Loading...
HomeMy WebLinkAbout2525 EL CAMINO REAL; 101; CBC2018-0080; Recycle(City of Carlsbad NONRESIDENTIAL GREEN BUILDING CODE STANDARDS MANDATORY MEASURES CERTIFICATION CHECKLIST B-52 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov [This form, signed and completed, and all receipts for the recycled materials shall b 's ubmitted to the Building Inspector prior to Final lnspectJ Site Development Mandatory 5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to (x) the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is required for projects over one acre. The plan should cover prevention of soil loss by storm water run-off and/or wind erosion, of sedimentation and/or of dust/particulate matter air pollution. 5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (x) meet local ordinance, whichever is stricter. 5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic; provide permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to (x) passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two- bike capacity rack. 5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum (x) of one space. 5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. (X) 5.106.8 Light pollution reduction. Comply with lighting power requirements in the California Energy Code and design interior lighting such that zero direct-beam illumination leaves the building (x) site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in Chapter 10 of the California Administrative Code, using the following strategies: Shield all exterior luminaries or use cutoff luminaries (X) Contain interior lighting within each source (x) Allow no more than .01 horizontal foot candle 15ft. beyond the site (X) Contain all exterior lighting within property boundaries (X) Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking facilities and walkways. 5.106.10 Grading and paving. The site shall be planned and developed to keep surface water away from buildings. Construction plans shall indicate how site grading or drainage system will (x) manage all surface water flows. Water Efficiency and Conservation Indoor Water Use 5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1.1 (x) through 503.1.3. 5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as follows: For each individual leased, rented, or other tenant space within the building projected to (X) consume more than 100 gal/day. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office, laboratory or beauty salon or barber shop projected to consume more than 100 gal/day. B-52 Page 1 of 5 Rev. 5/17 5.303.1.2 Excess consumption. Any building within a project or space within a building that is projected to consume more than 1,000 gal/day. (x) 5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the overall use of potable water within the building by 20 percent shall be provided (Calculate (X) savings by Water Use Worksheets or utilize Table 5.303.2.3). 5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are served by more than one showerhead, the combined flow rate of all the showerheads shall not (x) exceed the maximum flow rates specified in the 20 percent reduction column contained in Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in operation at a time. 5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the requirements listed As applicable for each type in items listed in Table 5.303.6. Water closets (toilets) - flushometer type (X) Water closets (toilets) - tank type (x) Urinals (X) Public lavatory faucets (X) Public metering self-closing faucets (x) Residential bathroom lavatory sink faucets (X) Residential bathroom lavatory sinks (x) Residential showerheads (x) Single shower fixtures served by more than one showerhead (x) Outdoor Water Use 5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use. (X) 5.304.2 Outdoor potable water use. For new water service, separate meters or submeters shall be installed for indoor and outdoor potable water use for landscaped areas between 1,000 and 5,000 square feet. (X) 5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500 square feet of landscaped area (the level at which the MLO applies), install irrigation controllers and sensors which include the following criteria and meet manufacturer's recommendations. 5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of final inspection shall comply with the following: Controllers shall be weather- or soil moisture-based controllers that automatically adjust irrigation in response to changes in plant's needs as weather conditions change. (x) Weather based controllers without integral rain sensors or communication systems that As applicable account for local rainfall shall have separate wired or wireless rain sensors which connects or (x) communicates with the controller(s). Soil moisture-based controllers are not required to have rain sensor input. Construction Waste Management Plan (x) 5408.1 Construction waste diversion. Establish a construction waste management plan or meet local ordinance, whichever is more stringent. (x) 5.408.2 Construction waste management plan. Submit plan per this section to enforcement authority within the city. 5.408.1.4 Documentation. Provide documentation of the waste management plan (see form (x) B-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is accessible to the enforcement authority. 5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of nonhazardous construction and demolition debris or meet local ordinance, whichever is more stringent. (x) Exceptions: Excavated soil and land-clearing debris Alternate waste reduction methods, developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist. 5.408.3 Excavated soil and land clearing debris. 100 percent of trees. Stumps, rocks and B-52 Page 2 of 5 Rev. 5/17 r associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. Building Maintenance and Operation 5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of nonhazardous materials (x) for recycling. 5.410.2 Commissioning. For new buildings 10,000 square feet and over, building (x) commissioning for all building systems covered by T24, Part 6, process systems and renewable energy systems shall be included in the design and construction processes of the building project. Commissioning requirements shall include items listed in Section 5.410.2. - 5.410.2.6 (X) 5.410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of the project begins the OPR shall include items listed in Section 5.410.4. (X) 5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project and updated periodically to cover the systems listed in Section 5.410.2.2. (x) 5.41 0.2.3 Commissioning plan. A commissioning plan describing how the project will be commissioned shall be started during the design phase of the building project and shall include items listed in Section 5.410.2.3. (x) 5.410.2.4 Functional performance testing shall demonstrate the correct installation and operation of each component, system and system-to-system interface in accordance with the (x) approved plans and specifications. 5.410.2.5 Documentation and training. A Systems manual and systems operations training are required. (x) 5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or representative and facilities operator and shall include the items listed in Section 5.410.2.5.1. (X) 5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. (X) 5.410.2.6 Commissioning report. A complete report of commissioning process activities undertaken through the design, construction and reporting recommendations for post construction phases of the building project shall be completed and provided to the owner or representative. 5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for (x) buildings less than 10,000 square feet. 5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. (X) Systems to be included for testing and adjusting shall include, as applicable to the project, the systems listed in Section 5.410.3.2. (x) 5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry best practices and applicable national standards on each system. (x) 5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or space is operated for normal use, the system should be balanced in accordance with the procedures defined by national standards listed in Section 5.410.3.3.1. (X) 5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X) of testing signed by the individual responsible for performing those services. maintenance instructions and copies of guaranties/warranties for each system prior to final inspection. 5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed operating and maintenance manual 5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports required by the enforcing agency. B-52 Page 3 of 5 Rev. 5/17 5 Environmental Quality Fireplaces 5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a (x) sealed woodstove and refer to residential requirements in the California Energy Code, Title 24, Part 6, Subchapter 7, Section 150. As Applicable 5.503.1.1 Woodstoves. Woodstoves shall comply with US EPA Phase II emission limits. (x) Weather Resistance and Moisture Management 5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope as required by California Building Code Section 1403.2 and California Energy Code Section 150, (X) manufacturer's installation instruction instructions or local ordinance, whichever is more stringent. 5.407.2 Moisture control. Employ moisture control measured by the following methods: 5.407.2.1 Sprinklers. Prevent irrigation spray on structures. (x) 5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X) into buildings. Pollution Control 5.504.3 Covering of duct openings and protection of mechanical equipment during construction. At the time of rough installation or during storage on the construction site and until final start up of the heating and cooling equipment, all duct and other related air distribution (X) component openings shall be covered with tape, plastic, sheet metal or other methods to reduce the deb ris_or duct which the _amount _of _may _collect _in_ _system. 5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the building with outside and return air prior to occupancy that provides at least a MERV of 8. 5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1 through 5.504.4.6 5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet the requirements of the following standards: (x) Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 VOC limits as shown in Tables 5.504.4.1 and 5.504.4.2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than one pound and do not consist of more than 16 fluid ounces) shall comply with statewide VOC standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with Section 94507. 5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3 5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product- Weighted MIR limits for ROC in Section 94522 (a)(3) and other requirements, including prohibition on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520 et seq.). 5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and product requirements of one of the standards listed in Section 5.504.4.4. 50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the Carpet and Rug Institute Green Label Program. 5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1. 5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the building shall meet the requirements for formaldehyde as specified in Table 5.504.4. 5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: Product certification and specifications Chain of custody certifications Other methods acceptable to the enforcing agency 5.504.4.6 Resilient flooring systems. Comply with the VOC emission limits defined in the 2009 (X) CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under the _FloorScore_ program _of the _Resilient _Floor _Covering _Institute. B-52 Page 4 of 5 Rev. 5/17 Indoor Moisture and Radon Control 5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California Building Code, Title 24 Part 2, Sections 1203 (Ventilation) Chapter 14.1. (X) Air quality and Exhaust 5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the (x) minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent. 5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation, CO2 sensors and ventilation controls shall be specified and installed in accordance with the (X) requirements of the latest edition of the California Energy Code, Title 24, Part 6, Section 120.1.(C) (4). Outdoor Air Quality 5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. As 5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. applicable 5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. (X) (x) I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016 California Green Building Standards. All receipts for recycled materials have been attached to this form. ''2zoO Project Address: _Plan Check Number- Print Name: Signed: License Number: I o3 30 Date: '2..— 2- - I I 8-52 Page 5 of 5 Rev. 5/17 (City of Carlsbad WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Owner: /-Q$.. (7k' & '/ Contractor: Job Address: 9U 11 C'cm 'i'o ip (sf (' Phone Number: 'j I 3 710 Permit #: /_<6 o Z re" 7 Estimated Cost of Project: $_c6'6/ . Type of Project: LI New Construction ffRemodelorT.I. E] Residential Commercial IJ Demolition (check all that apply) fl Other Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables I & 2 below) LI Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area c66 / X 2 lbs. = //_3Z '1- lbs. of allowable waste. 0 I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.) MATERIALS lbs. of waste to betaken to LANDFILL lbs. of waste to be RE-USED or RECYCLED Waste Hauling Company or Re-Use Method Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals ::Waste —; Trash / Garbage Other: TOTAL Ibs: - - Estimated Percentage to be Re-Used or Recycled_ I certify that the information provided herein, to the best of my knowledge, is true and correct. & b' contrac wner (print name) o2- 25- I? Date Official Use Only 0 Plan Approved LI Plan Denied 0 Project Valuation Approved Reviewed / Approved by:________________________________ Page 1 of 2 REV.01-2017 fr' Table 2 -Actual Waste (To be completed after construction.) MATERIALS lbs. of waste taken to LANDFILL lbs. of waste RE-USED or RECYCLED Waste Hauling Company or Re-Use Method (complete only if different than Table 1) Asphalt! Concrete Brick! Masonry Cardboard Drywall Landscape Debris Lumber! Wood Metals Mixed Waste Z .' (/) /0 )44 0&_— Trash / Garbage Other: TOTAL lbs.: ' 3 Actual Percentage Re-Used or Recycled q t' Official Use Only 0 65% Goal Achieved 065% Goal Not Achieved []Alternative Compliance Achieved Penalty Paid $ Reviewed ! Approved EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be taken to LANDFILL lbs. of waste to be RE-USED or RECYCLED Waste Hauling Company or Re-Use Method Asphalt/Concrete 0 3000 Aa -LL Co. Brick /Masonry 350 V/M/ Re-$eo _grL.ck ov-sfte Cardboard 0 150 ARC- _-ciLiCo. Drywall o 50 ABC. ___LL Co. Landscape Debris o 120 MLLct1 _E o-sft Lumber [Wood soo 0 Vcst Mcvt&evt Metals 300 200 WM /A::, C. LIi Mixed Waste 1500 0 V/M Trash / Garbage 300 0 V/M ooL vtfte 0 00 1-kSOGIS C.YtSktec _Bc.ce o-ste lbs.: E 200 5,30 Percentage to be Re-Used or Recycled 67% Formula: Total Re-used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) 5370 X 100 = 67% Re-Used or Recycled (2700+ 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page 2 of 2 --- ® WASTE MANAGEMENT DUMPSITE/LANDFILL Palomar Landfill (PAL) 5960 El Camino Real Carlsbad, CA, 92008 GENERAL CONTRACTOR: PRIVATE LABEL CONSTRUCTION 2525 ELCAMINO REAL STE 101 CARLSBAD, CA. 92008 Construction & Recycling Services 5701 S. Eastern Ave., STE 300, Commerce, CA 90040 714-480-2317 (Direct) 866-459-3985 (Fax) C&D SORT & TRANSFER FACILITY Acct: 350-72848 EDCO CDI Recycling & Buy Back Center Sales Rep: Victoria Brown-Delgado 224 S Las Posas Rd NORAAZURECONSTRUCTIONCOM San Marcos, CA. 92078 Prepared Date: 02/18/2019 DATE OF SERVICE SVC TICKET # BIN SIZE MATERIAL TYPE Total Tons Tons RCY RECY RATE % FACILITY 8/1/2018 995506 40YD MSW/TRASH 0.44 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJT'D 9/7/2018 8552 40YD MIXED DEMO ' 3.35 2.78 83.00% EDCO SAN MARCOS TRNSFR STA (EDD) 9/21/2018 13380 40YD MSW / TRASH 4.08 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJT'D 10/17/2018 21192 40YD MSW / TRASH 2.16 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJTD 10/30/2018 25684 40YD MIXED DEMOS 2.96 2.43 82.00% EDCO SAN MARCOS TRNSFR STA (EDD) 11/13/2018 30410 40YD MSW / TRASH 1.70 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJT'D 11/27/2018 34778 40YD MIXED DEMO 2.90 2.38 82.00% EDCO SAN MARCOS TRNSFR STA (EDD) 12/17/2018 41456 40YD MIXED DEMO 2.51 1.76 70.00% PALOMAR LANDFILL (PAL) TO OTAY C&D 1/3/2019 45856 40YD MSW / TRASH 3.30 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJT'D 1/16/2019 50809 40YD MSW / TRASH 5.93 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJT'D 1/22/2019 52432 40YD MSW / TRASH 2.36 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJT'D 1/29/2019 54671 40YD MSW / TRASH 4.60 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJT'D 2/12/2019 58538 40YD MSW / TRASH 4.34 0.00 0.00% PALOMAR LANDFILL (PAL) EDCO REJT'D Total Tons 40.63 Total Tons Diverted 9.34 Total Tons Landfilled 31.29 Total Diversion 1 22.99% INVOICE Customer ID: Service Penod Invoice Darer Invoice Nuinbe: Page 1. of 2 20-41410-63003 PFLVATF LABEL CONS rRLCTION 12101/28-12/31/28 011,101/2019 46158670274-2 Visit wm .com Due- Upon. Receipt $643.80 • 5tarAerO marage CAJ a:ccunt, ne '0 Cd7 S doles, f5E'/ vnrjr 1 CM Ce Q sohedi e a :S.ee Re. :eise..for ImpOiftànt Messages (800) 596-444 - 103480 j + (103480) 1+ 1 + L 64380 - 64380 Details for Service Location Customer ID 20-41410-63003 ::i .Private Label Construction, 2525 El Camino Real Ste 101 Carlsbad CA t:92008-1204 Description 40 Yd c.urnolitci i Disposal per tar Ttcket Total Coitner-usage charge cIay :-Thropofr 12,3-/2018 Ticket Total Total Current Char9és r3 'JJF\ LE:tJL) \\ WASTE MAN Lr AAS'E MANAGEMENT P0 BOY °3530 PHOErc,< ac neoiÔ --oor 596-7 544 (OGY'AE-5954 FAX wd--send the lower pod ion with payment - - - ice ca.-sh or staples) ---------------------------------------- :1 olfcill2olo 2815867 0774-2 I 20-41410-63003 Payment Terms . Total Due Amount Due I con Receipt 30 fl274flOfl2fl4.i41U63UO3B6:i:5.&6?.ODO.O64OCOOOUU64D 9. 0011C9 U' '11 ir41' 'AUTU Ti C 7000 a-1 41') 4 - Q 7 13a-11 raiicsr COAST WASTE MANAGEMENT PRIVATE LABEL CONSTRUCTION P0 BOX 541065 2649 BRENNER DR LOS ANGELES CA 90054-1065 DALLAS TX 75220-1319 kv THINK GREEN'.' • 2 • . • •• •j ,. If full payrre, !t'0 the nnoced air cent is rMt-rene1v- wtCM yourcontra-Ml terols, you irsy be tfsed i monthly ate cllarçy ci 2 5% of the unoad arrount, w' a mrmum rnorAtiy charge of $5, or such ate cFaire. datd oncler eppliosb1e air, regjiatrr, or oceonct : C[ INVOICE , Customer ID: WASTE MANAGEMENT . . . Customer Name: SvjCe Peood:.: Invoice Date: InOdee Number: Page lot 2 20-41410-63003 PRIVATE LABEL CONSTRUCTION 11/01/8 1/30/18 1 /01/2018 4(5155(58-02/4-6 VIStiWfl1:.CO m lose upyoarcs prdfIe gduffo- pe .dess staterrm4,rwinc -,mcccwit vfthse, scredukcim, ywir mcce cr sclscu leap cnip _W.. lltl 2 Cjctomer Ser''ic U (800)596-7444 1,07034 (1,070 34) ----- :1 Details for Service Location: Due Upon Receipt $1,034.80 Li L( J9 if fut pa9ment of. the (IwiDICCO arrrjnt s rrt receIved -: 5 within your cc, trmrtuel wi-cs,v,--u rey cxc 'fergsei a ncolth late clleoL!5%ottoeun paid smroutwolle I £' rrnmmUn -rrcxithej chxce of $3, or such late ctmcmge recworcwiLmaut See Reverse for Impoant Mcssges + = 1,034 801 Ctistomer ID: 20-41410-63003 000 Private LabeCønstruction, 2525 El Camino Real Ste 101, Carlsbad CA g2008-1204• Description - Date 4034 dernr.Jitsmn '1/13!? PhDne-nacif ol msw Dsp sa1 per ton Ticket Total 40 3d demolition Disposal per t-x7 dnmc' two Ticket Total - C on, c i r usdoC :hrgn d! Thriujuh 11 130'20 1 Ticket Total [_lota Current Charges ------------------- Pleas lefaciand send the lower Ticket Quantity Amount 30410 - 1.00 227.03 0.00 1.7.0. /9.45 306.48. i(50 227 O 2 30 31.49 438.52 80.03 289.80 1,034.80 . ------------------------- 1if27/ia:l 34.778 I !.0/18 .175733 12j01.D112 40 5063-C274 6 20-41410-63003 3A$J[ mANAGEMENT DO BOX 43530 Payment Terms Total Due Amount PHOENIX, 72 OSOtO C je lipcc RcepE $.I •0c4 1802) c6 444 :(866)796_6955:FAX. .,-,----------------------'------.-- ------------------------.........- L• 9: em 'uio T 0 182572) 1w51? m-1358t5 1: jitflilliilIIIlfjliaiIJiiJIhllilllljI1lstijjliili!li,lt :11 kc COAST WASTE MANAGEMENT . . PRIVATE LABEL CONSTRUCTION P0 BOX 541065 2549 BRENNER DR LOS ANGELES CA 90054-1065 DALLAS TX 75220-1319 Iw. THNK GREEN. INVOICE •.Page 1 of 2 Customer ID: .. 20-41410-63003 WASTE .. Customer Jame: PRIVATE LABEL CONSTRUCTION 5ervoe°eric€; •• 1O/01/18-10/31/8 Date.i 1 1/01/2018 InvocoNurnber . .46-1498-/-0274-9 Visitwm.com I Due,.Upon:.Receip.t.., $1,070.34 stat t"-1 TLS, rT anage your acou m, ,I- v" ftcy . . pay yc4J I irvace01 okeU1eapckp .. . . .. . . -. If klil• \JITIOt 6f: . . . atRnyr Add&I minrnjrr Traithly c-rrrge of $5, cN 9Cn late CbcJO Customer ru [ allowedurd i t- See Reverse for Important Messages (800) 596-7444 777 fl _ + + 34 1,07034 [Detaiis for Service Location: - Customer ID: 20-41410-63003 Private Label Construction, 2525 El CaminoRèaFSte 101, Carlsbad CA 92008-1204 Description Date Ticket Quantity Amount 40 Yd comh 0 Fj Z rnw 0/ 7118 i 1 9 1 00 0.10003 Dopcaal per ton UJ) 2.1€ 10 9 Ticket Total 32798 40 Yd aemolit on g j ic 018 256814 100 22703 Doponol par -_or demolition 2:96 21587 Ticket Total. .. 442.90 Cont.erier.:usage:charge daily T.o/3.ijTa..M71311: 1.00 29.9.46 crough 10/31/2018 . . I Ticket Total -' I I 299.46 Total Current Charges - - - - - -------------. ---------------- .hderjdffie Id War poffion with payment - - - (no cash orstspies)---------------------------------- N I R FIRM 20-41410-63003 PC) BOX 43530 Payment Terms Total Due Amount 5Q Due icon Receipt ,ii703L (800):596-7444 1 j •.• (66)I7.96-695.1. FAX ---..--------,---- O?4OflOaO414iO63OU3D4b149?UUOUOiO7O34UDODO1O?U34 S 012196401.AB.a.40: ''tO f0 T2'0 'Olt .)(ia14) 01-P2095-H 027403: Pill! hJlIIhh1II1hIlhl III hIIIII Jill tIhl1lbhI1lh1:IfljIIU IlILIlIjlII(lIl[lItlIlEl1IItIIIIIlIIlIlIIIfjJIIiIlllLIlIIIIIIIt • COAST 'WASTE MANAGEMENT PRIVATE LABEL CONSTRUCTION P0 BOX 541065 2649 BRENNER DR LOS ANGELES CA 90054 1065 DALLAS TX 75220-1319 • •••• • ® • THINK GREEN •• ecyd papa. 1,070.34 Visit w.rn.com I— w WASTE MANAGEMENT I NVOI CE . . Customer ID: Customer Nia roe: Service Peuod, InvoLe Date: Invoice Number: Due Upon:Receip.t.. Pagel1 of 3 20-41410-63003 PRIVATE LABEL CONSTRUCTION 09,101/1809/30/18 1 0i'011/2018 4014725 U2/1 $1335.40 Tostunircnap'cfi. Ugn opforaarIcss rna'viqo yc*ir a cc:rn, ie H day 707 py your 7CaOcr70mddeapd'U7 . if full oaeiient of the d aiTmrt C nut (B'Wd veftwi viour cciitramj2 -arms, you may Sc cl arced a . . ncHylatacTwoecf 2.5Aottheunpadart,70ia Irli'SCOIT rmzr,th dscrg'e Of $5, ci SLOI1 lam I70 0vsterner Sarvca.allow Cca See Reverse for Important Message L (500)5944 5975/ (597 57) 0.00, 1,335.40 - 1,3.35.40 Details for Service Location: Customer ID: 20-41410-63003 Private Label Construction, 2525 El Camino Real Ste 101, Carlsbad CA 92008-1204 Description Date Ticket Quantity Amount /35/1 8 70 0.00 [E- Pty icket Tothi: . 78.27. 40 Yd demotion Disposal po ondernolition 09/07/18 8552 100 22703 Ticket Total . .. . 47134 I9 227:03 t40 Yddemolitn 09/2/18 13380 tOO Ed:orejHd-tl 0.00 Trip charge: 72,2 7 t:Edco i cucted load / ( 7 L . 1 .4,Q5 9.00 1 Disposal per ton Ticket Total . . . . Gbflninc, usage Charm? daily 28930 I - --------------.- - - - Please detach and .sand tr- !ower po.fron with payment - - - (no cash or step!es/ --------------------. :-... - -.-- ----- 0/0702018 . 4014726-02741 20-41410-63003 wSTE M.ANaGEE:ENT 1 Payment Terms Total Due Amount P080543530 acENi7. Z :rsoo y ijnRtcipr 5' 330 10 (000)595-744 (66) 793 7051 F:: . . .. . O24OO.U4191U63Ofl3fl4.614?:2.6.UUUflfl1BS4UOUOUfli3354O 4 )arsas: 01 MC C i1' -'5,1 'S5,C-13 V' - 01-f''b517-L1 MCi i32C IIl1I.11I,l1IIuIllll till lI1llIIlIIII)rtllllI1IIliillluhlIIlIll ujtI1hiuilllliIiipiIIiItInuhllflUlhiuI1llP COAST WASTE MANAGEMENT PRIVATE LABEL CONSTRUCTION P0 BOX 541065 .2649:BF1ENNER DR LOS ANGELES CA 90054-1065 DALLAS .TX.75220-1319. ZTIA THINK GREEN.': r3iu 'per Page, 3Of 3 Customer ID: . 20741410-6:30103 WASTE MANAGEMENT Customer Na ie: PRIVATE LABEL CONSTRUCTION. . Period: 09/01/1 09/ 0/18 v;ce Dt 10/01/201 vcce N.mber. 614 /20271 1 Customer ID 20-41410-63003 Details for Service Location Private Label Construction, 2525 El Camino Real Ste 101, Carlsbad CA 92008-1204 Description . Date Ticket . . . Quantity .. Amount 000 TicketTot8li . 28980 Total Current Charges 335 40 Ii THNK GREEN. W page 1 of 2: Customer ID 20-41410-63003 WASTE flAAEMET Lustoner Name. PRIVATE LABEL CONSTRUCTION Sery us Psrcd. 08/01/18- 00/71/18. Invo c_a Date 09/01/7018 .iioiceNunbéf: . 4614471-0274-4 Visit wm.corn Due Upon Receipt $597:.57 To erupycar onIne profile, sgn up fcr dess SteTeJff ecs soar aorci n i- c\ day cicijles payvoarinceciscHedueapctp .: . i . ft full pjrnenr of th r -re-i arrrerct s ot receved .wohn ur a troatus trrns \Oo mey Ia dssrq€d a rtHylaediereof2.5iof the Jarrciutwoho cri rcruu-ic nccciU-dy chaps of $5, c ate chayé Customer Service:a'cusadunIa sppksUelr\ ecatcno -rJ See Reverse for Irriportant Messages (800) 596-7444 mamw + - 145.70 (1570) + 0.00 + . — . 597.57 Details for Service Location: Customer ID: 20-41410-63003: Private Label Construction, 2525 El Camino Real Ste 101, Carlsbad CA 92008-1204 Description Date Ticket Quantity Amount 10 7orolloffreoyc . . . . 0/01/18 9P 506 . 100 22703 DSPJS4 oontarnn,atedtbns . Al 20.56 Ticket Total - . 24759 15/1 240 pelivery 4, G Yd jerno j Ticket Total c.f j : 118.14c r iage ha diy Q331 M6345R 1 PC 23 I Through 08/31/2012 Ticket Total /f7 23184 LITota Current Charges -597,57 ------------ ---------------- .: :.:PleasedetahandaendtheIawerporhon with payment - - (no caoh or staples) ------------------------------------------- 09/01/238 4&1447'1-02214_4 20-41410-63003 OJASTE '.SAJSAGEME T Pp sox 4i530 Payment Terms Total Due Amount PHOENIX, uZ85088 Due c_pop Recscpt (007) 596-7.444 I ___________ . ..... . . . . (064) 776-6951:FAX.. ................................. . .......... .. n27uoo.a4141ob3uu3u4k144?1unuuou5?s7uouuunT?s7 • s-na ;.cLci uslcu 0 aUr() I0114022. 1lIlfIl1sIIIJhIIu11*1r:JlIl.*III.IltlhhIIIl 1llhlhnhhIIlIi COAST WASTE MANAGEMENT PRIVATE LABEL CONSTRUCTION P0 BOX 541065 . 2649 BRENNER DR LOS ANGELES CA9oO54 DALLAS TX7S22O-1319 . THINK . w,. WASTE MANAGEMENT N.VOCE: Customer ID Customer Name: Service eridd:. -oce Date: Invoice Number. Page 1of2 204141063003 PRIVATE LABEL CONSTRUCTION 071/01/18-07/3 1/18 08/01/2016: 4614191-0274-8 Visit wm..cO.m I o bet rreofiIe. 519100 Ice' rcrless... titmecit5. T303IDJr 1 'I0k15 thiUl payyour nce ci vihedie a pdup wa: .... Customer Servic (800)596-7444 Di eiUpon Receipt if fuJ pyrrlerit of il-a invoiced SODU it is not received rothn your contractual tonic, yOu my be &eryed a rrenthy late charge of 2.5c of tie urpec arrcoint. ceth a rr/nenjm rrocthlv óarc c $5, cc such late charge allowed urv.kr cze eregäBriicc contract. $145.70 --- ft - . , LLtct fl I LP1 FH9 See Reverse for Important Messages . . . .... ..:... ____ - .. i ++ ,.+ —_ 35144 1 (351.4.4) .0.00 145.70 1 —145-70 - I Details for Service Location Customer ID 20-41410-63003 Private Label Construction, 2525 El Camino Real Ste 101a Carlsbad CA 92008-1 204 Description + Date - Ticket T_Quantity Amount :,Container usage charge daily. . .... ...... . . 07/31/18 M6 1811 F 1,00 3 45.70 Through 07/31/2018 . . 0.00 Ticket Total 1 145.70 L Total Current Charges ... . - - ________..,_ct__+_*+______________------------------------------------------------------------------14510 ------------------- ----------------- Se detach and send the lower pOtion wITh paymettt - - - (no cash orap(as) - -- -----------------.+ 08/01/ct-OS 461419ct02748 20-41410-63003 PO BOX 43530 ... Payment Terms - Total Due I Amount PHOENIX, 03 35000 Due Ucon Receipt $103.73 1803) 5957444 .856) 796-6951 faX .. ... D274.DUO2O4i4,1O63OPO46]. 4191UIJDDflO]457DOOD.DOQ.1457O 7 6W90i ,ttnioc "eOO) 13 i721 7520) r305c-r t3i40.L4 IiiIu1tsiiIitlIutiiti1IItIiiIllahIlhih iIhhu hiIr !4hiihl III1Ij111I1I1IlII1I,I1lIII1t1il1IIIh1vIIlluIIl1IIIu1It1t111 COAST WASTE: MANAGEMENT PRIVATE LABEL CONSTRUCTION P0 BOX 541065 2649 BRENNER DR LOS ANGELES C490054-065. 2 DALLAS TX 752201319 THINK GREEN. 'npfl W .. NVOI CE . . Customer ID: 20-41410-63003 STE MANAGEMEftT . . . . Customer Name: PRVATE LABEL CONSTRUCTION: Sthce erod: 06/01/180E/30/1 Invoice Date:. . 07/0/20118 lñvcceNurnber: . 461334 027' I Visit wmcom Due Upon Receipt $351.44 . . . . tffflts, flIO9 J XO4it, VIEW ftEW 'chles, payyJrin'rce CA- J[eaIEfup . . . :. A full is .f received ...... j .ltffl yclJr co,trectu terr you r'ey he chexed a Wo char( 2.5% ofthe urpdarroiirit. a . . . . . rnmurn rncqTthly cirig of $5 such late charc ie CustornerSoru:ce i eiEpc.Ow,reguteecrrccntraot. See Reverse for lrnportan Messges: (800) 596 7444 j + + 000 0.00 00 .351.44 .J 35144 Details for Service Location: . : Customer ID:. 20-411410-630.03 Private Label Construction, 2525 El Camino Real Ste 101, Carlsbad CA 920081204 . Descrlpton Date Ticket . Quantity Amount Ta p charge flat - 06J6J18 93356 1 JO 54 71 Defvery 10ydpentp Be. ThlCy :TtTatI . .. .. .. . . . .. . 111,60 I0e128118 96482: 11:0 . 22l04 Ticket Total c 221.04 Container usaqr dire daily 06/30118:: M0 1.00 BOO 06/30/20B TicketTotal Total Current Charges 351 44 ___ ....__ L RIéeetacanbsend the lower portion with p0yrn0171 - - - (io ciesh or staples) ------------------------------- ="=1344 0-, 07/7 NASTE M.ANAGEME11T . - P0 aCX 4353(J . . . . .., Payment Terms TotalDue Amount PHOENIX, AZ Dua Upon Receipt . $3 5`A4 800) 596-744: L . . ... (866)796-5951. FAX . ... OE3GV0I \130405 '.\urO I U'1VI :s?o 101 CO I3'693774'1 30274006 .. J,iItt iiIlIuhIiiuuuu,uIhhIuiIIItl,u,hi1uhiI,huihulhi,U iuIuIi,I1ttsirhIiuuuIIuuIthiIIi fit ilNIilhdIhuiPYh1h1 'COAST WASTE MANAGEMENT: :PRIVATE LABEL CONSTRUCTION P0 BOX 541065 2649 BRENNER DR LOS ANGELES CA 90054-1065 DALLAS T)(75220-1319 . - THINK GREEN .