Loading...
HomeMy WebLinkAbout2523 NAVARRA DR; 202; CB051729; Permit05-09-2006 . Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No: CB051729 Building Inspection Request Line (760) 602-2725 2523 NAVARRA DR CBAD RESDNTL 2161702000 $1,451,938.00 8 16 Sub Type: CONDO Lot#: 41 Construction Type: NEW Reference #: Structure Type: MF5+ Bathrooms: 16 MATCHPLAY-8 UNIT CONDO BLDG Status: ISSUED Applied: 05/16/2005 Entered By: LSM Plan Approved: 05/09/2006 Issued: 05/09/2006 Inspect Area: Orig PC#: UNITS 100-103,200-203,12,952 SF,7,972 SF GAR-3116 SF Plan Check*: Applicant: MICHAEL CREWS COMMERCIAL DEVELOPMENT, INC PO BOX 300429 92030 760749-1919 Owner: MICHAEL CREWS COMMERCIAL DEVELOPMENT P O BOX 300429 ESCONDIDO CA 92030 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD#3Fee Renewal Fee Add'l Renewal Fee Other Building Fee HMP Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $3,993.33 Meter Size $0.00 Add'l Reel. Water Con. Fee $2,595.66 Meter Fee: $0.00 ; SDCWA Fee $0.00 CFD Payoff Fee $145.19 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $2,480.00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $3,392.00 Traffic Impact Fee (4305541) $0.00 Sidewalk Fee $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0:00 MECHANICAL TOTAL 1 $0.00 Housing Impact Fee ?? Housing InLieu Fee $23,992.00 Housing Credit Fee D5/8 Master Drainage Fee $1,512.00 Sewer Fee $0.00 Additional Fees, TOTAL PERMIT FEES $0.00 $1,280.00 $19,688.00 $0.00 $26,425.27 $24,392.56 $0.00 $0.00 $3,218.56 $3,629.44 $0.00 $693.00 $510.00 $362.50 $0.00 $0.00 $0.00 $0.00 $0.00 $14,816.00 $133,125.51 Total Fees: $133,125.51 Total Payments To Date: $133,125.51 Balance Due:$0.00 BUILDING PLANS IN STORAGE ATTACHED Inspector: - FINA Date:Clearance. NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside; void, or annul their imposition.. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitationsJias DteviouslvothetwJse excired.