HomeMy WebLinkAbout2555 EL CAMINO REAL; ; CB100216; PermitCity o Carlsbad
1636 Faraday Av Carlsbad, CA 92008
03-25-2010 Commercial/Industrial Permit Permit No: CB100216
Building Inspection Request Line (760) 602-2725
Job Address:
2555 EL CAMINO REAL CBAD
Permit Type:
TI
Sub Type: COMM
Parcel No:
1563021000
Lot #: 0
Status:
Valuation:
$3,743,530.00
Construction Type: NEW
Applied:
Occupancy Group:
Reference #:
Entered By:
Project Title:
JC PENNY: 106,958SF
INTERIOR
Plan Approved:
REMODEL
Issued:
Inspect Area:
Plan Check#:
Applicant:
Owner: -
DAN HARRIS
NEW MARJORAMASSOCIATES
17992 MITCHELL SOUTH
C/O JCPE,NNY CO
INC #566-0
IRVINE
P 0 BOX.'10001
CA 92614
DALLAS,TX 75301
949-268-8150
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Recl. Water Con. Fee
Green Bldg Stands (SB1473). Fee
Fire Expedited Plan Review
$9,270.89 Meter Size
ISSUED
02/04/2010
JMA
03/25/2010
03/25/2010
$0.00
Add'] Recl: Water Con. Fee
$0.00
$6,026.08
Meter Fee
$0.00
$0.00
SDCWA Fee
$0.00
$0.00
CFD Payoff Fee _
$0.00
$786,14
PFF (310554.0)
$0.00
$0.00
PFF (4305540)
$0.00
$0.00
License Tax (3104193)
$0.00
$0.00
License Tax (4304193)
$0.00
$0.00
Traffic Impact Fee (3105541.)
$0.00
$0.00
Traffic Impact Fee (430554T)
$0.00
'$0,.00
PLUMBING -TOTAL
$27.00
I ; $0.00._
ELECTRICALTOTAL
$20.00
$0,00 ,
MECHANICAL TOTAL
$37.50
$0.00
Master Drainage Fee
$0.00
Sewer Fee -
$0.00
$0.00
'Redev Parking Fee
$0.00
$0.00,-'
': , ,,Additionat'Fees
$0.00
$148.00
'HMP Fee
??
TOTAL PERMIT FEES
$16,315.61
Total Fees: $16,316.61 Total Payments To Date: $16,31Z.61 Balance Due: $0.00
FINAL APM
Inspector:AWDate: ' Clearance:
NOTICE: Please take Nd) `ICE tFiat approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030, Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or -other similar application processing or service -fees in connection with this project. NOR DOES IT APPLY to any
:c.Z>
V CITY OF
Plan Check No. 00 Zip
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008 Est. Value 3 ? t+'9 53d
760 602-2717 / 2718 / 2719
-yen 1n 1 o. 0 Plan C!k_ DennSit
CARLSR
www.carlsbadca.isov
AD I vvv r arlsbad c� 9,o
Datei
,
J0,4 "15 �1 `.G m W q
/� ✓�
�-hh✓✓
SUITE#/SPACE#/UNIT#
APN
CT/PROJECT #__yyJJ♦`
LOT #
PHASE # # OF UNITS
T BEDROOMS
# BATHROOMS
TENANT BUSINESS NAME
G einptev
CONSTR. TYPE
2 /V
OCC.-GROUP
are Feet of ct Ares(s)
DESCRIPTION OF WORK: Inclurev
T triN 1 8
5,;
USE
EXISR.+.,
PRO ED SE
fYES
GARAGE (SF)
PATIOS (SF)
DECKS (SF)
FIREPLACE
❑ #_ N
AIR CON-DjTIONING
YES Jj°�I NO ❑
FIRE SPRINKLERS
YES NO O
CONTACTNAME (if Different FomApplicant)
'pa t✓1 �i I(✓1
APPLICANT NAME
ADDELPSL. 1
/1 { •,`y to
ADDRESS
CITY STAT ZIP
CITY
STATE
ZIP
PHON _
I/A..�
FAX
..4114
PHONE
FAX
EMAIL .•�*
C. ele 1 1 W
EMAIL
PROPERTY OWNER NAME N I/ s
r 11 •
CONTRACTOR BUS. NAME �(" C
„�s is
ADDRESS
ADDRESS
;4z . c e,lr{ g--Ave,
STATE ZIP
G ✓� 4
CITY 1
NA
STYE
G
—ZIP
PHONE `i1 5 !I '� � /
�T
F9 -7:—5'3 `i ...
!
jeim
N
PH+7j�'I - 4q r 1 . / 7
1
F
EMAIL
�Giark 3ctlek,he . Gok*1
EMAIL 1
,�ta,�✓1,
•
6t
t
e✓5t✓ C1- GOP"
RCH/DESIGNER NAME & ADDRESS
STATE LIC. #
ATE LIC.#
CLAS
"BUS. uc.#
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish oc repair any structure, pnor to Its Issuance, ansorequrFes the
applicant for such Per
to file a si ned statement that he Is licensed pursuant to the,provisions of the Contractor's License Law (Chappter 9, commending with Section 7000 of Diviston 3 of the
Business and Professions Code) or t�rat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 031.5 by any applicant for a permit subjects the applicant to a
civil penalty of not more than five hundred dollars ($500}).
Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations:
❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which thispermitis issued. My workers' compensation insura ecamer and policy
number are: Insurance Co. L_t I�(ta'k'� i'Auxu^L, Policy No: W -% _�, )— Ie L09 Expiration Date 10
This section need not be completed if the permit is for one hundred dollars (a100) or less.
❑ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers'Compensation Laws of
California. WARNING: Failure to securq w rkers' co nsation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in
addition to the cost of compensation, da es as proved for in Sect4 3706 of the Labor code, interest and attorney's fees.
,ea CONTRACTOR SIGNATURE
DATE -3 f 2_�5 1 I
I hereby affirm that 1 am exempt from Contractor's License Law for the following reason:
O 1, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offeredlor
sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale).
O I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The -Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law).
I am exempt under Section Business and Professions Code for this reason:
1.1 personally plan -to provide the major labor and materials for construction of the proposed property improvement. O Yes 'O No
2.1(have / have not) signed an application for a building permit for -the proposed work.
3.1 have contracted with the following person (firm)'to provide the proposed construction {include name address / phone / contractors' license number):
4. I.plan to provide portions of the work, but I have hired the following person to'coordinale, supervise and provide the major work (include name I address I phone / contractors' license number):
5.1 will provide some of the work, but I have contracted jhired) the.following persons to provide the work indicated (include name / address / phone / type of work):
.ESPROPERTY OWNER SIGNATURE
❑ AGENT DATE
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the
Presley -Tanner Hazardous Substance Account Act? O Yes O No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? O Yes O No
Is the facility to be constructed within 1,000-feet of the outer boundary of a school site? O Yes O No
IF -ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name
Lender's Address
I certifythat I have read the application and statethatthe above infomration iscorrectand thattbe information on the plans is accurate.I agreetocomplywith all Cityordinances and State laws relatingto building construction.
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes.) ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT,
OSHA: An OSHA permit is required for excavations over SO' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION --Every permit issued by the Building Official underthelprovisiqns of this Code shall expire by limitation and become null and void I the building or work authorized by such permit is not commenced within
180 days from the date of such permit or if the building or work u by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Cade).
APPLICANT'S SIGNATURE DATE
U
Inspection List
Permit#: CB100216 Type: TI COMM JC PENNY: 106,958SF INTERIOR
REMODEL
Date Inspection Item _
Inspector
Act
Comments
10/18/2010 89
Final Combo
-
RI
A M PLEASE
10/15/2010 89
Final Combo
-
RI
MAY BE DONE THURSDAY
10/15/2010 89
Final Combo
PY
AP
10/14/2010 89
Final Combo
-
RI,
A.M. PLEASE
10/14/2010 89
Final Combo
PY
CA
10/13/2010 89
Final Combo
-
RI
after 11 am please
10/13/2010 89
Final Combo
PY
CA
08/31/2010 84
Rough Combo
PY
AP
T-BAR
08/26/2010 17
Interior Lath/Drywall
PY
AP
08/25/2010 14
Frame/Steel/Bolting/Weldin
PY
AP
08/25/2010 24
Rough/Topout
PY
AP
NEW OPTICAL AREA
08/25/2010 34
Rough Electric
PY
AP
08/24/2010 24
Rough/Topout
PY
CA
RESCHEDULE FOR WEDNESDAY
08/23/2010 31
Underground/Conduit-Wirin
PY
AP
08/20/201A 31
Underground/Conduit-Wirin
PY
CA
RESCH FOR MONDAY
08/12/2010 14
Frame/Steel/Bolting/Weldin
PY
AP
FRAME @ OPTOMISTRIST
08/05/2010 17
Interior Lath/Drywall
PY
AP
08/04/2010 14
Frame/Steel/Bolting/Weldin
PY
AP
PHASE 10 1 ST FLOOR
07/28/2010 17
Interior Lath/Drywall
PY
AP
PHASE 10 2ND FLOOR
07/26/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
PHASE 10 2ND FLOOR
07/26/2010 17,
Interior Lath/Drywall
PY
PA
PHASE 9 1 ST AND 2ND FLOORS
07/23/2010 17
Interior Lath/Drywall
PY
CA
RESCHEDULE FOR MON 7-26.
07/22/2010 14
Frame/Steel/Bolting/Weldin
PY
AP
1ST FLOOR PHASE 9 2ND FLOOR
PHASE 10
07/21/2010 1.7'
Interior Lath/Drywall
PY
AP
PHASE NINE
07/20/2010 14
Frame/Steel/Bolting/Weldin
PY.
AP
PHASE NINE 2ND FLOOR
07/13/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
WALLS @ ESCALATOR
07/06/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
T-BAR @ 2ND FLOOR FITTING ROOM
07/08/2010 17
Interior Lath/Drywall
PY
PA
1ST FLOOR
07/07/2010' 14
Frame/Steel/Bolting/Weldin
TP
AP
WALLS PHS. 7, CLNG PHS 5 1ST FLR
07/07/2010 24
Rough/Topout
TP
WC
07/07/2010 34
Rough Electric
TP
AP
07/07/2010 44
Rough/Ducts/Dampers
TP
WC
07/06/2010 17
Interior Lath/Drywall
PY
PA
2ND FLOOR HAND BAG
07/01/201014
Frame/Steel/Bolting/Weldin
PY
AP
06/30/2010 17
Interior Lath/Drywall
PY
PA
1ST FLOOR FITTING ROOMS
06/28/2010 17
Interior Lath/Drywall
PY
PA
FITTING ROOMS
06/28/2010 84
Rough Combo
-PY
AP
FITTING ROOM @ 1ST FLOOR
06/24/2010 17
Interior Lath/Drywall
PY
PA
06/22/201014
Frame/Steel/Bolting/Weldin
PY
PA
06/22/2010 17
Interior Lath/Drywall
PY
PA
06/17/201-0 14
Frame/Steel/Bolting/Weldin
PY
PA
PHASE 9
06/17/2010 17
Interior Lath/Drywall
PY
PA
PHASE12
Q6/16/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
PHASE 12 UPPER FLOOR
Monday, October 18,
201.0
Page 1 of 2
06/14/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
SEPHORA RACKS
06/14/2010 17
Interior Lath/Drywall
PY
PA
PHASE 5 2ND FLOOR
06/10/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
PHASE 5 SECOND FLOOR
05/27/2010 17
Interior Lath/Drywall
PY
AP
JEWELRY WALL & PHASE 5 2ND FLOOR
05/26/2010 14
Frame/Steel/Bolting/Weldin
PY
AP
2ND FLOOR @ ESCALATOR AND WING
WALL
05/21/2010 17
Interior Lath/Drywall
PY
AP
05/20/2010 84
Rough Combo
PY
AP
PHASE 6 2ND FLOOR
05/19/2010 17
Interior Lath/Drywall
PY
PA
2ND FLOOR
05/18/2010 84
Rough Combo
PY
AP
2ND PHASE 13
05/17/2010 17
Interior Lath/Drywall
PY
AP
1ST FLOOR PHASE 4
05/13/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
1 ST FLOOR T-WALL
05/12/2010 17
Interior Lath/Drywall
PY
AP
1ST FLOOR FITTING ROOM PHASE 2
05/11/2010 84
Rough Combo
PY
AP
1ST FLOOR PHASE 2 FITTING ROOM
05/04/2010 17
:Interior Lath/Drywall
TP
AP
FITTING ROOM @ 2ND FLR
04/29/2010 14
Frame/Steel/Bolting/Weldin
PY
AP
WALL FRAMING & FITTING ROOM @
2ND FLOOR
04/27/2010 84
Rough Combo
PY
PA
T-BAR @ FITTING ROOM 1ST FLR
04/26/2010 17
Interior Lath/Drywall
PY
PA
1ST & 2ND FLOOR
04/22/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
T-BAR & WALL
04/22/2010 84
Rough Combo
PY
PA
04/21/2010 17
Interior Lath/Drywall
PY
AP
1ST FLOOR FITTING ROOM
04/19/2010 17
Interior Lath/Drywall
PY
PA
04/15/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
1ST FLOOR DRESSING ROOMS & WALL
AT STORE FRONT
04/1-2/2010 17
Interior Lath/Drywall
PY
AP
2ND FLR 1 ST PHASE
04/08/2010 14
Frame/Steel/Bolting/Weldin
PY
AP
T-BAR PHASE ONE
04/07/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
PHASE ONE SECOND FLOOR
04/07/2010 34
Rough Electric
PY
PA
03/31/2010 17
Interior Lath/Drywall
PY
PA
03/30/2010 31
Underground/Conduit-Wirin
PY
PA
PHASE ONE
03/29/2010 14
Frame/Steel/Bolting/Weldin
PY
PA
PHASE ONE 1ST FLOOR WALL
03/29/2010 31
Underground/Conduit-Wirin
PY
NR
Monday, October 18, 2010 Page 2 of 2
City of Carlsbad Bldg, Inspection Request
�a For: 10/15/2010
Permit# CB100216
Title: JC PENNY: 106,958SF INTERIOR
Description: REMODEL
Type: TI
Sub Type: COMM
Job Address: 2656 EL CAMINO REAL
Suite: Lot: 0
Location:
APPLICANT DAN HARRIS
Owner: NEW MARJORAM ASSOCIATES
Remarks: MAY BE DONE THURSDAY
Total Time:
CD
Description
Act
19
Final Structural
29
Final Plumbing
39
Final Electrical
49
Final Mechanical
Comments
Comments/Notices/Molds
Associated PCRs/CVs/S-WPPPs Original PC#
CV010595 CLOSED DELINQUINT BIZ LICENSE,
Inspection History
,Date
Description
10/13/2010
89 Final Combo
08/31/2010
84 Rough Combo
08/26/2010
17 Interior-Lath/Drywall
08/25/2010
14 Frame/Steel/BoltingMelding
08/25/2010
24 Rough/Topout
08/25/2010
34 Rough Electric
08/24/2010
24 Rough/Topout
08/23/2010
31 Underground/Conduit-Wiring
08/20/2010
31 Underground/Conduit-Wiring
08/12/2010
14 Frame/Steel/Bolting/Welding
08/05/2010
17 Interior Lath/Drywall
08/04/2010
14 Frame/Steel/Bolting/Welding
07/28/2010
1-7 Interior Lath/Drywall
Inspector Assignment: PY
Phone: 7143297932
Inspector:
Requested By: GREG
Entered By: CHRISTINE
Act Insp Comments
CA PY
AP PY T-BAR
AP PY
AP PY
AP PY NEW OPTICAL AREA
AP PY
CA 'PY RESCHEDULE FOR WEDNESDAY
AP PY
CA PY RESCH FOR MONDAY
AP PY FRAME @ OPTOMISTRIST
AP PY
AP PY PHASE 10 1 ST FLOOR
AP PY PHASE 10 2ND FLOOR
EsGil Corporation
In Partnership with Government for Buifding Safety
DATE: MARCH 10, 2010
JURISDICTION: CARLSBAD
- PLAN CHECK NO.: 10-0216 SET: II
PROJECT ADDRESS: 2555 EL CAMINO REAL
AWe CANT
JURIS.
❑ PLAN REVIEWER
❑ FILE
PROJECT NAME: JC PENNEY STORE # 0566 INTERIOR REMODEL
❑ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
❑ The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
❑ The applicant's copy of the check list -is enclosed for the jurisdiction to forward to the applicant
contact person.
® The applicant's copy of the check list has been sent to:
KTGY 17922 FITCH IRVINE, CA 92614
Esgil Corporation staff did. not advise the applicant that the plan check has been completed.
® Esgil Corporation staff did advise the applicant that the plan check has been completed.
.Person contacted:T Y (Mike Flynn)
Date contacted td /4( dm)-
MailV-17relephone Faxv/ln Person
❑ REMARKS:
By: ALI SADRE
EsGil Corporation
0 GA ❑ EJ ❑ PC 3/4
Enclosures:
Telephone #: 949-851-2133
Fax #: 949-851-5156
0320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
NOTE: The items listed below are from the previous, correction list. These
remaining items have not been adequately addressed. The numbers of the items
are from the previous check list and may not necessarily be in sequence. The
notes in bold font are current.
Please make all corrections, as -requested in the correction list. Submit three new
complete sets of plans for commercial/industrial projects (two sets of plans for
residential projects). For expeditious processing, corrected sets can be submitted
in one of two ways:
1. Deliver all corrected sets of plans and, calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday. Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire. Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320-Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560A468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted, directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
• PLANS
1. A reminder that all revised plans shall be signed .by the California state licensed
engineer or architect. Please include the California license number, seal, date of
license expiration and date plans are signed. California Business and
Professions Code. Many sheets are still not signed and sealed.
• ADDITIONAL
20. Please see attached for P/M/E & HC items.
,,21. To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e.,, plan, sheet, note or detail number, .
-calculation page, etc.
22. Please indicate here if any changes have, been made to the plans that are not a
result of corrections from this list. If there are other changes, please briefly
describe them and where they are located in the plans.
Have changes been made to the plans not resulting from this correction
list? Please indicate: ❑ Yes ❑ No
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 02123; telephone number of 858/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact ALI SADRE at Esgil Corporation. Thank you.
PLUMBING AND MECHANICAL CORRECTIONS
♦ JURISDICTION: Carlsbad
DATE: 3/9/10
♦ PLAN REVIEW NUMBER: 100216 SET: II
PLAN REVIEWER: Glen Adamek
The -final set of -corrected drawings to -be reviewed for signing and sealing just
before the permits -are to be issued. Each sheet of the plans must be signed by
the person responsible for their preparation, even though there are no structural
changes, before the permits are issued. Business and Professions Code. Many
sheets are still not signed and sealed: And no plumbing drawing and
calculations provided.
4. The Fire Department must review the drawings for the proposed construction.
The Building Official to check for Fire Department's approval.
8. A complete plumbing and mechanical plan review will be done when complete
corrected drawings -are provided showing all proposed plumbing and mechanical
changes and complete energy designs for the provided changes are provided.
The response states: "No change" in plumbing. But the Architecture
Drawings clearly show plumbing changes. Please correct. (See following
item #9.) Also, the drawings do not clearly show the clothe washer and
dryer in the Salon Dispensary Room (relocated, existing, and/or new).
PLUMBING (2006 UNIFORM PLUMBING CODE)
9. Please provide plumbing drawings to show all proposed changes to the existing
plumbing systems. The response states: "No change" in plumbing. But the
Architecture Drawings clearly show plumbing changes. Please correct the
following:
A) Sheets D101=C, A101-C & A401--C clearly shows: "Abandoned toilet
use for storage." The room has two water closets and two
lavatories.
B) Sheet D1.02-D Keynote #22C seems to show the Shampoo basins in
the Salon are shown to be replaced.
C) Sheet D102-D Keynote #22D and- sheet A102-D Keynote #27 calls for
the sink in the -Salon Dispensary to be replaced.
113. Provide calculations to show compliance with UPC Section 412.0 & Table 4-1,
(Minimum Plumbing Facilities). Sheets D101-C, A101-C & A401-C clearly
shows.: "Abandoned toilet use for storage." The room has two water
closets and two lavatories. Please provide data to show the number of
plumbing fixtures are allowed to be reduced (the remaining number of
plumbing fixtures still comply with the required minimum required fixtures.
19. Provide the following information concerning the -existing and/or new water
heaters: No response provided and no data on the .existing water heaters
provided.
a) Show the existing and/or new water heater sizes,_ types and locations on
plans. UPC 501.0
b) Show that water heater is adequately braced, to resist seismic forces.
Provide two straps. One strap at top 1/3 of -the tank and one strap at
bottom 1/3 of the tank. UPC 50&.2
MECHANICAL (2006 UNIFORM MECHANICAL CODE)
25. Please provide the MECH-3-C forms showing the required mechanical ventilation
rates for the new or revised conditioned spaces. Coordinate the mechanical and
the Title 24 outside air design. CIVIC 403.0 & Title 24 121(b)2 & (d). The MECH-
3=C form used to provide the ventilation requirements from the CIVIC for
each separate room must show each separate room or area, not just the
total building. Please correct MECH-3-C form on sheet M103.
26. Provide the exhaust and make-up air design for the occupancy type listed in
Table 4.4. UMC 403.7 The sheet M102-D does not show the required
minimum 108 cfm of exhaust from the Salon Dispensary Room. Please
correct.
27. On the mechanical plans clearly show the limits of ceiling space used as duct or
plenum. The drawings do not clearly show the limits of the ceiling space
being used as a return air plenum. Please correct. Then address the
following on the plans:
C) Exhaust ducts under positive pressure and venting systems shall not
extend into or pass through ducts or plenums. UMC Section 602.1..
Please address the exhaust fan ducts over the Salon Areas.
D) Clothes -dryer moisture -exhaust ducts shall not extend into or through
ducts or plenums. UMC Section 504.3.1. The drawings do not clearly
show the clothe washer and dryer in the Salon Dispensary Room
(relocated, existing, and/or new).
E) 'Environmental and/or product=conveying duct systems shall not extend
into or through ducts or plenums. UMC Sections 504.1 (Environment) &
505.1 (Product conveying). Please address the exhaust fan ducts over
the Salon Areas and the clothe dryer in the Salon Dispensary Room
(relocated, existing, and/or new). -
28. Detail exhaust ventilation system compliance with UMC Chapters 5 & 6.Please
address the new and/or revised ventilation systems for the Salon areas.
A) Detail the required make-up air as per UMC 505.3
,.VI
B) Detail the exhaust outlet clearances as per UMC 504.5 (Environmental) &
506.9 (Product conveying).
C) Clearly show the exhaust duct material and- gage used for each duct size.
UMC Tables 5-5 and/or 5-6
D) Detail duct support as per UMC 506.5 & 6040.5
Note: If you have any questions regarding this Plumbing and Mechanical plan review
list please contact Glen Adamek at (858) -560-1468. To speed the review process, note
on this list (or a copy) where the corrected items have been addressed on the plans.
EsGil Corporation
In eartnersUp witk Government for (Building Safety
DATE: FEB. 16, 2010 ❑AF'-RLLCANT
M JURIS
JURISDICTION: CARLSBAD O .PLAN REVIEWER
❑ FILE
PLAN CHECK NO.: 10-0216 SET: I
PROJECT ADDRESS: 2555 EL CAMINO REAL
PROJECT NAME: JC PENNEY STORE # 0566 INTERIOR REMODEL
❑ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
❑ The.plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified below are resolved and checked by building department staff.
❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected. and resubmitted for a complete recheck.
Z The check list transmitted herewith, is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
® The applicant's copy of the check list has been sent.to:
KTGY 17922 FITCH IRVINE, CA 92614
❑ Esgil Corporation staff did not advise the applicant that the plan check has been completed.
® Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: KTGY 0A I i4e ) -4, Telephone #: 949-851-2133
Date contacted: 211$1 bo (by: r-- ) Fax #: Lt 9_
Mail Telephone ✓ Fax ✓In Person,
❑ REMARKS:
By: ALI SADRE Enclosures:
EsGil Corporation
®GA. ®EJ ❑PC 218
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
CARLSBAD 10-0216
FEB. 16, 2010
PLAN REVIEW CORRECTION LIST
TENANT IMPROVEMENTS
PLAN CHECK'NO.: 10-0216
OCCUPANCY: M/B/S1
(TYPE OF CONSTRUCTION: II-B
I ALLOWABLEFLOOR AREA: Unlimited
SPRINKLERS?: Y
REMARKS:
DATE PLANS RECEIVED BY
JURISDICTION: 2/4
DATE INITIAL PLAN REVIEW
COMPLETED: FEB. 16, 2010
FOREWORD (PLEASE READ):
JURISDICTION: CARLSBAD
USE: RETAIL
ACTUAL AREA: 106,958 remodeling area
STORIES: Two
HEIGHT: 30'
OCCUPANT LOAD: 3,000
DATE PLANS RECEIVED BY
ESGIL CORPORATION: 2/8
PLAN REVIEWER: ALI SADRE
This plan review is .limited to the technical requirements contained in the International Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinances enforced by the Planning Department, Engineering
Department, Fire Department or other departments. _Clearance from.those departments may be
required prior to the issuance of a building permit.
Code sections cited, are based on the 2007 CBC, which adopts the 2006 IBC.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of
the 2006 International Building Code, the approval. of the plans does not permit the violation of
any state, county or city law.
e - GENERAL
1. The following note should be given with each correction list:
Please make all corrections, as requested in the correction list. Submit
three new complete sets of plans for commercialAndustrial projects (two sets of
plans for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
1. Deliver all corrected sets of plans and calculations/reports directly to the City of
Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760)
602-2700. The City will route the plans to EsGil Corporation and the Carlsbad
Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculations/reports to EsGil Corporation,
9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468.
Deliver all remaining sets of plans and calculations/reports directly to the City of
Carlsbad Building Department for routing to their Planning, Engineering and Fire
Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not be
reviewed by the City Planning, Engineering and Fire Departments until review by
EsGil Corporation is complete.
e PLANS
1. A reminder that all revised* plans shall be signed by the California state licensed
engineer or architect. Please include the California license number, seal, date of
license expiration and date plans are signed. - California Business and
Professions Code.
2. Include the following code information for the proposed remodel on the Title
Sheet: Revise the notes on Sheet A000 accordingly:
♦ Occupancy Classification(s): B (Office/ Misc.)/ S1 (Storage)/M (Retail)
♦ Description of Use: As per above
♦ Type of Construction: II-B
♦ Sprinklers: Yes
♦ Stories: Two
♦ i1ei ht: 35'
♦ F/oorArea: -1st Fir. = 78,760; 2"d Fir. = 72,060; Remodel Area: 15t = 51,655; 2"d = 65,003
♦ Occupant Load: 3,000
e SITE PLAN -
3. Please note.on plans that all site items including parking, curb ramps, walks, etc.
are existing -accessible subject to field: verification. Section A1.06.1 A.
e EXITS
4. The plans shall designate the number of occupants to be accommodated on
every floor, and in all rooms and spaces: Section Al06.1.2.
5. Please provide an exit analysis plan (may be 8 1/2" x 11" or any convenient
size). Show in this analysis the occupant load of each area, the general exit flow
patterns (by using arrows), accumulated occupant loads and required exit widths.
Section Al06.1.2. Show the number of exits and'their separation are adequate
as -presented. Sheets A101 & A102.,
6. Regardless of -occupant load, a floor or landing not more than Y2 inch below the
threshold is required on each side of an egress door. Section 1008.1.4.
7. Note_ on the plans: "All egress doors shall be readily openable from the egress
side without the use of a key or special knowledge or effort." Section 1008.1.8.
In lieu of the above, in a Group B, M or S occupancies, you may note on the
plans Provide a sign on -'or near the exit door, reading THIS DOOR TO REMAIN
UNLOCKED WHEN BUILDING IS OCCUPIED." This signage is only allowed at
the main exit.
• EXIT SIGNS
8. Exit signs are required whenever two exits are required. Show all required exit
sign locations. Section 1011.1.
9. A tactile sign stating "EXIT" and complying with ICC A117.1 shall be provided
adjacent to each door to an egress.stairway, an exit passageway and the exit
discharge. Section 1011.3. i
10. ' Show two sources of power for the lamps at exit signs. Section 1011.5.3.
11. Show that the means of egress path will be lighted with at least one foot candle
at floor level. Section 1006.
12. Show separate sources of power may be required for exit illumination. Review
Section 1006.3.
MISCELLANEOUS LIFE/SAFETY
13. Please provide notes on the .plans to show the suspended ceilings in Seismic
Design Categories D, E & F comply with: ASCE 7-05 Section 13.5.6.2.1 as
follows:
a) All ceilings shall use a Heavy Duty T-bar grid system.
b) The width of the perimeter supporting closure angle shall be not less than 2 inches.
c) In each orthogonal horizontal direction, one end of the ceiling grid shall be attached to the
closure angle.
d) The other end in each horizontal direction shall have a'/" clearance from the wall and
shall rest upon and be free to slide on a closure angle or a listed assembly.
e) Ceiling areas over 1,000 ft.2 must have horizontal restraint wires (typically restraint would
consist of four 12 gauge wires splayed 90° to each other and sloped 450 to the horizontal,
spaced 12" o.c.).
f) Ceiling areas over 2500 ft.2 must,have seismic separation joints or full height partitions.
g) Ceilings without rigid bracing must have 2" oversize trim rings for sprinklers and other
ceiling penetrations.
14. Please .note on plans that any storage/ racks and shelving over 8' including their
plans, calculations and anchorage will be under a separate permit.
15. Please show method attachment for the interior non -bearing partitions to the
floor and ceiling (for full height partitions),. E.g., see detail 6/A601, etc.
16. Please include expansion anchors, epoxy anchors, wedge anchors, or shot pins
size, spacing, ICC approval # and embedment on plans. This applies to the non -
bearing partitions or steel tube attachment(s) to the floor and/or ceilings on
plans. Please see details on 6/A601, etc.
17. . Please show the tubes base plate size, thickness and connections with weld size
and type. as well as plate to floor anchorage details, .i.e,, bolts size, number,
layout and embedment on plans as per=6A/A601.
18. Please note on plans that all the interior facilities are HC accessible to remain
including stairs, elevators, fitting rooms, restrooms, etc.
19. Please see attached HC list for remaining items to be addressed on plans.
• ADDITIONAL
20. Please see attached for P/M/E & _HC items..
21. To speed up the review process, note on this list (or a copy) where each
correction item has been addressed, i.e.; plan sheet, note or detail number,
calculation page, etc.
22. Please indicate here if any changes have been made to the plans that are not a
result of corrections from, this list. If there are other changes, please briefly
describe them and where they are located in the. plans.
Have changes been made to the plans not resulting from this correction
list? Please indicate: ❑ Yes - Q No-
23. The jurisdiction has contracted with Esgil Corporation located at 9320
Chesapeake Drive, Suite 208, San Diego, California 921.23; telephone number of
858/560-1468, to perform the plan review for your project. If you have any
questions regarding these plan review items, please contact ALI SADRE at Esgil .
Corporation. Thank you.
PLUMBING AND MECHANICAL CORRECTIONS
♦ JURISDICTION: Carlsbad
DATE: 2/10/10
PLAN REVIEW NUMBER: 100216 SET: 1
PLAN REVIEWER: Glen Adamek
1. The final set of corrected drawings to be reviewed for signing and sealing iust
before the permits are to be issued. Each sheet of the plans must be signed by
the person responsible for their preparation, even though there are no structural
changes, before the permits are issued. Business and Professions Code.
2. Please provide statements on the Title Sheet of the plans to show compliance
with the current -Codes, as of the first day of 2010. The following are the correct
current Codes:
a). The 2007 edition of the California Building Code (CBC) adopts the 2006 International
Building Code (IBC) and the 2007 California Amendments.
b) The 2007 edition of -the California Electrical Code (CEC) adopts the 2005 National
Electrical Code (NEC) and the 2007 California Amendments.
c) The 2007 edition of the California Mechanical Code (.CMC) adopts the 2006-Uniform
Mechanical Code (UMC), and the 2007 California Amendments.
d) The 2007 edition of the California Plumbing Code (CPC) adopts the 2006 Uniform
Plumbing Code (UPC) and the 2007 California Amendments.
e) The 2007 edition of the California Fire Code (CFC) adopts the 2006 International Fire
Code (IFC) and the 2007.California Amendments.
fi) The 2008 edition of the California Energy. Efficiency Standards.
3. Provide data on the proposed hazardous materials to be stored and used. CBC
414. Present the description of the hazardous materials in a format that
coincides with the material classifications found in CBC Tables 307.1(1) and
307.1(2).
a) Clearly show the types of hazardous materials being stored or used. Provide a list of the
proposed hazardous_ materials; include the material safety data sheets (MSDS), if
applicable.
b) Clearly show the amounts for each type of hazardous material to be stored and in use.
c) Clearly show the locations in the building where each type of hazardous material is being
stored or used.
d) Note: If hazardous materials are present in any amount, forward this information to the
mechanical designer for design compliance with CMC Chapter 5.
4. The Fire Department must review the drawings for the proposed construction.
The Building Official to check for Fire Department's approval.
5. Include, on the mechanical plans, the locations of all required smoke, fire,
combination smoke and fire, or, ceiling radiation dampers. Be sure to include a
symbol on the symbol schedule for each damper type. CBC 716
6. For mechanical plan check, include the architectural design detailing the
following: CBC, Section 71-6.5.
a) Fire Barriers
b). Shaft Enclosures
c) Fire Partitions
d) Corridors
e) Vertical Exit Enclosures (Stair & Ramp Enclosures)
If this tenant improvement contains any of the above assemblies, be sure to provide construction
details. For example: Rated corridor construction style -Tunnel VS Full height corridor walls.
7. - Please correct the drawings to show the required 42 inch tall "Guards" (guard
rails) as per CBC, Section 1013.5: "Where appliances, equipment, fans, roof
hatch openings or other components that require service are located within 10
feet of a roof edge or open side of a walking surface..."
8. A complete plumbing and mechanical plan review will be done when complete
corrected drawings are provided showing all proposed plumbing and mechanical
changes and complete energy designs for the provided changes are provided. ,
PLUMBING (2006 UNIFORM PLUMBING CODE)
9. Please provide plumbing drawings to show all proposed changes to the existing
plumbing systems.
10. Provide a plumbing material schedule on; the plans describing the following
systems: Potable water piping, the drain; waste, and vent piping, gas piping, and
the roof drains.
11. Provide gas line plans and calculations, showing gas pressures, piping types,
pipe lengths, gas demands and pipe sizing method used. UPC Section 1217.0.
12.. Include the gas piping sediment trap installed as close as possible to the
appliance inlet with the plumbing design., Exceptions: Appliances with an
internal sediment trap;(or) ranges, clothes dryers, gas fireplaces, and outdoor
grilles. UPC 1212.7.
'13. Provide calculations to show compliance with UPC Section 412.0 & Table 4-1,
(Minimum Plumbing Facilities)..
14. Provide calculations to show compliance with UPC Section 412.0 & Table 4-1,
(Minimum Plumbing Facilities).
15. New or relocated water closets and associated flushometer valves, if any, shall
use no more than 1.6 gallons per flush, UPC, Sections 402.1 & 402.2; and shall
meet performance standards, established by the American National Standards
Institute Standard Al12.19.2, H & S Code, Section 17921.3(b).
16. New or relocated urinals and associated flushometer, valves,. if any, shall use no
more than one gallon per flush, UPC, Section 402.1 & 402.3; and shall meet
performance standards established by the American National Standards Institute
Standard A1-12.1.9.2. H & S Code, Section 17921*.3(b).
17. All water closet seats, except -those within dwelling units, shall be of the open
front type or have an automatic seat cover dispenser:, as per UPC, Section
408.2.2. -
18. Hot water supplied to a public use lavatory oF any bath is limited to a
maximum temperature potential of 120 degrees. Detail how this temperature
limitation -is achieved. Note: The water heater thermostat may not be used for
compliance with this Code section. UPC 413.1 & UPC 414.
19. Provide the following information concerning the existing and/or new water
heaters:
a) Show the existing and/or new water heater sizes, types and locations on plans. UPC
501.0
b) Show that water heater is adequately braced to resist seismic forces. Provide two straps,
One strap at top 1/3 of the tank and one strap at bottom 1/3 of the tank. UPC 508.2
MECHANICAL (2006 UNIFORM MECHANICAL CODE)
20. Review with the architect the locations that require (fire/ceiling radiation/or
fire/smoke) damper and/or shaft protection and identify installations on the
mechanical plans themselves. See "Architectural PME" items above directly
below the PME list heading.
21. Provide complete mechanical plans showing existing and proposed .HVAC
equipment, ducts, and access -to all equipment.
22. Provide smoke detection in the supply air duct of an "air -moving system" for
required- shut-off of equipment for smoke control. UMC Section 609.0 An "air -
moving system" is a system designed to provide heating, cooling, or ventilation in
which one or more air -handling units are used to supply air to a common space
or to draw air from a common plenum or space. UMC Section 203.0
23. Buildings of more than 15' in height shall have an inside means of access that
meets the design requirements of UMC 904.10-.3.3. Please provide. City
-approval for use of an outside ladder is required:
24. Please detail roof access to roof mounted HVAC equipment. CIVIC 904.10.3.3.
25. Please provide the MECH-3-C forms showing the required mechanical ventilation
rates for the new or revised conditioned spaces.- Coordinate the mechanical and
the Title 24 outside air design. CIVIC 463.0 & Title 24 121(b)2 & (d).
26. Provide -the exhaust and make-up air design for the occupancy type listed in
Table 4.4. UMC 403.7
27. On the mechanical plans clearly show the limits of ceiling space used as duct or
plenum. Then address the following on the plans:
a) Clearly show that all material exposed within .the plenum complies with UMC Section
602.2 (10).& Section 605.0. "Materials shall have.a,mold-, humidity-, and erosion -
resistant face that meets the requirements of UL 181."
b) Clearly show"that all combustible materials exposed within the plenum space must
comply with UMC Section 602.2. Flame -spread index of not more than 25 and a smoke -
developed rating of not -more than 50.
c) Exhaust ducts under positive pressure and venting systems shall not extend into or pass
through ducts or plenums. UMC-Section 602.1.
d). Clothes -dryer moisture -exhaust ducts shall not extend into or through ducts or plenums.
,UMC Section 504.3.1.
e) Environmental and/or product -conveying duct systems shall not extend into or through
ducts or plenums. UMC Sections 504.1 (Environment) & 505.1 (Product conveying).
28- Detail exhaust ventilation system compliance with UMC Chapters 5 & 6.
'a) Detail the required make-up air as per UMC .505.3
b) Detail the exhaust outlet clearances'as ,per UMC 504.6 (Environmental) & 506.9 (Product
conveying).
c) Clearly show the exhaust duct material and gage used for each duct size. UMC Tables 5-
5 and/or 5-6
d) Detail duct support as per UMC 506.5 & 6040.5
e) Detail protection from physical damage as per UMC 506.8 & 604.4.
Note: If you have any questions regarding this Plumbing and Mechanical plan review
list please contact Glen Adamek'at (858) 560-1468. To speed the review process, note
on this list (or a copy) where the corrected items have been addressed on the plans.
ELECTRICAL and ENERGY COMMENTS
PLAN REVIEWER: Eric Jensen
ELECTRICAL (2005 NATIONAL, ELECTRICAL CODE)
1. How do I know which of the fixtures are connected to the generator system?
ENERGY CONSERVATION
2. Correct the LTG-2-C and LTG-1-C'to accurately reflect the correct wattages for
the newly installed lighting.
3. Describe, on the plans, the methods of providing bi4evel and complete building
shut off types of control.
Note: If you have any questions regarding this Electrical .and Energy plan review list
please contact Eric Jensen at (858) 560-1468. To speed the review process, note on
this list (or a copy) where the corrected .items have been addressed on the plans.
DISABLED ACCESS REVIEW LIST
DEPARTMENT OF STATE. ARCHITECT - TITLE 24
The following disabled access items are taken from the 2007 edition of California Building Code, Title 24. Per Section
109.1, all publicly and _privately funded public accommodations and commercial facilities shall be accessible to persons
with disabilities.
NOTE: All Figures and Tables referenced in this _checklist are printed in the California Building Code, Title 24. Please
imprint the following items on plans:
DOORS
1. Specify that every required passage door has >_32" clear width, per Section 1133B.2.
2. Show, or note, -that there is a level floor or landing on each side of all doors. The floor or landing is to be <_%"
lower than the doorway threshold, per Section 1133.2.4.1.
3. Show or note that all hand=activated door opening hardware meets the following requirements, per Section
1133B.2.5.2:
a) Latching, or locking, doors in a path of travel are operated with a single effort by lever type hardware,
by panic bars,,push-pull activating bars, or other hardware, designed to provide passage without
requiring, the ability to grasp the opening hardware.
b) Is to be centered >30" but s44" above floor.
4. Show or note that the maximum effort to operate doors shall not exceed 8-% pounds for exterior doors and 5,
pounds for interior doors, with such pull -or push effort being applied at right angles to hinged doors and at the
center -plane -of sliding or folding doors. When fire doors are utilized, the -maximum effort to operate the door
may be increased to not exceed 15 pounds. Section 1133B.2.5.
5. Show or note that the lower 10" of all doors comply with Section 1133B.2.6, as follows:
a) To be smooth and uninterrupted, to allow the door to be opened by a wheelchair footrest, without
creating a trap or hazardous condition.
b) Narrow frame doors may use a 10" high smooth panel on the push side of the door.
6. Show that the minimum strike edge distances are provided' at the level area on the side to which a door (or a
gate) swings, per Section 1. 1 33B.2.4.3:
a) >94" at exterior conditions.
b) >_18" at interior conditions.
c) �12" on the push side, if the -door has both a latch and a closer. Figure 11 B-26A.
d) Where a door is located in a recess or alcove where the distance from the face of the wall to the face
of the door is greater than 8 inches, the above clearances shall apply. Section 1133B.2.4.5.
GENERAL ACCESSIBILITY REQUIREMENTS
• DRINKING'FOUNTAINS A
• The following provisions apply if drinking fountains are indicated on the plans
7. Plans shall indicate that drinking fountains comply with Section 1115B.4.6 as either:
a) Located completely in an alcove, �:32" in width and >_18" in depth.
b) Positioned to not encroach -into accessible pedestriamways.
&. The drinking fountain shall be a minimum of 18 inches in depth and there shall be clear and unobstructed
knee space under the drinking fountain not less than 27 inches in height and 8 inches in depth, the depth
measurements being taken from the front edge of the fountain. Additionally, there shall be toe clearance of
9 inches in height above the floor and 17 inches in height above the floor and 17 inches in depth from the
front edge of the fountain. A side approach drinking fountain is not acceptable. Section 1115B.4.6.
9. Drinking fountains shall be accessible to -individuals who use wheelchairs and to those who have
difficulty bending or stooping. This can be accommodated by the use of. "hi=low" fountains. Section
1115B.4.6.
10. Note on the plans that the drinking fountain(s) will comply -with all applicable Title 24 provisions (bubbler height,
- etc.).
• CONTROLS AND OPERATING MECHANISMS
11. The highest and lowest operable parts of all controls, dispensers, receptacles and other operable equipment
- shall be placed within 48" of the floor but not -lower than 15" for forward approach (or within 54" but not lower
than 9" if side approached). Electrical and communication system receptacles on walls shall be mounted' no
less than 15" above the floor. Section 1117B.6.3.
12. Note on the plans that controls and operating mechanisms shall comply with the requirements of Section
1117B.6.
• SIGNAGE
13. Per Section 1011.8, tactile exit signs shall be required at the following locations:
A Wherever basic CBC provisions require exit signs from a room -or area to a corridor or hallway. The
tactile exit sign shall have the words, "EXIT ROUTE."
b) Each grade -level exit door. The tactile exit sign shall have the word, "EXIT."
c) Each exit door that leads directly to a grade -level exterior exit by means of a stairway or ramp. The
tactile exit sign shall have the following -words as appropriate:
i) "EXIT STAIR DOWN."
"EXIT RAMP DOWN:'
iii) "EXIT STAIR UP."
iv) "EXIT RAMP UP."
d) Each exit door that leads directly to a grade level exterior -exit by means of an exit enclosure or an exit
passageway. The tactile exit sign shall have the words, "EXIT ROUTE."
e) Each exit door through a horizontal exit. The tactile exit sign shall have the words, "TO EXIT."
14. Where permanent identification is provided for rooms and spaces, raised letters shall also be provided and
- , shall be accompanied by Braille. Section 111713.5.
15. Provide a note on the plans stating that the signage requirements of Section 111713.5 will be satisfied.
16. Tactile stair level identification signs (complying with Section 1117B.5.1) shall be located at each floor level
landing in all enclosed stairways in buildings two or more stories in height to identify the floor level. At the exit
discharge level, the sign shall include a raised five -pointed star located to the left of the identifying floor level.
Section 1020.1.6. -
• COUNTERS AND TABLES
17. Where fixed or built-in counters or tables are provided for the public, and in general employee areas, 5% (but
never less than one) must be accessible. Section 1122B.1.
18. The tops of tables and counters shall be 28" to 34" from'the floor. Where a single counter -contains more than
one transaction station, such as a retail sales counter with multiple cash register stations, at least 5% (but
never less than one of each type of station) shall be located at a section of counter that is at least 36" long and
no more than 28" to 34" high. Section 1122B.4.
19. Where counters are used for distribution of goods/services, or have -cash resisters, at least one of each type
shall have a portion of the counter, which is at least 36" in length with a maximum height of 34 inches. Section
1122B.5.
• GROUP M OCCUPANCIES
20. "Show -or note that the proposed general sales, display and office areas are accessible, per Section 11106.1,
as follows:
a) Work stations are located on accessible levels.
b) The customer side, of sales or checkout stations are accessible.
c) Employee work -areas are sized and arranged to provide access to employees in wheelchairs.
d) Checkstands shall provide:
i) A 36" aisle on the,customer side of the checkstand.
ii) Where quick checkstands are provided, Z1 shall be accessible.
iii) Where regular checkstands are provided, the number of accessible checkstands shall be as
follows, per table 11 B-2:
a) �1 but s4 regular total =1 accessible.
b) Z5 but :58 regular total = 2 accessible.
c) z9 but 515 regulartotal = 3 accessible.
d) >15 regular total = 3, + an additional 20%, accessible.
e) Accessible checkstands shall provide a clear check-out aisle width of 36" with an adjoining counter
538" above finished floor. Note that they will always be open and be identified by a sign clearly visible
to -those in wheelchairs.
f) All circulation aisles and ,pedestrian ways shall be sized according to functional requirements and z j
�:36" in clear width.
g) Per Section 1117B.8, z1 fitting room or dressing room -for male and female customers shall be
provided at each area.as follows:
i) Entry doors shall,provide:
a) >32" clearance.
b) �_>18" strike edge.
ii) The room dimension shall be >_60" in width and length. No door shall encroach into this
required space.
iii) Show a 24" x 48" bench:
a) Fixed along the wall at the 48" dimension.
b) Mounted >17" but 519".
h) All point -of -sale machines, used by customers for the primary purpose�of executing transactions
between the business entity -and the customer shall .comply with Section 111713.7 for ATM and point
of sale machines.
a. r
CARLSBAD 10-0216
FEB. 16, 2010
[DO NOT PAY— THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: CARLSBAD PLAN CHECK NO.: 10-0216
PREPARED BY: ALI SADRE DATE: FEB. 16, 2010
BUILDING ADDRESS: 2555 EL CAMINO REAL
BUILDING OCCUPANCY: M TYPE OF CONSTRUCTION: II-B
BUILDING
PORTION
AREA
( Sq. Ft.)
Valuation
Multiplier
Reg.
Mod.
VALUE ($)
Remodeling
106958
Air Conditioning
Fire Sprinklers
TOTAL VALUE
3,743,530
Jurisdiction Code - 'cb (By Ordinance I
Bldg. Permit Fee by Ordinance
Plan Check Fee by Ordinance T
Type of Review: CI Complete Review.
❑ Repetitive Fee
Repeats
Comments:
❑ Structural Only
❑ Other
❑ Hourly Hr. @
Es011 Fee
$9,270,891
$6,026.08
$5,191.70
Sheet 1 of 1
macvalue.doc +
PLANNING/ENGINEERING APPROVALS
PERMIT NUMBER CB 10-0216 DATE 2/5/10
ADDRESS 2555 El Camino Real
RESIDENTIAL ADDITION- POOLISPA
MINOR (07,000.00)
TENANT IMPROVEMENT
RETAINING WALL.
VILLAGE, FAIRE
OTHER Interior Remodel
PLAN
ENGIN
COMPLETE OFFICE BUILDING
NER Chris S DATE 2/5/10
EER(WzkV�-e-�DATE v /v
II:�AD6IIN�COUNTED JPLANNING/ENGINEEDING APPROVALS
Carlsbad Fire Department
Plan Review Requirements Category: TI , COMM
Date of Report: 03-04-2010
Name: DAN HARRIS
Address: 17992 MITCHELL. SOUTH
IRVINE
CA
92614
Permit #: CB 1002.16
Job Name: JC PENNY: 106,958SF INTERIOR
Job Address: 2555 EL CAMINO REAL CBAD
Reviewed by:
BLDG. DEPT Cod
-INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot
adequateiree.n4m—t-n rewje4v.4adataVUjUQcomDlianRg with the a licable codes and/or standards.. Please review
carefully all comments attached. Please resubmit the pans ith changes "clouded",
to this office for review and approval.
Conditions:
Cond: CON0003884
[NOT MET]
*** Bubble All Changes****
1. Add 2007 edition of California Fire Code.
2. Sheet GS 101 Add the following or similiar to Fire Departent or General Notes ares:
"(If required) Complete plans and specifications for fire alarm systems, fire extinguishing
systems, including automatic sprinklers and wet and dry standpipes; inert/halocarbon systems and
other special types of automatic fire protection systems and appurtenances thereto shall be
submitted to Carlsbad Fire Department for review and approval PRIOR to installation. (CFC 901.2)"
3. Provide egress plan. with occupant loads calculated for both floors.
4. Indicate whether or not storage configurations will change. If like for like exchange, just
indicate.
5. Show emergency egress lighting and exit signage in -relation to egress plan for both floors
seperate from other details.
Entry: 02/26/2010 By: cwong Action: CO
Cond: CON0003892
[MET]
71
3- ease cite -that exiting shall comply with CBC 402.4.3.1 *****
"APPROVED:
THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A
BUILDING PERMIT.
THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT
NOTATIONS,
CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND
REGULATIONS..
THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW.
Entry: 03/04/2010 By: cwong A, fion: AP
m 4_0 EaiyC� v
SAN DIEGO REGIONAL
acce HAZARDOUS MATERIALSQUESTIONNAIRE
OFFICE USE ONLY
UPFP#
HV#
BP DATE t d
Business Name
�C �'
Busines
ct
C
Telephone #
57
hv►
>nC..
OL
2
—17
Project Address i
� ity r Q State Zip
` 2
i 5.4p � 2 /oav
•Mailing Address
City State Zip Code
Plan File#
VVl
.
Project Contact
alrA0140.
C -$v; er5
Telephone #
1-15 7
i nu ruuuwmg-quesuons represent the racnity"s activines, wu t tut@ specitic project description.
PART'I: FIRE DEPARTMENT — HAZARDOUS MATERIALS -DIVISION: OCCUPANCY CLASSIFICATION: Indicate -by circling the item, whether your business
will use, process, or .store any of the following .hazardous materials. If any -of the items are circled, applicant must contact the Fire Protection Agency with
Jurisdiction prior to plan,submittal.
1. 'Explosive or Blasting Agents 5. Organic'Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards
& Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These.
4.-Flammable Solids 8. Unstable Reactives 12. Radioactives
Call (619)-338-2222 prior to the issuance of a building permit. occ-W, r /
FEES ARE REQUIRED. Expected Date of Occupancy:
YES 0
1. ❑ is - your business listed on the reverse side of this form? (check all that apply).
2. ❑ Will your business dispose of Hazardous Substances or Medical Waste in any amount?
3. ❑ Will your'business store or handle Hazardous Substances in quantities equal -to orgreater than
55.galions, 500 pounds, 200 cubic feet, or carcinogenstreproductive toxins in any quantity?
4. ❑ Will your business use an existing or install an underground storage tank?
'5. ❑ 0 Will your -business store or handle Regulated Substances.(CaIARP)?
-6. ❑ Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
If the answer to any of the
:go, CA 92101.
❑ CaIARP Exempt
Date Initials
❑ CaIARP Required
Date Initials
❑ CaIARP Complete
Date Initials
PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the questions below is yes, applicant must contact the Air
Pollution Control District (APCD), 10124 Old Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 prior to the issuance of a building or demolition
permit. Note: if the answer to questions 3 or 4 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 working days prior to
Commencing demolition or renovation, except- demolition or renovation of residential structures of four units or less. Contact the APCD for more information.
YES
i. ❑ Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the
APCD factsheet at h#tD:/lwwwsdancd.orQCnfo/facts/oermit_pdf, and the list of typical equipment requiring an APCD permit on the reverse side
of this from. Contact APCD if you have any questions).
2. ❑ ❑ (ANSWER ONLY 1F QUESTION 1 IS YES) Will the subject facility be located -within 1,000feet of the outer boundary of a school (K through 12)?
(Public and private schools may be found after search of the California School 'Directory at http://www.cde.ca.uov/-re/sd/,, or contact the
appropriate school district).
3. X ❑ Will there be renovation that involves handling of anyfdable asbestos materials, or disturbing any material that contains non -friable asbestos?
4. ❑ 'Will there be demolition involving -the removal of a load supporting structural member?
Briefly describe b siness activities: Briefly describe proposed project:
�2e-Fti, �
�clare under I of ry that to -the best of my knowledge and belief the responses made herein are -true and correct.
Name of owner Agent Signature of Owner or Authorized Agent Date
,FOR OFFICIAL USE ONLY:
FIRE.DEPARTMENT OCCUPANCY CLASSIFICATION:
.BY: DATE: I
EXEMPT OR NO FURTHER INFORMATION REQUIRED
RELEASED FOR BUILDING PERMIT BUT -NOT FOR OCCUPANCY
RELEASED FOR OCCUPANCY
COUNTY-HMD
APCD
COUNTY-HMD
APCD
COUNTY-HMD
APCD
Con
,\0 ro`
o\`
C
o(,D�ate Ire 1ts`v0
of at��
HM-9111 {04/07) 4,10" 2ato „ 11,9 County of San Diego— DEH•— Hazardous Materials Division
CB100216 2555 EL CAMINO REAL
JC PENNY: 106,958SF INTERIOR
REMODEL
4
br! !:v s�d�v�o cdvsr,�uc.
,51NCe- l/ae%e of 400
,51f 11da11( la, &Cat7IOW Cf&
I
3 (z l io - "To sco; C �-} , \vl�s�
FC
3► b l - PW � �sc1' L u i A
3-046 &VJ,�14
CV
Approved
Date
B
BUILDING
— zz-/ o
PLANNING
ENGINEERING
:,I/ (D /0
FIRE (J
( 0
HazMat
APCD
Health
Forms/Fees
Sent
Rec'd
Due?
By
Encina
Z. /Q
Z . I a
Y
N
Fire
Y
N
HazHealthAPCD
/0
Y
N
PE&M
ip
Y
N
School
Y
N
Sewer
Y
N
Stormwater
Y
N
Y
N
CFD: Y (5,
LandUse:
ImpArea: FY:
Factor:
PFF: Y N
Comments
Date
Date Date
Date
Building
,� 1 tp 1 f�
If3
Planning
Engineering
Fire
(C7
Need?
N
❑ Done
-
6a3
Done
❑ Done
❑ Done
❑ Done
Application Complete? Y N By:
Fees Complete? Y N By: