 j " l"Y\.(._.( s fni'At\.ev- Soil Engineer: Geologist: Weather: (circle one) ~ ~e\~--r-"' v,J,,,~ Sunn~ Overcast Rainy Other: Unit/Phase/Lots: V Plan File No. Permit No. C..l!!~"'-. ').tl\l \,J-s. 115' -177 ci.,,t I '1~ · z._o I -<::, 1£,'\--0¼5 -0 ~1,,tt -o-"""' '-oac,1 ,1 -01.., .. Footina Observation Summarv: Initials: ~l,J A representative of LGC Valley, Inc. observed the on-site soil conditions. The soil conditions at Date: f..-'f...\,J the site are substantially in conformance with those assumed in the geotechnical report. Initials: ~"w A representative of LGC Valley, Inc. observed the fooling excavation(s). The footing Date: ~ excavation(s) extend into the proper bearing strata and are in general conformance with the recommendations of the geotechnical report. Initials: Date: ' ' Notes: 1. Footing excavations should be cleaned of loose soil and debris and thoroughly moistened just prior to placing the concrete. 2. Line and grade of the footing excavation(s) are not part of the purview of LGC Valley, Inc. 3 .. In the event of a site change subsequent to our observation of footing excavations and prior to concrete placement (i.e. heavy rain, a construction/placement delay, etc.), LGC should be contacted to perform a recheck of footing excavations and site observations, as necessary. ' e:~ .. ,L\\ \f'.J,.lHC Jc. w,, ""7 1 1,,.018 1..0 I For LGC Valley, Inc. -Date Technician Hours FOOTING OBSERVATION Received by: LGC VALLEY, INC .... ,. SUMMARY Print: Geotechnical Consulting .. White -File Copy Yellow -Client Copy Pink -Field Copy Gold -Client/Agency Copy Southwest Inspection and Testing, Inc. 441 Commercial Way, La Habra, Ca 90631 (562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026 REGISTERED INSPECTOR'S DAILY REPORT I SWIT Job No. I <"c,t3'--f Dat1 /, I o'-1 ,er TYPE OF □ Reinforced Concrete □ Welding □ DIN~poxy • INSPECTION ~ Post Tensioned Concrete □ Fireproofing □ Wood Framing REQUIRED I Reinforced Masonry □ Asphalt □ Other Job Address -Jt_ .,__,,,,_ ~ rz,.,,, o..,J Tract No. Lot No. a.c. 7 _1 I .-0 Job Name · l/1, <..'f'_,A ,.. P~o. ~ ~ .... !SS;!e<! ~.1 --_ . -. , Type of Structure ~ -.I" Architect --Z:, ...v f-1a~_!.al D1;scri@~n ~typ~ grade, ~u,::e)A , .~ Engineer ~-A.,. _ .... . 7" ~-,,,...__ . .., , ,Vz,_.,,..,..( -~= / ,4.-L,'u Contractor I r>t , -. -,, I , I Inspector's Name ~ ,>J'i), . ' Subcontractor .,, .... ,._,. . -.r --TESTS PERFORMED SAMPLE AIR CONC WATER TIME SET# TRUCK# TICKET# LOCATION SLUMP TEMP TEMP ADDED CAST MIX# REMARKS INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF TEST SAMPLES TAKEN: STRUCT. CONNECTIONS !WELD MADE H,T. BOLTS TORQUED\ CHECKED, ETC. -A'"'b --1_,,. --------<..,o-r-->1f.1t::t°l-~-? 01 --~---.__ .. -I ,11. .-./_ ~ • ...-) 01 A• -• -. -7-rrtF" -• -£lh ., ..L °Z"-c..) I e:;, _ • ,, ,,.,,,.___,,.,,,,, • A~ ~"Tr:: -. ,_ _, ~ ----., ' .I • /?/) ... --,L' --/'_ '---<:,h~ (.QQ ~ fF-Z.0·1 . C. -~ --"C"cA~r-,.,,.., -·-""' ~~ .. .(?__ .,...__ -'I • c.. ' " • • .,,;,i 7.-# s. -A .n,_,, <'...-<..--• .n • . , , .,.,,, "' . '1--, ='T" # 1-=ta 7.<"?'7 l ~,£,.. , ---. , -sr. # .,, ---7 ~,r? c,'Z~'-(' ~ 1(----7--;?,7--..; .. " N=-c.. ,~ -• ,..,,-1'7 ,..,,~ ., * -z..,o 1 "Z....5'1 or .,,. • 'flt -_,, -• Z,.or-7 c,?(;,C-, . CERTIFICATION OF COMPLIANCE CONTINUED ON NEXT PAGE 0 PAGE OF TIMEIN TIMEOUT SAMPLES Approved By k ~ Project Superintendent White -Office Copy o Canary-Accounting Copy • Pink -Inspector's Copy • Goldenrod -Jobsite Copy Southwest Inspection and Testing, Inc. 441 Commercial Way, La Habra, Ca 90631 (562) 941-2990 • (714) 526-8441 • Fax (562) 946-0026 . REGISTERED INSPECTOR'S DAILY REPORT I SWIT Job No. ,<.---,r3~ I Oat/. Ii f o'-1 ,a TYPE OF □ Reinforced Concrete □ Welding □ DINllpoxy INSPECTION f'J" Post Tensioned Concrete □ Fireproofing □ Wood Framing REQUIRED I Reinforced Masonry □ Asphalt □ Other Job Address -...J{... ...,_..:; --= r:z;_., o..,J Tract No. LotNo ___ ?. 1 /. .-0 Job Name . \ /1, <,_ T'/-1. .... P~O-,tZ.,,,_ , -lss~eq ~.1 _. _ ..... , Type of Structure ~ ,,,,..-r .I"-~ Architect ..,., {,.,.__ ~I Descri@~n (1YP.J!,. grade, source) '---· • '. _,, -:.a. i' -.-c:-Engineer ~-A, -A .- ~ . ~ -. -s. -Yz...,. ,,( ""-=<'-/ .,,_.,u Contractor l r ,..,. -" ----I ' •. ' Inspector's Name i,s Mt~ ' Subcontractor , . ~ "',,. . ' --TESTS PERFORMED SAMPLE AIR CONC WATER TIME SET# TRUCK# TICKET# LOCATION SLUMP TEMP TEMP ADDED CAST MIX# REMARKS INSPECTION SUMMARY-LOCATIONS OF WORK INSPECTED, TEST SAMPLES TAKEN, WORK REJECTED, JOB PROBLEMS, PROGRESS, REMARKS, ETC. INCLUDES INFORMATION ABOUT -AMOUNTS OF MATERIAL PLACED OR WORK PERFORMED, NUMBER, TYPE & IDENT. NO'S OF TEST SAMPLES TAKEN: STRUCT. CONNECTIONS IWELD MADE H.T. BOLTS TORQUED\ CHECKED. ETC. --,,_ ,,, --tu -. .----,,,. JrVO._A <...,Or ,;• l&f""T -~-? 01 -~ ~ . . I Ll , y _ ..-,,j _, ,r ) D, A ~ J/l!!!J: • • -~. -~ m" -, , .~AS. /t.!z ., ~ -z: ...,._, c:.. . ) ..::,n;: _. , I ~ ,,, . ---... /. . / -• ,' <,iL , ,,.,__6 -• .I • /'?r) •A --c:::.. ~r .. L-c,-...tl= (&;&; FZot, . , --T""vi~~--.. ,., --.......,., -~ -r?.. ....... -, ,, • u ., -c ~t ?--6S, " • "'le:: <=-<.....-•o A •I_&..:.. . .., e:, T" 4 I "i '°' '7.~77 1 A ,Lao, , ---. -sr. # ,, ---7 ~,'7 ozc.. V 1f---7~ .. ~ "7',7.~ .. ., ;t z...o 1 <-S1°1 .,,. . CERTIFICATION OF COMPLIANCE I HEREBY CERTIFY THAT I HAVE OBSERVED TO THE BEST OF MY KNOWLEDGE ALL OF THE ABOVE REPO WORK U LESS OTHERWISE NOTED. l HAVE FOUND THIS WORK T,...,._..,LY WITH TH A ROVED PLANS, SPECIFICATION, AND APPLICABLE LDING LAWS. " 'f/1:.. C. f'" · -,..,17 c,~ • 'lit -" -• Zor7 o,.c.e,_ CONTINUED ON NEXT PAGE 0 PAGE OF TIMEIN TIMEOUT SAMPLES Approved By K ~ Project Superintendent White -Office Copy • Canary-Accounting Copy • Pink -Inspector's Copy • Goldenrod -Jobsite Copy