HomeMy WebLinkAbout2533 NAVARRA DR; BLDG 1; 73-3550; Permita
BUILDI1G PERMIT APPLITION
Permit No7 City of CARLSBAD, CALIFORNIA 92008
Applicant to complete numbereIspiconly. Phone 729-1181
JOB ADDRESS
S *1
o '-
LEGAL
DES N.
LOT NO. BLK TRACT
rnth T'1t
(DSEE ATTACHED SHEET)
I ?4,4yarrit flr.. Tvaq (+-a
M 0 0
OWNER MAIL ADDRESS ZIP PHONE / in
2 47 47f, 1 gAn A4^ftf% 47111S 2 817111
CONTRACTOR MAIL ADDRESS
3
PHONE LICENSE NO.
ARCHITECT OR DESIGNER MAIL ADDRESS
4 Tit- V-'v, Goarvrinry Thi.kn rrt4t.s*q
PHONE
S1 ?*v.'r
LICENSE NO. Lid.
12 1n IN-7trN, Calif.
ENGINEER MAIL ADDRESS PHONE LICENSE NO.
M. p c *.gw. 1$Qfl nv nr r114: 114
LENDER MAIL ADDRESS BRANCH
6 4%(!l1r1+u P,se4fic, Flank leafn Of flea Si'i plitern
USE OF BUILDJNG ., 1 4 titr-oriciam-triltm J . '
8 Class ofwork: M NEW DADDITION 11 ALTERATION 13 REPAIR OMOVE DREMOVE
9 Describe work: W
10 Change of use from
Change of use to
11 Valuation of work: $ / PLAN CHECK FEE PERMIT FEE
SPECIAL CONDITIONS: Type of -
Const.
Occupancy
Group
,/•
Division
Size of Bldg.
(Total) Sq. Ft// ,rI
No. of
Stories -'
Max.
0cc. Load --
___________________________________________________________________ Fire
Zone
Use
Zone ,
Fire Sprinklers
Required Dyes EINo APPLICATION ACCEPTED BY. PLANS CHECKED BY APPROVED FOR ISSUANCE BY
No. of
Dwelling Units ,
OFFSTREET PARKING SPACES:
- fT
Covered j Uncovered
NOTICE Special Approvals Required Received Not Required
ZONING SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB.
ING, HEATING, VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- HEALTH DEPT.
FIRE DEPT. TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
SOIL REPORT CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM-
MENCED. OTHER (Specify)
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT (DATE)
SIGNATURE or OWNER (I OWNER BUILDER) (DATE)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH
INSPECTOR
INSPECTION RECORD -75557
DATE REMARKS INSPECTOR
FOUNDATIONS:
SET BACK
TRENCH
REINFORCING
FOUNDATION WALL&
WEATHER PROOFING
CONCRETE SLAB
FRAMING
INT. LATHING OR DRYWALL
EXT. LATHING
MASONRY
FINAL
USE SPACE BELOW FOR NOTES, FOLLOW-UP, ETC.
?-7-74 Masonry: 4 1 lift main bldg. O.K. B. Nelson
3-7-74 8' lift parking garages. O.K. B. Nelson
-
JOB ADDRESS
231.37 Navarra Driva 5
In
0
>
LEGAL
IDESCR.t
I LOT NO. i
38 & 39
BLE T TRACT
(c3SEE ATTACHED SHEET) Rancho La Costs
S
a
In
OWNER MAIL ADDRESS ZIP PHONE UI
2 Ralxh BuT 4287 k7th. St. San Dim Ro 9211 281.7136
CONTRACTOR MAIL ADDRESS PHONE LICENSE NO.
3 PcwaiVaUtr Flub. Inc. P.O. Box 12k Poway, Calif 92061 ':z;:).:?/ ARCHITECTOR DESIGNER MAIL ADDRESS PHONE LICENSE#NO.
Phons (748-8282)
ENGINEER MAIL ADDRESS PHONE LICENSE NO.
5. S.
LENDER MAIL ADDRESS BRANCH
USE OF BUILDING 61 A
8 Class ofwork: 4 NEW 0 ADDITION 0 ALTERATION 0 REPAIR
9 Describe work: .
PERMIT FEES
No. Type of Fixture or Item Fee
SPECIAL CONDITIONS: WATER CLOSET (TOILET) Ii
BATHTUB )U
LAVATORY (WASH BASIN) r3 cr
46 SHOWER
KITCHEN SINK & DISP. 3 00
DISHWASHER
APPLICATION ACCEPTED BY:IPLANSCUECKEOBY: APPROVED FOR ISSUANCE BY. LAU!1QR.T'RA...
CLOTHES WASHER ._3 00
WATER HEATER 3 00
NOTICE _J Pool Stand Pine _j .5Q
I DRINKING FOUNTAIN 1 50 THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC.
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A I -
FLOOR—SINK OR DRAIN ILI 50
Bar Sinks .39 QQ PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM.
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT.
TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
j GAS SYSTEMS: NO. OUTLETS
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
WATER PIPING & TREATING EQUIP.
WASTE INTERCEPTOR ____________________________________ - -
- VACUUM BREAKERS
-
____________________________________
LAWN SPRINKLER SYSTEM
- -
SEWER tn
CESSPOOL - -
SEPTIC TANK & PIT
SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT (DATE)
PERMIT $ j
TOTAL FEE $ - SIGNATURE OF OWNER (IF OWNER BUILDER) (DATE)
ti S
.
PLUMBING PERMIT
CALIFORNIA
Applicant
APPLICATION
**t
Permit No
WHEN PROPERLY VALIDATED ON THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH_-
1715V _-1k
INSPECTOR
I
INSPECTION REPORTS -
DATE ITEM REMARKS INSPECTOR
1-30-74 Underground Plbg. O.K. B.-Nelson
B:, Nelson 1-24-74
3-18-74
tough
Underground P1b
O.K.
. fl.K.. P N1g
- 10 ' DOk- -P/0m19,n
,3 o.1/. *
12-27-74 Tubs O.K. B. Ne1pn
USE SPACE BELOW FOR NOTES, FOLLOW-UP, ETC.
r
4.
MECHAAL PERMIT AP PL
Permit No. 79-/'/i% City of CARLSBAD, CALIFORNIA 92008 .—
Aon/icant to comniete number s.oaces Phone 729-1181
o 0
z 01
JOB ADDR ESS
It;-
F1 (14
LE GAL locace.
Gir NO. 1'cICIC RACT -- ' DSEE ATTACHED SHEET)
OWNER MAIL ADDRESS
V./1P I
ZIP PHONE
MAIL ADDRESS
3L D:E 444 C. JL'ARES//'t
PHONE LICENSE NO.
P" H01J12L
r_3A 010010 ENGINEER MAIL
5 -
LENDER MAIL ADDRESS
6
BRANCH
USE OF BUILDING
1 Cav vtL. céi
8 Classofwork: NEW DADDITION DALTERATION 13 REPAIR - - -
9 Describe work:
'
— —
Type of Fuel: Oil 0 Nat. Gas 0 LPG. 0
PERMIT FEES
SPECIAL CONDITIONS: No. Type of Equipment Fee
Air Cond. Units—H.P. Ea. $
4
Refrigeration Units—H.P. Ea. ) . . #
Boilers—H.P. Ea.
-
Gas Fired A.C. Units—Tonnage Ea. -
Forced Air Systems—B.T.U. M Ea.
APPLICATION ACCEPTED BY:
1
PLANSCUECKEOBY APPROVED FOR ISSUANCE . Gravity Systems—B.T.U. ms—B.T.U. M Ea.
Floor Furnaces—B.T.U. M - -
Wall Heaters—B.T.U. M
NOTICE
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC-
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM- MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
- Unit Heaters—B.T.U. M - -
Evaporative Coolers - -
Clothes Dryers _ -
Ventilation Fan - -
- ___________________________________ Range Hood
-
Air Handling Unit— C.F.M.
- -
-
Incinerator
- - -
-
341ATURE or COIRACT OR AUTHORIZED AGENT (DATE)
PERMIT $
TOTAL FEE _S SIGNATURE _OF_ OWNER _(IF _OWNER _BUILDER) (DATE)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH
INSPECTOR
INSPECTION REPORTS
DATE ITEM REMARKS INSPECTOR
USE SPACE BELOW FOR NOTES, FOLLOW-UP, ETC. .
/
I
ELECTRICAL PERMIT APPLICATION U
Permit No.________ City of CARLSBAD, CALIFORNIA 92008
.. -
Applicant to complete numbered spaces only. Phone 729-1181 Eq p
1
tK t/IJVjTRACT
.5o'#/ U,,#r / (EJSEE ATTACHED SHEET)
OWNER MAIL A/ ZIP PHONE
Pot S'AI~4 C4 ry
MAt1DDRt? PHOQ't 1 LICENSE NO.
AR(ft4WZ NCREL"T '& '" A!RttWOA LI +c 's
ENGINEER MAIL ADDRESS PHONE LICENSE NO.
5
LENDER I MAIADDRE5S :.r.RANCH j
6 I
USE OI! BUILDING --
1
'Crflh,7fv/1
8 CIA ofwork: EJMEW 4JADDITION DALTERATION 11 REPAIR
ig Describe work:
PERMIT FEES
I No. lEach I Fee
ISPECIAL CONDITIONS:
ISSUANCE OF EACH PERMIT
Elm
NEW CONSTRUCTION, FOR EACH
PPLICATION ACCEPTED BY: PLANSCHECKEDBY: APPROVED FOR ISSUANCE BY: AMPERES OF MAIN SERVICE, SWITCH, f 00
FUSE OR BREAKER
I 1 FOR EA. AMPERE OF INCREASE
NEW SERVICE ON EXISTING BLDG.
NOTICE /' IN MAIN SERVICE, SWITCH, FUSE
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- OR BREAKER
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF -
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF, 120 DAYS AT ANY TIME AFTER WORKIS COM- REMODEL, ALTERATION, NO CHANGE
MENCED ?IN ..SERVICE, FOR EA
I HEREBY CERTIFY TIAT I HAVE READ AND EXAMINED THIS INCREASE
;EE
APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS - TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE TEMP. SERVICE UP TO AND INCLUD- PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING ING 200 AMP. CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
TEMP. SERVICE OVER 200 AMP.
PER 100
SyITURE:OF TRACTOR OR AUTHORIZED AGENT (DATE)
MINIMUM PERMIT FEE
43 SIGNATURE OF OWNER (IF OWNER BUILDER) (DATE) -I U4
WHEN PROPERLY VALIDATED ON THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH
INSPECTOR
INSPECTION REPORTS
DATE ITEM . REMARKS INSPECTOR
.4L$75 72 /L
USE SPACE BELOW FOR NOTES, FOLLOW-UP, ETC.
MECHANICAL PERMIT APPiiCATlON- -i L.
z III City of CARLSBAD, CALIFORNIA 92008
Permit No.
Applicant to complete numbered spaces only. Phone 729-1181
JOB ADDRESS
2533, 2535. 2537 and 2531 NAVARRA DRIVE. LA COSTA
III
In
LEGAL
1 DESCR.
I LOT NO. I
38 & 39
LK TRACT
—]SEE ATTACHED
LA COSTA SOUTH 1 1
OWNSR' MAIL ADDRESS
2/9L Ii/4287 47th St.
/
ZIP PHONE
San Diego, Cal. 281-7133
CdONTACTOR — MAIL ADDRESS
Saxae AS ovnet
PHONE LICENSE NO I
240322
ARCHITECT OR DESIGNER MAIL ADDRESS
4
PHONE LICENSE NO.
ENGINEER MAIL ADDRESS
5
PHONE LICENSE NO.
-. - -
LENDER - MAIADDREIS - I • BRACH
6 Security Pacific-Main Branch P.O. Box 17919 S.D., Ca. 92112
USE OF BUILDING
24 tONDOMINItIl UNITS
8 Class ofwork: NEW 11 ADDITION DALTERATION DREPAIR - -
9 Describe work:
— —
Type of Fuel: Oil 0 Nat. Gas 0 LPG. 0
PERMIT FEES
SPECIAL CONDITIONS: No. Type of Equipment Fee
Air Cond. Units—H.P. Ea. $ -
Refrigeration Units—H.P. Ea. - -
Boilers—H.P. Ea.
Gas Fired A.C. Units—Tonnage Ea. - -
Forced Air Systems—B.T.U. M Ea. - -
APPLICATION ACCEPTED BY; PLANS CHECKED BY APPROVED FOR ISSUANCE BY - Gravity Systems—B.T.U. M Ea. - -
Floor Furnaces—B.T.U. M - -
Wall Heaters—B.T.U. M - -
NOTICE
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC-
TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM-
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS- TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
?
- Unit Heaters—B.T.U. M - -
Evaporative Coolers -
Clothes Dryers - -
Ventilation Fan..
- Range Hood
Air Handling Unit— ef'1&. C.F.M.ov
___________________
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT
-
Incinerator
-
- -
- - - - - -
- SIGNATURE OF CONTRACTOR OR AUTHORIZED AGENT (DATE)
PERMIT
TOTAL FEE $1 ....L ff .. SIGNATURE OF OWNER (IF OWNER BUILDER) (DATE)
- -- WHEN PROPERLY VALIDATED ON THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH
INSPECTOR
5-
S.. S
,
) .
This Certi ficate issued pursuant to the Tequire!nents of Section 306 .-
y of the Uniform Building Code certifies that at the time of issuance
I this structure complies with applicable ordinances of the City
regulating building construction use.
Use Ckssiiicaticn_(24) CONDOMINIUM UNITS/REC./POOL Bldg. Permit No. 733550
'3 Group _V - 1 —hr-- Typo Construction HLE..l Fire Zone _..3___________ Use Zone _ —
Occupant Load
Owner oi Building _RALPH BWY Address 4287 47th St. San Diego, Cal
<c Bui 'ding tddress 3_,3.53.731..NA.VARRLD.RLV,.E y_bACO1,_CRLS.8Aa,_cl -
1_(4) Buil dings Bv
Dote_' OTR_2.li25
NOT E: Alteration ; chanoc,, additions or changes cf occupancy n-jl!ifies thls ce;ificata.
(Post in conspicuous place)
',v'
LEUCADIA COUNTY WATER DISTRICT
1959 EL CAMINO REAL • LEUCADIA, CALIFORNIA 92024 . 753-0155
October 29, 1973 SIN V
Ci1
Mr. Ralph Bwy
4287 47th Street 'D( of C3iet
San tDiecso. California 92115
Dear Mr. Bwy:
In response to your request this date, the applicable connection costs
for sewer service for Lots 38 & 39, La. Costa South Unit 1:1 are as follows:
Bldg. 1 16 units Conn. Fee $ 4,800.00
Bldg. 2 8 units Conn. Fee 2,400.00
Bldg. 1 16 units Surcharge Fee 850.00
Bldg. 2 8 units Surcharge Fee 450.00
•
••
• TOTAL: $ 8,500.00
If we can be of further service in regard to the connection fees and
surcharge fees, please contact the District office. .•
Yours very truly,
LEUCADIA COUNTY WATER DISTRICT
•
•
Carol A. Bartkiewicz
cab
ALVARADO SOILS ENGINEERING
WILLIAM G. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 9204 462-3000
June 10, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
24 Unit Condominium, Building No. 2
533 Navarra Dr1
La Costa Area, Carlsbad, California
Gentlemen:
Forwarded herewith are the results of the 28-day break for the concrete pour
made on May 10, 1974.
Please refer to our letter of May 10, 1974, same subject as above for details
of the placement.
Respectfully submitted,
Wi1jp G. CatlirRCE 11579
Distr. (2) Addressee
(2) Mr. Ralph Bwy
4287 47th Street
San Diego, California 92115
Ends.
mkd
RECEIVED
JUN 12 1974
CITY OF CARLSBAD
Building Department
ALVARADO SOILS ENGINEERING
WILLIAM G. CATLIN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 92041 462.3000
May 10, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
for 24 Unit Condominium, Building No. 2
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the foundations and floor slab for Building No. 2
on subject project for 24 Unit Condominium.
The placement of concrete and reinforcing steel was in accordance with
the plans and specifications and the Uniform Building Code. Any welded
wire fabric was all lifted into place during placement of concrete. The
concrete mix design was as follows:
Nelson Sloan Concrete Company
No. 350-75-550 1911 1" Rock
Modified 1265 Sand
448 Ceient
N.T.E. 39 gal. Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 112.5
Starting Time - 0750
Finish Placing - 1525
One set of 3 cylinders was obtained during concrete placement. The 7, 14,
and 28 day breaks will be reported when the laboratory work is completed.
Respectfully submitted,
am G. Catl1n, RCE 11579
Distr. If)--'Addressee
4-'City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Attn: Mr. Nelson, Inspector
4'1'r. Ralph Bwy
4287 47th Street
Suite 1
San Diego, California 92115
I
I out(ieiui C(A~ohiita J°eIng abokatoit
INSPECTION • TESTING • RESEARCH • DEVELOPMENT
6280 CQWeAdae g fheef • gan CDego. Cai6oiva 92120
REPORT OF COMPRESSION TESTS XU1 CONCRETE
0 MORTAR
FILE NUMBER 420044 DATE_... May 17, 1974 0 GROUT JOB NAME... 24 Unit Condominium 0 GUNITE ADDRESS------ 2533 Navarra Drive; Carlsbad, Calif. 0
ARCHITECT... Derk Vyn & George Drueker
ENGI NEER——Truck #373
CLIENT--------Alvarado Soils Engineering, Inc. Ticket #E 646960
LOCATION IN STRUCTURE--
CEMENT ------
ADM1XTURE
SAND -----------------------
ROCK
MIX NO. OR PROPORTIONS.
TIME IN MIXER, minutes__.
SLUMP, inches-------------
MADE BY--------------------
Footings & Slab, Bldg. #2
Riverside Type II
Pozzoljth 300
Nelson and Sloan
Nelson and Sloan
350-75-550, 5 1/2 Sacks
60 Mm.
5"
Lloyd W. Cpffer
LABORATORY NO.
MARK
2854
20B66-Kl
2855
20B6C-x2
2856
20B6c-K3
DATE MADE 5/10/74
DATE RECEIVED . 5/13/74
DATE TESTED 5/17/74 6/7/74 HOLD
DIAMETER, inches 6.00
AREA, sq. inches 28.27
MAXIMUM LOAD, lbs. 74,200 117,200
COMPRESSIVE STR., psi 2,620. 4,150
AGE TESTED. days 7 Days .28 Days
REQD PSI at 28 DAYS 3,000
UNIT WT./CU. FT. (plastic)
DISTRIBUTION: (2) Alvarado Engineering
RESPECTFULLY SUBMITTED.
ou1eMi Co 6oinLa Uesung Sgabotiatohy
BY
.
., •k,.•
ALVARADO SOILS ENGINEERING
WILLIAM 0. CATIJN 7830 LA MESA BOULEVARD TELEPHONE
Civil Ers9ifl.s, LA MESA, CALIFORNIA 92041 462-3000
May 30, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
tN:3
U i,t...Con.o ium Building Nos. 1 and 2
3 Navarra Drive
La Costa AF rCffb"r, California
Gentlemen:
Forwarded herewith are the results of the 29-day break for the
concrete pour made on April 29, 1974. -
Please refer to our letter of April 29, 1974, same subject as
above for details of the placement.
Respectfully submitted,
.William G.t,ll5
Distr. J21' Addressee
(2) Mr. Ralph Bwy
4287 47th Street
San Diego, California 92115
Encl s.
iiam
ALVARADO SOILS ENGINEERING
WILLIAM G. CATUN 7930 LA MESA BOULEVARD TELEPHONE
Civil Enin.s, LA MESA, CALIFORNIA 92041 462-3000
April 29, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
for 24 Unit Condominium, Building Nos. 1 and 2
2533 Navarra Drive
La Costa Area, Carlsbad) California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the 2nd floor deck slab, Building No. 1; and
foundations lines 2, 3, and J Building No. 2 on subject project
for 24 Unit Condominium.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into place during placement
of concrete. The concrete mix design was as follows:
Nelson Sloan Concrete Comoan
No. 350-75-550 1911 1" Rock
Modified 1265 Sand
448 Cement
N.T.E. 39 gal. Water
The water-cement ratio was not exceeded.
Tot41 Cubic Yards Placed - 150
Starting Time - 7:00 a.m.
Finish Placing - 3:30 p.m.
Two sets of 3 cylinders were obtained during concrete placement. The
7, 14, and 28 day breaks will be reported when the Laboratory Work is
completed.
William G. Catlin, RCE 11579
Distr. ..ifr Addressee
City of Carlsbad
1200 Elm Avenue
Carlsbad, California92008
Attn: Mr. Nelson, Inspector
..'4"7 Mr. Ralph Bwy
4287 47th Street
Suite 1
San Diego, California 92115
ou1iein Ca& o/uiia Unting abokatoitj
INSPECTION • TESTING • RESEARCH • DEVELOPMENT
6280 'T~e,daQe teet • gan 'Dte9o, CaQoiva 92120
REPORT OF COMPRESSION TESTS XEY 0 MORTAR
FILE NUMBER.. 420044 DATE__ 5/6/74 0 GROUT JOB NAME-----24 Unit Condominium 0 GUNITE ADDRESS------ 2533 Navarra Dr. Carlsbad, CA 0 ARCHITECL_... Derk Vyn & George Dueker
ENGINEER..____.. Truck #392 CLIENT--------Alvarado Engineering
Ticket #E040860
LOCATION IN STRUCTURE. 2nd Floor Deck Slab, Bldg. #1 CEMENL..-------------------- Riverside Type II ADMIXTURE------------------Pozzolith 300
SAND ----------------------- Nelson-Sloan
ROCK ------------------------ Nelson-Sloan
MIX NO. OR PROPORTIONS 350-75-550, 5 1/2 Sacks TIME IN MIXER, minutes__.... 60 Mm.
SLUMP, inches.._-----------5 1/2"
MADE BY--------------------- L. Coffer
LABORATORY NO. 2697 2698 2699 MARK 20B6C-J1 20B6C-J2 20B6C-J3 DATE MADE 4/29/74
DATE RECEIVED 5/1/74
DATE TESTED 5/6/74 5/28/74 DIAMETER; inches 6.00
AREA, sq. inches 28.27
MAXIMUM LOAD. lbs. 69,800 113,500
COMPRESSIVE STR., psi 2,470 4,010 ACE TESTED. days 7 Days 29 Days REQ'D PSI at 28 DAYS 3,000 UNIT WI/CU. FT. (plastic)
DISTRIBUTION: (2) Alvarado Engineering
.
.
.
RESPECTFULLY SUBMITTED,
Ooutheii CaQL6oia J'tug SfabohafoAg
BY _____
ouL(ie/n Wijohiiia Tethg Skabohatohq
INSPECTION • TESTING • RESEARCH • DEVELOPMENT
620 LeAdae g theef • an De9o, CaQtoALa 92120
REPORT OF COMPRESSION TESTS J<CONCRETE 0 MORTAR
FILE NUMBER-- 420044 DATE_... 5/6/74 0 GROUT JOB NAME-----24 Unit Condominium 0 GUNITE
ADDRESS------ 2533 Navarra Dr.; Carlsbad, CA
ARCHITECT...... Derk Vyn & George Dueker
ENGINEER__ Truck #391
CLIENT------- Alvarado Engineering Ticket #E041711
LOCATION IN STRUCTURE. Footings Bldg. #2, Lines 2, 3 & J
CEMENT ----------------------- Riverside Type II
ADMIXTURE------------------Pozzolith 300
SAND------- 7 - - - - - - - - - - - - - - - Nelson-Sloan
ROCK ------------------------- -Nelson-Sloan
MIX NO. OR PROPORTIONS.... 356-75-550, 5 1/2 Sacks
TIME IN MIXER. minutes____.
SLUMP, inches__-----------5 3/4"
MADE BY-------------------- L. Coffer
LABORATORY NO. 2700 2701 2702
MARK
DATE MADE 4/29/74
DATE RECEIVED 5/1/74
DATE TESTED 5/6/74 5/28/74
DIAMETER, inches 6.00
AREA, sq. inches 28.27
MAXIMUM LOAD, lbs. 41,400 75,400
COMPRESSIVE STR.. psi 1,460 2,670
AGE TESTED. days 7 Days 29 Days
REQ'D PSI at 28 DAYS
UNIT WT./CU. FT. (plastic)
DISTRIBUTION: (2) Alvarado Engineering
RESPECTFULLY SUBMITTED,
outeit CaQioithLa Jethg SgaboAafoAg
BY________
ALVARADO SOILS ENGINEERING
WILLIAM G. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer IA MESA, CALIFORNIA 92041 4624000
May 22, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
24 Unit Condominium, Building No. 2
- 2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
Forwarded herewith are the results of the 7-day break for the
concrete pour made on May 10, 1974.
Please refer to our letter of May 10, 1974, same subject as
above for details of the placement.
Respectfully submi
Wi1liaat1in, RCE 11579
Distr. Addressee
(2 Mr. Ralph Bwy
4287 47th Street
San Diego, California 92115
Encl.
jed
RECEIVED
W1 AY 2 91974
CITY OF CARLSBAD
Building Department
ALVARADO SOILS ENGINEERING
WILLIAM 0. CATtJN 7830 LA MESA BOULEVARD
Civil Engineer LA MESA, CALIFORNIA 92041
May 15, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm
Car1sbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
24 Unit Con—dQminjium, Building Nos. 1 and 4
,,,::-=~Navarra Drive
a rea, Carlsbad, California:
Gentlemen:
TELEPHONE
462-3000
Forwarded herewith are the results of the 7 and 28-day breaks for the
concrete pour made on April 15, 1974. d.
Please refer to our letter of April 15, 1974, same subject as above
for details of the placement.
S, ily submit d,~...
William C. Catlin, RCE 11579
Distr. JI1'T" Addressee
(jj_.kB
4287 47th Street
- San Diego, California 92115
End.
j ed
RECEIVED
M AY1,1 174
CITY OF CARLSBAD
Building Department
ALVARADO SOILS ENGINEERING
WILLIAM 0. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 92041 462-3000
April 15, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condominium, Building Nos. 1 and 4
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed
the special inspection of the slab on grade Building No. 1, Lines
A to E and Lines 2 to 3; as well as Building No. 1, Line H,
retaining-wall footing, Building No. 4 all slab on grade.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into place during placement
of concrete. The concrete mix design was as follows:
Nelson Sloan Concrete Company
No. 335-1•530 1904 1" Rock
1260 Sand
470 Cement
N.T.E. 41 Water
The water.-cement ratio was net exceeded.
Total Cub-ic Yards Placed — 52 1/2
Starting Time — 7:15 a.m.
Finish Placing — 11:45 a.m.
One set of 3 cylinders were obtained during concrete placement. The
7, 14 and-28 day breaks will be reported when the Laboratory work
is completed.
Res tfuily submitted,
( William G. Ca in, RCE 11579
Distr. iAddressee .._-Y Mr. Ralph Bwy
.0~rCity of Carlsbad 4287 47th Street
1200 Elm Avenue. Suite 1
MAP n MqMt W ifbrIii0 q113
cu(ieiu CA otuia E1estig SRabohatohq
INSPECTION • TESTING • RESEARCH • DEVELOPMENT
6280 C~we,daQe 9theef • gan Diego. CA~ohma 92120
REPORT ':OF COMPRESSION TESTS CONCRETE 0 MORTAR
FILE NUMBER...420044 DATE--4-22-74 0 GROUT JOB NAME-----24 Unit Condominum 0 GUNITE ADDRESS-----...2533 Navarra Dr. Carlsbad, Ca. ARCHITECL_......Derk Vyn & George Dueker
ENGINEER Tr.#379 CLIENT-------.Alvarado Engineering Tic.#E040829
r
LOCATION IN STRUCTURL.S1ab on grade-Bldg.#1 lines A to E, 2 to 3 Bidg.4
CEMENT --------------------Riverside Type II (all, retaining wall footinç ADMIXTURE ------------------- Pozzolith 300 line H.) SAND----------------------.Nelson Sloan
ROCK ------------------------ Nelson Sloan
MIX NO. OR POPORTIONS.....335-1-530 - 5.30 Sks. TIME IN MIXER, minutes----.50 mins.
SLUMP, inches.--- Is
MADE BY-------------------.L. W. Coffer
LABORATORY NO. 2464 2465 2466
MARK 11 21 31 DATE MADE 4-15-74
DATE RECEIVED 4-16-74
DATE TESTED 4-22-74 5-13-74
DIAMETER, inches 6.00
AREA, sq. inches . 28.27
MAXIMUM LOAD, lbs. 75,500 110,800
COMPRESSIVE STR., psi 2,670 3,920 ./
ACE TESTED, days 7 days 28 Days
REQ'D PSI at ?8 DAYS
UNIT WT./CU. FT. (plastici
DISTRIBUTION: (2) Alvarado Engineefing
REspEcTFuLLY SUBMITTED,
-
..
goufhehn C aQ o!71,.La CJnWig Sgabohofohg
• .. BY-
ALVARADO SOILS ENGINEERING
WILLIAM G. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 92041 4624000
May 10, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
for 24 Unit Condominium, Building No. 2
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the foundations and floor slab for Building No. 2
on subject project for 24 Unit Condominium.
The placement of concrete and reinforcing steel was in accordance with
the plans and specifications and the Uniform Building Code. Any welded
wire fabric was all lifted into place during placement of concrete. The
concrete mix design was as follows:
Nelson Sloan Concrete Company
No.:350-757550 1911 1" Rock
Modified 1265 -Sand
448 Cement
N.T.E. 39 gal. Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 112.5
Starting Time - 0750
Finish Placing - 1525
One set of 3 cylinders was obtained during concrete placement. The 7, 14,
and 28 day breaks will be reported when the laboratory work is completed.
Respectfully submitted,
( ()ijj'flfam G. Catfl.n, RCE 11579 -
Distr. iAddressee .3 City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Attn: Mr. Nelson, Inspector
Ralph Bwy
4287 47th Street
Suite 1
San Diego, California 92115
ou(ieiut CaDiona cJ°ethig abokaLok
INSPECTION • TESTING • RESEARCH •. DEVELOPMENT
6280 Qwedae 91heet • gait CDiego. CaQoA1a 92120
REPORT OF COMPRESSION TESTS XU CONCRETE
0 MORTAR
FILE NUMBER.._ 420044 DATE-- May 17, 1974 0 GROUT JOB NAME-----24 Unit Condominium 0 GUNITE
ADDRESS------ 2533 Navarra Drive; Carlsbad, Calif. 0 ARCHITECT-----Derk Vyn & George Drueker
ENGINEER..._... Truck #373
CLIENT--------Alvarado Soils Engineering, Inc. Ticket #E 646960
LOCATION IN STRUCTURE____ Footings & Slab, Bldg. #2
CEMENT..._-----------------Riverside Type II
ADMIXTURE------------------Pozzolith 300
SAND --- --------------------Nelson and Sloan
ROCK ---------------------- -- Nelson and Sloan
MIX NO. OR PROPORTIONS.... 350-75-550, 5 1/2 Sacks
TIME IN MIXER, minutes____. 60 Mm.
SLUMP, inches..
MADE BY Lloyd W. Coffer
LABORATORY NO. 2854 2855 2856
MARK 20B66-K1 20B6C-K2 2036C-K3
DATE MADE 5/10/74
DATE RECEIVED 5/13/14
DATE TESTED 5/17/74
DIAMETER, inches 6.00
AREA, sq. Inches 28.27
MAXIMUM LOAD, lbs. 74,200 _
COMPRESSIVE SIR., psi 2,620
AGE TESTED, days 7 Days
REQ'D PSI 'at 28 DAYS 3,000
UNIT WT./CU. FT.(plastic)
DISTRIBUTION: (2) Alvarado Engineering
RESPECTFULLY SUBMITTED,
outke,tp Ca ijohnia cJegunq SgabowtoAg
ALVARADO SOILS ENGINEERING
WILLIAM G. CATLIN 7830 LA MESA BOULEVARD TELEPHONE
Civil EiçIn,.r LA MESA, CALIFORNIA 92041 462.3000
May 14, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 2086C
Special Inspection of Foundation and Structural Concrete
for _24jUnit Condominium, Building No. 2
ç-2533 Navarra Drive
Ld Losta Area, ar shad, California ki
Gentlemen':
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the foundations and floor slab for Building No. 2
on subject project for 24 Unit Condominium.
The placement of concrete and reinforcing steel was in accordance with
the plans and specifications and the Uniform Building Code. Any welded
wire fabric was all lifted into place during placement of concrete. The
concrete mix design was as follows:
Nelson Sloan Concrete Company
No. 350-75-550 1911 U' Rock '
CtIv
Modifiec 1265 Sand
448 Cement r
'.T. E. 39 gal. Water
The water-cement ratio was not exceeded. GAIRI
Total Cubic Yards Placed - 112.5 DegartMent
Starting Time - 0750
Finish Placing - 1525
One set of 3 cylinders was obtained during concrete placement. The 7, 14,
and 28 day breaks will be reported when the laboratory work is completed.
Respectfully submitted,
~P 11579
Distr. (2) Addressee (1) Mr. Ralph Bwy
( ) City of Carlsbad 4287 47th Street
1200 Elm Avenue Suite 1
Carlsbad, California 92008 San Diego, California 92115
Attn: Mr. Nelson, Inspector
I 3a.
ALVARADO SOILS ENINEERING
WILLIAM G CATLIN 7830 LA MESA ROULEVARO TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 92041 462.3000
May 7, 1974
City of Carlsbad -
Department of Building Inspection
1200 Elm
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
24 Unit Condominium
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
Forwarded herewith are the results of the 7-day break for the concrete
pour made on April 15, 1974.
Please refer to our letter of April 15, 1974 same subject as above
for details of the placement.
itted
-William G. Catlin, RCE 11579
(R
Distr. 2T"Addressee
(1) Mr. Ralph Bwy
4287 47th Street
San Diego, Calforhia 92115
End.
j ed
ALVARADO SOILS ENGINEERING
WILLIAM G. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 92041 4624000
April 29, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
for 24 Unit Condominium, Building Nos. 1 and 2
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the 2nd floor deck slab, Building No. 1; and
foundations lines 2, 3, and J Building No. 2 on subject project
for 24 Unit Condominium.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into place during placement
of concrete. The concrete mix design was as follows:
Nelson Sloan Concrete Company
No. 350-75-550 1911 1" Rock
Modified 1265 ,Sand
448 Cement
N.T.E. 39 gal. Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 150
Starting Time - 7:00 a.m.
Finish Placing - 3:30 p.m.
Two sets of 3 cylinders were obtained during concrete placement. The
7, 14, and 28 day breaks will be reported when the Laboratory Work is
completed.
William G. Catlin, RCE 11579
Distr. e(i00Addressee (1) Mr. Ralph Bwy
(1) City of Carlsbad 4287 47th Street
1200 Elm Avenue Suite 1
Carlsbad, California 92008 San Diego, California 92115
Attn: Mr. Nelson, Inspector
J. •
ALVARADO SOILS ENGINEERING
WILLIAM G. CATUN 7830 IA MESA BOULEVARD TELEPHONE
Civil Enginser IA MESA, CALIFORNIA 92041 462-3000
ItECEIVErh April 15, 1974 Ay
City of Carlsbad MAY 3 1974
Department of Building Inspection
1200 Elm Avenue CITY OF CARLSBAD Carlsbad, California 92008 Building Department
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condominium, Building Nos. 1 and 4
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed
the special inspection of the slab on grade Building No. 1, Lines
A to E and Lines 2 to 3; as well as Building No. 1, Line H,
retaining wall footing, Building No. 4 all slab on grade.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into place during placement
of concrete. The concrete mix design was as follows:
Nelson Sloan Concrete Compan
No. 335-1-530 1.904 1" Rock
1260 Sand
470 Cement
N.T.E. 41 Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 52 1/2
Starting Time - 7:15 a.m.
Finish Placing - 11:45 a.m.
One set of 3 cylinders were obtained during concrete placement. The
7, 14t and 28 day breaks will be reported when the Laboratory work
is completed.
4es
l
fullv submitted,
iam G. La n,'RCE 11579
Distr. I _4 Addressee Mr. Ralph Bwy
4287 47th Street
1200 Elm Avenue Suite 1
äU fOa 92008 San D'ego, Cal ifornia 92115
outtieitn Cdi~ohwa Uegung SRaboftatolkq
INSPECTION • TESTING • RESEARCH DEVELOPMENT
6280 Lueftdae tkeet • an CDiego. ea&olthLa 92120
REPORT OF COMPRESSION TESTS CONCRETE
0 MORTAR
FILE NUMBER-_420044 DATE-A-22-74 0 GROUT
JOB NAME-----24 Unit Condominun 0 GUNITE
ADDRESS------.2533 Navarra Dr. Cartsbad, Ca. 0
ARCH ITECT-----Derk Vyn & George Dueker
ENGINEER..___.... Tr.4#379
CLIENT--------Alvarado Engineering . Tic.#E040929
LOCATION IN STRUCTURE---.Slab on grade-Bldg.#1 lines A to E, 2 to 3 Bldg.-'4
-------- Riverside Type II (all, retaining wall footing
ADMIXTURE------------------Pozzolith 300 . line H.)
SAND ----------------------- Nelson Sloan
ROCK ------------------------ Nelson Sloan
MIX NO. OR PROPORTION S....335-l-530 - 5.30 Sks.
TIME IN MIXER, minutes----.50 Inins.
SLUMP, inches__ ----------6'
MADE BY-------------------.L.W. Coffer
LABORATORY NO. 2464 2465 2466
MARK 11 21 31
DATE MADE 4-15-74
DATE RECEIVED 4-16-74
DATE TESTED 4-22-74
DIAMETER, inches 6.00
AREA, sq. inches 28.27
MAXIMUM LOAD. lbs. 75,500 -
COMPRESSIVE SIR., psi 2,670
AGE TESTED, days 7 days.
REQ'D PSI at 28 DAYS
UNIT WT./CU. FT. (plastic)
DISTRIBUTION: (2) Alvarado Engineering
RESPECTFULLY SUBMITTED.
outiieiut CaQLothta EJ'eting €aboato
BY _ 2i-
I
ALVARADO SOILS ENGINEERING
WILLIAM G. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 9204 462-3000
April 16, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
or_24 Unit Condominium, Building No. 1
2533 NavarraDWei
Costãfeä7Car1sbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the garage floor slab Lines 5 to 3 and 2 to 1,
from A to E and Lines 5 to 1 from E to H on subject project for 24
Unit Condominium, Building No. 1.
The placement of concrete and reinforcing steel was in accordance with
the plans and specifications and the Uniform Building Code except
as follows:
Expansion joint deleted on Line 2, H to E. Replaced
with contraction joint.
Construction joints Lines 2 and 3 from A to E and Line
E from 2 to 3 used #4 reinforcing bar rather than smooth
5/8" 0 bar.
All contraction joints 1 inch in depth rather than 1 1/2
inch in depth.
Any welded wire fabric was all lifted into place during placement of
concrete. The concrete mix design was as follows:
Nelson Sloan Concrete Company
No. 333-1-530 1904 1" Rock
1260 Sand
470 Cement
N.J.E. 41 Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 82 1/2
Starting Time -7:30 a.m.
Finish Placing - 2:45 p.m.
RECEIVED
APR 2 31974
CITY OF CARLSBAD
Building Department
Page 2 Project No. 2086C City of Carlsbad 4/8/74
One set of 3 cylinders were obtained during concrete placement. The
7, 14 and 28 day breaks will be reported when the Laboratory work
is completed.
,-Ø?çtfully submited,.
Will
G. Catlin, RCE 1579
Distr. (2) Addressee
4i1City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Attn: Mr. Nelsen, inspector
(1) Mr. Ralph Bwy
4287 47th Street
Suite 1
San Diego, California 92115
j ed
p.,
ALYARADO SOILS ENGINEERING
WILLIAM G. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engln..r IA MESA, CAUFORNIA 92041 462-3000
April 16, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For _24J1n1t Condominium, Building Nos. 1 and 4
Navarra
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed
the special inspection of the slab on grade Building No. 1, Lines
A to E and Lines 2 to 3; as well as Building No. 1, Line H,
retaining wall footing, Building No. 4 all slab on grade.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into place during placement
of concrete. The concrete mix design was as follows:
Nelson Sloan Concrete Compan
No. 335-1-530 1904 1" Rock
1260 Sand
470 Cement
N.T.E. 41 Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 52 1/2
Starting Time - 7:15 a.m.
Finish Placing - 11:45 a.m.
One set of 3 cylinders were obtained during concrete placement. The
7, 14nd 28 day breaks will be reported when the Laboratory work
is completed.
Resp=tfully submitted,
A4Wiliaml. Ca in. RC 11579
Distr. (2) Addressee (1) Mr. Ralph Bwy.
1' City of Carlsbad 4287 47th Street
1,209 ,Elm Avenue Suite .
43j .92UQ C1ifrii '9i15
ALVARADO SOILS ENGINEERING
WILLIAM G. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engino.r LA MESA, CALIFORNIA 92041 462-3000
April 19, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condominium, Building Nos. 1 and 4
rr&.,QrivT
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of some of the poured-in place beams on subject
project, Building No. 1, Lines 1, 5 and A and BuildingNo. 4, Line A.
The placement of concrete and reinforcing steel was in accordance with
the plans -and specifications and the Uniform Building Code, except that
the contractor elected to form block-outs for anchor bolts rather than
install the weld plates as set forth in detail 1/58. The concrete mix
design was as follows:
Nelson Sloan Concrete Comoan
No. 350-75-550 1911 1" Rock
modified
1265 Sand
448 Cement
N.T.E. 39 gal. Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 19
Starting Time - 8:00 a.m.
Finish Placing - 10:40 a.m.
One set of 3 cylinders were obtained during concrete placement. The 7,
14, and 28 day breaks will be reported when the Laboratory work is com-
pleted.
William G. Catlin, RCE 11579
mkd
Distr. (2) Addressee
4rj'City of Carlsbad
(1) Mr. Ralph Bwy
ALVARADO SOILS ENGINEERING
WILLIAM C. CATUN 78.0 LA MESA BOULEVARD IE1PHONE
Civil En6ln..r LA MESA, CALIFORNIA 92041 442-3000
May 13, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm
Carlsbad, California 92008
Subject: Project No. 2086C
Special Inspection of Foundation and Structural Concrete
24 Unit Condominium, Bldg. No. I Garage Floor Slab
...2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen.:
Forwarded herewith are the results of the 7 and 28-day breaks for the
concrete pour made on April 8, 1974.
Please refer to our letter of April 8, 1974, same subject as above for
details of the placement.
Respectfully submitted,
(
William G.Cat in, 579
Distr. Addressee
(1.) Mr. Ralph Bwy
4287 47th Street
San Diego, California 92115
End.
mkd
T4
of ID
ALVARADO SOILS ENGINEERING
WILLIAM 0. CATUN 7830 IA MESA BOULEVARD TELEPHONE
Civil EigInu, LA MESA, CALIFORNIA 92041 •62-3000
April 29, 1974
City of Carlsbad
Department of Building inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
for 24 Unit Condominium, Building Nos. 1 and 2
2533 Navarra Drive
La Costa Ared, Carlsbad, California
Gentl errien:
This is to inform you that on this date, Lloyd Coffer .completed the
special inspection of the 2nd floor deck slab, Building No. 1; and
foundations lines 2, 3, and J Building No. 2 on subject project
for 24 Unit Condominium.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into place during placement
of concrete. The concrete mix design was as follows:
Nelson .Sloan Concrete Company
No. 350-75-550 1911 1" Rock
Modified 1265 Sand
448 Cement
N.T.E. 39 Qal. Water
The water-cement ratio was Pot exceeded.
Total Cubic Yards Placed - 150
Starting Time - 7:00 a.m.
Finish Placing - 3:30 p.m.
Two sets of 3 cylinders were obtained during concrete placement. The
7, 14, and 28 day breaks will be reported when the Laboratory Work is
completed.
—Rectfu11y sub
William G. Catlin, RCE 11579
Distr. r Addressee
LII+ City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Attn: Mr. Nelson, Inspector
.I.I4I4o7'' Mr. Ralph Bwy
4287 47th Street
Suite 1
San Diego, California 92115
0u(ieki Cafi tomita ciegUng gabohatoh9
INSPECTION TESTING • RESEARCH • DEVELOPMENT
6280 CQiuekdaPe Ct,eet • an CDiego,. Cao,ut[a 92120
REPORT OF COMPRESSION TESTS
FILE NUMBER. 420044 DATE__ 5/6/74
JOB NAME------24 Unit Condominium
ADDRESS-------2533 Navarra Dr. Carlsbad, CA
ARCHITECT-----Derk Vyn & Ceorge Dueker
ENCINER_____ CLIENT__.-----Alvarado Engineering
X3 CONCRETE
MORTAR
O GROUT
0 GUNITE
0
Truck 4392
Ticket #E040860
LOCATION IN STRUCTURE... 2nd Floor Deck Slab, Bldg.
CEMENT.._------------------Riverside Type II
ADMIXTURE.:---------------- Pozolith 300
SAD ------------------------ Nelson-Sloan
ROCK ------------------------ Nelson-Sloan
MIX NO. OR PROPORTIONS.... 350-75-550, 5 1/2 Sacks
TIME IN MIXER, minutes_...__. 60 Mm.
SLUMP, inches-------------5 1/2"
MADE BY------.--------------. L. Coffer
#1
LABORATORY NO.
MARK
2697
2036C-Jl -
2698
2CB6C-J2
2699
20B6C-J
DATE MADE 4/29/74
DATE RECEIVED 5/1/74
DATE TESTED 5/6/74
DIAMETER, inches 6.00
AREA, sq. inches 28.27
MAXIMUM LOAD. lbs. 69,800
COMPRESSIVE STR., psi 2,470 "
AGE TESTED. days 7 Days
REQD PSI ,at 28 DAYS 3,000 .
UNT WT./CU. FT. (plastic)
DISTRIBUTION: (2) Alvarado Engineering
RESPECTFULLY SUBMITTED,
outei Caioiuta Uesung SgaboAafoAS
BY I4L
/
ouaie,ui Cd o1uiia Te Lng abokato,..j u
INSPECTION • TESTING • RESEARCH • DEVELOPMENT
6280 wedae .Qt,teet • an CDiego. CaQioa 92120
REPORT OF COMPRESSION TESTS CONCRETE
- MORTAR
FILE NUMBER_ 420044 DATE 5/6/74 0 GROUT
JOB NAME..... 24 Unit Condominium 0 GUNITE
ADDRESS-------2533 Navarra Dr.; Carlsbad, CA 0
ARCHITECT-----Derk Vyn & George Dueker
ENGINEER..___ Truck #391
CLIENT._...___... Alvarado Engineering Ticket #E041711
LOCATION IN 5TRUCTURE.... Footings Bldg. #2, Lines 2, 3 & J
CEMENT..__--- --------------- Riierside Type II
ADMIXTURE---- --------------- Pozzolith 300
SAND-------------------------Nelson-Sloan
ROCK..------- ---------------- Nelson-Sloan
MIX NO. OR PROPORTIONS.... 356-75-550, 5 1/2 Sacks
TIME IN MIXER, minutes_....
SLUMP, inches:.....----------5 3/4"
MADE BY-------------------. L. Coffer
LABORATORY NO. 2700 2701 2702
MARK
DATE MADE 4/29/74
DATE RECEIVED 5/1/74
DATE TESTED 5/6/74
DIAMETER, inches 6.00
AREA, sq. inches 28.27
MAXIMUM LOAD. lbs. 41,400
COMPRESSIVE STR.. psi 1,460
AGE TESTED. days 7 Days
REQD PSI at 28 DAYS
UNIT WT./ CU. FT. iplastic)
DISTRIBUTION: (2) Alvarado Engineering
RESPECTFULLY SUBMITTED.
goudieot CaQtottLa Efetig aboato
-
ALVARADO SOILS ENGINEERING
WIWAM G. CATUN 7830 LA MESA BOULEVARD TELEPHONE
Civil Rnglnur LA MESA, CAUFORNIA 92041 462-3000
April 8, 1974
City of Carlsbad -
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condominium, Building No. 1
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed
the special inspection of garage floor slab, lines 5 to 3, 2 to 1,
A to E, and lines 5 to 1, E to H, on subject project for 24 Unit
Condominium, Building N. 1.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into place during place-
ment of concrete. The concrete mix design was as fo1lcws:
Nelson Sloan Concrete Company
No. 335-1-530 1904 l Rock 'C1h1TED
1260 Sand
470 Cement MAY 8 17 N.T.E. 41 Water
The water-cement ratio was not exceeded. CITY OF CARLSBAD
Total Cubic Yards Placed - 82 1/2
Starting Time - 7:30 a.m.
Finish Placing - 3:15 p.m.
One set of 3 cylinders were obtained during concrete placement. The
7, 14, and 28 day breaks will be reported when the Laboratory Work
is completed.
—ectfu1 ly submitted,
1(;g 2_
Distr. (2) Addressee (1) Mr. Ralph Bwy
(7) City of Carlsbad 4287 47th Street
1200 Elm Avenue Suite 1
Carlsbad, California 92008 San Diego, California 92115
Attn: Mr. Nelson, Inspector
ALVARADO SOILS ENGINEERING
WILLIAM 0. CATLIN 7830 IA MESA BOULEVARD TELEPHONE
Clvii Engin.., IA MESA. CALIFORNIA 92041 462.3000
April 3, 1974
City of Carlsbad -
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condominium, Building Nos. 1 and 4
2533 Navarra Drive
La Costa Area, Carlsbad, Califorp4a
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of some of the poured-in place beams on subject
project, Building No. 1, Lines l,5 and A and Building No. 4, Line A.
The placement of concrete and reinforcing steel was in accordance with
the plans and specifications and the Uniform Building Code, except that
the contractor elected to form block-outs for anchor bolts rather than
install the weld plates as set forth in detail 1/58. The concrete mix
design was as follows:
Nelson Sloan Concrete Compan
No. 350-75-550 1911 1 Rock
modified
1265 Sand
448 Cement
N.T.E. 39 gal. Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 19
Starting Time - 8:00 a.m.
Finish Placing - 10:40 a.m.
One set of 3 cylinders were obtained during concrete placement. The 7,
14, and 28 day breaks will be reported when the Laboratory work is com-
pleted.
Lfully sub itt
William G. Catlin, RCE 11579
mkd
Distr.dressee
e) C ity of Carlsbad
Mr. Ralph Bwy
outheiui J°eUrg gabohotohq
INSPECTION • TESTING • RESEARCH • DEVELOPMENT
6280 Qiuedae 9theef • an COjego. Cdijohma 92120
REPORT OF COMPRESSION TESTS £ CONCRETE
0 MORTAR
FILE NUMBER.....42 0044 DATE--4-10-74 0 GROUT
JOB NAME-----24 Unit Condominium 1 GUNITE
ADDRESS------.2533 Navarra Dr. Carrsbad, Ca. 0
ARCHITECT----- Derk Vyn & George Dueker
ENGINEER Tr.#379
CLIENT------- Alvarado Engineering Tic.71r-E-037014
LOCATION IN STRUCTURE...Poured in place beams - Bldg. 41, Lines A,E, 1 and 5
CEMENT..__-----------------Riverside. Type II (& Bldg.1#4 Line A)
ADMIXTURE------------------Pozzolith 300
SAND -----------------------Nelson Sloan
ROCK ------------------------ Nelson Sloan
MIX NO. OR PROPORTIONS.... 350-75-550 Mod. - 7 Sks.
TIME IN MIXER, minutes----.l hr.
SLUMP, inches ------------- 5½"
MADE BY-----------------. L. W. Coffer
LABORATORY NO.
MARK I
2292
1G
2293
2G
2294
3G
DATE MADE 4-3-74
DATE RECEIVED . 4-8-74
DATE TESTED 4-10-74 5-1-74
DIAMETER, inches 6.00
AREA, sq. inches 28.27
MAXIMUM LOAD. lbs. 80,300 124,800
COMPRESSIVE STR.. psi 2,840 4,410
AGE TESTED, days 7 days 28 days
REQ'D PSI at 28 DAYS 3,000
UNIT WT./CU.FT. (plastic)
DISTRIBUTION: (2) Alvarado Engineering
RESPECTFULLY SUBMITTED,
outkeiui CaQioiuiia Uesting Sgabmtotig
BY
ALVARADO SOILS ENGINEERING
WILLIAM G. CATI.IN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer IA MESA, CALIFORNIA 92041 462-3000
March 23, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
24 Unit Condominium
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
Forwarded herewith are the results of the 7-day and 28-day breaks for
the concrete pour made on February 21, 1974.
Please refer to our letter of 2/21/74 same project number as above, for
details of the placement.
Respectfully submitted,
William G1. Catli'n, RCE 11579
Distr. J,24''Addressee
(1) Mr. Ralph Bwy
4287 47th Street
San Diego, California 92115
mkd
/
•
Lop
0 . OAKLAND
SANTA CLARA
TESTING ENGINEERS, INCORPORATED LOS ANGELES
3467 KURTZ ST.. P.O. BOX 80985. SAN DIEGO, CA 92138 (714)222-1185 SAN DIEGO
FILE No. 663 - SUMMARY OF COMPRESSION TEST RESULTS PAGE.-1
Joe: 24 Unit COndoiflifliUlM
.
Mix No. 350-75-550 SPEC 28-DAY SiR_3000 PsI
ADDRESS' 2533 Navarra Drive TYPE _______CEMENT_____________ SCY SPEC SLUMP _______IN.
Carlsbad, California
ADidix ________________________________ AGO SIZE— —IN.
YEAR: _'?L_ ULTIMATE COI.4PflESSIVE STRENGTH. PSI MAIL DATE
Lab. No. DATE . OTHER _____ AND
CAST LOCATION IN STRUCTURE SLUMP 7. DAY 2&.DAY TEST RESULTS INITIALS
MO. DA • IN. AGE
662 2/21 Bldg. #1,. columns and Lines . 33 2330 3680 60-day Disc. 2/28/74
B2,B3,C2,C3,D2,D3. 20B6C-Fl,
20B6C-F2,20B6.C-F3. Made by
L.W.C. . . .
'F (1) Alvarado Soils Engineering Company
'(1) Nelson-Sloan Concrete Company
PY ( (
THCdch .
T,H. Chapinan,.E. 12882
AIVAR4DO $OIL$ ENGINEERING
WILLIAM 0. CATLIN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 92041 462-3000
March 20, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm
Carlsbad, California 92008,
Subject: Project No. 2086C
Special Inspection of Foundation and Structural Concrete
24 Unit Condominium
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
Forwarded herewith are the results of the 7-day breaks, 14-day breaks,
where applicable and 28-day breaks for the concrete pours made on
January 12, and February 15, 1974.
Please'refer to our letters of 1/31/74, 2/12/74, and 2/15/74 same subject
as ab,aor details of the placement.
It s noted that Test No. 530 which was sampled from the floor slab pour
did not reach 3000 psi however, the strength requirement for the floor
slab o1i grade was 2000 psi at 28 days.
Res ectfully submitted,
William G. thim, RCE 11579
Distr. (1Addressee
(1) Mr. Ralph Bwy
4287 47th Street
San Diego, California 92115
mkd
p
I—
TESTING ENGINEERS, INCORPORATED
3467 KURTZ ST.. P.O. BOX 80985. SAN DIEGO, CA 92138 (714)222-1188
SUMMARY OF COMPRESSION TEST RESULTS
OAKLAND
SANTA CLARA
LOS ANGELES
SAN DIEGO
FILE No. 663 PAGE ONE
JOB: 24-Unit Condominium
ADDRESS 2533 Navarra Drive
Carlsbad California
Mix No 3351530 SPEC 2-8-DAY STR___3000 ____ _Psi
TYPE H CEI4ENT_5 3 SCY SPEC. SLUMP 4 iN
Aaiaix Pozz. 300 Acc SIzE_L.JN.
YEAR; 1974 ULTIMATE COMPRESSIVE STRENGTH. PSI _________ MAIL DATE
AND Lab. No • DATE . -- OThER______
TEST
AGE
RESULTS C29 CAST MO. DA
LOCATION IN S1RUCTURE SLUMP
IN. 7-DAY 28.DAY
.
INITIALS
347 1/31 Footings Bldg. #1, Lines 4 2580 4070 60-day Disc. 2/7 74
NA", '1E" and 1 and 3. . 2/22 /74
20B6C-A1, 20B6C7A2, 20B6C-A3 2 /28/74
Made by L.W.C. 3/15/74
346 1/31 Footings Bldg. #i., Lines "B" 4-1/4 620 4440 60-day Disc.
''C'', "W's IhI "G11 ,1111" and
2, 3, 4 and 5, 20B6C-A4,
20B6C-A5, 20B6C-A6. Made by
L.W.C.
529 2/12 Bldg. 113, all footings. 31 2070 3430 60-day disc.
• 20B6C-Cl , 20B6C-C2 ,20B6C-C3.
Made by L.W.C.
530 2/12 Bldg. #3, 1st floor slab 4 1590 2810 14-day 2190
(all). 20B6C-Dl,20B6C-D2,
20B6C-D3. Made by L.W.C.
606 2/15 Bldg. 7474, all footings. 4,L4 2030 3610 60-day Disc.
20B6C-El, 20B6C-E2 206C-E3.
Made by L.W.C.
Alvarado Soils Engineering Company
(1) Nelson-Sloan Concrete Company
fltC:rnek T. H. Chapman, RE4 #12882
ALVARADO SOILS ENGINEERING
WH.LIAM 0. CATLIN 7830 LA MESA BOULEVARD TELEPHONE
Civil Eninoer LA MESA, CALIFORNIA 92041 462-3000
February. 21, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condominium, Building No. 1
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the columns on B-2,. 8-3, C-2, C-3, 0-2 and D-3
on subject project for 24 Unit Condominium, Building No. 1.
The placement of concrete and reinforcing steel was in accordance with
the plans and specifications and the Uniform Building Code.
Nelson Sloan Concrete Company
No. 335-1-530 1904 1" Rock
1260 Sand
470 Cement
N.T.E. 41 Water
The water-cement ratio was not exceeded.
Tota1. Cubic Yards Placed - 3 1/2
Starting Time - 12:55 p.m.
Finish Time - 3:20 p.m.
One set of 3 cylinders was obtained during concrete placement. The
7, 14, and 28 day breaks will be reported when the Laboratory work is
completed.
Aesp tfully submitted,
William G. Catlin, RCE 11579
Distr. (2) Addressee ,(r1"ty of Carlsbad . (1) rio
1200 Elm Avenue
Carlsbad, California 92008
Attn: Mr. Nelson, Inspector
mkd
Mr. Ralph Bwy
4287 47th Street
Suite 1
San Diego, Californi
92115
ALVARADO $OILS ENGINEERING
WILLIAM G. CATLIN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 92041 462-3000
February 15, 1974
City of Carlsbad
Department of Building Inspection
1200 Elm Avenue
Carlsbad, California
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condominium, Building No. 4
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the foundations on subject project for 25 Unit
Condominium, Building No. 4. /
The placement of concrete and reinforcing steel was in accordance with
the plans and specifications and the Uniform Building Code. Any welded
wire fabric was all lifted into place during placement of concrete. The
concrete mix design was as follows:
Nelson Sloan Concrete Company
No. 335-1-530 1904 ]H Rock
1260 Sand
470 Cement
41 Water
The water-cement ratio was not, exceeded.
Total Cubic Yards Placed - 34
Starting Time - 7:35 a.m.
Finish Placing - 12:00 p.m.
One set of 3 cylinders were obtained during concrete placement. The 7,
14, and 28 day breaks will be reported when the Laboratory work is com-
pleted.
Res ectfully submitted,
William G. CatTifr, RCE 11579'
(1) Mr. Ralph Bwy
4281 47th Street
Suite 1
Sari Diego, California 92115
Distr. .'Addressee
(1) City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Attn: Mr. Nelson, Inspector
mkd
ALYARADO SOILS ENGINEERING
WILLIAM G. CATLIN 7833 LA MESA BOULEVARD TELEPHONE
Civil Enine.i, LA MESA, CALIFORNIA 92041 462-3000
February 12 1974
City of Carlsbad
Department of Building Inspection
1200 Elm
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
24 Unit Condominium
2533 Navarra Drive
La Costa Area, Carlsbad, California
Gentlemen:
Forwarded herewith are the results of the 7-day breaks for the
concrete pour made on January 31, 1974.
Please refer to our lettei' of 1/31/74 same subject as above,
for details of the placement.
Reectfully submi ted,
William G Catlin, RCE 11579
Distr. (2) Addressee
(1) Mr. Ralph Bwy
4287 47th Street
San Diego, California 92115
j ed
p I •.I,, I U
I OAKLAND I
TESTING ENGINEERS, INCORPORATED
SANTA CLARA
LOS ANGELES
3467 KURTZ ST.. P.O. BOX 6096. SAN DIEGO. CA 92138 (714)222-1185 SAN DIEGO
FILE No. 663 - SUMMARY OF COMPRESSION TEST RESULTS PAGE._Q -
.105: 24-Unit Condominium Mix No. 335-1-530 SPEC. 28-DAY STR Psi
ADDRESS: 2533 Navaria Drive TYPE ....JI CEMENT____________ SCY SPEC. SLUMP ______IN.
Carlsbad, California
ADMIX. -Pozz. 300 AGO. SIZE IN.
YEAR: 1974 ULTIMATE COMPRESSIVE STRENGTH. PSI
1 DATE - .- OTHER
MAIL DATE
AND
TEST RESULTS LAB. NO
C28
CAST
MO. DA.
LOCATION IN STRUCTURE SLUMP
IN.
7-DAY 28-DAY INITIALS
AGE ___ ___
347 1/31 Footings Bldg. #i, Lines 4 2580 - ----------- 77 /74
HA", "E" and 1. and 3.
20B6C-Al, 20B6C-A2, 20B6C-A3
Made by L.W.C.
346 1/31 Footings Bldg. #1, Lines "B" 4-1/4 2620
"C
a ''F'' 111311,111111 and
2, 3, 4 and 5. 20B6C-A4,
20B6C-A5, 20B6C-A6. Made by
L.W.C.
Alvarado Soils Engineering Company
.~~Z~l
fit4i*144~1,j 1 ;i, IL C hapman.. 'u1kC :
ALVARADO SOILS ENGINEERING
WILLIAM G. CATLIN 7830 LA MESA BOULEVARD TELEPHONE
Civil Engineer LA MESA, CALIFORNIA 92041 B. 1. C E i v jj62-3000
February 12, 1974
MAR 2 81974
City of Carlsbad
Department of Building Inspection crry OF CARLSBAD 1200 Elm Avenue
Carlsbad, California 92008 Building Department
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condon:inium, Building No. 3
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed the
special inspection of the foundations and slab on grade on subject
project for 24 Unit Condominium, Building No. 3.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into place during placement
of concrete. The concrete mix design was as follows:
Nelson Sloan Concrete Ccmpan
No. 335-1-530 1904 1" Rock
1260 Sand
470 Cement
41 Water
The water-cement ratio was not exceeded.
Total Cubic Yards Placed - 180
Starting Ti;e - 7:45 a.m.
Finish Placing - 5:00 P.M.
Two sets of 3 cylinders were obtained during concrete placement. It is
especially noted that one of the trucks had greater than one hour of time
in the mixer. The second set of cylinders represent this concrete. The
concrete was placed in the floor slab on grade. The 7, 14, and 28 day
breaks will be reported when the Laboratory work is completed.
R ,~espe,ctfull,y submitted,
William G. Càtiii RCE 11579
Distr. (2) Addressee XCity of Carlsbad
1200 E1II1 Street
Carlsbad, California
Attn: hr. Nelson
al
87 47th
Suite 1
San Diego, California i 1
ALVARADO SOILS ENGINEERING
WILLIAM G. CATLIN 7830 LA MESA BOULEVARD TELEPHONE
Civil EnInear LA MESA, CALIFORNIA 92041 462-3000
January 31, 1974
City of Carlsbad
Department of Building Inspection 1 1200 Elm Avenue
Carlsbad, California 92008
Subject: Project No. 20B6C
Special Inspection of Foundation and Structural Concrete
For 24 Unit Condominium, Building No. 1
La Costa Area, Carlsbad, California
Gentlemen:
This is to inform you that on this date, Lloyd Coffer completed
the special inspection of the foundations on subject project for
24 Upit Condominium, Building No. 1.
The placement of concrete and reinforcing steel was in accordance
with the plans and specifications and the Uniform Building Code.
Any welded wire fabric was all lifted into placedurip 0.3-acaman-+
of concrete. The concrete mix design was as follows:
Nelson Sloan Concrete Company
No. 335-1-530 1904
1260
470
N.T.E. 41
FEB 4 1974
1" Rock
Sand CITY OF CARLSBAD Cement Building Department Water
The water-cement ratio was not exceeded,
Total Cubic Yards Placed - 202 1/2
Starting Time - 7:45a.m.
Finish Placing - 5:00 p.m.
Two sets of 3 cylinders were obtained during concrete placement. The
7, 14, and 28 day breaks will be reported when the Laboratory work
is completed.
,-.-R ctfully sub itted,
William G. Ca n, E 11579
Distr. (2)
j ed
Mr. RalphAddressee (1) Mr Ralph
City of Carlsbad 487 47th
1200 Elm Avenue ulte
Carlsbad, California 92008 San Diego, California 92115
Attn: Mr. Nelson, Inspector
A EJIES
IDEPARTMENT
INTERDEPARTMENTAL INFORMATION SHEET
-,
E:CEIVEj
ffrVI5B ,-tr
PLANNING DEPARTMENT
LOT SIZE LOT WIDTH ZONE____________
UNITS PROVIDED ALLOWED PRKG. SPACES PROVIDED REQ._____
% OF COVERAGE ALLOWED BLDG. HEIGHT ALLOWED
FRONT SETBACK SIDE YARD REAR YARD INTRUSIONS
ENVIRONMENTAL PROTECTION REQ'TS._ = t LANDSCAPE PLAN
ADDITIONAL COMMENTS
ISSUE PERMIT DATE \ occur
ENG1NEERING DEPARTMENT
R.O.W. ellt INDUSTRIAL WASTE____________________________
PROVEMENTS_. SEWER CONNECTION_ rl, V0'-a' ________________________
DRIVJAY LOCATIONS_,'i" C(.17" GRADING PERMIT____________
EASEMENTS t21< DRAINAGE _ak-
LEGAL DESCRIPTION
ADDITIONAL COMMENTS N
- (17ftTh,Fu -. ( A7/41e 11 , fl'ø('?i
ISSUE PERMIT ILL_DATE OCCUPANCY
4n- 4 ,7 q44/75 /, iL Z i-192; 7,
FIRE DEPARTMENT
SPRINKLING SYSTEM I2t Ld PkA f'-
F
FIRE PROTECTION EQUIPMENT Ac S(Aa FIRE ALARMS _ J
EXITS
HYDRANTS 9 4.d5)P2i_/2f r.. LOCATION_
ITICNAL COMMENTS
UE PERMITQ.WcQCQ.'.DATE ) / 73 OCCUPANCY
ATER DEPARTMENT I I I
M WD '. 1"'CARLAD r OLIVENHAIN________ SAN MARCOS_______
- 'S-,
• / -.----S--_
DITIONAVzM1rETS )
ANCY DATE _gvt
.4NING. I n.- 1T aIfl(
SENT TO ENG DEPT.
11
I PFTIIRNFfl Tfl Pfl(,. DEPT.
LEUCADIA COUNTY WATER DISTRICT
APPLICATION FOR SEWER SERVICE
Owner's Name: Ralph Bwy Receipt No. 3307
Mailing Address: 4R7 47th Street
San _Diego_92115 Phone No.________
Job Address: Navarra Drive
SERVICE REQUESTED: Condominium, La Costa South Unit #1, Lots 38 &'39 COST
CONNECTION CHARGE 16 units
for Condominium. (type of building) s4,800.00
If a multiple unit building, indicate no. of living units 1
SERVICE LATERAL Lateral installed by La Costa
If service lateral previously installed - No Fee
If service lateral required: Surcharge 850.00
Check size lateral required: Amount Rec'd $_$8,500.00
(4")— (6")- Other_______ How Paid check 4622
Date Paid 11-21-73 Saddle connection required: Yes— No— Rec'd by: J. Geiseihart
TOTAL CHARGES check dated 10-29-73 $c.cicn..nc
The application must be signed by the owner (or his aithorized representative) of the property
to be served. The total charges must be paid to the District at the time the application is
submitted:
If a service lateral is required, it will be installed by the Leucadia County Water District.
The service lateral is that part of the sewer system that extends from the main collection line
in the street (or easement) to the point in the street (at or near the applicant's property line)
Where the service lateral is connected to the applicant's building sewer.
The applicant is responsible for the construction, at the applicant's expense, of the sewer
pipeline (building sewer) from the applicant's plumbing to the point in the street (or easement)
where a connection is made to the service lateral.
The connection of the applicant's building sewer to the service lateral shall be made by the
applicant at his expense. The connection must be made in conformity with the District's
specifications, rules and regulations; and it must be insDected and approved by the District
before the sewer system may be used by the applicant. The applicant, or his authorized. re
resentative, must notify the District at the time inspection is desired. Any connection made
to the service lateral or collection line without prior approval and inspection by the District
will be considered invalid and will not be acknowledged.
After connection is complete, the property described above is subject to a monthly sewer serv-
ice charge. The rate will be governed by the use of the property - residential, commercial, or
multiple dwelling. Non-payment of the sewer service charge is subject to a 5% penalty per
month, plus disconnection if necessary.
The undersigned hereby agrees that the above information given is correct and agrees to the
conditions as stated:
•
A i ~ ~ 1173
Owner's S e Date
COST
V - -- - - ----. -- ------
LEUCADIA COUNTY WATER DISTRICT
APPLICATION FOR SEWER SERVICE
Owner's Name: Ralph Bwy
_______
Mailing Address: 4287 47th St
San Diego 92115 Phone No.________
Job Address:
SERVICE REQUESTED: Condominium 8 units, La Costa South Unit #1
Lots 38 & 39 CONNECTION CHARGE
for Condominium (type of building)
If a multiple unit building, indicate no. of living units p
SERVICE LATERAL Lateral installed by La Costa
If service lateral previously installed - No Fee
If service lateral required:
Check size lateral required:
(41_ (61_ Other_____
Saddle connection required: Yes. No
Amount Rec'd 8,500.00 I
How Pai # 2522
Date Paid 11-21-73
Rec'd by: •• Geiseihar
450.0
'/46r/7.3_____
TOTAL CHARGES
The application must be signed by the owner (or his ifuthorized representative) of the property
to be served. The total charges must be paid to the District at the time the application is
submitted:
If a service lateral is required, it will be installed by the Leucadia County Water District.
The service lateral is that part of the sewer system that extends from the main collection line
in the street (or easement) to the point in the street (at or near the applicant's property line)
where the service lateral is connected to the applicant's building sewer.
The applicant is responsible for the construction, at the applicant's expense, of the sewer
pipeline (building sewer) from the applicant's plumbing to the point in the street (or easement)
where a connection is made to the service lateral.
The connection of the applicant's building sewer to the service lateral shall be made by the
applicant at his expense. The connection must be made in conformity with the District's
specifications, rules and regulations; and it must be inspected and approved by the District
before the sewer system may be used by the aoplicant. The applicant, or his authorized rei
resentative, must notify the District at the time inspection is desired. Any connection made
to the service lateral or collection line without prior approval and inspection by the District
will be considered invalid and will not be acknowledged.
After connection is complete, the property described above is subject to a monthly sewer serv-
ice charge. The rate will be governed by the use of the property -. residential, commercial, or
multiple dwelling. Non-payment of the sewer service charge is subject to a 5% penalty per
month, plus disconnection if necessary.
The undersigned hereby agrees that the above information given is correct and agrees to the
conditions as stated:
pwner'_;ge
Dat
Receipt No-3308
L.- I F ....'
Application for Grading Permit
CITY OF CARLSBAD
PUBLIC WORKS & BUILDING DEPARTMENT
1200 Elm Avenue
729-1151
PERMIT X0.________
(letter code -1 number
Llot
S=subdivis ion
C=City contract
flEC cc
FOR APPI lCAr"iT TO Fill IN
Site,Address Surety Bond Bond No.
Legal Description Map No Surety Company
Subdivision Name Surety Address
)wner Phone
f / 7/
Date Filed Rec'd by
),.qnerl,s Address
,,, ,,
Cash deposit Rec'd by Date filed
'lans, by Clvi R.C.E. The following documents are required and shall
become a part of the grading permit when they
are approved.
,Grading plans ?-<Specifications
><Soi I report Vicinity map
)Dràinage structures >(Retaining walls
)Compaction report _Other
Address Phone
79307,
Soil Engineer R.C.E. Phone
rag Contractor Phone
. if supervised ddress -$
Ik7rad 4Lt/4/ c-%-Y,-d ing
SPECIAL CONDITIONS WHICH ARE MADE
A PART OF THIS PERMIT
arty on ible for overall supervision
I. Authorized hours of operation: 7:00 AM to
roposed use of'çjradè site
_•4"
5:00 PM, Monday-Friday.
Haul routes are to be approved by City
lumber of cubic yards
Cut Fill Import Waste
Engineer.
Adequate provisions shall be made for
erosion and siltation control.
All slopes shall be planted per direction 6±cc2 v 0
of Parks & Recreation Director. Total 2cc"
Compacted fills (yes or no)
Proposed Schedule of Start Finish
Operations (dates) 4773 4. ', T -
I hereby acknowledge that I have read the applica-
tion and state that the information I have provide
Is correct and agree to comply with all City
ordinances and State laws regulating excavating and
grading, and the provisions and conditions of any
permit issued pursuant to this application.
Signature of Permittee ___-7:.-/-c:1
Owner or authorized agent _
- INSPECTION DATE INSPECTOR'S
SIGNATURE
Ground preparation
Rough grading
Compaction report rec'd.
Planting & drainage
Final certification rec'd.
Grading permit fee $ 9 (' C, work compieea
Surety bond released
Permit Val idption
by Date______
Permit Expirat ion Date
THIS FORM WHEN PROPERLY VALIDATED BY SIGNATURE IS A PERMIT TO DO THE WORK DESCRIBED
THIS PERMIT 15 VALID FOR A SIX (6) MONTH PERIOD
0
0
WOODSIDE/KUBOTA & ASSOCIATES, INC.
CONSULTING
ENGINEERS
2965 Roosevelt St. • P.O. Box 1095 • Carlsbad, California 92008 • (714)729-1194 September 30, 1975
City of Carlsbad
Department of Building & Safety
1200 Elm Ave.
Carlsbad, Calif. 92008
Subject: •Cota Verde Subdivision— Lots 38 & 39 -
La Costa So.uth Unit No. 1 -
Carlsbad Municipal Water District.
Gentlemen:
This letter is to confirm our telephonic reporting to you that the
subject subdivision has completed its public water system and our
District has formally accepted same for operation and maintenance.
Accordingly, we have no objections., for your agency to process
appropriate request for occupancy of the individual units and
water service will be made available by regular procedures of
cation at the Water District office..
4Vetruly your.,
~
acik Y. Nta.~Distr-ict
5tlsbajMuniciPa1 Water
cc: Carlsbad Municipal Water District
Costa Verde*- Mr. Ralph Bwy
the
public
appli -
Engineer
District
JYK/le
In Orange County, Santa Ana
7325
It rl
.1 Dc// R vvvc9
0 O%
o vo
.ç 00J -2v
-Y6 i Y
La
00 Q,;,17
w
'L(Z.
00 &/; /3 6 'I
hl-sbeo~~'
\\ jrSI
ii 1 4-
.__v_7/
-Dp-1/f)1/
o-
E
_ 7s12/g 4g'b
I. / 1'
0QO) -:(0iQ) .---)-J1c:' £
K sov
vl C .) 1
_!i*;.4/
p,# /
Don
Bill
Marshal Woolenchuck
Dave
Roy
Jobe Gay
COSTA T1dOJJ 2533 NVR(1co ALPH BWI
47,Street #1 .4287
Rancho La Costa, San Diego, Ca. 92115 LA COSTA . SUB-CONTRACTORS h 436-2861 ph: 281-7133 /
ARTIMEX IRON (stairs) Jose Padilla 429-6242
• BARHAM ELECTRIC Jack Barham
. 284-9245
RECEIVED BRADWISE ROOFING. Wess 444-9489
JUL. 1975 464-0423 (home)
CABLE COMM CITY OF CARLSBAD 280-2673
Building Department
- - - COMMERCIAL FURNISHINGS (carpet) Carry Hanaf in - 28677151
CONTRACTOR SUPPLY Jay 262-9911
CROWN DOOR & TRIM
CUSTOM CRAFT MARBLE
CARLSBAD BLDG. INSPECTOR
CARLSBAD FIRE MARSHAL
DAVE'S CLASS
FIREPLACE DIST.
JOBE GAY CONCRETE SAWING
HOFFMAN ATCHLEY CABINETS Jim Ritzell or
•. Don Kay
L & M PAINTING Carl Larson
Rick's home
LA COSTA COMMUNITY ANTENNA SYSTEMS
LUCADIA COUNTY WATER DIST.
WOODSIDE KUBOTA John Pierce
465-2290
447-7887'
729-1181
729-5937
447-7025
453-9300
729-1329,.
295-4461
213-341-5701
444-8928
444-8016
N 729-911].
753-0155
729-1194
MILLS CONCRETE Ron Mills 582-4114
291-1954 (home)
METOS SAUNA Gene Hundhausen 291-8949 Mark Hundhausen 291-4114
PATIO POOLS - AZURE CONST. Mr. Beneto 460-3565
466-4315 (home)
PERNA TILE Tony Perna 222-3727
Ramona--789-0964 (home)
..
POWAY VALLEY PLUMBING Tom Devlin 278-8378
SAN DIEGO GAS & ELECTRIC Mr. Sprint 722-5463 Mr. Cotter (Operations) 729-4917
SORRENTO SAND --- 276-8400
SORRENTO VALLEY DISPOSAL --- 753-4157
SQUIRES BELT MATERIAL CO. --- .232-8188
SUPREME PAINTING & DRYWALL Art Hopkey 287-2910
RAY TORRICELLAS (plaster) --- 465-6421
UNITED CALIF. INSULATION Bob 444-6109
VICO PRODUCTS'lct'4 )4i.&.. Ted Davidson 213-442-4420 '71ighters) 213-686-0509
VIKING FIRE PROTECTION Jay Kam 463-8864
WESCO HEATING & AIR Dick Glover or 448-6550 Walt Latham 444-2667 (home • 448-3728 (home
WEST COAST HDWE. Leonard Small 565-2881
: WESTERN LUMBER --- 262-9963
WHIRLPOOL Steve Olden 454-8444
454-5831 (home)