Pool Permit Permit No:CB990847
Building Inspection Request Line (760) 438-3101
2523 AEEDUL ST CEAD
2152602100 Lot #: 0 Applied: 03/05/1999
Plan Approved: 03/22/1999 Issued: 03/22/1999
POOL Status: ISSUED
$1 1,070.00 Construction Type: NEW Entered By: DT
360SF GUNITE POOL inspect* 03/p/99 a001 01 62
C- 179.19
City of Carlsbad Inspection Request
For: 7/21/99
Permit# CB990847
Title: 360SF GUNITE POOL
Description:
Type: POOL Sub Type:
Job Address: 2523 ABEDUL ST
Suite: Lot 0
Location:
APPLICANT JAY DENTON POOLS
Owner: LEWIS LINDONUNNA
Remarks:
Inspector Assignment: PD
Phone: 7607413000
Inspector &
Total Time: Requested By: BARRY
Entered By: BARBARA
CD Description Act Comments
59 Final Pool Y
Date Desaiption Ad lnsp Comments
Inspection History
6/3/99 53 ElectridConduiVWiring AP RE
6/3/99 55 FencdPre-Plaster AP RE
4/27/99 51 Excav/Steel/Bonding/Fenm AP PD
4/28/99 51 Excav/Steel/Bonding/Fenca AP PD AP ON 4/27/99
4/27/99 53 ElectridConduiVWiring AP PD
4/26/99 51 Excav/Steel/Bonding/Fenca CO PD SEE CARD
BUILDING PLANCHECK CHECKLIST
POOLS
BUILDING PLANCHECK NUMBER: CB 99- 847
BUILDING ADDRESS: 2S2 3 Du L ST
PROJECT DESCRIPTION: Pool
ASSESSORS PARCEL NUMBER: 2 I 5” &o -21 - 6
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans, information
andlor specifications provided in your submittal;
therefore. any changes to these items after this date,
office to insure continued conformance with applicable
including field modifications, must be reviewed by this
codes. Please review carefully all comments attached, as failure to comply with instructions in this report can
result in suspensjon of permit to build.
AlTACHMENTS
Grading Permit Application
Grading Permit Checklist
Right-of-way Permit Application
Right-of-way Permit Submittal
Checklist and Information Sheet
DENIAL
Piease see the attached report of deficiencies
or specifications for compliance with applicable
marked with OMake necessary corrections to plans
codes and standards. Submit corrected plans
andlor specifications to this office for review.
By: Date:
By: 7 Date:
By: Date:
ENGINEERING DEPT. CONTACT PERSON
NAME: Kathleen M. Farmer
City of Carlsbad
ADDRESS: 2075 Las Palmas Drive
Carlsbad, CA 92009
PHONE (619) 438-1361, ext. 4374
-bad, CA 92009-1 576 - (61 9) 438-11 61 FAX (6lT38-0894 @
BUILDING PLANCHECK CHECKLIST - POOLS
a a
a
a a a
1. Provide a fully dimensioned site plan drawn to scale. Show:
Mkh Arrow eperty Lines
Mxisting & Proposed Structures Wasements
2. Show site plan: d rainage Patterns dte what will happen with -sting & Proposed Slopes s il excavated from pool area
(location and height) d' mxisting Topography etainlng Walls
Note: If excavated soil is not to be removed from propetiy but regraded on
site, show proposed elevations and slopes.
If any portion of retaining walls are over 4' in height, a separate permit is required.
Retaining Wall Permit CB Applied for Approved
3. Include on title sheet:
*%:arcel Number
&I Description
N&rading Quantities Cut Fill ImporVExport
4. Project does not comply with the following Engineering Conditions of approval
for Project No.
Conditions were complied with by: Date:
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for grading permit are found in Section 11.06.030
of the Municipal code.
5a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill, import,
export).
5b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form attached.
Note: The Grading Permit must be issued and rough grading approval
obtained prior to issuance of a Building Permit
Page 1 of 2
..
,ST/ 2NW 3W
P 0 0 5c. A Grading Permit has been applied for:
PE2 DWG
Grading Inspector sign off by: Date:
0 P 0 5d. No Grading Permit required.
MISCELLANEOUS PERMITS
60 P 6. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or
private work adjacent tot he public Right-of-way.
A separate Right-of-way issued by the Engineering Department is required
for the following:
Please complete attached Right-of-way application form and return to the
Way checklist, at the time of resubmittal.
Engineering Deparbnent together with the requirements on the attached Right-of-
Right-of-way Permit and Pool Building Permit will be issued simultaneously.
0 P 0 7. Remarks