Loading...
HomeMy WebLinkAbout2529 NAVARRA DR; 175; CB132934; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-07-2016 Residential Permit Permit No: CB132934 Building Inspection Request Line (760) 602-2725 Job Address: 2529 NAVARRA DR CBAD St: 175 Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED Parcel No: 2161701900 Lot #: 8 Applied: 11/25/2013 Valuation: $226,478.00 Constuction Type: 5B Entered By: JMA Occupancy Group: Reference #:CT130002 Plan Approved: 02/19/2015 # Dwelling Units: I Structure TypMF2-4 Issued: 02/19/2015 Bedrooms: 4 Bathrooms: 3 Inspect Area: PB Orig PC #fPC130058 Plan Check #: Project Title: COASTAL LIVING 10: 1,827 SF LV 400 SF GAR// 23 SF PATIO// 421 SF DECK Applicant: Owner: COASTAL LIVING 10/BRIAN'MERRITT COASTAL LIVING 10 L L C STE 210 2710 LOKER AVE W 814 S WESTGATE AVE #15 CARLSBAD CA 92010-6646 LOS ANGELES CA 90049 619-995-6044 Building Permit $1,193.46 Meter Size D5/8 Add'l Building Permit Fee $0.00 Add'l Red. Water Con. Fee $0.00 '. Plan Check $835.42• Meter Fee .- $268.00 AddI Plan Check Fee ($500.00) SDCWA Fee $4,492.00 Plan Check Discount $0.00 CFD Payoff Fee . $0.00 Strong Motion Fee $22.65 PFF (3105540) $4,121.90 Park in Lieu Fee $4,636.00 PFF (4305540) $3,804.83 Park Fee $0.00 License Tax (3104193) $0.00 LFM Fee $310.00 License Tax (4304193) $0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541) $2,528.00 Other Bridge Fee $494.00 Traffic Impact Fee (4305541) $0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $192.00 Renewal Fee $0.00 ELECTRICAL TOTAL $65.50 AddI Renewal Fee $0.00 MECHANICAL TOTAL $155.95 Other Building Fee $0.00 Housing Impact Fee $0.09 HMP Fee $0.00 Housing InLieu Fee $0.00 Pot. Water Con. Fee $3,549.00 Housing Credit Fee $0.00 Meter Size D5/8 Master Drainage Fee $0.00 Add'l Pot. Water Con. Fee $382.00 Sewer Fee $0.00 Red. Water Con. Fee $0.00 Additional Fees . $308.00 Green Bldg Stands (5B1473) Fee $8.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $26,866.71 Total Fees: $26,866.71 Total Payments to Date: $26,866.71 Balance Due: $0.00 FINAL APPROVAL lnsnector: 'Date: 'f/i '/t Clearance: NOTICE Flee take NOTICE that appoM of your prqect includes the "IrTpion° of fees, dedications reservations, or other cadior heeafior cdectiwly refeeed toes Tior&' You hate 90 clays froni the date this pemit mw lastEd to protest inposition of these fees(adions. If you protest therr you rn.st follaNthe protest procedures sat bth in Gamment Coda Section a), and file the protest arid any other required infomon With the City MmW for processing in adariossith Carlsbad IVtinidpal Coda Section 332 OW. Failure totirTEIyfdIothet procedure Will bar any subsequent legal action to attadc, review, sat aside, void, or annul their inposition You are hereby RRfl-ER Ml1RED that your right to pnest the specified fees/eadions DOES NOT APPLYtoeter and saw connection fees and capacity changes, nor planning, moning, grauirig or other sinilar application processing or service fees in connection with this p,ed. NOR IXES ITAPPi..Yto any Inspection List Permit#: CB132934 Type: RESDNTL CONDO COASTAL LIVING 10: 1,827 SF LV 400 SF GARII 23 SF PATIO!! 421 SF DECK Date Inspection Item Inspector Act Comments 04/13/2016 89 Final Combo PB AP 04/12/2016 89 Final Combo - RI AM PLEASE 04/12/2016 89 Final Combo PB NR 03/31/2016 89 Final Combo PB NR 02/26/2016 29 Final Plumbing PB AP 02/26/2016 39 Final Electrical PB AP 02/22/2016 22 Sewer/Water Service PB AP 02/22/2016 23 Gas/Test/Repairs PB AP 01/22/2016 22 Sewer/Water Service PB CA 01/21/2016 22 Sewer/Water Service PB CA 10/01/2015 17 Interior Lath/Drywall PB AP 09/23/2015 18 Exterior Lath/Drywall PB AP 09/15/2015 16 Insulation PB AP 09/14/2015 16 Insulation PB NR 09/04/2015 84 Rough Combo PB AP 09/02/2015 24 Rough/Topout PB NR 08/13/2015 14 Frame/Steel/Bolting/Weldin PB AP 07/22/2015 13 Shear Panels/HO's PD AP 06/22/2015 15 Roof/Reroof PB AP 05/05/2015 11 Ftg/Foundation/Piers PB AP 04/23/2015 21 Underground/Under Floor PB AP 04/22/2015 21 Underground/Under Floor PB AP 04/22/201521 Underground/Under Floor PB NR 03/02/2015 66 Grout PB CA 02/26/2015 11 Ftg/Foundation/Piers PB PA Thursday, April 14, 2016 Page 1 of 1 $ DEFERRED FEES $ 41,111,111: ITY OF ARLSBAD ilding Division INSPECTION RECORD INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB CALL BEFORE 3:30 am FOR NEXT WORK DAY INSPECTION FOR BUILDING INSPECTION CALL: 760-6022725 OR GO TO: www.Carlsbadca.gov/Building AND CLICK ON "Request I ti n" TE: CB132934 2529. NAVARRA DR 175 COASTAL LIVING 10: 1,827 SF LV 400 SF GAR// 23 SF PATIO//'421 SF DECK RESDNTL ; . CONDO Lot#: * 8' COASTAL LIVING 10/BRIAN MERRITT RECORD COPY .. TNO I YES I Required Prior to Requesting Building Final If Checked YES I Date I Inspector I Notes - _.. Landscape 760-944-8463 Allow 48 hours fs i//i. .. .- CM&i (Engineering inspections) 760-438-3891 Call before 2 pm 4'C) Fire Prevention 760-6024660 Allow 48 hours /// )/f// Land Development Engineering 760-602-2750 V Planning 760-6024600 Type of Inspection Type of Inspection Date Inspector Date . Inspector #11 FOUNDATION (s" #31 0 ELECTRIC UNDERGROUND 0 UFER #12 REINFORCED STEEL #34 ROUGH ELECTRIC #66 MASONRY PRE GROUT #33 0 ELECTRIC SERVICE 0 TEMPORARY 0 GROUT D WALL DRAINS #35 PHOTOVOLTAIC #10 TILT PANELS #39 FINAL #11 POUR STRIPS #11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS & PIPING #14 SUBFRAME 0 FLOOR 0 CEILING #44 0 DUCT& PLENUM 0 REF. PIPING #15 ROOFSHEAThING #43 HEAT-AIR COND. SYSTEMS #13 EXT. SHEAR PANELS 7 .77. f f'' - #49 FINAL #16 INSULATION #81 UNDERGROUND (11,12,21,31) #18 EXTERIOR LATH 'f 23 -yg #17 INTERIOR LATH & DRYWALL -Jo - #82 DRYWAU.,EXI LATH, CASTES (17,18,23) #51 POOLEXCA/STEEL/BOND/FENCE . #83 ROOF SHEATING, EXT SHEAR (13,15) #55 PREPLASTER/ FINAL #84 FRAME ROUGH COMBO (14,24,34,44) #19 FINAL #85 T-BAR (14,24,34,44) #22 0 SEWER & BL/CO 0 PL/CO Date _. \c4! Inspector r #89 FINAL OCCUPANCY (19,29,39,49) Date Inspector I:1 #21 UNDERGROUND OWASTE DWTR 1> - #24 TOP OUT OWASTE DWTR A/S UNDERGROUND VISUAL #27 TUB & SHOWER PAN A/S UNDERGROUND HYDRO " #23 0 GAS TEST 0 GAS PIPING . A/S UNDERGROUND FLUSH #25 WATER HEATER A/S OVERHEAD VISUAL #28 SOLAR WATER A/S OVERHEAD HYDROSTATIC #29 FINAL A/S FINAL #600 PRE-CONSTRUCTION MEETING F/A ROUGH-IN F/A FINAL #603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN #605 NOTICETO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST #607 WRITTEN WARNING - ' ' FIXED EXTINGUISHING SYSTEM FINAL #609 NOTICE OF VIOLATION MEDICAL GAS PRESSLIRETEST #610 VERBAIWARNING MEDICAL GAS FINAL REV 1012012 SEE SACK FOR SPECIAL NOTES