Loading...
HomeMy WebLinkAbout2534 Glasgow Dr; ; CBRA2017-0008; Recycle... Pollutant Control 4.504.1 Duct openings and other related air distribution component openings shall be covered (X) during construction. 4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC an.d otherfoxic compound (X) limits. (X) 4.504.2.2 Paints, stains and other coatings shall be compliant with voe limits. (X) 4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MI R limits for ROC and other toxic compounds. ' (X) 4.504.2.4 Documentation shall be provided to verify that compliant voe limit finish materials have been used. (X) 4.504.3 Carpet and carpet systems shall be compliant with voe limits. 4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (X) ' defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or be certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. (X) 4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior finish systems shall comply with low formaldehyde emission standards. Interior Moisture Cpntrol -Y"· r-'"' : ..---~U\ 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X) 4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X) enclosure. Indoor Air Quality and Exhaust ·-.....,.......~ ·-~.--_1. - 4.506.1 Exhaust fans which terminate outside the buildina are provided in everv bathroom. (X) . 1llil, 1,;,;1'"Y f vo-,.f-" Environmental Comfort . ' ·-•... 4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (X) fan is off. Covers or louvers shall have a minimum insulation value of R-4.2. 4.507.2 Duct systems are sized, designed, and equipment is selected using the following methods: (X) 1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent. 2. Size duct systems according to ACCA 29-D (Manual D) or equivalent 3. Select heatinQ and coolina equipment accordinQ to ACCA 36-S (Manual S) or equivalent. -installer ana Specia1 ins~p~ctorciualificat1ons ---. -C ---. : -....v--• ._... ...... -·· -.-~ .. 702.1 HVAC system installers are trained and certified in the proper installation of HVAC (X) systems. • 702.2 Special inspE:lciors employed by the owner must be qualified and able to demonstrate (X) competence in the discipline they are inspectinQ. I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2013 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: "25 5 (). ~S;jovJ b~ Plan Check Number: pacm~S Print Nam:: ~0 ~.,,.,.,_,s-~y.1 SignedJ{ }71~ License Number: G -g ~ ~ ~iate: q,/~~ 8-51 Page2of2 Rev. 11/15 54 Ticket#: 1792960 PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 Weighmaster: gomezda (7 60) 603-0153 In: 333367 -RUBIO CONSTRUCTION SERVICES INC out: 25350 WATER WHEEL CT MENIFEE, CA 92584 Vehicle: Contract: INDUSTRIAL-GATE 2 GROSS 33,960 Scale In TARE 29,260 Tare Out NET 4,700 Tracking Qty: 0.00 Ref: BOL: INBOUND INVOICE July 30, 2018 July 30, 2018 A43287 Qty 2.35 Origin: Unit Description TN MSW CARLSBAD Rate $69.33 Ext ension Tax 100% signature: $162.93 $0.00 ~/ rpr(;tS'z 3 Total Paid Change 7:35 am 7 : 35 am Total $162.93 $162.93 $0.00 $0.0 0 I , .. -.'- .111&1'11..:: D -· DISPOS.A~ RE,OEIPT . 8354;M1:tS0NWAY ;,. ESCONDIDO; CM12026 . ,'1"J!r205-1797-' •• f~ 760-749-;17l7 ~ I J-. DATE 7 / 12-/ l ff .· CUSf.ND.. 1 CUSTOMER Cb I c:::J__. \Gh{o. J ~- PRICE i O -~ef) I~ r /OD~ ' ., .... / .,i :- X / ! • ' /· .•( ·:·(."}, 1· ·.: ,·-,· .. , .... .,,'*.,,,.-:;:._. N2 : -; \., ~;.~,., ,I -~-i,--i DRIVER'S SIGNATURE . . :··· ... ::. .~ .. '. .......... --------~--_________ ..,____ __ PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD , CA 92008 (760)603-0153 333367 -RUBIO CONSTRUCTION SERVICES INC 25350 WATER WHEEL CT MENIFEE, CA 92584 Contract: INDUSTRIAL-GATE 2 GROSS 33,580 TARE 28,880 NET Tracking Qty: 4,700 0.00 Qty 2.35 Unit Description TN MSW Scale In Tare Out 54 Ticket #: 1763023 Weighmaster: reyesma3 In: Out:. Vehicle: Ref: BOL: INBOUND INVO ICE May 25, 2018 May 25, 2018 a41707 Rate Extension $67.30 $158.16 Tax $0.00 Origin: CARLSBAD 100% Signature: Total Paid Change 7:28 am 7 :28 am Total $158.16 $158.16 $0.00 $0.00 54 Ticket #: 1792960 PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD , CA 92008 Weighmaster: gomezda (760)603-0153 In: July 30, 2018 333367 -RUBIO CONSTRUCTION SERVICES INC out : July 30, 2018 25350 WATER WHEEL CT MENIFEE , CA 92584 Vehicle: A43287 Contract: INDUSTRIAL-GATE 2 GROSS 33,960 Scale In TARE 29,260 Tare Out NET 4,700 Tracking Qty: 0.00 Qty 2 .35 Origin: Unit Description TN MSW CARLSBAD Signature: 100% Ref: BOL: INBOUND INVOICE Rate $69.33 Extension Tax $162 .93 $0.00 ~1 1)V-Ct5l 3 Total Paid Change 7:35 am 7:35 am Total $162.93 $162.9~ $0.0C $0. oc