Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2525 EL CAMINO REAL; 262; CBC2017-0343; Permit
4City of Carlsbad Commercial Permit Print Date: 04/11/2018 Job Address: 2525 El Camino Real, 262 Permit Type: BLDG-Commercial Work Class: Tenant Improvement Status: Parcel No: 1563022700 Lot U: Applied: Valuation: $161,411.68 Reference U: Issued: Occupancy Group: Construction Type: Permit Finaled: U Dwelling Units: Bathrooms: Inspector: Bedrooms: Orig. Plan Check U: Final Plan Check U: Inspection Project Title: Description: GREAT KHANS: T.I. 2,494 SF (TAKING OVER SUITES 262 & 264) Applicant: Owner: KEVIN KIM R P1 CARLSBAD LP 1114 Avenue Of The Americas, Floor 45 213-503-8018 New York, NY 10036-7700 214-660-5232 x215232 Permit No: CBC2017-0343 Closed - Finaled 06/23/2017 09/26/2017 MCoII 4/11/2018 4:21:25PM BUILDING PERMIT FEE ($2000+) $846.10 BUILDING PLAN CHECK FEE (BLDG) $592.27 ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL $89.00 FIRE A-2 & A-3 Occupancies - TI $609.00 MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL $55.00 PLUMBING BLDG COMMERCIAL NEW/ADDITION/REMODEL $86.00 5B1473 GREEN BUILDING STATE STANDARDS FEE $7.00 STRONG MOTION-COMMERCIAL $45.20 Total Fees: $2,329.57 Total Payments To Date: $2,329.57 Balance Due: $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue, Carlsbad, CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov FOLLOIft*,'NG APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: 'PLANNING 'ENGINEERING I 'BUILDING FIRE &THEALTH EJ HAZMATIAPCD Building Permit Application 11 c3i city 3 of 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value C( % Plan Check No. C&2O Cidisbad Ph 760-602-2719 Fax: 760-602-8558 Plan Ck. Deposit it 41email: 21 bUlIdIngcarIsbadca.gov , Date www.carisbadca.gov JOB ADDRESS SUITE#/SPACE#/UNIT# 2.. APN 225 61,At wn 4i— 2k - - CT/PROJECT # LOT # PASE # # OF UNITS C BEDROOMS C BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE 0CC. GROUP 64 WA) V _ IV A 2- DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) 1.J&W kT,A J-r ON -tHL4 (2.) rAJ44./-1 sP1. 211q4 EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING 1/4 I YES# NOE 51 YES NOE IFIRESPRINKLERS YESNOE APPLICANT NAME ' k4 PROPERTY OWNER Primary Contact MIJ/AJ t4. AJç. 01C .SLic Ap ADDRESS ADDRESS 201 'v-rHii it, $mllll If 742P zsz CITY STATE ZIP CITY STATE ZIP I( CsSSVYAr I1Id C.4gL&BAD 4ç. PHONE FAX PHONE FAX EMAIL 7 EMAIL 40 PC ) 11vC_C-1 DESIGN PROFESSIONAL CONTRACTOR BUS. NAME J Vv ADDRESS '1 ADDRESS ( W 65 S4i76a el Rr4lI rte., CITY STATE ZIP CITY STAT ZIP Pcp fL1 _________ ,4 OCC) PHONE FAX PHON 7 ( f FAX EMAIL EMAIL (a LL* I STATE LIC. C STATE LIC.# f s.J CLASS Ci..O CITY S. LIC.# L47'f (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law [Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)). Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: E1I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. IN I have and will maintain wo ' omp nsation, required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' Compensation insurance carrier and policy number are: Insurance Co. _frj'ip 'i3__f No. 91/4 "7.mf .7 Expiration Date 2? This section need not be completed if the permit is for one hundred dollars ($100) or less. Certificate of Exemption: I certify that in the performance of the work for which this permit is issued. I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees. CONTRACTOR SIGNATURE AGENT DATE /7 DWOXJ D'?D®O thereby affirm that lam exempt from Contractor's License Law for the following mason: El I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). El I am exempt under Section ______________Business and Professions Code for this reason: I personally plan to provide the major labor and materials for construction of the proposed property improvement. EYes No I (have / have not) signed an application for a building permit for the proposed work. I have contracted with the following person (firm) to provide the proposed construction (include name address I phone / contractors' license number): I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address I phone I contractors' license number): I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name I address / phone / type of work): ..€ PROPERTY OWNER SIGNATURE flAGENT DATE Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? 13 Yes 11 No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 73 Yes 73 No Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 73 Yes 0 No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lenders Name Lenders Address I 4ifuthnt I hnun nn,l thn flnnIk'finn nn ffn thntfhn nhnun inf m,,.tinn in rn,n't nnd thnffhn infnnnntinn nn ffin nInni rnfn I fldfl n "ilywith all Cityordinances and State laws relattngte building constction. E, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD CE OF THE GRANTING OF THIS PERMIT. ilding or work authorized by such permit is not commenced within menced fora period of 180 days (Section 106.4.4 Uniform Building Code). I33)1 2 MIT ISSUANCE. uested at final inspection. AJ cEsUIE ion 1635 Faraday Avenue, Carlsbad, California 92008. CO#: (Office Use Only) STATE ZIP CA 41 Z-0 cd 7-2- CONSTRUCTION INSTRUCTION ,,T, E I =ST 0 P620 ~720 01 Permit Type: BLDG-Commercial Application Date: 06/23/2017 Owner: R P I CARLSBAD LP Work Class: Tenant Improvement Issue Date: 09/26/2017 Subdivision: CARLSBAD TCT#76-18 Status: Closed - Finaled Expiration Date: 07/25/2018 Address: 2525 El Camino Real 262 Carlsbad, CA 92008-1210 IVR Number: 4608 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete 03/30/2018 03/30/2018 BLDG-Final 063350.2018 Partial Pass Michael Collins Reinspection Incomplete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency TCO, only, see card for pick up No BLDG-Mechanical Final No BLDG-Electrical Final No 04/02/2018 04/02/2018 BLDG-Final 053439-2018 Partial Pass Michael Collins Reinspection Incomplete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency BLDG-Building Deficiency BLDG-Building Deficiency 04/11/2018 04/11/2018 BLDG-Final 054846-2018 Inspection Checklist Item BLDG-Building Deficiency BLDG-Building Deficiency BLDG-Building Deficiency BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Electrical Final Need waste management paperwork No Not ready No Prelim, not ready No Passed Michael Collins Complete COMMENTS Passed Need waste management paperwork No Not ready No Prelim, not ready No Under the minimum valuation threshold for Yes recycling. Yes Yes Yes April ll,2018 Page 4of4 L:. Permit Type: BLDG-Commercial Application Date: 06/23/2017 Owner: R P I CARLSBAD LP Work Class: Tenant Improvement Issue Date: 09/26/2017 Subdivision: CARLSBAD TCT#76-18 Status: Closed - Finaled Expiration Date: 07/25/2018 Address: 2525 El Camino Real , 262 Carlsbad, CA 92008-1210 IVR Number: 4608 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date Checklist Item COMMENTS Passed BLDG-Building Deficiency No 01/0412018 01/04/2018 BLDG-17 Interior 044963-2018 Passed Michael Collins Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 01/19/2018 01/19/2018 BLDG-23 046242-2018 Failed Michael Collins Reinspection Complete Gas/Test/Repairs Checklist Item COMMENTS Passed BLDG-Building Deficiency Wrong gauge No 01/22/2018 01/22/2018 BLDG-23 046414-2018 Passed Michael Collins Complete Gas/Test/Repairs Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 01/26/2018 01/26/2018 BLDG-23 046925.2018 Passed Paul Burnette Complete Gas/Test/Repairs Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Final 046924-2018 Cancelled Paul Burnette Reinspection Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No 02/27/2018 02/27/2018 BLDG-Final 049909.2018 Failed Michael Collins Reinspection Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Prelim, not ready No 03/20/2018 03/20/2018 BLDG-Fire Final 052424-2018 Passed Cindy Wong Complete Checklist Item COMMENTS Passed FIRE- Building Final Yes 03/29/2018 03/29/2018 BLDG-Final 053093-2018 Partial Pass Michael Collins Reinspection Incomplete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No BLDG-Building Deficiency Prelim, not ready No April 11, 2018 Page 3 0f4 Permit Type: BLDG-Commercial Application Date: 06/23/2017 Owner: R P I CARLSBAD LP Work Class: Tenant Improvement Issue Date: 09/26/2017 Subdivision: CARLSBAD TCT#76-18 Status: Closed - Finaled Expiration Date: 07/25/2018 Address: 2525 El Camino Real 262 Carlsbad, CA 92008-1210 IVR Number: 4606 Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date Checklist Item COMMENTS Passed BLDG-Building Deficiency Base layer grease duct wrap Yes 11/2112017 11/21/2017 BLDG-17 Interior 041078-2017 Cancelled Michael Collins Reinspection Complete. Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency No 11/30/2017 11/30/2017 BLDG-86 T-Bar, 041815-2017 Failed Michael Collins Reinspection Complete Ceiling Grids, Overhead Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 12/14/2017 12/14/2017 BLDG-17 Interior 043532-2017 Passed Michael Collins Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Hard lid/walls at Rm 105-107 Yes BLDG-85 T-Bar, 043361-2017 Passed Michael Collins Complete Ceiling Grids, Overhead Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No BLDG-Building Deficiency Rm 102 only Yes BLDG-44 Yes Rough-Ducts-Dampers BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout Yes BLDG-34 Rough Electrical Yes BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 12/28/2017 12/28/2017 BLDG-14 044465-2017 Partial Pass Paul Burnette Reinspection Incomplete Frame/Steel/Bolting/ Welding (Decks) April 11, 2018 Page 2 of 4 MI:N, IOR$BFOik33) Permit Typo: BLDG-Commercial Application Date: 06/23/2017 Owner: R P1 CARLSBAD LP Work Class: Tenant Improvement Issue Date: 09/26/2017 Subdivision: CARLSBAD TCT#76-18 Status: Closed - Finaled Expiration Date: 07/25/2018 Address: 2525 El Camino Real 262 Carlsbad, CA 92008-1210 IVR Number: 4608 Scheduled Actual Inspection TypeInspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date 02/22/2018 BLDG-Final 049621-2018 Cancelled Paul Burnette Reinspection Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No 11/14/2017 11/14/2017 BLDG-24 040604.2017 Passed Michael Collins Complete Rough/Topout Checklist Item COMMENTS Passed BLDG-Building Deficiency Below floor waste & waste/vent to top of Yes walls only 11/15/2017 11/15/2017 BLDG-21 040587-2017 Passed Michael Collins Complete Underground/Underf 190r Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-44 040747.2017 Passed Michael Collins Complete Rough/Ducts/Dampe rs Checklist Item COMMENTS Passed BLDG-Building Deficiency Grease duct smoke test Yes BLDG-84 Rough 040588-2017 Passed Michael Collins Complete Combo(1424,34,44) Checklist Item COMMENTS Passed BLDG-Building Deficiency Walls only, see card Yes BLDG-14 Yes Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout Yes BLDG-34 Rough Electrical Yes BLDG-44 Yes Rough-Ducts-Dampers 11/20/2017 11/20/2017 BLDG-17 Interior 041213-2017 Partial Pass Michael Collins Reinspection Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Walls only except restrooms and west Yes dining rm wall BLDG-44 040969-2017 Passed Michael Collins Complete Rough/Ducts/Dampe rs April 11, 2018 Page 1 of 4 I 1 1,11 CBC20I7-0343 CARLSBAD 2525 EL CAMINO REAL # INSPECTION RECORD SUITES 262 262 30ding Division O INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB RECORD COPY O CALL BEFORE FOR NEXT WORK DAY INSPECTION 1563022700 0 FOR BUILDING INSPECTION CALL: 760-602-2725 9/26/2017 OR GO TO: www.Carlsbadca.gOV/BUiIdIfl9 AND CLICK ON Request Inspection' j,.., v i ui43 DATE: a' / It"YES" Is chocked below that Division's approval Is required prior to requestin a Final Building Inspectlom If you have anyquestions please call the applicable divisions at the phone numbers provided below. After all required appro v a l s a r e s i g n e d o f f - f a x t o 760-602-8560, email to hW"n 'pections9carlsbadca.gov or bring in a COPY of this card to: 1635 Faraday Ave., Carlsbad, YES NO IFMARI(ED YES. IT IS REQUIRED PRIOR TO ANY CONSTRUCTION - Date i inspector Notes STORM WATER PRECON MEETING REOUIRED 760-607-2725 Allow 48 hour; IF MARICED YES', IT IS ROUIRED PRIOR TO REQUESTING BUILDING FINAL - Fire Prevention 760.602-4660 Allow 48 hours Planning/Landscape 760-9448463 AllOw 48 hours CM&I lEicjincrng Inspections) 760438-3891 Call before 2 p Type of Inspection OrM.M.W11111 =IIJIW!JEFr— Date 11 FOUNDATION Type of Inspection Inspector r.ir 4UIz1[.V-I Date Inspector #31 0 ELECTRIC UNDERGROUND 0 UFER #12 REINFORCED STEF.I. #34 ROUGH ELECTRIC 66 MASONRY PRE GROUT #33 1 ELECTRIC SERVICE 0 TEMPORARY 0 GROUT 0 WALL DRAINS #35 PHOTO VOLTAIC 10 TILT PANELS #53 ELEC/CONDUIT/WIRING #1.1 POUR STRIPS #39 FINAL #11 COLUMN FOOTINGS #41 UNDGROUND DUCTS &PIPING #14 SUBFRAME OFLOOR 00EILING F15 ROOF SHEATHING ,.LJCT & PLENUM 0 REF. PIPING #13 EXT. SHEAR PANELS #43 HEAT-AIR CON D. SYSTEMS #16 INSULATION -__________ #49 FINAL #18 EXTERIOR LATH Oi/ J'4( ________ #81 UNDERGROUND (11.12.21,4-j) #17 INTERIOR LATH & DRYWALL #51 POOL EXCA/STEEL/ BOND/ FENCE #82 DRYWALL,EXILATH, GAS TES (17,18,23) #55 PREPLASTER/FINAL ____________ #83 ROOF SHEATING, EXT SHEAR (13,15) 019 FINAL / . .\.)'F=M #84 FRAME ROUGH COrf1B0(14.24.34,44) tzlt'aBjp cooR t. PLUMBING 922 OSEWER&BL/CO 0 PL/CO Date ___ Inspector #85 T-Bar(14,24.34,44) #89 FINAL OCCUPANCY (19,29,39,49.) UNDERGROUNDI 9ASTE DWTR _#21 t lii JV - _..ik1_ Il A/S UNDERGROUNDVISUAL Date - I Inspector #24 TOPOUT ZVASTE .Z'WTR #27 TUB & SHOWER PAN #23 iZTEST 0 GAS PIPING '#/t.i{tP J1 A/S UNDERGROUND FLUSH ' #25 WATER HEATER A/S OVERN EAD VISUAl #28 SOLAR WATER A/S OVERHEAD HYDROStIITIC I #29 FINAL A/S FINAL #600 PRE-CONSIRUCTION MEETING . F/AROUGH-IN . .-. F/A FINAL #603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN TE05 NOTICETOCLEAN . . FIXEDEXTIN HY GSYSTEMDROSTATICTEST .!to? WRIT !EN WARNING FIXED EXTINGUISHING SYSTEM FINAL #609 NOTICEOFVIOLATION . . - . - 1MEDIALGASPRESSURETEST 4610 VERBALWARNING ---------------. - ..MEDICAL -,— .- US Fit -- --- ........................... REV7117 . ..- - , - . EEBACKFOPECRS .. CBC20I7-0343 ngDftnon INSPECTION RECORD # 262 KS VrF ir & 264) ];INSPECTION RECORD CARD WITH APPROVED hPLANS MUST BE KEPT ON THE JOB LCALL BEFORE 300 j FOR NEXT WORKDAY INSPECTION 15 6 3 0 2227 0 0 FOR BUILDING INSPECTION CALL: 760-602-2725 9 /2612017 OR GO TO: www. CrIsbadca. fALdj AND CLICK ON 7Request Inspection' Ira -) // C2017-0343 TI U ., rwi k-imwny ti VT. ,I-rViT-rtT-raaue%t0nPr Section 5416 Health and Safety Code, State of California '(a) There shall be not less than one water closet for each 20 employees or fractioñbl pad thereof wodipga 6scn job site The water closet shall consist of a patented chemical type toilet For the purpose of this section the term construction site shall mean the location on which actual constnJctionofa building is in progress A violation of this section shall constitute a misdemeanor. All construction or work for which a permit is required shall be subject to irrspec nd all such constictir work shall remain accessible and exposed for inspection puoses until approved by etor Work ha0e done beyond the point indicated in each successive inspechon thout firstobtaining the or oval OT the inspector - - - • - • I I ( City of Carlsbad CBC2017-0343 8/25/17 EsGil Corporation In Partners/lip with government for (Bui(ding Safety DATE: 8/25/17 JURISDICTION: City of Carlsbad PLAN CHECK NO.: CBC2017-0343 SET: III PROJECT ADDRESS: 2525 El Camino Real Suite 264 PROJECT NAME: Great Kahn's - TI U APPLICANT URIS. U PLAN EVIEWER U FILE The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. LI The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. Lii The check list transmitted herewith is for your information. The plans are being held at EsGil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. LII The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. LI EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: -172.) Email: Mail Telephone Fax In Person LI REMARKS: By: Jason Pasiut Enclosures: EsGil Corporation LI GA LI EJ LI MB LI PC 8/21/17 i 11 EsGil Corporation In Partnership with covernmentforBui(6ing Safety DATE: 8/3/17 UbdDPLICANT .-JURIS. JURISDICTION: City of Carlsbad u PLAN REVIEWER U FILE PLAN CHECK NO.: CBC2017-0343 SET: II PROJECT ADDRESS: 2525 El Camino Real Suite 264 PROJECT NAME: Great Kahn's - TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. LI The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Kevin Kim Telephone #: 213-503-8018 Date contacted: Vf) (by:f(...)- Email: info@cpstudioinc.com 'Mail Telephone Fax In Person REMARKS: By: Jason Pasiut (for DM) Enclosures: EsGil Corporation E GA E EJ LI MB LI PC 7/27/17 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576 City of Carlsbad CBC2017-0343 8/3/17 NOTE: The items listed below are from the previous correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and, may not necessarily be in sequence. The notes in bold font are current. Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (Iwo sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring two corrected sets of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. Signatures are missing on sheets HI and H2. Also, the index is not complete. Please update the sheet index to include all sheets. Provide evidence of Health Department approval (for restaurants), where regulated by the local Health Department. A letter was not submitted with the latest set. PLUMBING Grease interceptor needs to include the floor drain (FDA) at the hot plate and the mop sink along with the three-compartment sink. Please show all three of these fixtures connected to the grease interceptor. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: YesLJ No LI EsGil Corporation In (Partnership with Government for cBui(ding Safety DATE: 7/6/17 UPPLICANT U RI S. JURISDICTION: City of Carlsbad LI PLAN REVIEWER LI FILE PLAN CHECK NO.: CBC2017-0343 SET: I PROJECT ADDRESS: 2525 El Camino Real Suite 264 PROJECT NAME: Great Kahn's - TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. El The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil Corporation until corrected plans are submitted for recheck. Lii The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Kevin Kim Telephone #: 213-503-8018 _-I jp.te col ephone cted: -j1(? (by.__) Email: info@cpstudioinc.com l....M'ail ' Fax In Person REMARKS: By: Doug Moody Enclosures: EsGil Corporation El GA El EJ El MB [1 PC 6/26/17 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 City of Carlsbad CBC2017-0343 7/6/17 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: CBC2017-0343 OCCUPANCY: A2 TYPE OF CONSTRUCTION: IIB ALLOWABLE FLOOR AREA: SPRINKLERS?: YES REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 6/23/17 DATE INITIAL PLAN REVIEW COMPLETED: 7/6/17 JURISDICTION: City of Carlsbad USE: Restaurant ACTUAL AREA: 2494sf STORIES: 1 HEIGHT: OCCUPANT LOAD: 86 DATE PLANS RECEIVED BY ESGIL CORPORATION: 6/26/17 PLAN REVIEWER: Doug Moody FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by- the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2016 CBC, which adopts the 2015 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2015 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. City of Carlsbad CBC2017-0343 7/6/17 Please make all corrections on the original tracings, as requested in the correction list. Submit three sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring two corrected sets of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes. Business and Professions Code. 2. Provide evidence of Health Department approval (for restaurants), where regulated by the local Health Department. 3. Please correct the wall legend, indicate on the plans the wall type and reference the appropriate construction details. 4. Provide a section view of all new interior partitions. Show: Method of attaching top and bottom plates to structure. (Please indicate the spacing of the braces). Show height of partition and suspended ceiling, and height from floor to roof framing or floor framing. 5. Please provide plans and calculations signed by the California State licensed engineer or architect for the structural support and lateral bracing of the new roof mounted HVAC equipment weighing 775#'s. Include all calculations and finding on the plans. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. 6. Please review the requirements, revise the plans appropriately and imprint on the plans the City of Carlsbad Policies and Procedures for Roof Mounted Equipment to the plans. 7. Please have the document author and principle designer sign all of the MECH forms. City of Carlsbad CBC2017-0343 7/6/17 Please provide a door schedule; indicate the type of hardware and reference the doors on the floor plan. Show that the water closet is located in a space which provides: a) A clear space in front of the water closet measuring 60" wide by 48" in front. Section 11B-604.3.1. See the following figures. The depth of the restroom will not provide the required clearance. The water closet is 29 3/4" in depth plus the required 48" equals 77 3/4" and the restroom is show to be 76" 60 MIN: -7--.------__________-- ...-- CENTERLINE CENTERLINE OF OF FiXTURE FIXTURE T1j MIN, FLUSH ACTIVATOR ON WIDE SIDE To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes No U City of Carlsbad CBC2017-0343 7/6/17 The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Doug Moody at Esgil Corporation. Thank you. City of Carlsbad CBC2017-0343 7'/6/'1'7 [DO NOT PAY - THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Carlsbad PLAN CHECK NO.: CBC2017-0343 PREPARED BY: Doug Moody DATE: 7/6/17 BUILDING ADDRESS: 2525 El Camino Real Suite 264 BUILDING OCCUPANCY: A2 BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) TI 2494 64.72 161,412 Air Conditioning _ Fire Sprinklers _ TOTAL VALUE 161,412 Jurisdiction Code 1cb IBY Ordinance Bldg. Permit Fee by Ordinance V I $846.161 Plan Check Fee by Ordinance V I $550.00I Type of Review: L11 Complete Review Structural Only Repetitive Fee Repeats LIII Other Hourly Hr. @ * EsGil Fee I $473.851 Comments: Sheet I of I macvalue.doc + 20!? C/Ty op 13L11L0 ELISE ROTHSCHILD Countp at ban 1tciO AMY HARBERT Director Assistant Director DEPARTMENT OF ENVIRONMENTAL HEALTH FOOD AND HOUSING DIVISION P.O. BOX 129261, SAN DIEGO, CA 92112-9261 Phone: (858) 505-6659 FAX: (858) 505-6824 1 (800) 253-9933 www.sdcdeh.org PLAN APPROVAL SHEET DBA: Great Khans DATE: 6/28/17 SITE: 2525 El Camino Real #264 Carlsbad 92008 PC #: FFPP-008253 BUSINESS OWNER: Allen Kim Plans are approved contingent upon the following: iL Department of Environmental Health (DEH) stamped plans shall be maintained at the jobsite and 'available for review at the time of the inspection.I 2) Changes to equipment layout, menu, or application must be submitted for approval. Changes made without approval will make the plan approval null and void. 3)btain local Building Department and all applicable agencies permits and approvals PRIOR TO FINAL INSPECTION AND APPROVAL TO OPERATE BY THIS DEPARTMEfl 4) All food and utensil-related equipment shall be certified to applicable sanitation standards by an ANSI accredited testing agency. 5) Upon completion of 60%-80% of construction, call (858) 505-6660 to schedule a preliminary inspection. In lieu of a plumbing inspection by DEH: Floor sinks shall be installed Vz exposed and equipped with an appropriate grill cover if no access is provided for cleaning. Drain lines shall slope ¼" per foot to gravity, shall not exceed 15' in length and shall terminate a minimum of 1" above the floor sink with a legal air gap. Drain lines shall not intersect walkways or door ways. C. No condensate drainage of any kind, including FIVAC can drain to the mop sink. The entire floor surface must be sloped to the floor drains approximately 1/8 inch per foot or a four feet diameter depression that slopes 1:50 (approximately ¼ inch per foot). Conduits of all types shall be installed within walls as practicable. When otherwise installed, they shall be mounted or enclosed in a chase so as to facilitate cleaning. 6) Owners and/or operators must pass an approved and accredited Food Safety Certification course. Proof of successful completion of this course is to be furnished at the final inspection. 7) At the time when the final inspection is requested, the facility shall have all utilities operational and all refrigeration shall have an ambient air temperature of 38'F or below and shall be equipped with a thermometer accurate to +1- 2'F in the warmest section of the unit. All equipment is to be in place and functional. 8) Seal all cracks, gaps and crevices in counters, cabinets, around metal flashing, sink backsplashes, around pipes and conduits with silicone sealant. Plans reviewed by Nathan Griffiths, REHS @ 858-505-6660 Chris Cardwell, EHT @ (858) 505-6660 CALL (858) 505-6660 AT LEAST 10 WORKING DAYS IN ADVANCE TO SCHEDULE PRELIMINARY AND FINAL INSPECTIONS. A FINAL INSPECTION SHALL BE CONDUCTED AND AN ENVIRONMENTAL HEALTH PERMIT SHALL BE ISSUED PRIOR TO OPENING AND OPERATING THIS FOOD ESTABLISHMENT. cc: File "Environmental and public health through leadership, partnership and science" JUL 25 2017 July, 2017 Address: 2525 El Camino Real Space #262 Carlsbad, CA 92008 1/7 Site Class D Site Specific Spectral Acceleration Max.S, S1 provided from USGS Site Coefficients S (0.2 sac) 1.114 g Fa 1.0 S1 (1.0 sac) 0.429 g F 1.5 Ajusted MCE spectral response acceleration SMS = F. SS 1.114 SMI -FS 1 0.644 Design Spectral Response Acceleration Parameters S Ds =2/3S ms 0.743 SDI = 2/3S,I 0.429 Seismic design force The concentrated force applied at = 0.4apScw1p(1+2z/h)Wp/R 0 = 179.43 < 1.6SlpWp = 897.14 > 0.3SI pWp = 168.21 where, Fpa = 0.24 W,, Seismic design force SDS = 0.743 spectral acceleration = 1.0 component amplification factor IP = 1.0 component importance factor W,, = 755 lb component operating weight R = 2.5 component response modification factor h = 14.0 average roof height z = 7.0 height in structure point of attachement For Allowable Stress Design VBASE =0.7*F8 2/7 Seismic Force Resisting System Desian Criteria 3/7 pesign Load (Seismic Load) Lee & Lee Structural Engineering Inc. EMERMHOW Design Maps Summary Report Pagel of2 USGS Design Maps Summary Report User-Specified Input Report Title Great Khan Thu luly 20, 2017 17:28:52 UTC Building Code Reference Document ASCE 7-10 Standard (which utilizes USGS hazard data available In 2009) Site Coordinates 33.17820N, 117.33280W Site Soil Classification Site Class 0 - "Stiff Soil" Risk Category 1/11/111 USGS-Provided Output = 1.114 g S 1.174 g S 0.783 g 5, = 0,429 g 5,,, = 0.673 g 5,, = 0.449 g For Information on how the SS and Si values above have been calculated from probabilistic (risk-targeted) and deterministic ground motions in the direction of maximum horizontal response, please return to the application and select the 2009 NEHRP" building code reference document. MCeResporIee Spectrum Oesin Response Spectrum P,,q,s,d. t (use) Par,ed. T (aec) For PGA,, T,, Ca,, and C,,, values, please view the detailed report. https://earthquake.usgs.gov/cn2/designmaps/us/sumrnary.php?tempjate=minimajlalj0 7/20/2017 Lateral Load 4/7 Calculation Coefficients ap = i R = 1.5 Weight of the equipment W, = 775 lb/ft width The concentrated force applied at the mid-height of the equipment F pa 04aSosI(1+2Z/h)W/R = 460.45 lb/ft < 1.6S 0 1W = 920.91 lb/ft 0.3S05IW = 172.67 lb/ft F pa = i'i.1 lb/ft Moment M =Fps h,/2 FW lb-ft Resisting Moemnt Ma = Use (O.6-O.14SDs ) *Wp*L/2 1345.5 lb-ft Anchorage forces Anchor design forces Mreq = Mpa - M a 309.45 lb-ft = M/2/L = No required anchorage devices = lb this is the QE load in the seismic load combination Design force premariufactured steel anchorage element Strength design Iaod EQEPEF anch lb Allowable stress design load requirement_______ 0.7E=0.7PE = EI lb (i.) ?4X )1 el L-Pd LEE & LEE STRUCTURAL ENGIERING INC. r ::- c Lr ' k fc L LEE & LEE STRUCTURAL ENGIERING INC. \HT ()r ()*f Cr) ; c,fr: ?(.Ofl, 3.125X21 Downward L+Lr+S 0.381 in Downward Total 0.726 in Upward L+Lr+S 0.000 in Upward Total 0.000 in Live Load Deft Ratio 865 >360 Total Deft Ratio 454 >180 iiownwara L+Lr+b 0.181 in Downward Total 0.365 in Upward L+Lr+S 0.000 in Upward Total 0.000 in Live Load Defi Ratio 994 >360 Total Defi Ratio 492 >180 7/7 ect Calculation\2017 Junho\CommrciaCP Studlo(P17 EN1ERCALC, Roof Equip su Wood Beam Design: RB Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10 BEAM Size: 4x6, Sawn, Fully Unbraced Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending Wood Species : Douglas Fir - Larch Wood Grade: No.2 Fb - Tension 900.0 psi Fc - Prll 1,350.0 psi Fv 180.0 psi Ebend- xx 1,600.0 ksi Density 31.20 pcf Fb - Compr 900.0 psi Fc - Perp 625.0 psi Ft 575.0 psi Eminbend - xx 580.0 ksi Applied Loads Point: 0 = 0.3780 k @ 4.0 ft Design Summary , Max fb/Fb Ratio 0.490 1 fb : Actual: 514.12 psi at 4.000 ft in Span #1 Fb : Allowable: 1,049.35 psi Load Comb: +D+H Max fv/FvRatio = 0.091: 1 / fv: Actual: 14.73 psi at 0.000 ft in Span # 1 Fv: Allowable: 162.00 psi 8+0 ft. 4x6 Load Comb: i-D+H Max Max Deflections Max Reactions (k) L L! SW U Downward L+Lr+S 0.000 in Downward Total 0.090 in Left Support 0.19 Upward L+Lr+S 0.000 in Upward Total 0.000 in Right Support 0.19 Live Load Defi Ratio 999999 >360 Total Defi Ratio 1064 >180 Wood Beam Design:.(E)3 125x21 Calculations per NDS 2012 IBC 2012 CBC 2013 ASCE 7-10 BEAM Size: 3.125x21, GIB, Fully Unbraced Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending Wood Species: DF/DF Wood Grade: 24F - V4 Fb - Tension 2400 psi Fc - Prll 1650 psi Fv 265 psi Ebend-xx 1800 ksi Density 31.2pcf Fb - Compr 1850 psi Fc - Pep 650 psi Ft 1100 psi Eminbend - xx 950 ksi Applied Loads Unit Load: 0 = 0.0960, Lr = 0.1280 k/fl, Trib= 1.0 ft Point: 0 = 0.3780 k @ 17.50 ft Design Summary Max fb/Fb Ratio = 0.876: 1 fb : Actual: 1,207.23 psi at 14.392 ft in Span # 1 Fb: Allowable: 1,378.74 psi Load Comb: +D+Lr+H Max fv/FvRatio = , 0.202: 1 fv : Actual: 66.98 psi at 25.758 ft in Span # 1 Fv: Allowable: 331.25 psi Load Comb: +D+Lr+H Max Reactions (k) 2 L Lr 5 W Left Support 1.46 1.76 Right Support 1.56 1.76 Wood Beam Design: (E)3 12x12 Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10 BEAM Size: 3.125x12, GLB, Fully Unbraced Using Allowable Stress Design with ASCE 7-10 Load Combinations, Major Axis Bending Wood Species: DF/DF Wood Grade: 24F - V4 Fb - Tension 2400.0 psi Fc - PrIl 1,650.0 psi Fv 265.0 psi Ebend- xx 1,800.0 ksi Density 31.20 pcf Fb-Compr 1,850.0 psi Fc - Perp 650.0 psi Ft 1,100.0 psi Eminbend - xx 950.0 ksi Applied Loads Unit Load: 0 = 0.0960, Lr = 0.1280 k/fl, Tnb= 1.0 ft Point: 0 = 0.3780 k 10.0 ft Design Summary Max fb/Fb Ratio = 0.418 I fb : Actual: 1164.87 psi at 8.050 ft in Span #1 Fb : Allowable: 2,787.11 psi Load Comb: +D+Lr+H Max fv/FvRatio = 0.208: 1 fv : Actual: 68,77 psi at 14.050 ft in Span # I Fv: Allowable: 331.25 psi Load Comb: +D+Lr+H Max Reactions (k) 2 k i,i aW Left Support 0.85 0.96 Right Support 0.97 0.96 is Air Balance & Duct Testing Co. Test & Balance Report Hood & MAU Heating & A/C 2525 El Camino Real Carlsbad, CA Project: Tenant Improvement Business: Great Khan Mongolian BBQ Use: Restaurant Architect /Designer: CP Studio Engineer: Han Engineering, Inc Contractor: JVN Construction Permit #: CBC20I7-0343 Date of approved plans:12/26/17 THE TESTING AND BALANCING HAS BEEN PERFORMED IN ACCORDANCE WITH THE "AS BUILT" DRAWINGS AND SPECIFICATIONS, AND/ OR THE STANDARD REQUIREMENTS AND PROCEDURES OF THE NATIONAL BALANCING INSTITUTE. THE RESULTS OF THESE TESTS ARE HEREIN RECORDED. CERTIFICATION # 06-199-01 DATE: January 30, 2018 APPROVED: John Kwan Report #: 18-4500 J. Air Balancing & Duct Testing I 9040 lelstar Ave. #137 El Monte, CA 91731 \ \ Phone: 626-274-0522 I Fax: 626-448-6568 \. ... NATIONAL BALANCING/COMFORT INSTITUE(NBIINBI) Certified Lic #06-199-OIL. Calcerts EXHAUST MOTOR PULLEY DATA DIAMETER 4.75 DIAMETER 5 ADJ/FIXED ADJ. MAU FAN PULLEY DATA DIAMETER 4" DIAMETER 16" ADJ/FIXED ADJ. MAKE UP AIR UNIT MANUFACTURER CHAMPION MODEL 85SD STYLE SUPPLY FAN MUA MOTOR HORSE POWER 1 HP TYPE TDB PHASE 1 PH READINGS BY J. Air Balance ADDRESS 2525 El Camino Real Carlsbad, CA co Ct., o CD 0 10 - CT <90 ca O(0W x -2 -0 - Wuco O F- LI 2CJo o a) ...L.. cis C\J 4t 1- - _Q). EXHAUST FAN MANUFACTURER CAPTIVE AIRE MODEL NCA24HPFA EXHAUST FAN MOTOR DATA MANUFACTURER HSSA VOLTS/PHASE 230/3 HORSEPOWER 3 BQ EXHAUST CFM BQ MAKEUP AIR IT. EXHAUST CFM IT. MAKEUP DTAL EXHAUST AIR JTAL MAKEUP AIR pq DATE January 30, 2018 *i[eTh ACTUAL PROJECT 1,000 280794% Great Khan 1,000 285595% Mongolian BBQ 800 79699% 800 77897% FYSTEM 1,800 360395% Exhaust /MUA IHORSEPOWER I 3 I 3 I FAN RPM 1735 1718 STATIC PRESSURE 2.25'wc 2.19"wc MUA MOTOR 1 ID] L.1 HORSEPOWER 1 1 MOTOR RPM 1750 1698 STATIC PRESSURE .5"wc .60"wc HOOD STYLE Canopy Canopy HOOD TYPE (1 OR 2) 1 1 FILTER TYPE BAFFLE BAFFLE iIsi I I DUCT VELOCITY 1 1350 FPM 1264 FPM DUCT VELOCITY 2 1600 FPM 11592 FPM (3)I.- ot 0 _CORRECTION _FACTORS _____________ I AIR TEMPERATURE 68 0 0) I z ALTITUDE I N/A - is is a Certified Type 1, 2,3 sided Canopy Hood NO sting and adjusting was done erencing the 2013 California Mechanical Code Sections 507, 3 & 509 - Commercial Hoods and Kitchen Ventilating Systems. The results of this diagnostic and air balance test are within acceptable limits. 2018 NCI, Inc. 0 2018 CONTENTS KITCHEN EXHAUST AND MAKEUP AIR REPORT (PAGE 2) FILTER1MEASUREMENTS AND1HOODAIRFLOW Filter Required FILTER Test 1 Final LtoR CFM CFM CFM CFM TYPE CFM CFM l:I.1UJI.I;]:r. WIIIIIIIIIII I11lc_ Zs1] 4] Kid I1R1I: lI1rIe ViWIWi 4. I'1uI.I#1P'4 IYA!.IsI&' iIMAKE UP Area Served AIR1.11111 Outlet System Test 1 Required Final Number CFM CFM No. CFM 1 CFM $14.1 Ir KITCHEN EXHAUST AND MAKEUP AIR REPORT (PAGE 3) FILTER1MEASUREMENTS A IiiHOOD IAIRFLOW 1 Filter Required FILTER Test 1 Final LtoR CFM CFM CFM CFM TYPE CFM CFM 11II.]:Iu iuriw [IIIIII] IR I:E1.].rA'irnll: 11111.1 11 P4 MAKE Area Outlet System Served Number No. 11II.]:lu ii JAIR OUTL Required CFM CFM Final Test 1 CFM 1 CFM SUPPLY AIR CFM 2000 11934 RETURN AIR CFM 2000 1956 FRESH AIR CFM 400 376 STATIC PRESSURE + .75 wc .67wc STATIC PRESSURE - .75 wc .73wc TOTAL STATIC PRES. 11.5 wc 1 .40wc FILTER STATIC PRESSI0.03 wc I0.032wc 230 1223 DATE 30-Jan-2018 PROJECT 2525 El Camino Real Carlsbad, CA SYSTEM Central A/C and Heating - READINGS John Kwan- National Balancing Institute #01 199-01 FAN NAMEPLATE DATA MANUFACTURER CARRIER TYPE PACKAGE VC LOCATION ROOF -IEATER LOCATION ROOF JNIT# -- tAODEL# 50i-ICQA06A2A5A0A0A0 SERIAL# 391 7C79042 EMPERATUR rEMPERATURE IN 68 ' EEMPERATURE OUT 69 i SYSTEM DROP / Rise 1 M'JOB NUMBER Outlet Room Purpose Supply! Vent Air Change Air Change Exhaust Exhaust Exfittratio Extittratio DUCT Design ACTUAL Comments 18-4500 Return Location Required Actual Design Actual Design Actual CFM CFM ,]iII[cI i.IIIre1 •!'I'J)'1:I - ___________________ Z uirirui 51 CEILING 8 8.21 ENCLOSED 400 392 3 DINING S1 CEILING 8 8.2 ' ' ENCLOSED 400 385 4 DINING S CEILING 8 8.2 " ' " ENCLOSED 400 401 5 DINING S CEILING 8 8.2 - ' ' ENCLOSED 400 378 " 6 DINING R CEILING 8 8.2 " 2000 1956 ENCLOSED 2000 1956 ' " o 0. CC H REMARKS! RESULTS . REQUIRED SUPPLY 2000 REQUIRED RETURN _____ 2000 This system is within acceptable limits. +/-3% 97% TOTAL SUPPLY 1934 _______ TOTAL RETURN 1956 I%I I%I _282° © 2018 ARB/JK Air Balance CONTENTS El DATE 30-Jan-2018 SUPPLY AIR CFM 2000 1915 PROJECT 2525 El Camino Real Carlsbad, CA RETURN AIR CFM 2000 1914 FRESH AIR CFM 400 369 STATIC PRESSURE + .75 wc .69wc SYSTEM Central A/C and Heating 2 STATIC PRESSURE- .75 wc .74wc TOTAL STATIC PRES. 1.5 wc 1 .43wc FILTER STATIC PRESS 0.03 wc 10.034wc I 230 225 __IREADINGS John Kwan- National Balancing Institute #01 199-01 FAN NAMEPLATE DATA MANUFACTURER CARRIER TYPE PACKAGE VC LOCATION ROOF -IEATER LOCATION ROOF JNIT# 2 V1ODEL# 50HCOA06A2A5AOAOAO 3ERIAL# 0517C79299 EMPERATURE EEMPERATURE IN 68 PERATURE T 69 e— ::: :e I NUMBER Outlet Room Pur pose Supply! Vent Air Change Air Change Exhaust Exhaust E4illratio EiItratio DUCT Design ACTUAL JOB Comments 18-4500 Return Location Required Actual Design Actual Design Actual CFM CFM 2 KITCHEN S1 CEILING 81 8.2 ENCLOSED 300 2811" 3 COUNTER S1 CEILING 8 8.2 '' ENCLOSED 300 289 4 HALL S CEILING 8 8.2 ' ' ENCLOSED 400 405 u 5 DINING A CEILING 8 8.2 ' 1400 1349 ENCLOSED 1400 1349 6 DINING S CEILING 8 8.2 0 ENCLOSED 400 393 7 KITCHEN A CEILING 8 8.2 0 600 565 ENCLOSED 600 565 8 RESTRM S CEILING 6 6 150 139 0 0 0 0 ENCLOSED 150 130 9 RESTRM S CEILING 6 6 150 137 ENCLOSED 150 131 EMARKS/ RESULTS REQUIRED SUPPLY 2000 REQUIRED RETURN 2000 us system is within acceptable limits. +1-4% TOTAL SUPPLY 1915 TOTAL RETURN 1914 I I 96% I 96% © 2018 ARB/JK Air Balance CONTENTS DATE 30-Jan-2018 PROJECT 2525 PROJECT Real Carlsbad, CA SYSTEM Hood & MAU Heating & A/C READINGS John Kwan- National Balancing Institute #06 199-01 fJOB NUMBER I 18-4500 p II:] II.iI u1 I [e1llz1I,Ic1 1:I.]Iiz4I.Ici Y1IC11I. ifi[SIz1*IuJlL1 - • 1[.1III I a !J1r1 TTi I I • IIiii , ,I.]iiF1 .I (I I 0 2018 ARB/J Air Balance CONTENTS OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A (Revised 12/15) CALIFORNIA ENERGY COMMISSION IS CERTIFICATE OF ACCEPTANCE N RCA-MCH-02-A Outdoor Air Acceptance (Page 1 of 3) Project Name; 2525 El Camino Real Enforcement Agency; Carlsbad, CA Permit Number; 0343 Project Address; 2525 El Camino Real City; Carlsbad, CA Zip Code; 92008 System Name or Identification/Tag; 1,2 System Location or Area Served; 1,2, Note: Submit one Certificate of Acceptance for each system Enforcement Agency Use: Checked by/Date that must demonstrate compliance. Verify measured outside airflow reading is within 10% of the total required outside airflow. Required for all newly installed HVAC Intent: units. Reference MECH-3C (Column H or Column I) or Mechanical Equipment Schedules. A. Construction Inspection Note: MCH-02-A can be performed in conjunction with MCH-07-A Supply Fan VFD Acceptance (if applicable) since testing activities overlap. Supporting documentation needed to perform test includes: As-built and/or design documents (for example, Mechanical Equipment Schedules, Equipment Start-Up Sheets or Balancing Reports). 2013 Building Energy Efficiency Standards Nonresidential Compliance Manual (NA7.5.1.1 Ventilation Systems: Variable Air Systems At-A-Glance and NA 7.5.1.2 Constant Volume Systems Outdoor Air Acceptance At-A-Glance). C. 2013 Building Energy Efficiency Standards. 2. Instrumentation needed to perform test includes: Watch Calibrated means to measure airflow (i.e. hot-wire anemometer, velocity pressure probe, etc.). Method and equipment used:VELOCITY PRESSURE PROBE Equipment calibration date (must be within one year):8/17/2017CAV 3. System type (check either VAV or CAV): VAV CAV a. Check if Variable Air Volume (VAV) and complete the following: Outside airflow is either factory calibrated or field calibrated. El Check if factory calibrated and attach calibration certification. ) Check if field calibrated and attach calibration results. Damper Control (must be checked): Dynamic damper control is being used to control outside air. (This is NOT a fixed minimum position). One of the following dynamic controls is being utilized to control outside air (check method used) ) Outdoor Air CFM Compensation Energy Balance Method Demand Control Ventilation Return Fan Tracking Injection Fan Method LI Dedicated Minimum Ventilation Damper with Pressure Control Other Active Control, Describe: b. Check if Constant Air Volume (CAV) and verify the following: System is designed to provide a fixed minimum OSA when the unit is on. 4. Method of delivering outside air to the unit (check one of the following): Outside air is ducted to the return air plenum. Confirm that outside air is ducted to either (check one of the following): Within five ft. of the unit. LI Within 15 ft. of the unit, with the air directed substantially toward the unit. Return air plenum is NOT used to distribute outside air to the unit. I.e. outside air is ducted directly to the unit or outside air is provided independent of the unit. Pre-occupancy purge has been programmed for the 1-hour period immediately before the building is normally occupied to provide (one of the following methods must be verified and checked): LI The conditioned floor area times the ventilation rate from the 2013 Building Energy Efficiency Standards TABLE 120.1-A, or 15 cfm per person times the expected number of occupants, whichever is less. LI 3 complete air changes to the zone served by the air handler. CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance December 2015 OUTDOOR AIR ACCEPTANCE CEC-NRCA-MCH-02-A (Revised 12/15) (AI 'DKjIA ID(V ,AIQIrK, CERTIFICATE OF ACCEPTANCE N RCA-MCH-02-A Outdoor Air Acceptance (Page 2 of 3) Project Name: 2525 El Camino Real Enforcement Agency: Carlsbad, CA Permit Number: 0343 Project Address: 2525 El Camino Real City: Carlsbad, CA Zip Code: 92008 System Name or Identification/Tag: 1,2 System Location or Area Served: 1,2, LICAV LIVAV Hz SEE REPORT cfm cfm SEE REPORT cfm Cfm mm VAV CAV ting, or 30% of the Hz cfm pment schedules), cfm ed (minutes): - mm El El )/5tep3c) NaN % % Yes ® No Yes 0 No 0 Yes C No ly) (Step4b/Step4C) % - -• Yes 0 NoC YesQ NoC i amount of OSA and 2) VAV air handlers use dynamic tions & Results responses are positive December 2015 OUTDOOR AIR ACCEPTANCE ('.Fr.-C.-MCH-02-A (Revised 12115( $ CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-02-A Outdoor Air Acceptance (Page 3 of 3) Project Name: 2525 El Camino Real Enforcement Agency: Carlsbad, CA Permit Number: 0343 Project Address: 2525 El Camino Real City: Carlsbad, CA Zip Code: 92008 System Name or Identification/Tag: 1,2 System Location or Area Served: 1,2, DOCUMENTATION AUTHORS DECLARATION STATEMENT 1. I certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: John Kwan Documentation Author Signature: John Kwan Documentation Author Company Name: Ai Air Balancing & Duct Testing Date Signed: January 30, 2018 Address. 9040 Telstar Ave. #137 All Certification identification (if applicable). 06-199-01 City/State/Zip: El Monte, CA 91731 phone. 626-274-0522 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: The information provided on this Certificate of Acceptance is true and correct. I am the person who performed the acceptance verification reported on this certificate of Acceptance (Field Technician). The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and signed by the responsible builder/installer and has been posted or made available with issued for the building. .g''_21..' . Field Technician Name: John Kwan Field Technician Signature: John Kwan Field Technician Company Name:J Air Balancing & Duct Testing Position with Company (Title): Tech \ \ Address, 9040 Telstar Ave. #137 AlT Certification identification (if applicable ,/) J City/State/Zip. El Monte, CA 91731 Phone. 626-274-0522 DI 'January RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: JOHN LAU Responsible Acceptance Person Signature: JOHN LAU - Responsible Acceptance Person Company Name: JVN CONSTRUCTION INC Position with Company (Title): Contractor Address. 3669 SAN GABRIEL RIVER PKWAY CSLB License. 856932 City/State/Zip. PICO RIVERA, CA 90660 phone: 626) 383-6819 Date Signed: January 30, 2018 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance December 2015 STATt OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS CEC-NRCA-MCH-03-A (Revised 12)15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and H e a t P u m p S y s t e m s (Page 1 of 3) Project Name: 2525 El Camino Real Enforcement Agency: Carlsbad, CA Permit Number. 0343 Project Address: 2525 El Camino Real City: Carlsbad, CA Zip Code: 92008 System Name or Identification/Tag: System Location or Area Served: 1,2, Note: Submit one Certificate of Acceptance for each system that must Enforcement Agency Use: Checked by/bate demonstrate compliance. A. Construction Inspection 1. Supporting documentation needed to perform test includes, but not limited to: 2013 Building Energy Efficiency Standards Nonresidential Compliance Manual (NA 7.5 .2 Constant Volume, Single-zone, Unitary Air Conditioner and Heat Pumps Systems Acceptance At-A-Glance). 2013 Building Energy Efficiency Standards Manual. 2. Instrumentation to perform test includes, but not limited to: Temperature Meter Amp Meter 3. Installation (check if applies): Thermostat is located within the space-conditioning zone that is served by the HVAC system. 4. Programming (check all those that apply): 71 Thermostat meets the temperature adjustment and dead band requirements of 2013 Bu i l d i n g E n e r g y E f f i c i e n c y S t a n d a r d s Manual section 120.2(b). Minimum heating setpoint: 72 OF. Maximum cooling setpoint 78 OF. Deadband: 6 °F. EZI Occupied, unoccupied, and holiday schedules have been programmed per the facility's schedule. Pre-occupancy purge has been programmed to meet the requirements of 2013 Building Energy E f f i c i e n c y S t a n d a r d s M a n u a l section 120.1(c)2. 1. Check method used to determine pre-occupancy purge: LII Lesser of: conditioned floor area times ventilation rate from 2013 Building Energy Efficie n c y S t a n d a r d s T A B L E 120.1-A or 15cfm per person times the expected number of occupants. EI 3 complete air changes. Notes: CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance December 2015 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS 1FC.-NRCA-MCH-03-A (Revised 12/15) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 2 of 3) Project Name: 2525 El Camino Real Enforcement Agency: Carlsbad, CA Permit Number. 0343 Project Address: 2525 El Camino Real City: Carlsbad, CA Zip Code: 92008 System Name or Identif,cationhlag: 1,2, System Location or Area Served: 1,2, B. Functional Testing Requirements I Operating Modes Step 1: Disable economizer control and demand-controlled ventilation (if applicable) to prevent unexpected interactions. Occupied Mode Step 2: Heating load during occupied condition Step 3: No-load during occupied condition Step 4: Cooling load during occupied condition Unoccupied Mode Step 5: No-load during unoccupied condition - Step 6: Heating load during unoccupied condition Step 7: Cooling load during unoccupied condition Step 8: Manual override 8 7 6 5 4 3 2 Step 2-8: Check and verify the following for each simulation mode required a Supply fan operates continually 'e' - / / / b Supply fan turns off - - / C. Supply fan cycles on and off 77-7 / / r d System reverts to occupied mode to satisfy any condition / - e System turns off when manual override time period expires 1. Gas-fired furnace, heat pump, or electric heater stages on - I / g. No heating is provided by the unit / I I I h No cooling is provided by the unit / / Compressor stages on Outside air damper is open to minimum position / / / / / k Outside air damper closes completely / Step 9: System returned to initial operating conditions after all tests have been completed: Yes ® - No 0 - C. Testing Results 8 7 6 5 4 3 Indicate if Passed (P), Failed (F), or N/A (X), fill in appropriate letter :J P p P P _ TP ] D. Evaluation [ ( PASS: All Construction Inspection responses are complete and all applicable Testing Results responses are "Pass" (P) CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance December 2015 STATE OF CALIFORNIA CONSTANT VOLUME, SINGLE ZONE, UNITARY (PACKAGED AND SPLIT) AIR CONDITIONER AND HEAT PUMP SYSTEMS rR('.AMC.i-i-fl2.A (Puinasd 12/15t CALIFORNIA ENERGY COMMISSION CERTIFICATE OF ACCEPTANCE NRCA-MCH-03-A Constant Volume, Single Zone, Unitary (Packaged and Split) Air Conditioner and Heat Pump Systems (Page 3 of 3) Project Name: 2525 El Camino Real Enforcement Agency: Carlsbad, CA Permit Number. 0343 Project Address: 2525 El Camino Real City: Carlsbad, CA ZIP Code: 92008 System Name or Identification/Tag: 1,2, System Location or Area Served: 1,2, DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. I certify that this Certificate of Acceptance documentation is accurate and complete. Documentation Author Name: John Kwan Documentation Author Signature: John Kwan Documentation Author Company Name: Air Balancing & Duct Testing Date Signed: January 30, 2018 Address: 9040 Telstar Ave. #137 AU Certification Identification (If applicable): 06-199-01 City/State/Zip: El Monte, CA 91731 Phone: 626-274-0522 FIELD TECHNICIAN'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: The information provided on this Certificate of Acceptance is true and correct. I am the person who performed the acceptance verification reported on this Certificate of Acceptance (Field Technician). The construction or installation identified on this Certificate of Acceptance complies with the applicable acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. 4 I have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Cert atefAt.eptnce has been completed and signed by the responsible builder/installer and has been posted or made available wit,t bilding prmit(s) issued for the building. 10/ Field Technician Name: John Kwan Field Technician Signature: I t 474, John Kwan Field Technician Company Name: J Air Balancing & Duct Testing Position with Company (Title): Tech. ' I Address: 9040 Telstar Ave. #137 AU Certification Identification (if / ) City/State/Zip: El Monte CA 91731 Phone 626-274-0522 Dat e' ned' 30 2018' RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: I am the Field Technician, or the Field Technician is acting on my behalf as my employee or my agent and I have reviewed the information provided on this Certificate of Acceptance. I am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Acceptance and attest to the declarations in this statement (responsible acceptance person). The information provided on this Certificate of Acceptance substantiates that the construction or installation identified on this Certificate of Acceptance complies with the acceptance requirements indicated in the plans and specifications approved by the enforcement agency, and conforms to the applicable acceptance requirements and procedures specified in Reference Nonresidential Appendix NA7. I have confirmed that the Certificate(s) of Installation for the construction or installation identified on this Certificate of Acceptance has been completed and is posted or made available with the building permit(s) issued for the building. I will ensure that a completed, signed copy of this Certificate of Acceptance shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Certificate of Acceptance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Acceptance Person Name: JOHN LAU J Responsible Acceptance Person Signature: JOHN LAU Responsible Acceptance Person Company Name: JVN CONSTRUCTION INC Position with company (Title): Contractor Address: 3669 SAN GABRIEL RIVER PKWAY TCSLB License: 856932 City/State/Zip: PICO RIVERA, CA 90660 Phone: 626) 383-6819 Date Signed: January 30, 2018 CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance December 2015 ABBREVIATIONS, DEFIN[T1OS, SYMBOLS & CONVERSIONS Pound u:. unit number ABS Absolute AC AiiConuoiior or Ar Hardting (-ml ACCU .nr-Coce.r Connsnsg Unit ACGiH Ainencair Confcrerrer; of ovcn1a: H. c:u5O AC] Actual ADP: Apparatus Dcw Point A.EE; AssociaLlori of Energy Engineers ATE: Association for Facility Engineering Al-IC: Air Handling Unit AK: Free Area Factor ALT. Altitude .AMB: Ambient AMP: Ampere ANSI; American National Standards Institute A-Scale or i)bA); A filtering svetem whrch roughly matches tire response charnctertsucs of the human ear AS}-IR.A.E; Arnencan Society of -leaura. Air Conoruorrtrr: and kelngeraLon. Eng;neers ASTM; American Sor;tet for Testing and Marenais ATM; Atmosphere .AVG: Average AZ: Azimuth B; Boiler BHP; Brake Horseçowcr BP: Boiling Point. BSC; Building Sysrarnu Coramissrorring BTU; British Thermal Unit BTUH: British Thermal Unit oar Hour C to C; Center to Center C: Celsius CA y; Constant Air Volume CC: Cooling Coil COW: Counter-Clockwise CD: Ceiling Diffisuer CEG: Ceiling Exbaitst Grill CER: Ceiling Exhaust Register CFM: Cubic Feet per Minute CH; Chiller CHW or CHWS Chihico Water Suppi:. CH\VR: Chiller Water Return CMD: Count Mean Diacoene: C?: Specific Heat aLer . .0 ETU/ lb per F, iii :0.24 BTU lb per :p CPT; Capactry Perforrna'rce Tasting (.Bwicrtr Cornnussrcniun. CF-: Ceiling l-tegrs:er CPR. Ceiling Return Register CT: Cooling Tower CU: Condensing Unit CUll: Cabinet Urn Heater CV: Specific Hear at Constant Volume CV; Valve Constant (2W or CWS; Condenser Water Supply CW; Chilled \Vatet C\VR: Condenser W2,LeV Return DAT; Discharge Air Temperature DB; Dry Bulb Do; Decibel DC: Direct Current DD: Direct Drive Delia (5): DiLiererrce or Ne Change DIA; Diarnate: DNL Data No: L:stei DOP; Dio-my: [lriha!ate, ar eurosni gcner::eo b ucirns a:r durugfl u.urn l)COt'l Pnilraiaie mean panucle drairreter s betneen 0.2 aria G. rruclorri Differential Pressure or Pressure Drop, net ir. Pressure DPT; Dew Point Temperature DST[) Standanil Air Dei.:itv. jjli 0.075 lb /-"u. F. i) 2F' 92 fl. ABBREVIAIOcS. DEFINITIONS, SYMBOLS 6., CONVERSIONS Difieretu:a I emoer1.ue. :0: chnc liD llc;rj:.tj .):s: ::a:C. FtiICin.i A.:: BC. Lvaporau c cOoticm1Cer Allows air ii rdkr iC U.: CU: 000! 0LSi0C iii Or C u2CCC 1.: :u0rurrg ole C0oltC5S0t (or rite .:0oltrtr. —;-DC Electric Duct Coil EDH. Electnc Duet Ranter EER: Energy Efficiency Ratio EF or E. Exhaust Fan EFF: Efficiency EG: Exhaust Grill EMCS: Energy Managetnem Control System EMF: Electromotive Force ENT: Entering Air lemperaaLre EP: Eleciro-Pneuinauc Switches ER Exhaust Register ESP: External Static Pressure EWT: Entering Water Temperature F to F: Face to Face PAP Forced Air Uait FCU: Fan Coil Unit FDA. Food and Drug Aorrumrirauon FG: Floor Grille P7-I: Flow Hood Itiessutet Cl-7r.l diructh so FPI'l oil AK Firtors ate itO( rmtqUtied) FIV: Field Installation Verification (Building Comnirussiotting) FLA: FuJi Load Amperage FP: Freezing Point FPB: Fan Powered Box FPM: Feet per Mimmie FPS: Feet per Second FPT: Functional Performance Testing (Building (:oranstssioning) ER Floor Register FtU: Fan Terminal DuE G or g: Gravitational Constant GA Gauge GC General Contractor GPH Gallons Per Hour GPM Gallons per Minute GR Grain, measurement c actual moisture mu at; ijr sample. 7000 grainu r one pouud of water GSP: Geonreuic Standard Deviauon H: EnWalpy H20: Water HC: Reams Coil HD: Head Pressure measured in feet of water Heater OL: Thermal Overload protection. for motor:; located a; time note: natte: l-IEPA Filter: Ptgb EtlJc.;eo:y Partic:uiate Air Fil;r Hg: Mercur, HOA Hand/Off/Am 1;00 HP: Horse Power or Hen; ?ump tiPS. High Prtmssm.ir: Strain RRC: Hear. Recovery Coil or Heat Reclaim Coil HV: Heating Ventilator UVAC: Heaung, Venmilauon & Air Conditioning I-FW or FITH'W Hot Water or High Temperature Hot Water HWR Hot Water Return or Healing Water Return HWS Hot Water Supply or Heating Water Supply HX Heat Exchanger Hydroruc: Perr.ainiitg to water & glyco; I inhibitor ihunnal transfer systerri Hz: Hertz LD. inside Diameter 110: Input/Output ID: Impeller Diameter (pump) IES: InstUtute. of Environmental Sciences IV: inlet Valve K: Kelvin (absolute ee:p-er.;tu rz). Edit;; ABBREVIAT[ONS DEF[NIT!ONS. SYMBOLS s CON VERSIONS LAl Leaving .Atr LI): Lnear Diffuser LIZ. Linear Foot IFS: Low Pressuru Sitcom ITS: Liters per Secono LTD: Least Temp. I)iiferee:r LTH'tV: Low Temp Hot Water LVG: Leaving Air Temperature LWG: Low Wall Grille LWR: Low Wall Register LWT: Leaving Water Temperature MAU or MUA: Make-Up Air Unit or MakeUp Air MAX: Maxunum MB: Mixing Box MBH: 1000 BTU per Hour MET Mean Effective Temp Micron: lOx 10-6 meter Mi!: 2.54 x 10-5 meter MIN: Minimum MMD: Mass Mean Diameter MTD: Mean Temp Deretne MVD: Manual \Oiiittit Sian 512: Mulazone Not applicable; Hc A:ccss NASA: National Aeronanucs ind Space AdrniarsuaO:i NC: Noise Criteria or Normally Closed NEBB: National Environmental Balancing Bureau NIC: Not in Contract NM: Not measured NO: Normally Open NPFC: Naval Publications and Forms Center NPSHA: Net Positive Suction 1-lead Available NS: Not specified NSF: National Sanitation Foundation NTIS: National Technical Inlbrruauoo Service NTS: Not to Scale NVL: No Valid Location Octave Band, a range f frequency where the highest frequency of the band is double the lowest frequency or we band ftc band is usually specified by ore Centet frequency. The preferred octave bands are de512051e5 DY die foilowrng center frequencies: ";;.5. 63. .25, 250. 500. 1000. 2000. 4000. 8001;. 5000 Outside Diameter OAT: Outside .-\.rs lemj:.erairr; Degrees Fahz;ridiett OPT: Operational l'erfonnaicr [citing i l3wldui Coinnussionros) OSA or OA: Outside Air P.E. Professional Engineer P: Power Pa: Pascal, 1 Pascal = 6.894 x 10-3 psi PCT: Percent PD: Pressure Drop PE: Pneumatic Electric Switch PF: Power Factor PH: Phase PHC: PreHeat Coil PNC: Preferred Noise Critenori Curves PPM: Parts per Million PSI: Pounds per Square Inch PS Lk Pounds per Square loch Absolute PSIG: Pounds per Square Inert Gauge I'S L: Polystyrene Latex Sphrrc.s, used to generate ii rerosci :r.alienge medrem where lectroni.: . semondu:tyr ornouco are manufaclu red. Rankine(absolute rerr:perawrel. Rankint = S Ii: Thermal Resistance ABI3REVLATIONS, DEFENIT[ONS. SYMBOLS & CONVERSIONS Return Ar Retori: -Vt femrr:r:,Lr FEC Rcorn Cr: tenon r REQ. Reuuirer RE Return Air Len Rh: Relative Humidity Ri-iC: Reheat Coil RPM; Revolutions per Minute RTU Roof Top Unit S: Entropy SA: Supply An Suppl Art Register SAT.: Supply Art Temperature SAT.: Saturation SD: Smoke Detector or Smoke Damper SEER; Season Energy Efficient Ratio SEE: Smoke Exhaust Fan SF (Motor: Factor by which rcral amps cur :ce1 :;re1 airr:erirrr. it trw uxoense .r( txpecied (e, pan SF Supply Fan SHC Steam Heung Cr-I SMACNA. Sheet Metal ard A:: Ccn urtrrinrCnrr.r;rc:cri y:ru:na ASSOC;3EOn SF VOL.: Specific Volume SE Set Fatal or Smut. Pressure SPF: Stairwell Pressurization Fan SQ: Square STD: Standard SWG: Sidewall Grille SWR. Sidewall Register SWR: Side Wall Return SWS Side Wall Supply I STAT: ThermosLat IkE.: Testing, Adjusting and Balancing ID: Temperature Difference TDH: Total Dynamic Head or Total Dead Head (pressure differential when flow equals zero) Throw: Distance an airstream travels after leaving an air outlet before the air stream velocity is reduced to approxinastely 50 fpm. Ton(AirCond): Equals 12.000 BTLT per hour TPrMotor): Thermally Protected lopens motor crrcu:u if rated amos are excecaeo) traverse Furor. 1 tsr POini or T aral Presser: TSP: Total Steno Pressure LH: Unit Hearer ULPr Filter. Ukra tow Peneterruort ,'ar Filter ER: Unit Ventilator V; Volt or Voltage VA: Volt Ampere Vacuum VA Variable Air \:oiutne VD: Volume Damper VFD: Variable Frequency Drive (aumumau'r motor spoad controller) VP Velocity Pressure Watts WB: Wet Bulb WO; Water Gauge WT: Weight \rfR; Water 2: Zone Zorrirr: The pracuce of dividing a building nrc rrr:O eccuons for :auot and cooilrtg control. selected so hat one inersr:oslar can he used ta each 5ecu3ir S nearing & Coln;rc recnrt:rcrnOcls ii1t'i iiitic to perform HVAC commercial system balancing up to 25 tons, according to NO practical standards and procedures. (crtified Since October 11) 2006 a' idrt'unmeied and recognized by intIinI CCFMtk7rt Int, Rob Falke President ( / - [er t iii e Air Balancer I Coil II; O6-19l-01 I ltD (1 ifi1,61llflh1MTiiiIi! 111l UI1tJt U. J O HN K"VV- A A- 1 Has successtnUy compieed the required training and passed , 4;\ //• ' the written exam by the v4e fçJ (I Cic2DJ7 -O393 ELISE ROTHSCHILD O o Ufl t ) Of 6an aiego AMY HARBERT Director RECEIVED DEPARTMENT OF ENVIRONMENTAL HEALTH Assistant Director FOOD AND HOUSING DIVISION JUL 2 1 2017 P.O. BOX 129261, SAN DIEGO, CA 92112-9261 Phone: (858) 505-6659 FAX: (858) 505-6824 1(800) 253-9933 Guy OF CARLSBAD www.sdedeh.org BUILDING DMSION PLAN APPROVAL SHEET DBA: Great Khans DATE: 6/28/17 SITE: 2525 El Camino Real #264 Carlsbad 92008 PC #: FFPP-008253 BUSINESS OWNER: Allen Kim Plans are approved contingent upon the following: Department of Environmental Health (DEH) stamped plans shall be maintained at the jobsiti available for review at the time of the inspection Changes to equipment layout, menu, or application must be submitted for approval. Changes made without approval will make the plan approval null and void. ) Obtain local Building Department and all applicable agencies permits and approvals PRIOR TO FINAL1 INSPECTION AND APPROVAL TO OPERATE BY THIS DEPARTMENT 4) All food and utensil-related equipment shall be certified to applicable sanitation standards by an ANSI accredited testing agency. 5) Upon completion of 60%-80% of construction, call (858) 505-6660 to schedule a preliminary inspection. In lieu of a plumbing inspection by DEH: Floor sinks shall be installed ¼ exposed and equipped with an appropriate grill cover if no access is provided for cleaning. Drain lines shall slope ¼" per foot to gravity, shall not exceed 15' in length and shall terminate a minimum of 1" above the floor sink with a legal air gap. Drain lines shall not intersect walkways or door ways. C. No condensate drainage of any kind, including HVAC can drain to the mop sink. The entire floor surface must be sloped to the floor drains approximately 1/8 inch per foot or a four feet diameter depression that slopes 1:50 (approximately ¼ inch per foot). Conduits of all types shall be installed within walls as practicable. When otherwise installed, they shall be mounted or enclosed in a chase so as to facilitate cleaning. 6) Owners and/or operators must pass an approved and accredited Food Safety Certification course. Proof of successful completion of this course is to be furnished at the final inspection. 7) At the time when the final inspection is requested, the facility shall have all utilities operational and all refrigeration shall have an ambient air temperature of 38F or below and shall be equipped with a thermometer accurate to +1- 2F in the warmest section of the unit. All equipment is to be in place and functional. 8) Seal all cracks, gaps and crevices in counters, cabinets, around metal flashing, sink backsplashes, around pipes and conduits with silicone sealant. Plans reviewed by Nathan Griffiths, REHS @ 858-505-6660 Chris Cardwell, EHT @ (858) 505-6660 CALL (858) 505-6660 AT LEAST 10 WORKING DAYS IN ADVANCE TO SCHEDULE PRELIMINARY AND FINAL INSPECTIONS. A FINAL INSPECTION SHALL BE CONDUCTED AND AN ENVIRONMENTAL HEALTH PERMIT SHALL BE ISSUED PRIOR TO OPENING AND OPERATING THIS FOOD ESTABLISHMENT. cc: File "Environmental and public health through leadership, partnership and science" SAN DIEGO REGIONAL OFFICE USE ONLY HAZARDOUS MATERIALS RECORD ID # PLAN CHECK #___________________ OCCC QUESTIONNAIRE BP DATE / I Business Name Business Contact Telephone # 6 P.a4-r kzRA0 Project Address City State Zip Code APN# 232.S & , v , 6J..s4f C4 c Mailing Address City State Zip Code Plan File# Project Contact Applicant E-mail Telephone # )&IJ,A) -? fri / IJOkCPvIvhO II-t .tc'M t 7 I\ co- RO ht The following questions represent the facility's activities, NOT the specific-proje-6t description. nur' ijr-,ir I ivuii I - n,i.pr,J',Ju uyu,i I F-FNIML.0 IJIVII%JI1. Ur,'rl I %..L. dicate by circling the item, whether your business will use, process, or store any materials. It any of the items are must contact the Fire Protection Agency with jurisdiction prior to plan submittal. Occupancy Rating: Facility's Square Footage (including proposed project): Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These, Flammable Solids 8. Unstable Reactives 12. Radioactives questions is yes, applicant must contact the County ot San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 110, 5 Call (858) 505-6700 prior to the issuance of a building permit. FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: YES 0 NO L" (for new construction or remodeling projects) 0 E' Is your business listed on the reverse side of this form? (check all that apply). Will your business dispose of Hazardous Substances or Medical Waste in any amount? 0 L!1' Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500 pounds and/or 200 cubic feet? 0 EFI Will your business store or handle carcinogens/reproductive toxins in any quantity? 0 E Will your business use an existing or install an underground storage tank? 0 Will your business store or handle Regulated Substances (CalARP)? 0 E!3' Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? 0 LU' Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act). If the answer to any of the Diego, CA 92123. 0 CalARP Exempt Date Initials El CalARP Required Date Initials El CalARP Complete Date Initials PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (APCD): Any YES* answer requires a stamp from APCD 10124 Old Grove Road, San Diego, CA 92131 apcdcompsdcounty.ca.gov (858) 586-2650). [*No stamp required if Qi Yes and Q3 Yes and Q4-Q6 No]. The following questions are intended to identify the majority of air pollution issues at the planning stage. Projects may require additional measures not identified by these questions. For comprehensive requirements contact APCD. Residences are typically exempt, except - those with more than one building* on the property; single buildings with more than four dwelling units; townhomes; condos; mixed-commercial use; deliberate burns; residences forming part of a larger project. [Excludes garages & small outbuildings.] YES NO 0 Will the project disturb 160 square feet or more of existing building materials? 0Et Will any load supporting structural members be removed? Notification may be required 10 working days prior to commencing demolition. 0 0 (ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by a Certified Asbestos Consultant or Site Surveillance Technician? 0 0 (ANSWER ONLY IF QUESTION 3 IS YES) Based on the survey results, will the project disturb any asbestos containing material? Notification may be required 10 working days prior to commencing asbestos removal. 0 t( Will the project or associated construction equipment emit air contaminants? See the reverse side of this form or APCD factsheet (www.sdaocd.org/info/facts/oermits.pdf) for typical equipment requiring an APCD permit. 0 0 (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school boundary Briefly describe business activities: Briefly describe proposed project: 04Au24AJr (A') I declare under penalty of perjury that to the best of my knowledge and belief tHe r onses mad herein are true and correct. &-4 fr1 6 / I I7 Name of Owner or Authorized Agent Sign ure of Owner or Authorized Agent Date FOR OFFICAL USE ONLY: FIRE DEPARTMENT OCCUPANCY CLASSIFICATION:____________________________________________________________________ BY: DATE: I I EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTYHMD* APCD COUNTY-HMD APCD COUNTY-HMI) APCD A stamp in this box oniv exempts businesses tram completing or updating a Hazardous Materials Business Plan. Other permitting requirements may still apply HM-9171 (08/15) County of San Diego - DEH - Hazardous Materials Division nCENONA Date 'i - - Business Name 6EA-r KHqU Street Address?S L. ICAMI k Email Address PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS) Check all below that are present at your facility: Acid Cleaning Ink Manufacturing Nutritional Supplement/ Assembly Laboratory Vitamin Manufacturing Automotive Repair Machining I Milling Painting I Finishing Battery Manufacturing Manufacturing Paint Manufacturing Biofuel Manufacturing Membrane Manufacturing Personal Care Products Biotech Laboratory (i.e. water filter membranes) Manufacturing Bulk Chemical Storage Metal Casting / Forming Pesticide Manufacturing I Car Wash Metal Fabrication Packaging Chemical Manufacturing Metal Finishing Pharmaceutical Manufacturing Chemical Purification Electroplating (including precursors) Dry Cleaning Electroless plating Porcelain Enameling Electrical Component Anodizing Power Generation Manufacturing Coating (i.e. phosphating) Print Shop Fertilizer Manufacturing Chemical Etching I Milling Research and Development Film /X-ray Processing Printed Circuit Board Rubber Manufacturing Food Processing Manufacturing Semiconductor Manufacturing Glass Manufacturing Metal Powders Forming Soap/ Detergent Manufacturing Industrial Laundry Waste Treatment! Storage SIC Code(s) (if known): Brief description of business activities (Production! Manufacturing Operations):_______________ IE~7AUP,4#) 7 Description of operations generating wastewater (discharged to sewer, hauled or evaporated): Estimated volume of industrial wastewater to be discharged (gal /day): List hazardous wastes generated (type / volume): Date operation began/or will begin at this location: Have you apØJ for a Wastewater Discharge Permit from the Encina Wastewater Authority? Yes (,) If yes, when: Site Contact 's4V,'lJ WM, Title Signature Phone No. O5 ENCINA WJTWATER AUTHORITY, 6200 Avenida Encinas Carlsbad, CA 92011 (760) 438-3941 FAX: (760) 476-9852 INDUSTRIAL WASTEWATER DISCHARGE PERMIT II rcIuIAYA '4 <7 ity of Carlsbad Print Date: 04/16/2018 Permit No: PREV2017-0308 Job Address: 2525 El Camino Real, 262 Permit Type: BLDG-Permit Revision Work Class: Residential PermitRevisi Status: Closed - Finaled Parcel No: 1563022700 Lot #: Applied: 12/26/2017 Valuation: $0.00 Reference #: Issued: 01/12/2018 Occupancy Group: Construction Type Permit 04/16/2018 Finaled: # Dwelling Units: Bathrooms: Inspector: MCoIl Bedrooms: Orig. Plan Check #: CBC2017-0343 Final Plan Check #: Inspection: Project Title: Description: GREAT KHANS: MCHANICAL HOOD DRAWINGS AND CALCULATIONS Applicant: Owner: KEVIN KIM R P I CARLSBAD LP 1114 Avenue Of The Americas, Floor 45 213-503-8018 New York, NY 10036-7700 214-660-5232 x215232 FEE AMOUNT MANUAL BUILDING PLAN CHECK FEE $112.50 Total Fees: $ 112.50 Total Payments To Date : $ 112.50 Balance Due: $0.00 Building Division 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov PLAN CHECK REVISION OR Development Services TCity of- DEFERRED SUBMITTAL Building Division Caiisba'a APPLICATION. 1635 Faraday Avenue 760-602-2719 B-I 5 www.carlsbadca.gov Original Plan Check Number _C& ° /9 - 03 Y3 Plan Revision Number PQ FVQ Di 7 Project Address 2--cel A?e/ 'f- 2,-6 2_ General Scope of Revision/Deferred Submittal: / 'C(' CONTACT INFORMATION: Name ,4// Phone Yf''_d2- _0/SY F Address /9'&S City Zip Email Address &,qM7,19 Original plans prepared by an archit; 'Calculations engineer, revisions must be signed & stamped by that person. ' 1 . Elements revised: Plans LI Soils F1 Energy Eli Other 2. Describe revisions in detail 3. List page(s) where each revision is shown /14/ i/eev o 1 i97 Does this revision, in any way, alter the exterior of the project? LII Yes ~SrNo Does this revision add ANY new floor area(s)? LI Yes i.Jo Does this revision affect any fire related issues? LI Yes No Is this a complete set? Eli Yes iNo Signature Date 1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602- 2719 Fax: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov A EsGil A SAFEbuittcornparly DATE: 1/8/2018 JURISDICTION: Carlsbad I APPLICANT ___-J URIS. PLAN CHECK #.: CBC2017-0343.rev SET: I PROJECT ADDRESS: 2525 El Camino Real #262 PROJECT NAME: Great Khan's, Revision The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contactea_g Telephone #: Date contacted: ) Email: Mail Telephone Fax In Person REMARKS: By: Jason Pasiut Enclosures: EsGil 12/29/2017 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 --.Carlsbad CBC2017-0343.rev 1/8/2018 [DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK #.: CBC2017-0343.rev PREPARED BY: Jason Pasiut DATE: 1/8/2018 BUILDING ADDRESS: 2525 El Camino Real #262 BUILDING OCCUPANCY: A-2 BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code I I #N/A Bldg. Permit Fee by Ordinance V Plan Check Fee by Ordinance I $112.501 Type of Review: Liii Complete Review Li Structural Only Li Repetitive Fee Repeats * Based on hourly rate El Other Hourly I Hr.@* EsGil Fee $90.00 I $90.00I Comments: Sheet 1 of 1 Address: 2525 El Camino Real Space #262 Carlsbad, CA 92008 Great Khan CITY OF CARLSBAD BUILDING DIVISION 0/6 Project: Naentankless P17-0109 RECEIVED DEC 2. 217 December, 2017 Hood support - Lee & Lee Structural Engineering Inc. T) 213-351-0034 Consulting Structural Engineers F) 213-368-0034 3550 Wilshire Blvd., Suite 480 E-mail) sylee@leenlee.net Los Angeles, CA 90010 mail@leenlee.net Site Class D Site Specific Spectral Acceleration Max.S, S1 provided from USGS Site Coefficients S (O.2sec) 1.114 g F,, 1.0 S1 (1.Osec) 0.429 g F 1.5 Ajusted MCE spectral response acceleration SMS = FS 1.114 SMI FS1 0.644 Design Spectral Response Acceleration Parameters S05 = 2/3S ms 0.743 S01 = 2135M1 0.429 Seismic design force The concentrated force applied at = = 179.43 1.6S05lW = 897.14 > 0.3Sl,W, = 168.21 OM where, F 0.24 W,, Seismic design force SDS = 0.743 spectral acceleration a = 1.0 component amplification factor I, = 1.0 component importance factor W,, = 755 lb component operating weight R = 2.5 component response modification factor h = 14.0 average roof height z = 7.0 height in structure point of attachement For Allowable Stress Design VSE =O.7'F pa .1 E7-1Section T SCE7 Table 1t4-1 1ASCE 740, Table 11.4-2 'ASCE7-lO EQ 11.4-1 1/6 Design Criteria Lee & Lee Structural Engineering Inc. Building Code CBC 2016 Project Address 2525 El Camino Real Space #262 Carlsbad, CA 92008 Latitude 33.1782 Longitud -117.3328 Decimal Project Type Commercial Seismic Force Resisting System Design Criteria 2/6 Design Load (Seismic Load) Lee& Lee Structural Engineering Inc. Design Maps Summary Report Page 1 of 2 IJSGS Design Maps Summary Report User—Specified Input Report Title Great Khan Thu July 20 2017 17:28:52 UTC Building Code Reference Document ASCE 7-10 Standard (which utilizes USGS hazard data available In 2008) Site Coordinates 33. 1782°N, 117.3328°W Site Soil Classification Site Class D — "Stiff Soil" Risk Category 1/11/111 ji . .. 8 ..P '• ' ' :. - - ,, . k 0eansi .- 1.4 - 's-__ • '.'•"'--- arlsk.1d' \ Sn Mdrcu - , •_j, USGS—Provided Output S= 1.1149 S= 1.174g S,,= 0.783g S1 = 0.429 9 S.,. = 0.673 9 S. = 0.449 g For information on how the SS and Si values above have been calculated from probabilistic (risk-targeted) and deterministic ground motions In the direction of maximum horizontal response, please return to the application and select the "2009 NEIIRP" building code reference document. MCEuRcopGfl8a Spectrum 0GsiijG Ruspaviuc Spbctiwn Ii r (aec) P'.id. I (see) For PGA.,, T, C,, and CO3 values, please view the detailed report. https://earthquake.usgs.gov/cn2/designmaps/us/surnmary.php?template=minimal&latjtude.., 7/20/2017 Lateral Load 3/6 Hood Lee & Lee Structural Engineering Inc. -'r -i Design Occupancy Category II Seismic Design Category D 1:U.L121 = 1 SDS 0.7427 hr Hood Height = . 8. ft h Roof height = 14 ft The tension force applied at every 4 places The lateral supports applied at every 1; places Calculation Coefficients a,, = 1.0 7-10, Table 13.51J R,, = 2.5 Weight of the hood WC& 563 psf Gravity design forces The tension force applied at every T=W 0/p!aces = •[sWL1 lb Lateral design forces The lateral supports applied at every Fpa -0.4a,,S0sI(1+2z/h)W/R = 143.36 IN 1 places < 1.6S!W,. = 668.99 lb/ft j).13.3.21 > 0.3SI,W,, = 125.44 lb/ft [EQ.13.3.J where W, = 563 lb/ 1 places F,, = 143.36 lb/ 1 places Brace tension force TL = Fpa /cos45 = ('WLI IN 1 places Compression force C =0.2SDs W,, = 1I'I.1 IN 4 places O12.14..g Tension wire Length L = 6.00 ft Use 12GA Wire 0.1254) A = 001231 in2 FY = 33000 psi Ta,, = 0.6*F*A = 242.95 lb > T Round tube for compression Length L = 6 ft Use 3/84) Pipe Area A = 0.23 in2 / = 1 0.0161 in S = 003881 in radius of gyration r = , 0.264 1 in E = 3E+07 psi FY = 36000 psi From Part VII, Design Aids, Table 2-21 Slenderness kL/r = 272.73 Slenderness limit 4.71(E/F) It2 = 133.68 The allowable stress is = (0.658'")F = psi kL/r < Fcr = 0.877F e = 3374.7 psi kL/r > F0 = rr 2E/(KL/r)2 3848 psi Allowable axial force F. =F 0A = 776.19 lb > C From Table 1-14, Pipe From Table 1-14, Pipe From Table 1-14, Pipe From Table 1-14, Pipe 4.71(E/F) 1/2 4.71(E/F) 1,2 4/6 Suspended Ceiling Design Cont. - - . •r-,-----. -. Brace for lateral Length L = 8.49 ft Use 2-12GA Wire 0.1254) A = 0.0123 in F y = 33000 psi Ta11 = 2*0.6*F*A = 485.89 lb > T Anchorage Use 1500 0.1454) 1 1/4 mm. embed [ESR-i 799, LARR 22668 T811 = 159 lb 2000ps1 NWC L.:_._:__•• Va11 = 265 lb Use 1500 0.145(o for 1/4 A36 Steel T011 = 181 lb V a11 = 273 lb Use S0C125 0.1454) 11/8 mm. embed for steel deck Ta11 = 94 lb Steel Deck w/ 3000ps1 V att = 106 lb Lower Flute Use #8-18 screw for 20GA cold-formed steel 25678 268 lb Use 3/4° Lag screw for 2xwood Tat1 = 513 lb V,, = 830 lb parallel to grain Vper 450 lb perpendicular to grain Adjusted value V45 = 515 lb 5/6 Hood Lee & Lee Structural Engineering Inc. Design Occupancy Category Seismic Design Category D SDS 07427 h r Hood Height = 8 ft h Roof height = 14. ft The tension force applied at every 4 places The lateral supports applied at every ._ I places Calculation Coefficients a9 = 1.0 = 2.5 Weight of the hood W = 212 psf ii-io, Sec 13.5.8.1 Gravity design forces The tension force applied at every T='W/pIaces = *I lb Lateral design forces The lateral supports applied at every F, 0.4a9SI9(1+2ilh)W9/R9 lTi3.3-1} = 53.981 IN 1 places < 1.6S s I pWp = 251.91 lb/ft [EQ. 13i] > 0.3S,,,I,,W9 = 47.234 lb/ft {.133-3J where W, = 212 lb/ 1 places F = 53.981 IN 1 places Brace tension force T L = F pa /c0s45 = IBM IN 1 places Compression force C=0.2S W9 = I:*I IN 4 places Tension wire Length L = 6.00 ft Use 12GA Wire 0.1254) A = 0.0123 in F = 33000, psi aII = O.6*F*A = 242.95 lb > T Round tube for compression Length L = 6 ft Use 3/84) Pipe Area A = 0.2' in / = 0.016i in S = 0.0388 in3 radius of gyration r = 0,2641 in E = 3E+07 psi F = Loos psi From Part VII, Design Aids, Table 2-21 Slenderness kL/r = 272.73 Slenderness limit 4.71(E.'r) = 133.68 The allowable stress is Fcr = (O.658")F = psi kL/r < F, = 0.877F 0 = 3374.7 psi kL/r > Fe = Jr2 E/(KUr)2 = 3848 psi Allowable axial force F8 =F *A = 776.19 lb > C From Table 1-14, Pipe From Table 1-14, Pipe From Table 1-14, Pipe From Table 1-14, Pipe 4.71(E/F) ia 4.71(E(F)1'2 6/6 Suspended Ceiling Design Cont. Brace for lateral Length L = 8.49 ft Use 2-12GA Wire 0.1254> A = 0.0123 in' F = 33000 psi Tali = 2*0.6*F*A = 485.89 lb > T Anchorage Use 1500 0.1454> 1 1/4 mm. embed Tali = 159 lb 2000psi NWC V a!! = 265 lb Use 1500 0.1454> for 1/4 A36 Steel Tali = 181 lb V 8!! = 273 lb Use S0C125 0.1454> 1 1/8 mm. embed for steel deck Tali = 94 lb Steel Deck w/ 3000psi Vau = 106 lb Lower Flute Use #8-18 screw for 20GA cold formed steel 12196 T671 Va!! = 268 lb Use 3/4 Lag screw for 2xwood Tali = 513 lb V,1 = 830 lb parallel to grain V,, = 450 lb perpendicular to grain Adjusted value V 45 = 515 lb (rat y of Carlsbad Print Date: 04/16/2018 Permit No: PREV2017-0261 Job Address: 2525 El Camino Real, 262 Permit Type: BLDG-Permit Revision Work Class: Residential Permit Revisi Status: Closed - Finaled Parcel No: 1563022700 Lot #: Applied: 11/07/2017 Valuation: $ 0.00 Reference #: Issued: 12/26/2017 Occupancy Group: Construction Type Permit 04/16/2018 Finaled: U Dwelling Units: Bathrooms: Inspector: Bedrooms: Orig. Plan Check # CBC2017-0343 Final Plan Check #: Inspection: Project Title: Description: GREAT KHAN'S: ARCHITECTURAL CHANGES - DOORS & COUNTERS II ELEC/ PLUM CHANGES Applicant: Owner: KEVIN KIM R P I CARLSBAD LP 1114 Avenue Of The Americas, Floor 45 213-503-8018 New York, NY 10036-7700 214-660-5232 x215232 FEE AMOUNT MANUAL BUILDING PLAN CHECK FEE $225.00 Total Fees: $ 225.00 Total Payments To Date : $ 225.00 Balance Due: $0.00 Building Division 1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov PLAN CHECK REVISION OR Development Services City Of DEFERRED SUBMITTAL Building Division C ai lsbad APPLICATION 1635FaradayAvenue 760-602-2719 B-I 5 Original Plan Check Number &M ZC'ji - O343 Plan Revision Number PRE.Y2.Oi7 2 ( Project Address 2525 EL CAlvt//IO k4L #26'2. At5,4D 1260 General Scope of Revision/Deferred Submittal: CONTACT INFORMATION: Name FVIAJ '/P1 Phone (Z)3)503-0)8 F Address_2g2,I I'1IiL ?L'.Jb City 2PSAJ7,4 Zip_1 t14 Email Address 1JVV0 ,TU1W 011J6,49M Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person. 1 . Elements revised: Plans Calculations Soils LI Energy Lii Other 2. Describe revisions in detail 3. List page(s) where each revision is shown i) i'iiu. cinrn&, t) PLMPM i-a iWivi&J6i A z 2. /JJAIL A)EY'T TO &/OI'lPjt) TJ'/'1 z) 4PDJT/oA) j)/i1uAL AT 7'/EJUS 7Jc7 ' p o,Rb 4E)LifiJ6 /ç JiJftA4A A31 EL IALOM oa 9&MdV9D j,-tg jiWi,kJ JaJ 4 ,A. L) TWA) iA AN D An () WAtL rwJ iai &DwHkH PREP TAL Does this revision, in any way, alter the exterior of the project? Yes qf No Does this revision add ANY new floor area(s)? Yes No Does this revision affect any fire related issues? Yes No Is this a complete set? Yes I1'No (ko 6NM6 OA) U)c AL 49M/Ct. Signature Date 11)1/17 1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602- 27 19 Fax: 760-602-8558 Email: building@carlsbadca.gov www.carlsbadca.gov EsGil A SAFEbuittCompany DATE: 12/11/2017 LI APPLICANT URIS. JURISDICTION: Carlsbad PLAN CHECK #.: CBC2017-0343.rev SET: II PROJECT ADDRESS: 2525 El Camino Real #262 PROJECT NAME: Great Khan's Revision LI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant -' contact person. The applicant's copy of the check list has been sent to: EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted:. Telephone #: Date contacted: Email: Mail Telephone Fax In-Person REMARKS: PREV CBC20I7-0261. City staff please have applicant transfer red clouded clarification on sheet A2.2 to the approved City II set prior to permit. By: Jason Pasiut Enclosures: EsGil 12/7/2017 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax(858)560-1576 EsGil A SAFEbudf Company DATE: 11/14/2017 IJ APPLICANT ,Z JURIS. JURISDICTION: Carlsbad PLAN CHECK #.: CBC2017-0343.rev SET: I PROJECT ADDRESS: 2525 El Camino Real #262 PROJECT NAME: Great Khan's Revision The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. LI The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at EsGil until corrected plans are submitted for recheck. LI The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Kevin Kim LI EsGil staff did not advise the applicant that the plan check has been completed. EsGil staff did advise the applicant that the plan check has been completed. Person contacted: Kevin Kim Telephone #: 213-503-8018 Date contacted: lt tiLl In (by:-9) Email: info@cpstudioinc.c0r14-2) , Fax In Person REMARKS: WG2O 17..026 By: Jason Pasiut Enclosures: EsGil 11/9/2017 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK #.: CBC2017-0343.rev JURISDICTION: Carlsbad OCCUPANCY: A-2 USE: Restaurant TYPE OF CONSTRUCTION: IT-B ACTUAL AREA: 2,494 s.f. ALLOWABLE FLOOR AREA: within STORIES: 1 HEIGHT: unchanged SPRINKLERS?: YES REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 11/6/2017 DATE INITIAL PLAN REVIEW COMPLETED: 11/14/2017 OCCUPANT LOAD: 86 DATE PLANS RECEIVED BY ESGIL CORPORATION: 11/9/2017 PLAN REVIEWER: Jason Pasiut FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the California version of the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 2016 CBC, which adopts the 2015 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2015 International Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section, etc. Be sure to enclose the marked up list when you submit the revised plans. [DO NOT PAY- THIS IS NOTAN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK #.: CBC2017-0343.rev PREPARED BY: Jason Pasiut DATE: 11/14/2017 BUILDING ADDRESS: 2525 El Camino Real #262 BUILDING OCCUPANCY: A-2 BUILDING PORTION AREA (Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Air Conditioning Fire Sprinklers TOTAL VALUE Jurisdiction Code *N/A Bldg. Permit Fee by Ordinance V Plan Check Fee by Ordinance I $225.00I Type of Review: LI Repetitive Fee Repeats * Based on hourly rate LII Complete Review LII Other LI Hourly EsGil Fee LI Structural Only 2 Hrs.@* $90.00 I $180.00I Comments: Sheet 1 of 1 Please make all corrections, as requested in the correction list. Submit FOUR new complete sets of plans for commercial/industrial projects (THREE sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602- 2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. Bring TWO corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. . ACCESSIBILITY FOR REMODELS, ADDITIONS, AND REPAIRS Detail on the plans the following elements of the existing path of travel that are required to comply with the 2016 accessibility standards: Existing toilet and bathing facilities (if any) that serve the remodeled area shall be shown to comply with all accessibility features. The men's restroom requires a 48" maneuvering space in front of the water closet per 11 B-604.3.1. The urinal encroaches into this required space. Please revise to show the required clearance. CENTERLINE CENTERLINE OF OF FIXTURE FIXTURE 17-18"18 MN. FLUSH ACTIVATOR ON WIDE ') SIDE - IN . GYPSUM CEILING Please expand detail 3 on sheet A5.2 to include fasteners proposed at all new connections of metal stud to stud and gypsum to studs. Please also expand detail 2 on sheet A5.2 to show connection detail for ceiling to new partition framing, including fasteners proposed. Show R-13 minimum insulation at new interior partitions. CEC 120.7. . END OF REVIEW To speed up the review process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: LI Yes U No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Jason Pasiut at Esgil Corporation. Thank you.