Loading...
HomeMy WebLinkAbout2529 NAVARRA DR; 115; CB132928; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-07-2016 Residential Permit Permit No: CB132928 Building Inspection Request Line (760) 602-2725 Job Address: 2529 NAVARRA DR CBAD St: 115 Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED Parcel No: 2161701900 Lot #: 2 Applied: 11/25/2013 Valuation: $241,402.00 Constuction Type:5B Entered By: JMA Occupancy Group: Reference #:CT130002 Plan Approved: 02/19/2015 # Dwelling Units: I Structure Type: MF2-4 Issued: 02/19/2015 Bedrooms: 4 Bathrooms: 3.5 Inspect Area: PB Orig PC #:Ci 30058 Plan Check #: Project Title: COASTAL LIVING 10: 1,988 SF LV 400 SF GAR// 33 SF PATIO// 202 SF DECK Applicant: Owner: COASTAL LIVING 10/131RIAN MERRI1T COASTAL LIVING 10 L L C STE 210 2710 LOKER AVE W 8145 WESTGATE AVE #15 CARLSBAD CA 92010-6646 LOS ANGELES CA 90049 619-995-6044 Building Permit $1,252.26 Meter Size D5/8 Add'I Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00 Plan Check $876.58 Meter Fee $268.00 Add'I Plan. Check Fee ($500.00) SDCWA Fee $4,492.00 Plan Check Discount $0.00 . CFD Payoff Fee $0.00 Strong Motion Fee $24.14 PFF (3105540) $4,393.52 Park in Lieu Fee $4,636.00 PFF (4305540) $4,055.55 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $310.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $2,528.00 Other Bridge Fee $494.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $187.00 Renewal Fee $0.00 ELECTRICAL TOTAL $65.50 Add'I Renewal Fee $0.00 MECHANICAL TOTAL $172.24 Other Building Fee $0.00 Housing Impact Fee $0.00 HMP Fee $0.00 Housing lnLieu Fee $0.00 Pot. Water Con. Fee $3,549.00 Housing Credit Fee $0.00 Meter Size 05/8 Master Drainage Fee $0.00 Add'l Pot. Water Con. Fee $382.00 Sewer Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $308.00 Green Bldg Stands (5B1473) Fee $8.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $27,501.79 Total Fees: $27,501.79 Total Payments to Date: $27,501.79 Balance Due: $0.00 FINAL APPROVAL I lnsnector\n&~,.-A Date: q11-7-4 Clearance: I FC11cEPlease-take l'.D11cE that appod of your piqed irdudes the "lirpesitiorf' cf fees, dedeeticxis, iservatior, or atheraiactions hereafter collectively refesed toes aatior" You have 90 days from the date this peimt Ym issued to protest iriposition of these fees/exadions. If you protest that you mist follcwthe protest procedures sat foith in Ck,verrnisnt Cede Section 66(O(a), aid file the pretest ard any other ruired infomedonth the City Wager for proiesslrig in aoathrfth Carisbari Minicipal Code Sation 3.O30. Failureto firrelyfdlc that procedure will bar any subsequent legal action toattack review, sat aside, id, or annul thsir initiort You are hereby FURTHER NOTIFIED that your right to protest the spedfieri fees/eisstiois DOES NOT APPLYtoeter aid saw connection fees aid capacity charges, nor pIannir, zoning,grating or other smiler application processing or service fees in unnedion Mth this piqed. NCR DOES ITAPftYto any Inspection List Permit#: CB132928 Type: RESDNTL CONDO COASTAL LIVING 10: 19988 SF LV 400SF GARY 33 SF PATIO!! 202 SF DECK Date. Inspection Item Inspector Act Comments 04/13/2016 89 Final Combo PB AP 04/12/2016 89 Final Combo PB NR 04/12/2016 89 Final Combo - RI AM PLEASE 03/31/2016 89 Final Combo PB NR 02/26/2016 29 Final Plumbing PB . AP 02/26/2016 39 Final Electrical PB AP 02/22/2016 22 Sewer/Water Service PB AP 02/22/2016 23 Gas/Test/Repairs PB AP 01112/2016 39 Final Electrical PB NR 01/11/2016 39 Final Electrical PB CA 01/07/2016 39 Final Electrical PB CA 09/17/2015 17 Interior Lath/Drywall PD AP 09/15/2015 18 Exterior Lath/Drywall PB AP 09/14/2015 18 Exterior Lath/Drywall PB NR 09/02/2015 16 Insulation PB AP 09/02/2015 84 Rough Combo PB AP 09/01/2015 16 Insulation PB NR 08/31/2015 84 Rough Combo PB NR 08/27/2015 84 Rough Combo PB . NR 07/29/2015 18 Exterior Lath/Drywall PB PA 07/22/2015 13 Shear Panels/HO's PD . AP 07/16/2015 13 Shear Panels/HD's . PD PA 07/15/2015 13 Shear Panels/HO's PD CO 06/19/2015 15 Roof/Reroof PB AP 04/13/2015 11 Ftg/Foundation/Piers PB AP 04/10/2015 11 Ftg/Foundation/Piers PB NR 03/31/2015 21 Underground/Under Floor PB. AP 03/26/2015 22 Sewer/Water Service PB NR 03/02/2015 66 Grout PB CA im Thursday, April 14, 2016 $ DEFERRED FEES $ CITY OF :ARLsBAD INSPECTION RECORD Aiding Division I INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB I CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION FOR BUILDING INSPECTION CALL: 760-602-2725 OR GO TO: www.Carlsbadca.gov/Building AND CLICK ON "Reques~ t j nspe tion" TE: 2- C8132928 2529 NAVARRA DR 115 COASTAL LIVING 10: 1,988 SF LV 400 SF GAR// 33 SF PATIO// 202 SF DECK RESDNTL CONDO Lot#: 2 COASTAL LIVING 10/BRIAN MERRITT RECORD COPY *, NO I YES I Required Prior to Requesting Building Final If Checked YES Date I Inspector I Notes Landscape 760-944-8463 Allow 48 hours CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm q t467 ,(k, Fire Prevention 760-602-4660 Allow 48 hours s7/fi,, 1;e4 Land Development Engineering 760-602-2750 - V Planning 760-6024600 E A 4- Tvoe of InsDection Tvoe of Insoection l u :1UII.]k[e #11 FOUNDATION Date Inspector flQ, i.id:l[ #31 0 ELECTRIC UNDERGROUND 0 UFER Date Inspector #12 REINFORCED STEEL i4 b' #34 ROUGH ELECTRIC #66 MASONRY PRE GROUT #33 0 ELECTRIC SERVICE 0 TEMPORARY 0 GROUT 0 WALL DRAINS #35 PHOTO VOLTAIC #10 TILT PANELS #39 FINAL #11 POUR STRIPS #11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING #14 SUBFRAME 0 FoOR 0 CEILING #44 0 DUCT& PLENUM 0 REF. PIPING #15 ROOF SHEATHING f , —f ,ç rW #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS - 7 21-IS- '(tig #49 FINAL #16 INSULATION q .Z '1 5 #k. #18 EXTERIOR LATH 4 (iS"&5 ,I9S #81 UNDERGROUND (11,12,21,31) #17 INTERIOR LATH & DRYWALL 9f7. ,5 VI(( #82 DRYWALL,EXT LATH, GAS TES (17,18,23) #51 POOL EXCA/STEEL/BOND/FENCE #83 ROOF SHEATING, EXT SHEAR (13,15) #55 PREPLASTER #84 FRAME ROUGH COMBO (14,24,34,44) #19 FINAL #85 T-BAR (14,24,34,44) #22 0 SEWER & BL/CO 0 PL/CO Date Inspector #89 FINAL OCCUPANCY (19,29,39,49) Date Inspector A R I:1 #21 UNDERGROUND DWASTEOWTR _ IY ________ #24 TOP OUT 0 WASTE 0 WTR 2-27-1 f A/S UNDERGROUND VISUAL #27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO #23 0 GAS TEST 0 GAS PIPING A/S UNDERGROUND FLUSH \ #25 WATER HEATER A/S OVERHEAD VISUAL 2z zoi.6 _. #28 SOLAR WATER A/S OVERHEAD HYDROSTATIC 701K L. #29 FINAL #29 A/S FINAL R11~6 If ____________ #600 PRE-CONSTRUCTION MEETING . F/A ROUGH-IN F/AFINAL #603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN #605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATICTEST #607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL #609 NOTICE OF VIOLATION MEDICAL GAS PRESSURE TEST #610 VERBAL WARNING MEDICAL GAS FINAL REV 1012012 SEE BACK FOR SPECIAL NOTES