HomeMy WebLinkAbout2529 NAVARRA DR; 115; CB132928; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-07-2016 Residential Permit Permit No: CB132928
Building Inspection Request Line (760) 602-2725
Job Address: 2529 NAVARRA DR CBAD St: 115
Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED
Parcel No: 2161701900 Lot #: 2 Applied: 11/25/2013
Valuation: $241,402.00 Constuction Type:5B Entered By: JMA
Occupancy Group: Reference #:CT130002 Plan Approved: 02/19/2015
# Dwelling Units: I Structure Type: MF2-4 Issued: 02/19/2015
Bedrooms: 4 Bathrooms: 3.5 Inspect Area: PB
Orig PC #:Ci 30058 Plan Check #:
Project Title: COASTAL LIVING 10: 1,988 SF LV
400 SF GAR// 33 SF PATIO// 202 SF DECK
Applicant: Owner:
COASTAL LIVING 10/131RIAN MERRI1T COASTAL LIVING 10 L L C
STE 210
2710 LOKER AVE W 8145 WESTGATE AVE #15
CARLSBAD CA 92010-6646 LOS ANGELES CA 90049
619-995-6044
Building Permit $1,252.26 Meter Size D5/8
Add'I Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00
Plan Check $876.58 Meter Fee $268.00
Add'I Plan. Check Fee ($500.00) SDCWA Fee $4,492.00
Plan Check Discount $0.00 . CFD Payoff Fee $0.00
Strong Motion Fee $24.14 PFF (3105540) $4,393.52
Park in Lieu Fee $4,636.00 PFF (4305540) $4,055.55
Park Fee $0.00 License Tax (3104193) $0.00
LFM Fee $310.00 License Tax (4304193) $0.00
Bridge Fee $0.00 Traffic Impact Fee (3105541) $2,528.00
Other Bridge Fee $494.00 Traffic Impact Fee (4305541) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $187.00
Renewal Fee $0.00 ELECTRICAL TOTAL $65.50
Add'I Renewal Fee $0.00 MECHANICAL TOTAL $172.24
Other Building Fee $0.00 Housing Impact Fee $0.00
HMP Fee $0.00 Housing lnLieu Fee $0.00
Pot. Water Con. Fee $3,549.00 Housing Credit Fee $0.00
Meter Size 05/8 Master Drainage Fee $0.00
Add'l Pot. Water Con. Fee $382.00 Sewer Fee $0.00
Red. Water Con. Fee $0.00 Additional Fees $308.00
Green Bldg Stands (5B1473) Fee $8.00 Fire Sprinkler Fees $0.00
Green Bldg Stands Plan Chk Fee $0.00
TOTAL PERMIT FEES $27,501.79
Total Fees: $27,501.79 Total Payments to Date: $27,501.79 Balance Due: $0.00
FINAL APPROVAL I
lnsnector\n&~,.-A Date: q11-7-4 Clearance: I
FC11cEPlease-take l'.D11cE that appod of your piqed irdudes the "lirpesitiorf' cf fees, dedeeticxis, iservatior, or atheraiactions hereafter collectively
refesed toes aatior" You have 90 days from the date this peimt Ym issued to protest iriposition of these fees/exadions. If you protest that you mist
follcwthe protest procedures sat foith in Ck,verrnisnt Cede Section 66(O(a), aid file the pretest ard any other ruired infomedonth the City Wager for
proiesslrig in aoathrfth Carisbari Minicipal Code Sation 3.O30. Failureto firrelyfdlc that procedure will bar any subsequent legal action toattack
review, sat aside, id, or annul thsir initiort
You are hereby FURTHER NOTIFIED that your right to protest the spedfieri fees/eisstiois DOES NOT APPLYtoeter aid saw connection fees aid capacity
charges, nor pIannir, zoning,grating or other smiler application processing or service fees in unnedion Mth this piqed. NCR DOES ITAPftYto any
Inspection List
Permit#: CB132928 Type: RESDNTL CONDO COASTAL LIVING 10: 19988 SF LV
400SF GARY 33 SF PATIO!! 202 SF DECK
Date. Inspection Item Inspector Act Comments
04/13/2016 89 Final Combo PB AP
04/12/2016 89 Final Combo PB NR
04/12/2016 89 Final Combo - RI AM PLEASE
03/31/2016 89 Final Combo PB NR
02/26/2016 29 Final Plumbing PB . AP
02/26/2016 39 Final Electrical PB AP
02/22/2016 22 Sewer/Water Service PB AP
02/22/2016 23 Gas/Test/Repairs PB AP
01112/2016 39 Final Electrical PB NR
01/11/2016 39 Final Electrical PB CA
01/07/2016 39 Final Electrical PB CA
09/17/2015 17 Interior Lath/Drywall PD AP
09/15/2015 18 Exterior Lath/Drywall PB AP
09/14/2015 18 Exterior Lath/Drywall PB NR
09/02/2015 16 Insulation PB AP
09/02/2015 84 Rough Combo PB AP
09/01/2015 16 Insulation PB NR
08/31/2015 84 Rough Combo PB NR
08/27/2015 84 Rough Combo PB . NR
07/29/2015 18 Exterior Lath/Drywall PB PA
07/22/2015 13 Shear Panels/HO's PD . AP
07/16/2015 13 Shear Panels/HD's . PD PA
07/15/2015 13 Shear Panels/HO's PD CO
06/19/2015 15 Roof/Reroof PB AP
04/13/2015 11 Ftg/Foundation/Piers PB AP
04/10/2015 11 Ftg/Foundation/Piers PB NR
03/31/2015 21 Underground/Under Floor PB. AP
03/26/2015 22 Sewer/Water Service PB NR
03/02/2015 66 Grout PB CA
im
Thursday, April 14, 2016
$ DEFERRED FEES $
CITY OF
:ARLsBAD
INSPECTION RECORD
Aiding Division
I INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
I CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION
FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Carlsbadca.gov/Building AND CLICK ON
"Reques~
t j
nspe tion"
TE: 2-
C8132928 2529 NAVARRA DR 115
COASTAL LIVING 10: 1,988 SF LV
400 SF GAR// 33 SF PATIO// 202 SF DECK
RESDNTL CONDO
Lot#: 2 COASTAL LIVING 10/BRIAN MERRITT
RECORD COPY *,
NO I YES I Required Prior to Requesting Building Final If Checked YES Date I Inspector I Notes
Landscape 760-944-8463 Allow 48 hours
CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm q t467 ,(k,
Fire Prevention 760-602-4660 Allow 48 hours s7/fi,, 1;e4
Land Development Engineering 760-602-2750
-
V Planning 760-6024600
E A 4-
Tvoe of InsDection Tvoe of Insoection
l u :1UII.]k[e
#11 FOUNDATION
Date Inspector
flQ,
i.id:l[
#31 0 ELECTRIC UNDERGROUND 0 UFER
Date Inspector
#12 REINFORCED STEEL i4 b' #34 ROUGH ELECTRIC
#66 MASONRY PRE GROUT #33 0 ELECTRIC SERVICE 0 TEMPORARY
0 GROUT 0 WALL DRAINS #35 PHOTO VOLTAIC
#10 TILT PANELS #39 FINAL
#11 POUR STRIPS
#11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING
#14 SUBFRAME 0 FoOR 0 CEILING #44 0 DUCT& PLENUM 0 REF. PIPING
#15 ROOF SHEATHING f , —f ,ç rW #43 HEAT-AIR COND. SYSTEMS
#13 EXT. SHEAR PANELS - 7 21-IS- '(tig #49 FINAL
#16 INSULATION q .Z '1 5 #k.
#18 EXTERIOR LATH 4 (iS"&5 ,I9S #81 UNDERGROUND (11,12,21,31)
#17 INTERIOR LATH & DRYWALL 9f7. ,5 VI(( #82 DRYWALL,EXT LATH, GAS TES (17,18,23)
#51 POOL EXCA/STEEL/BOND/FENCE #83 ROOF SHEATING, EXT SHEAR (13,15)
#55 PREPLASTER #84 FRAME ROUGH COMBO (14,24,34,44)
#19 FINAL #85 T-BAR (14,24,34,44)
#22 0 SEWER & BL/CO 0 PL/CO
Date Inspector #89 FINAL OCCUPANCY (19,29,39,49)
Date Inspector A R I:1
#21 UNDERGROUND DWASTEOWTR _
IY ________
#24 TOP OUT 0 WASTE 0 WTR 2-27-1 f A/S UNDERGROUND VISUAL
#27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO
#23 0 GAS TEST 0 GAS PIPING A/S UNDERGROUND FLUSH \
#25 WATER HEATER A/S OVERHEAD VISUAL 2z zoi.6 _.
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC 701K L.
#29 FINAL #29 A/S FINAL R11~6 If ____________
#600 PRE-CONSTRUCTION MEETING .
F/A ROUGH-IN
F/AFINAL
#603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
#605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATICTEST
#607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL
#609 NOTICE OF VIOLATION MEDICAL GAS PRESSURE TEST
#610 VERBAL WARNING MEDICAL GAS FINAL
REV 1012012 SEE BACK FOR SPECIAL NOTES