Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2525 EL CAMINO REAL; ; CBC2017-0040; Permit
r~~(City Of Carlsbad -- __ Print Date 07/20/2018 Permit No CBC2017-0040 Job Address: • 2525 El Camino Real - Permit Type: BLDG-Commercial Work Class: Tenant Improvement Status: Closed - Finaled -, Parcel No:' •.1563020900 , Lot #: Applied: 01/24/2017 VaIuati6n: ; •$ 65,1i4.00..-. Reference if: Issued: 04/11/2017 Occupancy Group:Construction Type Permit 07/20/2018 1' - . Finaled: - - -- ,• ,, 4., if Dwelling Units: -' - . Bathrooms: Inspector: Bedrooms Orig. Plan Check if Final - Plan Check if Inspection Project Title: Description:: 'THE,SHOPIES: (PHASE 3.5) NORTH EAST MALL ENTRY RENOVATION // UPGRADE EXTERIOR FINISHES // NEW LIGHTING REWORK INTERIOR FINISHES AT ENTRY (1,400 SF) Applicant Owner Contractor STEVEN RU Z R P I CARLSBAD LP THE WHITING TURNER CONTRACTING CO 3500WBurbank-Blvd • - . , -• - _4•4 - Burbank, CA 91505-2235. - • . .- 1114 Avenue Of The Americas, Floor 45 818-972-5080 . .. - New York, NY 10036-7700 • 214-660-5232 x215232 858-792-0600 FEE - .. - . . : AMOUNT -r BUILDING PERMIT FEE $2000-i-. - - - . ' . •. . $476.88: ;BUILDING PLAN CHECK FEE (BLDG) , . • .. . . $333.82 ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL I . $60.00 MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL $45.00 5B1473 BUILDING STANDARDS FEE $3.00 '. STRONG MOTIO'N COMMERCIAL 1 $18.23 Total Fees $ 936 93 Total Payments To Date $936.93 Balance Due $0.00 71 Please take NOTICE that approval of your project includes the Imposition of fees, dedications, reservations, or other exactions hereafter collectively, referred to as fees/exaction You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If ybu protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information \wlth the City Manager for processing in accordance with Carlsbad Municipal Code Section 3J2.030. Failure to timely follow that procedure will bar any subsequent legal action to attack review, set aside void or annul their imposition - • -' ,. 4 . .4-..... You are herby FURTHER NOTIFIED that your right to protest the specified fees /exactions DOES NOT APPLY to water and sewer connection - fees and capacity changes nor planning zoning grading or other similar application processing or service fees in connection with this project. NOR DOES IT. APPLY to any fees/exactions ofwhich you have previously been given a NOTICE similar to this, or as to which the' - statute of limitation has pre'iouy otherwise expired. - • 4 - I •#., .• ! . • F - • .-•-• - , - -. 4 - . . • •. . -; -4 •. • , -- • I •• • -- - • - •:- • - - • - I:, - A- •4I I - - . . ---:' Building Division 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 I 7607602-8560 f I www carlsbadca gov - - - '4 -. • 4 THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: QPLANNING E3ENGINEERING[Z]BUILDING FIRE E3HEALTH DHAZMAT!APCD Buildiig Permit Application Plan Check NC C.Q,2..O ii- k City Ave., of .. 1635 Faraday Carlsbad, CA 92008 Est. Value I Ph76002-2719 Fax: 76002-8558 Cd1sbdd Plan Ck. Deposit email: building@carlsbadca.gov Date 112.20.16 . . .1 www.carlsbadca.gov JOB ADDRESS .. . . ," . . ' ... 2525 El Camino Real SUITE#/SPACF#/UNIT# APN 156 - 302 - 08 - CTIPROJEcT# . . . PHASE# #OFUNITS #BEDROOMS BATHROOMS TENANIBUSINESS NAME CONSTR.r(pE OCC.GROuP ]LOT#~ The Shoppes at Carlsbad Ill B M DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) . . . . . Phase 3.5:. North East Mall Entry renovation (Entry#2) Upgrade exterior site work finishes, new lighting, & minor rework to the interior finishes at the mall entry. 1,400sf EXISTING USE PROPOSED USE - GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING FIRE SPRINKLERS Retail Mall: . .. Retail Mall . . . 1. . YES J# Nail YES ilNOE YES ilNO APPLICANT NAME . . . . - . . . Primary contact . . Steven Ruiz, LDA Design Group PROPERTY OWNER NAME . . Kyle Godat, Rouse Properties ADDRESS . . . .' .,.', . - . , , . ADDRESS 3500.W Burbank Blvd. . . . 555 Broadway Suite 1019 CITY * STATE - . ._. . .- ZIP - . CITY . STATE . . ZIP - Burbank : ..CA. . . 91505. Chula Vista . CA 91910 PHONE . 818-972-5080: FAX . .:• . .:. : . 8188483895 6194276701 PHONE : . . EMAIL ... ... . . . ., •, EMAIL . . . -. stevenr(ãldadesigngroup.com . . kyle.godatcrouseproperties.com . DESIGN PROFESSIONAL ':" . - .. . . Donald D. LinaneAIA ,. - CONTRACTOR BUS. NAME . . .. Rob Prather Whitinq Turner Contractinq Co ADDRESS. ADDRESS .. . . . . 3500W. Burbank Blvd . . 250 Commerce Street, Suite 150 . CITY . . .. STATE. .. . . ZIP, . CITY . STATE . ZIP Burbank CA 91505 Irvine CA 92602 PHONE PHONE .. 949-863-0800 '. EMAIL . . ., . . . ......... - '. EMAIL . . . . . . ....... , . . . ... .- . Rob.Pratherwhiting-tumer.com STATE LIC. a STATE LIC.# . . . . . CLASS CITY BUS. LIC.# ' ' C187 3/ I1O I (Sec. 7031.5 Business and Professions code: Any City or Count) applicant for such permit to file a signed statement that he is tic Business and Professions Code) or that he is exempt therefrom, Civil penalty of not more than five hundred dollars ($5001). which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the. ensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commending with Section 7000 of Division 3 of the. and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a . Workers' Compensatton Declaration: I hereby affirm under penalty of perjury one of the following declarations: [,] I have and will maintain a certificate of consent to self.insure for workers'compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. , I have and will maintain workers' compensation, as required by Sec 'on 3700 of the Labor Co or the performance I the Øt for,iich this ye ills I . workers' compensation Insurance canter and policy number are: Insurance Co ZtY/g O.-POIrcy No. [/1!J'2,( W Expiration Date_________________ hi section need not be completed if the permit is for one hundred dollars ($100) or less. . . . . .. . Certificate of Exemption: I certify that in the performance of the work for wtrlcli this permit is issued, I employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. . WARNING: Failure to secure workers' ompensatlon coveraãe I , subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000); in addition to the cost of compensation, dam . provided for in S I aborde, interest and attorney's fees. CONTRACTOR SIGNATU AGENT DATE I hereby affirm that I am exempt from Contractor's License Law for the following reason......... . . . . ITI I; as owner of the properly or my employe es.with wag 'es as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors License Law does not apply loan owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale If, however, the building or improvement is sold within one year of completion the owner builder will have the burden of proving that he did not build or improve for the purpose of sale) [J I, as owner of the property, am exclusively contracting with licensed con tractors to construct the project (Sec. 7044, Business and Professions Code: The Contract ors License Law does not apply loan owner of property who builds or improves thereon and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law) [] I am'exempt under Seclion. . . 'Businese and Professions COde for this reason: . . . 1 I personally plan to provide the mor labor and matenals for construction of the proposed property improvement ]Yes (lNo I (havel have not) signed an application for a building perrisit for the pioposed Work. Ihave contracted with the followlOg person (firm) to provide theproposed'cànslcuctioO (include name address / phone contractors' license number): - I plan to provide portions of the wok, bull have hired the following person to coordinate,,supervise and provide the major work (include name! address phone contractors' license number): . I will provide some of the work, bull have cohlracted (hired) the foflowing persons to provide the work indicated (include name address! phone / type of work): ..PROPERTY OWNER SIGNATURE []AGENT DATE .._s •• . .. . • . . Is the applicant or future building occupant iequired to submit a business plan,* acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley Tanner Hazardous Substance Account Act' Dyes LNo Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district' Dyes [J No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? ElVes [J.No IF ANY OF THEANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF . EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT . . . . . - I hereby affirm that there is a construchon lending agency for the performance of the work this permit is issued (Sec 3097 (i) Civil Code) Lender's Name — Lender's Address - 1 G ic3oi — I certify that l have read. the application and slate thatthe above Information u correctandthatthe information on the plans us accurate. I agree to comply wrthall City ordinances and State laws relating to buildlngconstniction hereby authonze representative of the City of Carlsbad to enter upon the above rniitroned properly for inspection purposes. I ALSO AGREE TO SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALLUABIUTIES,JUDGMENTS, COSTS AND EXPEN I H MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT:......... . OSHAAn OSHApemft required foxcavtions over 50 and tb nstruutbnolsUucturesover3stories in height • . . • • EXPIRATION: Evefypermtinsrjed by the Building ndérthep of • Cod hail expire by limitation and become nut and void if the building brwork authorized btjsuch permit is not commenced within 180daysfromthedaleofsuth per di orwork ysucti dedor abandoned at any time after the work m commenced for a pencil of 180 days (Section 106.4.4 Uniform Building Code) 'APPLICANT S SIGNATURE - DATE 70 Permit Type: BLDG-Commercial - ,. . Application Date: 01/24/2017 Owner: R P I CARLSBAD LP Work Class: .Tenant Improvement •. Issue Date: 04/11/2017 Subdivision: CARLSBAD TCT#76-18 - Status:' Closed - Finaled1 - Expiration Date: 11/05/2018 Address: 2525 El Camino Real - 'S Carlsbad, CA 92008 . IVR Number: 1581 - Scheduled Actual . Inspection Type Inspection No. \ Inspection Status Primary Inspector Reinspection Complete Date • Start Date 05/1512017' 05/15/2017 BLDG-12 Steel/Bond 023328-2017 Passed Michael Collins Complete Beam -- , . Checklist Item j - COMMENTS ' Passed - BLDG-Building Deficiency Spread footing at Line L.3 & 32-3.8 Yes 07117/2017 07/17/2017 BLDG-I2 Steel/Bond 028974-2017 Passed Michael Collins Complete Beam . S - -' Checklist Item COMMENTS Passed - BLDG.Building Deficiency Bollards, light bases & seat walls, North Yes entry/Cheesecake area. S '- BLDG731 028973-2017 Passed Michael Collins Complete - Underground/Condu S ., i t - Wiring - . Checklist Item COMMENTS Passed BLDG-Building Deficiency Conduit only at bollards/light bases, North Yes ' entry 'S. 08/16/2017 08/16/2017. - BLDG-14 032064-2017 Passed Michael Collins Complete Frame/Steel/Bolting! - - Welding (Decks) - S 'S . Checklist lteri . '8 COMMENTS Passed BLDG-Building Deficiency Column/parapet frame at Entrance #2 Yes 09/15/2017 09/14/2017 BLDG-21 -, 034874-2017 Cancelled Michael Collins Reinspection Complete Underground/Underf loor Plumbing . S s Checklist Item COMMENTS Passed BLDG-Building Deficiency . No .5. 09/20/2017 '09/20/2017 '.4 BLDG-11 035375-2017 . Passed Michael Collins " Complete . -Foundation/Ftg/Pier S s(Rebar) :Checklist Item COMMENTS Passed S BLDG-Building Deficiency Remaining light bases & light bollards(5) at Yes - -- : Entry 12/20/2017 12/20/2017 BLDG-Final-5 , 043895-2017 Failed Michael Collins Reinspection Complete .- Inspection ' • • 5. -•, Checklist Item ' COMMENTS . Passed -. • . - - •, BLDG-Building Deficiency Not ready No - S BLDG-Plumbing Final - No - . BLDG-Mechanical Final No BLDG-Structural Final No - BLDG-Electrical Final No 05/07/2018 05/07/2018 BLDG-Final .. , 057232-2018 - - Partial Pass Michael Collins Reinspection Incomplete Inspection - - - - . , ''- - - - July 20, 2018 , . - : - Page 1 of 2 Permit Type:' BLDG-Commercial Application Date: 01/24/2017 Owner: - R P I CARLSBAD LP -t. Work Classy, Tenant Improvement? Issue Date: 04/11/2017 Subdivision: CARLSBAD TCT#76-18 Status: Closed - Finaled Expiration Date: 11/05/2018 Address: 2525 El Camino Real r Carlsbad, CA 92008 IVR Number: 1581 - •- . Scheduled Actual i -• - + Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date, D - a - - - Checklist Item COMMENTS Passed !" BLDG-Building Deficiency Partial --' Yes BLDG-Building Deficiency Not ready No - 'BLDG-Electrical Final No - - : •' ( -.• ''•i-_•'- •- -.- --- - _/ • July 20, 2018 , - Page 2 of 2, Report items comply with excçtio\l* El In Progress I Not complete Klelnfotder Repr SeIative Signature _James Hamilton I Kletnfetder Representative Print Nwne - (~KLEINrEL DER - POOP* AliU 5oJ,Iioni. / - •. Daily Field Report Project Name Shoppes at Carlsbad Date 2017-08-18 Project No. 20172781.001a Bldg. Permit No, CBC 2017•0040 DFR1Repor1 No. 05 Project Address 82525 El Camino Real' Time Arrived 12:00AM -. Client Whiting Turner - Contractor Whiting Turner Time Departed 4:00AM * - - Equipment Observed - - - - Travel Time - -- -: -- - Weather Night -. .. - Mileage -. - Reviewed By Date Reviewed Types 01 lestslobservations - - - E1 cvo rn an Es . Jretincaiirr Iic,r;I J.aoy El Semp!e Pickup thhec EJ E . MileI s, Entrance 2 framing. B&v Pin I [J I-ounnabon [J Pie F*un Te**nie [J steel tldct El Conciato El HS (511.ng El relnro-ng Stock f] Weldog Documetits Referenced:- - - approved Construction Documents: Approved construction documents. \ - - .. Observations/Remarks; . -• I ' 001: inspected the Dens Element exterior at Entrance 2 finish. Dens Element installation complete and joints cautked with Georgia Pacific product PROSOCO R-guard liquid fast flashing LOT 11100897-17178. Gypsum wail board ceiling at Entrance 2 complete and contractor can begin level 5 finish work. NQ discepancles noted. . C -- •. • -. - - . ., ••I_• .-'i -' ,. . - - -. -. --. 1 - - - • 7.- I - •--• t - - .-.- I • t - .. I' - I -.• * - Report items corriply El Report items do not comply - Acknowledged by - Representing Pageof I -. • .• -- MAT10REV5/08 ( KLE/NFELDER . : * . : Bright People. Right Solutions. . Daily Field Report ProjectNarre . Shoppes at Carlsbad .. . . . Date 2017-08-16 . * Project No: ; 20172781.001a Bldg. Permit No. CBC 2017-0040 DFRlReport No. 04 - Project Address 62525 El Camino Real. . . Time Arrived 12:00AM Client'. * Whiting Turner,. . • • Contractor Whiting Turner ' Time Departed 4:00AM - . • • Equipme'nt Observed * . . " . • .. . . . . Travel Time , * . .• Weather Night:Mileage Reviewed By Date Reviewed KLEINFELDER Bright People Right Solutions Daily Field Report Project Name Shoppes at Carlsbad Date 2017-08-10 Project No 20172781.001a Bldg Permit No CBC 2017-0040 DFRlReport No 03 Project Address •. 62525 El Camino Real - Time Arrived 12:00AM• Client Whiting Turner. Contractor Whiting Turner Time Departed 4 OOAM Equipment Observed Travel Time Weather . _Night . •• Mileage . Reviewed By Date Reviewed Documents Referenced approved Construction Documents Approved construction documents Observations/Remarks .1 .001: Inspected light gauge metal stud framing at entrance 2. Contractor installed 14 gauge stud wall. Stud spacing is 16" O.C. Top and sid tracks attached with (30),1/4" x 3-1/2" Hilti KH EZ anchor. (30) 1/4 holes brushed and blown clean prior to screw anchor installation Inspector checked torque 18 Ft/lbs per, manufacturers installation and ESR 3027 Inspected the framed out openings access panels 003 No discrepancies noted Contractor can install drywall JZ Report items comply Report items do not comply Report items comply with eeptins 0 In Progress / Not complete Acknowledged by \ a4M----------------- L.— Repreenting . . . :. Kleinfeider Representative Signature . Page 1.0f 1. James Hamilton MAT-1 O REV 5/08 Kleinfelder Representative Print Name KLEINFEL DER Bright People. Right Solutions. Daily Field Report Project Name Shoppes at Carlsbad Date 2017-07-28 V. Project No 20172781.001a Bldg Permit No CBC 2017-0040 DFR/Report No 02 Project Address 62525 El Caminc Real. - •. Time Arrived 12:00AM Client: Whiting Turner . Contractor Whiting Turner Time Departed 4:00AM Equipment Observed Travel Time Weather Night'Mileage Reviewed By. Date Reviewed u ypes or u esisiuoservations • • . • £1 AC Pavements D Fabncahon Plant EJ Masonry El Sample Pickup Other LI Anchor Bolts El Fireproofing El Metal Decking El Soil Aggregate Framing & overhead MEPs U Batch Plant El Foundations U] Pre Post Tension U] Steel Erection LI Concrete • • [] HS Bolting [1 Reinforcing Steel U] Welding . ( KLEINEELDER . Bright People. Right Solutions. . 20172781.001A FINAL REPORT FOR - SPECIAL INSPECTION AND MATERIALS TESTING Date December 20, 2017 To City of Carlsbad Building Department 1635 Faraday Avenue Carlsbad, Califorma 92008 •. . . 4. •, -.•. -. SUBJECT SATISFACTORY COMPLETION OF WORK REQUIRING SPECIAL INSPECTION AND MATERIAL TESTING PERMIT NO CBC20I7-0040 PROJECT ADDRESS 2525 El Camino Real, Carlsbad, California We declae under penalty of perjury that, to the best of our knowledge, all the work listed below -. requiring, special . inspectionj material Sampling and testing, including the off-site fabrication of building components for the structure!s constructed under the subject permits is in conformance with the approved plans, the inspection and observation program and other construction documents, and the applicable workmanship provisions of the California Building Code Executed on this 20th___day of December 2017 MONTH YEAR Special Inspection and Materials Testing covered by this final report include the specific inspection and testing services described in our Daily Field Reports summarized as Observation during field welding and high strength bolting, and observation and torque testing of wedge anchors A if the inspection services were provided by an approved materials testing laboratory or special inspection agency RESPONSIBLE MANAGING ENGINEER OF THE TESTING LABORATORY OR SPECIAL INSPECTION AGENCY: . . •. NAME (Print or Type) JAMES STIADY State of California registration Number 66243Expiration Date 06I 30118 SIGNATURE FESslo CO c9 rn OF CAO~ 20.172781.0'01A The Shopes at Carlsbad Page 1 of 1 December 20, 2017 .' .' --. —•-'•-. KL E/NFEL DER - Bright People. Right Solutions. • Daily Field Report Project Name ThèShoppesatCarlsbad Phase 2, 3.5, &1.5 Date 6-1-17 •. ' Ph#2 CB163654/Ph#1.5 , •'ø. Project No 20172781.601A Bldg Permit No CB 16321 9/Ph#3 5 I 7-0040 DFR/Report No 30 Project Address 2525 El Camino Real, Carlsbad CA ' Whiting Turner! (Sub) Minegar Concrete, John Pulliam - - Client ' - ' Contractor - Masonry, Alliance Drilling Equipment Observed 'Dual Drum Remote sheepsfooted roller - Total Time 10.5'Hr , Weather Cool -. ' Mileage 62 miles Reviewed By x _ Date Reviewed x I ypes or iestsiuoservanions - - - AC Pavements LII Fabrication Plant - Masonry LI Sample Pickup Other - kEI Anchor Boils [I Firerooling '. - Metal Decking Soil / Aggregate LII Batch Plant [I] Foundations . -LIL Pre-Post Tension Stool Erection - Concrete HS Boiling ,. - -s" Reinforcing Steel LI Welding Documents Referenced Approved Plans -• Minegar Concrete: I continued périodià inspectiônof installation' of reinforcing steel and epoxy dowels at slabs on decks at Upper Level Unes (8-91A.2-D) and.(4-71A.2-E) per Schedules on Sheet S5.20, Detail (1/S5.23),'Details (1&2/S5.23), and. 4..1. * embedments per Structural notes. Holes were verified to be clean with proper epoxy used, Simpson Set XP (Ex. c2-17-19), with proper installation procedures noted. These areas are ready to receive concrete. City of Carlsbad.-. inspector. on site to Verify that these areas are ready for concrete. , '. -•- - . I inspected the placement of 2in Non Shrink Grout section under column base plates at Lower Level Lines (A.514), (B.5/4), (B16), and (B/5). HUB 100 II, exp. 2-17-18, SKN#450033 was used with proper mixing and placemht procedures noted. - inspectédthe placement of 19 yds of shotcrete, Superior mix #SH-6875P, 5000 psi at 10 in wall at Line (2.6- 3.2/L.2) and at.Wall infill areas at Lower Level Line 6 and 6.5. Certified nozzleman on site and proper procedures noed:lsampld Load '2 andrnade 1 test panel-that will be cored and tested at Kleinfelder lab. John Pu111arn Masonry: I Inspected the lay up of 8 inch Masonry Walls at Elevator #2 up to full height Steel was installed per details on Sheet S3.30-.ànd proper, construction procedures noted. Orco Type "S"mortar, Lot #131-17, used with proper ri-iixihg and placing procedures noted. I performed pre grout inspection at Elevator #1 up to 20ft 4in above upper level and at Elevator #2 up to full height City of Carlsbad inspector on site to verify that areas are ready for grout Alliance Drilling l I performed compaction testing on subgrade at outside of building at Northside of Cheesecake Factory.. I perfbfmed 4 nuclear density tests andall showed passing results. See sheets 2 and 3 for locations and results. C Report items comply LI Report items do not comply LI Report items comply with exceptions LI In Progress / Not complete • -- •.. . I' Acknoklledged by - Emailed to Kasey Kaeser' Representing Whiting Turner Page 1— of 1_ John Leonard ]CC #6311990 SD #1222 MAT 10 REV 5/08 Klein felder Representative - , r •.. . Nuclear Gauge Density Test Data Sheet Project Name: The Shoppes at Carlsbad-Phase 3 - '- " Date 6/1/2017 Project No.: 20172781 DFR/Report No. 30 rKLEINEEL1 EI Project Address: 2525 El Camino Real, Carlsbad CA Bright People. Right Solutions. Bldg. Permit No. Contractor Alliance Drilling Gauge No. 4765 Test Locations Selected By John Leonard Results Reported to: Albert (Whiting-Turner) Dens. Std. Count Reviewed by: Date Reviewed: Moist. Std. Count QJ C) SI) 4... 0 - 0 0 w u o U C z _. 6 E '15 :i -o C)) Cu 2 E lu CL - Appromate Location . 5)VI .- 2 >- 3 o E 3 E 3 Remarks CL I 57 12 Finish grade at northside of Cheesecake Factry FSG 10.4 104.3 1 108.9 11 96% 90% PASS 58 12 Finish grade at northside of Cheesecake Factry FSG 11.2 104.2 1 1 108.9 11 96% 90% PASS 59 12 Finish grade at northside of Cheesecake Factry FSG 10 103.8 1 108.9 11 95% 90% PASS 60 12 Finish grade at northside of Cheesecake Factry FSG 10.6 104 1 108.9 11 95% 90% PASS - .r-- - -' — '- - E MAT 26 REV 03/09 ' A C - -. 1 , - . S . .%_ , - SI • 1 - - S - 'l,, •' . .S - ' .c • .. f *4* I Al . - ( KL EINFffL DER aught People.. RigISctutions. . . . - . . - - - '. Daily Fed Report Project Name The Shopps at Carlsbad Phase 2, 3.5, & 1.5 Date 5-31-17 . Ph#2 CB163654fPh#1 5 Project No. 20172781.001A - ' - Bg.PermitNo. CB163219/Ph3.5 CBC2O17-0040 DFRIReportNo. -- . Project Address 2525 El Camino Real, Carlsbad CA * Whiting Turner/ (Sub) Minegar Concrete, John Pulliam - Client .. .- . Contractor Masonry - Equipment Observed . Total Time 10.5 Hr -f Weather Cool . Mileage 62 miles -. . Reviewed By x - - Date Reviewed x It * . . . -. - - I ypes OT I ests/Libservations U Sample Pickup U Other - t LI Soil / Aggregate - P U Steel Erection Welding - •, .• .- . - - •1 , Documents Referenced Approved Plans 4 Observations/Rema'11-ks Minegar Concrete 1 -con'tin'ued ' periodic inspection of ihêtallation of reinforcing steel and epoxy dowels at slabs on decks at Upp'er Level Lines (8-9/A2D).'and (4-6.5/A-D) per Schedules on Sheet S5.20, Detail (1/S5.23), and embedments per Structural notes at lOin shotcrete wall at Lines (2.6-3.2/L.2) peir detail (6/S3.20) and RFl#213 and at Wall infill areas at Lower. Level Lines 6 and 6.'5 per detail (6/S4.01) to be filled with shotcrete Holes were verified to ibe clean with prope r epoxy-used, Simpson Set XP (Exp. 2-17-19), with proper installation procedures noted. Areas to' receive shotcrete are ready and reinforcing steel in per plans and RFI. 0 0t1; *.;. John Pulliam Masonry: • .• . llñspeOted the lày,.u5óf 8ihch Masonry Walls at Elevator #1 up to 20ft 4in above upper level and at Elevator #2 up to 21ft 8in Steel was installed per details on Sheet S3.30 and proper construction procedures noted Orco Type "S' rnórtaLot#131-17, used with poper mixing and placing procedures noted. I sampled mortar and made 1 set of 3 samples for testing at Kleinfelder lab 0 ••• (_ A. - - Report Iterni corly - U Report items do not comply. . U Report items comply with exceptions U in Progress (Not complete -. P. . '*• -, •• 0• •.. I o': , Acknowledged by Emaiiedto Kasey Kaeser • - - ...... [,-ç/ Representing 1 Whiting Turner . -, : '.••-' . 8 -. - - .. Pagel.. of 1_ ...,• -' John Leonard iCC #5311990 SD #1222 MAT 10 REV 5108 Klein (elder Represenlative U AC Pavements U Fabrication Plant - Mason, U Anchor Boils l Fireproofing . . •.'. Metal Docking ir U Btch Plant EI,Foundalions - ,• . U Pre-Post Tension [I] Concrte U HS Bolling . Reinforcing Steel V . KLE/NFEWER flrIgM PCopIC. A19hl OlIion SpeciaO Inspection Report Project Name r The Shoppes at Carlsbad Date 8-24-17 (Thu) Project No 20172781 Bldg Permit No CBC2017 0040 DFRlReportNo 38 rProjectAddress 2525 El Camino Real - Time Arrived 7:00 am Client •• V(. Contractor Whiting-Turner Time Departed Equipment Observed Total Time 6 hrs. Weather Sunny Mileage 65 4V V 'V Tvoes of Tests/Observations'- - A 0 Epoxy. ". . 0 Fabrication Plant." D'Masonry 0 Sample Pickup 9 Soils Compaction Testing -- O Anchor Bolts. DFireproofiñg 0-Metal Decking 0 Roofing 0 Batch Plant 0 Foundations 0 Pie-Post Tension 0 Steel Erection 0 Concrete 0 HS Bolting V.0 Reinforcing Steel 0 Welding Documents Referenced Observations / Remarks -' - V - - - On 'site as requèstéd by Albert w/Whiting-Turner for soils testing. Observed contractor Minegér, Concrete place approx. 6" of base in hardscape area in front of. The Cheesecake Factory, contractor moisture conditioned and thoroughly mixed base, material was spread using, bobcat, compactive effort was applied with wacker and dual drum vibratory roller. Performed in-place nuclear'density testing and recorded test results on data sheet. Suppliers max density,: ,was used for te'stingbase (117.0 -fl- 2 @11.8%). V V ' ,VI -- V - . - -" - . •_p. - V V - •,V• V - '-V * '.•t -, VV:, :,, V' V Report items comply • Report items do not comply 0 Report items comply with exceptions 0 In progress I Not complete 0 VV •• -V V •'Acknowledged by V • • V V Mel Oronoz Kleinfelder Representative Print Name/ Certificate Number V Representing V VV V •• V Page 1 of '4 Klelnfelder Representative Signature V 'C • • VV - - V 5761 Copley Drive Suite 100 San Diego California 92111 Phone (858) 223-8500 V•1 - •1 : - - Nuclear Gauge Density Test Data Sheet Page Project Nme - The Same: at Carlsbad Date 8-24-17 (Thu) Project No 2525 El Camino Real - I DFR/Report No 38 ( KLE/NFELDER Project Address 2525 El Camino Real Bright People Right Solutions. Bldg Permit No CBC2017 0040 - '•.;;;=;;;;._ - fr Contractor Whiting-Turn er Gauge No 6736 Test Locations Selected By Mel Ororioz .. Results Reported t Albert Oroco Dens Std Count Reviewed by . Date Reviewed Moist Std Count 4 I 0. U o . - - . . .. . Approximate Location 0 U- > c -CU C 0 CU - 0 >. '13 • >. 0' Z .. E "- E -- . c t o c3 o - 0 — E (3 0 . QL E (3 -_ - Remarks 101 6 Hardscape area base FBG 14.3 120.6 105.5 SM 117.0 8.5 90% 90% PASS 102 6 Hardscape area base FBG 13.4 122.1 107.7 SM 117.0 8.5 92% 90% PASS 103 6 Hardscape area base FBG 14.8 128.2 111.7 SM 117.0 8.5 95% 90% PASS 104 6 Hardscape area base FBG 15.1 126.5 109.9 SM 117.0 8.5 94% 90% PASS 105 6 Hardscape area base FBG 13.1 129.4 114.4 SM 117.0 8.5 98% 90% PASS - -- . . E MATi6 REV 03/09 4 1 . 1/ •/ 4.yn zyç-' / , / / ' -- o;/)/ / I.' •./ / / / / - S / 1;-. - / ,. / 5. - I L Work Area I DFR#38 8-24-17 Page3of4 .. M I- A, KLE/NFELDER p 8 1gb: P p1 81gb, 5.t .dm. Speci al Inspecti on Report Project Name The Shoppes at Carlsbad Date 8-25-17 (Fri) - CBC20I7 0040 Project No., 20172781 Bldg. Permit No. CB163654 DFRlReport No. 39 $ Project Address . 2525 El Camino Real Time Arrived Client - - Contractor Whiting-Turner Time Departed Equipment Observed Total Time 6 hrs. Weather-. Sunny . Mileage 35 Types of Tests/Observtions D Epoxy * 0 FabricatiorPlant 0 Masonry 0 Sample Pickup Soils Compaction Testing O Anchor Bolts 0 Fireproofing 0 Metal Decking 0 Roofing o Batch Plant 9 Foundations - 0 Pre-Post Tension 0 Steel Erection 0' Concrete ' 0 HS Bolting: - 0 Reinforcing Steel 0 Welding 'Documents Referenced - 1 -, -. . Observations / Remarks : 4 :Ofl site as requstéd by Albert w/Whiting-Turner for soils testing. Observed contractor Minegàr- --' COncrete place approx. 6" of base in hardscape area in front of The Cheesecake Factory, and curbs at. south parking area, contractor moisture conditioned and thoroughly mixed base, material was spread using bobcat, compactive effort was applied with wacker and dual drum iibratory, roller. Performed in place nuclear density testing and recorded test results on data sheet Suppliers max density was used for testing base (1117.0 +1- 2 @ 11.8 ½ 8 - - S. - - : - • r - .- 4U 1. • •, - . - - --S S. I 5 S * •b- $ • .. Report items comply'S Report items do not comply 0 Re1port items comply with exceptions 0 In progress! Not complete 0 Acknowledged b • - .• • . - Mel Oronoz ., . . . Kleinfelder Representative Print Name/ Certificate Number Representing --• Page 1 of -4• . - - klelnfelder Representative Signature -- • • •,; ---• 5761 Copley Drive Suite 100 Sari Diego California 92111 Phone (858)223-8500 .;• . .• E MAT 26 REV 03/09 - 4 q - r - - •4 -- - - - - - 7" .. . . ...., .. :_- _.; NucIearGauge Density Test Data Sheet Page I:7. Project Name The Shoppes at Carlsbad Date r 8-25-17 (Fri) 00 Project No 20172781 /iEI,V/.EL DFR/Report No 39 Project Address 2525 El Camino Real Bright People Right Solutions - Bldg Permit No CBC2017-0040 / C8163654 Contractor - Whiting Turner Gauge No 6736 y Mel Dronoz Test Locations Selected By" t Results Reported to Albert Orozco ,. Den., Std Count Reviewed by:Date Reviewed Moist Std Count - - - - CL o - - : Approximate Location C .-. 0 U 0, - C w > - 0 z - o c X C E - o 3 - 0: - - E 3 0 E - 3 Remarks 106 6 Hardscape area base FBG 13.5 126.3 111.3 SM 117.0 8.5 . 95% 90% PASS 107 6 Hardscape area base FBG 14.0 126.5 111.0 SM 117.0 8.5 95% 90% PASS 108 6 Hardscape area base FBG 11.2 1 124.4 111.9 SM 117.0 8.5 96% 90% PASS 109 6 Hardscape area base FBG 13.6 122.3 107.7 SM 117.0 8.5 92% 90% PASS 110 6 Curbs in South parking area FBG 14.1 129.2 113.2 SM 117.0 8.5 97% 95% PASS 111 6 Curbs in South parking area FBG 13.9 128.6 112.9 SM 117.0 8.5 96% 95% PASS 112 6 Curbs in South parking area FBG 14.5 127.9 111.7 SM 117.0 8.5 95% 95% PASS DFR #39 8-25-17 Page3of4 - - :- • S.. S I- r - N 4 ., Al 4 - - - - * . ;- I •- - - V •4 .V. V._• * - - -V.. V -. V . - . * Nuclear Gauge Density Test Data Sheet lk -V. 4 Project Name: The ShoppesatCarlsbad-Phase 3 . Date 6/8/2017 Project No.: 20172781 . DFR/Report No. 34 V KLEIIVPELDE? Project Address: 2525 El Camino Real, Carlsbad CA V Bright People. Right Solutions. Bldg. Permit No. Contractor /ICS Gauge No. 4765 Test Locations Selected By John Leonard Results Reported to: Albert (Whiting-Turner) Dens. Std. Count Reviewed by: .-. . Date Reviewed: / Moist. Std. Count CL Q CL 4.)CU 4. 10 a) 0 . 4-. 0 o 0 U C 0 a z E E -. V C G) o -0 U a, U - L -g Cu 4-. 42 . • 0 V E . • CL Z CL V - App romate L&ation CU 2 - 8 3 3 3 V Remarks 69 12 8in Sewer Line at South Parking Lot St.8+10 FSG-lft 11.6 105.4 1 108.9 11 97% 90% PASS 70 12 8in Sewer Line at South Parking Lot St.8+00 FSG 12.3 106.3 1 108.9 11 98% 90% PASS 71 12 8in Sewer Line at South Parking Lot St.7+85 FSG-1.5ft 12.6 105.2 1 108.9 11 97% 90% PASS 72 12 81n Sewer Line at South Parking Lot St.7+90 FSG 12.2 106.9 1 108.9 11 98% 90% PASS - > ) C V r - . V -. - - V.V•4 / . -V.- - - V - N. - '. - .. . V - 4_V - . - V - . - - V V 4 V - - 4. - -. - - . -' j - - E-MAT-26 REV 03/09 --- -4 - . - . -- • -. V. V - '..4 '- - : . - - * * - . - - - .-' .-' •. * , - _': . .. -, 4 • a Nudear Gauge Density Test Data Sheet Project Name: The Shop pes at Carlsbad-Phase 3 Date .6/2/2017 Project No.: 20172781 DFR/Report No. 31 Project Address: 2525 El Camino Real, Carlsbad CA KL E/IVFE'L DEIP Bright People. Right Solutions. Bldg. Permit No, Contractor ICS Gauge No. 4765 Test Locations Selected By John Leonard Results Reported to: Albert (Whiting-Turner) Dens. Std. Count Reviewed by: Date Reviewed: Moist. Std. Count CL U =3 d 0 S. a) a .E 0 z E E Z q a) ._ - - Appromate Location - 2 . ~c E 0E 8 8 3 I Remarks 61 12 Sewer line trenches FSG 11.4 102.3 1 108.9 11 94% 90% PASS 62 12 Sewer line trenches FSG 11.8 103.8 1 1 108.9 11 95% 90% PASS 63 12 Sewer line trenches FSG 11.5 102.1 1 108.9 11 .94% . 90% PASS -v * F F'. I. • -- -, F.-.-- - • . •.. F -. . 'F. - .5.- - E-MAT-26 REV 03/09 — • , i__ •1 - . • -r .j — -------------- I® \ b \ L 4 \& a1k NAM WE AR O \Imp : b IL r - :-.- ., ] EE - - - - I, - - • - . --- - .*. -- 111*-- - p . - *- :; - - The Shoppes - - t *I -'' • I ILJ - - . NTERIOR RENOVATION • . k 2525 EL CALA I - 1 .' CARLSMDCAINLIFORNLA #* ',. EsGil Corporation In Partners flip with government for cBuz(dng Safety ' 4 ,. DATE: FEB. 03, 2017 0 APPLICANT 1 . /JURIS. JURISDICTION [CARLSBADJ LI PLAN REVIEWER OFILE ., PLAN CHECK NO.: C2017-0040 SET: I PROJECT ADDRESS: 2525 EL CAMINO REAL ) PROJECT NAME: THE SHOPPES AT CARLSBAD (ENTRY RENOVATION) 1 The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. plans transmitted herewith will substantially comply with the jurisdiction's ..........codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. '1. The check list transmitted herewith is for your information. The plans are being held at EsGil Corporation until corrected plans are submitted for recheck. :. The applicant' s áop of the check list is enclosed for the jurisdiction to forward to the applicant '*contact person. . The applicant's copy of the check list has been sent to . ,EsGil Corporation staff did not advise the applicant that the plan check has been completed. Lii EsGil Corporation staff did advise the applicant that the plan check has been completed Person boritactéd: Telephone #: i... . Date contacted: (b) Email: Mail Telephone Fax In Person REMARKS:. . . / By: AL! SADRE, S.E. Enclosures: EsGil Corporation El GA El EJ F1 MB El Pc 1/25 - 9320 Chesapeake Drive Suite 208 • San Diego California 92123 • (858) 560-1468 • Fax (858) 560-1576 ..r•i . I. - .'. - CARLSBAD C2017-0040 .FEB. 03, 2017 [DO NOT PAY — THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PLAN CHECK NO.: C2017-0040 PREPARED BY: ALI SADRE, S.E. DATE: FEB. 03, 2017 BUILDING ADDRESS: 2525 EL CAMINO REAL BUILDING OCCUPANCY: M; III-B/SPR. BUILDING • . PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) ENTRY . 1400 RENOVATION 1.'. AiConditioning Fire Sprinklers "TOTAL VALUE . 64,114 Jurisdiction Cod.èi. CB By Ordinance Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance - ' Type of Review: r Complete Review .1 ••I• - • . . 0 Other o Structural Only I $467.551 I $303.911 .•. **, ukepeuuvel-ee • Hourly Hr. © * EsGI $261.831 I Fee Sheet lofi - macvalue.doc + • ' . • • - CirY OF CARLSBAD. PLANNING DIVISION Development Services BUILDING PLAN CHECK Planning Division APPROVAL 1635 Faraday Avenue (760) 602-4610 P29 wwwcarIcbdcgov - DATE: 02/03/2017 PROJECT,NAME: Shoppes at Carlsbad PROJECT ID: N/A PLAN CHECK NO: CBC2017-0040 SET#: I ADDRESS: 2525 ECR APN: 156-302-09 This plan check review is complete and has been APPROVED by the Division. By A Final Inspection by the Planning Division is required Z Yes El No You may also have corrections from one or more of the divisions listed below. Approval -- from these divisions may be required prior to the issuance of a building permit. : Resubmitted plans should include corrections from all divisions. . ; This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. A. .4 52 Plan Check MP.R.OAL has been sent to: Steven Ruiz - stevnr@ldadesigngroun.com rFor questions or clarifications on the attached checklist please contact the following reviewer as marked PLANNING ENGINEERING FIRE PREVENTION 760-602-4610 760-602-2750 760-602-4665 Chris Sexton Chris Glassen Greg Ryan - 760-602-4624 760-602-2784 760-602-4663 Chris.Sexton@carisbadca.gov Christopher.Glassen@carlsbadca.gov Gregoiy.Ryan@carlsbadca.gov Gina Ruiz' VálRay Marshall Cindy Wong .,. 760-602-4675 760-602-2741 760-602-4662 Gina.Ruiz@carisbadca.gov ValRay.Marshaii@carlsbadca.gov Cvntha.Won@carisbadca.gov Jason Goff Linda Ontiveros Dominic Fieri 760-602-4643 0" 760-602-2773 760-602-4664 Jason.Goff@carisbadca.ov Linda.0ntiveros@carlsbadca.ov Dominic.Fieri@carisbadca.gov Remarks: The Landscape improvement Plans for the Shoppes at Carlsbad Phase 3J enovation Entry #2 Plaza made part of this building permit (CBC20I7-0040) submitt P require a separate Final Landscape Plan review and approval through' the City' anning Division Once those are approved, Planning Staff can release this permit I 4iIit'y Of c Carlsbad / ,'Print Date: 07/20/2018 Permit No: PREV2017-0063, Job Address 2525 El Camino Real Permit Type: BLDG-Permit Revision Work Class: Residential Permit Revisi Status: Closed - Finaled Parcel No: 1563020900 ., 'Lot U: Applied: 04/06/2017 Valuation $0.00 Reference U Issued11/27/2017: - Occupancy Group Construction Type Permit 07/20/2018 Finaled: L. .. U Dwelling' Units: 1 " Bathrooms: Inspector: .. I -. . Bedrooms:. - -' Orig. Plan Check U: CBC2017-0040 - .1 Final * - Plan Check U: Inspection: ' r Project Title: - Description THE SHOPPES MINIMIZED STRUCTURAL CHANGES TO BUILDING AT ENTRY WAY & ROOFING PLAN I/CEILING AND LIGHTING CHANGES - •' •• Applicant: -, Owner: STEVEN RUIZ R P I CARLSBAD LP 3500WBurbankBlvd - Burbahk,CA 91505-2235. ' lll4 Avenue Of The Americas, Floor 45 ••' 818-972-5080: '. .•• ' ,New York, NY 10036-7700 214-660-5232 x215232 •• ' - ' FEE AMOUNT BUILDING PLAN CHECK ADMIN FEE -- ' $35.00 MANUAL BUILDING PERMIT FEE 4 $435.00 Total Fees $ 470.00 Total Payments To Date $435.00 Balance Due $35.00. - .,; • : -r'• 4 •. _3_ - ,• 3 • . . ,, - ., - r , ¶ 4 4 4 .4 ' • '.4 4 . ' '•' • . . , . .* - /. -'.. -'3 , . *• Building Division 1635 FáradayAvenue, Carlsbad CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov ' I i: ..,.I: 1 14 EsGil Corporation In Partners flip wit/i government for Bui(iing Safety .DATE: APR. 17, 2017 APPLICANT ,4 JURIS. :JURISDICTION: CARLSBAD 0 PLAN REVIEWER 0 FILE PLAN CHECK NO.: C2017-0040 (REV. #1) - PREV2017-0063_ SET: I PROJECT ADDRESS: 2525 EL CAMINO REAL .PROJECT NAME: THE SHOPPES AT CARLSBAD (ENTRY RENOVATION) plans transmitted herewith have been corrected where necessary and substantially comply * with the jurisdiction's building codes ElI The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building dpartment staff. El The plhs.transmitted herewith have significant deficiencies identified on the enclosed check list .and should be corrected and resubmitted for a complete recheck The check list transmitted herewith is for your information. The plans are being held at EsGil . Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant :. contact person. - J The applicant's copy of the check list has been sent to: - I EsGil Corporation staff did not advise the applicant that the plan check has been completed. . :[71 EsGil Corporation staff did advise the applicant that the plan check has been completed. 'Pérson contacted: - Telephone #: __ ()o .' Date contacted: (by..-1) Email: Mail* Telephone Fax In Person .. . . REMARKS: Miscellaneous revisions are under this permit. All disciplines are impacted. Replacement sets are resubmitted for review & approval . :By: ALl SADRE, S.E. Enclosures: EsGil Corporation LI GA LI EJ - LI MB LI PC 4/10 • - 9320 Chesapeake Drive Suite 208 • San Diego California 92123 • (858 4 - - -. - I' * CARLSBAD C2017-0040 (REV. #1) - PREV2017-0063 ,APR. 17, 2017 [DONOTPAY— THISISNOTANINVOICE] T ' •:. VALUATION AND PLAN CHECK FEE , JURISDICTION: CARLSBAD PLAN CHECK NO.: C2017-0040 (REV. #1) - PREV2017-0063 PREPARED BY ALl SADRE,SE DATE APR 17, 2017 .BUILDING ADDRESS: 2525 EL CAMINO REAL : BUILDING OCCUPANCY: M; III-B/SPR. BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Plan revisions Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code CB By Ordinance ;Bldg. Permit Fee by Ordinance Plan Check Fee byOrdinance hType of Review: 0 Complete Review o Structural Only 0 Other ........0 Repetitive Fee :• Repeats Hourly 3 Hrs. @ * EsGil Fee $116.00 . . ,Based on hourly rate ' Comments: I . • 7. . . • 'f . - * -•• , • .* •. $435.00I I $348.00I AV of PLAN CHECK REVISION Development Services APPLICATION 1635 Faraday Avenue Carls Building Division, bad B-1 760-602-2719, Plan Check Revision No. PVOI7- 0O3 Original Plan Check No. OI 7 Project Address - ovo le Date 7/7 __- Contact1 */z Ph 1772 PS Fax Email cM& Ke-#i r & Con' tact Address City Zip General Scope ofWork V6 Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person: I • Elements revised:. - Pns Calcations Soils Energy Other___________________________ TH.• , ' 2 F 3 4 besribe revisions in detail List page(s) where List revised sheets each revision is that replace V V shown existing sheets .: ,,.V• V'• )- - ,4•.V •, S. I - • . .. 5. Does-this*revision: in any way, alter the exterior of the project? No 6; Does this revision add ANY new floor area(s)? Yes ,VNo V Dbesthis.révision affect any fire related issues? Yes Is this a complete set? )Zf Yes No ~Signature :- •• ... 1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602- 2719 E: 760-602-8558 Email: building@carlsbadca.gov - V V V - • ' , - V www.carlsbadca.gov p • I!'V•V • Q •i,, V V .• ' - has 3 5 Bulletin 1 - Date: March 28, 2017 Project Number: RP160601 Project Name The Shoppes at Carlsbad Phase 3.5 Project Location Carlsbad, CA Bulietin No 1 The follOvmg changes, deletions, additions, additions, and / or alterations in, on and to the drawnigs and specifications shall apply to proposals made for and to the execution of the various- .pafts of the work affected thereby. / Careful note of this Biilletm shall be taken by all parties of interest so that the proper allowance may be made in all computations, estimats and contracts, and all trades affected shall be fully advised in the performance of the work which will be required of them This Bulletin supersedes all previous drawings, specifications and instructions pertaining to the items of work herein. In case of conflict between drawings, specifications, and this Bulletin, the architect shall determine what governs. DescripUön of BullenItems . Enlry#2 Tower redesign AO.00 . Added Sheet LD3.0. Removed AS.1C from index (never issued) A1.00. .. Note 8 not used to reflect new design, No masonry wall removal. Refer to Structural A1.1C - : '-- * 3. NcStè 6and 7 not usedto reflect new design, No Masonry walls, floor or structure removal 4 Note 8 clarified to identify removal Refer to Structural A1.4C' . .• . Modifies hote 3 to clarify removal of cornice Not 4-6,not used.to reflect new design. No parapet or roofing removal. Refer to Structural A2.00 Existing Masonry walls remain, Refer to Structural Moedstorefront tower elenient outside existing structure. Refer to Structural, Lighting, E1ectiica1 9 Reduced ifiterior walls to reflect Cheesecake Storefront A2.1C - .1O.'Edstirg tenant spaces toremain. - - -ii: Removed Shotcrete work. Refer to structural documents 12. Removed new floor structure infifi work. Refer to structural -, -: 3500 West Burbank Boulevard Burbank California 91505 T 818-972-5080 F 818-848-3895 www.LDAdesigngroup.com -4 ' .- • •• •, .- • * 13. Reduced interior wall scope . . . A2.2C - . : • 14 Existing parapet and roofing to remain. Refer to Structural 15. Reduced new roofing and removed ladder acces, scuppers and overflow drains * A2.2D 16. Omitted and modified roofing details - - 1• A2.3C .• . Moved floor finishes • A2.5 - Modified Entry Doors Added GL-5 with glass film above entry doors, - ./.. A3.O Modified plan/section/elevation to reflect new design with backlit translucent glazing. and ceiling finish adjustments 0 A31 5 Clarified details to reflect design A5.00 Ceiling design to reflect Phase 1 with minor modifications. Refer to Lightingind Electrical Removed suspended chandelier fixture, Refer to Lighting and Electrical - 8 Added lighting to backlight translucent glazing. Refer to Lighting and Electrical — 9. Omitted suspended chandelier detail 10 Modified LiiIe of Building and affected dimensions Added footing note from FFA clarifications to detail 3 Clarifications to site grading based on 2.27.17 civil survey : ••; I. - S ELECTRICAL: - •-. .. -. Sheet E3.1 C . * 13. Lighting revisions per updated background and reflected ceiling plan: 14 Added power connection to automatic sliding door. 15.Revised keyed note 5 and added keyed notes 6'& 7.,'- . 0 0 r - Sheet E6.0 16 Updated lunimaire schedule per lighting revision Added type CB49 Sheet E6.1 -' - *0 • 17. Updated panel schedules '1HR1E', 'D1A', and 'ED1'. - . •• - Sheet E8.0 •. OS, - - - 18. Updated Title 24 Indoor Lighting per lighting revision' 0 • 40* • is Sheet E8.1 - 19. Updated Title 24 Outdoor Lighting per lighting revisidn.- End ofBulletin-''- Page2 - 4 ' • .