HomeMy WebLinkAbout2525 EL CAMINO REAL; 214; CBC2019-0318; PermitCity of
PERMIT REPORT Carlsbad
Tenant Improvement
Print Date: 03/03/2020
Job Address: 2525 El Camino Real, 214
Permit Type: BLDG-Commercial Work Class:
Parcel No: 1563020900 Lot #:
Valuation: $ 281,525.03 Reference #:
Occupancy Group: Construction Type
# Dwelling Units: Bathrooms:
Bedrooms: Orig. Plan Check #:
Plan Check #:
Project Title:
Description: SEPHORA: 6,053 SF T.I. WITH EXTERIOR FACADE WORK
Owner:
BROOKFIELD PROPERTIES
6225 N State Highway 161
Irving, TX 75038-2222
214-556-5142
Permit No: CBC2019-0318
Status: Closed - Fina led
Applied: 06/25/2019
Issued: 09/23/2019
PermitFinal 03/02/2020
Close Out:
Inspector: MColI
Final
Inspection: 03/02/2020
Contractor:
BOGART CONSTRUCTION INC
9980 Irvine Center Dr, Ste 200
Irvine, CA 92618-4364
949-279-6631
FEE AMOUNT
BUILDING PERMIT FEE ($2000+) $1,272.10
BUILDING PLAN CHECK FEE (BLDG) $890.47
ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL $89.00
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION $175.00
MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL $55.00
PLUMBING BLDG COMMERCIAL NEW/ADDITION/REMODEL $86.00
5B1473 GREEN BUILDING STATE STANDARDS FEE $12.00
STRONG MOTION-COMMERCIAL $78.83
Total Fees: $ 2,658.40 Total Payments To Date: $ 2,658.40 Balance Due: $0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees /exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees /exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division
1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-2700 1760-602-8560 f I www.carlsbadca.gov Page 1 of 1
(City of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check ______19 __
Est. Value
PC Deposit
Date
Job Address THE SHOPPES AT CARLSBAD -2525 EL CAMINO REAL Suite: 214 APN: 156-302-07,156-302-08
Tenant Name: SEPI-IORA CT/Project #: Lot #:0
Occupancy: M- MERCANTILE Construction Type: Ill-B Fire Sprinklers:I no Air Conditioning: 0no
BRIEF DESCRIPTION OF WORK: INTERIOR TENANT FIT-OUT OF 6053 SF SPACE WITHIN AN ENCLOSED MALL. WORK INCULDES BUT NOT
LIMITED TO: CONSTRUCTION OF INTERIOR WALLS/PARTITIONS, WALL FIXTURES, FLOORING, SOFFIT, LIGHT FIXTURES AND PARTIAL MECHANICAL
ELECTRICAL, PLUMBING; NEW STOREFRONT AT INTERIOR AND MINOR STOREFRONT IMPROVEMENT AT EXTERIOR FACADE.
El Addition/New: New SF and Use, __New SF and Use,
Deck SF, _________ Patio Cover SF (not including flatwork)
FRI Tenant Improvement: 6053 SF SF,
SF,
Existing Use M-MERCANTILE Proposed Use MMERCANTILE(RETAIL)
Existing Use (RETAIL) Proposed Use
Pool/Spa: SF Additional Gas or Electrical Features?
U Solar: KW, _Modules, Mounted, Tilt: Yes / No, RMA: Yes / No, Panel Upgrade: Yes / No
U Plumbing/Mechanical/Electrical Only:
U Other:
APPLICANT (PRIMARY) PROPERTY OWNER
Nanic. i 2 4_ Name: BROOKFIELD PROPERTIES
Address: ?131'0 W115. I"i V. tl3t' 03,v* Address: 650 N. ORLEANS STREET, SUITE 300
City: _'EJC.-V t1 i11 State. Cu- Zip: q0 LJ(... City: CHICAGO State: IL Zip: 60654
Phone: ,v 2ç r '-( Phone: 312.960.2829
Em: t44 2Etoi 1 4-4d t1 eS ot2. Email: TIMOTHY.WERSELL@BROOKFIELDPROPERTIESRETAIL.COM
DESIGN PROFESSIONAL CONTRACTOR BUSINESS
Name: ROBERT J. SARGENTI - SARGENTI ARCHITECTS Name: Bogart Construction Inc
Address: 461 FROM ROAD #255 Address: 9980 Irvine Center Dr. Ste 200
City: PARAMUS State:NJ Zip: 07652 City: Irvine State:CA Zip: 92618
Phone: (973) 253-9393 Phone: (949) 783-5403
Email: SDELELLO@SARGARCH.COM Email: todd@bogartconstruction.com
Architect State License: C-31054 State License:707471 Bus. License: 14W6-d;A it ____________
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to it_./
issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law
(Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code) or that he/she is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($5001).
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: Buildingcarlsbadca.gov
8-2 Page 1 of 2 Rev. 06/18
(OPTION A): WORKERS'COMPENSATION DECLARATION:
I hearby affirm under penalty of perjury one of the following declarations:
0 I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued.
I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: Zurich American Ins Co
Policy No. WC980956205 Expiration Date: 04/0112020
O Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
Interest and attorney's fees.
CONTRACTOR SIGNATURE: ,2d/K-I" DAGENT DATE: 06/18/2019
(OPTION 131): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
O I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
O I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
O I am exempt under Section _______Business and Professions Code for this reason:
I personally plan to provide the major labor and materials for construction of the proposed property improvement. 0 Yes 0 No
I (have / have not) signed an application for a building permit for the proposed work.
I have contracted with the following person (firm) to provide the proposed construction (include name address / phone / contractors' license number):
I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone /
contractors' license number):
S. I will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone /type of work):
6.20.19 Natalia Shorten / LJAGENT DATE: OWNER SIGNATURE:
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: Lender's Address:
ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYes Xl No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? 0 Yes C1 No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? 0 Yes 6No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
APPLICANT CERTIFICATION:
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP
HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF
THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over 5'O' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within 180 days from the date of such permit or if the building or work authorized by such permit is suspended or abandoned at anytime
after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Code).
6.21.19 Natalia Shorten APPLICANT SIGNATURE: '""" DATE:
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 Email: BuildingcarIsbadca.gov
B-2 Page 2 of 2 Rev. 06118
Permit Type: BLDG-Commercial Application Date: 06125/2019 Owner: BROOKFIELD PROPERTIES
Work Class: Tenant improvement Issue Date: 09/23/2019 Subdivision: CARLSBAD TCT#76-18
Status: Closed - Finaled Expiration Date: 06/22/2020 Address: 2525 El Camino Real , 214
lVR Number: 19997 Carlsbad, CA 92008-1208
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector •Reinspection Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency 12/23/19 Sub floor substrate at sales floor Yes
BLDG-Building Deficiency Sales floor sleepers & EMT conduit! floor Yes
boxes, Line E.5-G.2 & 11.5-13 only
BLDG-Building Deficiency Wrong code No
BLDG-Building Deficiency RTU 2 & 3 underside of roof, framing Yes
BLDG-Building Deficiency 12/18/19, completion of floor sleepers & Yes
conduit/floor boxes at sales floor
0113112020 0113112020 BLDG-97 Disabled 118177-2020 Partial Pass Mièhael Collins Reinspection Incomplete
Accessibility
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial plumbing fixtures at Inside of Yes
restrooms & break counter
0211312020 0211312020 BLDG-Final 119286-2020 Partial Pass Michael Collins Reinspection Incomplete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Ok to merchandise, stock & train. Yes
Accessibility, GFCI, EM lighting Ok.
0211912020 0211912620 BLDG-Final 119739-2020 Partial Pass Paul Burnette Reinspection Incomplete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Ok to merchandise, stock & train. Yes
Accessibility, GFCI, EM lighting Ok.
03/02/2020 0310212020 BLDG-Final 120942-2020 Passed Michael Collins Complete
Inspection
Checklist Item COMMENTS • • Passed
BLDG-Building Deficiency Ok to merchandise, stock & train. Yes
• Accessibility, GFCI, EM lighting Ok.
BLDG-Building Deficiency 3/02/20 received all final reports. Yes •
BLDG-Plumbing Final . • Yes•
BLDG-Mechanical Final . . . Yes
BLDG-Electrical Final Yes
March 02, 2020 • .• •
Page 3 of 3
Permit Type: BLDG-Commercial Application Date: 06/25/2019 Owner: BROOKFIELD PROPERTIES
Work Class: Tenant Improvement Issue Date: . 09/23/2019 Subdivision: CARLSBAD TCT#76-18
Status: Closed - Finaled Expiration Date: 06/22/2020 Address: 2525 El Camino Real , 214
Carlsbad, CA 92008-1208
IVR Number: 19997
Scheduled Actual
Date Start Date Inspection Type • Inspection No. Inspection Status Primary Inspector Reinspection Complete
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Restroom & plumbing wall Yes
BLDG-Building Deficiency Walls/vertical soffit areas except plumbing Yes
walls at back of house & sales floor.
12/1112019 1211112019 BLDG-11 113295-2019 Passed Michael Collins Complete
FoundationIFtg1Pler
s(Rebar)
Checklist Item COMMENTS Passed
- BLDG-Building•Deficiency Storefront stem wall/steel Yes
BLDG-14 113296-2019 Cancelled Michael Collins Reinspection Complete
Frame!SteeUBoltin
giWeldlng (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Wrong code No
- BLDG-Building Deficiency RTU 2 & 3 underside of roof, framing Yes
12/16/2019 12116/2019 BLDG-14 113969-2019 Partial Pass Michael Collins Reinspection Incomplete
FramelSteellBoltin
g!Welding (Decks)
Checklist Item COMMENTS . Passed
BLDG-Building Deficiency RTU 2 & 3 underside of roof, framing Yes
BLDG-Building Deficiency Sales floor sleepers & EMT conduit! floor Yes
boxes, Line E.5-G.2 & 11.5-13 only
BLDG-Building Deficiency Wrong code No
12/1812019 1211812019 BLDG-14 114122-2019. Partial Pass Michael Collins Reinspection Incomplete
Frame/SteelIBOltin
glWelding (Decks) .
Checklist Item COMMENTS . Passed.
BLDG-Building Deficiency Wrong code No
BLDG-Building Deficiency RTU 2 & 3 underside of roof, framing Yes
BLDG-Building Deficiency 12/18/19, completion of,floor sleepers & Yes
conduit/floor boxes at-sales floor
BLDG-Building Deficiency Sales floor sleepers & EMT conduit! floor Yes
boxes, Line E.5-G.2 & 11.5-13 only
12123/2019 1212312019 BLDG-14 114719-2019 Passed Michael Collins Complete
FramelSteellBoltin
glWelding (Decks)
March 02, 2020 - . Page 2 of 3
Permit Type: BLDG-Commercial Application Date: 06/25/2019 Owner: BROOKFlELD PROPERTIES
Work Class: Tenant Improvement Issue Date: 09/23/2019 Subdivision: CARLSBAD TCT#76-18
Status: Closed - Finaled Expiration Date: 06/22/2020 Address: 2525 El Camino Real , 214
Carlsbad, CA 92008-1208
IVR Number: 19997
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector ReinsPection Complete
Date Start Date
1111412019 1111412019 BLDG-84 Rough 110763-2019 Failed Michael Collins Reinspection Complete
Combo(14,24,34,44) -
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
BLDG-14 No
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
1111512019 11115/2019 BLDG-14 110986-2019 Partial Pass Paul Burnette Reinspection Incomplete
FramelSteollBoltin
glWelding (Decks)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
1112012019 11/20/2019 BLDG-17 Interior 111510-2019 Partial Pass Michael Collins Reinspection Incomplete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Walls/vertical soffit areas except plumbing Yes
wails at back of house & sales floor.
BLDG-34 Rough 111511-2019 Failed Michael Collins Reinspection Complete
Electrical
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
11/25/2019 1112512019 BLDG-84 Rough 111911-2019 Partial Pass Paul Burnette Reinspection Incomplete
Cornbo(14,24,34,44)
• Checklist item COMMENTS Passed
BLDG-Building Deficiency Not ready Yes
BLDG-14 Yes
• Frame-Steel-Bolting-Welding .
• (Decks) •
BLDG-24 Rough-Topout . Yes
BLDG-34 Rough Electrical . Yes
12/03/2019 1210312019 BLDG-14 11250$-2019 Partial Pass • Michael Collins Reinspection Incomplete
Frame/Steel/Boltin •
g!Welding (Decks) •
Checklist Item COMMENTS Passed
BLDG-Building Deficiency RTU 2 & 3 underside of roof, framing Yes
12/09/2019 12/09/2019 BLDG-17 Interior 113047-2019 Passed Michael Collins Complete
Lath/Drywall • •
March 02, 2020 • . •
• Page 1 of .3
/417Acdon
INSPECTIONS
11111 Buena Vista Way
Lancaster, CA 93336
(661) 400-1051 INSPECTION REPORT
DEPARTMENT OF BUILDING AND SAFETY
CITY OF_CARLSBAD
COUNTY OF SAN DIEGO
BUILDING PERMIT NO. JOB NO. I DATE:
CBC2019-0318 11/13/2019
JOB NAME/ADDRESS SEPHORA : THE SHOPPES AT CARLSBAD 2525 EL CAMINO REAL #214
GENERAL CONTRACTOR/ADDRESS BOGART
ARCHITECT/ENGINEER ADDRESS SARGENTI I J.F.SIERRA
SUBCONTRACTOR/ADDRESS A&R WELDING
WELDING REINFORCED CONCRETE P.T. CONCRETE DRILLED-IN ANCHORS H.S.0 BOLT ASSEMBLY
FIREPROOFING STRUCTURAL MASONRY EPDXY INJECTION OTHER_______________________________
DESCRIPTION OF WORK
ON SITE FOR WELDING INSPECTION
Welding of 8 Plates 6"x1/4"x 0,-loll with 1/4" fillet welds to existing beams.
Welding/ Erection performed on gridlines F & E @ 12.2 & 12.7.
AT THIS TIME THESE PIECES ARE COMPLETED.
SMAW 7018 W/ BIG BLUE 300 PRO
Welding work performed by certified welder per Apprvd Plans and Specs
CONCRETE GROUT I MORTAR BLOCK PRISMS DENSITY
DAILY HOURS/TERMS: MONDAY EDNESDAY Th AY URSDRIDAY F SATURDAY SUNDAY I TUESDAY~
41-111S
All inspections based on a 4 hour minimum ror each trade Inspected, and over 4 hours Is an B hour minimum. Any inspections extending past noon
will be an 8 hour minimum. Weekends, holidays, and hours between 6pm -6 am are paid at time and a half. There Is a 4-hour minimum charge if
job is cancelled for any reason, including rain, and inspector Is not notified in advance. Testing fees vary and will be indicated on invoice.
ATTORNEY FEES: If any action at law or inequity is brought to enforce or interpret the terms of this Contract, the prevailing party shall be
entitled to reasonable attorney's fees, costs and necessary disbursements in addition to any other relief to which such party may be entitled.
CERTIFICATE OF COMPLIANCE '
INSPECTOR'S NAME KEVIN GAY INSPECTOR'S SIGNATURE
INSPECTOR'S ID/LIC. NO. ICC 5285418 has been (lied and it states that the above work to the best of
his/her knowledge complies with the provisions of the Uniform Building Co eets approved plans and specifications
APPROVED/AUTHORIZED BY: .Yt2J',L Project Superintendent
White--Office Yellow=Jobslte Plnk=Inspector
EsGil
A SAFEbui1tCompany
DATE: July 8, 2019 ',APPLICANT
JURIS.
JURISDICTION: Carlsbad
PLAN CHECK #.:-CBC20I9O3 18? f-SET:T"7
PROJECT ADDRESS: 2525 El Camino Real, #214
PROJECT NAME: Sephora TI
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's codes.
The plans transmitted herewith will substantially comply with the jurisdictions building codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
El The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
El The applicant's copy of the check list has been sent to:
EsGil staff did not advise the applicant that the plan check has been completed.
EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: ;
/Y.
Telephone #:
Date contacted: (Z./) Email:
Mail Telephone Fax In Person
REMARKS: JOnsheetA:101théiéire 2T iónWh-lopeof-1 :-12.(by the -
rétöoms and in the stockroom): Those2 ramps must be ave a slope of 1:20 (per
sheetA-401).
By: Kurt Culver Enclosures:
EsGil
6/27/19
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
Carlsbad CBC20 19-0318
July 8, 2019
(DO NOT PAY— THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK #.: CBC2019-0318
PREPARED BY: Kurt Culver DATE: July 8, 2019
BUILDING ADDRESS: 2525 El Camino Real, #214
BUILDING OCCUPANCY: M
BUILDING AREA Valuation
PORTION (Sq. Ft.) Multiplier
TI 6053 46.51
Reg.
Mod.
VALUE ($)
281,525
Air Conditioning
Fire Sprinklers
TOTAL VALUE 281,525
Jurisdiction Code cb By Ordinance
.........
- L_J
1997 UBC Plan Check Fee
Type of Review: LI Complete Review LI Structural Only
LI Repetitive Fee
Repeats
LI Other
LI Hourly
EsGil Fee
___Hr. @ *
I $826.90 I
Comments:
Sheet 1 of 1
A 39812 MISSION BLVD., SUITE #100 FREMONT, CALIFORNIA 94539 PH: 510.445.0550
It
FAx: 510.445.0440 A
June 21, 201
A ENGINEERING
GROUP
2019
STRUCTURAL CALCULATIONS 10N
for
1 Sep hora
at The Shoppes at Carlsbad
2525 El Camino Real
Space #214
Carlsbad, CA
BY FF DATE 6-21-19 SUBJECT Sephora - Carlsbad SHEET NO ii OF Ii
CHCKBY DATE_____ -
JOB NO 19035.0
TABLE OF CONTENTS
DESCRIPTION PAGE
Introduction H
Roof Top Unit Support and Anchorage
Soffit Framing
SIERRA ENGINEERING GROUP
sci I BY__ DATE 'l1. SUBJECT SHEET NO. OF_____
CHKD. BY DATE JOB. NO. ___________
- .L.LJ..!
+t:i:LWi:::i:i:U.I++iJt
L......I....L.LJJ.J .LLL. LL.LLJILIJ........I.
:i±LU:LLLhL4h
.LI
LL:I±Li:
IL...LI.......LLL!JI.......I...L.LL..LI.I.LL1....LI.1_L.
J.::H::LH:H:EI.:LfLH4.::.:J±I:i.:::LH±
....[.........[
H-H-
!4I L
H I n MJ Hft kI*4 * i k
L.1.LIJ.....Li. I .. . . .i. i_i.. ....
L
10, . I -
. .. .
.
-............:.j..._..:..L...1..[...:...............L.'_.....!.I..[I..L.:.
- .
........._.L4._L.l......-I.........LL.LI...L_L....j........
. ........
..............I.........
L:...............
.
.....L.L.....L -_ ..................f...:...:.:...i.......
:uuj1:;.*: iL1E:IL::i1.
.......J.I..1._.......
.FI:[tFHikI[iiI1 .Fl:11I1IL[ILIIEI:
ill J.1.tI I I E[.I I I 'I I .LLt1 I I
[I liii.
ELILWI
ii.... LL.HJlI
J_I ii F
I
I-IH-I-LIrIJLJft'
L .LI i } I IL
LLLI
I:1I
......
i11111i1:
H Li.LIHJJ..Ji...I.
rl+:Hh
I I
LIHL
I
WLLI
Ii
j;L iLUkJ: i. :1 LI .1 .111!-
11rll:II[I...!i IIII'Ii1IFIIHIiIIU1III
:11 111.:i 9i F - FITI IL4J'II'I :1 I 11111 IHIL
::HI:I+r[i:Lf:EH
-
i-:' Ii
+i:J:LLftk HH I fi-
:4 '
LU
... ...
+i.i..±EiI
Ei=JILW:
.. ..
I
r
-
SIERRA ENGINEERING GROUP
/\ *
2525 El Camino Real, Carlsbad, CA 92008, USA
Latitude, Longitude: 33.1781898, -117.3324447
9 Marshalls The Shoppes at Ca
If
SC2
OSH PD
rn
24 Hour Fitness 9
Regal Cinemas •
'V Carlsbad 12
Olive Garden
£ogle
Date
Design Code Reference Document
Risk Category
Site Class
Type Value Description
Ss 1.113 MC ER ground motion. (for 0.2 second period)
S1 0.428 MCER ground motion. (for 1.0s period)
5MS 1.174 Site-modified spectral acceleration value
SM1 0.673 Site-modified spectral acceleration value
SDS 0.783 Numeric seismic design value at 0.2 second SA
SDI 0.449 Numeric seismic design value at 1.0 second SA
Type Value Description
SOC D Seismic design category
F2 1.055 Site amplification factor at 0.2 second
Fv 1.572 Site amplification factor at 1.0 second
PGA 0.433 MCEG peak ground acceleration
FPGA 1.067 Site amplification factor at PGA
PGAM 0.462 Site modified peak ground acceleration
Marron Rd Map data 02019 Google
6119/2019, 5:33:39 PM
ASCE7-10
11
D -Stiff Soil
TL 8 Long-period transition period in seconds
SsRT 1.113 Probabilistic risk-targeted ground motion. (0.2 second)
SsUH 1.156 Factored uniform-hazard (2% probability of exceedance in I
SsD 1.5 Factored deterministic acceleration value. (0.2. second)
SI RT 0.428 Probabilistic risk-targeted ground motion. (1.0 second)
SI UH 0.423 Factored uniform-hazard (2% probability of exceedance in
SI D 0.6 Factored deterministic acceleration value. (1 .O second)
PGAd 0.531 Factored deterministic acceleration value. (Peak Ground Ac
CRS 0.963 Mapped value of the risk coefficient at short periods
CR1 1.013 Mapped value of the risk coefficient at a period of 1 s
50 years) spectral acceleration
50 years) spectral acceleration.
:celeratlon)
SC3
Design Response Spectrum
0.8
2.5 5.0
Period, T(sec)
- Sa(g)
7.5
MCER Response Spectrum
1.5
2.5 5.0
Period, T(sec)
- Sa(g)
7.5
DISCLAIMER
- While the Information presented on this website is believed to be correct, SEAdC /OS .IiE and its sponsors and contributors assume no responsibility or
liability for its accuracy. The material presented in this web application should not be used or relied upon for any specific application without competent examination
and verification of Its accuracy, suitability and applicability by engineers or other licensed professionals. SEAOC / OSHPD do not intend that the use of this
information replace the sound Judgment of such competent professionals, having experience and knowledge in the field of practice, nor to substitute for the
standard of care required of such professionals in interpreting and applying the results of the seismic data provided by this website. Users of the information from
this website assume all liability arising from such use. Use of the output of this website does not imply approval by the governing building code bodies responsible
for building code approval and interpretation for the building site described by latitude/longitude location in the search results of this webstie.
SIERRA ENGINEERING GROUP
BY FF DATE 6-21-19 SUBJECT Sephora - Carlsbad SHEET NO
CHCK
OF
BYFF DATE 6-21-19 SUBJECT Sephora - Carlsbad SHEET NO OF
CHCK BYDATE JOB NO 19035.0
Lateral Wind Analysis for RTU
Per ASCE 7-10 29.5
F=qzxGCrxAf
qz= 0.00256x KzxKztxKdxV2 xl
Kz = V = Islam
V2 12100
Kd = ME Or I =
qz= 23.70 PSF
GCr(Hor.) =
GCr(Vert.)=
Af=bxh andwxh
b = ft (b is the larger of b and w)
w = mj~fl 3j ft
h =jft Including Roof curb height
AM = 58.00 ft'
Af2 = 32.00 ft2
Fl = 2611.46 lbs
F2= 1440.67 lbs
Fv = 1832.49 lbs
ASD Fh = 1566.9 lbs
Fv= 1099.5 lbs ASD
SC5
SIERRA ENGINEERING GROUP
SC6
BYFF DATE 6-21-19SUBJECT Sephora - Carlsbad SHEET NO OF_____
CHCKBY DATE_____ JOB N019035.0
Lateral Seismic Analysis for Components - RTU
= 0.4aPSdSWP 1+2 PerASCE7-10 13.3.1 Fp R/I (. h)
ap =I Rp = z =IM
SdsP2 I 1pf h
Wp =
Fp = 0.392 Wp
Fpmax= 1.6 x Sds x 1p x Wp
1.253 Wp
Fpmin = 0.3 x Sds x 1p x Wp
0.235 Wp
Fp = 0.392 Wp controls Seismic load
709.40 lbs
Controlina Load Case - W vs E
Wind
Fp = 1567 lbs (ASD) Wind Controls
Seismic
Fp (e)= 497 lbs (ASD)
Mechanical Unit information
Width = 5.33 ft
Length 9.7 ft
Height = 6.00 ft
Wp= 1812 lbs
Fp (e)= 497 lbs
Fp (w) = 1567 lbs
Fpv= 1099 lbs
Combination (ASO)
0.60+0.7E
0.60+0.6W
VIP
Fp
X L
w
UPLIFT (LBS) =
SHEAR (LBS) =
Seismic Wind
164.9 NO UPLIFT -887.5694 UPLIFT
496.581 1566.88
SIERRA ENGINEERING GROUP
BY FF DATE 6-2149 SUBJECT Sephora - Carlsbad SHEET NO OF_____
CHKD.BY DATE JOB. NO. 19035.0
tTI:1±W
I......I•I._i_I _I_.I._.IL.j_.I_
WEL
i_LI. _._L
Dip
P I:
:ftLI.J
I_ I•.........1._LI_I_I I.j__L__LI__.jj_J_i
MJ ftb H-' I H
U
1 1LL1 L .LL.1i.l h1 FJ4..ftLL.J......fL I ...........I.I.LL.I..!Itl..IH...
WLII, 1111 F .1. L1 Li:
+Lfl. ..LJ...Lj I--! iIHIFL+f 1 II)..............L.1...
LH H
,•I_•J••I._T.I..i.l.I._i_.__L!..
1{4t!HTrTIFF1flI
I____L.I..........I__'..........
[M'f H
'1rTET!r .._.L..F_.L_...LJ
_.
...L.1. I....I i .. J.ii.
,...1±
050 rt-T LL4J
all
41 1
MI
I
M
H 4,J4.I1(I I I.
....I_I..,
------------------------------
------------ J.1..LL.l.LLL
1IPfj 1I'1 F !II
-HI' H HH HH4
IIiIHIJH +I-H+f-H-'I4
-----------------
LH
II 1 H'H Fl WH'Wl HHW ii LHLWHLH'-H :1 :iHII.i1TIH. J.L:[ HUt F'. IL tIN
LLF.:It:I. IHHHi :IH irFI..HfHJHJH.LELL ---------------------
--------------------------------
I HFH I H H tf
H1
IN IjiIiiF
-I' 11i
I HI IJILiJI 1HITIkH II III :Hi•.i Hi. ILIIIL!I11L II Llf,II IlL IFI H :1
H F 1UHH Ji
------------.
--------------------------------------- -----------
: ...]..ILkLH:LL..LLLi:.L.L
-------------------------------------------
EEH-F L-HrUULLH
SIERRA ENGINEERING GROUP
Project Title: S08
Engineer:
Project ID:
Project Descr:
Description: BM1 - Existing BM
CODE REFERENCES
Calculations perAlSC 360-10, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method: Allowable Strength Design Fy Steel Yield: 50.0 ksi
Beam Bracing: Beam bracing is defined Beam..by-Beam E: Modulus: 29,000.0 ksi
Bending Axis: Major Axis Bending
Unbraced Lengths
Span # 1, Braced @ Mid Span
Span = 27.0 ft
Applied Loads ••.. Service loads entered. Load Factors will be applied for calculations.
Beam self weight NOT internally calculated and added
Uniform Load: D = 0.020, Lr = 0.020 ksf, Tributary Width = 1.0 ft
Uniform Load: D = 0.020, Lr = 0.020 ksl, Tributary Width = 9.250 It, (Trib btwn gridl3/14)
Point Load: D 0.9060, W = 0.8810 k @ 13.50 ft, (RTU2)
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.488:1 Maximum Shear Stress Ratio = 0.068: 1
Section used for this span WI 6x31 Section used for this span WI 6x3I
Me: Applied 43.477 k-ft Va : Applied 5.988 k
Mn! Omega: Allowable 89.134k-ft Vn!Omega : Allowable 87.450 k
Load Combination 4D+Lr Load Combination +D+Lr
Location of maximum on span 13.500 ft Location of maximum on span 0.000 ft
Span # where maximum occurs Span # I Span # where maximum occurs Span # 1
Maximum Deflection Max Downward Transient Deflection 0.226 in Ratio = 1,430 >=360
Max Upward Transient Deflection 0.000 in Ratio = 0 <360
Max Downward Total Deflection 0.512 in Ratio = 633 >=180
Max Upward Total Deflection 0.000 in Ratio = 0 <jQ
0vera11 Maximm u Déflections :
Load Combination Span Max. U Dell Location In Span Load Combination Max. '+' Defi Location in Span
404.r 1 0.5122 13.577 0.0000 0.000
Vertical Reactions Support notation Far left Is #1 Values In KIPS
Load Combination Support I Support 2
Overall MAXimum 5.988 5.988
Overall MiNimum 0.441 0.441
O Only 3.221 3.221
+0+Lr 5.988 5.988
'0'0.750Lr 5.296 5.296
4040.60W 3.485 3.485
4040.750Lr40.450W 5.494 5.494
4040.450W 3.419 3.419
40.600+0.60W 2.197 2.197
+0.60D 1.932 1.932
Lr Only 2.768 2.768
W Only 0.441 0.441
= 0.9091
5.0 X 13.250
818.21 psi
= 900.00 psi
0 Only
= 13.500ft
= Span #1
Maximum Shear Stress Ratio
Section used for this span
fv : Actual
Fv : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
= 0.148:1
5.0 X 13.250
= 33.41 psi
= 225.00 psi
+D+Lr
= 0.000 ft
= Span #1
0.381 in Ratio = 850 >=360
0.000 in Ratio = 0<360
1.091 in Ratio= 296>=180
0.000 in Ratio= 0<180
Project Title: SC9
Engineer:
Project ID:
Project Descr:
Description: BM2 - Retrofit to existing Joist to support RTU2
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method: Allowable Stress Design Fb + 1,000.0 psi E: Modulus of Elasticity
Load Combination ASCE 7-10 Fb - 1,000.0 psi Ebend- xx I ,700.0ksi
Fc - PrIl 1,500.0 psi Eminbend - xx 620.0 ksi
Wood Species : Douglas Fir - Larch Fc - Perp 625.0 psi
Wood Grade : No.1 Fv 180.0 psi
Ft 675.0 psi Density 31.210pc1
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
0(0.906) -
5.0 X 13.250
Span = 27.0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load: D =0.0140, Lr = 0.020 ksf, Tributary Width = 2.0 ft
Point Load: D=0.9060, W = 0.8810k @ 13.50 ft
Maximum Bending Stress Ratio
Section used for this span
fb : Actual
F13: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Maximum Deflections .-•
Load Combination Span Max. ' Defi Location in Span Load Combination Max. '-9 Defl Location in Span
4040.750Lr+0.450W 1 1.0913 13.599 0.0000 0.000
Vertical Reactions Support notation: Far left is #1 Values in KIPS
Load Combination Support 1 Support 2
Overall MAXimum 1.628 1.628
Overall MiNimum 0.441 0.441
D Only 1.025 1.025
404r 1.565 1.565
+O+0.750Lr 1.430 1.430
+0+0.60W 1.289 1.289
+0-+0.750Lr40.450W 1.628 1.628
Project Title: SC1 0
Engineer:
Project ID:
Project Descr:
Printed: 21 JUN 2019, 6:23PM
Description : BM2 - Retrofit to existing Joist to support RTU2
Vertical Reactions Support notation : Far left is #1 Values !nKIPS
Load Combination Support 1 Support 2
4040.450W 1.223 1.223
40.60040.60W 0.879 0.879
+0.600 0.615 0.615
Lr Only 0.540 0.540
W Only 0.441 0.441
Project Title: SC1 1
Engineer:
Project ID:
Project Descr:
Description: BM2 - Retrofit to existing joist to support RTU2
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method: Allowable Stress Design Fb + 2,900.0 psi E: Modulus of Elasticity
Load Combination ASCE 7-10 Fb - 2,900.0 psi Ebend- xx 2,000.0 ksi
Fc - Pill 2,900.0 psi Eminbend - xx 1,016.54 ksi
Wood Species : Trus Joist Fc - Perp 625.0 psi
Wood Grade : Parallam PSL 2.OE Fv 290.0 psi
Fl 2,025.0 psi Density 45.070pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Lr(O.04)
Lr(0.04) D(O.906) W(O.881)
3.5xl 1.875 2
Span = 27.0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load: D = 0.0140 ksf, Tributary Width = 2.0 ft
Point Load: D = 0.9060, W = 0.8810k @ 13.50 ft
Uniform Load: Lr = 0.020 ksf, Extent = 0.0 ->> 9.0 ft, Tributary Width = 2.0 ft
Uniform Load: Lr = 0.020 ksf, Extent = 18.0 ->> 27.0 ft, Tributary Width = 2.0 It
Maximum Bending Stress Ratio =
Section used for this span
fb:Actual =
FB : Allowable
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.551:1 Maximum Shear Stress Ratio
3.5x11.875 Section used for this span
1,437.27 psi N : Actual
2,610.00psi Fv : Allowable
D Only Load Combination
13.500f1 Location of maximum on span
Span # 1 Span # where maximum occurs
0.643 In Ratio = 504 >=360
0.000 in Ratio= 0<360
1.637 in Ratio= 197>=180
0.000 in Ratio = 0<180
= 0.134:1
3.5x11.875
= 34.87 psi
= 261.00 psi
0 Only
= 0.000 ft
= Span #1
Overall Maximum Deflections
Load Combination -- - Span Max. Deft Location In Span Load Combination Max. "-i-' Deft Location in Span
4040.750Lr40.450W 1 1.6373 13.599 0.0000 0.000
.:Ve.flcaI Reactions ........:. :: Support notation : Far left is #1 Values in KIPS
Load Cambinaion Support I Support 2
Overall MAXImum 1.475 1.475
Overall MINimum 0.441 0.441
D Only 1.007 1.007
4O4Lr 1.367 1.367
-,040.750Lr 1.277 1.277
Project Title: SC12
Engineer:
Project ID:
Project Descr:
Description : BM2 - Reimfit to existing Joist to support RTU2
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination Support 1 Support 2
4040.60W 1.271 1.271
+0+0.750Lr40.450W 1.475 1.475
+040.450W 1.205 1.205
40.60D40.60W 0.868 0.868
+0.60D 0.604 0.604
LrOnly 0.360 0.360
W Only 0.441 0.441
im bnear stress Katio =
Section used for this span
Va : Applied
VnlOmega : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
526 >=240
332 >=240
288 >=180
183 >=180
0.191 : 1
W1 6x26
10.780 k
56.520 k
+D+Lr+H, LL Comb Run (LL*)
4.000 ft
Span # 1
Project Title: SC13
Engineer:
Project ID:
Project Descr:
Printed: 21 JUN 2019, 6:27PM
Description: BM6
CODE REFERENCES
Calculations per AISC 360-10, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method: Allowable Strength Design Fy: Steel Yield: 36.0 ksi
Beam Bracing: Beam is Fully Braced against lateral-torsional buckling E: Modulus: 29,000.0 ksl
Bending Axis: Major Axis Bending
D(2.079 Lr2.268l D(O.453)W(0.441) D(o.I91) W(0.44U3.267) Lr3.564) D .297 Lf(O.324) I D(O.297) Lr(O.324) I D.297) Lr(O.324)
WI 6x26 WI 6x26 1 WI 6x26
Span = 4.0 ft Span = 30.0 ft Span = 4.0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform Load: D =0.0110, Lr = 0.0120 ksf, Tributary Width = 27.0 ft
Point Load: D = 2.079, Lr = 2.268 k @0.0 ft
Load for Span Number 2
Uniform Load: D =0.0110, Lr = 0.0120 ksf, Tributary Width = 27.0 ft
Point Load: D =0.19`10, W = 0.4410k @25.0 ft
Point Load: D =0.4530, W = 0.4410k @5.0 ft
Load for Span Number 3
Uniform Load: 0 = 0.0110, Lr = 0.0120 ksf, Tributary Width = 27.0 ft
Point Load: 0 = 3.267, Lr = 3.564k @0.0 ft
DESIGN SUMMARY
Maximum Bending Stress R = 0.853:1
Section used for this span W1 6x26
Ma: Applied 67.697 k-ft
Mn I Omega: Allowable 79.401 k-ft
Load Combination 4O4tr4H, LL Comb Run (*L*)
Location of maximum on span 15.400 ft
Span # where maximum occurs Span #2
Maximum Deflection Max Downward Transient Deflection 0.683 in Ratio
Max Upward Transient Deflection -0.289 in Ratio =
Max Downward Total Deflection 1.248 in Ratio =
Max Upward Total Deflection -0.525 in Ratio =
:overall Maximum Deflections
Load Combination Span Max. Defi Location in Span Load Combination Max. Deli Location In Span
1 0.0000 0.000 *0tr+H -0.4863 0.000
404.r4H 2 1.2478 15.200 0.0000 0.000
3 0.0000 15.200 40+Lr-'+I -0.5252 4.000
Project Title: SC14
Engineer:
Project ID:
Project Descr:
Printed: 21 JUN 2019, 6:27PM
Description: BM6
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination Support 1 Support 2 Support 3 Support 4
Overall MAXimum 17.715 19:168
Overall MINimum -0.086 -0.389
404H 8.903 9.361
+O*L'i+I, LL Comb Run (AlL) 8.903 9.361
404.41, LL Comb Run (*L*) 8.903 9.361
4041+1-I, LL Comb Run (ALL) 8.903 9.361
.4D+141, LL Comb Run (L") 8.903 9.361
404141, LL Comb Run (L4L) 8.903 9361
40414H, LL Comb Run (LL*) 8.903 9.361
40+14H, LL Comb Run (LLL) 8.903 9.361
'0tr4H, LL Comb Run (DL) 8.816 14:308
40+Ir+H, LL Comb Run (ALA) 13.763 14:221
4041r-'H, LL Comb Run (ALL) 13.676 19:168
4041r+H, LL Comb Run (Lu) 12.855 8.973
+0*tr+H, IL Comb Run (L1L) 12.769 13:919
4041r4H, IL Comb Run (ILk) 17.715 13.833
401&r+H, LL Comb Run (ILL) 17.629 18.779
40+S4H 8.903 9.361
4040.750Lr40.750L#I, IL Comb Run (A 8,838 13:071
4040.750Lr40.750L#I, IL Comb Run (A 12.548 13006
4040.750Ir40.750L41, LL Comb Run (A 12.483 16116
-f040.750Lr40.750L4H, LL Comb-Run (L 11.867 9.070
4040.750Lrs0.750L4H, LL Comb Run (L 11.802 12:780
4040,750Lr-f0.750L.*l, LL Comb Run (L 15.512 12:715
10,0.750Ir40.750L.*l, LL Comb Run (1 15.447 16:425
4040.750L40.750S4H, LL Comb Run (" 8.903 9.361
'040.750L40.750S+H, LL Comb Run (*1 8.903 9.361
#040.750L40.75054H, LL Comb Run (AL 8.903 9.361
4040.750L40.750S+H, IL Comb Run (I 8.903 9.361
'090.750L40.750S-*I, LL Comb Run (I 8.903 9.361
4040.750L40.750S#1, LL Comb Run (II 8.903 9.361
+0'0.750L*0.7505+H, LL Comb Run (LI 8.903 9.361
1D+0,60W4H 9.167 9.626
*0*0,70E41 8.903 9.361
'040.750Lr40.750L40.450W41-I, IL Corr 9.036 13,270
4040.750Lr40.750L40.450W4H, LL COlT 12.746 13.205
4040.750Lr40.750140.450W4H, LL Corr 12.681 16.915
4040.7501-r+0.7501-40.450W#l, LL Corr 12.066 9.268
4040.750Lr40.750L40.450W+H, LL Corr 12.001 12.978
l090.750Lr40.750L*0.450W'fH, IL Corr 15.711 12.913
4040.750Lr40.750L40.450W+H LL Corr 15.646 16.623
4040.750L40.750540.450W#I, LL Corn 9.101 9:560
4O40.750L40.750S40.450W+H LL Corn 9.101 9:560
1040.750L40.750S+0.450W+H, LL Corn 9.101 9:560
4040.750L40.750540.450W+H LL Corn 9.101 9560
4040.750140.750S40.450W4H, LL Corn 9.101 9.560
.'0"0750L40750S40450W+H LL Corn 9.101 9:560
4040.750L40.7508'+0.450W41, LL Corn 9.101 9:560
4040.750L40.750S90.5250E'fH, LL Con 8.903 9:361
+D+0.750L40.750S40.5250EH, LL Con 8.903 9:361
4040.750L40.750840.5250E+H, LL Con 8.903 9361
-'D40,750L40,750S40.5250E4l LL Con 8.903 9:361
4040.750L-f0.750840.5250E#l, IL Con 8.903 9:361
40+0.750L40.750540.5250E4H, LL Con 8.903 9:361
#0+0.750L40.750S40.5250E'H, LL Con 8.903 9:361
,0.60D40.60W40.60H 5.606 5.881
460D40.70E40.60H 5.342 5.617
D Only 8.903 9,361
Lr Only, LL Comb Run (AAL) -0.086 4.946
Lr Only, LL Comb Run (AL*) 4.860 4.860
Lr Only, LL Comb Run ('LL) 4.774 9.806
Lr Only, LL Comb Run (LA*) 3,953 0389
Lr Only, LL Comb Run (LL) 3.866 4.558
Lr Only, LL Comb Run (LL1) 8.813 4A71
Project Title: SC1 5
Engineer:
Project ID:
Project Descr:
Description: 8M6
Vertical Reactions Support notation : Far left Is #1 Values in KIPS
Load Combination Support 1 Support 2 Support 3 Support 4
Lr Only, LL Comb Run (LLL) 8.726 9.4f 8-
L Only, LL Comb Run (**L)
I Only LL Comb Run (*L*)
L Only, LL Comb Run (*LL)
L Only, LL Comb Run (L**)
L Only, IL Comb Run (LL)
L Only, IL Comb Run (11*)
L Only, IL Comb Run (LII)
S Only
W Only 0.441 0.441
E Only
H Only
Project Title: SC1 6
Engineer:
Project ID:
Project Descr:
Printed: 21 JUN 2019, 6:28PM
Description: BM7
CODE REFERENCES
Calculations perAlSC 360-10, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method: Allowable Strength Design Fy : Steel Yield: 50.0 ksi
Beam Bracing: Beam is Fully Braced against lateral-torsional buckling E: Modulus: 29,000.0 ksi
Bending Axis: Major Axis Bending
Span = 30.0 ft
Applied Loads .........•. . •:• Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load: 0 = 0.0160, Lr = 0.020 ksf, Tributary Width = 7.0 ft
Point Load: D=0.9060, W = 0.8810 k @5.0 ft
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.400: 1 Maximum Shear Stress Ratio = 0.077 :1
Section used for this span WI 4x22 Section used for this span WI 4x22
Me: Applied 33.131 k-ft Va : Applied 4.865 k
Mn / Omega: Allowable 82.834 k-ft Vn/Omega : Allowable 63.020 k
Load Combination +O.'Is Load Combination +0411
Location of maximum on span 14.486ft Location of maximum on span 0.000 ft
Span # where maximum occurs Span # 1 Span # where maximum occurs Span #1
Maximum Deflection
Max Downward Transient Deflection 0.444 in Ratio = 810 >=360
Max Upward Transient Deflection 0.000 in Ratio = 0 <360
Max Downward Total Deflection 0.943 iin Ratio = 382 >=180
Max Upward Total Deflection 0.000 in Ratio = 0 <180
Overall Maximum Deflections
Load Combination Span Max. Dell Locaon In Span Load Combination Max. Ofl Dell Locallon In Span
4D4t.r 1 0.9433 14.914 0.0000 0.000
;:Ve.rticàl Reactions . . ..
. ... Support notation: Far left is #1 Values In KIPS
Load Combination Support 1 Support 2
Overall MAXimum 4.865 4.261
Overall MINimum 0.734 0.147
D Only 2.765 2.161
4.865 4.261
4040.750Lr 4.340 3.736
4040.60W 3.206 2.249
4Df0.750Lr40.450W 4.670 3.802
4040.450W 3.095 2.227
40.60D+0.60W 2.100 1.385
40.601) 1.659 1.297
LrOnly 2.100 2.100
W Only 0.734 0.147
Project Title: SC1 7
Engineer:
Project ID:
Project Descr:
Description: BM8
CODE REFERENCES
Calculations perAlSC 360-10, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties .::..
Analysis Method: Allowable Strength Design Fy: Steel Yield: 50.0 ksl
Beam Bracing: Beam is Fully Braced against lateral-torsional buckling E: Modulus: 29,000.0 ksi
Bending Axis: Major Axis Bending
Span = 30.0 ft
Applied Loads . . .. Service loads entered. Load Factors will be applied for calculations.
Beam sell weight calculated and added to loading
Uniform Load: D=0.0160, Li = 0.020 ksf, Tributary Width= 3.50 It
Point Load: D = 0.9060, W = 0.8810 k @5.0 it
Uniform Load: 0 0.0160, Lr = 0.020 ksl, Tributary Width = 13.50 ft
DESIGN SUMMARY :.
Section used for this span
Ma: Applied
Mn I Omega: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
W14x30 Section used for this span W14x30
74.508 k-ft Va : Applied 10.385 k
118.014k-ft VnlOmega : Allowable 74.520 k
-*0-*tr Load Combination 40+Lr
14.743ft Location of maximum on span 0.000 ft
Span #1 Span # where maximum occurs Span # 1
0.736 in Ratio = 488 >=360
0.000 in Ratio = 0 <360
1.443 in Ratio = 249 >=180
0.000 in Ratio = 0 <180
Overall Maximum Deflections ' Load Combination Span Max. - Dell Location in Span Load Combination Max. Dell Location in Span
'04Lr 1 1.4434 15.000 0.0000 0.000
Vertical Reactions ........ : ......Support notation : Far left is #1 Values In KIPS
Load Combination Support 1 Support 2
Overall MAXimum 10.385 9.781
Overall MiNimum 0.734 0.147
O Only 5.285 4.681
40+1r 10.385 9.781
4040.750Lr 9.110 8.506
40*0.60W 5.726 4.769
+040.750Lr+0.450W 9.440 8.572
4040.450W 5.615 4.747
.,060D4060W 3.612 2.897
*0.601) 3.171 2.809
Lr0nly 5.100 5.100
Wanly 0.734 0.147
Project Title: SC18
Engineer:
Project ID:
Project Descr:
Printed: 21 JUN 2019, 6:29PM
LIc. #: KW-0600315
CODE REFERENCES
Calculations per AISC 360-10, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method: Allowable Strength Design Fy : Steel Yield: 50.0 ksi
Beam Bracing: Beam is Fully Braced against lateral-torsional buckling E: Modulus: 29,000.0 ksi
Bending Aids: Major Axis Bending
Span = 27.0 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Uniform Load: D =0.0160, Lr = 0.0140 ksf, Tributary Width = 24.250 It, (Roof DL and Reduced Roof LL)
Point Load: D = 0.9060, W = 0.8810k @ 5.0 ft. (RTUI)
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.530:1 Maximum Shear Stress Ratio = 0.126 : I
Section used for this span W16x31 Section used for this span W16x31
Ma: Applied 71.402k-ft Va : Applied 10.978 k
Mn! Omega : Allowable 134.731 k-ft Vn/Omega : Allowable 87.450 k
Load Combination 404tr Load Combination +Dr Location of maximum on span 13.26911 Location of maximum on span 0.000 ft
Span # where maximum occurs Span # I Span # where maximum occurs Span # 1
Maximum Deflection
Max Downward Transient Deflection 0.375 in Ratio = 864 >=360 Max Upward Transient Deflection 0.000 in Ratio = 0 <360 Max Downward Total Deflection 0.869 in Ratio = 373 >=180 Max Upward Total Deflection 0.000 in Ratio = 0 <180
Overall Maximum Deflections . . ...
Load Combination Span Max."-' Dell Location In Span Load Combination Max. +" Defi Location in Span
+D+Lr 1 0.8693 13.500 0.0000 0.000
Vertical Reactions ..' Support notation : Far left is #1 Values in KIPS
Load Combination Support 1 Support 2
Overall MAXimum 10.978 10.408
Overall MiNimum 0.718 0.163
D Only 6.395 5.824
4DfLr 10.978 10.408
+040.750Lr 9.832 9.262
4040.60W 6.825 5.922
*040.750Lr40.450W 10.155 9.335
4040.450W 6.718 5.898
40.60D40.60W 4.268 3.592
40.60D 3.837 3.495
LrOnly 4.583 4.583
W Only 0.718 0.163
Project Title: SC1 9
Engineer:
Project ID:
Project Descr:
Printed: 21 JUN 2019, 6:32PM
L e1 nnflwarpennvnnhIENFRCAIC INC 1583.2018 kulldlfll81213
Description: --None--
CODE REFERENCES
Calculations per AISC 360-10, IBC 2012, CBC 2613, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method: Allowable Strength Design Fy : Steel Yield: 36.0 ksi
Beam Bracing: Completely Unbraced E: Modulus: 29,000.0 ksi
Bending Axis: Minor Axis Bending
Span = 8.0 ft
Applied Loads . Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load(s) for Span Number I
Point Load: D = 0.9060, W = 0.8820k @4.0 ft
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.614:1 Maximum Shear Stress Ratio = 0.042: 1
Section used for this span C12x20.7 Section used for this span C12x20.7
Ma: Applied 3.036k-fl Va : Applied 0.8004 k
Mn I Omega: Allowable 4.944k-ft Vn/Omega : Allowable 19.051 k
Load Combination 40+0.60W Load Combination +D-+0.60W
Location of maximum on span 4.000ft Location of maximum on span 0.000 ft
Span # where maximum occurs Span # 1 Span # where maximum occurs Span # I
Maximum Deflection
Max Downward Transient Deflection 0.146 in Ratio 658 >=360 Max Upward Transient Deflection 0.000 in Ratio = 0 <360
Max Downward Total Deflection 0.254 in Ratio = 377 >=180 Max Upward Total Deflection 0.000 in Ratio = 0 <180
Overall Maximum Deflections
Load Combination Span Max. V Dell Location in Span Load Combination Max. '-'-a Deft Location in Span
+0+0.60W 1 0.2545 4.023 0.0000 0.000
Vertical Reactions .. . . . Support notation : Far left is #1 Values in KIPS
Load Combination Support 1 Support 2
Overall MAXimum 0.800 0.800
Overall MiNimum 0.321 0.321
D Only 0.536 0.536
-'0+0.60W 0.800 0.800
+0*0.450W 0.734 0.734
-+0.600+0.60W 0.586 0.586
40.60D 0.321 0.321
W Only 0.441 0.441
SC2O
BYFF DATE 6-21-19 SUBJECT• Sephora - Carlsbad SHEET NO. OF
CHKD. BY DATE JOB. NO. 19035.0
1-4-141...
... 4LI1I..
:1::..'.::i.::L.:1:1: :L H4::ELL:. :I:i::L ::E: :'...Lt44:jt:f. JFI•I•f.•• :.L. .. ......
K- I 1.11
4J
y I' 'I
M.
.:I..L.i:[..I...I.I4 J.FI.HJ..J..l.:.I ..I:J.fLI..... lii I I I' I
LJj....IJ....HI HHHHIILHHWThiTiWTH1H I.I'T'FFM1..LII .W.LtjIW T1I1I H l 11rUT[HtftHI LW.{L.j i
WJ1TTh 1JflTL111 LL -J-1A r
k F
L 1.11
N L H
*11 it :I:It:c 1111 ..WLHLI I11Lij1LJL
I I H ! CPO
TH f'4ft*[
1J_F+'_Luft± It tt Lj: H L LW_ftftJF4j -
%L1[I
Ltd
SIERRA ENGINEERING GROUP
SC21
BYFF DATE 6-21-19 SUBJECT Sephora - Carlsbad SHEET NO. OF
CHKD.BY DATE JOB. NO. 19035.0
C;
RIP Ell
gh-
L J-1 q ----------
j:.N:!.::::.::::.: :1 :I::".::
I. ........
I
-
L.LLH!I1J.JJ.I.....i...JLL.LJ...J_....11.LI..ii
L'Hu'IHHi I III
...L.L.LLL.I......LI....
Ii
LLL.........
IL !IL i4 1i' kMHH U r H H L L U
HJj1k1H1L:iiiiHHHH H
H$4tLLL
HI
I
F'U H LL
I Li ---------------------------- HHI U :
..LL.Ii.LL LI._LL.L.L.i.LL.F.....Jll.Ji..I. LI1I..1WJ
. - I.........I.L.L.LJ.i.,'......L J I ..LL I .:......I.I..L
T-IMM
LI
H .. ........
......L.'4'JL.L. ILIL.LL JJ..IJ
.i_i........I.1................_II_!....._.....I.I flI uIJ.LL..I. I LI
.Li.'.I IL.L!jjj. ul.l 1.1 '.LLLI .1JJ i ...LI.
I_I_I:..
1.11.1:1.1. .........
+i:LL .1. LI: .......Li
il!liIIJ-IIIIIHIHIf'HIIIIJJIIJI
:H H::LL.I.:I....!IfI: EL:U:ffIJ:.Li::k:.ii.f.H.:.it. Li fH.'
PIELLHI1:IHL
I......LLI+I....i f
I. .H.iII J.I. :I.I.. :LI.'.HI.
L.h11
I I:III.I.[ k'IfF:HI.l
i.I1I.IJii.1 1.I.IiIiIi:
1.
I
ii....I.I....[
.J......:Hi:1---------------
I.ulillI.I:II[I:I:1 .1:
....
Iii:I:1i.I:'
I :LIi.iiFPIf ILk.. LH:1H:L
:ttL:I.
HHH:IHH. JI..I.:..i:...
.I. :IiFILLI. L:LI.4 :1..
[w.tFL
+:+cLL:::HH.fF:
.Ii.i
.i.:i:::E III: .J :. ['I II• ':::.:::
:1 .ri
:I:ftkkkk::I+': ..i.I:I1 :H::: :.+idl....++1±EH
L1
HJLHHII1:IHLILf:Ifl1:H:LIH.IflHIH:
JI
'
------------------------------ ----------------------:I:IHf
.........4•I...:4.FI......L
iIH [[
I.Hi.IIIIILI:I------------
.I.iII+t...I:....
hL i1rLHri
lI:
I II:
---------------------------------------------
:1
i I L F
------
±::I:LL:fti:::.:
:I.:I:I:4:I44::4I4.I4::L:[4.I:i..t:t4l.:I:I
:I:LLF4:LL:L±:IH..E:i:1:LH:I:Eb::I:L :. ::: : :1+H: :LL:
:1:1 :1: :1 ..II:I4::I.:I.::
SIERRA ENGINEERING GROUP
= 0.5591
3x14
= 629.41 psi
= 1,125.00psi
= 9.927f1
= Span #1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
= 0.149:1
3x14
= 33.47 psi
= 225.00 psi
+IJ+Lr
= 0.00011
= Span #1
0.176 In Ratio = 1365>=360
0.000 in Ratio = 0<360
0.339 in Ratio= 708>=180
0.000 in Ratio= 0<180
Project Title: SC22
Engineer:
Project ID:
Project Descr:
Description : Existing Typ Wood Joist - 3x14 @24' oc @ Interior soffit entry
CODE REFERENCES
Calculations per NDS 2012, IBC 2012, CBC 2013, ASCE 7-10
Load Combination Set: ASCE 7-10
Material Properties
Analysis Method: Allowable Stress Design Fb + 1,000.0 psi E: Modulus of Elasticity
Load Combination ASCE 7-10 Fb - 1,000.0 psi Ebend- xx I ,700.0ks1
Fc - Pill 1,500.0 psi Eminbend - xx 620.0ks1
Wood Species : Douglas Fir - Larch Fc - Perp 625.0 psi
Wood Grade : No-1 Fv 180.0 psi
Ft 675.0 psi Density 31.210pcf
Beam Bracing : Beam is Fully Braced against lateral-torsional buckling
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load: D = 0.0140, Lr = 0.020 ksf, Tributary Width = 2.0 ft
Point Load: D = 0.07750 k @2.0(1, (soffit weight)
Maximum Bending Stress Ratio
Section used for this span
fb : Actual
F`13: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
Overall Máximum.Deflectioñs. f..
Load Combination Span Max. °-' Defi Location In Span Load Combination Max. Y Dell Location in Span
4D+Lr 1 0.3385 10.000 0.0000 0.000
Vertical Reactions . Support notation : Far left is #1 Values in KIPS
Load Combination Support I Support 2
Overall MAXimum 0.822 0.760
Overall MiNimum 0.400 0.400
D Only 0.422 0.360
40tr 0.822 0.760
#0'0.750Lr 0.722 0.660
40.60D 0.253 0.216
LrOnly 0.400 0.400
SC23
BY FF DATE 6-21-19 SUBJECT
CHKD. BY DATE -
Sephora - Carlsbad SHEET NO. OF
JOB. NO. 19035.0
.1:i 1 ' ..._ ..
1.... :_1:.
,:TLLflTflifl1f 1 LriI1
...J
.I.HL...LLJ..L.LI.H4.LJJfi.jd.J4...L.LH...IJ..Li Tr1:............EEt:1 ......W.U..i......
.!
-41
... . . U. .J 1. I. -
VI_P'jIiHI'HI'IhIH[:iL
:Fj I
T
H.
I I I I
H.J
i
1.1: ii
H I
I
I I
J F I
1tI•
I HI
H ' t H WI
H I
1
I
:1.1 •II•'
I I I t I III
I
[Ii
H I I
I-
J
Li •I.
I H
11:111
I I I I
I(ii4i1
r ri1
iH
F -1[I
H.... H
I IJ.iJ
'fl
t!i1t!111 !
1 R LLLJ::frE 111k4.I fi•jJ•I.-1f---H 1L11..
Set
SIERRA ENGINEERING GROUP
SC24
CFS Version 10.0.1
Section: 362S162-43.cfss
362S162-43, 33 ksi Stud
SSMA Library
Rev. Date: 9/26/2016 12:00:00 PM
By: RSG Software
Printed: 6/21/2019 6:09:08 PM
Francis Franco
Sierra Engineering Group
Page 1
Section Inputs
Material: A1003 ST Grade 331-I
Apply strength increase from cold work of forming.
Modulus of Elasticity, E 29500 ksi
Yield Strength, Fy 33 ksi
Tensile Strength, Fu 45 ksi
Warping Constant Override, Cw 0 in'6
Torsion Constant Override, J 0 in'4
Net Section Ratio (Lnet/L) 0.1875
Stud, Thickness 0.0451 in (18 Gage)
Placement of Part from Origin:
X to center of gravity
Y to center of gravity
Outside dimensions, Open
Length Angle
(in) (deg)
1 0.5000 270.000
2 1.6250 180.000
3 3.6250 90.000
4 1.6250 0.000
5 0.5000 -90.000
0 in
0 in
shape
Radius Web k Hole Size Distance
(in) Coef. (in) (in)
0.071200 None 0.000 0.0000 0.2500
0.071200 Single 0.000 0.0000 0.8125
0.071200 Cee 0.000 1.5000 1.8125
0.071200 Single 0.000 0.0000 0.8125
0.071200 None 0.000 0.0000 0.2500
SC25
CFS Version 10.0.1
Analysis: Exterior Soffit - Cantilever bm.cfsa
Rev. Date: 6/20/20198:09:56 PM
By: Francis Franco
Printed: 6/21/2019 6:09:09 PM
Francis Franco
Sierra Engineering Group
Page 1
Analysis Inputs
Members
Section File Revision Date and Time
1 362S162-43.cfss 9/26/2016 12:00:00 PM
Start Loc. End Loc. Braced R k4 Lm
(ft)
(ft) Flange (k) (ft)
1 0.0000 2.5800 None 0.0000 0.0000 20.0000
ex ey
(in) (in)
1 0.000 0.000
Supports
Type Location
(ft)
1 XYT 0.0000
2 XYT 0.7500
Loading: Dead Load
Bearing Fastened
(in)
1.00 No
1.00 No
K
1.0000
1.0000
Type Angle Start Loc. End Loc. Start End
(deg) (ft) (ft) Magnitude Magnitude
1 Concentrated 90.000 2.5000 NA -0.050000 NA k
Bearing Length 1.00 in
Load Combination: D
2016 North American Specification - US (ASD)
Specification: Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
Load Combination: D+L
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 1.000
4 Product Load 1.000
SC26
CFS Version 10.0.1
Analysis: Exterior Soffit - Cantilever bm.cfsa
Rev. Date: 6/20/2019 8:09:56 PM
By: Francis Franco
Printed: 6/21/2019 6:09:09 PM
Load Combination: D+Lr
Francis Franco
Sierra Engineering Group
Page 2
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Roof Live Load 1.000
Load Combination: D+S
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Snow Load 1.000
Load Combination: D+0.75(L+Lr)
Specification: 2016 North American Specification
Inflection Point Bracing: No
Loading' Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Roof Live Load 0.750
Load Combination: D+0.75(L+S)
Specification: 2016 North American Specification
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Snow Load 0.750
- US (ASD)
- US (ASD)
Load Combination: D+0.6W
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Wind Load 0.600
Load Combination: D+0.7E
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.700
SG27
CFS Version 10.0.1
Analysis: Exterior Soffit - Cantilever bm.cfsa
Rev. Date: 6/20/2019 8:09:56 PM
By: Francis Franco
Printed: 6/21/2019 6:09:09 PM
Francis Franca
Sierra Engineering Group
Page 3
Load Combination,: D+0 .75(0. 6W+L+Lr)
Specification: 2016 North American Specification
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Roof Live Load 0.750
6 Wind Load 0.450
Load Combination: D+0.75(0.6W+L+S)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Snow Load 0.750
6 Wind Load 0.450
- US (ASD)
Load Combination: 0+0.75 (0. 7E+L+Lr)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.525
4 Live Load 0.750
5 Product Load 0.750
6 Roof Live Load 0.750
Load Combination: D+0.75(0.7E+L+S)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.525
4 Live Load 0.750
5 Product Load 0.750
6 Snow Load 0.750
Load Combination: 0.6D+0.6W
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 0.600
2 Dead Load 0.600
3 Wind Load 0.600
Load Combination: 0.6D+0.7E
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 0.600
2 Dead Load 0.600
3 Earthquake Load 0.700
SC28
US Version 10.0.1
Analysis: Exterior Soffit - Cantilever bm.cfsa
Rev. Date: 6/20/2019 8:09:56 PM
By: Francis Franco
Printed: 6/21/2019 6:09:09 PM
Francis Franco
Sierra Engineering Group
Page 4
Member Check - 2016 North American Specification - US (ASD)
Load Combination: D
Design Parameters at 0.75000 ft, Left side:
Lx 0.75000 ft Ly 0.75000 ft Lt 0.75000 ft
Kx 1.0000 Ky 1.0000 Kt 1.0000
Section: 362S162-43.cfss
Material Type: A1003 ST Grade 33H, Fy=33 ksi
Cbx 1.6684 Cby 1.0000 ex 0.0000 in
Cmx 1.0000 Cmy 1.0000 ey 0.0000 in
Braced Flange: None k4 0 k
Red. Factor, R: 0 Lm 20.00000 ft
Loads: P Mx Vy My Vx
(k) (k-in) (k) (k-in) (k)
Total 0.0000 -1.0732 -0.1197 0.0000 0.0000
Applied 0.0000 -1.0732 -0.1197 0.0000 0.0000
Strength 4.3309 7.4218 0.6759 2.4939 1.5542
Effective section properties at applied loads:
Ae 0.33977 inA2 Ixe 0.70993 inA4 lye 0.12690 inA4
Sxe(t) 0.39169 inA3 Sye(l) 0.23621 inA3
Sxe(b) 0.39169 inA3 Sye(r) 0.11667 inA3
Interaction Equations -.
NAS Eq. H1.2-1 (P, Mx, My) 0.000 + 0.145 + 0.000 = 0.145 <= 1.0
NAS Eq. H2-1 (Mx, Vy) Sqrt(0.020 + 0.031)= 0.228 <= 1.0
NAS Eq. H2-1 (My, Vx) Sqrt(0.000 + 0.000)= 0.000 <= 1.0
Web Crippling Check - 2016 North American Specification - US (ASD)
Load Combination: D
Parameters at 0.75000 ft:
Total Load: 0.17179 k on bottom flange
Total Moment: -1.0732 k-in
Bearing: 1.0000 in
Flange fastened to bearing surface: No
Distance from edge of bearing to edge of opposite load: 0.66667 ft
Section: 362S162-43.cfss
Material Type: A1003 ST Grade 33H, Fy=33 ksi
Applied Load: 0.17179 k on bottom flange
Applied Moment: -1.0732 k-in
Distance from edge of bearing to end of member: 0.70833 ft
Part Elem Calculation Type Pa (k) Pay (k) Notes
1 3 Cee, US-IOF 0.50097 0.50097 N<3
Web Crippling Strength 0.50097
Web Crippling Check: 0.17179 k <= 0.50097 k
Moment Check: 1.0732 k-in <= 7.5035 k-in
Interaction Equations
NAS Eq. 113-la (P, M) 0.189 + 0.086 = 0.275 <= 0.782
Maximum Shears, Moments, and Deflections
SC29
CFS Version 10.0.1
Analysis: Exterior Soffit - Cantilever bm.cfsa
Rev. Date: 6/20/2019 8:09:56 PM
By: Francis Franco
Printed: 6/21/2019 6:09:09 PM
Francis Franco
Sierra Engineering Group
Page 5
Load Combination: D, Y Direction
Location Shear(l) Shear'(r) Reaction
(ft) (k) 1(k) (k)
0.0000 0.00000 -0.11881 -0.11881
0.7500 -0.11968 0.05211 0.17179
Location Moment Location Deflection Inflections
(ft) (k-in) (ft) (in) (ft)
0.7500 -1.0732 0.4331 0.000266 2.5769
2.5800 -0.011382
BY FF DATE 6-2149 SUBJECT Sephora - Carlsbad SHEET NO. OF_____
CHKD. BY DATE JOB. NO. 19035.0
:.E::I:.±:L::J.:H: H--------
If..--
--------
.LJJIJ1.LJ.....LLLJ.......-
- ..... .1 ....
H.............- Wi
!J..I..LLLLJ LL..L.LL .J.L.ILJ .1.......1 I.L..i..
ftk J".L.L ...
-h I Hr4*ift- *H1* i1+k ''ill ('_..J__11111 liii I I
1 111 1 F
i I: 'I 'i7 MIWT
.1 :1........IELLL+:
..FIH.H-----LLJ..4i.J4i....iIL.i.I IIiIi.jii HH
F EL:Li:
HHI1HHLIHHHW I HHHH
IIiH'!IiIT[t1*[ ifHi I +.4LLE.t
iH;HIIIWHI1I
}j.
H....HH+FI+H: :±::J: JiIiLiLI':Hiim1:iHI[[HL F I t:LLH:LLL
_7HHH
EL 1.
I
------------....LFfI+'r±:H±.* :f.HJ+I:H ------------------------------------------------------- ----------------
LF1iI-Lr!-ILrH HLIIl{[IIIiHiIHIIiIiIHIIUI[LiFIL
..L•_L .I LFLI:H:HiiHHI ... II .1 .. H Y..H. IL JIIH11W[H:IH1I'I11IW1IF LI I ----------I..
I • .1 . I.,......... HH
}tIH:±j.IHH
f111 IiH.HiIHjJLrlil
-1-•L1.........Li......I.... H.I1J.L .F :1
-1IiL[IIII1ILII'-IIIiIiI[LrIILIi1HII;JHIFIHHI-i-II-LIJ
H.HIF[i.IW1Li....LL(dI:iiH::
.....F:LHL"H:------H1H ..iJ.:[.I..i..i..I:I...LI: -IL1 HLH+i :,:HHHTEFI - 1.1: HI.------------------
----------
:[III.....tIHI'.'LijHH.H: ---------------- t.i.I1I:J:Li ii:I.III1[: IH :r[I: .1 1.11 HII.
IIIIiiIHjIF
I'1 ii.I----------
---------- iIiI....II:
LU
ILH:.Li..I.:.I...
U
I.: }LW:.LJ:....Lll.,i.I..LL'.i I
---------------I I '
'F[IIIIIHHIfi 1-i -'-I--IIHJ
I 4111
.:Li.LLj.:i---.:L..Ii:...Li:
----------------
-I---III1;II-
i I IIIiLrIII .L:1Li iL1HIIi'HI HH.HrlL r
It r[LftHH
LIi Li WIHH LLLULLL1 LUIUFLU
::+: :If:H.L :E4j: ::i±1:: :::r: ± ::: :1:k :k :: :F1:I:1IT:F1:
: r:Lb: :L6: :.E: ::If:
SIERRA ENGINEERING GROUP
k
Coef.
0.000
0.000
0.000
0.000
0.000
Hole Size
(in)
0.0000
0.0000
1.5000
0.0000
0.0000
Distance
(in)
0.2500
0.8125
4.0000
0.8125
0.2500
SC31
CFS Version 10.0.1
Section: BUHI-1.cfss
1000S162-54, 50 ksi Stud
SSMA Library
Rev. Date: 6/21/2019 9:49:15 AM
By: Francis Franco
Printed: 6/21/2019 6:10:00 PM
Francis Franco
Sierra Engineering Group
Page 1
+
Section Inputs
Material: A1003 ST Grade 50H
Apply strength increase from cold work of forming.
Modulus of Elasticity, E 29500 ksi
Yield Strength, Fy 50 ksi
Tensile Strength, Fu 65 ksi
Warping Constant Override, Cw 0 inA6
Torsion Constant Override, J 0 in'4
Connector Spacing 0 in
Net Section Ratio (Lnet/L) 0.1875
Part 5, Thickness 0.0451 in (18 Gage)
Placement of Part from Origin:
X to center of gravity -21.65 in
Y to center of gravity 0 in
Outside dimensions, Open shape
Length Angle Radius Web
(in) (deg) (in)
1 0.5000 270.000 0.071200 None
2 1.6250 180.000 0.071200 Single
3 8.0000 90.000 0.071200 Cee
4 1.6250 0.000 0.071200 Single
5 0.5000 -90.000 0.0.71200 None
Track, Thickness 0.0566 in (16 Gage)
Placement of Part from Origin:
X to center of gravity 0 in
Y to center of gravity -3.82 in
Outside dimensions, Open shape
Length Angle Radius Web k Hole Size Distance
(in) (deg) (in) Coef. (in) (in)
1 1.5000 270.000 0.084900 Single 0.000 0.0000 0.7500
2 6.1981 180.000 0.0:84900 Cee 0.000 0.0000 3.0991
3 1.5000 90.000 0.084900 Single 0.000 0.0000 0.7500
SC32
CFS Version 10.0.1
Section: BUHI-1 .cfss
10008162-54, 50 ksi Stud
SSMA Library
Rev. Date: 6/21/2019 9:49:15 AM
By: Francis Franco
Printed: 6/21/2019 6:10:00 PM
Francis Franco
Sierra Engineering Group
Page 2
Part 3, Thickness 0.0566 in (16 Gage)
Placement of Part from Origin:
X to center of gravity 7.4378e-7 in
Y to center of gravity 3.82 in
Outside dimensions, Open shape
Length Angle Radius Web
(in) (deg) (in)
1 1.5000 90.000 0.084900 Single
2 6.1981 360.000 0.084900 Cee
3 1.5000 270.000 0.084900 Single
Part 4, Thickness 0.0451 in (18 Gage)
Placement of Part from Origin:
k Hole Size Distance
Coef. (in) (in)
0.000 0.0000 0.7500
0.000 0.0000 3.0991
0.000 0.0000 0.7500
X to center of gravity 2.65 in
Y to center of gravity -1.6847e-7 in
Outside dimensions, Open shape
Length Angle Radius
(in) (deg) (in)
1 0.5000 90.000 0.071200
2 1.6250 360.000 0.071200
3 8.0000 270.000 0.071200
4 1.6250 180.000 0.071200
5 0.5000 90.000 0.071200
Web k Hole Size Distance
Coef. (in) (in)
None 0.000 0.0000 0.2500
Single 0.000 0.0000 0.8125
Cee 0.000 1.5000 4.0000
Single 0.000 0.0000 0.8125
None 0.000 0.0000 0.2500
SG33
CFS Version 10.0.1
Analysis: Exterior Soffit - glazing support.cfsa
Rev. Date: 6/21/2019 9:54:45 AM
By: Francis Franco
Printed: 6/21/2019 6:10:00 PM
Francis Franca
Sierra Engineering Group
Page 1
Analysis Inputs
Members
Section File Revision Date and Time
1 BtJH1-1.cfss 6/21/2019 9:49:15 AM
Start Loc. End Loc. Braced R k4 Lm
(ft) (ft) Flange (k) (ft)
1 0.000 24.500 None 0.0000 0.0000 20.000
ex ey
(in) (in)
1 0.000 0.000
Supports
Type Location Bearing Fastened K
(ft) (in)
1 XYT 0.000 1.00 No 1.0000
2 X 8.000 1.00 No 1.0000
3 X 16.000 1.00 No 1.0000
4 XYT 24.500 1.00 No 1.0000
Loading: Dead Load
Type Angle Start Loc. End Loc. Start End
(deg) (ft) (ft) Magnitude Magnitude
1 Distributed 90.000 0.000 24.500 -0.01000 -0.01000 k/ft
Loading: Wind Load
Type Angle Start Loc. End Loc. Start End
(deg) (ft) (ft) Magnitude Magnitude
1 Distributed 0.000 0.000 24.500 -0.25200 -0.25200 k/ft
Load Combination: D
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
SC34
CFS Version 10.0.1
Analysis: Exterior Soffit - glazing support.cfsa
Rev. Date: 6/21/2019 9:54:45 AM
By: Francis Franco
Printed: 6/21/2019 6:10:00 PM
Load Combination: D+L
Francis Franco
Sierra Engineering Group
Page 2
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 1.000
4 Product Load 1.000
Load Combination: D+Lr
Specification: 2016 North American Specification US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Roof Live Load 1.000
Load Combination: D+S
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Snow Load 1.000
Load Combination: D+0.75(L4-Lr)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Roof Live Load 0.750
Load Combination: D+0.75(L+S)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Snow Load 0.750
Load Combination: D+0.6W
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Wind Load 0.600
SC35
CFS Version 10.0.1
Analysis: Exterior Soffit - glazing support.cfsa
Rev. Date: 6/21/2019 9:54:45 AM
By: Francis Franco
Printed: 6/21/2019 6:10:00 PM
Francis Franco
Sierra Engineering Group
Page 3
Load Combination.: D+0.7E
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.700
Load Combination: D+0.75(0.6W+L+Lr)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Roof Live Load 0.750
6 Wind Load 0.450
Load Combination: D+0.75(0.6W+L+S)
Specification: 2016 North American Specification US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Snow Load 0.750
6 Wind Load 0.450
Load Combination: D+0 .75(0. 7E+L+Lr)
Specification: 2016 North American Specification
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.525
4 Live Load 0.750
5 Product Load 0.750
6 Roof Live Load 0.750
Load Combination: D+0.75(0.7E+L+S)
Specification: 2016 North American Specification
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.525
4 Live Load 0.750
5 Product Load 0.750
6 Snow Load 0.750
Load Combination: 0.6D+0.6W
- US (ASD)
- US (ASD)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 0.600
2 Dead Load 0.600
3 Wind Load 0.600
SC36
CFS Version 10.0.1
Analysis: Exterior Soffit - glazing support.cfsa
Rev. Date: 6/21/2019 9:54:45 AM
By: Francis Franco
Printed: 6/21/2019 6:10:00 PM
Francis Franco
Sierra Engineering Group
Page 4
Load Combination: 0.6D-4-0.7E
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 0.600
2 Dead Load 0.600
3 Earthquake Load 0.700
Member Check - 2016 North American Specification - US (ASD)
Load Combination: D+0.6W
Design Parameters at 16.000 ft, Left side:
Lx 24.500 ft Ly 8.000 ft Lt 24.500 ft
I(x 1.0000 Ky .1.0000 Kt 1.0000
Section: BUH1-1.cfss
Material Type: A1003 ST Grade 50H, Fy=50 ksi
Cbx 1.0133 Cby 2.7133 ex 0.0000 in
Cmx 1.0000 Cmy 1.0000 ey 0.0000 in
Braced Flange: None k4) 0 k
Red. Factor, R: 0 Lm 20.000 ft
Loads: P Mx Vy My Vx
(k) (k-in) (k) (k-in) (k)
Total 0.000 13.963 -0.064 -12.732 -0.619
Applied 0.000 13.963 -0.064 -12.732 -0.619
Strength 0.960 58.141 7.869 49.855 10.165
Effective section properties at applied loads:
Ae 2.03562 inA2 Ixe 24.232 inA4 lye 12.577 inA4
Sxe(t) 5.8864 in"3 Sye(l) 3.9539 in'3
Sxe(b) 5.9652 in"3 Sye(r) 4.1683 in"3
Interaction Equations
NAS Eq. H1.2-1 (P, Mx, My) 0.000 + 0.240 + 0.255 = 0.496 <= 1.0
NAS Eq. H2-1 (Mx, Vy) Sqrt(0.017 + 0.000)= 0.132 <= 1.0
NAS Eq. H2-1 (My, Vx) Sqrt(0.039 + 0.004)= 0.206 <= 1.0
Shear flow between parts due to: Vertical Shear Horizontal Shear
Part Part 5 0.00000 k/ft 0.80839 k/ft
Part Track 0.06159 k/ft 0.00000 k/ft
Part Part 3 0.06159 k/ft 0.00000 k/ft
Part Part 4 0.00000 k/ft 0.80839 k/ft
Web Crippling Check - 2016 North American Specification - US (ASD)
Load Combination: D+0.6W
Parameters at 16.000 ft:
Total Load: 1.3868 k on left flange
Total Moment: -12.732 k-in
Bearing: 1.0000 in
Flange fastened to bearing surface: No
Distance from edge of bearing to edge of opposite load: 24.500 ft
Section: BUH1-1.cfss
Material Type: A1003 ST Grade 50H, Fy=50 ksi
Applied Load: 1.3868 k on left flange
SC37
US Version 10.0.1
Analysis: Exterior Soffit - glazing support.cfsa
Rev. Date: 6/21/2019 9:54:45 AM
By: Francis Franca
Printed: 6/21/2019 6:10:00 PM
Francis Franco
Sierra Engineering Group
Page 5
Applied Moment: -12.732 k-in
Distance from edge of bearing to end of member: 8.4583 ft
Part Elem Calculation Type Pa (k) Fax (k) Notes
2 2 Cee, UU-IOF 0.8970 0.8970 R/t>l
3 2 Cee, DU-IOF 0.8970 0.8970 R/t>1
Web Crippling Strength 1.7940
Web Crippling Check: 1.3868 k <= 1.7940 k
Moment Check: 12.732 k-in <= 64.834 k-in
Interaction Equations
NAS Eq. 53-la (F, M) 0.391 + 0.118 = 0.508 <= 0.782
Maximum Shears, Moments, and Deflections
Load Combination: D+0.6W, Y Direction
Location Shear(l) Shear (r) Reaction
(ft) (k) (k) (k)
0.000 0.00000 0.20961 0.20961
24.500 -0.20961 0.00000 0.20961
Location Moment Location Deflection Inflections
(ft) (k-in) (ft) (in) (ft)
12.250 15.407 12.250 -0.19355
Maximum Shears, Moments, and Deflections
Load Combination: D+0.6W, X Direction
Location Shear(l) Shear(r) Reaction
(ft) (k) (k) (k)
0.000 0.0000 0.4868 0.4868
8.000 -0.7228 0.5902 1.3131
16.000 -0.6194 0.7674 1.3868
24.500 -0.5178 0.0000 - 0.5178
Location Moment Location Deflection Inflections
(ft) (k-in) (ft) (in) (ft)
3.219 9.402 3.584 -0.019483 6.439
8.000 -11.332 9.080 0.001471 10.246
11.904 2.492 11.813 -0.000207 13.561
16.000 -12.732 14.818 0.001956 17.651
21.076 10.639 20.688 -0.024928
SC38
CFS Version 10.0.1
Section: 362S162-43.cfss
362S162-43, 33 ksi Stud
SSMA Library
Rev. Date: 9/26/2016 12:00:00 PM
By: RSG Software
Printed: 6/21/2019 6:10:18 PM
Francis Franco
Sierra Engineering Group
Page 1
Section Inputs
Material: A1003 ST Grade 33H
Apply strength increase from cold work of forming.
Modulus of Elasticity, E 29500 ksi
Yield Strength, Fy 33 ksi
Tensile Strength, Fu 45 ksi
Warping Constant Override, Cw 0 in'6
Torsion Constant Override, J 0 in'4
Net Section Ratio (Lnet/L) 0.1875
Stud, Thickness 0.0451 in (18 Gage)
Placement of Part from Origin:
X to center of gravity 0 in
Y to center of gravity 0 in
Outside dimensions, Open shape
Length Angle Radius Web k Hole Size Distance
(in) (deg) (in) Coef. (in) (in)
1 0.5000 270.000 0.071200 None 0.000 0.0000 0.2500
2 1.6250 180.000 0.071200 Single 0.000 0.0000 0.8125
3 3.6250 90.000 0.071200 Cee 0.000 1.5000 1.8125
4 1.6250 0.000 0.071200 Single 0.000 0.0000 0.8125
5 0.5000 -90.000 0.071200 None 0.000 0.0000 0.2500
SC39
CFS Version 10.0.1
Analysis: Exterior soffit - strongback.cfsa
Rev. Date: 6/21/2019 1:21:56 PM
By: Francis Franco
Printed: 6/21/2019 6:10:18 PM
Francis Franco
Sierra Engineering Group
Page 1
Analysis Inputs
Members
Section File Revision Date and Time
1 362S162-43.cfss . 9/26/2016 12:00:00 PM
Start Loc. End Loc. Braced R k4 Lm
(ft) (ft) Flange (k) (ft)
1 0.0000 6.8330 None 0.0000 0.0000 20.0000
ex ey
(in) (in)
1 0.000 0.000
Supports
Type Location Bearing Fastened K
(ft) (in)
1 XYT 0.0000 1.00 No 1.0000
2 XYT 6.8330 i.c0 No 1.0000
Loading: Dead Load
Type Angle Start Loc. End Loc. Start End
(deg) (ft) (ft) Magnitude Magnitude
1 Distributed 90.000 0.0000 6.8330 -0.040000 -0.040000 k/ft
Load Combination: D
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
Load Combination: D+L
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 1.000
4 Product Load 1.000
SC4O
CFS Version 10.0.1
Analysis: Exterior soffit - strongback.cfsa
Rev. Date: 6/21/2019 1:21:56 PM
By: Francis Franco
Printed: 6/21/2019 6:10:18 PM
Load Combination: D+Lr
Francis Franco
Sierra Engineering Group
Page 2
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Roof Live Load 1.000
Load Combination:: D+S
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self weight 1.000
2 Dead Load 1.000
3 Snow Load 1.000
Load Combination: D+0.75(L+Lr)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Roof Live Load 0.750
Load Combination: D+0.75(L+S)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Snow Load 0.750
Load Combination: D+0.6W
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Wind Load 0.600
Load Combination: D+0.7E
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.700
SC41
CFS Version 10.0.1
Analysis: Exterior soffit - strongback.cfsa
Rev. Date: 6/21/2019 1:21:56 PM
By: Francis Franco
Printed: 6/21/2019 6:10:18 PM
Francis Franco
Sierra Engineering Group
Page 3
Load Combination: D+O .75(0. 6W+L+Lr)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Roof Live Load 0.750
6 Wind Load 0.450
Load Combination: D+0.75(0.6W+L+S)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self weight 1.000
2 Dead Load 1.000
3 Live Load 0.750
4 Product Load 0.750
5 Snow Load 0.750
6 Wind Load 0.450
Load Combination: D+0 .75 (0. 7E-I-L+Lr)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.525
4 Live Load 0.750
5 Product Load 0.750
6 Roof Live Load 0.750
Load Combination: D+0.75(0.7E+L+S)
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 1.000
2 Dead Load 1.000
3 Earthquake Load 0.525
4 Live Load 0.750
5 Product Load 0.750
6 Snow Load 0.750
Load Combination: 0.6D+0.6W
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 0.600
2 Dead Load 0.600
3 Wind Load 0.600
Load Combination: 0.6D+0.7E
Specification: 2016 North American Specification - US (ASD)
Inflection Point Bracing: No
Loading Factor
1 Beam Self Weight 0.600
2 Dead Load 0.600
3 Earthquake Load 0.700
SC42
US Version 10.0.1
Analysis: Exterior soffit - strongback.cfsa
Rev. Date: 6/21/2019 1:21:56 PM
By: Francis Franca
Printed: 6/21/2019 6:10:18 PM
Francis Franco
Sierra Engineering Group
Page 4
Member Check - 2016 North American Specification - US (ASD)
Load Combination: D
Design Parameters at 3.4165 ft:
Lx 6.8330 ft Ly 6.8330 ft Lt 6.8330 ft
Kx 1.0000 Ky 1.0000 Kt 1.0000
Section: 362S162-43.cfss
Material Type: A1003 ST Grade 33H, Fy=33 ksi
Cbx 1.1364 Cby 1.0000 ex 0.0000 in
Cmx 1.0000 Cmy 1.0000 ey 0.0000 in
Braced Flange: None k4 0 k
Red. Factor, R: 0 Lm 20.0000 ft
Loads: P Mx Vy My Vx
(k) (k-in) (k) (k-in) (k)
Total 0.0000 2.8823 0.0000 0.0000 0.0000
Applied 0.0000 2.8823 0.0000 0.0000 0.0000
Strength 1.5254 5.9361 0.6759 1.9627 1.5542
Effective section properties at applied loads:
Ae 0.33977 in'2 Ixe 0.70993 inA4 lye 0.12690 in4
Sxe(t) 0.39169 in"3 Sye(l) 0.23621 in"3
Sxe(b) 0.39169 in"3 Sye(r) 0.11667 in'3
Interaction Equations
NAS Eq. 51.2-1 (P, Mx, My) 0.000 + 0.486 + 0.000 = 0.486 <= 1.0
NAS Eq. 52-1 (Mx, Vy) Sqrt(0.148 + 0.000)= 0.384 <= 1.0
NAS Eq. H2-1 (My, Vx) Sqrt(0.000 -P 0.000)= 0.000 <= 1.0
Web Crippling Check -2016 North American Specification - US (ASD)
Load Combination: D
Parameters at 0.0000 ft:
Total Load: 0.14061 k on bottom flange
Total Moment: 0.0000 k-in
Bearing: 1.0000 in
Flange fastened to bearing surface: No
Distance from edge of bearing to edge of opposite load: 6.8330 ft
Section: 3625162-43.cfss
Material Type: A1003 ST Grade 335, Fy=33 ksi
Applied Load: 0.14061 k on bottom flange
Applied Moment: 0.0000 k-in
Distance from edge of bearing to end of member: 0.0000 ft
Part Elem Calculation Type Pa (k) Pay (k) Notes
1 3 Cee, US-EOF 0.22678 0.22678
Web Crippling Strength 0.22678
Web Crippling Check: 0.14061 k <= 0.22678 k
Moment Check: 0.0000 k-in <= 7.5035 k-in
Interaction Equations
NAS Eq. 53-la (P, M) 0.305 + 0.000 = 0.305 <= 0.782
Maximum Shears, Moments, and Deflections
SC43
CFS Version 10.0.1
Analysis: Exterior soffit - strongback.cfsa
Rev. Date: 6/21/2019 1:21:56 PM
By: Francis Franco
Printed: 6/21/2019 6:10:18 PM
Francis Franco
Sierra Engineering Group
Page 5
Load Combination: D, Y Direction
Location Shear(l) Shear(r) Reaction
(ft) (k) (k) (k)
0.0000 0.00000 0.14061 0.14061
6.8330 -0.14061 0.00000 0.14061
Location Moment Location Deflection Inflections
(ft) (k-in) (ft) (in) (ft)
3.4165 2.8823 3.4165 -0.096386
69
SAN DIEGO REGIONAL"
HAZARDOUS MATEjES
QUESTIONNAIRE
I
°i
OFFICE USE ONLY
g —H MW- flfl7(o (o.
BPDATE_I _I
Business Name
SEPHORAUSA
Business CoMact , (.3.
- NATAUASiORTEN ç., Telephone U 415.802.4690
Project Address City ..ç(. \ State 2525 EL CAMINO REAL, SPACE #214 CARLSBA)> \, CA
Zip Code
92008
APN#
156-302-07,156-302-08
Mailing Address City . State Zip Code Plan FileU
525 MARKET STREET. 11TH FLOOR SAN FRANCISCO CA 94105
Project Contact Applicant E-mail
GREG ANDERSON
- -
GREG.ANDERSON@SEPHORA.COM
Telephone U
415284.3477
inc TOJlOW9 quesuona represent me mcluty-s acuvmes, NUT inc specmc project aescnpuon.
PMT I: FIRE DEPARTMENT - HAZARDOUS MATERJALS DIVISION: OCCUPANCY CL$SlF1cATlON:_not peulmtfot prpjecls the CIty p1 San DIeiot:IndIcate by eliding the item, whether your business will use, process, or store any of the foilov.ing_hazardousmaterials. U any of the items are aided. applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project): ,p..86
. 1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2._Conieressed Gaas 8. Oxidizers 10 Cryogenics 14. Other Health Hazards
13.FlammablelCombustibte Liquids] 7 Pyrophoncs 11, Highly Toxic or Toxic Materials 15. None of TIeso. / ) 4. Flammable sours 8, Unstable Reactives 12. Radioactives Pd. 7i ri I) q
Call (858)55.8706prIor to the issuance of a building Permit. -
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy:
YES NO (for new construction or remodeling projects)
0 IN is your business listed on the reverse side of this form? (check all that apply).
C 0 Will your business dispose of Hazardous Substances or Medical Waste In any amount? (3 Will your business store or handle Hazardous Substancós in quantities greater than or equal to 55 gallons, 500
pounds andlor 200 cubic feet?
0 (I WE your business store or handle carclnogenslreproductive toxins in any quantity?
0 IXI Will your business use an existing or Install an undergiound storage tank?
0 (N Will your business store or handle Regulated Substances (CelARP)?
0 (N Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
8, 0 (N Will your business store petroleum In tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1.320 gallons? (California's Aboveground Petroleum Storage Act).
[the answer to any
Diego, CA 92123.
CalARP Exempt
Oato initials
CalARP Required
Oat. 1n1ts1e
CalARP Complete
Dat. Initials'
pAMV in: sAit 131=Qn couryiR POLLtfl OM'CQNTROL DISThICTIAPCDI: Any YES answer requires a stamp from APCD 10124 Old Grove Road, San
DlegO. CA 92131 aXdcomcadcoun&caoov (858);588-2650). No stamp required If 01 Yes AW 03 Yes AW 04-06 No]. The following questions are intended
to identify the majority of air pollution issues at the planning stage.: Projects may require additional measures not Identified by these questions. For comprehensive requirements contact APCD; Residences are typically exempt, except - those with more than one building' on the property; single buildings with more than four dwelling units: townhomes; condos; mixed-commerclal use: deliberate bums; resIdences forming part of a larger project rExcludes garages & small outbuildings.)
YES NO 0 II Will the project disturb 180 square feet or more of existing building materials?
0 I1 Will any load supporting structural members be removed? Notification may be required 10 working days Peer to commencing demolition.
0 0 (ANSWER ONLY IF QUESTION I or 2 IS YES) Has an asbestos survey been performed by a Certified Asbestos Consultant or Site Surveillance
Technician?
0 0 (ANSWER ONLY IF QUESTION 3 IS YES) Bared on the survey results, will the project disturb any asbestos containing material? Notification
may be requIred 10 working days prior to commencing asbestos removal.
0 50 Will the project or associated construction equipment emit air contaminints? See the reverse side of this tone or APCD factsheet
tw.sdaocd.oroilntàfadsfeermIts.odfl for typical equipment requiring an APCD permit.
0 0 (ANSWER ONLY IF QUESTIONS IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
boundary
Briefly describe business activities: Briefly describe proposed project:
RETAIL COSMETICS STORE
,
NEW RETAIL STORE
l declare under pgaftyo1pewy that to the best ofmy knowledge and bellefUresponses made her&n are true and corred. _____-. NATALIASHOIIN Natalia Shorten _--'--'--- _21/4
Name of Owner or Authorized Agent Signature of Owner or Authorized AqOnt Date
- FIRE DEPARTMENT OCCUPANCY CLASSIFICATION, FOR OFFICAL USE ONLY:
BY:__. DATE - J I
RulER INFORMATION REQUIRED RELEASED FOR 8U1L01NG PERMfT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
- APCD COUNTY-HMD - - APCD COUNTV'-HMD APCD
-
EVIEWEO \fC
I UJ1414J C Re4d '
SIG)1ATUE C
7/17lg.
TAM j
QifluI5 °
/
of Sao
ousinesses irom compieting or upoaung a Iiazar0ous Materials business Plan. Other permitting requirements may still apply.
HM-9171 ( 15) County of San Diego - DEH - Hazardous Materials Division
/t&)ai.z (into Vfl CES
INDUSTRIAL WASTEWATER DISCHARGE PERMIT
SCREENING SURVEY
ENONA
WASTEWTER
AUIHORIJV
-V
1*
Date 06.21.2019
Business Name SEPHORA USA
Street Address 525 MARKET STREET, 32ND FLOOR; SAN FRANCISCO, CA 94105
Email Address GREG.ANDERSON@SEPHORA.COM
PLEASE CHECK HERE IF YOUR BUSINESS IS EXEMPT: (ON REVERSE SIDE CHECK TYPE OF BUSINESS)
Check all below that are present at your facility:
Acid Cleaning Ink Manufacturing Nutritional Supplement!
Assembly Laboratory Vitamin Manufacturing
Automotive Repair Machining I Milling Painting I Finishing
Battery Manufacturing Manufacturing Paint Manufacturing
Biofuel Manufacturing Membrane Manufacturing Personal Care Products
Biotech Laboratory (i.e. water filter membranes) Manufacturing
Bulk Chemical Storage Metal Casting/ Forming Pesticide Manufacturing /
Car Wash Metal Fabrication Packaging
Chemical Manufacturing Metal Finishing Pharmaceutical Manufacturing
Chemical Purification Electroplating (including precursors)
Dry Cleaning Electroless plating Porcelain Enameling
Electrical Component Anodizing Power Generation
Manufacturing Coating (i.e. phosphating) Print Shop
Fertilizer Manufacturing Chemical Etching / Milling Research and Development
Film /X-ray Processing Printed Circuit Board Rubber Manufacturing
Food Processing Manufacturing Semiconductor Manufacturing
Glass Manufacturing Metal Powders Forming Soap! Detergent Manufacturing
Industrial Laundry Waste Treatment/ Storage I
SIC Code(s) (if known):
Brief description of business activities (Production / Manufacturing Operations):______________
Description of operations generating wastewater (discharged to sewer, hauled or evaporated):
Estimated volume of industrial wastewater to be discharged (gal/ day):
List hazardous wastes generated (type/ volume):
Date operation began/or will begin at this location:
Have you applied for a Wastewater Discharge Permit from the Encina Wastewater Authority?
Yes No If yes, when:
Site Contact Title_______________________________
Signature Phone No.___________________________
ENCINA WASTEWATER AUTHORITY, 6200 Avenida Encinas Carlsbad, CA 92011 (760) 438-3941
FAX: (760) 476-9852
(city of
Carlsbad
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
PURPOSE
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. Unless none of the requirements apply, the completed checklist must be
included in the building permit application. It may be necessary to supplement the completed checklist with
supporting materials, calculations or certifications, to demonstrate full compliance with CAP ordinance
requirements. For example, projects that propose or require a performance approach to comply with energy-
related measures will need to attach to this checklist separate calculations and .documentation as specified by
the ordinances.
. If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required
by ordinance, an explanation must be provided to the satisfaction of the Building Official.
A Details on CAP ordinance requirements are available on the city's website.
Application Information
Project Name/Building
Permit No.: BP No.: Ci1)Cc 'g — 031 clL5 SEPHORA - SHOPPES AT CARLSBAD _____________________
Property Address/APN: 2525 EL CAMINIO REAL, SPACE #214 (APN 156-302-07,156-302-08)
Applicant Name/Co.: NATALIA SHORTEN; SEPHORA USA
Applicant Address: 525 MARKET STREET, 11TH FLOOR; SAN FRANCISCO, CA 94105
Contact Phone: 415-284-3477 Contact Email: NATALIA.SHORTEN@SEPHORA.COM
Contact information of person completing this checklist (if different than above):
Name: SCOTT DE LELLO Contact Phone: 310-437-8205
Company SARGEN1I ARCHITECTS
name/address: 448 SOUTH HILL STREET, SUITE 808 Contact Email: SDELELLO@SARGARCH.COM LOS ANGELES, CA 90013
Natalia Shorten 6.21.19
Applicant Signature: wc2alm2l 11SM47W Date:
B-50 Page 1 of 3 Revised 04/19
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project.
For residential alterations and additions to existing buildings, contact the building counter for the building permit valuation.
Building Permit Valuation (BPV) $ $400,000
Construction Type --
I El Residential
O New construction
Alterations:
BPV 2:$60,000
Electrical service panel upgrade
o BPV 2:$200,000
E1 Nonresidential
O New construction
[A Alterations
Complete Section(s) I Notes:
IA
0 exempt
1A
IA
1-2 family dwellings and townhouses with attached garages
only
IA
Multi-family dwellings only where interior finishes are removed
and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
lB and 2
2
1. Electric Vehicle Charging
Residential New construction and major alterations (or electric panel upgrade)*
Please refer to Carlsbad Ordinance CS-349 when completing this section.
0 One and two-family residential dwelling or townhouse with attached garage:
0 One EVSE ready parking space required 0 Exception:
0 Multi-family residential: 0 Exception:
Total Parking Spaces
Proposed
EVSE Spaces
Capable Ready Installed Total
Calculations: Total EVSE spaces= .10 x Total parking (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other Total EVSE spaces - EVSE Installed
(EVSE other may be "Capable," 'Read/' or "Installed.")
*Major alterations are: (1) for one and two-family dwellings and townhouses with attached garages, alterations have a building permit valuation 2t $60,000 or
include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached garages), alterations have a building permit valuation
~ $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing systems are proposed.
El Nonresidential new construction (includes hotels!motels) 0 Exception:
Total Parking Spaces
Proposed
EVSE Spaces
Capable Ready Installed Total
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
0-9 1 I
10-25 2 1
26-50 4 2
51-75 6 3
76-100 9 5
101-150 12 6
151-200 17 9
201 and over 10 percent of total 50 percent of Required EV Spaces
Updated 4/12/2019 2
City of Carlsbad Climate Action Plan Consistency Checklist
2. Transportation Demand Management (TDM)
List each proposed nonresidential use and gross floor area (GFA) allocated to each use.
Employee AOl/I ,000 square feet is selected from the table below.
Use GFA Employee ADT for first
1,000 S.F.
Employee ADT for each
subsequent 1,000 S.F.
Total Employee ADT
MERCANTILE/RETAIL 6053 SF 8 4.5 31
Total 31
If total employee ADT is greater than or equal to 110 employee ADT, a TOM plan is required.
TDM plan required: Yes 0 No l
Employee ADT Estimation for Various Commercial Uses
LwMø1J
Office (all)2 20 20
Restaurant 11 11
Retai13 8 4.5
Industrial 4 3.5
Manufacturing 4 3
Warehousing 4 1
1 Unless otherwise noted, rates estimated from ITE Trip
Generation Manual, 10t'Edition
2 For all office uses, use SANDAG rate of 20 ADT/1 ,000 sf to
calculate employee ADT
Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
First 1,000 sf=8ADT
9,334 sf- 1,000 sf= 8,334 sf
(8,334 sf/1,000 x 4.5) + 8 = 46 Employee ADT
Updated 4/12/2019
èity of
PERMIT REPORT Carlsbad
Print Date: 03/03/2020 Permit No: PREV2019-0194
Job Address: 2525 El Camino Real, 214
Permit Type: BLDG-Permit Revision Work Class: Commercial Permit Rev15 Status: Closed - Finaled
Parcel No: 1563020900 Lot #: Applied: 09/27/2019
Valuation: $0.00 Reference#: Issued: 10/28/2019
Occupancy Group: .
Construction Type PermitFinal 03/02/2020
Close Out:
# Dwelling Units: Bathrooms: . Inspector:
Bedrooms: . Orig. Plan Check #: CBC2019-0318 Final
Plan Check #: Inspection:
Project Title:
Description: SEPHORA: CHANGES TO DEMO, ARCHITECTURAL AND ELECTRICAL SHEETS
Owner: Contractor:
BROOKFIELD PROPERTIES BOGART CONSTRUCTION INC
6225 N State Highway 161 9980 Irvine Center Dr, Ste 200
Irving, TX 75038-2222 Irvine, CA 92618-4364
214-556-5142 . 949-279-6631
FEE . AMOUNT
BUILDING PLAN.CHECK REVISION ADMIN FEE $35.00
MANUAL BLDG PLAN CHECK FEE .
$168.75
Total Fees: $ 203.75 Total Payments To Date: $ 203.75. Balance Due: $0.00
Building Division
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov Page 1 of 1
PLAN CHECK REVISION OR Development Services
0" tv cr of DEFERRED SUBMITTAL Building Division
Carlsbad APPLICATION 1635 Faraday Avenue
760-602-2719
B-I 5 www.carlsbadca.gov
Original Plan Check Number 3C- 20/cf - 03 ( S Plan Revision Number &A-O i g - i q '-/
Project Address 2-S 25 El C1 ; i t—g
General Scope of Revision/Deferred Submittal: ChMje o Lc..øi ó eSle c Jrs
1' YC(i-eCJ(b't kec,5 , 04 e.gJ-4c
CONTACT INFORMATION:
Name JkJ+- Rczrj Phone (0-Z.75 777 Fax______________
Address !0370 W; 1$L:Y_E3(vc( City (sv.e4y f-fllc Zip
Email Address I( Cttt OVii ,k V i L 01
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1 . Elements revised: [2 Plans fl Calculations EJ Soils LI Energy LI Other
2.
Describe revisions in detail
3.
List page(s) where each
revision is shown
D ti' iedc -,-cJt It -- ,
' I-ti
EicA-ii c.ok Ste cf- - '3" flt
Does this revision, in any way, alter the exterior of the project? LI Yes Ef'No
Does this revision add ANY new floor area(s)? E1 Yes
Does this revision affect any fire related issues? El Yes
7e is this a complete set? Ef Yes No
-7/-ZDf Signature -Z-- Date
1635 Faraday Avenue, Carlsbad, CA 92008 Ph: 760-602-2719 E: 760-602-8558 Email: builcling@carlsbadca.gov
www.carlsbadca.gov
EsGil
A SAFEbulif Company
DATE: 10-17-2019 U APPLICANT
U JURIS.
JURISDICTION: Carlsbad
PLAN CHECK #.: CBC2019-0318 (2019-0194REV)
SET:I
PROJECT ADDRESS: 2525 El Camino Real #214
PROJECT NAME: Sephora TI
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
El The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at EsGil until
corrected plans are submitted for recheck.
E The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
The applicant's copy of the check list has been sent to:
EsGil staff did not advise the applicant that the plan check has been completed.
EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
,('te contacted: O-'I'1-t,(bft Email:
all Telephone Fax In Person
REMARKS:
By: David Kniff AlA Enclosures:
EsGil
10-1-2019
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
[DO NOT PAY - THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK #.: CBC2019-0318
(2019-0194REV)
PREPARED BY: David Kniff AlA DATE: 10-17-2019
BUILDING ADDRESS: 2525 El Camino Real #214
BUILDING OCCUPANCY: M
BUILDING
PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code Icb ]By Ordinance
11997 UBC Building Permit Fee [] rorr you cnecicea Lomp. Ke1ew and Hourly at the same time
11997 UBC Plan Check Fee LMJ
Type of Review: F Complete Review E Structural Only
1 Repetitive Fee r Other
FEI __
1
450
-I - Repeats Hourly
s9o.$1EsGil Fee
p. p. p.
* Based on hourly rate
Comments: EsGil fee is based on an hourly rate. 1.5 x 90.00/hr. Sheet 1 of 1
MEMMENEW 448 South Hill Street, Suite 808, Los Angeles, CA 90013
SARGENTI 0. 310.437.8204
September 25, 2019
City of Carlsbad - Building Department
1636 Faraday Avenue
Carlsbad, CA 92008
Re: Commercial Tenant Improvement
Sephora: Shoppes at Carlsbad
2525 El Camino Real #214
Carlsbad, CA 92008
Plan Check Number: CBC2019-0318
RECEIVED
SEP 2 6 2019
CITY OF CARLSBAD
BUILDING DIVISION
This letter addresses an Amendment to an approved TI Permit for the above mentioned project
(Plan Check Number: CBC2019-0318). All revisions to the plans have been clouded and identified
with a Delta 3, dated September 27, 2019.
Enclosed Documents: Drawings: G-001; D-101, D-102, D-104, D-104A, D-104B, A-101. A-102.
A-ill. A-121. A-122, A-131, A-201, A-301A, A-3018, A-301C, A-301D, A-302, A-302A, A-303, A-
401, A-402, A-403, A-504, A-506, A-601, A-804 -
Architectural -
Sheet G-001
1. Included for reference only.
Sheet D-101
Revision General Note and Keynotes
Omission: Trenching removed from scope. Store will used a raised floor system as previously
approved. Refer to plans and keynote 14.
Sheet D-102
1. Clarification: Keynote 3 added to plans per site conditions.
Sheets D-104, D-104A, D-104B
1. Revision: Barricade return details as required by Landlord.
Sheet D-104A
1. Revision: Barricade return details as required by Landlord
Sheet D-104B
1. Clarification: Annotation added as required by Landlord
SARGENTI ARCHITECTS Pagel 9/25/2019
llillilliMilOW 448 South Hill Street, Suite 808, Los Angeles, CA 90013
SAGENTI 0.310.437.8204
September 25, 2019
Sheet A-101
Revision: Furr-out wall added to "Plan North" demising wall between Column lines C & D.
Dimensions adjusted accordingly.
Clarification :Location of lighting controller, inverter and low voltage switches.
Revision: General Notes and Keynotes including:
- Volume Control Location
- Access panel spec
- Ejector Pump. See also revised Plumbing drawings
- Backwrap power and conduit. Refer to Keynote 12.
Revision: Floor slope at Hallway 102 deceased to 1:20 slope per City redlines.
Sheet A-102
Revision: Location of select floor-mounted 3-Boxes at Sales Area.
Revision: Spacing of wall mounted receptacles at Sales Area 'Plan North" wall between Column
lines C & D
Addition: (Qty 1) twist-lock 3-Box at "Plan South" wall. Refer also to revised Electrical plans.
Omission: Keynote #9 and associated receptacle at Sales Area removed from scope
Clarification: Location of power and low voltage receptacles. Refer to Plan and Keynotes.
Sheet A- 111
Clarification: Symbol legend added Refer to Detail 9
Addition: Ceiling-mounted receptacles at storefront interior. Refer also to revised Electrical plans.
Sheet A-121
Revision: Finishes at Sales Area - finish type and locations
Revision: Floor slope at Hallway 102 decreased to 1:20 per City redlines
Sheet A-122
Revision: Floor Tile Pattern at both entry areas at Sales Area.
Revision: Tile quantities. Refer to Detail 5.
Revision: Floor slope at Hallway 102 decreased to 1:30 per City redlines
SARGENTI ARCHITECTS Page 9/25/2019
A
448 South Hill Street, Suite 808, Los Angeles, CA 90013
SAGENTI 0.310.437.8204
September 25, 2019
Sheet A-131
Revision: Fixture layout adjusted and Hold Dimensions between end panels adjusted in Sales Area
Addition: "Hair Distortion" Fixture to Sales Area.
Sheet A-201
Revision: Fixture updates and layout Refer to Details 5 & 19.
Clarification: Location of perimeter fixture blocking.
Clarification: Location of EAS Controll and storefront wall power receptacles.
Sheets A-301A-D
1. Revision: Channel letter sign style revised to be a face-lit type.
Sheet A-302
1. Clarification: Note regarding attachment to Base Building added per Landlord requirements.
Sheet A-302A
1. Clarification: Note regarding attachment to Base Building added per Landlord requirements.
Sheet A-303
1. Omitted: Delta 12 is no longer in scope
Sheet A-401
Revision: Fixture updates and layout at Office Area 107 and Stock Area 106
Clarification Location of lighting controller, inverter and low voltage switches
Revision: Floor slope dimensions at Hallway 102 to accommodate a 1:20 slope per City redlines.
Sheet A-402
1. Revision: Floor slope at Hallway 102 decreased to 1:20 per City redlines. Refer to revised Details
8 & 18.
Sheet A-403
1. Clarification: Bottle Filler to Drinking Fountain. Refer to Toilet Accessory Schedule.
Sheet A-504
1. Clarification: General Note regarding a floor sweep added per Landlord requirements.
Sheet A-506
1. Revision: Fixture adjustments to entire sheet.
SARGENT! ARCHITECTS Page 9/25/2019
A
448 South Hill Street, Suite 808, Los Angeles, CA 90013
SAGENTI 0.310.437.8204
September 25, 2019
Sheet A-601
Revision: Door Type B. Remove Conan detail from door frame
Revision: Hardware type 113: Closer and Lock specification changed.
Revision: Updates to digital door locking hardware specification. Refer to Door #1.4 and Hardware
Type 6.
Clarification: General Note added to Door Type Al elevation per Landlord requirements.
Sheet A-804
1. Addition: Landlord general notes
Scott De Lello
Sargenti Architects
sdelello@sargarch.com
310.437.8205
SARGENTI ARCHITECTS Page 9/25/2019
RECEIVED
4 SEP 26 2019
i
S CITY OF CARLSBAD
BUILDING DIVISION
M-Engineering Project Revision Summary
REVISION NO. # 3 ISSUE DATE: 09-27-19
Project: Sephora Carlsbad Store No: xxx
Dwg. Date: 05-17-2019 Project No: 1942050
p Architectural Changes (A) r j Building Department Comments (B) P Landlord Comments (L)
P Owner's Changes (OC) fl Other (0):
Item Reference Comments No. Document
1. E-100 Revised locations of multiple floor boxes and circuitry per updated
architectural backgrounds.
Revised Beauty Studio area by adding pumps and revising layout.
Revised layout of wall linear fixtures and circuitry per updated architectural
backgrounds.
Added pumps for studio update per prototype updates.
Revised BOH electrical device locations per prototype updates and updated
architectural design.
2. E-101 1. Revised/added various coded notes per prototype updates.
3. E-200 Revised BOH electrical device locations per prototype updates and updated
architectural design.
Updated lighting control locations in BOH area per updated architectural
backgrounds.
4. E-300 1. Removed details from sheet per prototype updates.
5. E-400 1. Removed detail from sheet per prototype updates.
6. E-500 1. Revised panel schedules in multiple locations per above noted changes.
7. P-100 Added drain pump and sink.
Added soldered joint note per prototype update
8. P-101 1. Added drain pump, sink, and recirculating pump.
9. FP-100 Added Note "FOR REFERENCE ONLY" to drawing per billing department
comment.
Added fire sprinkler heads in back hallway
Page 1 of 1
A
448 South Hill Street, Suite 808, Los Angeles, CA 90013
SAGENTI 0.310.437.8204
Tony Gallant
Bogart Construction, Inc
9980 Irvine Center Drive, Suite 200
Irvine, CA 92618
CC: Todd Mc Connell; Bogart Construction
Kristin Mummery; Sephora USA
VIA EMAIL
November 14, 2019
J.
No. c-31054
Re: Commercial Tenant Improvement
Sephora: Shoppes at Carlsbad
2525 El Camino Real #214
Carlsbad, CA 92008
Plan Check Number: CBC2019-0318
This letter addresses Field Inspector comments received via email on November 14, 2019
regarding the above-mentioned Commercial Tenant Improvement Architect or Record response is
noted in blue text below each query
on the walls type B that is full height drywall both sides, do we need to install bridging? At 4' and 8' on
center? This occurs at the wall between the back of house and sales floor. Detail A501 Detail 3 and 17
Response: Lateral bracing is required on any wall with GWB on one hide only or above the location
where the GWB stops, if it doesn't run to the top track. Lateral bracing should not be required on a
full height wall interior partition with GWB running to the top track on both sides of the framing.
Type G walls show bridging all so and we are drywalling both sides.
Response: See response to Point 1. The (qty 2) common walls between the two restrooms and
demising wall furring is single-sided GWB. Bridging is required at those locations.
At column line Ethru G on column line 13 we have the full height wall with dead space behind it, the
inspector says the plans show dry wall both sides, do we need to dry wall the dead space side?
Response: The intent is to provide drywall on the Sales side only and not to drywall the dead
space side. Lateral bracing will be. required at this location.
mv~wrw: m!
Robert 3. Sargenti
Sargenti Architects
SARGENT! ARCHITECTS Pagel 11/14/2019
eity of
PERMIT REPORT Carlsbad.
Print Date: 03/03/2020 Permit No: PREV2019-0225
2525 El Camino Real, 214
BLDG-Permit Revision
1563020900
$0.00
'Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title
Description:
Work Class: Commercial Permit Revi5 Status: Closed - Finaled
Lot #: Applied: 10/29/2019
Reference #; Issued: 11/21/2019
Construction Type PermitFinal 03/02/2020 Close Out:
Bathrooms: . Inspector:
Orig. Plan Check #: CBC2019-0318 Final
Plan Check #: Inspection:
SEPHORA: PLUMBING/MECHANICAL/ ELECTRICAL CHANGES
Owner: Contractor:
BROOKFIELD PROPERTIES BOGART CONSTRUCTION INC
6225 N State Highway 161 9980 Irvine Center Dr, Ste 200
Irving, TX 75038-2222 Irvine, CA 92618-4364
214-556-5142 949-279-6631
FEE .
AMOUNT
BUILDING PLAN CHECK REVISION ADMIN FEE . $35.00
MANUAL BLDG PLAN CHECK FEE . $450.00
Total Fees $ 485.00 Total Payments To Date: $ 485.00 Balance Due: $0.00
Building Division •
1635 Faraday Avenue, Carlsbad CA 92008-7314 1 760-602-2700 1 760-602-8560 f I www.carlsbadca.gov
. Page 1 of 1
PLAN CHECK REVISION OR Development Services 'tCity Of DEFERRED SUBMITTAL Building Division
Carlsbad APPLICATION 1635 Faraday Avenue
760-602-2719
B-I 5 www.carlsbadca.gov
221
Original Plan Check Number C&62l q 3 t tt Plan Revision Number
Project Address 2$2-5 i . I ZN Cpv/d CA
General Scope of Revision/Deferred Submittal:
CONTACT INFORMATION:
Name 96* 1?Ot140S Phone 3/0 7S777( Fax
Address 2?7Q 144I4i.,ve R lucl 44-3 city I?c1ev1y 141 /-% Zip_?c2/ I
Email Address J4a?IL() jv fr&i,7di,,%ct-c. CO frs-p
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that person.
1. Elements revised: Plans i:i Calculations El Soils• El Energy El Other
2. 3.
Describe revisions in detail List page(s) where each
revision is shown
4. Does this revision, in any way, alter the exterior of the project? El Yes 'fT No
Does this revision add ANY new floor area(s)? El Yes
Does this revision affect any fire related issues? fl Yes
Is this a complete set? Yes El No
A!~Si Date —OZ2 -C(/—/ 4
1635 Faraday Avfue, Carlsbad, CA 92008 Ph: 760-602-2719 f: 760-602-8558 Email: buitding@carlsbadca.gov
www.carlsbadca.gov
EsGil
A SAFEbui1tCornpony
/13APPLICANT DATE: 11-12-19
URIS.
JURlSDlCTlO!lsba
PLAN CHECK #.: CBC2019-0318 (REV._2) - PREy. 2019-0225 SET: I
PROJECT ADDRESS: 2525 El Camino Real #214
PROJECT NAME: Sephora TI
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
Li The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
Li The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
Li The check list transmitted herewith is for your information. The plans are being held at EsGil until
corrected plans are submitted for recheck.
Li The applicant's copy of the check list is enclosed for the jurisdiction to forward to the.applicant
contact person.
Li The applicant's copy of the check list has been sent to:
EsGil staff did not advise the applicant that the plan check has been completed.
Li EsGil staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: IIIP((btY") Email:
Mail Telephone Fax In Person
REMARKS: Owner's revisions; all disciplines are impacted. Updated sheets of plans are revised and resubmitted
for review and approval.
By: ALl SADRE, S.E. Enclosures:
EsGil
10/31
9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (858) 560-1468 • Fax (858) 560-1576
r: Other r Repetitive Fee
pp Repeats Hourly
EsGil Fee
r r
* Based on hourly rate
r
Comments:
L $120.00
Sheet I of I
(DO NOT PAY- THIS IS NOT AN INVOICE)
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK #.: CBC2019-
0318 (REV.-2) - PREy. 2019-0225
PREPARED BY: AU SADRE, S.E. DATE: 11-12-19
BUILDING ADDRESS: 2525 El Camino Real #214
BUILDING OCCUPANCY: M
BUILDING
PORTION
AREA
(Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code Cb JBy Ordinance
11997 UBC Building Permit Fee
11997 UBC Plan Check Fee [j
Type of Review: l Complete Review r Structural Only
0
M-Engineering
REVISION NO. # 4
RECEIVED
OCT 29 2019
CITY OF CARLSBAD
BUILDING DIVISION
Project Revision Summary
ISSUE DATE: 10-23-19
Project: Sephora Carlsbad Store No: xxx
Dwg. Date: 05-17-2019 Project No: 1942050
I Architectural Changes (A) j Building Department Comments (B) Li Landlord Comments (L)
E Owner's Changes (OC) L Other (0):
Item Reference Comments No. Document
1. E-100 Revised Beauty Studio to Version 4.0.
Revised Back Of House device locations.
Added Printer Carts.
Removed EAS system keypad coded note call out and circuit/receptacle from
corridor per updates to system design requirements.
Added power call outs and new circuit for storefront signage per coordination
with architect.
2. E-101 Revised Coded Note #23.
Removed Coded Note #43.
Revised Coded Note #11.
Revised Coded Note #18 to align with current standards.
3. E-200 Removed 4' length of light.
Added box note per vendor request.
Revised coded note #9 to align with current standards.
E-400 1. Updated spec for UC fixture per owner updates.
E-500 1. Added circuit "B-29".
2. Removed circuits for hair dryer test stations per updated architectural
backgrounds.
3. Added circuit A-8 per updates from owner regarding inverter charging circuit.
4. Added circuit A-36 for storefront signage per updates noted above.
5. Revised circuit description for circuit A-30 per addition of circuit A-36 (for
clarity).
6. M-100 Moved RTU- 1 sensor per architectural update.
Moved RTU-1-3 controllers to receiving desk.
7. P-100 1. Updated drain pump to duplex per EBLAST.
8. P-101 1. Updated drain pump to duplex per EBLAST.
Page lofi
'1
A
448 South Hill Street, Suite 808, Los Angeles, CA 90013
SAGENTI 0.310.437.8204
October 21, 2019
City of Carlsbad - Building Department
1636 Faraday Avenue
Carlsbad, CA 92008
Re: Commercial Tenant Improvement
Sephora: Shoppes at Carlsbad
2525 El Camino Real #214
Carlsbad, CA 92008
Plan Check Number: CBC2019-0318
This letter addresses an Amendment to an approved TI Permit for the above mentioned project
(Plan Check Number: CBC2019-0318). Aforementioned revisions are a resulting of recent Tenant
standards update. All revisions to the plans have been clouded and identified with a Delta 4, dated
October 23, 2019.
Enclosed Documents: Drawings: G-OOl, G-002, G-003, A-101, A-102, A-ill, A-121, A-122, A-
131, A-201, A-301A, A-301B, A-302B, A-302C, A-303, A-304, A-305, A-401, A-402, A-501, A-502,
A-503, A-505, A-506, A-507, A-601, A-602
Architectural -
Sheet G-001
1. Addition: EAS system added to list of Shop Drawing Requirements. Refer to Detail 15
Sheet G-002
Revision: Vendor contacts updated to current contact information. EAS System Vendor changed.
Clarification: Responsibility Schedule updated to include additional line items to coordinate with
drawing set.
Sheet G-003
1. Revision: Partition and fixture layout.
Sheet A-101
Revision: Fur-out wall dimensions behind Beauty Studio Fixture and Wall Types.
Revision: Wall Type "J" added to Wall Legend. See Detail 1.
Revision: Added wing wall and Wall Type C-2. Shifted "Plan North" Sales Area wall.
Sheet A-102
1. Clarification: Stub-up location for cashwrap
SARGENTI ARCHITECTS Pagel 10/21/2019
A
448 South Hill Street, Suite 808, Los Angeles, CA 90013
SAGENTI 0.310.437.8204
October 21, 2019
Revision: Power location at Beauty Studio
Revision: Fin-Type EAS system at entry ways to replace overhead EAS System.
Revision: Manager's Desk power location. Refer to Plan
Sheet A-ill
Clarification: Specification for Emergency Lights to coordinate with Electrical Plans. See Symbol
Legend.
Omission: Overhead EAST System. Refer to Plan and omitted Keynote #7
Revision: General note on plan to clarify power feed location and revised linear light lengths.
Addition: Access Points. Refer to Plan and Symbol Legend.
S. Revision: Linear light fixture length at "Plan North" Sales Area
Sheet A-121
Revision: Remove striping from interior storefront area and replace with solid paint color.
Revision: Beauty Studio fur-out wall dimension
Revision: Finishes and layout at "Plan North" Sales Area wall.
Sheet A-122
1. Revision: Floor tile as required for partition revision.
Sheet A-131
Clarification: Fixture endcap type. Refer to added Fixture Code 24 in Fixture Schedule and Plan.
Addition: Moss Backwrap Non-Illuminated Graphic Box. Refer to Fixture Code 17 in Fixture
Schedule and Plan.
Omission: Fixture Linear Schedule.
Revision: Fixture layout at "Plan North" Sales Area.
Addition: Freestanding Hygiene Station fixture. Refer to Plan dn Fixture Code 15.
Sheet A-201
Omitted: Overhead EAS System. Refer to Details 5 & 6
Omitted: Perimeter Fixture End Panel blocking.
SARGENTI ARCHITECTS Page 10/21/2019
I
MMME 1
I-
448 South Hill Street, Suite 808, Los Angeles, CA 90013
SAGENTI 0.310.437.8204
October 21, 2019
Revision: Removed P-4 Wall Paint from Door 1.3 adjacent wall and adjusted exit sign height. Refer
to Detail 19.
Revision: Beauty Studio pump enclosure finishes and graphic. Refer to Detail 19.
Revision: Interior storefront finishes, to remove striping and replace with solid paint finish. Refer
to Details: 5, 19 & 20.
Addition: Signage access panels. Refer to Details: 5, 6 & 20
Revision: Receptacle location and orientation at Backwrap and addition of volume controls. Refer
to Detail 10.
Sheet A-301A
Clarification: Storefront detail call-out
Revision: Interior Storefront build-out.
Sheet A-301B
1. Clarification: Storefront detail call-out.
Sheet A-302B
1. Revision: Removed VF-1 stripe finish from storefront interior. Refer to Detail 13.
Sheet A-302C
1. Revision: Removed VF-1 Stripes from storefront interior.
Sheet A-303
1. Addition: Reveal at window opening jamb. Refer to Detail 17.
Sheet A-304
Clarification: Storefront mullion details. Refer to Detail 7 & 11.
Clarification: Storefront base detail. Refer to Detail 5.
Revision: Enlarged storefront plan per revise interior partition walls. See Detail 14.
Sheet A-305
1. Revision: Signage details.
Sheet A-401
Revision: Fixture codes changes and additional codes added. Refer to Fixture & Equipment
Schedule and Plan.
Revision: Location of Manager's Desk Fixture.
SARGENTI ARCHITECTS Page 10/21/2019
I
.4
448. South Hill Street, Suite 808, Los Angeles, CA 90013
S A GE NT I 0.310.437.8204
October 21, 2019
Addition: Printer shelves and printers. Refer to Plan layout adjustments and Fixture & Equipment
Schedule.
Sheet A-402
Clarification: Mirror shown in Elevation to align with Plan. See Detail 12.
Revision: Decal Size. Refer to Detail 9
Clarification: Coffee Maker location in Elevation to align with Plan. See Detail 9.
Addition: Printer shelf and printer. Refer to Detail 10.
Revision: Fixture layout to align with Plan. See Detail 9.
Sheet A-501
1. Revision: Wall Type "J" added to Wall Types to coordinate with Construction Plan. See Detail 17.
Sheet A-502
Clarification: Speaker mounting detail. Refer to Detail 2.
Clarification: Installation of Rose Display mounting brackets. See Details 9 & 19.
Sheet A-503
1. Clarification: Grout joint at exterior entry door. See Detail 5.
Sheet A-505
1. Clarification: Power location at column to coordinate with Power Plan. Refer to Details 2 & 6
Sheet A-506
1. Revision: Fixture details per Sephora standards update.
Sheet A-507
1. Revision: Millwork per Sephora standards update.
Sheet A-601
1. Revision: Stockroom hardware requirements. See Door Hardware Schedule, Group 6.
2. Clarification: Spacing for entry door pulls. Refer to Detail 2.
Sheet A-602
Revision: Paint finishes - P1-3, PT-4, & PT-13.
Revision: Stone joints and grout color - ST-1 and ST-3
SARGENTI ARCHITECTS Page 10/21/2019
-4
448 South Hill Street, Suite 808, Los Angeles, CA 90013
SARGENTI 0.310.437.8204
October 21, 2019
Scott De Lello
Sargenti Architects
sdelello@sargarch.com
310.437.8205
SARGENT! ARCHITECTS Page 10/21/2019