HomeMy WebLinkAbout2529 NAVARRA DR; 175; CB132934; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-07-2016 Residential Permit Permit No: CB132934
Building Inspection Request Line (760) 602-2725
Job Address: 2529 NAVARRA DR CBAD St: 175
Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED
Parcel No: 2161701900 Lot #: 8 Applied: 11/25/2013
Valuation: $226,478.00 Constuction Type: 5B Entered By: JMA
Occupancy Group: Reference #:CT130002 Plan Approved: 02/19/2015
# Dwelling Units: I Structure TypMF2-4 Issued: 02/19/2015
Bedrooms: 4 Bathrooms: 3 Inspect Area: PB
Orig PC #fPC130058 Plan Check #:
Project Title: COASTAL LIVING 10: 1,827 SF LV
400 SF GAR// 23 SF PATIO// 421 SF DECK
Applicant: Owner:
COASTAL LIVING 10/BRIAN'MERRITT COASTAL LIVING 10 L L C
STE 210
2710 LOKER AVE W 814 S WESTGATE AVE #15
CARLSBAD CA 92010-6646 LOS ANGELES CA 90049
619-995-6044
Building Permit $1,193.46 Meter Size D5/8
Add'l Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00 '.
Plan Check $835.42• Meter Fee .- $268.00
AddI Plan Check Fee ($500.00) SDCWA Fee $4,492.00
Plan Check Discount $0.00 CFD Payoff Fee . $0.00
Strong Motion Fee $22.65 PFF (3105540) $4,121.90
Park in Lieu Fee $4,636.00 PFF (4305540) $3,804.83
Park Fee $0.00 License Tax (3104193) $0.00
LFM Fee $310.00 License Tax (4304193) $0.00
Bridge Fee $0.00 Traffic Impact Fee (3105541) $2,528.00
Other Bridge Fee $494.00 Traffic Impact Fee (4305541) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $192.00
Renewal Fee $0.00 ELECTRICAL TOTAL $65.50
AddI Renewal Fee $0.00 MECHANICAL TOTAL $155.95
Other Building Fee $0.00 Housing Impact Fee $0.09
HMP Fee $0.00 Housing InLieu Fee $0.00
Pot. Water Con. Fee $3,549.00 Housing Credit Fee $0.00
Meter Size D5/8 Master Drainage Fee $0.00
Add'l Pot. Water Con. Fee $382.00 Sewer Fee $0.00
Red. Water Con. Fee $0.00 Additional Fees . $308.00
Green Bldg Stands (5B1473) Fee $8.00 Fire Sprinkler Fees $0.00
Green Bldg Stands Plan Chk Fee $0.00
TOTAL PERMIT FEES $26,866.71
Total Fees: $26,866.71 Total Payments to Date: $26,866.71 Balance Due: $0.00
FINAL APPROVAL
lnsnector: 'Date: 'f/i '/t Clearance:
NOTICE Flee take NOTICE that appoM of your prqect includes the "IrTpion° of fees, dedications reservations, or other cadior heeafior cdectiwly
refeeed toes Tior&' You hate 90 clays froni the date this pemit mw lastEd to protest inposition of these fees(adions. If you protest therr you rn.st
follaNthe protest procedures sat bth in Gamment Coda Section a), and file the protest arid any other required infomon With the City MmW for
processing in adariossith Carlsbad IVtinidpal Coda Section 332 OW. Failure totirTEIyfdIothet procedure Will bar any subsequent legal action to attadc,
review, sat aside, void, or annul their inposition
You are hereby RRfl-ER Ml1RED that your right to pnest the specified fees/eadions DOES NOT APPLYtoeter and saw connection fees and capacity
changes, nor planning, moning, grauirig or other sinilar application processing or service fees in connection with this p,ed. NOR IXES ITAPPi..Yto any
Inspection List
Permit#: CB132934 Type: RESDNTL CONDO COASTAL LIVING 10: 1,827 SF LV
400 SF GARII 23 SF PATIO!! 421 SF DECK
Date Inspection Item Inspector Act Comments
04/13/2016 89 Final Combo PB AP
04/12/2016 89 Final Combo - RI AM PLEASE
04/12/2016 89 Final Combo PB NR
03/31/2016 89 Final Combo PB NR
02/26/2016 29 Final Plumbing PB AP
02/26/2016 39 Final Electrical PB AP
02/22/2016 22 Sewer/Water Service PB AP
02/22/2016 23 Gas/Test/Repairs PB AP
01/22/2016 22 Sewer/Water Service PB CA
01/21/2016 22 Sewer/Water Service PB CA
10/01/2015 17 Interior Lath/Drywall PB AP
09/23/2015 18 Exterior Lath/Drywall PB AP
09/15/2015 16 Insulation PB AP
09/14/2015 16 Insulation PB NR
09/04/2015 84 Rough Combo PB AP
09/02/2015 24 Rough/Topout PB NR
08/13/2015 14 Frame/Steel/Bolting/Weldin PB AP
07/22/2015 13 Shear Panels/HO's PD AP
06/22/2015 15 Roof/Reroof PB AP
05/05/2015 11 Ftg/Foundation/Piers PB AP
04/23/2015 21 Underground/Under Floor PB AP
04/22/2015 21 Underground/Under Floor PB AP
04/22/201521 Underground/Under Floor PB NR
03/02/2015 66 Grout PB CA
02/26/2015 11 Ftg/Foundation/Piers PB PA
Thursday, April 14, 2016 Page 1 of 1
$ DEFERRED FEES $
41,111,111: ITY OF
ARLSBAD
ilding Division
INSPECTION RECORD
INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
CALL BEFORE 3:30 am FOR NEXT WORK DAY INSPECTION
FOR BUILDING INSPECTION CALL: 760-6022725
OR GO TO: www.Carlsbadca.gov/Building AND CLICK ON
"Request I ti n"
TE:
CB132934 2529. NAVARRA DR 175
COASTAL LIVING 10: 1,827 SF LV
400 SF GAR// 23 SF PATIO//'421 SF DECK
RESDNTL ; . CONDO
Lot#: * 8' COASTAL LIVING 10/BRIAN MERRITT
RECORD COPY ..
TNO I YES I Required Prior to Requesting Building Final If Checked YES I Date I Inspector I Notes
- _.. Landscape 760-944-8463 Allow 48 hours fs i//i. .. .-
CM&i (Engineering inspections) 760-438-3891 Call before 2 pm 4'C)
Fire Prevention 760-6024660 Allow 48 hours /// )/f//
Land Development Engineering 760-602-2750
V Planning 760-6024600
Type of Inspection Type of Inspection
Date Inspector Date . Inspector
#11 FOUNDATION (s" #31 0 ELECTRIC UNDERGROUND 0 UFER
#12 REINFORCED STEEL #34 ROUGH ELECTRIC
#66 MASONRY PRE GROUT #33 0 ELECTRIC SERVICE 0 TEMPORARY
0 GROUT D WALL DRAINS #35 PHOTOVOLTAIC
#10 TILT PANELS #39 FINAL
#11 POUR STRIPS
#11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING
#14 SUBFRAME 0 FLOOR 0 CEILING #44 0 DUCT& PLENUM 0 REF. PIPING
#15 ROOFSHEAThING #43 HEAT-AIR COND. SYSTEMS
#13 EXT. SHEAR PANELS 7 .77. f f'' - #49 FINAL
#16 INSULATION
#81 UNDERGROUND (11,12,21,31)
#18 EXTERIOR LATH 'f 23 -yg
#17 INTERIOR LATH & DRYWALL -Jo - #82 DRYWAU.,EXI LATH, CASTES (17,18,23)
#51 POOLEXCA/STEEL/BOND/FENCE . #83 ROOF SHEATING, EXT SHEAR (13,15)
#55 PREPLASTER/ FINAL #84 FRAME ROUGH COMBO (14,24,34,44)
#19 FINAL #85 T-BAR (14,24,34,44)
#22 0 SEWER & BL/CO 0 PL/CO
Date
_.
\c4!
Inspector
r
#89 FINAL OCCUPANCY (19,29,39,49)
Date Inspector I:1
#21 UNDERGROUND OWASTE DWTR 1> -
#24 TOP OUT OWASTE DWTR A/S UNDERGROUND VISUAL
#27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO "
#23 0 GAS TEST 0 GAS PIPING . A/S UNDERGROUND FLUSH
#25 WATER HEATER A/S OVERHEAD VISUAL
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC
#29 FINAL A/S FINAL
#600 PRE-CONSTRUCTION MEETING
F/A ROUGH-IN
F/A FINAL
#603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN
#605 NOTICETO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST
#607 WRITTEN WARNING - ' ' FIXED EXTINGUISHING SYSTEM FINAL
#609 NOTICE OF VIOLATION MEDICAL GAS PRESSLIRETEST
#610 VERBAIWARNING MEDICAL GAS FINAL
REV 1012012
SEE SACK FOR SPECIAL NOTES