Loading...
HomeMy WebLinkAbout2548 CAMPBELL PL; BLDG A; CB061083; Permit08-28-2006 City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Commercial/Industrial Permit Permit No: CB061083 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: Project Title: 2548 CAMPBELL PL CBAD COMMIND Sub Type: COMM 2132610700 Lot#: 16 $3,001,778.00 Construction Type: VN Reference #: DEVO5113 BRESSI RANCH LOT 16-BLDG. A 47,504 SF OFFICE BLDG Status: Applied: Applicant: SMITH CONSULTING ARCHITECTS STE 200 12220 EL CAMINO REAL SAN DIEGO CA 92130 858-793-4777 Plan Approved: Issued: Inspect Area: Plan Check#: Owner: - RED TEXAS REALTY L L C C/0 ST. CROIX CAPITAL CORP 4350 EXECUTIVE DR;#301 SAN DIEGO CA 92121 ISSUED 03/08/2006 Entered By: 08/28/2006 08/28/2006 TP , PC060006 KG Building Permit Add'l Building Permit Fee Plan Check Add'l Plan Check Fee/ • Plan Check Discount Strong Motion Fee Park Fee . LFM Fee Bridge Fee BID #2 Fee BID #3 fee Renewal Fee Add'l Renewal Fee Other Building Fee Pot, Water Con. Fee " Meter Size Add'l Pot. Water Con. Fee Reel. Water Con. Fee $7,108:83 Meter Size • • ..'•'• ' •. •' ,:. • $0.00 Add'l Reel. Water Con-. Fee,'. $4,620.74 Meter Fee ' $0.00 SDCWAFee $0.00 CFD Payoff Fee .$630.37 ' PFF(310'5540).,- .. $19,001.60 PFF (4305540) "'.••-' $0.00 License Tax (3,104193) ...-/ • $0.00 License Tax (4304193) • '^ , $0.00 Traffic Impact Fee (310554t)' '.$0.00 • ' Traffic Impact Fee (4305541) $0.00 PLUMBING, TOTAL -."'."- . :. $0.00 . ELECTRICAL TOTAL -' $0.00' "• MECHANICAL TOTAL •' '$13,550.00 ~ Master Drainage Fee ' "O1.5 • Sewer Fee $0.00 Redev Parking Fee $0.00 Additional Fees . . -' HMPFee TOTAL PERMIT FEES $0.00 $420.00 '• $12,939.00 •A $0.00 ;'$54,632.36 ,'•: ' $0.00' -; $0.00 $0.00 .••••$6,664.00 $0.00 ' $322.00 ; $810.00 '•"•• $78.00 :.•.: . $0.00 :.; $17,518.00 $0.00 $0.00 $0.00 $138,294.90 Total Fees:$138,294.90 Total Payments To Date: $138,294.90 Balance Due:$0.00 Inspector: FINAL APPROVAL Date:Clearance: NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY, to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute.of limitations has previously otherwise expired.