Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2524 GATEWAY RD; ; CB133183; Permit
02-12-2014 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No. CB133183 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group; Project Title: 2524 GATEWAY RD CBAD Tl Sub Type: INDUST 2132611511 Lot#; 0 $116,112.00 Construction Type: 5B Reference # WHITE CONSTRUCTION: 4,475 SHEL TO OFFICE Status: Applied: Entered By: Plan Approved: Issued: Inspect Area Plan Check #: ISSUED 12/23/2013 JMA 02/12/2014 02/12/2014 Applicant: WHITE CONSTRUCTION/ANGELA 2540 GATEWAY RD CARLSBAD CA 92009 760-931-1130 Owner: OCEAN COLLECTION LLC C/o GREENE PROPERTIES INC P O BOX 1388 VISTA CA 92085 Building Permit $762.26 Meter Size Add'l Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00 Plan Check $533.58 Meter Fee $0.00 Add'l Building Permit Fee $0.00 SDCWA Fee $0.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $24.38 PFF (3105540) $2,113.24 Park Fee $0.00 PFF (4305540) $0.00 LFM Fee $0.00 License Tax (3104193) $0.00 Bridge Fee $0.00 License Tax (4304193) $0.00 BTD #2 Fee $0.00 Traffic Impact Fee (3105541) $6,499.00 BTD #3 Fee $0.00 Traffic Impact Fee (4305541) $0.00 Renewal Fee $0.00 PLUMBING TOTAL $124.00 Add'l Renewal Fee $0.00 ELECTRICAL TOTAL $86.00 Other Building Fee $0.00 MECHANICAL TOTAL $84.46 Pot. Water Con. Fee $0.00 Master Drainage Fee $0.00 Meter Size Sewer Fee $2,799.99 Add'l Pot. Water Con. Fee $0.00 Redev Parking Fee $0.00 Reel. Water Con. Fee $0.00 Additional Fees $0.00 Green BIdg Stands (SB1473) Fee $4.00 HMP Fee ?? Fire Expedidted Plan Review $0.00 Green BIdg Standards Plan Chk ?? TOTAL PERMIT FEES $13,030.91 Total Fees: $13,030.91 Total Payments To Date: $13,030.91 Balance Due: $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively refen'ed to as "fees/exactions," You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which vou have previouslv been given a NOTICE similar to this, or as to which the statute of limitations has previouslv othenwise expired. C I T Y OF CARLSBAD BuHdiiig P«»niift AppiiccAion 1635 Faraday Ave.. Cartstod, CA 92008 760-602-2717 / 2718 / 2719 Fax 780-602-8558 www.cari«bac(ca.s<»v Plan Check No. Est Valiie ^ IhO, I IZ- Plan Ck. Deposit tOTK teecmoom »8AIWBO0MS ttMummmtmaitmi White eonsiruction V-B B «et»dArea(* iOBAOOIieSS 2524 Gateway Road 213 261 15 11 commercial tenant improvement to an existing 2 story 4,475 sf shell building, work includes new restrooms, offices, meeting and support space. mtmisf) DECKS SSE) mmjm m<xmmKmm TOESfN?INHLERS shell office 0 0 0 CWfraCTNMIK mmmmmtfmAmMatn^ S.P. White Construction, Inc. i^nximtwum S.P. White Construction. Inc. ADORESS 2540 Gateway Rd 2540 Gateway Rd crrv Carlsbad STATE CA zm 92009 crry Carisbad STATE SP CA 92009 PHONE 760-931-1130 FAX 760-931.1171 PHONE 760-931-1130 FAX 760-931.1171 CMKft angeia@whiteconstnictionlnc.com £«*«. angeia@whiteconstructioninc.com mmmrtimmmmm oetirniAcroR MS. NAME S.P. White Construction, inc. ADDRESS ADWESS 2540 Gateway Rd cnv STATE ZIP CITY Carlsbad STATE S3P CA 92009 pmm fWNE 760-931-1130 EAX 760-931-1171 Eum EMAIl angeia@whlt6Constructloninc.com T7 Architechipe. Inc. Andrew Crocker mm yc.» C.29487 IIATEUCJ 452513 OMSS B 1 1202380 nmi3am«.VmntxCo m,tim.m0imtmmiHm P*yNo »»ctaKWM<i» gxpa^ionOats Bsscito nsaa «1» cowplelal If Ihe pe»* IS to twnd^ C<Mtllle«li # Baw>(*e« I SwI in »» pertwaro C^Kkirm. W)>I^ISitS:fiiSmiamm*mttm*'omifmMkm«m^ mm 11/26/2013 sate lf,n(»w*«,tt»fes**\9orhp»<)wn(8^ Q t,m«mmoimpeeipe^.mmajmi^sxiiacmsmtl^^ ?m.8t«me»aiaPfOhsmisCoij»TimCeriracmtslkmrmlm nsapp^ioiwoiwrof p(!pe% Mo iwMK or lii|)ram tlwm, ami • _%Knes$ and PEi4mion» Co(^ tx M teason 1 am sisntpl under S«esion . >.l(WSone%$*«topw*«fe»wm^awartfrn!*«i» [I]Y« Qto 211»» / hB» nc*) agnrt « apf*o«on for a but*^ P9(w» 6 l*«p»i(kS»son»c^«»M*,Wlh»«!a«»aDt«di!»9!|lteto^^ OATf itimapfstcatoiiMmtukiipgaxutiarimti^ Ptesl8^Ta(KWHa»*usSu66laricaA6eourtAcr? CHI'''** Ej* 1$ fhe applied ot Mure buikSngooofartfetiM to I ifet I7]HO (s(h8Jai*ytoB6(Mr8(fucted*i«Wn1.00Ofe«lo<tt»aule«t»i^^ L-Jves {TjNo AMT or THE AH^«e«/tft£ A fWAL GSrrn^TE OE OCOIPAMCY MAY IK^ aiBtoatcY setvKxs ANO TW Am imuTioN ixNTAOL D«tiua i h«r«by affirm Ihat there is a coratrucbon lending agency for the perfonnance of the worti Ihm pemt n issued (Sec 3097 (i) CivH Code) lefldK'3 Name Lender's Athftees I I ORt%«wlt MwnMawippfc^Md ilMtlh«aMitawlnft^^ I h«aby wlharia fci^mwMiM dithe C%g(CMM AGAINST Aa UAmn«S, JUDGMBffS, AND ©^Bl^«««^ OSHA: As <^HA pem* Is reiMnd In eiie«M«MS DCBRATKSM Bwy peiini issued tylhs Buliit^^ 11IO days Irom tts dati of such p«fiit v rjiMMng flu^ 180 days Irom tts dati of such p«fiit v ir|)MM^ fl^^ Inspection List Permit*: CB133183 Type: Tl INDUST WHITE CONSTRUCTION: 4,475 SHEL TO OFFICE Date Inspection Item Inspector Act 07/23/2014 19 Final Structural -Rl 07/23/2014 89 Final Combo PY AP 07/23/2014 89 Final Combo PY AP 07/11/2014 19 Final Structural PB NR 06/04/2014 17 Interior Lath/Drywall PY PA 06/02/2014 84 Rough Combo PY AP 05/01/2014 17 Interior Lath/Drywall PY AP 04/24/2014 84 Rough Combo PD AP 03/25/2014 21 Underground/Under Floor PY AP 03/25/2014 31 Underground/Conduit-Wirin PY AP Comments BLDG FINAL Thursday, July 31, 2014 Page 1 of 1 EsGil Corporation In (Partnership with government for (BuiCding Safety DATE: 1/24/14 •APPLICANT >a JURIS. JURISDICTION: City of Carlsbad • PLAN REVIEWER • FILE PLANCHECKNO.: 13-3183 SET: II PROJECT ADDRESS: 2524 Gateway Rd PROJECT NAME: White Construction - TI I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. Xl The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. XI The applicant's copy of the check list has been sent to: White Construction Inc. 2450 Gateway Rd, Carlsbad, CA 92009 I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Angela ^ Telephone #: 760-931-1130 Date contacted: f (by^^|p ) Email: angela@whiteconstructioninc.com / andv@t7architecture.com Fax #: 760-931-1171 J^ali \/Telephone Fax In Person • REMARKS: By: Doug Moody Enclosures: EsGil Corporation • GA • EJ • MB • PC 1/16/14 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad 13-3183 1/24/14 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. These corrections are in response to items not fully addressed or as the result of information provided, the text in bold print indicates the unresolved issue. 2. Please provide plans and calculations signed by the California State licensed engineer or architect for the structural support and lateral bracing of the operable conference wall (garage door). Include all calculations and finding on the plans. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. Please clarify the detail on sheet A400 to show the method of connecting the 6x6 steel beam to the 6x6 steel columns? Number and size of connectors? On the cover sheet of the plans, specify any items requiring special inspection, in a format similar to that shown below. Section 107.2. • REQUIRED SPECIAL INSPECTIONS In addition to the regular inspections, the following checked items will also require Special Inspection in accordance with Sec. 1701 ofthe Uniform Building Code. ITEM REQUIRED? REMARKS • EXPANSION/EPOXY ANCHORS 5. Please provide a roof plan showing the new roof mounted equipment and a service receptacle located less than 25' from the new equipment and GFCI protected. Please show the receptacle to be GFCI protected. 6. Please clarify the mechanical plans to show the outside air connection to the fan coils on the first floor. The plans show a new 10" outside air duct directly City of Carlsbad 13-3183 1/24/14 adjacent to the exhaust duct from the restrooms? Please show the exhaust duct termination location and dimension the separation to the air intake. 7. Hot water supplied to a public use lavatory is limited to a maximum temperature potential of 120 degrees by a device that conforms to ASSE 1070 or CSA B125.3; please provide the manufacturer's listing showing compliance. Detail how this temperature limitation is achieved. The water heater thermostat may not be used for compliance with this Code section. UPC 413.1 & UPC 414.Please indicate in the plumbing fixtures schedule the manufacturer's name and model number of the mixing valve and show the location/s it will be installed. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes • No • The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. EsGil Corporation In Partnership with government for (BuiCding Safety DATE: 1/3/lA^ • APPLICANT «a JURIS. JURISDICTION: City of Carlsbad • PLAN REVIEWER • FILE PLANCHECKNO.: 13-3183 SET: I PROJECT ADDRESS: 2524 Gateway Rd PROJECT NAME: White Construction - TI I I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. I I The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. I I The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. X The check list transmitted herewith Is for your Information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. I I The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. X The applicant's copy of the check list has been sent to: White Construction Inc. 2450 Gateway Rd, Carlsbad, CA 92009 I I EsGil Corporation staff did not advise the applicant that the plan check has been completed. X EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Angela Telephone #: 760-931-1130 Date contacted: \\[p (by: V^lfmail: angela@whiteconstructioninc.com Fax #: 760-931- 117jl^ v^Mall Telephone v^ax In Person n REMARKS: By: Doug Moody Enclosures: EsGil Corporation • GA • EJ • MB • PC 12/24/13 9320 Chesapeake Drive, Suite 208 • San Diego, Califomia 92123 • (858)560-1468 • Fax (858) 560-1576 City of Carlsbad 13-3183 1/3/14 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLANCHECKNO.: 13-3183 JURISDICTION: City ofCarlsbad OCCUPANCY: B USE: Office TYPE OF CONSTRUCTION: VB ACTUAL AREA: 4475sf ALLOWABLE FLOOR AREA: STORIES: 2 HEIGHT: SPRINKLERS?: Yes OCCUPANT LOAD: 92 REMARKS: DATE PLANS RECEIVED BY JURISDICTION: DATE PLANS RECEIVED BY ESGIL CORPORATION: 12/24/13 DATE INITIAL PLAN REVIEW COMPLETED: 1/3/14 PLAN REVIEWER: Doug Moody FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a buliding permit. Code sections cited are based on the 2010 CBC, which adopts the 2009 IBC. The following items listed need clarification, modification or change. All Items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2009 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e.. plan sheet number, specification section, etc. Be sure to enclose the marked up list when vou submit the revised plans. City of Carlsbad 13-3183 1/3/14 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Dlego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. 1. Provide a section view of the new interior glazed partitions. Show: a) Specify manufacturer and approval number or Indicate "to be ICC approved". b) Method of attaching top and bottom plates to structure. (NOTE: Top of partition must be secured to roof or floor framing, unless suspended ceiling has been designed for partition lateral load). c) Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing. 2. Please provide plans and calculations signed by the California State licensed engineer or architect for the structural support and lateral bracing of the operable conference wall (garage door). Include all calculations and finding on the plans. Please Include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. 3. Please have the document author and the principle designer of the LTG-1 C form sign the imprinted document. 4. Occupancy sensors are required for the following room types: Offices 250 square feet and smaller, multipurpose rooms less than 1,000 square feet, and classrooms and conference rooms of any size. Please add to Offices 109, 110, 203 and Office 204. Section 131. 5. Please provide a roof plan showing the new roof mounted equipment and a service receptacle located less than 25' from the new equipment and GFCI protected. 6. Please clarify the mechanical plans to show the outside air connection to the fan coils on the first floor. City of Carlsbad 13-3183 1/3/14 7. Hot water supplied to a public use lavatory Is limited to a maximum temperature potential of 120 degrees by a device that conforms to ASSE 1070 or CSA B125.3; please provide the manufacturer's listing showing compliance. Detail how this temperature limitation Is achieved. The water heater thermostat may not be used for compliance with this Code section. UPC 413.1 & UPC 414. 8. Please complete the plumbing plans to show the water lines to the second floor sink. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please Indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please Indicate: Yes • No • The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad 13-3183 1/3/14 [DO NOT PAY- THIS IS NOTAN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLANCHECKNO.: 13-3183 PREPARED BY: Doug Moody DATE: 1/3/14 BUILDING ADDRESS: 2524 Gateway Rd BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VB BUILDING PORTION AREA ( Sq. Ft.) Valuation Mutt! pilar Reg. Mod. VALUE ($) Tl 4475 37.12 166,112 Air Conditioning Fire Sprinklers TOTAL VALUE 166,112 Jurisdiction Code cb By Ordinance BIdg.Permt Fee by OrdinancE Plan Checl< Fee by Ordinance • Type of Review: 0 Complete Review [^Repetitive Fee ^ Repeats • Other j—I Hourly EsGil Fee [J Structural Only Hr. @* $958.26 $622.87 $536.63 Comments: Sheet 1 of 1 macvalue.doc + City of Carlsbad 13-3183 1/3/14 [DO NOT PAY- THIS IS NOTAN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLANCHECKNO.: 13-3183 PREPARED BY: Doug Moody DATE: 1/3/14 BUILDING ADDRESS: 2524 Gateway Rd BUILDING OCCUPANCY: B TYPE OF CONSTRUCTION: VB BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Tl 4475 37.12 166,112 Air Conditioning Fire Sprinklers TOTAL VALUE cb "" By Ordinance 166,112 Jurisdiction Code cb "" By Ordinance BIdg. Permit Fee by Ordinance Plan Qieck Fee by Ordinance Type of Review: | Repetitive Fee ^ Repeats Complete Review I j Other II Hourly EsGil Fee Structural Only Hr. @ $958.26 $622.87 $536.63 Comments: Sheetl of 1 macvalue.doc + ^ CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov DATE:01/06/14 PROJECT NAIVIE: WHITE CONSTRUCTION PLANCHECKNO: 1 SET#: 1 ADDRESS: 2524 GATEWAY VALUATION: $166,112 PROJECT ID: CB 13 3183 APN: / This plan check review Is complete and has been APPROVED by the ENGINEERING Division. By: KATHLEEN LAWRENCE 01/06/13 A Final Inspection by the Division is required Yes / No This plan check review is NOT COIVIPLETE. Items missing or Incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: ANGELA@WHITECONSTRUCTIONINC.COM You may also Iiave corrections from one or more of tlie divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checi<list please contact the following reviewer as mariced: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov / Kathleen Lawrence ^ 760-602-2741 Kathleen.Lawrence@carlsbadca.fiov Greg Ryan 760-602-4663 Grefiorv.Rvan@carlsbadca.fiov Gina Ruiz 760-602-4675 Glna.Ruiz@carlsbadca.fiov Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov Cindy Wong 760-602-4662 Cvnthia.Wonfi@carlsbadca.fiov Dominic Fieri 760-602-4664 Domlnlc.Fieri@carlsbadca.fiov Remarks: ^ CITY OF CARLSBAD BUILDING PLANCHECK CHECKLIST QUICK-CHECK/APPROVAL Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov ENGINEERING Plan Check for CB 13-3183 Date:01/06/14 Project Address: 2524 GATEWAY APN: Project Description: Tl SHELL TO OFFICE 4475 SF Valuation: $166,112 ENGINEERING Contact: Kathleen Lawrence Phone: 760-602-2741 Email: kathleen.lawrence@carlsbadca.gov Fax: 760-602-1052 RESIDENTIAL INTERIOR / TENANT IMPROVEMENT RESIDENTIAL ADDITION MINOR (<$20,000.00) PLAZA CAMINO REAL CARLSBAD PREMIER OUTLETS COMPLETE OFFIGE BUILDING OTHER: PCR OFFICIAL USE ONLY ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT BY: KATHLEEN LAWRENCE REMARKS: DATE:01I06I14 E-36 Notification of Engineering APPROVAL has been sent to ANGELA@WHITEC0NSTRUCTI0NINC.COM via EMAIL ^ on 01/06/14 Page 1 of 1 REV 4/30/11 Fee Calculation Worksheet ENGINEERING DIVISION Prepared by: K LAWRENCE Date: 01/06/14 GEO DATA: LFMZ: / B&T: Address: 2524 GATEWAY BIdg. Permit #; CB 13-3183 Fees Update by: KML Date: 01/06/14 Fees Update by; Date; 01/06/14 EDU CALCULATIONS: List types and square footages for all uses. Types of Use: OFFICE Sq.Ft./Units 4475 SF EDU's 1.59 Types of Use: Sq.Ft./Units EDU's Types of Use: Sq.Ft./Units EDU's Types of Use: Sq.Ft./Units EDU's ADT CALCULATIONS: List types and square footages for all uses. Types of Use; OFFICE Sq.Ft./Units 4475 SF ADTs 67 Types of Use: Sq.Ft./Units ADTs Types of Use: Sq.Ft./Units ADT's Types of Use: Sq.Ft./Units ADT's FEES REQUIRED: Within CFD: YES (no bridge & thoroughfare fee in District #1, reduces Traffic Impact Fee) NO 1. PARK-IN-LIEU FEE: NW QUADRANT NE QUADRANT SE QUADARANT SW QUADRANT ADT'S/UNITS: X FEE/ADT; =$ N/A • 2.TRAFFIC IMPACT FEE: ADTS/UNITS: 67 X FEE/ADT; $97 =$ 6499 3. BRIDGE & THOROUGHFARE FEE: / DIST#1 DIST.#2 DIST.#3 ADT'S/UNITS: < FEE/ADT; =$ N/A • 4. FACILITIES MANAGEMENT FEE ZONE; • ADTS/UNITS: X FEE/SQ.FT./UNIT; =$ N/A • 5. SEWER FEE EDU's 1.59 X FEE/EDU; 842 =$ 1338.78 IZl BENEFIT AREA: H EDU's 1.59 X FEE/EDU; 919 =$ 1461.21 6. DRAINAGE FEES: PLDA: HIGH MED UM LOW ACRES: X FEE/AC; =$ N/A u 7. POTABLE WATER FEES; UNITS CODE CONN. FEE METER FEE SDCWA FEE TOTAL ^ CITY OF CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK APPROVAL P-28 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.eov DATE: 1/15/14 PROJECT NAME: T.l. PROJECT ID: PLAN CHECK NO: CB133183 SET#: ADDRESS: 2524 GATEWAY RD APN: This plan check review is complete and has been APPROVED by the PLANNING Division. By: GINA RUIZ A Final Inspection by the PLANNING Division is required n Yes ^ No You may also have corrections from one or more ofthe divisions Usted below. Approval from these divisions may be required prior to the Issuance of a building permit. Resubmitted plans should Include corrections from all divisions. Q This plan check review is NOT COIVIPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Approval has been sent to: ANGELA@WHITEC0NSTRUCTI0NINC.COM For questions or clarifications on tfie attaclied ciiect<list please contact the following reviewer as markied: PLANNING 760-602-4610 ENGINEERING 760-602-2750 FIRE PREVENTION 760-602-4665 1 1 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.fiov 1 I Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.fiov 1 Greg Ryan 760-602-4663 Grefiorv.Rvan@carlsbadca.fiov X Gina Ruiz 760-602-4675 Gina.Rulz@carlsbadca.fiov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.fiov Cindy Wong 760-602-4662 Cvnthia.Wonfi@carlsbadca.gov • [ 1 Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: Plan Check No. CB133183 Address 2524 GATEWAY RD Date 1/15/14 Review # 2 Planner GINA RUIZ Phone (760) 602- 4675 Type of Project & Use: TL Net Project Density: DU/AC Zoning: PC General Plan: Pj Facilities Management Zone: ^Z CFD (in/out) # 1 Date of participation:3/11/2003 Remaining net dev acres: (For non-residential development: Type of land use created by this permit: ) REVIEW #: 12 3 Legend: ^ Item Complete • Item Incomplete - Needs your action ^ • • Environmental Review Required: YES • NO ^ TYPE DATE OF COMPLETION: Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: lEI • • Discretionary Action Required: YES • NO |EI TYPE APPROVAL/RESO. NO. DATE PROJECT NO. OTHER RELATED CASES: Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: • O Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES ONO El CA Coastal Commission Authority? YES O NO M If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): • • Habitat Management Plan Data Entry Completed? YES • NO If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) • • Inclusionary Housing Fee required: YES • NO ^ (Effective date of Inclusionary Housing Ordinance - May 21, 1993.) Data Entry Completed? YES • NO • (A/P/Ds, Activity Maintenance, enter CB#, toolbar. Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) • • Housing Tracking Form (form P-20) completed: YES • NO • N/A^ p-28 Page 2 of 3 07/11 Site Plan: K • • • • • • • • • • K • • • El • EDO • ED City Council Policy 44 - Neighborhood Architectural Design Guidelines 1. Applicability: YES • NO K 2. Project complies: YES • NOQ Zoning: 1. Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Required Shown Required Shown Required Shown Required Shown Required Shown 2. Accessory structure setbacks: Front: Interior Side: Street Side: Rear: Structure separation: 3. Lot Coverage: Required Shown Required Shown Required Shown Required Shown Required Shown Required. Shown 4. Screening of Equipment: Required YES Shown PARAPET SHOWN 5. Parking: Spaces Required Shown (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required Shown Additional Comments PARAPET SHOWN AND NO GROUND MOUNTED UNITS. ONLY ROOF MOUNTED OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER GINA RUIZ DATE 1/15/14 p-28 Page 3 of 3 07/11 BUILDIMG DE¥h ' & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov ^ CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL Corrtni DATE: 01/23/2014 PLA|4 CHECK NO: 2 SET#: 1 PROJECT NAIVIE: WHITE CONST. T.l. PROJECT ID: CB133183 ADDRESS: 2524 GATEWAY RD APN: 213-261-15-11 3 This plan check review Is complete and has been APPROVED by the FIRE Division. By: GR A Final Inspection by the FIRE Division Is required El Yes • No 3 This plan check review is NOT COIVIPLETE. Items missing or Incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: W.C.I. You may also have corrections from one or more of the divisions Usted below. Approval from these divisions may be required prior to the Issuance of a building permit. Resubmitted plans should include corrections from aU divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: f€0-G02-4610 ENGINEERING 760-602-2750 FIRE piiii^^# 76O^0:2-4€65 ' 1 1 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.fiov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.fiov X Gi'eg Ryan 760-602-4663 Grefiorv.Rvari@carlsbadca.fiov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov 1 1 Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov Q Cindy Wong 760-602-4662 Cvnthia.Wonfi@carlsbadca.gov • • 1 1 Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: See Attached Carlsbad Fire Department COF^*' Plan Review Requirements Category: TI, INDUST Date of Report: 01-23-2014 Reviewed by: Name: WHITE CONSTRUCTION/ANGELA Address: 2540 GATEWAY RD CARLSBAD CA 92009 Permit #: CB133183 Job Name: WHITE CONSTRUCTION: 4,475 SHEL Job Address: 2524 GATEWAY RD CBAD Please review carefully all comments attached. CITY OF CARLSBAD FIRE DEPARTMENT - APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUANCE OF BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTION AND REQUIRED TEST, NOTATIONS HEREON, CONDITIONS IN CORRESPONDENCE AND CONFORMANCE WITH ALL APPLICABLE REGULATIONS. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE THE VIOLATION OF ANY LAW. At or prior to Final Fire and Building inspection an Emergency lighting facilities test shall be conducted by CFD personnel during pre-dawn or dusk hours when ambient light is at 0.00 Lux or 0.0 Foot-candle. This test shall be conducted to test the initial loss ofpower reading of illumination that is at least an average of 1 foot candle (11 lux) and a minimum of 0.1 foot-candle (1 lux) measured along the path of egress at the floor level. And tested after 60-minutes to 0.6fc (6 lux). Failure to provide sufficient lighting in egress aisles, corridors, exit enclosures, exit passageways and stair enclosures is the AOR's responsibility. CFC Ch. 10, Sec. 1006. Entry: 01/23/2014 By: GR Action: AP ^ CITY OF CARLSBAD PLAN CHECK REVIEW TRANSMITTAL LDit^G DEF r Cdmnkthft}/ & Economic Development Department 1635 FaradayAvenue Carlsbad CA 92008 www.carlsbadca.gov DATE: 12/26/2013 PLAN CHECK NO: 1 SET#: 1 PROJECT NAME: 2524 GATEWAY RD ADDRESS: 2524 GATEWAY RD PROJECT ID: CB133183 APN: 213-261-15-11 • This plan check review is complete and has been APPROVED by the FIRE Division. By: GR A Final Inspection by the FIRE Division is required Klves [Jtio ^ This plan check review is NOT COIVIPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: Tony @ Baker Architecture You may a/so have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should mclude corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING 760-602-4610 ENGINEERING 760602-2750 FIRE PREVENTION 760^02-4665 1 1 Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov 1 1 Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov X Greg Ryan 760-602-4663 Gregorv.Rvan@carlsbadca.gov 1 1 Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov Linda Ontiveros 760-602-2773 Llnda.Ontiveros@carlsbadca.gov 1 1 Cindy Wong 760-602-4662 Cvnthia.Wong@carlsbadca.gov • 1 Dominic Fieri 760-602-4664 Dominic.Fieri@carlsbadca.gov Remarks: See Attached Carlsbad Fire Department OEP r„ Plan Review Requirements Category: Tl, INDUST Date of Report: 12-26-2013 Reviewed by: ^. )^g*»v Name: WHITE CONSTRUCTION/ANGELA Address: 2540 GATEWAY RD CARLSBAD CA 92009 Permit #: CB133183 Job Name: WHITE CONSTRUCTION: 4,475 SHEL Job Address: 2524 GATEWAY RD CBAD INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot adequately conduct a review to determine compliance with the applicable codes and/or standards. Please review carefully all comments attached. Please resubmit the necessary plans and/or specifications, with changes "clouded", to this office for review and approval. Conditions: Cond: CON0006894 [NOT MET] 1. SHEET AlOl: YOU MAY WANT TO REVISIT INCORPORATING A STORAGE CLOSET WITH THE HOUSE E- PANEL INSIDE. OCCUPANT SHALL BE REQUIRED TO MAINTAIN A 30-INCH CLEARANCE AROUND THE HOUSE PANEL WHICH WILL RENDER MUCH OF THIS SPACE UNUSABLE. SUGGEST BUILDING A CLOSET FOR THE E- PANEL AND A SEPERATE CLOSET FOR STORAGE OR LEAVE PANEL EXPOSED AND BUILD A STORAGE CLOSET ALONE. 2. SHEET A007: PROVIDE SIGNAGE ON SHARED STAIRWELL ENTRY DOOR STATING "ROOF ACCESS LADDER" MINIMUM OF 2-INCH LETTERING. 3. SHEET A201/E2 & E4: SHEETS SHOULD SHOW ALL EMERGENCY LIGHTING INCLUDING BOTH STAIRS. Entry: 12/26/2013 By: GR Action: CO PALOS VERDES Engineering Civil and Structural Consulting a Please Respond To: 663 Valley Avenue Suite 101 Solana Beach California 92075 856 509 8505 858 509 8515 FAX sandiego@pvec.com a Please Respond To: 27520 Hawthorne Blvd. Suite 250 Rolling Hills Estates California 90274-3512 310 541 5055 310 541 0321 FAX info@pvec.com Structural Calculations Tenant Improvement Prepared For White Constniction 2540 Gateway Road Carlsbad, CA 92009 Project White Constnictioin 2540 Gateway Road Carlsbad, CA 920009 RCE C57182, exp. 12/31/15 RECEIVED JAN 14 ?nH C\T/ OF CARLSBAD BUILDING DIViSION PROJECT ENGINEER January 7,2014 PVECFileNo. 24-14-007 PALOS VERDES ENGINEERING CORPORATION 663 Valley Avenue, Suite 101, SolanaBeach, CA 92075 Telephone (858) 509-8505 - Fax (858) 509-8515 1.0 Desien Criteria: White Constnictioin 24-14-007 Code: 2013 Califomia Building Code - ASCE 7-10 Timber: Douglas Fir-Larch (DF-L), WWPA or WCLIB 2x Wall Framing: DF-L #2 (unless noted otherwise) 2x Rafters & Joists: DF-L #2 " Posts & Beams: DF-L#1 " Glue-Lam Beams: Simple Span: Grade 24F-V4 (DF/DF) Cantilevers: Grade 24F-V8 (DF/DF) Sheathing: Min. APA-Rated Sheathing, Exposure 1, Plywood or OSB (U.N.O.) Engineered Framing: Wood I-Joists: TJI 110,210,230,360,560 ICC ESR-1153 LVL, PSL 1.9E Microllam, 2.0E Parallam ICBO ER-4979 Concrete: Compressive Strength @ 28 days per ASTM C39-96: Footings: f c = 2500 psi Grade Beams: f c = 3000 psi Concrete Block: Grade N-I per ASTM C90-95, f m = 1500 psi per ASTM E447-92 Mortar: Type S Mortar Cement per ASTM C270-95, Min. f m = 1800 psi @ 28 days. Grout: Coarse Grout w/ 3/8" Max. Aggregate per ASTM C476-91, Min. f m = 2000 psi @ 28 days. Reinforcing Steel: #4 & Larger: ASTM A615-60 (Fy = 60 ksi) #3 & Smaller: ASTM A615-40 (Fy = 40 ksi) Structural Steel: 'W' Shapes: ASTM A992, Fy= 50-65 ksi Plates, Angles, Channels: ASTM A36, Fy = 36 ksi Tube Shapes: ASTM A500, Grade B, Fy= 46 ksi Pipe Shapes: ASTM A53, Grade B, Fy=35 ksi Welding Electrodes: Structural Steel: E70-T6 A615-60 Rebar: E90 Series Bolts: Sill Plate Anchor Botls & Threaded Rods: A307 Quality Minimum Steel Moment & Braced Frames: A325 (Bearing, U.N.O.) Soils: 1000 psf Bearing Pressure References: Palos Verdes Engineering Corporation Consulting ^444-007 Structural Engineers SHEET NO_ OF 663 Valley Avenue., Suite 101 • SolanaBeach. CA 92075 Telephone (858) 509-8505 • Fax (858) 509-8515 CALCULATED BY DATE ^jljli CHECKED BY DATE SCALE 2.5 ^^fAOAfiL DC_ 5l7Pfiofl,r 3^ \IS A' 3-H us^_ iS^^-^/f" V ?c. ATTACMrtfLLn' a. FLCU- 2A/ iDOOfl A-2 SPEC SHEET Order Number: Bid Number: 121213-AD Bid Date: 12/12A13 Door Width Door Height Wdg. Overall Height Door Style 14'-4.00" B'-O.OO" ; 3D" ; ld'-6.60" SCHWEISS Drive Type \ Uft Type ! Truss \ Hinge Style Tot W - Inches Tot H • Inches Top Drive Strap Lift internal Single Hinges. 174" 126" I5<! PRELIMINARY SPECS -These are Preliminary Spec Sheets - do not manufacture the building header/columns using these specs. This is a rough estimate of what the door measurements and weights will be when purchased. FINAL SPECS - ^^^^ Will be provided when the door contract is finalized. Preliininsry - Design criteria - Required Door Information Building Code Wind Speed Wind Exposure Wind Type Enclosure Topographic Factor Occupancy Building Height Roof Slope Kzt 2009 IBC SOmjsh Component Enclosed 1 Standard 11' 1 :12 Door Operational Wind Speed 30 riiph Building Code - (Default is 2009 IBC) 3 second gust - (Detault is 90 mph) Exposure - (Default is C) Component Wind or Main Wind Force (MWFRS) - (Component if less than 700sqft.) Enclosed or Partially Enclosed - (Default is Enclosed) Must Be Provided by the Engineer of Record- (Default is 1) Standard, Essential, or High Occupancy - (Default is Standard) Mean Roof Height or Eave Height for Buiiding with Roof Slope of 10 Degrees or Less. Roof Slope - (Default is 1:12) Maximum Wind Speed for Door Operation Is: 30 mph Do not operate door if wind speed exceeds the maximum door operating speed. Door must be closed with floor pins and locks engaged when un-attended or when wind speed Is expected to exceed the maximum door operating speed. PtelirninBry - Tectinical information For Your Bi-Fold Door 3 Number of Hinges 2 Number of Lift Points Distributed Equally. 240-1 PH Electrical System with Up/Stop/Down Switch and Power Unit on the (Ll) - Left/Inside Door Weights 1566 Ibs Structural Framing Weight 151 lbs Exterior Sheeting & Trim Weight (29ga. = 0.82 psf. - 26ga. = 0.99 psf.) Liner Sheeting & Trim Weight (29ga. = 0.82 psf. - 26ga. = 0.99 pst.) 12 If Only Bottom Half Insulation Weight (4" Blanket = 0.5 psf. •- 6" Blanket = 0.65 psf.) 1523 lbs Optional - added accessories 3239 Tbs Estimated Total Door Weight WARNING - Bchwelss manufactures the door based on the listed weights above. DO NOT modify the weight of the door. Preliminary' Door Reactions A1- A2 A3 Bl 82 B3 B4 B5' 86' WIND DIRECTION WIND DIRECTION LEEWARD WALL Dead Load WINDWARD WALL f Internal Pressure Interna) Suction ' LEEWARD WALL J Internal Pressure Internal Suction Column Raact. side Column and Ist Hinge atBese(lbs.) ,'Loc. from Each End Ol>e.) o_ ' ?____ Di 0 90 MPH WIND LOAD Interior HIngas (Iba.) (A,) 346 '549 605 402 1 • i 190 302 333 221 • 381 604_ 666 443 1782 Dj Hollar Forces (lbs.) 1652 Sitte Column »wl 1«* >j'"q^ ' Loc- frortiTach End (Iba j (A.) 908 I (A,) 891 a: interior HIngas (in..) j (Ax) (A,) 1817 g 1782 D ~30MPH MAXIMUM WINDTOR DOOR OPERATION 157 Q~ 67 a 77 '"j]f 133"c2l J55 133 i=j &6 a 66 gi 113 11:3 131 Dead Load WINDWARD WALL r Internal Pressure. Intemal Suction 1 LEEWARD WALL P Intemal Pressure Internal Suction Important Note: When your bi-fold door is opening or in the wide open position, the door tends to pull away from the building at the hinge line also putting stress on each building column where the roller moves along the column flange. The building manufacturer/contractor/owner is responsible to insure that the building structure is capable of handling all the imposed loads. All materials not supplied by Schweiss are the full responsibility of others!! 121213 6:25 173' 173 74 73 in 86 85 147 147 171 171 WINDWARD WALL OUT conqfeWfioor : Horizontal : Vertical Palos Verdes Engineering Corpation 663 Valley Avenue, Ste. 101 Solana Beach, CA 92075 (858)509-8505 - 0(0 (858) 509-8515-Fax paul@pvec.cgm Steel Column Lie. # : KW-06006948 Description: Garage Column Code References Calculations per AISC 360-05, IBC 2006, CBC 2007, ASCE 7-05 Load Connbinations Used : ASCE 7-10 General Information Project Title: Engineer: Project Descr: Project ID: V Prmled 8JAN20H, SOOAM f^ile=c;\Users\Paul©BslitoplTernpil4^)00-1\wliite.ec6 ENERCALC, INC. 198^2013. Bulld£.13.B.31, Ver6.13.12.31 Licensee : PALOS VERDES ENGINEERING CORP. Steel Section Name: Analysis Metiiod: Steel Stress Grade Fy: Steel Yield E : Elastic Bending Modulus Load Combination: TS6x6x3/8 Allowable Strength 35.0 ksi 29,000.0 ksi ASCE 7-10 Applied Loads Column self weight induded: 380.754 Ibs * Dead Load Factor AXIAL LOADS... DL: Axial Load at 10.0 ft, D = 1.0 k BENDING LOADS... DL: Lat. Point Load at 10.0 ft creating Mx-x, D = 1.652 k Ax-DL: Lal. Point Load at 13.0 ff aeating Mx-x, D = 0.9080 k DESIGN SUMMARY Bending & Sliear Checl( Results Overall Column Height 13.0 ft Top & Bottom Fixity Top & Bottom Pinned Brace condition for deflection (buckling) along columns: X-X (width) axis: Unbraced Length for X-X Axis buckling = 13.0 ft K = 1.0 Y-Y (depth) axis: UnDraceo Lengtii for Y-Y Axis buckling = 13.0 ft, K= 1.0 Service loads entered. Load Factors will be applied for calculations PASS Max. Axial+Bending Stress Ratio = 0.1344 :1 Load Combination +D+H Location of max.above base 9.946 ft At maximum location values are .. Pa: Axial 1.381 k Pn / Omega: Allowable 132.979 k Ma-x: Applied 3.792 k-ft Mn-x 1 Omega: Altowable 29.341 k-ft Ma-y: Applied 0.0 k-ft Mn-y / Omega: Allowable 29.341 k-ft PASS Maximum Shear Stress Ratio = 0.05012 :1 Load Combination +D+H Location of max. above base 13.0 ft At maximum location values are.. Va: Applied 2.179 k Vn 1 Omega: Allowable 43.474 k Maximum SERVICE Load Reactions.. Top along X-X Bottom along X-X Top along Y-Y Bottom along Y-Y Maximum SERVICE Load Deftections. Along Y-Y 0.07153 in at for load combination :D Only 0.0 k 0.0 k 2.179 k 0.3812 k Along X-X 0.0 in for load combinatton: at 7.329ft above base 0.0ft above base Load Combination Results Maximum Axial + BendlnQ Stress Ratios Maximum Shear Ratios Load Combination Stress Ratio Status Location Stress Ratio Status Location +D+H 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft +D+L+H 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft +D+Lr+H 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft +D+S+H 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft H-D-^.750Lr-K).750L+H 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft +D-tfl.750L-*0.750S-HH 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft -HD-+€.60W+H 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft +OHO.70E+H 0.134 PASS 9.95 ft 0050 PASS 13.00 ft +O4€.750Lr-t0 750L-»O.450W+H 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft +D-K).750L-^.750S-.fl.450W+H 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft +D-tO.750L+O.750S+O.5250E-m 0.134 PASS 9.95 ft 0.050 PASS 13.00 ft •to.GOD+o.eow+o.eoH 0.081 PASS 9.95 ft 0.030 PASS 13.00 ft +0.60D-K).70E-K).60H 0.081 PASS 9.95 ft 0.030 PASS 13.00 ft Palos Verdes Engineering Corpation 663 Valley Avenue, Ste. 101 Solana Beach, CA 92075 (858) 509-5505-Ofc (858) 509-8515-Fax paul@pvec.com Steel Column Lie. # : KW-06006948 Description: Garage Column Maximum Reactions • Unfactored Load Combination DOnly " ~^ Maximum Deflections for Load Combinations X-X Axis Reactkjn @ Sase @ Top Project Title: Engineer Project Descr: Proiect ID; Pnnted 8JAKI20I4 SOOAI.I ENERCALC, INC. 1983-2013, Buiid:ai3.8.31, Ver;6.13.12.31 Licensee : PALOS VERDES ENGINEERING CORP. • Unfactored Loads Load Combination Max. X-X Deflection Distance Y-Y Axis Reactfen @ Base @ Top -0.381 2179 Max. Y-Y Dellectton DOnly 0.0000 In O.OOO K 0,072 Steel Section Properties : TS6x6x3/8 Depth 6.000 In Ixx 41.60 InM Web Thick 0.000 in Sxx 13.90 in*3 Widtti 6.000 in Rxx 2.270 in Wall Thk* 0.375 in Zx 16.800 in*3 Area = 8.080 in«2 lyy 41.600 inM Weigtit = 29.289 plf Syy 13 900 in»3 Ryy 2.270 in Note: Only non-zero reactions are listed. Axial Reaction @Base 1.381 k Distance 7.329 ft J = 68 500 inM Ycg 0,000 in M-x Loads Loads are total entered value. Arrows do not reflect absolute direction. Palos Verdes Engineering Corpation 663 Valley Avenue, Ste. 101 Solana Beach, CA 92075 (858) 509-8505-Ofc (858) 509-8515 - Fax paul(gpvec.com _ _ Steel Beam Lie. # : KW-06006948 Project Title: Engineer: Project Descr: Description: Garage Dr Hdr Bm CODERB'ERENCES Calculations per AISC 360-05. IBC 2006, CBC 2007, ASCE 7-05 Load Combination Set: ASCE 7-10 Material Properties Analysis Method: Allowable Strength Design Beam Bradng: Completely Unbraced Bending Axis: Major Axis Bending Load Combination ASCE 7-10 Prmled 8JW2014, 5(MAM Fie = c:\Useis\Paul\Desl<topVreinpM4.«)(H1 White.ec6 ENERCALC INC. 1983-2013, Build:6.13.a31. Ver6.13.12.31 Licensee : PALOS VERDES ENGINEERING CORP. Fy: Steel Yield: E: Modulus: 35.0 ksi 29,000.0 ksi D(0.231) Span = 14.0 ft TS6x6x3/16 Applied Loads Beam self weight calculated and added to loads Uniform Load: D = 0.2310 k/ft, Tributary Width = 1.0 ft DESIGN SUMMARY Maximum Bending Stress Ratio = 0.374:1 Section used for this span TS6x6x3/16 Ma: Applied 6.039 k-ft Mn / Omega : Allowable 16.138 k-ft Load Combination -tC+H Location of maximum on span 7,000ft Span # where maximum occurs Span # 1 Maximum Deflection Max Downward L+Lr+S Deflection 0.000 in Max Upward L+Lr+S Deflection 0.000 in Max Downward Total Deflection 0.311 in Max Upward Total Deflection 0.000 in Service loads entered. Load Factors will be applied for calculations. Maximum Shear Stress Ratio = Section used for this span Va: Applied Vn/Omega: Allowable Load Combination Location of maximum on span Span # wiiere maximum occurs Design OK 0.072 :1 TS6x6x3/16 1.725 k 24.034 k +0+H 14.000 ft Span # 1 Ratio = Ratio = Ratio = Ratio = Overall Maximum Deflections • Unfactored Loads Load Combination Span Max."-" Defl Location in Span DOnly 1 0.3111 7.070 Maximum Deflections for Load Combinations • Unfactored Loads 0<360 O<360 540 0 <240 Load Combination Max. Def! Location in Span OOOOO 0.000 Load Combinatton Span Max. Downward Defl DOnly" ' T ' ' 03111 Vertical Reactions - Unfactored Load Combinatwn Support 1 Support 2 Overall MAXimum 1725 1.725 DOnly 1.725 1.725 Locatton in Span 7:670 Support notatton : Far left is #1 Span Max. UpwanJ Defl 0.0000 Values in KIPS Location in Span 0,000 BUILDING ENERGY ANALYSIS REPORT PROJECT: White Construction Office 2524 GatewayRoad Carlsbad, Project Designer: 17 Architecture Report Prepared by: IVIichael Dell DELL CO. 1629 York Drive Vista, Ca 92084 760-940-0064 RECEIVED DEC 2 3 2013 CITY OF CARLSBAD BUILDING DIVISION 1^ Job Number: NR12-1313 Date: 12/13/2013 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form MECH-1-C Certificate of Compliance 3 Form MECH-2-C Air & Water System Requirements 9 Form MECH-3-C Mechanical Ventilation 11 Form MECH-4-C HVAC Misc. Prescriptive Requirements 12 Form MECH-MM Mechanical Mandatory Measures 16 HVAC System Heating and Cooling Loads Summary 17 EnergyPro 5.1 by EnergySoft Job Number: ID:NR12-1313 User Number: 1712 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 5) MECH-1 C Project Name White Construction Office Date 12/13/2013 Project Address 2524 GatewayRoad Carlsbad Climate Zone Total Cond. Floor Area 4,800 Addition Floor Area 0 GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. 13 Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Gonstruction: • New Gonstruction • Addition B Alteration Approach of Compliance: • Component Overall Envelope Energy TDV • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fall - Describe Reason^ Item or System Tags (i.e. AG-1, RTU-1, HP-1) SHP 1 • • Equipment Type^: Split DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 26,494 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 46,528 Btu/hr • • Cooling Efficiency' 13.0 SEER/10.6 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fall - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) SHP 2 • • Equipment Type^: Sp//f DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 18,426 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 54,043 Btu/hr • • Cooling Efficiency' 13.0 SEER/10.6 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 3 of 20 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 1 of 5) MECH-1 C Project Name White Construction Office Date 12/13/2013 Project Address 2524 GatewayRoad Carlsbad Climate Zone Total Cond. Floor Area 4,800 Addition Floor Area 0 GENERAL INFORMATION Building Type: B Nonresidential • High-Rise Residential • Hotel/Motel Guest Room • Schools (Public School) • Relocatable Public School BIdg. B Conditioned Spaces Unconditioned Spaces (affidavit) Phase of Construction: • New Construction • Addition B Alteration Approach of Compliance: • Component Overall Envelope TDV Energy • Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: Odeg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Meets Criteria or Requirements Equipment^ Inspection Criteria Pass Fall - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP 1 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 19,804 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 49,848 Btu/hr • • Cooling Efficiency' 13.2 SEER/11.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • Equipment^ Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Equipment^ Inspection Criteria Pass Fail - Describe Reason^ Item or System Tags (i.e. AC-1, RTU-1, HP-1) HP 2 • • Equipment Type^: Packaged DX • • Number of Systems 1 • • Max Allowed Heating Capacity' 18,116 Btu/hr • • Minimum Heating Efficiency' 7.70 HSPF • • Max Allowed Cooling Capacity' 57,450 Btu/hr • • Cooling Efficiency' 13.5 SEER/11.5 EER • • Duct Location/ R-Value Conditioned / 4.2 • • When duct testing is required, submit MECH-4A & MECH-4-HERS No • • Economizer No Economizer • • Thermostat Setback Required • • Fan Control Constant Volume • • 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or. Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 4 of 20 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 2 of 5) MECH-1 C Project Name White Construction Office Date 12/13/2013 Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 5 of 20 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 5) MECH-1 C Project Name White Construction Office Date 12/13/2013 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Relerence Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-10 form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A N^ECH-7A MECH-8A MECH-9A MECH-1 OA MECH-11A Equipment Requiring Testing or Verification Qty. Outdoor Ventilation For VAV & CAV Constant Volume & Single-Zone Unitary Air Distribution Ducts Economizer Controls Demand Control Ventilation DCV Supply Fan VAV Valve Leakage Test Supply Water Temp. Reset Hydronic System Variable Flow Control Automatic Demand Shed Control Payne PH13NA042 1 El El • • • • • • • • Payne PH13NA048 1 El El • • • • • • • • Payne PH3G42 1 El El • • • • • • • • Payne PH3G-048 1 El El • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 6 of 20 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 5) MECH-1 C Project Name Date White Construction Office 12/13/2013 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment Requiring Testing Qty. Fault Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC Systems Thermal Energy Storage (TES) Systems Test Performed By: Payne PH13NA042 1 • • • • West Air Mechanical Payne PH13NA04a 1 • • • • Payne PH3G42 1 • • • • Payne PH3G-048 1 • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NRI2-1313 Page 7 of 20 CERTIFICATE OF COMPLIANCE (Part 5 of 5) MECH-1 C Project Name White Construction Office Date 12/13/2013 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete Name (Jlichael Dell Company DELL CO. Address 1629 York Drive Gity/State/Zip Vista, Ca 92084 ..imm.. ...mHBni., aJHhltHHllOT'^ aJHbwHtMIB ^VNHOT*^ California Association of Building Energy Consultants CERTIFIED ENERGY ANALYST Michael Dell R08-10-317 & NR08-10-576 Signature Date 12/13/2013 GEA# CEPE# NR08-90-3530 Phone 760-940-0064 The Principal Mechanical Designer's Declaration Statement • I am eligible under Division 3 of the Galifornia Business and Professions Code to accept responsibility for the mechanical design. • This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance with Title-24, Parts 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Derek Irwin Company West Air Mechanical Signature Date 12-13-2013 Address License # 820165 City/State/Zip Phone Mandatory Measures Indicate location on building plans of Note Block for Mandatory Measures. M2 MECHANICAL COMPLIANCE FORMS & WORKSHEETS (check box if worksheet is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, please refer to the 2008 Nonresidential Manual. Note: The Enforcement Agency may require all forms to be incorporated onto the building plans. MECH-1 G Certificate of Compliance. Required on plans for all submittals. B MEGH-2G Mechanical Equipment Summary is required for all submittals. MEGH-3C Mechanical Ventilation and Reheat is required for all submittals with mechanical ventilation. B MEGH-4C Fan Power Consumption is required for all prescriptive submittals. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 8 of 20 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date White Construction Office 12/13/2013 Item or System Tags (i.e. AC-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e. AC-1, RTU-1, HP-1) SHP 1 SHP 2 HP 1 Number of Systems 1 1 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF 7.70 HSPF 7.70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.0 SEER/10.6 EER 13.0 SEER/10.6 EER 13.2 SEER/11.5 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes Yes Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 315 cfm 210 cfm 176 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No No No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch Programmable Switch Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required Setback Required Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto Auto Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(q) n/a n/a n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 Conditioned / 4.2 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 26,494 Btu/hr 18,426 Btu/hr 19,804 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a& b) 29,835 Btu/hr 33,277 Btu/hr 30,600 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a& b) 32,570 Btu/hr 37,830 Btu/hr 34,894 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 29,032 Btu/hr 32,965 Btu/hr 26,051 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Constant Volume Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Yes Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No No No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(8) No Economizer No Economizer No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Constant Temp Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(q) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(1) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No No No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NRI2-1313 Page 9 of 20 AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date White Construction Office 12/13/2013 Item or System Tags (i.e. AG-1, RTU-1, HP-1) Indicate Air Systems Type (Central, Single Zone, Packag e, VAV, or etc..) Item or System Tags (i.e. AG-1, RTU-1, HP-1) HP 2 Number of Systems 1 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value Indicate Pat Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value T-24 Sections MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 7.70 HSPF MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(a) 13.5 SEER/11.5 EER MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(b), 112(c) Yes MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 112(c), 115(a) n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(b) 184 cfm MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 121(c) No MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Programmable Switch MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(e) Setback Required MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(f) Auto MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 122(q) n/a MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 123 MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Location/ R-value 124 Conditioned / 4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 18,116 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 35,572 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 40,215 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a&b) 31,683 Btu/hr Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Constant Volume Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(c) Yes Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(d) No Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(e) No Economizer Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(f) Constant Temp Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(q) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(i) Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID:NR12-1313 Page 10 of 20 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name White Construction Office Date 12/13/2013 MECHANICAL VENTILATION (§121(b)2) REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B 0 D E F G H 1 J K L M N Zone/System Condition Area (ft') CFM per ft^ Min CFM By Area BXC Number Of People CFM per Person Min CFM by Occupant EXF REQ'D V.A. Max of DorG Design Ventilation Air CFM 50% Of Design Zone Supply CFM BXO.4 CFM / ft^ Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Office 742 0.15 111 7.4 15.0 111 111 111 Conference 258 0.50 129 13.6 15.0 204 204 204 SHP 1 Total 315 315 Office 1,400 0.15 210 14.0 15.0 210 210 210 SHP 2 Total 210 210 HPI Office 1,175 0.15 176 11.8 15.0 176 176 176 HP1 Total 176 176 HP2 Office 1,225 0.15 184 12.3 15.0 184 184 184 HP 2 Total 184 184 Totals Column 1 Total Design Ventilation Air C Minimum ventilation rate per Section §121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces v\nthout fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column D or G). 1 Must be greater than or equal to H, or use Transfer Air (column N) to make up the difference. J Desiqn fan supply CFM (Fan CFM) x 50%; or the desiqn zone outdoor airflow rate per §121. K Condition area (ft^) x 0.4 CFM / ft^; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than or equal to Column L and greater than or equal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilafion Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (Column H) and the Desiqn Minimum Air (Column M), Column H minus M. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID:NR12-1313 Page11of20 FAN POWER CONSUMPTION MECH-4C Project Name White Construction Office Date 12/13/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) SHP 1 - Supply Fan 0.500 76.0% 97.0% 1.0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,400 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SPf) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa -1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.361 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 12 of 20 FAN POWER CONSUMPTION MECH-4C Project Name White Construction Office Date 12/13/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) SHP 2 - Supply Fan 0.750 77.0% 97.0% 1.0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa -1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.468 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 13 of 20 FAN POWER CONSUMPTION MECH-4C Project Name White Construction Office Date 12/13/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) HP 1 - Supply Fan 0.500 76.0% 97.0% 1.0 506 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 506 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,400 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -(SPa - 1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.36? W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 14 of 20 FAN POWER CONSUMPTION MECH-4C Project Name White Construction Office Date 12/13/2013 NOTE: Provide one copy of this worksheet for each fan system with a total fan system horsepower greater than 25 hp for Constant Air Volume (CAV) Fan Systems or Variable Air Volume (VAV) Systems when using the Prescriptive Approach. See Power Consumption of fan §144(c). B Fan Description Design Brake HP Efficiency Motor Drive Number of Fans Peak Watts B X E X 746 / (CXD) HP 2 - Supply Fan 0.750 77.0% 97.0% 1.0 749 TOTALS AND ADJUSTMENTS FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 1) TOTAL FAN SYSTEM POWER (WATTS, SUM COLUM F) 749 FILTER PRESSURE ADJUSTMENT Equation 144-A in §144(c) of the Energy Standards. 2) SUPPLY DESIGN AIRFLOW (CFM) 1,600 A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 3) TOTAL FAN SYSTEM POWER INDEX (Row 1 / Row 2) W/CFM A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 4) SPa A) If filter pressure drop (SPa) is greater than 1 inch W. C. or 245 Pascal then enter SPa on line 4. Enter Total Fan pressure drop across the fan (SP,) on Line 5. 5) SP, B) Calculate Fan Adjustment and enter on line 6. 6) Fan Adjustment = 1 -( SPa -1) / SP, C) Calculate Adjusted Fan Power Index and enter on Row 7 7) ADJUSTED FAN POWER INDEX (Line 3 x Line 6)' 0.468 W/CFM 1. TOTAL FAN SYSTEM POWER INDEX or ADJUSTED FAN POWER INDEX must not exceed 0.8 W/CFM for Constant Volume systems or 1.25 W/CFM for VAV systems. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 15 of 20 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name White Construction Office Date 12/13/2013 Equipment and System Efficiencies §111: Any appliance for which there is a Galifornia standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAG equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1 A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off-hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1B. An occupancy sensor to control the operating period of the system; or 1C. A 4-hour timer that can be manually operated to conlrol the operating period of the system. Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(g): Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. § 122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in ail openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121 (f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. Circulating service water-heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 16 of 20 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name White Construction Office Date 12/13/2013 System Name SHP 1 Floor Area 1,000 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 39,000 Total Room Loads 1,103 20,423 4,200 245 7,373 Total Output (Btuh) 39,000 Return Vented Lighting 0 Output (Btuh/sqft) 39.0 Return Air Ducts 1,021 369 Cooling System Return Fan 0 0 Output per System 40,000 Ventilation 315 2,725 3,058 315 12,144 Total Output (Btuh) 40,000 Supply Fan 1,727 -1,727 Total Output (Tons) 3.3 Supply Air Ducts 1,021 369 Total Output (Btuh/sqft) 40.0 Total Output (sqft/Ton) 300.0 TOTAL SYSTEM LOAD 26,917 7,258 18,527 Air System CFM per System 1,400 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,400 Payne PH13NA042 29,032 11,013 29,835 Airflow (cfm/sqft) 1.40 Airflow (cfm/Ton) 420.0 Outside Air (%) 22.5 % Total Adjusted System Output 29,032 11,013 29,835 Outside Air (cfm/sqft) 0.31 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Jul 4 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 315 cfm 70 °F 62 °F • 97 <'F 96 °F —• Heating Coil Supply Fan 1,400 cfm 1 98 "F ROOM 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 33 / 68 "F Outside Air 315 cfm 75 / 62 "f < * 76 / 63 "F 55 / 54 °F • 56 / 54 °F • Cooling Coil Supply Fan 1,400 cfm 50.6 % 57 / 55 °F ROOM ^ •• 74 / 62 EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 17 of 20 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name White Construction Office Date 12/13/2013 System Name SHP 2 Floor Area 1,400 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 43,500 Total Room Loads 1,393 25,219 2,800 219 6,667 Total Output (Btuh) 43,500 Return Vented Lighting 0 Output (Btuh/sqft) 31.1 Return Air Ducts 1,261 333 Cooling System Return Fan 0 0 Output per System 45,000 Ventilation 210 967 919 210 8,108 Total Output (Btuh) 45,000 Supply Fan 2,557 -2,557 Total Output (Tons) 3.8 Supply Air Ducts 1,261 333 Total Output (Btuh/sqft) 32.1 Total Output (sqft/Ton) 373.3 TOTAL SYSTEM LOAD 31,264 3,719 12,885 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 Payne PH13NA048 32,965 12,014 33,277 Airflow (cfm/sqft) 1.14 Airflow (cfm/Ton) 426.7 Outside Air (%) 13.1 % Total Adjusted System Output 32,965 12,014 33,277 Outside Air (cfm/sqft) 0.15 (Adjusted for Peak Design conditions) Note: values above given at ARI conditions TIME OF SYSTEM PEAK Oct 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 210 cfm 70 "F 65 "F • 97 "F 98 °F —• Heating Coil Supply Fan 1,600 cfm 1 98 »F ROOM 1 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 79 / 65 Outside Air 210 cfm 75 / 62 "f =• 75 / 62 °F 55 / 54 °F • 56 / 54 °F • Cooling Coil Supply Fan 1,600 cfm 49.1 % 57 / 55 °F ROOM H 74 - 61 EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 18 of 20 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name White Construction Office Date 12/13/2013 System Name HP 1 Floor Area 1,175 ENGINEERING CHECKS SYSTEM LOAD Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) 40,000 40,000 34.0 Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqft/Ton) 40,000 40,000 3.3 34.0 352.5 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM 1,782 176 Sensible 23,224 1,161 1,564 1,727 1,161 Latent 2,350 COIL HTG. PEAK CFM 266 347 176 28,838 2,697 Sensible 7,986 399 6,791 -1,727 399 13,849 Air System CFM per System 1,400 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,400 Payne PH3G42 Airflow (cfm/sqft) 1.19 Airflow (cfm/Ton) 420.0 Outside Air (%) 12.6% Outside Air (cfm/sqft) 0.15 Note: values above given at ARI conditions Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 26,051 26,051 14,920 14,920 30,600 30,600 Jul 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 176 cfm 70 °F 65 °F • 97 "f 96 °F —• Heating Coil Supply Fan 1,400 cfm ROOM 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83 / 68 '-'F Outside Air 176 cfm 75 / 65 "f < ^ Cooling Coil Supply Fan 1,400 cfm 1 59.4 % 62 / 60 °F ROOM ^ 74 04 ^'i EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 19 of 20 I HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name White Construction Office Date 12/13/2013 System Name HP 2 Floor Area 1,225 ENGINEERING CHECKS SYSTEM LOAD Number of Systems Heating System Output per System Total Output (Btuh) Output (Btuh/sqft) 46,500 46,500 38.0 Cooling System Output per System Total Output (Btuh) Total Output (Tons) Total Output (Btuh/sqft) Total Output (sqft/Ton) 47,000 47,000 3.9 38.4 312.8 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK CFM 1,948 184 Sensible 26,769 1,338 0 1,233 2,557 1,338 Latent 2,450 COIL HTG. PEAK CFM 243 123 184 33,236 2,573 Sensible 7,396 370 7,090 -2,557 370 12,669 Air System CFM per System 1,600 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,600 Payne PH3G-048 Airflow (cfm/sqft) 1.31 Airflow (cfm/Ton) 408.5 Outside Air (%) 11.5% Outside Air (cfm/sqft) 0.15 Note: values above given at ARI conditions Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 31,683 31,683 16,345 16,345 35,572 35,572 Sep 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 34 °F Outside Air 184 cfm 70 "F -4 66 °F 97 T • 98 "F Heating Coil Supply Fan 1,600 cfm 1 ROOM 98 °F 70 °F _J COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 81 /66 "F Outside Air 184 cfm 75 / 64 <>F M * 1 Cooling Coil Supply Fan 1,600 cfm 57.0 % 61 / 59 "F ROOM Jim 74 / 64 EnergyPro 5.1 by EnergySoft User Number: 1712 RunCode: 2013-12-13717:31:16 ID: NR12-1313 Page 20 of 20 INDUSTRIAL WASTEWATER DISCHARGE PERMIT , , SCREENING SURVEY Date rzlzMn Business Name V^^^X^ CX^i^^^^C:^^^ Street Address TJ^Z^ C^/^&^£^ ^KQ^ , Ctmj^K^^^^K Email Address J^ty-^C^'X'^''^^ ^risXJ(\MJS .c^'^ PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT (ON REVERSE SIDE CHECK TYPE Of BUSINESS) Check all below that are present at your facility: Add Cleaning Assembly Automotive Repair Battery Manufacturing Biofuei Manufacturing Biotech Laboratory Bulk Chemiral Storage Car V^ash Chemical Manufacturing Chemical Purification Dry Cleaning Electrical Component Manufacturtng Fertilizer Manufacturing Film / X-ray Processing Food Processing Glass Manufacturing Industrial Laundry Ink Manufacturing Laboratory Machining / Milling Manufacturing Membrane Manufacturing (i.e. water filter membranes) Metal Casting / Forming Metal Fabrication Metai Finishing Bectroplating Electroless plating Anodizing Coating (i.e. phosphating) Chemical Etching / Milling Printed Circuit Board Manufacturing Metal Powders Forming Nutritional Supplement / Vitamin Manufacturing Painting / Finishing Paint Manufacturing Personal Care Products Manufacturing Pesticide Manufacturing / Packaging Phanmaceutical Manufacturing (including precursors) Porcelain Enameling Power Generation Print Shop Research and Development Rubber Manufacturing Semiconductor Manufacturing Soap / Detergent Manufacturing Waste Treatment / Storage SIC Code(s) (if known): Brief desaiption of business activities (Production / Manufacturing Operations):. Description of operations generating wastewater (discharged to sewer, hauled or evaporated): Estimated volume of Industrial wastewater to be discharged (gal / day); List hazardous wastes generated (type / volume); Date operatton began/or vwll begin at fhis location: Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes No If yes, when: , , Site Contact /j/U6^/./9- .^/az/W^^v/ Title Mana' &o/^-p>' Signature^ ENCINA WA: J Phone No. - ? 3/ -// dCi "^//O \im AUTHDRfTY. 6200 Avenida Encinas Carfsbad, CA 92011 (760) 438-3941 FAX; (760) 476-9852 C3 PC CARLSBAD FIRE DEPARTMENT EXPEDITED PLAN CHECK REQUEST t, fAAJ9i^^^^r.c£iX:.^^y^^ requesting 'EMpedited Plan Check Services' and understand i will be fevled an additional fee assessed at the rate of $90.00 dollars per hour plus $25.00 dollars administration fee. I understand that my plans shall not be released until all fees are paid. I, SJP. U^'Ld^iJfAA^J^iii^^ am solely responsible for aii fees due should the project be withdrawn or otherwise not completed. And by signing below I acknowledge that my plans shall be forwarded by the City of Carlsbad to an independent contractor/consultant I, acknowledge that the expected 'first review' time for all expedited fire plan reviews will be fourteen- (14) business days from date of submittal. I, acknowledge that revised plans shall be sent by me to the appropriate party at my cost, parcel post or other means. And I, acknowledge that a turnaround time for re- submittals is seven- (7) business days. The Carlsbad Fire Department does not perform 'Over-t^e-coynter' plan review services. Plans submitted to the Carlsbad Fire Department for review by CFD shall be checked on a 'first come, first served' basis and could take 60 days or more to be completed. YES ( NO PLEASE CIRCLE YOUR SELECTION Copy to Building and Fire Prevention file Applicant Signature 71^^\a^^pjoe^ Date M'^3-/3 SAN DIEGO REGIONAL HAZARDOUS MATERIALS QUESTIONNAIRE OFFICE USE ONLY UPFPf, MV# BP DATE. Business Name Business Cwttact , state OCv ZiDCode APf>«» State Z^jCode Plan File* Project Contact _ , The fc^kmiing questions r^sr^Mfit lh« fadti^'s acttvM«s, NOT specM: projNectateccrlpttofl. PART I: ORE opP/tf^TMEWT - HAZARTOUS MATgRIALS CJWIStOW: OCCUPANCY CLASStFtCATlOW: ImUcate by drding m itwn, vwhethw your tmmem vs*l USB, process, or store any ot tte Ma*^ hazardous materiate, If any of tf«e items are drcfe4_apfrticant mmt contact the Fire Protection Agency witf^ jurisdi<*<» prior to (Am sulxnittal. FadBty's Ssjuwa Fooftage (inctu<S»ig proposed project); ^A*'l'~r 0«xupaney Raflttng: ti» . 1. Explewe or BliKftvg Agents 5. C^pwite Peroxides 9. Water Rea<*¥88 13 Cmom/vs 2 Compressed Gs^ess 6. Oxicfeefs 10. Cryogenics 14, Other He#m Hazards 3, Fi*mro«bl«;Con*u8SWeljK|oi«ts 7. Pyroj^orics 11. ff^ly Toxic or Toxie Matenals IS, N<me of These, 4 F!*n«nat*i Solids 8. Unstable Reactives 12. RasSoactives que^ions m yes. apH^lcant must coftet the County of SanDTe^ Hszardow Matenais Oiviswn, SSOO OveSfxJ Ave.. Siute HoTSafiD* Call (858) 5(B-6700 prior to the issuance of a tsuMmg permit. Prefect Cofnj:^ion Date: / / If trie arjsvKer to any of ttte lego. CA 92123 FEES ARE REQUIRED Expected Oate of Occupancy: ^ / / Oate Initials • CaiARP Required Oate IrMtials O CalARP Comj^te YES NO ' (for new construction or remode8ng(»ojects) O ^ is your bt»lne«i Isted or< the reverse side of this form? {*eck all that apf^y), • ^ Will your tsiKini^ dispose of tearctotB Substences or Metficat Waste in any amount? • TQ, VVill your tsusfcw^ store or hantf e Hazardous Sytsstanwss in quaf»tities equal to a greyer than 55 gailotm, SOO pounds, 200 cubic fe^, or carcwogensffef^udliye twns fci any quantity? O ^ W8t your tsusiness use an exWr^ or install an iHxteraround storage tank? • lS» VWI your tM,rtness store or handle Regulated Sul»^noes (CalARP)? O "Sl^ Wi your Isusiriess use «ir»talt a Hazardous Tank Sy^ern (TWe 22, Aifiole 10)? • H,^ VWI yotff bisine^ store petroleum in tanks Of containers al your fawlity w«h a ttM stor^ capacity equal to or greater than 1.X20 gaBons? (CaWomia's Aboveground Petroleum Storage Ad), PART m: SAN DIEQO CWfjTY AtR PQU.OTCHi| CONTROL OISTR>C|; M" the answer to any <rf the questions tselow yes. appWcam must eor«ad the Air Mifcn eonW DM oidGrwe Road, » Di^. CA 92131-1649. telephone (858) 586-26{» prior to the i^uan(» of a building or dem<^itlon j»rmjt. Note: if the answer to questiorm 4 or 5 fe yes, af^jBoar* must also submft an i^tj^tos notiflcatksn form to the APCD a< le^t 10 wwrWng days pnor to commencing demcHKion or renovation, except demgiition or feriis^itjgf? of reskientiai strudures of four irtts or less. Contad the APCO for more infonmation. • CalARP Exeiitf* Oate tnitisis YES o NO 'El 2. O • • Wi the subject fediy or construdion acSvMies inciude open*ons or equipment that emit or are caf^lale of emittir^ an air oontaminaoT? (See the APCD factsheet a< http:/^>iwy.sdap{rf.wQ/tn(ofeets/Demits.Bdf. and tt»e list of typical equlpnwnt requiring an APCD permI on the reverse sWe of this from. Cortoct APCD if you have any quesfions). (ANSWER OtCY IF QUESTION 11S YES) Will ttw subjed fadlHy be located vvtthin 1.000 feet of tie outer boundary of a scfwol (K through 12)? (Sear* the Calitenia S<*iod Diredory * mcllwm^.sxk. a.QmlmMI for piWic am private sohorts or contKst the appropriate sdwrt dtetrid). Has a suw^ been perft»med to determine the preserwe of AstsestM Contairsng Mat«iate? Wit! there be renovation thaf involves handlirg of any ImtHe asbestos matenals, or disturbing any materiai that contains non-frtabie asbestos? WIB there be derrw(i<m invoMr^ ttse removal of a toad supporting struc&iraf member? Briefty desoibe tH«tir»e«s adiv*i«; Brtefiy describe proposed prpject: perjury that to ttie best of my imowtedQe and tsetief tfie re8p<»ises made herein are tme and coft&d. P^mt Signatufe of Owner or Authorized Agoit IX/ to /11 FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:. BY; FOR OPFICtAL USE ONLY DATE: mmmmmmMmmm<mmmHimximB> mueMmrmmMJomammrf wjT NOT ocomuicy iwupiseo ron occuPANcy APCO COUNTY-HMD APCO COUNTY+tMO m::o HM-9171 {02/in Cmttity ot San Diego - WM - Hajarttaus MatOTrts Division CiTY O CARLSBAD PLUMBING, ELECTRICAL, MECHANICAL WORKSHEET B-18 Development Services Building Department 1635 faraday Avenue 760-602-2719 www.c3rlsbadca.gov Project Address: Permit No.: information provided bdow refen to vMorb beirm done on the dbove mentioned permit only. This form mt>5t be tompleted aad rettirned to the BwildliBg Peportwent before the perntit tan be issuedl. Building Dept Fax: (760) 602-8558 Number of new or relocated fectures, traps, or floor drains.. // New building se^r line? Vas No Number of new roof dr0in$?„ O Install/alter wetter line? Yes Number of new water heofters? \ Number of new, reiocoted or repteced gas outlets? O Number of new hose bibs? , , , Q Upgrxade existing panel? From Yes No _Amps to ^Amps Number of new paneh or siA>panels?...„ t Singte Phase „... „.,..Number of new amperes Three Phase...............—„ ..„.„ „.. Number of new amperes )<^>%' Three Phase 480 „ „.. Number of new amperes. Remodel (relocate existing outtets/switcltes or add outlets/switches)? Ves Y- No___ - - - JL Ves No Number of new fumaces, A/C or heat pumps? New or relocated duct worfe? ,.,.„ . Number of new fireplaces? ~ , Number of new exhaust fans? Relocate/install uent? „ „... Number of new exhaust hoods? „ Number of new boilers or c<Hnpres50rs?.,„ , „,....„ ... Number of HP B-18 Page 1 of 1 Rev. 03/OS CB133183 2524 GATEWAY RD WHITE CONSTRUCTION; 4,475 SHEL 1 Final Inspection required by: • Plan • CM&I SW GissuEof acv. Approv^ ^..,.-Oate By BUILDING OOl/^Mi:)^ PLANNING ' T/it/.^ dk. ENGINEERING RRE Expedite? Y'^) AFS Checked by: HazH/lat APCD Health Forms/Fees Sent Rec'd Due? By Encina (Zl-z^s f/3 Y N Fire f ' » Y N HazHealthAPCD ft Y N PE&M Y N . School Y N ^euiEl Y N ft"^""wfitpr ^ Y N Special Inspection Y N LandUse: LandUse: Density: ImpArea: 1 FY:i)/ItJ Annex: .^/d^ factor. PFF: (fJ N Comments Date Date Date Date Building Planning IZi III 0 Engineering Fire Need? • Done • Done • Done • Done