HomeMy WebLinkAbout2523 NAVARRA DR; 203; CB051729; Permit05-09-2006 .•
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB051729
Building Inspection Request Line (760) 602-2725
2523 NAVARRA DR CBAD
RESDNTL
2161702000
$1,451,938.00
8
16
Sub Type:
Lot #:
Construction Type:
Reference #:
Structure Type:
Bathrooms:
MATCHPLAY-8 UNIT CONDO BLDG
CONDO Status: ISSUED
41 Applied: 05/16/2005
NEW Entered By: LSM
Plan Approved: 05/09/2006
MF5+ Issued: 05/09/2006
16 Inspect Area:
Orig PC#:
UNITS 100-103,200-203,12,952 SF,7,972 SF GAR- 3116 SF Plan Check*
Applicant:
MICHAEL CREWS COMMERCIAL DEVELOPMENT, INC
PO BOX 300429 92030
760749-1919
Owner: ,
MICHAEL CREWS COMMERCIAL DEVELOPMENT
P O BOX 300429
ESCONDIDO CA 92030
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$3,993.33 MeterSize
$0.00 Add'l Reel. Water Con. Fee
$2,595.66 Meter Fee
$0.00 SDCWA Fee
$0.00 CFD Payoff Fee
$145.19 PFF (3105540)
$0.00 PFF (4305540)
$0.00 License Tax (3104193)
$2,480.00 License Tax (4304193)
$0.00 Traffic Impact Fee (3105541)
$3,392.00 Traffic Impact Fee (4305541)
$0.00 Sidewalk Fee
$0.00 PLUMBING TOTAL
$0.00 ELECTRICAL TOTAL
$0.00 MECHANICAL TOTAL
. $0.00 • Housing Impact Fee
?? Housing InLieu Fee
$23,992.00 Housing Credit Fee
D5/8 Master Drainage Fee
$1,512.00 Sewer Fee
$0.00 Additional Fees
TOTAL PERMIT FEES
$0.00
$1,280.00
$19,688.00
$0.00
$26,425.27
$24,392.56
$0.00
$0.00
$3,218.56
$3,629.44
$0,00
$693.00
$510.00
$362.50
$0.00
$0.00
$0.00
$0.00
$0.00
$14,816.00
$133,125.51
Total Fees: $133,125.51 Total Payments To Date: $133,125.51 Balance Due:$0.00
•A.
BUILDING PLANS
STORAGE
ATTACHED
Inspector:
FINA
Date:Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been oiven a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.