HomeMy WebLinkAbout2521 PALOMAR AIRPORT RD; 105; CB141027; Permit07-23-2014
City of Carlsbad
1635 Faraday Av Carisbad.CA 92008
Commercial/Industrial Permit Permit No:
Building Inspection Request Line (760) 602-2725
CB141027
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
Project Title:
2521 PALOMAR AIRPORT RD CBADSt: 105
Tl Sub Type: COMM
2130201800 Lot#: 0
$51,151.00 Construction Type: 5B
Reference #
DIRTY DOGS: 1,378 SF SHELL TO
RETAIL
Status: ISSUED
Applied: 05/07/2014
Entered By: JMA
Plan Approved: 07/23/2014
Issued: 07/23/2014
Inspect Area
Plan Check #:
Applicant:
SUSANNA SAMANIEGO
Owner:
COUNTY OF SAN DIEGO
3611 OXFORD ST
CARLSBADCA 92010-2130
760-696-0502
PUBLIC AGENCY OOOOO
Building Permit $460.42 Meter Size
Add'l Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00
Plan Check $322.29 Meter Fee $0.00
Add'l Building Permit Fee $0.00 SDCWA Fee $0.00
Plan Check Discount $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $10.74 PFF (3105540) $930.95
Park Fee $0.00 PFF (4305540) $859.34
LFM Fee $0.00 License Tax (3104193) $0.00
Bridge Fee $0.00 License Tax (4304193) $0.00
BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $0.00
BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00
Renewal Fee $0.00 PLUMBING TOTAL $47.00
Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $149.00
Other Building Fee $0.00 MECHANICAL TOTAL $54.01
Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00
Meter Size Sewer Fee $0.00
Add'l Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00
Reel. Water Con. Fee $0.00 Additional Fees $0.00
Green BIdg Stands (SB 1473) Fee $1.00 HMP Fee ??
Fire Expedidted Plan Review $0.00 Green BIdg Standards Plan Chk ??
TOTAL PERMIT FEES $2,834.75
Total Fees: $2,834.75 Total Payments To Date: $2,834.75 Balance Due: $0.00
Inspector:
FINAL APPROVAL
Date: fi Clearance:
NOTICE; Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
refen-ed to as "fees/exactions." You have 90 days from the date this permit was issued to pnDtest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required infonnation with the City Manager for
processing In acconJance with Carlsbaci Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions ofwhich vou have oreviouslv been oiven a NOTICE similar to this, or as to which the statute of limitations has oreviouslv othenvise expired.
THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: EIPLANNING HIN ENGINEERING BUILOING rflRE •HEALTH •HAZMAT/APCD
^ CITY OF
CARLSBAD
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
Ph: 760-602-2719 Fax:760-602-8558
email: building@carlsbadca.gov
www.carisbadca.gov
PlanCheckNo. C^g>|<-|* \OZZ
Est. Value ^ Sl, /^/. >T>
Plan Ck. Deposit
Date SWPPP
JOB ADDRESS 5 Bu^iJUn-l Hie SUiTE#/SPACE#/UNIT#
/OS-to 10 - cofT
CT/PROJECT « ^HASE# # OF UNITS
0
# BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE
H
DESCRIPTION OF WORK: Include Square Feet of Affected Area(s)
Neyji/ a^dnsiry^fxcn sluUi con^sisi of r^ fa-^hi>6n^ ,r^^ U^^K -h^y^, diru^r^^
EXISTING USE PROPOSED USE GARAGE (SF)
NIA
PATIOS (SF) DECKS (SF) FIREPLACE
YES
AIR CONDITIONING
YESKINOD
FIRE SPRINKLERS
YESpPfNOl I
APPLICANT NAME
Primary Contact
PROPERTYOWNER
ADDRESS 5 /.
3lf/l Oxfrd 5^
ADDRESS
_ STATE . Vm CITY STATE ZIP
PHONE
'lb6 (p'\(^' 0<i/it-
FAX PHONE FAX
EMAIL EMAIL
om
DESIGN PROFESSIONAL A have-CONTRACTOR BUS. NAME
ADDRESS ADDRESS I nop .Wrcn/o \U/I^ M ^k^.
^ip CITY STATE ZIP CITY
T 77 I FAX PHONE FAX
EMAIL
CLASS17
loturs, prior
STATE uc. # STATE UC.#
(Sec. 7031.5 Business and Professions Code: Any Cityor County which requires a permitto construct, alter, improve, demolish or repair any structure, priorto its issi applicant for such permit to file a signed statement that hi • " " " .- . ,
Business and Professions Code) or that he is exempt thert
civil penalty of not more than five hundred dollars ($500)),
applicant for such permit to file a signed statement that he is licensed pursuantto the provisions ofthe Contractor's License LawfCnapter 9, commendingwlth Sectr
Business and Professions Code) or that he is exempt therefrom, and the basis forthe alleged exemption. Any violation of Section 7031.5 by any applicantfor a permi'
:e, also requires iif
'000 of Division 3 ofthe
permit subjects the applicant to a
WORKERS IPENS.'A-'jlO •aaib-—few —=i-
Workers' Compensation Declaration: / hereby affirm under penalty ofpeijuiy one ofthe following dedarations:
• I have and will maintain a certificate of consent to self-insure for worl<ers' compensalion as provided by Section 3700 of the Labor Code, for the performance of the work for which this pemiit is issued.
• l have and wili maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the worl< for which this permit is issued. Uy worlcers' compensation insurance earner and policy
number are: Insurance Co. Policy No. Expiration Date
fhisjsection need nol be completed if the permit Is for one hundred dellais ($100) or less,
ly I Certificate of Exemption: I certify that in the perfomiance;/the wod< for which this penriit
Caiifomla. WARNING: Failure to secure workers' comniflsatlon coverage is uniawful,
addition to the cost of compensation, damages as prp^M^qffn Section 3706 of thi
JS^ CONTRACTOR SIGNATURE
lued, I shallnpt employ any person in any manner so as to become subject to the Workers' Compensation Laws of
mpioyer to criminal penalties and civii fines up to one hundred thousand dollars (&100,000), in
interest arjd attomey's fees.
• AGENT DATE
;'|) W H Ki'-rJ U i LOE It Oi (ATION
/ hereby affimi that I am exempt from Contractor's Ucense Law for the following reason:
I I I, as owner of the property or my employees with wages as their sole compensation, will do the mik and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
I I i, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who buiids or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I I I am exempt under Section _ .Business and Professions Code for this reason:
1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement. QVes I iNo
2.1 (have / have not) signed an application for a building pennit for the pioposed work.
3.1 have contracted with the foilowing person (fimi) to provide the proposed construction (include name address / phone / contractors' license number):
4.1 plan to provide portions of the wori(, but I have hired the following person to coordinate, supereise and provide the major work (include name / address / phone / contractors' license number):
5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work):
PROPERTY OWNER SiGNATURE QAGENT DATE
Is the applicant or future building occupant required to submit a business plan^utely hazardous materials registration form or risit management and prevention program under Sections 25505,25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? Yes /Ro/
Is the applicant or future building occupant required to obtain a permit from tngair pollution control district or air quality management district? Yes ^S>
Is the fxility to be constmcted within 1,000 feet of the outer boundary of a school site? Yes /US)
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR iS MEETiNG THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
C O N S T R UCTION LENDIN G AG E N C V •III I hereby affirm that there is a construction lending agency for the perfomiance of the work this pennit is issued (Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
|,1C:A:«,T,,,,, C MR Tif iC ATI ON
I certily that I have read the application and state thatthe above infonnation Is conect and thatthe inforniation on the plans is accuiate. I agree to complywith all City oidinances and State laws relating to buiiding constructton.
I hereby authorize representative ofthe City of Carlsbad to enter upon the above mentioned property for inspectbn purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CffY OF CARLSBAD
AGAINST ALL LIABIUTIES, JUDGMENTS COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CfTY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required fOr excavations over 5'0' deep and demolition or constniction of stmctures over 3 stories in heght.
EXPIRATION: Every pemiit issued by thi
180 days fiom the date of such penmit or
y^TAPPLICANT'S SIGNATURE
(ng Official under the provisions of this Code shall expire by limitation and become null and vokJ ff the building or «ork authorized by such pemiit is not commenced within
f the building or vrork authorized by snch.permit is suspended or abandoned at any time after the viiorit is commenced for a period of 180 days (Sectbn 106.4.4 UnitOnm Building Code).
7^
DATE
STOP: THIS SECTION NOT REQUIRED FOR BUILDING PERMIT ISSUANCE.
Complete the following ONLY If a Certificate of Occupancy will be requested at final inspection.
Fax (760) 602-8560, Email buildinq(5)cai1sbadca.aov or Mail the completed fomi to City of Carlsbad, Building Division 1635 Faraday Avenue, Carlsbad, Califomia 92008.
C0#: (Office Use Only)
CONTACT NAME OCCUPANT NAME
ADDRESS BUILDING ADDRESS
CITY CITY STATE ZIP
Carlsbad CA
PHONE FAX
EMAIL OCCUPANT'S BUS. LIC. No.
DELIVERY OPTIONS
PICK UP: CONTACT (Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
MAILTO: CONTACH'(Listed above) OCCUPANT (Listed above)
CONTRACTOR (On Pg. 1)
MAIL / FAX TO OTHER:
ASSOCIATED CB#-
NO CHANGE IN USE / NO CONSTRUCTION
CHANGE OF USE / NO CONSTRUCTION
jeSAPPLICANT'S SIGNATURE DATE
Inspection List
Permit*: CB141027 Type: Tl
Date Inspection item
11/12/2014 89 Final Combo
11/11/2014 89 Final Combo
11/10/2014 44 Rough/Ducts/Dampers
11/10/2014 44 Rough/Ducts/Dampers
11/10/2014 89 Final Combo
11/10/2014 89 Final Combo
11/10/2014 89 Final Combo
11/7/2014 85 T-Bar
11/7/2014 85 T-Bar
11/7/2014 89 Final Combo
COMM
Inspector Act
Rl
MC Fl
MC AP
Rl
MC CO
Rl
MC NR
PD AP
PD NR
Rl
DIRTY DOGS: 1,378 SF SHELL TO
RETAIL
Comments
8-10 REQUESTS PETE (STE 105)
1ST STOP, NOTICE
8-10 REQUESTS PETE (STE 105)
2ND STOP
REQUEST PETE TO INSPECT 8-10 STE
105
10/30/2014 23 Gas/Test/Repairs MC AP GMR CALLED IN TO DEBBIE
10/23/2014 39 Final Electrical MC AP CALLED INTO DEBBIE
10/7/2014 17 Interior Lath/Drywall MC AP WALLS
10/1/2014 24 Rough/Topout MC AP
9/29/2014 14 Frame/Steel/Bolting/Weldin MC AP WALLS ONLY
9/29/2014 24 Rough/Topout MC PA
9/29/2014 34 Rough Electric MC PA
9/23/2014 84 Rough Combo MC CO NOTICE
9/22/2014 16 Insulation MC AP DEMISING WALL BETWEEN 104/105
9/22/2014 84 Rough Combo MC CO
9/19/2014 24 Rough/Topout MC NR
9/19/2014 34 Rough Electric MC PA DEMISING WALL ONLY
8/21/2014 11 Ftg/Foundation/Piers PD AP
7/24/2014 21 Underground/Under Floor PD AP
Thursday, November 13, 2014 Page 1 of 1
F^^'^SBAb INSPECTION RECORD
3uilding Division
01 INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
El CALL BEFORE j;30 pm FOR NEXT WORK DAY iNSPECTION
m FOR BUILDING INSPECTION CALL: 760-602-2725 *
OR GO TO! www.Carlsbadca.qov/Building AND CLICK ON
"Request Intpection"
5ATE: VlZ?//^
«CB141027 2521 PALOMAR AIRPORT RD
105
DIRTY DOGS: 1,378 SF SHELL TO
RETAIL /7 I
Tl COMM cy
Lot#; SUSANNA SAMANIEGO
RECORD COPY
IF "YES" IS CHECKED BELOW THAT DIVISION'S APPROVAL IS REQUIF^ED PRIOR TO REQUESTING A FINAL BUILDING INSPECTION.
IF YOU HAVE ANY QUESTIONS PLEASE CALL THE APPLICABLE DIVISIONS AT THE PHONE NUMBERS PROVIDED BELOW. AFTER
ALL REQUIRED APPROVALS ARE SIGNED OFF— FAX TO 760-602-8560. EMAIL TO BLDGINSPECTIONS 'CARLSBADCA.GOV OR
BRING IN A COPY OF THIS CARD TO: 1 635 FARADAY AVE,. CARLSBAD. CA 92008. BUILDING INSPECTORS CAN BE REACHED
AT 760-602-2700 BETWEEN 7:30 AM - 8:00 AM THE DAY OF YOUR INSPECTION.
NO
I—..
Required Prior to Requesting Buiiding Finai if Clieciced YES Date Inspector Notes
y Planning/Landscape 760-944-8463 Allow 48 hours
y CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm
t. Fire Prevention 760-602-4660 Allow 48 hours
Type off Inspection Type off Inspection
CODE » BUILDING Date Inspector CODE # ELECTRICAL Date Inspector
#11 FOUNDATION #31 D ELECTRIC UNDERGROUND DUFER
#12 REINFORCED STEEL #34 ROUGH ELECTRIC
#66 MASONRY PRE GROUT #33 • ELECTRICSERVICE DTEMPORARY
• GROUT • WALL DRAINS #35 PHOTOVOLTAIC
#10 TILTPANELS #39 HNAL
#11 POURSTRIPS CODE # MECHANICAL
#11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING
#14 SUBFRAME • FLOOR • CEILING #44 • DUCT & PLENUM • REF. PIPING
#15 ROOFSHEATHING #43 HEAT-AIR COND. SYSTEMS
#13 EXT. SHEAR PANELS #49 HNAL
#16 INSULATION coDEtf COMBO INSPECTION
#18 EXTERIORUTH #81 UNDERGROUND (11,12,21,31)
#17 INTERIOR UTH & DRVWALL #82 DRyWALL,EXT UTH, GAS TES (17,18,23)
#51 POOLEXCA/STEEL/BOND/FENCE #83 ROOFSHEATING, EXTSHEAR(13,15)
#55 PREPLASTER/HNAL #84 FRAME ROUGH COMBO (14,24,34,44)
#19 FINAL #85 T-Bar (14,24,34,44)
CODES PLUMBING Date inspector #89 nNAL OCCUPANCY (19,29,39,49)
#22 • SEWER & BL/CO • PL/CO FIRE Date Inspector
#21 UNDERGROUND OWASTE OWTR
#24 TOPOUT DWASTE OWTR A/S UNDERGROUND VISUAL
#27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO
#23 DGASTEST D GAS PIPING A/S UNDERGROUND FLUSH
#25 WATER HEATER A/S OVERHEAD VISUAL
#28 SOURWATER A/S OVERHEAD HYDROSTATIC
#29 HNAL A/S HNAL
coDE# STORMWATER F/AROUGH-IN
#600 PRE-CONSTRUCTION MEETING F/A HNAL
#603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
#605 NOTICETO CLEAN HXED EXTING SYSTEM HYDROSTATICTEST
#607 WRirrENWARNING HXED EXnNGUISHING SYSTEM HNAL
#609 NOTICEOFVIOUTION MEDICAL GAS PRESSURETEST
#610 VERBALWARNING MEDICAL GAS HNAL
SEE BACK FOR SPECIAL NOTES
EsGil Corporation
In (Partnersfiip •with government for (BuiCding Safety
DATE: 6/23/14 • APPLICANT
• JURIS.
JURISDICTION: City of Carlsbad • PLAN REVIEWER
• FILE
PLANCHECKNO.: 14-1027 SET: II
PROJECTADDRESS: 2521 Palomar Airport Rd Suite 6
PROJECT NAME: Dirty Dogs Scrub Grub & Meow - TI
XI The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
I I The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
I I The applicant's copy of the check list has been sent to:
^ EsGil Corporation staff did not advise the applicant that the plan check has been completed.
I I EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: ) Email: Fax #:
Mail Telephone Fax In Person
• REMARKS:
By: Doug Moody Enclosures:
EsGil Corporation
• GA • EJ • MB • PC 6/16/14
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576
EsGil Corporation
In (Partnership ivith government for (BuiCding Safety
DATE: 5/20/14 • APPLICANT
a<JURis.
JURISDICTION: City of Carlsbad PLAN REVIEWER
• FILE
PLANCHECKNO.: 14-1027 SET: I
PROJECT ADDRESS: 2521 Palomar Airport Rd Suite 6
PROJECT NAME: Dirty Dogs Scrub Grub & Meow - TI
I I The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
I I The plans transmitted herewith will substantially comply with the jurisdiction's
codes when minor deficiencies identified below are resolved and checked by building
department staff.
I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
^ The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
I I The applicant's copy of the check list has been sent to:
I I EsGil Corporation staff did not advise the applicant that the plan check has been completed.
IXI EsGil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Susanna Samanigo Telephone #:
Date contacted:^ |90 (by:yv^ Email: susanna@design4corners.com Fax #:
v'^Mall Telephone Fax In Person
• REMARKS:
By: Doug Moody Enclosures:
EsGil Corporation
• GA • EJ • MB • PC 5/12/14
9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576
City of Carlsbad 14-1027
5/20/14
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLANCHECKNO.: 14-1027 JURISDICTION; City ofCarlsbad
OCCUPANCY: M USE: Retail/Pet Salon
TYPE OF CONSTRUCTION: VB ACTUAL AREA: 1378sf
ALLOWABLE FLOOR AREA: STORIES: 1
HEIGHT:
SPRINKLERS?: Yes OCCUPANT LOAD: 31
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 5/7/14
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 5/12/14
DATE INITIAL PLAN REVIEW
COMPLETED: 5/20/14
PLAN REVIEWER: Doug Moody
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the California version of
the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy conservation, noise attenuation and access for
the disabled. This plan review is based on regulations enforced by the Building Department.
You may have other corrections based on laws and ordinances enforced by the Planning
Department, Engineering Department, Fire Department or other departments. Clearance from
those departments may be required prior to the issuance of a building permit.
Code sections cited are based on the 2013 CBC, which adopts the 2012 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2012 International Building Code, the approval of the plans does not permit the violation of
any state, county or city law.
To speed up the recheck process, please note on this list (or a copy) where each
correction item has been addressed, i.e.. plan sheet number, specification section, etc.
Be sure to enclose the marked up list when you submit the revised plans.
City of Carlsbad 14-1027
5/20/14
Please make all corrections on the original tracings, as requested in the correction
list. Submit three sets of plans for commercial/industrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
1. Each sheet of the plans must be signed by the person responsible for their
preparation, even though there are no structural changes. Business and
Professions Code.
2. Provide a section view of the new interior glazed partitions. Show:
a) Type, size and spacing of studs. Indicate gauge for metal studs. Specify
manufacturer and approval number or indicate "to be ICC approved".
b) Method of attaching top and bottom plates to structure. (NOTE: Top of
partition must be secured to roof or floor framing, unless suspended
ceiling has been designed for partition lateral load).
c) Show height of partition and suspended ceiling, and height from floor to
roof framing or floor framing.
3. Glazing in the following locations should be of safety glazing material in
accordance with Section 2406.3
d) Fixed and sliding panels of sliding door assemblies and panels in swinging
doors other than wardrobe doors.
e) Fixed or operable panels adjacent to a door where the nearest exposed
edge of the glazing is within a 24-inch arc of either vertical edge of the door
in a closed position. And where the bottom exposed edge of the glazing is
less than 60 inches above the walking surface.
4. Please provide plans and calculations signed by the California State licensed
engineer or architect for the structural support of the 562# rooftop air handler
unit. Include all calculations and finding on the plans. Please include the
California license number, seal, date of license expiration and date plans are
signed. Business and Professions Code.
City of Carlsbad 14-1027
5/20/14
5. Please review the requirements, revise the plans appropriately and imprint on
the plans the City of Carlsbad Policies and Procedures for Roof Mounted
Equipment to the plans.
6. Provide a section view of the new hard-lid ceiling in the wash room. Show:
f) Type, size and spacing of studs. Indicate gauge for metal studs. Specify
manufacturer and approval number or indicate "to be ICC approved".
g) Method of attaching top to the structure and lateral bracing.
h) Show height of the soffit from floor, soffit to roof framing or floor framing.
7. Please complete the LTG-1 -C part 3 of 4 mandatory automatic controls portion
of the LTG-I-C forms.
8. Please have the principle designer complete the Statement of Compliance
System Acceptance section of the LTG-I-C part 4 of 4 documents.
9. Please provide the required LTG-5C form.
10. Please clarify sheet El .2 to show note #9.
11. Please have the principle designers of the PERF-1 C form sign the imprinted
form.
To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e., plan sheet, note or detail number,
calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list?
Please indicate:
Yes • No •
The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact Doug Moody at
Esgil Corporation. Thank you.
City of Carlsbad 14-1027
5/20/14
[DO NOT PAY- THIS IS NOTAN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad PLANCHECKNO.: 14-1027
PREPARED BY: Doug Moody DATE: 5/20/14
BUILDING ADDRESS: 2521 Palomar Airport Rd Suite 6
BUILDING OCCUPANCY: M TYPE OF CONSTRUCTION: VB
BUILDING
PORTION
AREA
(Sq.Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Tl 1378 37.12 51,151
Air Conditioning
Fire Sprinklers
TOTAL VALUE 51,151
Jurisdiction Code cb By Ordinance
Bidg. Permit Fee by Ordinance •
Plan Check Fee by Ordinance •
Type of Review: 0 Complete Review
epetltive Fee
^ Repeats
• Other
|--| Hourly
EsGil Fee
• Structural Only
Hr. @ *
$460.42
$299.27
$257.84
Comments:
Sheet 1 of 1
macvalue.doc +
PLAN CHECK PLAN CHECK Community & Economic
^ CITY OF REVIEW Development Department
1635 FaradayAvenue
CARLSBAD TRANSMITTAL Carlsbad CA 92008
www.carisbadca.gov
DATE: 5/16/14 PROJECT NAME:Dirty Dogs scrub grub and meow PROJECTID: SDP 09-05
PLAN CHECK N0:CBi4iO27 SET#: I ADDRESS: 2521 Palomar Airport Rd#i05 APN:203-i43-02
VALUATION: $51,151 APPLICANT C0NTACT:susanna@design4corners.com
X Ths plan check review transmittal is to notify you of clearance by:
LAND DEVELOPMENT ENGINEERING DIVISION
Final Inspe ction by the Construction & Inspection Division is required: Yes
For status from a division not marked below, please call 760-602-2719
No X
This plan check review is NOTCOMPLETE Items missing or incorrect are listed
on the attache d checklist. Please resubmit ame nded plans as required.
LAND DEVELOPMENT ENG.
760-602-2750
.' . - '• \/ linda Ontiveros
760-602-2773
Linda. Ontive ro s @c ar Is bad ca. go V
Dorniriic Fieri
760-6C)2-46f54
Dorniiiic.Fieri#carisb3(lca.gov
Remarks: No additional fees. Fee'd as community shopping center with Paiomar Commons,
building no. 6 (CBI20788).
%^:t-
V CITY OF
CARLSBAD
PLANNING DIVISION
BUILDING PLAN CHECK
REVIEW CHECKLIST
P-28
Development Services
Planning Division
1635 FaradayAvenue
(760)602-4610
www.carlsbadca.eov
DATE: 6-12-14 PROJECTNAME: PROJECTID:
PLAN CHECK NO: CB 14-1027 SET#: 2 ADDRESS: 2521 Palomar Airport Rd APN:
This plan check review is complete and has been APPROVED by the Planning
Division.
By: Chris Sexton
A Final Inspection by the Planning Division is required • Yes ^ No
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance ofa buiiding permit.
Resubmitted pians should include corrections from all divisions.
Q This plan check review is NOT COMPLETE. Items missing or Incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to: susanna@design4corners.com
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
PLANNING
760-602-4610
ENGINEERING
760-602-2750
FIRE PREVENTION
760-602-4665
X Chris Sexton
760-602-4624
Chrls.Sexton@carlsbadca.gov
[~~| Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.fiov
1 Greg Ryan
760-602-4663
Grefiorv.Rvan@carlsbadca.fiov
Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.fiov
1 1 Linda Ontiveros
760-602-2773
Linda.Ontlveros@carlsbadca.gov
Cindy Wong
760-602-4662
Cvnthia.Wong@carlsbadca.gov
• 1 1 Dominic Fieri
760-602-4664
Dominic.Fleri@carlsbadca.gov
Remarks:
Plan Check No. CB 14-1027 Address 2521 Palomar Airport Rd Date 6-12-14 Review # 2
Planner Chris Sexton Phone (760) 602-4624
APN;
Type of Project & Use: Net Project Density: DU/AC
Zoning: M/P-M/C-2-Q General Plan: G/PI/GC Facilities Management Zone: 5
CFD (in/out) #_Date of participation: Remaining net dev acres:
(For non-residential development: Type of land use created by this permit: )
REVIEW #:
12 3 Legend: |E! Item Complete • Item Incomplete - Needs your action
S • • Environmental Review Required: YES • NO • TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
IEI • • Discretionary Action Required: YES • NO • TYPE
APPROVAL/RESO. NO. DATE
PROJECTNO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
• • Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES Q NO Q
CA Coastal Commission Authority? YES Q NO •
If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive,
Suite 103, San Diego, CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
• • Habitat Management Plan
Data Entry Completed? YES • NO •
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application
and assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, HMP Fees, Enter Acres of
Habitat Type impacted/tal<en, UPDATEI)
• • Inclusionary Housing Fee required: YES • NO Q
(Effective date of Inclusionary Housing Ordinance - May 21, 1993.)
Data Entry Completed? YES • NO •
(A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, Housing Fees, Construct
Housing Y/N, Enter Fee, UPDATE!)
• • Housing Tracking Form (form P-20) completed: YESQ NO • N/A •
p-28 Page 2 of 3 07/11
Site Plan:
K • • Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines,
easements, existing and proposed structures, streets, existing street improvements, right-of-
way width, dimensional setbacks and existing topographical lines (including all side and rear
yard slopes). Provide legal description of property and assessor's parcel number.
City Council Policy 44 - Neighborhood Architectural Design Guidelines
• • 1. Applicability: YES • NO •
• • 2. Project complies: YES • NOO
Zoning:
• •
• •
1. Setbacks:
Front:
Interior Side:
Street Side:
Rear:
Top of slope:
Required.
Required.
Required
Required
Required
2. Accessory structure setbacks:
Front: Required
Interior Side: Required
Street Side: Required
Rear: Required
Structure separation: Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
K • •
1^ • •
man
3. Lot Coverage:
4. Height:
5. Parking:
Required
Required
Spaces Required
Shown
Shown
Shown
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required Shown
Additional Comments 1) Will there be new roof mounted equipment? If so, please show
how new equipment will be screened. An example is attached.
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER Chris Sexton DATE 6-12-14
p-28 Page 3 of 3 07/11
^ CITY OF
CARLSBAD
PLAN CHECK
REVIEW
TRANSMITTAL
CornmQi^^^^ Economic
^D^^lofiment Department
^yC^ 1635 Faraday Avenue
, Carlsbad CA 92008
"^V* "^vffi-J www.carisbadca.gov
DATE: 5-21-14 PROJECTNAME: Dirty Dogs
PLANCHECKNO: CB141027 SET#: I
PROJECT ID:
ADDRESS: 2521 Palomar Airport Rd. APN:
•
This plan check review is complete and has been APPROVED by the Flre Division.
By: D. Fieri
A Final Inspection by the Flre Division is required ^ Yes • No
This plan check review is NOT COMPLETE. Items missing or incorrect are listed on
the attached checklist. Please resubmit amended plans as required.
Plan Check Comments have been sent to:
You may also have corrections from one or more of the divisions listed below. Approval
from these divisions may be required prior to the issuance ofa bullding permit
Resubmitted plans should Include corrections from all divisions.
For questions or clarifications on the attached checklist please contact the following reviewer as marked:
1 1 Chris Sexton
760-602-4624
Chris.Sexton@carlsbadca.gov
1 1 Kathleen Lawrence
760-602-2741
Kathleen.Lawrence@carlsbadca.gov
Q Greg Ryan
760-602-4663
GregorY.Ryan@carlsbadca.gov
1 1 Gina Ruiz
760-602-4675
Gina.Ruiz@carlsbadca.gov
1 1 Linda Ontiveros
760-602-2773
Linda.Ontiveros@carlsbadca.gov
1 1 Cindy Wong
760-602-4662
Cynthia.Wong@carlsbadca.gov
• • X Dominic Fieri
760-602-4664
Dominic.Fieri@carlsbadca.gov
Remarks:
Carlsbad Fire Department 3LDG. DEPT COPY
Plan Review Requirements Category: TI, COMM
Date of Report: 05-21 -2014 Reviewed by:
Name: SUSANNA SAMANIEGO
Address:
3611 OXFORD ST
CARLSBAD CA
92010-2130
Permit #: CB141027
Job Name: DIRTY DOGS: 1,378 SF SHELL TO
Job Address: 2521 PALOMAR AIRPORT RD CBAD St: 105
•IWCOINIPLETE The itom you havo oubmittod for roviow io inoomplotoi At thio timw; thio offigs gamiot •
•doquatoly oonduot a ra^iiow to dstgrmina eomplitmas with ths applicabia eodsc and/or ctandardBi Plaage r8>riaTiiri>
I oorofuUy all oommonto attaohodi Ploaoo rooubmit tho noooopapir piano andy'or DpooifioationD; with ohangoo "oloudodii',
•tei this effio-ii for i L v it mid uypi u ml. "
Cond: CON0007292
[MET]
APPROVED:
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF
BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON,
CONDITIONS IN
CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS.
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW.
Entry: 05/21/2014 By: df Action: AP
Salehi Engineering^ Inc.
Mechanical, Electrical and Plumbing Consulting Engineers with 25 years of experience
Energy Analysis
For
Dirty Dogs (Carlsbad)
2521 Palomar Airport Rd
Carlsbad, CA 92011
RECEIVED
MAY 07 2014
CITY OF CARLSBAD
BUILDING DIVISION
8360 Clairemont Mesa Blvd, Suite 111, San Diego, CA 92111
Telephone: (858)277-5551 Fax: (858)277-5544
C-418
ce>\H'\ozr
BUILDING ENERGY ANALYSIS REPORT
PROJECT:
Dirty Dogs (Carlsbad)
2521 Palomar Airport Rd
Carlsbad, CA 92011
Project Designer:
4 Corners Design Concepts
3611 Oxford Street
Carlsbad, CA 92024
760-696-0502
Report Prepared by:
Rocky Salehi
Salehi Engineering, Inc.
3680 Clairmont Mesa Blvd Suite 111
San Diego,, CA 92111
858-277-5551
Job Number:
C418
Date:
5/5/2014
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.oom.
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: C418
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Nonresidential Performance Title 24 Forms 3
Form ENV-MM Envelope Mandatory Measures 17
Form MECH-MM Mechanical Mandatory Measures 18
HVAC System Heating and Cooling Loads Summary 19
EnergyPro 5.1 by EnergySoft Job Number: ID; 0418 User Number: 1233
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C
Project Name
Dirty Dogs (Carlsbad)
Date
5/5/2014
Project Address
2521 Palomar Airport Rd Carlsbad
Climate Zone
CA Climate Zone 07
Total Cond. Floor Area
1,378
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: El Nonresidential •
• Relocatable - indicate •
High-Rise Residential •
specific climate zone •
Hotel/Motel Guest Room
all climates
Phase of Construction: • New Construction • Addition • Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and complete.
Documentation Author
Name Rocfey Salehl SignQturo
Company Salehi Engineering, Inc. Date 5/5/2014
Address JQQQ clairmont Mesa Blvd Suite 111 Phone 858-277-5551
City/State/Zip San Diego,, CA 92111
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV. LTG. MECH.
•
•
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
I affirm that I am eligible underthe provisions of Division 3 ofthe Business and Professions Code by section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
^^"^^ 4 Corners Design Concepts Signature
Company 4 Corners Design Concepts
Address 3611 Oxford Street
City/State/Zip Carlsbad. CA 92024 760-696-0502
Principal IVIechanicai Designer
Name Salehi Engineering Signature
Company Salehi Engineering Date
Address 8360 Clairmonet Mesa Blvd. #111 License #
City/State/Zip San Dlego, CA 92111 Phone 858-277-5551
Principal Lighting Designer
Name Signature
Company Lighting Compliance Not In The Scope Of This Submittal Date
Address License #
City/State/Zip Phone
INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box If worksheets are Included)
El ENV-IC Certificate of Compliance. Required on plans. El IVIECH-1C Certificate of Compliance. Required on plans.
• LTG-1 C Certificate of Compliance. Required on plans. El MECH-2C AirA/Vater Side/Service Hot Water & Pool Requirements.
• LTG-2C Lighting Controls Credit Worksheet. El MECH-3C Mechanical Ventilation and Reheat.
• LTG-3C Indoor Lighting Power Allowance. El MECH-5C Mechanical Equipment Details.
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: C418 Page 3 of 19
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1 C
Project Name Date
Dirty Dogs (Carlsbad) 5/5/2014
ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr)
Energy Component
Standard
Design
Proposed
Design
Compliance
Margin
Heating Space Heating 0.27 037 -010 Heating
Space Cooling 124.56 132.70 -8.14 Cooling
Indoor Fans 2799 28.25 -0.26 Fans
Heat Rejection 0.00 0.00 0.00 Heat Rej
Pumps & Misc. 0.00 0.00 0.00 Pumps
Domestic Hot Water 32.86 22.63 1023 DHW
Lighting 142.15 142.15 0.00 Lighting
Receptacle 70.60 70.60 0.00 Receptacle
Process 0.00 0.00 0.00 Process
Process Lighting 0.00 0.00 000 Process Ltg
TOTALS 398.43 396.70 1.73
Percent better than Standard 0.4 % ( 04 % excluding process)
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation (N) 0deg Conditioned Floor Area 1,378 sqft.
Number of Stories 1 Unconditioned Floor Area 0 sqft.
Number of Systems 1 Conditioned Footprint Area 1,378 sqft.
Number of Zones 1 Natural Gas Available On Site Yes
Orientation Gross Area Glazing Area Glazing Ratio
Front Elevation (N) 351 sqft. 174 sqft. 49.6 %
Left Elevation (E) 0 sqft. 0 sqft. 0.0%
Rear Elevation (S) 334 sqft. 0 sqft. 0.0%
Right Elevation (W) 0 sqft. 0 sqft. 0.0%
Total 685 sqft. 174 sqft. 25.4 %
Roof 1,378 sqft. 0 sqft. 0.0 %
Standard
Prescriptive Lighting Power Density
Prescriptive Envelope TDV Energy
1.600
17,464
W/sqft.
Proposed
1.600
20,527
Prescriptive Values for
W/sqft. Comparison only. See
LTG-1 C for allowed LPD.
Remarks:
CONTIACTOR MUST COMPLY:
. ALL FENESTRATION MUST BE CERTIFIED BY NFRC
. INSTALLED FENESTRATION VALUES MUST HAVE EQUAL OR LOWER U FACTOR AND SHGC CALLED OUT IN THIS CALCULATION.
. HVAC & W/H UNITS CALLED CUTIS FOR REFERENCE ONLY
. INSTALLED HVAC & W/H UNITS MUST HAVE EQUAL OR HIGHER EFFECIENCY THAN SPECIFIED IN THIS CALCULATION
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02T06:35:09 ID: C418 Page 4 of 19
PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1 C
Project Name
Dirty Dogs (Carlsbad)
Date
5/5/2014
ZONE INFORMATION
System Name Zone Name Occupancy Type
Floor
Area
(sqft.)
Inst.
LPD
(W/sf)^
Ctrl.
Credits
(W/sf)^
Allowed LPD Proc.
Loads
(W/sf) System Name Zone Name Occupancy Type
Floor
Area
(sqft.)
Inst.
LPD
(W/sf)^
Ctrl.
Credits
(W/sf)^
Area
(W/sf)^
Tailored
(W/sf)*
Proc.
Loads
(W/sf)
Sysfem # 1 Zone 1 Refa/7 Sales, Wholesale 1,378 *1.600
Notes: 1. See LTG-1 C 2. See LTG-2G 3. See LTG-3C 4. See LTG-4C
(items marked with asterisk, see LTG-1 -C by others) (by others) Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the Items specified In this checklist. These Items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The exceptional features listed In this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Sianature or Stamp
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 /O.C418 PageSof 19
1
I
I
CERTIFICATE OF COMPLIANCE
AND FIELD INSPECTION ENERGY CHECKLIST
(Part 1 of 3) ENV-IC
Project Name
Dirty Dogs (Carisbad)
Date
5/5/2014
Project Address
2521 Paiomar Airport Rd Carlsbad
Climate Zone Total Cond. Floor Area
^,378
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: d Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School
Bidg. EZI Conditioned Spaces • Unconditioned Spaces
• Skylight Area for Large Enclosed Space s 8000 ft (If checked include the ENV-4C with submittal)
Phase of Construction: Q New Construction • Addition • Alteration
Approach of Compliance: • Component • Overall Envelope • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: Odeg
FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS INSULATION
Tag/ID Assembly Type
c
0) LU
0) >. =
l>
o
01 3
UJ >
o cn .2 c
X
c •s " .E o-
-> <
c o
Is tfl tfl ra
0.
Wall 94 (N) 0.074 R-19 4.3.1-A5 New •
Wall 83 (NE) 0.074 R-19 4.3.1-A5 New •
Wall 314 (S) 0.074 R-19 4.3.1-A5 New
Door 20 (S) 1.450 None 4.5.1-Al New
Roof 1,378 (N) 0.032 R-30 4.2.1-A8 New
Slab 1,378 (N) 0.730 None 4.4.7-A1 New
•
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checl<list Form and tal<e appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
Tag/ID
Fenestration
Type
n
< Orientation N, E, S, W Max U-Factor U-Factor Source Max {R)SHGC SHGC Source Overhang Conditions Status Pass 1 Window 138 (N) 1.190 Default 0.680 Default • New • •
2 Window 36 (NE) 0.710 Default 0.730 Default • New • •
• • •
• • •
• • •
• • •
• • •
• • •
• • •
• • •
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: C418 Page 6 of 19
CERTIFICATE OF COMPLIANCE
AND FIELD INSPECTION ENERGY CHECKLIST
(Part 2 of 3) ENV-IC
Project Name
Dirty Dogs (Carlsbad)
Date
5/5/2014
ROOFING PRODUCT (COOL ROOFS)
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fall' N/A
• Roofing compliance net required in Climate Zones 1 and16 with a Low-Sloped. 2:12 pitch or less. • • •
• Roofing compliance ngj required in Climate Zone 1 with a Steep-Sloped with iess than 5 Ib/ft^. Greater than 2:12 pitch. • • •
(-. Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, soiar reflectance and thermal emittance or
SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly. Column H of ENV-2C. • • •
|-| Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
that have a U-factor of 0.048 or lower. See Opaque Surface Detaiis roof assembly below. Column H of ENV-2C. • • •
|-| The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
'-' exempted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.enerav.ca.aov/title24/ • • •
•-] Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft"^ are exempt from
the Cool Roof criteria below. • • •
p. High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9, 12 and 16 are
exempted from the low-sloped roofing criteria. • • •
1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to con'ect. Verify building plans if necessary.
CRRC Product ID
Number'
Roof Slope
S 2:12 >2:12
Product Weight
< 51b/ft^ 2 5lb/ft^
Product
Type^
Aged Solar
Reflectance'
Thermal
Emmitance SRI' Pass Fail^
• • • • • •
• • • • • •
• • • • • •
• • • • • •
• • • • n' • •
• • • • • •
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
www.coolroofs.ora/Droducts/search.php
2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+0.7(pinitiai - 0.2) to obtain a calculated aged value. Where p is the Initiai Soiar Reflectance from the Cool
Roof Rating Council's Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.enerav.ca.aov/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(1)4. Select the applicable coating:
• Aluminum-Pigmented Asphalt Roof Coating • Cement-Based Roof Coating • Other
Discrepancies:
EnergyPro 5.1 bv EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: 0418 Paqe 7 of 19
CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-IC
AND FIELD INSPECTION ENERGY CHECKLIST
(Part 3 of 3)
Project Name Date
Dirty Dogs (Carisbad) 5/5/2014
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different
fenestration product line must be provided to the owner of the building for their records.
Test Description ENV-2A Test Perforined By:
Fenestration Products Name or ID
Requiring Testing or Verification
Area of like
Products
Building Envelope
Acceptance Test
Single Metal Tinted 138 m
Double Metal Clear 36
•
•
•
•
•
•
•
•
•
•
•
•
•
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: C418 Page 8 of 19
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Parti of4) MECH-1 C
Project Name
Dirty Dogs (Carisbad)
Date
5/5/2014
Project Address
2521 Palomar Airport Rd Carisbad
Climate Zone Total Cond. Floor Area
1,378
Addition Floor Area
n/a
GENERAL INFORMATION
Building Type: El Nonresidential • High-Rise Residential • Hotel/Motel Guest Room
• Schools (Public School) • Relocatable Public School BIdg. 12 Conditioned Spaces Unconditioned Spaces
(affidavit)
Phase of Construction: • New Construction • Addition • Alteration
Approach of Compliance: • Component Overall Envelope
Energy
TDV • Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees: Odeg
HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST
Equipment^ Inspection Criteria
Meets Criteria or Requirements
Equipment^ Inspection Criteria Pass Fail - Describe Reason^
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) DHW Heater • •
Equipment Type^: Gas Fired DHW Boiler • •
Number of Systems 1 • •
Max Allowed Heating Capacity^ 77.500 Btu/lir • •
Minimum Heating Efficiency' 0.90 EF • •
Max Allowed Cooling Capacity' n/a • •
Cooling Efficiency' n/a • •
Duct Location/ R-Value n/a • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS n/a • •
Economizer n/a • •
Thermostat n/a • •
Fan Control n/a • •
Equipment^ Inspection Criteria
FIELD INSPECTION ENERGY CHECKLIST
Equipment^ Inspection Criteria Pass Fail - Describe Reason^
Item or System Tags
(Le. AC-1, RTU-1, HP-1) Sysfem # 1 • •
Equipment Type^: Packaged DX • •
Number of Systems 1 • •
Max Allowed Heating Capacity' 90,000 Btu/tir • •
Minimum Heating Efficiency' 80% AFUE • •
Max Allowed Cooling Capacity' 49,700 Btu/hr • •
Cooling Efficiency' 13.0 SEER/10.6 EER • •
Duct Location/ R-Value Attic, Ceiling ins, vented/4.0 • •
When duct testing is required, submit
MECH-4A & MECH-4-HERS No • •
Economizer No Economizer • •
Thermostat Setbaclc Required • •
Fan Control Constant Volume • •
1. If the Actual installed equipment perfomiance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode; 2014-05-02706:35:09 ID: C418 Page 9 of 19
CERTIFICATE OF COMPLIANCE and
FIELD INSPECTION ENERGY CHECKLIST
(Part 2 of 4) MECH-1 C
Project Name
Dirty Dogs (Carlsbad)
Date
5/5/2014
Discrepancies:
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: C418 Page 10 of 19
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1 C
Project Name
Dirty Dogs (Carlsbad)
Date
5/5/2014
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference /Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.
The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the
properiy filled out and signed forms before the building can receive final occupancy.
TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-SA MECH-7A MECH-8A MECH-9A MECH-1 OA MECH-11A
Equipment Requiring Testing or Verification Oty.
Outdoor
Ventilation
For
VAV & CAV
Constant
Volume &
Single-Zone
Unitary
Air
Distribution
Ducts
Economizer
Controls
Demand
Control
Ventilation
DCV
Supply
Fan
VAV
Valve
Leakage
Test
Supply
Water
Temp.
Reset
Hydronic
System
Variable
Flow
Control
Automatic
Demand
Shed
Control
YORKZXG05M2B 1 • • • • • • • • m
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
• • • • • • • • • •
EnergyPro 5.1 by EnergySoft User Number 1233 RunCode: 2014-05-02706:35:09 ID: C418 Page 11 of 19
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1 C
Project Name Pgjg
Dirty Dogs (Carlsbad) 5/5/2014
TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A
Equipment Requiring Testing Qty.
Fault
Detection &
Diagnostics
for DX Units
Automatic Fault
Detection &
Diagnostics for
Air & Zone
Distributed
Energy Storage
DX AC
Systems
Thermal Energy
Storage (TES)
Systems Test Performed By:
YORKZXG05M2e 1 • • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
• • • •
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: C418 Page12of19
AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C
Project Name Date
Dirty Dogs (Carlsbad) 5/5/2014
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)
Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..)
Item or System Tags
(i.e. AC-1, RTU-1, HP-1) System # 1
Number of Systems 1
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
Indicate Paqe Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
T-24 Sections MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
112(a) 80% AFUE
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
112(a) 13.0 SEER/10.6 EER
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
112(b), 112(c) n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
112(c), 115(a) Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
121(b) Yes
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
121(b) 207 cfm
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
121(c) No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
121(c) No
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
122(e) Programmable Switch
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
122(e) Setback Required
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
122(f) Auto
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
122(q) n/a
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value
123
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
HVAC Heat Pump Thermostat
Furnace Controls/Thermostat
Natural Ventilation
Mechanical Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Location/ R-value 124 Attic, Ceiling Ins, vented/4.0
PRESCRIPTIVE MEASURES
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a&b) n/a Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a&b) 90,000 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a&b) n/a
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(a&b) 37,453 Btu/hr
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) Constant Volume
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(c) Yes
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(d) No
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(e) No Economizer
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(f) Constant Temp
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(g)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted
144(i)
Calculated Design Heating Load
Proposed Heating Capacity
Calculated Design Cooling Load
Proposed Cooling Capacity
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heat Air Supply Reset
Cool Air Supply Reset
Electric Resistance Heating'
Air Cooled Chiller Limitation
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted 144(k) No
1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
explain which exception(s) to §144(g) apply.
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: C418 Page 13 of 19
WATER SIDE SYSTEM REQUIREMENTS (Part 2 of 2) MECH-2C
Project Name Date
Dirty Dogs (Carisbad) 5/5/2014
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)'
Number of Systems
MANDATORY MEASURES
Equipment Efficiency
Pipe Insulation
PRESCRIPTIVE MEASURES
Cooling Tower Fan Controls
Cooling Tower Flow Controls
Variable Flow System Design
Chiller and Boiler Isolation
CHW and HHW Reset Controls
WLHP Isolation Valves
VSD on CHW, CW & WLHP Pumps>5HP
DP Sensor Location
WATERS SIDE SYSTEMS: Chillers, Towers, Boilers, Hydronic Loops
Indicate Page Reference on Plans or Specification^
T-24 Sections
112(a)
123
144(a&b)
144(h)
144(h)
144(1)
144(j)
144(1)
144(i)
144(1)
1. The proposed equipment need to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification
section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" In the column next to
applicable section.
Service Hot Water, Pool Heating
Item or System Tags
(i.e. WH-1,WHP, DHW, etc...)' DHW Heater
Number of Systems 1
Indicate Page Reference on Plans or Schedule^
MANDATORY MEASURES T-24 Sections
SERVICE HOT WATER
Certified Water Heater 111, 113(a) RINNA R94LSI
Water Heater Efficiency 113(b) 0.90 EF
Service Water Heating Installation 113(c) Controls Req.
Pipe Insulation 123 Required
POOL AND SPA
Pool and Spa Efficiency and Control 114(a) n/a
Pool and Spa Installation 114(b) n/a
Pool Heater - No Pilot Light 115(c) n/a
Spa Heater - No Pilot Light 115(d) n/a
Pipe Insulation 123 n/a
1. The Proposed equipment needs to match the building plans schedule or specifications. If a requirement is not applicable, put "N/A" in the column
next to applicable section.
2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or
specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" In the
column.
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: 0418 Page 14 of 19
MECHANICAL VENTILATION AND REHEAT MECH-3C
Project Name
Dirty Dogs (Carisbad)
Date
5/5/2014
MECHANICAL VENTILATION (§121(b)2] REHEAT LIMITATION (§144(d))
AREA BASIS OCCUPANCY BASIS VAV MINIMUM
A B C D E F G H 1 J K L M N
Zone/System
Condition
Area
(ft')
CFM
per
ft'
Min CFM
By Area
BXC
Number
Of
People
CFM
per
Person
Min CFM
by
Occupant
EXF
REQ'D
V.A.
Max of
DorG
Design
Ventilation
Air
CFM
50% of
Design Zone
Supply
CFM
BXO.4
CFM/ft'
Max. of
Columns
H, J, K,
300 CFM
Design
Minimum
Air
Setpoint
Transfer
Air
Zone 1 1,378 0.25 345 13.8 15.0 207 345 207 138
System # 1 Total 345 207
Totals Column 1 Total Design Ventilation Air 1
C Minimum ventilation rate per Section §121, Table 121-A.
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating.
H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G).
1 Must be qreater than or equal to H, or use Transfer Air (coiumn N) to make up the difference.
J Desiqn fan supply CFM (Fan CFM) x 50%; or the desiqn zone outdoor airflow rate per §121.
K Condition area (ft^) x 0.4 CFM / ft^; or
L Maximum of Columns H, J, K, or 300 CFM
M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N.
N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air (Column H) and the Design Minimum Air (Column M), Column H minus M.
EnergyPro 5.1 by EnerqySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: 0418 Page 15 of 19
MECHANICAL EQUIPMENT DETAILS (Part 1 of 2) MECH-5C
Project Name Date
Dirty Dogs (Carisbad) 5/5/2014
CHILLER AND TOWER SUMMARY
PUMPS
Equipment Name Type Qty. Efficiency Tons Qty. GPM BHP
Pump
Control
DHW / BOILER SUMMARY
System Name Type Distribution Qty. Rated Input
Vol.
(Gals).
Energy Factor
or RE
Standby Loss
or Pilot
Tank Ext.
R-Value Status
RINNA R94LSI Instant Gas Kitchen Pipe Ins 1 77,500 0 0.90 n/a n/a New
MULTI-FAMILY CENTRAL WATER HEATING DETAILS
Hot Water Pump Hot Water Piping Length (ft)
Control Qty. HP Type In Plenum Outside Buried Add Yz" Insulation
•
•
•
CENTRAL SYSTEM RATINGS
HEATING COOLING
System Name Type Qty. Output Aux. kW Efficiency Output Efficiency Status
YORKZXG05M2B Packaged DX 1 90,000 5.0 80% AFUE 49,700 13.0 SEER/10.6 EER New
CENTRAL SYSTEM FAN SUMMARY
SUPPLY FAN RETURN FAN
System Name Fan Type Economizer Type CFM BHP CFM BHP
yORKZXG05M2e Constant Volume No Economizer 1,600 0.33 none
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: C418 Paqe 16 of 19
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM
Project Name
Dirty Dogs (Carlsbad)
Date
5/5/20^4
DESCRIPTION
Building Envelope Measures:
611 V Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
SI o(a). Standards for insulating material. Title 20 Chapter 4, Article 3.
c.....^, X All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
9110(0). Sections 2602 and 707 of Title 24, Part 2.
S1 iRffv opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value
^ ^'• of no less than R-13 between framing members.
5117(a)- ^" Join's and openings in the building that are obsen/able sources of air leakage shall be caulked, gasketed,
^ ^ weatherstripped or othenwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.^ of
§116(a) 1: window area, 0.3 cfm/ft.^ of door area for residential doors, 0.3 cfm/ft.^ of door area for nonresidential single doors
(swinging and sliding), and 1.0 cfm/ft.^ for nonresidential double doors (swinging).
§116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor.
§116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the
applicable default SHGC.
§116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors).
EnemvPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: 0418 Page 17 of 19
MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM
Project Name
Dirty Dogs (Carlsbad)
Date
5/5/2014
Equipment and System Efficiencies
§111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply
with the applicable standard.
§115(a): Fan type central furnaces shall not have a pilot light.
§123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC
equipment, shall be insulated in accordance with Standards Section 123.
§124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of
the CMC Standards.
Controls
§122(e): Each space conditioning system shall be installed with one of the following:
IA. Each space conditioning system sen/ing building types such as offices and manufacturing facilities (and all others not
explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch
shall be capable of programming different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or
IB. An occupancy sensor to control the operating period of the system; or
IC. A 4-hour timer that can be manually operated to control the operating period of the system.
2. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the
system as required to maintain a setback heating and/or a setup cooling thermostat setpoint.
§122(g):
Each space conditioning system sen/ing multiple zones with a combined conditioned floor area more than 25,000
square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided
with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off
independently of other isolation areas; and shall be controlled by a time control device as described above.
§122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to
authorized personnel.
§122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the
heating load can be met by the heat pump alone
§122(a&b):
Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the
zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the
control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be
capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
Ventilation
§121 (e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified
on these plans.
§122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all
openings to the outside, except for combustion air openings.
§121(f):
Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a
new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the
building or space shall be certified as meeting the Acceptance Requirements for Code Compliance
Service Water Heating Systems
§113(c) Installation
3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F.
2. Circulating sen/ice water-heating systems shall have a conlrol capable of automatically turning off the circulating pump
when hot water is not required.
EnergyPro 5.1 by EnergySoft User Number 1233 RunCode: 2014-05-02706:35:09 ID: C418 Page 18 of 19
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
Project Name
Dirty Dogs (Carlsbad)
Date
5/5/2014
System Name
System # 1
Floor Area
1,378
ENGINEERING CHECKS SYSTEM LOAD
Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK
Heating System CFM Sensible Latent CFM Sensible
Output per System 90,000 Total Room Loads 1,215 25,175 2,756 233 11,796
Total Output (Btuh) 90,000 Return Vented Lighting 0
Output (Btuh/sqft) 65.3 Return Air Ducts 1,259 590
Cooling System Return Fan 0 0
Output per System 49,700 Ventilation 207 1,776 2,612 207 7,947
Total Output (Btuh) 49,700 Supply Fan 0 0
Total Output (Tons) 4.1 Supply Air Ducts 1,259 590
Total Output (Btuh/sqft) 36.1
Total Output (sqft/Ton) 332.7 TOTAL SYSTEM LOAD 29,468 5,368 20,923
Air System
CFM per System 1,600 HVAC EQUIPMENT SELECTION
Airflow (cfm) 1,600 YORK ZXG05M2B 37,453 11,304 90,000
Airflow (cfm/sqft) 1.16
Airflow (cfm/Ton) 386.3
Outside Air (%) 12.9% Total Adjusted System Output 37,453 11,304 90.000
Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions)
Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 2 PM Jan 1 AM
HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peal<)
34 "f 65 °F 65 °F 117°F
Outside Air
207 cfm
70 °F
Supply Fan Heating Coil
1,600 cfm
117°F
ROOM Jl
70 °F
_J
COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak)
83 / 68 °F 76 / 62 "F 76 / 62 °F 54 / 53 °F
Outside Air
207 cfm
75/61 "F
•4
Supply Fan
1,600 cfm
Cooling Coil 55 / 53 "F
47.3 % ROOM
74/61 °F
EnergyPro 5.1 by EnergySoft User Number: 1233 RunCode: 2014-05-02706:35:09 ID: 0418 Page 19 of 19
^ CITY OF
CARLSBAD
PLUMBING,
ELECTRICAL,
MECHANICAL
WORKSHEET
B-18
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carisbadca.gov
Project Address: Z/f^l iZ PermitNo.: C&l^fOZ'?'
Wonmotton provided below refers to worh being done on the above mentioned permit only.
This ferm must be completed onJ refarnejl 10 the 8uiWii»i Division before the permit caw fae issued.
Building Dept. Fax: (760) 602-8558
Number of new or relocated fixtures, traps, or ftoor draim "D
New building sewer line? ...l5?l|?.f>|>Ji:^..XQ...S5C/.Sn<i<^...4.1^ No ___
Number of new roof drains?,,... &MSnd<^ Q
Install/alter water line?..
Number of new water heaters?..... ~ « }
Number of new, rebooted or replaced gas outlets? P
Number of new hose bibs? O
Residential Permits: , ,
New/expanded service: Number of new amps: —ts//^ _.
Minor Remodel onfy^ Ves No
Commerdal/industriai:
Tenant Improvement: Number of exiiting amps invo/ved in this project: .^^•SOQ
Number of new amps involved in this projed::
New Construdtion: Amps per Panel:
Single Phase , Number of new amperes
Three Phase Number of new amperes_ (1)200
Three Phase 480 „ Number of new amperes.
Number of new furnaces, A/C, or heat pumps?..... |
New or relocated duct worls? Ves No
Number of new fireplaces? „ Q
Numberof new exhaust fans? \
Relocate/install went? \
Number of new exhaust hoods? _JD-
Number of new tioilers or compressors? Number of HP 0
B-18 P,9g8 1 of • Rev 03/09
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS QUESTIONNAIRE
OFFICE USE ONLY
UPFP#
HV#
BP DATE / /
Business Name 'iHij DIMS
Business Contact . Teleptione #
Project Address
2S2I ~ , , . City , ; ~]
State Zip Code APN#
Mailing Address State
Project Contact
s I I / I ^''V I. I , I r I-Zip Cojje
Zl
Plan File#
i/^SGLi\yLCK KSduyyLO^yLj ^
Telephone #
FEES ARE REQUIRED
YES
1. •
2.
3.
• CalARP Exempt
/
The following questions represeorthe facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT - HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: Indicate by circling the item, whether your business
will use, process, or store any of the following hazardous materials. If any of the items are circled applicant must contact the Fire Protection Agency with
jurisdiction prior to plan submittal. Facility's Square Footage (including proposed project): /"^'7 ^ Occupancy Rating:
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14,. Other Health Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials /l5?HJone of These.
4. Flammable Solids 8. Unstable Reactives 12. Radioactives —^
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH - HAZARDOUS MATERIALS DIVISIONS (HMD): If the answer to anv of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Ave., Suite 110, San Diego, CA 92123
Call (858) 505-6700 prior to the issuance of a building permit.
Project Completion Date: I "2- / )-4 Expected Date of Occupancy: ll 11^
(for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantities equal to or greater than 55 gallons, 500 pounds
200 cubic feet, or carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the questions below is yes, applicant must contact the Air
Pollution Control District (APCD), 10124 Old Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 prior to the issuance of a building or demolition
permit. Note: if the answer fo questions 4 or 5 is yes, applicant must also submit an asbestos notification form fo fhe APCD at least 10 working days prior to
commencing demolition or renovation, except demolition or renovation of residential structures of four units or less. Contact the APCD for more information.
Date Initials
• CalARP Required
t
Date Initials
• CalARP Complete
Date Initials
1.
YES
•
NO
H^Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the
'^APCD factsheet at http://www.sdapcd.orq/info/facts/permits.pdf. and the list of typical equipment requiring an APCD permit on the reverse side
of this from. Contact APCD if you have any questions).
(ANSWER ONLY IF QUESTION 1 IS/ES) Will the subject facility be located within 1,000 feet of the outer boundary of a school (K through 12)?
(Search the Califomia School birectory at http://www.cde.ca.gov/re/sd/ for public and private schools or contact the appropriate school district).
Has a sun/ey been performed to determine the presence of Asbestos Containing Materials?
Will there be renovation that involves handling of any friable asbestos materials, or disturtDlng any material that contains non-friable asbestos?
Will there be demolition Involving the removal of a load supporting structural member?
•
Briefly describe business activities:
I de< under penalty of peijiiry that to the best of my knowledge and 3rare u
Name of Owner or Authorized Agent ir-
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:.
BY:
Briefly describe proposed project: ri(>CL> pity/l ii^L^
responses maclSVier^n are tcue and correct. ' ^
^cm^/u^j .f? / / I I'J
S responses
lature of Owneri Date
FICIAL USE ONLY:
DATE:
EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMD* APCD COUNTY-HMD APCD COUNTY-HMD APCD
*A stamp in this box onlv exempts businesses from completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply.
HM-9171 (02/11) County of San Diego - DEH - Hazardous Materials Division
LIST OF BUSINESSES WHICH REQUIRE REVIEW AND APPROVAL FROM THE COUNTY OF SAN DIEGO
DEPARTMENT OF ENVIRONMENTAL HEALTH - HAZARDOUS MATERIALS DIVISION
Check all that apply:
AUTOMOTIVE
• Battery Manufacturing/Recycling
O Boat Yard
• Car Wash
• Dealership Maintenance/Painting
• Machine Shop
D Painting
• Radiator Shop
• Rental Yard Equipment
P Repair/Preventive Maintenance
• Spray Booth
• Transportation Services
• Wrecking/Recycling
CHEMICAL HANDLING
• Agricultural supplier/distributor
• Chemical Manufacturer
• Chemical Supplier/Distributor
• Coatings/Adhesive
• Compressed Gas Supplier/Distributor
• Dry Cleaning
• Fiberglass/Resin Application
• Gas Station
• Industrial Laundry
• Laboratory
• Laboratory Supplier/Distributor
• Oil and Fuel Bulk Supply
D Pesticide Operator/Distributor
CHEMICAL HANDLING
• Photographic Processing
• Pool Supplies/Maintenance
• Printing/Blue Printing
• Road Coatings
• Swimming Pool
O Toxic Gas Handler
• Toxic Gas Manufacturer
METAL WORKING
• Anodizing
• Chemical Milling/Etching
• Finish-Coating/Painting
O Flame Spraying
• Foundry
• Machine Shop-Drilling/Lathes/Mills
• Metal Plating
• Metal Prepping/Chemical Coating
• Precious Metal Recovery
• Sand Blasting/Grinding
• Steel Fabricator
• Wrought Iron Manufacturing
AEROSPACE
• Aerospace Industry
• Aircraft Maintenance
• Aircraft Manufacturing
OTHERS AND MISCELLANEOUS
• Asphalt Plant
• Biotechnology/Research .
• Chiropractic Office
• Co-Generation Plant
• Dental Clinic/Office
• Dialysis Centet
• Emergency Generator
• Frozen Food Processing Facility
• Hazardous Waste Hauler
• Hospital/Convalescent Home
• Laboratory/Biological Lab
• Medical Clinic/Office
• Nitrous Oxide (N0„) Control System
• Pharmaceuticals
• Public Utility
• Refrigeration System
• Rock Quany
• Ship Repair/Construction
n Telecommunications Cell Site
• Veterinary Clinic/Hospital
• Wood/Furniture Manufacturing/Refinishing
ELECTRONICS
• Electronic Assembly/Sub-Assembly
• Electronic Components Manufacturing
• Printed Circuit Board Manufacturing
NOTE: THE ABOVE LIST INCLUDES BUSINESSES, WHICH TYPICALLY USE, STORE, HANDLE, AND DISPOSE OF HAZARDOUS SUBSTANCES.
ANY BUSINESS NOT INCLUDED ON THIS LIST, WHICH HANDLES, USES OR DISPOSES OF HAZARDOUS SUBSTANCES MAY STILL REQUIRE
HAZARDOUS MATERIALS DIVISION (HMD) REVIEWOF BUSINESS PLANS. FOR MORE INFORMATION CALL (858) 505-6880.
LIST OF AIR POLLUTION CONTROL DISTRICT PERMIT CATEGORIES
Businesses, which include any of the following operations or equipment, will require clearance from the Air Pollution Control District.
CHEMICAL COMBUSTION ROCK AND MINEI^L
47 - Organic Gas Sterilizers 34-Plston Internal - Combustion Engines 04 - Hot Asphalt Batch Plants ^
32 - Acid Chemical Milling 13-Boilers & Heaters (1 million BTU/hr or larger) 05 - Rock Drills
33 - Can & Coil Manufacturing 14-Incinerators & Crematories 06 - Screening Operations
44 - Evaporators, Dryers & Stills Processing 15-Burn Out Ovens 07 - Sand Rock & Aggregate Plants
Organic Materials 16-Core Ovens 08 - Concrete Batch, CTB, Concrete Mixers, Mixers
24 - Dry Chemical Mixing & Detergent Spray 20-Gas Turbines, and Turbine Test Cells & Stands & Silos
Towers 48-Landfill and/or Digester Gas Flares 10 - Brick Manufacturing
35 - Bulk Dry Chemicals Storage
55 - Chrome Electroplating Tanks
COATINGS & ORGANIC SOLVENTS
27 - Coating & Painting
37 - Plasma Arc & Ceramic Deposition Spray
Booths
38 - Paint, Stain & Ink Mfg
27 - Printing
27 - Polyester Resin/Fiberglass Operations
METALS
18 - Metal Melting Devices
19-011 Quenching & Salt Baths
32 - Hot Dip Galvanizing
39 - Precious Metals Refining
ORGANIC COMPOUND MARKETING
(GASOLINE. ETC)
25 - Gasoline & Alcohol Bulk Plants & Terminals
25 - Intermediate Refuelers
26 - Gasoline & Alcohol Fuel Dispensing
NOTE: OTHER EQUIPMENT NOT LISTED HERE THAT IS CAPABLE OF EMITTING AIR CONTAMINANTS MAY REQUIRE AN AIR POLLUTION
CONTROL DISTRICT PERMIT. IF THERE ARE ANY QUESTIONS, CONTACT THE AIR POLLUTION CONTROL DISTRICT AT (858) 586-2600.
ELECTRONICS
29 - Automated Soldering
42 - Electronic Component Mfg
FOOD
12 - Fish Canneries
12-Smoke Houses
50 - Coffee Roasters
35 - Bulk Flour & Powered Sugar Storage
SOLVENT USE
28 - Vapor & Cold Degreasing
30 - Solvent & Extract Driers
31 - Dry Cleaning
OTHER
01 - Abrasive Blasting Equipment
03 - Asphalt Roofing Kettles & Tankers
46 - Reverse Osmosis Membrane Mfg
51 - Aqueous Waste Neutralization
11 - Tire Buffers
17 - Brake Debonders
23 - Bulk Grain & Dry Chemical Transfer & Storage
45 - Rubber Mixers
21 - Waste Disposal & Reclamation Units
36 - Grinding Booths & Rooms
40 - Asphalt Pavement Heaters
43 - Ceramic Slip Casting
41 - Periite Processing
40 - Cooling Towers - Registration Only
91 - Fumigation Operations
56 - WWTP (1 million gal/day or larger) & Pump
Station
HM-9171 (02/11) County of San Diego - DEH - Hazardous Materials Division
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
. SCREENING SURVEY
Date^/y/^
Business Name ITZ/r-hj ^ S ^
Street Address 7^^//>/v^ r3.r >^rr^r-i /2j, ^i^J^/j^j G>
Email Address '5iJi .U.JL.ruic(o' Af'^/jh 4 /^/;rnj>r.S^ /y<^
PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS)
Check all below that are present at your facility:
Acid Cleaning
Assembly
Automotive Repair
Battery IVIanufacturing
Biofuei Manufacturing
Biotech Laboratory
Bulk Chemical Storage
Car-Wash
Chemical Manufacturing
Chemical Purification
Dry Cleaning
Electrical Component
Manufacturing
FertilizeF Manufacturing
Film / X-ray Processing
Food Processing
Glass Manufacturing
Industrial Laundry
Ink Manufacturing
Laboratory
Machining / Milling
Manufacturing
Membrane Manufacturing
(i.e. water filter membranes)
Metal Casting / Forming
Metal Fabrication
Metal Finishing
Electroplating
Electroless plating
Anodizing
Coating (i.e. phosphating)
Chemical Etching / Milling
Printed Circuit Board
Manufacturing
Metal Powders Forming
Nutritional Supplement/
Vitamin Manufacturing
Painting / Finishing
Paint Manufacturing
Personal Care Products
Manufacturing
Pesticide Manufacturing /
Packaging
Pharmaceutical Manufacturing
(including precursors)
Porcelain Enameling
Power Generation
Print Shop
Research and Development
Rubber Manufacturing
Semiconductor Manufacturing
Soap / Detergent Manufacturing
Waste Treatment / Storage
SIC Code(s) (if known):
Brief description of business activities (Production / Manufacturing Operations):
Description of operations generating wastewater (discharged to sewer, hauled or evaporated):
Estimated volume of industrial wastewater to be discharged (gal / day): /t^y—*-
List hazardous wastes generated (type/volume): /u^,
Date operation began/or will begin at this location: ^ l~~l j 1^
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority?
Yes If yes, when:
Site Contai
Signatur^ \ /f.VW^rvTgt.- \(L./rvia.i^ -pO
ENCINA WVASfTEWATER AUTHlORITY
rc^ 50 Phone No. dSoZ
, 625X5 Avenida Encinas Carlsbad, CA 92011 (760) 438-3941
FAX: (760)476-9852
DISCHARGE PERMIT EXEMPT LIST
The commercial enterprises listed below are a partial listing of businesses that are exempt
frpni industrial wastewater discharge permitting under nonnal operating conditions. They
are exempt because (a) they discharge no process wastewater (i.e., they only discharge
sanitary wastewater with no pollutants exceeding any local limits), and (b) they have no
potential to negatively impact the EWPCF or other wastewater treatment plants in the
ESS. Any questions regarding exemptions should be referred to EWA Source Control
staff.
Automobile Detailers
Barber/Beauty Shops
Business/Sales Offices
Carpet/Upholstery Cleaning Services
Childcare Facilities
Churches
Community Centers
Consulting Services
Contractors
Counseling Services
Educational Services (no auto repair/film developing)
Financial Institutions/Services
Fitness Centers
Gas Stations (no car w^ash/auto repair)
Grocery Stores (no film developing)
Home-based Businesses
Hotels/Motels (no laundry)
Laundromats
Libraries
Medical Offices (no x-ray developing)
Mortuaries
Museums
Nail Salons
Nursing Homes
Office Buildings (no process flow)
Optical Services
Pest Control Services (no pesticide repackaging for sale)
Pet Boarding/Grooming Facilities
Postal Services
Public Storage Facilities
Restaurants/Bars
Retail/Wholesale Stores (no auto repair/film developing)
Theaters (Movie/Live)
CB141027 2521 PALOIVIAR AIRPORT RD
6/7IIH . 7Z> r/^^ ^/^/ /^'^^ f <S<^-^ uj/^AJ^^
Final Inspection required by:
a Plan • CM&I • Flre
SW •ISSUED •cv.
Approved Date
BUILDING
PLANNING
ENGINEERING
FIRE Expedite? Y EI DIGrrAL FltJS Required? Y N
7lJ±
51 XI
By
'ULJ
D/^
HazMat
APCD
Health
Forms/Fees Sent
Encina
Fire
HazHealthAPCD
PE&M
School
Sewer
Stormwater
Special Inspection
CFD; Y
LandUse:
Reed Due?
i^/i(}^'i
By
Annex: Factor:
PFF: N
Comments
Building
Planning
Engineering
Fire
Date
5pV
Date Date Date
Need?
Done
LA one
• Done