Loading...
HomeMy WebLinkAbout2529 NAVARRA DR; 165; CB132933; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-07-2016 Residential Permit Permit No: CB132933 Building Inspection Request Line (760) 602-2725 Job Address: 2529 NAVARRA DR CBAD St: 165 Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED Parcel No: 2161701900 Lot #: 7 Applied: 11/25/2013 Valuation: $271,897.00 Constuction Type: 5B Entered By: JMA Occupancy Group: Reference #CT130002 Plan Approved: 02/19/2015 # Dwelling Units: I Structure Type: MF2-4 - Issued: 02/19/2015 Bedrooms: 4 Bathrooms: 4 Inspect Area: PB Orig PC #'PC130058 Plan Check#: Project Title: COASTAL LIVING 10: 2,242 SF LV 400 SF GAR// 86 SF PATIO// 280 SF DECK Applicant: Owner: COASTAL LIVING 10/BRIAN MERRITT COASTAL LIVING 10 L L C STE 210 2710 LOKER AVE W 814 S WESTGATE AVE #15 CARLSBAD CA 92010-6646 LOS ANGELES CA 90049 619-995-6044 Building Permit $1,369.86 Meter Size 05/8 Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00 Plan Check $958.90 Meter Fee $268.00 Add'I Plan Check Fee ($500.00) SDCWA Fee $4,492.00 Plan Check Discount $0.00 CFD Payoff Fee $0.00 Strong Motion Fee $27.19 PFF (3105540) $4,948.53 Park in Lieu Fee $4,636.00 PFF (4305540) $4,567.87 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $310.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $2,528.00 Other Bridge Fee $494.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $0:00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $187.00 Renewal Fee $0.00 ELECTRICAL TOTAL $65.50 Add'I Renewal Fee $0.00 MECHANICAL TOTAL $172.24 Other Building Fee $0.00 Housing Impact Fee . $0.00 HMP Fee $0.00 Housing lnLieu Fee $0.00 Pot. Water Con. Fee $3;549.00 Housing Credit Fee $0.00 Meter Size 05/8 Master Drainage Fee $0.00 Add'I Pot. Water Con. Fee $382.00 Sewer Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees $308.00 Green Bldg Stands (SB1473) Fee $8.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES . $28,772.09 Total Fees: $28,772.09 Total Payments to Date: $28,772.09 Balance Due: $0.00 lnspector:". FINAL APPROVAL Date: 1/13 /6 Clearance: NOTICE* Reese take rsollcE that aççiwal of your project includes the U_ft of fees, dedications, reservations, or other scactions hereafter calIedKIy referred toes 1ees/eriors." You hate 90 days from the date this perrrt mas issued to protest irrsitici of these fees/erarlions. If you protest therr you not fdkthe protest procedures sot forth in Gennerd Code Section 66020(a), and file the protest and any other required infometion With the City IJtereger for processing in ac,dance4th Carlsbad Mjriidpal Code Section 3,32 03D. Failure totinely fcllcwthat procedure wII bar any subaerient laI action to attack, review, sot asrde voicl, or annul their irrçosition You are hereby FIRfl-ER NOTIFIED that your right to protest the specified fees(erwdior5 DOES NOTAPPLY tometer and sew connection fees and capacity changes, nor planning, zoning, grading or other sirTilar application processing or service fees in connection Mth this piqed. NR IXES ITAPPLYto any Inspection List Permit#: CB132933 Type: RESDNTL CONDO COASTAL LIVING 10: 2,242 SF LV 400 SF GARII 86 SF PATIOII 280 SF DECK Date Inspection Item Inspector Act Comments 04/13/2016 89 Final Combo. PB AP 04/12/2016,89 Final Combo PB NR 04/12/2016 89 Final Combo - RI AM PLEASE 04/07/2016 89 Final Combo - RI COF 04/07/2016 89 Final Combo PB NR 03/31/2016 89 Final Combo PB NR 02/26/2016 29 Final Plumbing PB AP 02/26/2016 39 Final Electrical PB AP 02/22/2016 22 Sewer/Water Service PB AP 02/22/2016 23 Gas/Test/Repairs PB AP 01/22/2016 22 Sewer/Water Service PB CA 01/21/2016 22 Sewer/Water Service PB CA 10/08/2015 17 Interior Lath/Drywall PB AP 10/06/2015 18 Exterior Lath/Drywall PB AP 09/25/2015 16 Insulation PB . AP 09/18/2015 27 Shower Pan/Roman Tubs MC., AP 09/18/2015 84 Rough Combo MC AP MINOR PICK UP 09/17/2015 84 Rough Combo PD NR 08/27/2015 18 Exterior Lath/Drywall PB PA 08/14/2015 13 Shear Panels/HD's . PB PA 08/04/2015 13 Shear Panels/HO's PB AP 07/16/2015 13 Shear Panels/HO's PD PA 05/14/2015 11 Ftg/Foundation/Piers PB AP 05/06/2015 21 Underground/Under Floor PB AP 05/06/2015 21 Underground/Under Floor PB. . NR 03/02/201566 Grout PB CA Thursday, April 14, 2016 Page 1 of 1 r j<< $ DEFERRED FEES $ \/ CITY O CARLSBAD J. INSPECTION RECORD uuIding Division I INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION FOR BUILDING INSPECTION CALL: 760602-272 5 OR GO TO: www.Carlsbadca.gov/Building AND CLICK ON "Request InsoectLon" I •I-' ATE: -ff91t( CM31933.1 2529 NAVARRADR '165 COASTAL LIVING '1:.2,242SF L\i 400 SF GAR// 86 SF PATIO/I 280 SF DECK RESDNTL CONDO Lot#:: '7 COASTAL LIVING 10/13RIAN MERRITT 'RE CORD COPY ...~.... OWNE1i\J7'IVrc ______ IF "YES" IS CHECKED BELOW THAT DivisIoN's APPROVAL IS REQUIRED PRIOR TO REQUESTING A FINAL BUILDING INSPECTION. IF YOU HAVE ANY QUESTIONS PLEASE CALL ALL REQUIRED APPROVALS ARE SIGNED OFF— THE APPLICABLE DIVISIONS FAX TO 760-602-8560, AT THE PHONE EMAIL TO NUMBERS PROVIDED BELOW. AFTER BLDG INS PECTIONS@CARLSBADCA.GOV OR BRING IN A COPY OF THIS CARD TO: 1635 FARADAY AVE., CARLSBAD, CA 92008. BUILDING INSPECTORS CAN BE REACHED AT 760-602-2700 BETWEEN 7:30 AM - 8:00 AM THE DAY OF YOUR INSPECTION. Required Prior to Requesting Building Final If Checked YES __________co __________ MIM Land . scape 760-944-8463 Allow 48 hours CM&I (Engineering Inspections) 760-438-3891 Call before 2 pm Fire Preventioi 1.!.1.E!66' Allow zf:I hours Land Development Engineerhig 760-602-2750 of of Date Date #11 FOUNDATION (In #31 D ELECTRIC UNDERGROUND DUFER #12 REINFORCED STEEL #34 ROUGH ELECTRIC #66 MASONRY PRE GROUT #33 0 ELECTRIC SERVICE 0 TEMPORARY 0 GROUT 0 WALL DRAINS #35 PHOTOVOLTAIC #10 TILT PANELS #39 FINAL #11 POUR STRIPS #11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING #14 SUBFRAME 0 FLOOR 0 CEILING /9 #44 0 DUCT & PLENUM 0 REF. PIPING #15 ROOF SHEATHING 7,14 iS ref #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS ' 5/-f 3 .K k #49. FINAL #16 INSULATION g__IS 1& #81 UNDERGROUND (11,12,21,31) #18 EXTERIOR LATH -f.~ .'4? #17 INTERIOR LATH & DRYWALL /O-?•/S f)4) #82 DRYWALL,EXT LATH, GAS TES (17,18,23) #51 POOLEXCA/STEEL/BOND/FENCE #83 ROOF SHEATING, EXT SHEAR (13,15) #55 PREPLASTER/FINAL #84 FRAME ROUGH COMBO (14,24,34,44) 9/(P/I4 ('4 #19 FINAL #85 T-BAR (14,24,34,44) 1.9JI:II(c #22 0 SEWER & BL/CO 0 PL/CO Date Inspector #89 FINAL OCCUPANCY (19,29,39,49) Date Inspector I:1 . #21 UNDERGROUND DWASTEDWTR Xy V. #24 TOP OUT 0 WASTE 0 WTR A/S UNDERGROUND VISUAL \. ' #27 TUB & SHOWER PAN o(t(( frt' A/S UNDERGROUND HYDRO '\ #23 0 GAS TEST 0 GAS PIPING A/S UNDERGROUND FLUSH #25 WATER HEATER A/S OVERHEAD VISUAL ////'% #28 SOLAR WATER A/S OVERHEAD HYDROSTATIC io*r --/4e #29 FINAL • _________ ____________ A/S FINAL 9f( /?sfli1 #600 PRE-CONSTRUCTION MEETING F/A ROUGH-IN \ F/A FINAL #603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN #605 NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST #607 WRITI'EN WARNING FIXED EXTINGUISHING SYSTEM FINAL #609 NOTICE OF VIOLATION • MEDICAL GAS PRESSURE TEST #610 VERBALWARNING MEDICALGAS FINAL SEE BACK FR SPECIAL NOTES