HomeMy WebLinkAbout2529 NAVARRA DR; 185; CB132935; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
04-07-2016 Residential Permit Permit No: CB132935
Building Inspection Request Line (760) 602-2725
Job Address: 2529 NAVARRA DR CBAD St: 185 -
Permit Type: RESDNTL Sub Type: CONDO Status: ISSUED
Parcel No: 2161701900 Lot #: 9 Applied: 11/25/2013
Valuation: $225,022.00 Constuction Type: 5B Entered By: JMA
Occupancy Group: Reference #: CT130002 J Plan Approved: 02/19/2015
# Dwelling Units: 1 Structure Type: MF2-4 Issued: 02/19/2015
Bedrooms: 4 Bathrooms: 3 Inspect Area: PB
Orig PC #: PCI 30058 Plan Check #:
Project Title: COASTAL LIVING 10:1,818 SF LV
400 SF GARII 23 SF PATIO// 393 SF DECK
Applicant: Owner: 11
COASTAL LIVING 10/BRIAN MERRITT COASTAL LIVING 10 L L C
STE 210
2710 LOKER AVE W 814S WESTGATE AVE #15
CARLSBAD CA 92010-6646 LOS ANGELES CA 90049
619-995-6044
Building Permit $1,189.54 Meter Size D5/8
Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00
Plan Check $832.68 Meter Fee $268.00
Add'I Plan Check Fee ($500.00) SDCWA Fee $4,492.00
Plan Check Discáunt $0.00 CFD Payoff Fee $0.00
Strong Motion Fee $22.50 PFF (3105540) $4,095.40
Park in Lieu Fee $4,636.00 PFF (4305540) $3,780.37
Park Fee . $0.00 License Tax (3104193) $0.00
LFM Fee $310.00 License Tax (4304193) $0.00
Bridge Fee $0.00 Traffic Impact Fee (3105541) $2,528.00
Other Bridge Fee $494.00 Traffic Impact Fee (4305541) $0.00
BTD #2 Fee $0.00 Sidewalk Fee $0.00
BTD #3 Fee $0.00 PLUMBING TOTAL $192.00
Renewal Fee $0.00 ELECTRICAL TOTAL $65.50
Add'I Renewal Fee $0.00 MECHANICAL TOTAL $155.95
Other Building Fee $0.00 Housing Impact Fee $0.00
HMP Fee $0.00 Housing InLieu Fee $0.00
Pot. Water Con. Fee $3,549.00 Housing Credit Fee $0.00
Meter Size D5/8 Master Drainage Fee $0.00
Add'I Pot. Water Con. Fee $382.00 Sewer Fee $0.00
Red. Water Con. Fee $0.00 Additional Fees $308.00
Green Bldg Stands (5B1473) Fee $8.00 Fire Sprinkler Fees $0.00
Green Bldg Stands Plan Chk Fee $0.00
TOTAL PERMIT FEES
-
$26,808.94
Total Fees: $26,808.94 Total Payments to Date: $26,808.94 Balance Due: $0.00
Insoector:
FINAL APPROVAL I
Date: '1 7 / Clearance: I
NOTICE Please take F'.CllCE that açrwal of your prqect indudes the "lnesitioif of fees, darlItions, roseions, or other exactions hereafter eelledKly
rofened to 'fees/aicadior." You have 90 days from the date this pernit mw issued to protest inposition of these fees/enadions. If you protest them, you n
follow the protest procedures sat forth in Gmenvnent CAxle section a), and file the protest and any other requirod infornedonwth the City Manager for
processing in aIanceth Carisbal Mjniapal Code Section 3030. Failuietotinmfollthat procEdure wll bar any subsequent legal action to attack
review, set eeith, void, or annul their irTpition.
You are hereby FURTHER NOT FlED that your right to protest the sjdfled fees(erediore DOES NOT APPLY to water aid saw connection fees and capadty
changes, nor planning,zoning, grailng or other sirnilarapplicetial processing or service fees in cenredion wth this prqed. NCR DOES IT APPLY to any
CITY OF
$ DEFERRED FEES $
iilding ljon INSPECTION RECORD
INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION
FOR BUILDING INSPECTION CALL: 760-602-2725
OR GO TO: www.Carlsbadca.gov/Building AND CLICK ON
"Request Inpe4ion"
TE: -//9 // j
CB132935 2529 NAVARRADR. 185
COASTAL LIVING 10: 1,818 SF LV
400 SF. GAR// 23 SF PATIO// 393 SF DECK
RESDNTL CONDO
Loft- 9 COASTAL LIVING 10/13RIAN MERRITT
RECORD Copy,
INo I YES Required Prior to Requesting Building Final If Checked YES I ,Date I Inspector I Notes
Landscape 760-944-8463 Allow 48 hours 30/J,. 94!
CM&l (Engineering Inspections) 760-438-3891 Call before 2 p
Fire Prevention 760-6024660 Allow 48 hours
Ic [_ 7 Land Development Engineering 760-602-2750 Jc6
Planning
fj/ç
760-6024600 //(,
of of
CODE # BUILDING
#11 FOUNDATION
Date
-.
Inspector
#31 0 ELECTRIC UNDERGROUND 0 UFER
Date Inspector.
#12 REINFORCED STEEL #34 ROUGH ELECTRIC
#66 MASONRY PRE GROUT #33 0 ELECTRIC SERVICE 0 TEMPORARY
0 GROUT 0 WALL DRAINS #35 PHOTOVOLTAIC
#10 TILT PANELS
#11 POUR STRIPS
t#44 11
#11 COLUMN FOOTINGS ROUND DUCTS & PIPING
#14 SUBFRAME 0 FLOOR 0 CEILING & PLENUM 0 REF. PIPING
- #15 ROOFSHEATHING 4 -72 AY J'OZ #43 HEAT-AIR COND. SYSTEMS
#13 EXT. SHEAR PANELS -7. 24. (ç r't'-' #49 FINAL
#16 INSULATION
#18 EXTERIOR LATH J'
4'.-(j- c
#81 .UNDERGROUND(11,12,21,31)
#17 INTERIOR LATH & DRYWALL gjo—/.~ #82 DRYWALL,EXT LATH, CASTES (17,18,23)
#51 POOL EXCA/STEEL/BOND/FENCE #83 ROOF SHEATING, EXT SHEAR (13,15)
#55 PREPLASTER #84 FRAME ROUGH COMBO (14,2434,44)
#19 FINAL #85 T-BAR (14,24,34,44)
ffvlqyJUfl'I:JI[c
#22 0 SEWER & BL/CO 0 PL/CO
Date
- (I
Inspector
(
#89 FINAL OCCUPANCY (19,29,39,49) f"- 7 7
Date Inspector I:1
#21 UNDERGROUND DWASTE 0 WTR giZ
#24 TOPOUT 0 WASTE DWTR A/S UNDERGROUND VISUAL
#27 TUB & SHOWER PAN . A/S UNDERGROUND HYDRO
#23 0 GAS TEST 0 GAS PIPING A/S UNDERGROUND FLUSH
#25 WATER HEATER A/S OVERHEAD VISUAL
#28 SOLAR WATER A/S OVERHEAD HYDROSTATIC 7QJ
#29 FINAL . A/S FINAL i'i4?~2i
#600 PRE-CONSTRUCTION MEETING -
F/A ROUGH-IN
F/AANAL
#603 FOLLOW UP INSPECTION AXED EXTINGUISHING SYSTEM ROUGH-IN
#605 NOTICETO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST
#607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL
#609 NOTICE OF VIOLATION MEDICAL GAS PRESSURETEST
#610 VERBAL WARNING MEDICAL GAS FINAL
REV 1012012
SEE BACK FOR SPECIAL NOTES