HomeMy WebLinkAbout2535 Glasgow Dr; ; CB154620; RecycleCtityof
Carlsbad
WASTE MmkneJWeNf
PLAN
8-59
Development Services
Building DMsion
1635 Faraday Avenue
760--602-2719
www.carlsbadca.gov
owner: Contractor.
JobAddress: 25':,S . qc-ASC..,OW J:)-Z,, PhoneNumber. <=f'fC. -°3ln • \elo9
Estimated Cost crf Project $ 111 1 QOO • ex::>
Type of Project ~ New Construction D Remodel or T.I. D Residential D Commercial D Demolition
(check all that apply) D Other ------------------------------
Non-hazardous construction waste generated during the course of this projec:t shall be recycled and/or salvaged for re-use at a
minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of· new construction disposal that does not exceed 2
lbs per square foot of buildlng area affected by this permit, may be deemed to meet the 50% minimum requirement upon
approval of Building Department
ALTERNATIVE FORMS Ol= COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs: per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs.= lbs. of allowable waste.
D I plan on using a WAfrfE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1-Estimated Waste (To be filled out prior to permit issuance-refert~ example on Page 2.)
MATERIALS lbs. of waste to be taken tc lbs. of waste tc be Waste Hauling Company or Re-Use Method LANDA LL RE-USED or RECYCLED
Asphalt/ Concrete c.. ~ " ... ---. J •--• -\l. n -C. • ·-Brick/ Masonry =-·~·,•I • ...,,_\L" -'~ • ii<
cardboard £=--~·-'-O..Jr--.. --0 • -·-·-·
D_rywall -
I • . fl,1 "
Landscape Debris .s ,,.,,_ ,4,.~ A -,,._ J...,o ... , ..
Lumber/ Wood --i";: ... .-~ ?.-I/
Metals ~-=--. ..1~-'"" e.-o· A --. ~
Mixed Waste £6:.-.,. I~ 1-llor:11 • •,., -t.ewu ~
Trash I Ga"'""" I A -• ""
,
~
Other:
TcrTAL Jbs:
Estimated Percentage to be Re-Used or Recycle • ..._~--~.--%
Data
Contractoror~-:,...;
Contra-or~~~.//
Official Use Only
D Plan Approved D Plan Denied D Projec:t Valuation Approved
Reviewed/ Approved by:. ________________ _
Page 1of2
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash Garba e
other:
TOTAL lbs.:
lbs. of waste taken to
LANDFILL
L/, 'l 1
lbs. of waste
RE-USED or RECYCLED
Actual Percentage Re-Used or Recycled._~t;;~I,__ __ %
Official Use Only
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
D 50% Goal Achieved D 50% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _
Reviewed/ Approved bY:·------------------
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
lANDFILL RE-USED oc REcYCUED
Asphalt-/ Goncrete· .. ·O 2000
Brick I Masomy . ' 100 450
Cardboard . 0 150
Drywall .. '. . 0. 50
Landscape Debris 0 120
Lumber I Wood 500 0
Metal< ·,· 300 200
Mixed Waste '-.-. . ' 1500
. . 0
Trash I Garbage 300 0
Other: PooL c; uvci.te 0 'lOO
TOTAL lbs.: 2700 3zyD
Percentage to be Re-Used or Recycled 59 %
Fonmula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
Waste Hauhng Company or Re.:Use Method
AB-C-Hau.Lt·· ~ C-o .
WM I Re-v(sed 'R>tick?. ovc-stte
AB-C-~a e<.Lt· · ~ C-o.
AB.C-fta e<.Ll,, n C-o.
Me<.Lcned c: Re-L<.Sed OV1rstte
waste Mavu.t>e~eiAA:
WM I AB.C-HtrnLtvcg
WM
WM
v(sed as cru..sned B.ase OV1rstte
(Total Combined Waste)
3870 X 100 = 59% Re-Used or Recycled
(2700 + 3870)
Since.59% exceeds the minimum requirement of 50%, this plan complies.
Page2of2
Ccityof
Carlsbad
RESIDENTIAL GREEN
BUILDING CODE
STANDARDS MANDATORY
MEASURES
CERTIFICATION
CHECKLIST
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
B-51
Site (?evelopment . -. .. .. -.. . ,:,M.~od~tQrv
4.106.2 A plan is developed and implemented to manage storm water drainage during construction. (X)
4.106.3 The site shall be planned and developed to keep surface water away from buildings. (X)
Construction plans shall indicate how site grading or a drainage system will manage all surface water
flows.
lnlrgyJ;ffl~i~nc'y -
~JA-.1'11..M.... · .,4.:· .;.._ ... ,.
4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by (X)
the California Energy Standards.
_yv.~!ir l;ff!~i~~cy an~ _Co_11~~J'Y.~~i.Q.~ . -~ ~ ...... ~·"' ... . . . .....
i@f!tw W~!i~r ·u~'e ·. ' . .. ' ,-~,r ... ;-• ,.. ·"'t.;'"· ....-.. . ... · . ..:. ---., ,l •i .. -~·-'•,I, • •• .;.,,. ...... , ...... ~ . ,,_" . . .•• ...,11, ••• ,,·; •••
4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods: (X)
1. Water saving fixtures or flow restrictors shall be used. 7/01/201 1
2. A 20 percent reduction in baseline water use shall be demonstrated ..
4.303.2 When using the calculation method specified in Section 4.303.1 , multiple showerheads shall not (X)
exceed maximum flow rates. 7/01/2011
4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall (X)
comply with specified performance requirements. 7/01/2011
Outdoor Water Use •.'',!.!'..',, .. , ~--. .: . __ . .,, -. -' ..
..... .. ---,,,.(, ....... .._·.-, IA.·-,,, < ., . ---·-...., •· r ........ -··-• -·-.-~·•' • ..
4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather-(X)
based.
• ~ . • • ,, :J\; ... ; "*·,.~ . . . '·. . . -· .. ,
Enhanced Durability and Red1.1cea Maintenance
' . .... ~. ·-•: . ., ~-.
4.406.1 Joints and openings. Annular spaces around pipes, electric cable~. conduits or other openings
in plates at exterior walls shall be protected against the passage of rodents by closing such openings (X)
with cement mortar, concrete masonry or similar method acceptable to the enforcing agency.
Constructi6n'Waste ·M~riagement Plan . ~ .
, "!i.lY ., ,'J . # ·~ ...... :. ' •• .. ~\."'PC,..~~.c.'-"~ ... ~J'D ...., :J • ....... -.~} ·. t..' •• .I> ( ~ . . .. ..
4.408.1 A minimum of 50 percent of the construction waste gen_erated at the site is diverted to recycle or (X)
salvage. Recycled material receipts from approved recyclers must be attached to this form.
4.408.2 Where a local jurisdiction does n~ have a construction and demolition waste management (X)
ordinance, construction waste management plan, per form 8-59, shall be submitted for approval to the
enforcino aoencv.
, .. Building Maintenance and Operation . ,·. .. , . .. .. ,.,, •',• . ;.,, . . . ··' ·~-.r~··t ·. ' . . .. •' -.~ ..
·(x) 4.410.1 An operation and maintenance manual shall be provided to the building occupant or owner.
J~~v.fr<>nmental Qualify
. ····•········ ....... -···· :. Fireplaces ...
4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed
woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. (X)
Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances.
B-51 Page 1 of 2 Rev. 11/15
...
Pollutant Control
4.504.1 Duct openings and other related air distribution component openings shall be covered (X)
during construction.
4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC an.d other toxic compound (X)
limits. (X)
4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits. (X)
4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for
ROG and other toxic compounds. ' 4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials
(X)
have been used. (X)
4.504.3 Carpet and carpet systems shall be compliant with voe limits.
4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (X)
defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or
be certified under the Resilient Floor Covering Institute (RFC!) FloorScore program. (X)
4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior
finish svstems shall comolv with low formaldehyde emission standards.
Interior Moisture Control .,.~~f'•r..t-Mi -
. . _..,..M
4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X)
4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X)
enclosure.
Indoor Air Quality and Exhaust ..-....-~.:.:JI!. -
~ -........ -~
4.506.1 Exhaust fans which terminate outside the building are provided in every bathroom. (X) . , ~-f:.' Environmental Comfort ...
4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (X)
fan is off. Covers or louvers shall have a minimum insulation value of R-4.2.
4.507.2 Duct systems are sized, designed, and equipment is selected using the following
methods: (X)
1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent.
2. Size duct systems according to ACCA 29-D (Manual D) or equivalent
3. Select heating and coolino eauipment according to ACCA 36-S (Manual S) or equivalent.
-installer ancf spec1aii nspJttor-cfualifications .... -~ . . • ~ .,-• ..-..i -~--
.. -.-...t· .
702.1 HVAC system installers are trained and certified in the proper installation of HVAC (X)
systems. •
702.2 Special insp~ctors employed by the owner must be qualified and able to demonstrate (X)
competence in the discipline thev are inspecting.
I, as the professional responsible for this project. certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2013
California Green Building Standards. All receipts for recycled materials have been attached to this form.
Project Address: 2;:53 "5 &~oltJ D~ Plan Check Number: ?0Gm~5
Print Nam:: --.............,o-.,....-j" ~~ Signedk,' n~
;
License Number: G' "ZS~ ~ \iate: ~/;q/;~
B-51 Page 2 of 2 Rev. 11/15
;: :.
P.O.
CASH CHECK
CITY OF ORIGIN
JOB LOCATION
PU 'TRAILER
LOAD COUNT
1
)< . /-\ 1 • . ~\..,·
1 :
'#LOADS
2
-. -·. ~~;;.~~~f
SIG~RE
76 SAND & GRAVEl.,
CONCRETE & ASPHALT RECYCLE
POBOX965
BONSALL, CA 92003
SALES: (760) 497-6041 1
JOB#
CHARGE COMMERCIAL RESIDENCE
/' ,, ... ~. r:-. \ •(' /, \ (. ¥"'},
\... •• \..., {\ ::, '11 .._,t..,. '\ --·
/\ \ \ \ ( (1f . ," \-·,. ,rs; C ..
\ • I )t • ,. \
rLATBED BOBTAIL 110-~HJ.EL I END DUMP I T & T .X:,
MATERIAL_r..
~:, ' r··. v\e~ \-t> \
3 4 5 6 7 8 9
/···,--"•,, Li( { 1 _ .... ,,I
X PRICE OTHER CHARGES
$
TOTAL
10
All bills due upon presentation unless otherwise · ·. 76 SAND & GRAVEL is not responsible
arranged in advance. Open accounts subject to for damage to vehicle while being loaded ·
1 112'ro month. charge after 30 days unpaid or unloaded in yard. balance.
JOB COPY 01997
' :! ·1
i I !
1 i j
;
j
l I I j
l
l j
l ; l
J
r·· i.· ;-··.
C-'\5"} 'x:
NAME
CHECK
76 SAND & GRAVEL
CONCRETE & ASPHALT RECYCLE
POBOX965
BONSALL; .CA 92003
. SALES! (760f497-604°f 1
'· \ ·,
\t-.\ ...
JOB# DATE
\·\.'·ti -·
CHARGE COMMERCIAL RESIDENCE TIME
' ~:. JOB LOCATION
1r· f ", .... -~·. .; --PU I TRAILER rLATBEO BOBTAIL
MATERIAL
LOAD COUNT
1 2 3
. I \{_
\ ' #LOADS
..... 1 ·;t .I
J './ / . ..11 ... -' ./ .. I ., ,;i, .... /J i .·· / ' ~:I·.,., ( f ( .. ,
SIGNATURE
4 5
PRICE
All bills due upon presentation u_r,iless othenttis9
arranged in advance. Open-accounts subject to
1 1fl% month; charge after 30 days unpaid
balance.
110-WHEEL
\/ 1
ENO DUMP r & T
,,
.t ____ ... :.-\ .. , C ,~ ... ~ -r l:""
6 7 8 9 10
OTHER CHARGES
TOTAL
.J..1 I ·:; -· ·~ TRUCK#
· 76 SAND & GRAVEL is not responsible .
for damage to vehicl.e while being loaded
or unloaded in yard. ·
01871
JOB COPY
-,,,., .. ~ ~-.; -~
P.O.
CASH CHECK
76 SAND & GRAVEL
CONCRETE & ASPHALT RECYCLE
POBOX965
BONSALL, CA 92003
SALES: (760) 497-6841
JOBI
CHARGE COMMERCIAL RESIDENCE
NAME· {.,/, \-, •• ,
r-... !&:". ,·~~ V C'.c;n ,~ J , ... r J , .. , ,.,..) ( ./llL ft ,. T CITY OF ORIGIN
JOB LOCATION
,',·
PU 1TRAILER lFLATBED
LOAD COUNT
1 2 3 4
X
\( )
\ \
#LOADS ·X
..
BOBTAIL 110-WHEEL I ENO DUMP IT & T . ><
MATERIAL .n I 1 ,-rcre-f-'' \ . ' . ,,.
5
PRICE
6 7 8 9 10
OTHER CHARGES
$ / r---,, l --0 (_,.. L ,. .,
TOTAL
TBUCK#
76 SANO·& GRAVEL is·>tot responsible .
for damage to vehicle while being loaded.
or unloaded in yard;
!
l
J .,
J
l
j
i i l 1 ;
J j
l J ·1 l l ~
J
1 (
i
J
1
l
·1
1 ,l
J l j
~ 1
1 .... j
.--... ·.:: -~ . ... ~.-j
01998 ~J
P.O. IJOB#
1TIME 1
CITY OF UHIGIN
JOO LOCATION
I FLATBED
MATEAlAL ,1 \ 1\ nf'·r f · h LOAD COUNT
1 2
"#LOADS
__ ...... _ ..
.... ,._ ..... ~ ~
SIGNATURE
3
·x
4
I --. ,,-
1 I ..,
5
PRICE
·.Molls .due:opon:.presentation·unless otNKwise
arranged irfadvance. Gpen accounts subject to
1 ·112%·monttt; cha,ge after 30 days unpaid
·balance.
6 7 8 9 10
OTHER CHARGES
$ 17c .. .. I-· )
TOTAL
'1 C Ii-
,,_TRUCK# ·. .
76 SAND. &-GR.t 'EL is not responsible · ·-· , .
for damage to v nicle while being loaded
or unloaded in J rd.
... '08 COPY
01976
j
j
l
l
J 1
1 l
r
AGRISCAPE, INC.
37760 Borel Road
Murrieta, CA 92563
(951) 696-0651
,----AMOUNT--OF-A<::t::OJ-NT---r---y--, 0 CASH
THIS PAYMENT Q CHECK
1--------t---t-1
.___ __ BA_lAN_ce_ou_e _.___....__. O CHARGE Thank Youl
-· ----·------· ··--·--··-··--·---··---·---·----··-·--·-·----·-··-·-·--···---····-·····----· --··
AGRISCAPE, INC.
37760 Borel Road
Murrieta, CA 92563
(951) 696-0651
AMOUNT OF ACCOUNT
THIS PAYMENT
BALANCE DUE
AGRISCAPE, INC.
37760 Borel Road
Murrieta, CA 92563
-
0 CASH
Q CHECK
Q CHARGE
. 1107SS
DATE · f ! h -L 20_!_?
Thank You!
-~--s. ~---
110596
(951) 696-0651 DATE f l . I 9 20 _J.:J. ~ ~7 I ! t REC~FROM_·~ Ku=-h~1-==-o__,, __ 4~n...._s _., -:-. ----$1 =6 l ;; -wtfid
\ii For r11t1e J .'(JCj '/r1VI \II Trud<t ________________ ~
C ~-----,---,--11 0 CASH AMOUNT OF ACCOUNT
THIS PAYMENT O CHECK 1-------,--1---j
D CHARGE L----------~ BAIANCE DUE Thank Youl
---·---···------
54 Ticket #: 170084 7
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008 Weighrnaster : RAMOSAL
(760)603-0153 In : January 03, 2018
333367 -RUBIO CONSTRUCTION SERVICES INC Out : 03 2018 25350 WATER WHEEL CT January ,
MENIFEE , CA 92584 Vehicle: a41743
Contract: INDUSTRIAL-GATE 2
GROSS 35,680 Scale In
TARE 27 ,500 Tare Out
NET 8 ,180
Tracking Qty: 0~00
Qty Unit Descri ption
4.09 TN MSW
Origin: OCEANSIDE 100%
Signature:
Ref :
BOL:
INBOUND
INVOICE
Rate Extension
$67.30 $275.26
Tax
$0 .00
Total
Paid
Change
9:04 am
9:04 am
Total
$275 .26
$275 .26
$0.00
$0. 0 1
Escondido Resourc~ Recovery
112)2:i..
Escondido, CA 92025
{760) 745-·3203
Ci.1st orner·: 120.3 Ticket: '3'3751
Da t e : ;:zi 11 31 I 1 8
RUBIO CONSTRUCTION SERVI
2~i350
MENIFEE CA 92584
C()r.il?!O
In: 15 ~ ~8
ii SELFHAUL REFUSE 3.74 77. iZt!Zi 'per TON
-r ~·,: .. ~:.:-::: r. -~~··:~.·:~~ ;:,., ::~. ~ ·.:-~ -~-
c c r. ·:; ;;, ;. n ;;;:· ·,· ·.
-:. -,· .,:
:--·. . .. . . ~;~ ', ,'
•• ·-~ + ·'. •
::·.(. -::! . .:.-.;; ....
[Gr oss Ctn); 36,540. lbs Man Wt Tare 29,060. ibs Sl::or2d Net:
--·------------------
TOTAL DUE ,;~i\1}Ytiif c;~}1~ ' %
Driver ANGEL V.
The City of THE CITY OF SAN DIEGO
ENVIRONMENTAL SERVICES DEPARTMENT
REFUSE DISPOSAL DIVISION
MIRAMAR LANDFILL
5180 CONVOY STREET
SAN DIEGO, CA 92111 SAN ~
DIE.GO]i 9601 RIDGEHAVEN CT., SUITE 310 • SAN DIEGO, CA 92123-1636
(858) 694-7000
Landfill hours: Sun-Sat 7:00-4:30 NO hand unloads after 4:00 pm
Amount Tendered:$107.00 Change Due:$0
ES-072 (REV. 7-09) PW/PS-333
This information is available in alternative formats upon request
Remittance Number: 5211
LBS
Gross Weight 32260.00
Tare Weight 28300.00
Net Weight 3960.00
Tip Fee
Spec Fee
RCBus Tax
Recycle
Total
SIGNATURE
TONS
16.13
14.15
1.98
$ 69.00
$0
$ 16.00
$ 22.00
$ 107.00
OTAY LANDFILL
1700 MAXWELL RD
CHULA VISTA, CA 91911
() -
01 Ticket #: 1638074
Weighmaster: TOLBECO
In: January 30, 2018
400212 -RUBIO CONSTRUCTION SERVICES INC Out: 30 2018 25350 WATER WHEEL CT January ,
MANIFEE, CA 92584 Vehicle: A48601
Contract: GATE RATE
GROSS 39,020 Scale In
TARE 30,700 Scale Out
NET 8,320
Tracking Qty: 0.00
Qty
4.16
Origin:
1. 00
1. 00
Signature:
Unit Description
TN MSW
CHULA VISTA 100%
ENVIRONMENTAL FEE 1
FUEL RECOVERY FEE
Ref: 350.00
BOL:
INBOUND
INVOICE
Rate Extension
$86.00
$16.25
6.65
$357.76
$16.25
$23.79
Tax
$0.00
$0.00
$0.00
Total
Paid
Change
12:16 pm
12:47 pm
Total
$357.76
$16.25
$23.79
$397.80
$0.00
$0.00