Loading...
HomeMy WebLinkAbout2542 GATEWAY RD; ; CB101154; Permit08-16-2010 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB101154 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 2542 GATEWAY RD CBAD Tl Sub Type: INDUST 2132611500 Lot#: 0 $113,400.00 Construction Type: NEW Reference #: SPEC STE: 3240SF SHELL TO OFF Applicant: WHITE CONSTRUCTION 2540 GATEWAY RD CARLSBAD, CA 92009 760-931-1130 Owner: Status: Applied: Entered By: Plan Approved: Issued: Inspect Area: Plan Check#: ISSUED 06/23/2010 JMA 08/16/2010 08/16/2010 PC100026 Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Fire Expedited Plan Review $696.89 Meter Size $0.00 Add'l Reel. Water Con. Fee $452.98 Meter Fee $0.00 SDCWA Fee $0.00 CFD Payoff Fee $23.81 PFF (3105540) $0.00 PFF (4305540) $0.00 License Tax (3104193) $0.00 License Tax (4304193) $0.00 Traffic Impact Fee (3105541) $0.00 Traffic Impact Fee (4305541) $0.00 PLUMBING TOTAL $0.00 ELECTRICAL TOTAL $0.00 MECHANICAL TOTAL $0.00 Master Drainage Fee Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees $4.00 HMP Fee $0.00 TOTAL PERMIT FEES $0.00 $0.00 $0.00 $0.00 $2,063.88 $0.00 $0.00 $0.00 $4,394.32 $0.00 $111.00 $110.00 $46.00 $0.00 $2,264.35 $0.00 $0.00 $10,167.23 Total Fees:$10,167,23 Total Payments To Date:$10,167.23 Balance Due:$0.00 Inspector FINAL APPROVAL Date: f\Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. City of Carlsbad final Building Inspection Dept: Building Engineering Planning CMWD St Lite Fire Plan Check*: PC100026 Date: 10/19/2010 Permit*: CB101154 Permit Type: Tl Project Name: SPEC STE: 3240SF SHELL TO OFF Sub Type: INDUS! Address: 2542 GATEWAY RD Contact Person: Phone: Sewer Dist: CA Water Dist: CA Lot:0 Inspected By:_ Date Inspected By: 7\I) uate , y Inspected: IQM if ( QApproved: ^ ^ Disapproved: Inspected By: Date Inspected: Date Inspected: Approved:Disapproved: Approved:Disapproved: Comments: City of Carlsbad Bldg Inspection Request For: 10/21/2010 Permit* CB101154 Title: SPEC STE: 3240SF SHELL TO OFF Description: Inspector Assignment: RB Type:TI Sub Type: INDUS! Job Address: 2542 GATEWAY RD Suite: Lot: 0 Location: APPLICANT WHITE CONSTRUCTION Owner: Remarks: roof and final ? Phone: 8586881112 Inspector: Total Time:Requested By: DAVE Entered By: CHRISTINE CD Description 15 Roof/Reroof Act Comments Comments/Notices/Holds Associated PCRs/CVs/SWPPPs Original PC# PC100026 Inspection History Date Description 10/20/2010 15 Roof/Reroof 10/13/2010 15 Roof/Reroof 10/13/2010 39 Final Electrical 10/13/2010 44 Rough/Ducts/Dampers 09/22/2010 14 Frame/Steel/Bolting/Welding 09/22/2010 24 Rough/Topout 09/22/2010 34 Rough Electric 09/22/2010 44 Rough/Ducts/Dampers 08/30/2010 17 Interior Lath/Drywall 08/30/2010 34 Rough Electric 08/30/2010 39 Final Electrical 08/27/2010 17 Interior Lath/Drywall 08/27/2010 18 Exterior Lath/Drywall 08/26/2010 14 Frame/Steel/Bolting/Welding 08/26/2010 44 Rough/Ducts/Dampers 08/20/2010 84 Rough Combo 08/19/2010 14 Frame/Steel/Bolting/Welding 08/19/2010 34 Rough Electric 08/17/2010 21 Underground/Under Floor Act Insp Comments CA RB TOO WET WC RB AP RB EMR NR RB ON ROOF EQUIP INSP AP MC WC MC AP MC AP MC T-BAR AP RB AP RB WC RB AP RB WC RB AP RB ROOF PLATFORM WC RB CA RB INSP ON 8-19-10. AP RB PA RB 1STFLROK AP RB