Loading...
HomeMy WebLinkAbout2555 EL CAMINO REAL; ; CB100216; PermitCity o Carlsbad 1636 Faraday Av Carlsbad, CA 92008 03-25-2010 Commercial/Industrial Permit Permit No: CB100216 Building Inspection Request Line (760) 602-2725 Job Address: 2555 EL CAMINO REAL CBAD Permit Type: TI Sub Type: COMM Parcel No: 1563021000 Lot #: 0 Status: Valuation: $3,743,530.00 Construction Type: NEW Applied: Occupancy Group: Reference #: Entered By: Project Title: JC PENNY: 106,958SF INTERIOR Plan Approved: REMODEL Issued: Inspect Area: Plan Check#: Applicant: Owner: - DAN HARRIS NEW MARJORAMASSOCIATES 17992 MITCHELL SOUTH C/O JCPE,NNY CO INC #566-0 IRVINE P 0 BOX.'10001 CA 92614 DALLAS,TX 75301 949-268-8150 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park Fee LFM Fee Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Recl. Water Con. Fee Green Bldg Stands (SB1473). Fee Fire Expedited Plan Review $9,270.89 Meter Size ISSUED 02/04/2010 JMA 03/25/2010 03/25/2010 $0.00 Add'] Recl: Water Con. Fee $0.00 $6,026.08 Meter Fee $0.00 $0.00 SDCWA Fee $0.00 $0.00 CFD Payoff Fee _ $0.00 $786,14 PFF (310554.0) $0.00 $0.00 PFF (4305540) $0.00 $0.00 License Tax (3104193) $0.00 $0.00 License Tax (4304193) $0.00 $0.00 Traffic Impact Fee (3105541.) $0.00 $0.00 Traffic Impact Fee (430554T) $0.00 '$0,.00 PLUMBING -TOTAL $27.00 I ; $0.00._ ELECTRICALTOTAL $20.00 $0,00 , MECHANICAL TOTAL $37.50 $0.00 Master Drainage Fee $0.00 Sewer Fee - $0.00 $0.00 'Redev Parking Fee $0.00 $0.00,-' ': , ,,Additionat'Fees $0.00 $148.00 'HMP Fee ?? TOTAL PERMIT FEES $16,315.61 Total Fees: $16,316.61 Total Payments To Date: $16,31Z.61 Balance Due: $0.00 FINAL APM Inspector:AWDate: ' Clearance: NOTICE: Please take Nd) `ICE tFiat approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030, Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or -other similar application processing or service -fees in connection with this project. NOR DOES IT APPLY to any :c.Z> V CITY OF Plan Check No. 00 Zip Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Est. Value 3 ? t+'9 53d 760 602-2717 / 2718 / 2719 -yen 1n 1 o. 0 Plan C!k_ DennSit CARLSR www.carlsbadca.isov AD I vvv r arlsbad c� 9,o Datei , J0,4 "15 �1 `.G m W q /� ✓� �-hh✓✓ SUITE#/SPACE#/UNIT# APN CT/PROJECT #__yyJJ♦` LOT # PHASE # # OF UNITS T BEDROOMS # BATHROOMS TENANT BUSINESS NAME G einptev CONSTR. TYPE 2 /V OCC.-GROUP are Feet of ct Ares(s) DESCRIPTION OF WORK: Inclurev T triN 1 8 5,; USE EXISR.+., PRO ED SE fYES GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE ❑ #_ N AIR CON-DjTIONING YES Jj°�I NO ❑ FIRE SPRINKLERS YES NO O CONTACTNAME (if Different FomApplicant) 'pa t✓1 �i I(✓1 APPLICANT NAME ADDELPSL. 1 /1 { •,`y to ADDRESS CITY STAT ZIP CITY STATE ZIP PHON _ I/A..� FAX ..4114 PHONE FAX EMAIL .•�* C. ele 1 1 W EMAIL PROPERTY OWNER NAME N I/ s r 11 • CONTRACTOR BUS. NAME �(" C „�s is ADDRESS ADDRESS ;4z . c e,lr{ g--Ave, STATE ZIP G ✓� 4 CITY 1 NA STYE G —ZIP PHONE `i1 5 !I '� � / �T F9 -7:—5'3 `i ... ! jeim N PH+7j�'I - 4q r 1 . / 7 1 F EMAIL �Giark 3ctlek,he . Gok*1 EMAIL 1 ,�ta,�✓1, • 6t t e✓5t✓ C1- GOP" RCH/DESIGNER NAME & ADDRESS STATE LIC. # ATE LIC.# CLAS "BUS. uc.# (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish oc repair any structure, pnor to Its Issuance, ansorequrFes the applicant for such Per to file a si ned statement that he Is licensed pursuant to the,provisions of the Contractor's License Law (Chappter 9, commending with Section 7000 of Diviston 3 of the Business and Professions Code) or t�rat he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500}). Workers' Compensation Declaration: I hereby affirm under penalty of perjury one of the following declarations: ❑ 1 have and will maintain a certificate of consent to self -insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which thispermitis issued. My workers' compensation insura ecamer and policy number are: Insurance Co. L_t I�(ta'k'� i'Auxu^L, Policy No: W -% _�, )— Ie L09 Expiration Date 10 This section need not be completed if the permit is for one hundred dollars (a100) or less. ❑ Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers'Compensation Laws of California. WARNING: Failure to securq w rkers' co nsation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (&100,000), in addition to the cost of compensation, da es as proved for in Sect4 3706 of the Labor code, interest and attorney's fees. ,ea CONTRACTOR SIGNATURE DATE -3 f 2_�5 1 I I hereby affirm that 1 am exempt from Contractor's License Law for the following reason: O 1, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offeredlor sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale). O I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The -Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). I am exempt under Section Business and Professions Code for this reason: 1.1 personally plan -to provide the major labor and materials for construction of the proposed property improvement. O Yes 'O No 2.1(have / have not) signed an application for a building permit for -the proposed work. 3.1 have contracted with the following person (firm)'to provide the proposed construction {include name address / phone / contractors' license number): 4. I.plan to provide portions of the work, but I have hired the following person to'coordinale, supervise and provide the major work (include name I address I phone / contractors' license number): 5.1 will provide some of the work, but I have contracted jhired) the.following persons to provide the work indicated (include name / address / phone / type of work): .ESPROPERTY OWNER SIGNATURE ❑ AGENT DATE Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley -Tanner Hazardous Substance Account Act? O Yes O No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? O Yes O No Is the facility to be constructed within 1,000-feet of the outer boundary of a school site? O Yes O No IF -ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code). Lender's Name Lender's Address I certifythat I have read the application and statethatthe above infomration iscorrectand thattbe information on the plans is accurate.I agreetocomplywith all Cityordinances and State laws relatingto building construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes.) ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT, OSHA: An OSHA permit is required for excavations over SO' deep and demolition or construction of structures over 3 stories in height. EXPIRATION --Every permit issued by the Building Official underthelprovisiqns of this Code shall expire by limitation and become null and void I the building or work authorized by such permit is not commenced within 180 days from the date of such permit or if the building or work u by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days (Section 106.4.4 Uniform Building Cade). APPLICANT'S SIGNATURE DATE U Inspection List Permit#: CB100216 Type: TI COMM JC PENNY: 106,958SF INTERIOR REMODEL Date Inspection Item _ Inspector Act Comments 10/18/2010 89 Final Combo - RI A M PLEASE 10/15/2010 89 Final Combo - RI MAY BE DONE THURSDAY 10/15/2010 89 Final Combo PY AP 10/14/2010 89 Final Combo - RI, A.M. PLEASE 10/14/2010 89 Final Combo PY CA 10/13/2010 89 Final Combo - RI after 11 am please 10/13/2010 89 Final Combo PY CA 08/31/2010 84 Rough Combo PY AP T-BAR 08/26/2010 17 Interior Lath/Drywall PY AP 08/25/2010 14 Frame/Steel/Bolting/Weldin PY AP 08/25/2010 24 Rough/Topout PY AP NEW OPTICAL AREA 08/25/2010 34 Rough Electric PY AP 08/24/2010 24 Rough/Topout PY CA RESCHEDULE FOR WEDNESDAY 08/23/2010 31 Underground/Conduit-Wirin PY AP 08/20/201A 31 Underground/Conduit-Wirin PY CA RESCH FOR MONDAY 08/12/2010 14 Frame/Steel/Bolting/Weldin PY AP FRAME @ OPTOMISTRIST 08/05/2010 17 Interior Lath/Drywall PY AP 08/04/2010 14 Frame/Steel/Bolting/Weldin PY AP PHASE 10 1 ST FLOOR 07/28/2010 17 Interior Lath/Drywall PY AP PHASE 10 2ND FLOOR 07/26/2010 14 Frame/Steel/Bolting/Weldin PY PA PHASE 10 2ND FLOOR 07/26/2010 17, Interior Lath/Drywall PY PA PHASE 9 1 ST AND 2ND FLOORS 07/23/2010 17 Interior Lath/Drywall PY CA RESCHEDULE FOR MON 7-26. 07/22/2010 14 Frame/Steel/Bolting/Weldin PY AP 1ST FLOOR PHASE 9 2ND FLOOR PHASE 10 07/21/2010 1.7' Interior Lath/Drywall PY AP PHASE NINE 07/20/2010 14 Frame/Steel/Bolting/Weldin PY. AP PHASE NINE 2ND FLOOR 07/13/2010 14 Frame/Steel/Bolting/Weldin PY PA WALLS @ ESCALATOR 07/06/2010 14 Frame/Steel/Bolting/Weldin PY PA T-BAR @ 2ND FLOOR FITTING ROOM 07/08/2010 17 Interior Lath/Drywall PY PA 1ST FLOOR 07/07/2010' 14 Frame/Steel/Bolting/Weldin TP AP WALLS PHS. 7, CLNG PHS 5 1ST FLR 07/07/2010 24 Rough/Topout TP WC 07/07/2010 34 Rough Electric TP AP 07/07/2010 44 Rough/Ducts/Dampers TP WC 07/06/2010 17 Interior Lath/Drywall PY PA 2ND FLOOR HAND BAG 07/01/201014 Frame/Steel/Bolting/Weldin PY AP 06/30/2010 17 Interior Lath/Drywall PY PA 1ST FLOOR FITTING ROOMS 06/28/2010 17 Interior Lath/Drywall PY PA FITTING ROOMS 06/28/2010 84 Rough Combo -PY AP FITTING ROOM @ 1ST FLOOR 06/24/2010 17 Interior Lath/Drywall PY PA 06/22/201014 Frame/Steel/Bolting/Weldin PY PA 06/22/2010 17 Interior Lath/Drywall PY PA 06/17/201-0 14 Frame/Steel/Bolting/Weldin PY PA PHASE 9 06/17/2010 17 Interior Lath/Drywall PY PA PHASE12 Q6/16/2010 14 Frame/Steel/Bolting/Weldin PY PA PHASE 12 UPPER FLOOR Monday, October 18, 201.0 Page 1 of 2 06/14/2010 14 Frame/Steel/Bolting/Weldin PY PA SEPHORA RACKS 06/14/2010 17 Interior Lath/Drywall PY PA PHASE 5 2ND FLOOR 06/10/2010 14 Frame/Steel/Bolting/Weldin PY PA PHASE 5 SECOND FLOOR 05/27/2010 17 Interior Lath/Drywall PY AP JEWELRY WALL & PHASE 5 2ND FLOOR 05/26/2010 14 Frame/Steel/Bolting/Weldin PY AP 2ND FLOOR @ ESCALATOR AND WING WALL 05/21/2010 17 Interior Lath/Drywall PY AP 05/20/2010 84 Rough Combo PY AP PHASE 6 2ND FLOOR 05/19/2010 17 Interior Lath/Drywall PY PA 2ND FLOOR 05/18/2010 84 Rough Combo PY AP 2ND PHASE 13 05/17/2010 17 Interior Lath/Drywall PY AP 1ST FLOOR PHASE 4 05/13/2010 14 Frame/Steel/Bolting/Weldin PY PA 1 ST FLOOR T-WALL 05/12/2010 17 Interior Lath/Drywall PY AP 1ST FLOOR FITTING ROOM PHASE 2 05/11/2010 84 Rough Combo PY AP 1ST FLOOR PHASE 2 FITTING ROOM 05/04/2010 17 :Interior Lath/Drywall TP AP FITTING ROOM @ 2ND FLR 04/29/2010 14 Frame/Steel/Bolting/Weldin PY AP WALL FRAMING & FITTING ROOM @ 2ND FLOOR 04/27/2010 84 Rough Combo PY PA T-BAR @ FITTING ROOM 1ST FLR 04/26/2010 17 Interior Lath/Drywall PY PA 1ST & 2ND FLOOR 04/22/2010 14 Frame/Steel/Bolting/Weldin PY PA T-BAR & WALL 04/22/2010 84 Rough Combo PY PA 04/21/2010 17 Interior Lath/Drywall PY AP 1ST FLOOR FITTING ROOM 04/19/2010 17 Interior Lath/Drywall PY PA 04/15/2010 14 Frame/Steel/Bolting/Weldin PY PA 1ST FLOOR DRESSING ROOMS & WALL AT STORE FRONT 04/1-2/2010 17 Interior Lath/Drywall PY AP 2ND FLR 1 ST PHASE 04/08/2010 14 Frame/Steel/Bolting/Weldin PY AP T-BAR PHASE ONE 04/07/2010 14 Frame/Steel/Bolting/Weldin PY PA PHASE ONE SECOND FLOOR 04/07/2010 34 Rough Electric PY PA 03/31/2010 17 Interior Lath/Drywall PY PA 03/30/2010 31 Underground/Conduit-Wirin PY PA PHASE ONE 03/29/2010 14 Frame/Steel/Bolting/Weldin PY PA PHASE ONE 1ST FLOOR WALL 03/29/2010 31 Underground/Conduit-Wirin PY NR Monday, October 18, 2010 Page 2 of 2 City of Carlsbad Bldg, Inspection Request �a For: 10/15/2010 Permit# CB100216 Title: JC PENNY: 106,958SF INTERIOR Description: REMODEL Type: TI Sub Type: COMM Job Address: 2656 EL CAMINO REAL Suite: Lot: 0 Location: APPLICANT DAN HARRIS Owner: NEW MARJORAM ASSOCIATES Remarks: MAY BE DONE THURSDAY Total Time: CD Description Act 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Comments Comments/Notices/Molds Associated PCRs/CVs/S-WPPPs Original PC# CV010595 CLOSED DELINQUINT BIZ LICENSE, Inspection History ,Date Description 10/13/2010 89 Final Combo 08/31/2010 84 Rough Combo 08/26/2010 17 Interior-Lath/Drywall 08/25/2010 14 Frame/Steel/BoltingMelding 08/25/2010 24 Rough/Topout 08/25/2010 34 Rough Electric 08/24/2010 24 Rough/Topout 08/23/2010 31 Underground/Conduit-Wiring 08/20/2010 31 Underground/Conduit-Wiring 08/12/2010 14 Frame/Steel/Bolting/Welding 08/05/2010 17 Interior Lath/Drywall 08/04/2010 14 Frame/Steel/Bolting/Welding 07/28/2010 1-7 Interior Lath/Drywall Inspector Assignment: PY Phone: 7143297932 Inspector: Requested By: GREG Entered By: CHRISTINE Act Insp Comments CA PY AP PY T-BAR AP PY AP PY AP PY NEW OPTICAL AREA AP PY CA 'PY RESCHEDULE FOR WEDNESDAY AP PY CA PY RESCH FOR MONDAY AP PY FRAME @ OPTOMISTRIST AP PY AP PY PHASE 10 1 ST FLOOR AP PY PHASE 10 2ND FLOOR EsGil Corporation In Partnership with Government for Buifding Safety DATE: MARCH 10, 2010 JURISDICTION: CARLSBAD - PLAN CHECK NO.: 10-0216 SET: II PROJECT ADDRESS: 2555 EL CAMINO REAL AWe CANT JURIS. ❑ PLAN REVIEWER ❑ FILE PROJECT NAME: JC PENNEY STORE # 0566 INTERIOR REMODEL ❑ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list -is enclosed for the jurisdiction to forward to the applicant contact person. ® The applicant's copy of the check list has been sent to: KTGY 17922 FITCH IRVINE, CA 92614 Esgil Corporation staff did. not advise the applicant that the plan check has been completed. ® Esgil Corporation staff did advise the applicant that the plan check has been completed. .Person contacted:T Y (Mike Flynn) Date contacted td /4( dm)- MailV-17relephone Faxv/ln Person ❑ REMARKS: By: ALI SADRE EsGil Corporation 0 GA ❑ EJ ❑ PC 3/4 Enclosures: Telephone #: 949-851-2133 Fax #: 949-851-5156 0320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 NOTE: The items listed below are from the previous, correction list. These remaining items have not been adequately addressed. The numbers of the items are from the previous check list and may not necessarily be in sequence. The notes in bold font are current. Please make all corrections, as -requested in the correction list. Submit three new complete sets of plans for commercial/industrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and, calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday. Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire. Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320-Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560A468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted, directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. • PLANS 1. A reminder that all revised plans shall be signed .by the California state licensed engineer or architect. Please include the California license number, seal, date of license expiration and date plans are signed. California Business and Professions Code. Many sheets are still not signed and sealed. • ADDITIONAL 20. Please see attached for P/M/E & HC items. ,,21. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e.,, plan, sheet, note or detail number, . -calculation page, etc. 22. Please indicate here if any changes have, been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: ❑ Yes ❑ No The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 02123; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact ALI SADRE at Esgil Corporation. Thank you. PLUMBING AND MECHANICAL CORRECTIONS ♦ JURISDICTION: Carlsbad DATE: 3/9/10 ♦ PLAN REVIEW NUMBER: 100216 SET: II PLAN REVIEWER: Glen Adamek The -final set of -corrected drawings to -be reviewed for signing and sealing just before the permits -are to be issued. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes, before the permits are issued. Business and Professions Code. Many sheets are still not signed and sealed: And no plumbing drawing and calculations provided. 4. The Fire Department must review the drawings for the proposed construction. The Building Official to check for Fire Department's approval. 8. A complete plumbing and mechanical plan review will be done when complete corrected drawings -are provided showing all proposed plumbing and mechanical changes and complete energy designs for the provided changes are provided. The response states: "No change" in plumbing. But the Architecture Drawings clearly show plumbing changes. Please correct. (See following item #9.) Also, the drawings do not clearly show the clothe washer and dryer in the Salon Dispensary Room (relocated, existing, and/or new). PLUMBING (2006 UNIFORM PLUMBING CODE) 9. Please provide plumbing drawings to show all proposed changes to the existing plumbing systems. The response states: "No change" in plumbing. But the Architecture Drawings clearly show plumbing changes. Please correct the following: A) Sheets D101=C, A101-C & A401--C clearly shows: "Abandoned toilet use for storage." The room has two water closets and two lavatories. B) Sheet D1.02-D Keynote #22C seems to show the Shampoo basins in the Salon are shown to be replaced. C) Sheet D102-D Keynote #22D and- sheet A102-D Keynote #27 calls for the sink in the -Salon Dispensary to be replaced. 113. Provide calculations to show compliance with UPC Section 412.0 & Table 4-1, (Minimum Plumbing Facilities). Sheets D101-C, A101-C & A401-C clearly shows.: "Abandoned toilet use for storage." The room has two water closets and two lavatories. Please provide data to show the number of plumbing fixtures are allowed to be reduced (the remaining number of plumbing fixtures still comply with the required minimum required fixtures. 19. Provide the following information concerning the -existing and/or new water heaters: No response provided and no data on the .existing water heaters provided. a) Show the existing and/or new water heater sizes,_ types and locations on plans. UPC 501.0 b) Show that water heater is adequately braced, to resist seismic forces. Provide two straps. One strap at top 1/3 of -the tank and one strap at bottom 1/3 of the tank. UPC 50&.2 MECHANICAL (2006 UNIFORM MECHANICAL CODE) 25. Please provide the MECH-3-C forms showing the required mechanical ventilation rates for the new or revised conditioned spaces. Coordinate the mechanical and the Title 24 outside air design. CIVIC 403.0 & Title 24 121(b)2 & (d). The MECH- 3=C form used to provide the ventilation requirements from the CIVIC for each separate room must show each separate room or area, not just the total building. Please correct MECH-3-C form on sheet M103. 26. Provide the exhaust and make-up air design for the occupancy type listed in Table 4.4. UMC 403.7 The sheet M102-D does not show the required minimum 108 cfm of exhaust from the Salon Dispensary Room. Please correct. 27. On the mechanical plans clearly show the limits of ceiling space used as duct or plenum. The drawings do not clearly show the limits of the ceiling space being used as a return air plenum. Please correct. Then address the following on the plans: C) Exhaust ducts under positive pressure and venting systems shall not extend into or pass through ducts or plenums. UMC Section 602.1.. Please address the exhaust fan ducts over the Salon Areas. D) Clothes -dryer moisture -exhaust ducts shall not extend into or through ducts or plenums. UMC Section 504.3.1. The drawings do not clearly show the clothe washer and dryer in the Salon Dispensary Room (relocated, existing, and/or new). E) 'Environmental and/or product=conveying duct systems shall not extend into or through ducts or plenums. UMC Sections 504.1 (Environment) & 505.1 (Product conveying). Please address the exhaust fan ducts over the Salon Areas and the clothe dryer in the Salon Dispensary Room (relocated, existing, and/or new). - 28. Detail exhaust ventilation system compliance with UMC Chapters 5 & 6.Please address the new and/or revised ventilation systems for the Salon areas. A) Detail the required make-up air as per UMC 505.3 ,.VI B) Detail the exhaust outlet clearances as per UMC 504.5 (Environmental) & 506.9 (Product conveying). C) Clearly show the exhaust duct material and- gage used for each duct size. UMC Tables 5-5 and/or 5-6 D) Detail duct support as per UMC 506.5 & 6040.5 Note: If you have any questions regarding this Plumbing and Mechanical plan review list please contact Glen Adamek at (858) -560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. EsGil Corporation In eartnersUp witk Government for (Building Safety DATE: FEB. 16, 2010 ❑AF'-RLLCANT M JURIS JURISDICTION: CARLSBAD O .PLAN REVIEWER ❑ FILE PLAN CHECK NO.: 10-0216 SET: I PROJECT ADDRESS: 2555 EL CAMINO REAL PROJECT NAME: JC PENNEY STORE # 0566 INTERIOR REMODEL ❑ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. ❑ The.plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected. and resubmitted for a complete recheck. Z The check list transmitted herewith, is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ® The applicant's copy of the check list has been sent.to: KTGY 17922 FITCH IRVINE, CA 92614 ❑ Esgil Corporation staff did not advise the applicant that the plan check has been completed. ® Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: KTGY 0A I i4e ) -4, Telephone #: 949-851-2133 Date contacted: 211$1 bo (by: r-- ) Fax #: Lt 9_ Mail Telephone ✓ Fax ✓In Person, ❑ REMARKS: By: ALI SADRE Enclosures: EsGil Corporation ®GA. ®EJ ❑PC 218 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 CARLSBAD 10-0216 FEB. 16, 2010 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK'NO.: 10-0216 OCCUPANCY: M/B/S1 (TYPE OF CONSTRUCTION: II-B I ALLOWABLEFLOOR AREA: Unlimited SPRINKLERS?: Y REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 2/4 DATE INITIAL PLAN REVIEW COMPLETED: FEB. 16, 2010 FOREWORD (PLEASE READ): JURISDICTION: CARLSBAD USE: RETAIL ACTUAL AREA: 106,958 remodeling area STORIES: Two HEIGHT: 30' OCCUPANT LOAD: 3,000 DATE PLANS RECEIVED BY ESGIL CORPORATION: 2/8 PLAN REVIEWER: ALI SADRE This plan review is .limited to the technical requirements contained in the International Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. _Clearance from.those departments may be required prior to the issuance of a building permit. Code sections cited, are based on the 2007 CBC, which adopts the 2006 IBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 105.4 of the 2006 International Building Code, the approval. of the plans does not permit the violation of any state, county or city law. e - GENERAL 1. The following note should be given with each correction list: Please make all corrections, as requested in the correction list. Submit three new complete sets of plans for commercialAndustrial projects (two sets of plans for residential projects). For expeditious processing, corrected sets can be submitted in one of two ways: 1. Deliver all corrected sets of plans and calculations/reports directly to the City of Carlsbad Building Department, 1635 Faraday Ave., Carlsbad, CA 92008, (760) 602-2700. The City will route the plans to EsGil Corporation and the Carlsbad Planning, Engineering and Fire Departments. 2. Bring one corrected set of plans and calculations/reports to EsGil Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (858) 560-1468. Deliver all remaining sets of plans and calculations/reports directly to the City of Carlsbad Building Department for routing to their Planning, Engineering and Fire Departments. NOTE: Plans that are submitted directly to EsGil Corporation only will not be reviewed by the City Planning, Engineering and Fire Departments until review by EsGil Corporation is complete. e PLANS 1. A reminder that all revised* plans shall be signed by the California state licensed engineer or architect. Please include the California license number, seal, date of license expiration and date plans are signed. - California Business and Professions Code. 2. Include the following code information for the proposed remodel on the Title Sheet: Revise the notes on Sheet A000 accordingly: ♦ Occupancy Classification(s): B (Office/ Misc.)/ S1 (Storage)/M (Retail) ♦ Description of Use: As per above ♦ Type of Construction: II-B ♦ Sprinklers: Yes ♦ Stories: Two ♦ i1ei ht: 35' ♦ F/oorArea: -1st Fir. = 78,760; 2"d Fir. = 72,060; Remodel Area: 15t = 51,655; 2"d = 65,003 ♦ Occupant Load: 3,000 e SITE PLAN - 3. Please note.on plans that all site items including parking, curb ramps, walks, etc. are existing -accessible subject to field: verification. Section A1.06.1 A. e EXITS 4. The plans shall designate the number of occupants to be accommodated on every floor, and in all rooms and spaces: Section Al06.1.2. 5. Please provide an exit analysis plan (may be 8 1/2" x 11" or any convenient size). Show in this analysis the occupant load of each area, the general exit flow patterns (by using arrows), accumulated occupant loads and required exit widths. Section Al06.1.2. Show the number of exits and'their separation are adequate as -presented. Sheets A101 & A102., 6. Regardless of -occupant load, a floor or landing not more than Y2 inch below the threshold is required on each side of an egress door. Section 1008.1.4. 7. Note_ on the plans: "All egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort." Section 1008.1.8. In lieu of the above, in a Group B, M or S occupancies, you may note on the plans Provide a sign on -'or near the exit door, reading THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED." This signage is only allowed at the main exit. • EXIT SIGNS 8. Exit signs are required whenever two exits are required. Show all required exit sign locations. Section 1011.1. 9. A tactile sign stating "EXIT" and complying with ICC A117.1 shall be provided adjacent to each door to an egress.stairway, an exit passageway and the exit discharge. Section 1011.3. i 10. ' Show two sources of power for the lamps at exit signs. Section 1011.5.3. 11. Show that the means of egress path will be lighted with at least one foot candle at floor level. Section 1006. 12. Show separate sources of power may be required for exit illumination. Review Section 1006.3. MISCELLANEOUS LIFE/SAFETY 13. Please provide notes on the .plans to show the suspended ceilings in Seismic Design Categories D, E & F comply with: ASCE 7-05 Section 13.5.6.2.1 as follows: a) All ceilings shall use a Heavy Duty T-bar grid system. b) The width of the perimeter supporting closure angle shall be not less than 2 inches. c) In each orthogonal horizontal direction, one end of the ceiling grid shall be attached to the closure angle. d) The other end in each horizontal direction shall have a'/" clearance from the wall and shall rest upon and be free to slide on a closure angle or a listed assembly. e) Ceiling areas over 1,000 ft.2 must have horizontal restraint wires (typically restraint would consist of four 12 gauge wires splayed 90° to each other and sloped 450 to the horizontal, spaced 12" o.c.). f) Ceiling areas over 2500 ft.2 must,have seismic separation joints or full height partitions. g) Ceilings without rigid bracing must have 2" oversize trim rings for sprinklers and other ceiling penetrations. 14. Please .note on plans that any storage/ racks and shelving over 8' including their plans, calculations and anchorage will be under a separate permit. 15. Please show method attachment for the interior non -bearing partitions to the floor and ceiling (for full height partitions),. E.g., see detail 6/A601, etc. 16. Please include expansion anchors, epoxy anchors, wedge anchors, or shot pins size, spacing, ICC approval # and embedment on plans. This applies to the non - bearing partitions or steel tube attachment(s) to the floor and/or ceilings on plans. Please see details on 6/A601, etc. 17. . Please show the tubes base plate size, thickness and connections with weld size and type. as well as plate to floor anchorage details, .i.e,, bolts size, number, layout and embedment on plans as per=6A/A601. 18. Please note on plans that all the interior facilities are HC accessible to remain including stairs, elevators, fitting rooms, restrooms, etc. 19. Please see attached HC list for remaining items to be addressed on plans. • ADDITIONAL 20. Please see attached for P/M/E & _HC items.. 21. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e.; plan sheet, note or detail number, calculation page, etc. 22. Please indicate here if any changes have been made to the plans that are not a result of corrections from, this list. If there are other changes, please briefly describe them and where they are located in the. plans. Have changes been made to the plans not resulting from this correction list? Please indicate: ❑ Yes - Q No- 23. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 921.23; telephone number of 858/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact ALI SADRE at Esgil . Corporation. Thank you. PLUMBING AND MECHANICAL CORRECTIONS ♦ JURISDICTION: Carlsbad DATE: 2/10/10 PLAN REVIEW NUMBER: 100216 SET: 1 PLAN REVIEWER: Glen Adamek 1. The final set of corrected drawings to be reviewed for signing and sealing iust before the permits are to be issued. Each sheet of the plans must be signed by the person responsible for their preparation, even though there are no structural changes, before the permits are issued. Business and Professions Code. 2. Please provide statements on the Title Sheet of the plans to show compliance with the current -Codes, as of the first day of 2010. The following are the correct current Codes: a). The 2007 edition of the California Building Code (CBC) adopts the 2006 International Building Code (IBC) and the 2007 California Amendments. b) The 2007 edition of -the California Electrical Code (CEC) adopts the 2005 National Electrical Code (NEC) and the 2007 California Amendments. c) The 2007 edition of the California Mechanical Code (.CMC) adopts the 2006-Uniform Mechanical Code (UMC), and the 2007 California Amendments. d) The 2007 edition of the California Plumbing Code (CPC) adopts the 2006 Uniform Plumbing Code (UPC) and the 2007 California Amendments. e) The 2007 edition of the California Fire Code (CFC) adopts the 2006 International Fire Code (IFC) and the 2007.California Amendments. fi) The 2008 edition of the California Energy. Efficiency Standards. 3. Provide data on the proposed hazardous materials to be stored and used. CBC 414. Present the description of the hazardous materials in a format that coincides with the material classifications found in CBC Tables 307.1(1) and 307.1(2). a) Clearly show the types of hazardous materials being stored or used. Provide a list of the proposed hazardous_ materials; include the material safety data sheets (MSDS), if applicable. b) Clearly show the amounts for each type of hazardous material to be stored and in use. c) Clearly show the locations in the building where each type of hazardous material is being stored or used. d) Note: If hazardous materials are present in any amount, forward this information to the mechanical designer for design compliance with CMC Chapter 5. 4. The Fire Department must review the drawings for the proposed construction. The Building Official to check for Fire Department's approval. 5. Include, on the mechanical plans, the locations of all required smoke, fire, combination smoke and fire, or, ceiling radiation dampers. Be sure to include a symbol on the symbol schedule for each damper type. CBC 716 6. For mechanical plan check, include the architectural design detailing the following: CBC, Section 71-6.5. a) Fire Barriers b). Shaft Enclosures c) Fire Partitions d) Corridors e) Vertical Exit Enclosures (Stair & Ramp Enclosures) If this tenant improvement contains any of the above assemblies, be sure to provide construction details. For example: Rated corridor construction style -Tunnel VS Full height corridor walls. 7. - Please correct the drawings to show the required 42 inch tall "Guards" (guard rails) as per CBC, Section 1013.5: "Where appliances, equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface..." 8. A complete plumbing and mechanical plan review will be done when complete corrected drawings are provided showing all proposed plumbing and mechanical changes and complete energy designs for the provided changes are provided. , PLUMBING (2006 UNIFORM PLUMBING CODE) 9. Please provide plumbing drawings to show all proposed changes to the existing plumbing systems. 10. Provide a plumbing material schedule on; the plans describing the following systems: Potable water piping, the drain; waste, and vent piping, gas piping, and the roof drains. 11. Provide gas line plans and calculations, showing gas pressures, piping types, pipe lengths, gas demands and pipe sizing method used. UPC Section 1217.0. 12.. Include the gas piping sediment trap installed as close as possible to the appliance inlet with the plumbing design., Exceptions: Appliances with an internal sediment trap;(or) ranges, clothes dryers, gas fireplaces, and outdoor grilles. UPC 1212.7. '13. Provide calculations to show compliance with UPC Section 412.0 & Table 4-1, (Minimum Plumbing Facilities).. 14. Provide calculations to show compliance with UPC Section 412.0 & Table 4-1, (Minimum Plumbing Facilities). 15. New or relocated water closets and associated flushometer valves, if any, shall use no more than 1.6 gallons per flush, UPC, Sections 402.1 & 402.2; and shall meet performance standards, established by the American National Standards Institute Standard Al12.19.2, H & S Code, Section 17921.3(b). 16. New or relocated urinals and associated flushometer, valves,. if any, shall use no more than one gallon per flush, UPC, Section 402.1 & 402.3; and shall meet performance standards established by the American National Standards Institute Standard A1-12.1.9.2. H & S Code, Section 17921*.3(b). 17. All water closet seats, except -those within dwelling units, shall be of the open front type or have an automatic seat cover dispenser:, as per UPC, Section 408.2.2. - 18. Hot water supplied to a public use lavatory oF any bath is limited to a maximum temperature potential of 120 degrees. Detail how this temperature limitation -is achieved. Note: The water heater thermostat may not be used for compliance with this Code section. UPC 413.1 & UPC 414. 19. Provide the following information concerning the existing and/or new water heaters: a) Show the existing and/or new water heater sizes, types and locations on plans. UPC 501.0 b) Show that water heater is adequately braced to resist seismic forces. Provide two straps, One strap at top 1/3 of the tank and one strap at bottom 1/3 of the tank. UPC 508.2 MECHANICAL (2006 UNIFORM MECHANICAL CODE) 20. Review with the architect the locations that require (fire/ceiling radiation/or fire/smoke) damper and/or shaft protection and identify installations on the mechanical plans themselves. See "Architectural PME" items above directly below the PME list heading. 21. Provide complete mechanical plans showing existing and proposed .HVAC equipment, ducts, and access -to all equipment. 22. Provide smoke detection in the supply air duct of an "air -moving system" for required- shut-off of equipment for smoke control. UMC Section 609.0 An "air - moving system" is a system designed to provide heating, cooling, or ventilation in which one or more air -handling units are used to supply air to a common space or to draw air from a common plenum or space. UMC Section 203.0 23. Buildings of more than 15' in height shall have an inside means of access that meets the design requirements of UMC 904.10-.3.3. Please provide. City -approval for use of an outside ladder is required: 24. Please detail roof access to roof mounted HVAC equipment. CIVIC 904.10.3.3. 25. Please provide the MECH-3-C forms showing the required mechanical ventilation rates for the new or revised conditioned spaces.- Coordinate the mechanical and the Title 24 outside air design. CIVIC 463.0 & Title 24 121(b)2 & (d). 26. Provide -the exhaust and make-up air design for the occupancy type listed in Table 4.4. UMC 403.7 27. On the mechanical plans clearly show the limits of ceiling space used as duct or plenum. Then address the following on the plans: a) Clearly show that all material exposed within .the plenum complies with UMC Section 602.2 (10).& Section 605.0. "Materials shall have.a,mold-, humidity-, and erosion - resistant face that meets the requirements of UL 181." b) Clearly show"that all combustible materials exposed within the plenum space must comply with UMC Section 602.2. Flame -spread index of not more than 25 and a smoke - developed rating of not -more than 50. c) Exhaust ducts under positive pressure and venting systems shall not extend into or pass through ducts or plenums. UMC-Section 602.1. d). Clothes -dryer moisture -exhaust ducts shall not extend into or through ducts or plenums. ,UMC Section 504.3.1. e) Environmental and/or product -conveying duct systems shall not extend into or through ducts or plenums. UMC Sections 504.1 (Environment) & 505.1 (Product conveying). 28- Detail exhaust ventilation system compliance with UMC Chapters 5 & 6. 'a) Detail the required make-up air as per UMC .505.3 b) Detail the exhaust outlet clearances'as ,per UMC 504.6 (Environmental) & 506.9 (Product conveying). c) Clearly show the exhaust duct material and gage used for each duct size. UMC Tables 5- 5 and/or 5-6 d) Detail duct support as per UMC 506.5 & 6040.5 e) Detail protection from physical damage as per UMC 506.8 & 604.4. Note: If you have any questions regarding this Plumbing and Mechanical plan review list please contact Glen Adamek'at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. ELECTRICAL and ENERGY COMMENTS PLAN REVIEWER: Eric Jensen ELECTRICAL (2005 NATIONAL, ELECTRICAL CODE) 1. How do I know which of the fixtures are connected to the generator system? ENERGY CONSERVATION 2. Correct the LTG-2-C and LTG-1-C'to accurately reflect the correct wattages for the newly installed lighting. 3. Describe, on the plans, the methods of providing bi4evel and complete building shut off types of control. Note: If you have any questions regarding this Electrical .and Energy plan review list please contact Eric Jensen at (858) 560-1468. To speed the review process, note on this list (or a copy) where the corrected .items have been addressed on the plans. DISABLED ACCESS REVIEW LIST DEPARTMENT OF STATE. ARCHITECT - TITLE 24 The following disabled access items are taken from the 2007 edition of California Building Code, Title 24. Per Section 109.1, all publicly and _privately funded public accommodations and commercial facilities shall be accessible to persons with disabilities. NOTE: All Figures and Tables referenced in this _checklist are printed in the California Building Code, Title 24. Please imprint the following items on plans: DOORS 1. Specify that every required passage door has >_32" clear width, per Section 1133B.2. 2. Show, or note, -that there is a level floor or landing on each side of all doors. The floor or landing is to be <_%" lower than the doorway threshold, per Section 1133.2.4.1. 3. Show or note that all hand=activated door opening hardware meets the following requirements, per Section 1133B.2.5.2: a) Latching, or locking, doors in a path of travel are operated with a single effort by lever type hardware, by panic bars,,push-pull activating bars, or other hardware, designed to provide passage without requiring, the ability to grasp the opening hardware. b) Is to be centered >30" but s44" above floor. 4. Show or note that the maximum effort to operate doors shall not exceed 8-% pounds for exterior doors and 5, pounds for interior doors, with such pull -or push effort being applied at right angles to hinged doors and at the center -plane -of sliding or folding doors. When fire doors are utilized, the -maximum effort to operate the door may be increased to not exceed 15 pounds. Section 1133B.2.5. 5. Show or note that the lower 10" of all doors comply with Section 1133B.2.6, as follows: a) To be smooth and uninterrupted, to allow the door to be opened by a wheelchair footrest, without creating a trap or hazardous condition. b) Narrow frame doors may use a 10" high smooth panel on the push side of the door. 6. Show that the minimum strike edge distances are provided' at the level area on the side to which a door (or a gate) swings, per Section 1. 1 33B.2.4.3: a) >94" at exterior conditions. b) >_18" at interior conditions. c) �12" on the push side, if the -door has both a latch and a closer. Figure 11 B-26A. d) Where a door is located in a recess or alcove where the distance from the face of the wall to the face of the door is greater than 8 inches, the above clearances shall apply. Section 1133B.2.4.5. GENERAL ACCESSIBILITY REQUIREMENTS • DRINKING'FOUNTAINS A • The following provisions apply if drinking fountains are indicated on the plans 7. Plans shall indicate that drinking fountains comply with Section 1115B.4.6 as either: a) Located completely in an alcove, �:32" in width and >_18" in depth. b) Positioned to not encroach -into accessible pedestriamways. &. The drinking fountain shall be a minimum of 18 inches in depth and there shall be clear and unobstructed knee space under the drinking fountain not less than 27 inches in height and 8 inches in depth, the depth measurements being taken from the front edge of the fountain. Additionally, there shall be toe clearance of 9 inches in height above the floor and 17 inches in height above the floor and 17 inches in depth from the front edge of the fountain. A side approach drinking fountain is not acceptable. Section 1115B.4.6. 9. Drinking fountains shall be accessible to -individuals who use wheelchairs and to those who have difficulty bending or stooping. This can be accommodated by the use of. "hi=low" fountains. Section 1115B.4.6. 10. Note on the plans that the drinking fountain(s) will comply -with all applicable Title 24 provisions (bubbler height, - etc.). • CONTROLS AND OPERATING MECHANISMS 11. The highest and lowest operable parts of all controls, dispensers, receptacles and other operable equipment - shall be placed within 48" of the floor but not -lower than 15" for forward approach (or within 54" but not lower than 9" if side approached). Electrical and communication system receptacles on walls shall be mounted' no less than 15" above the floor. Section 1117B.6.3. 12. Note on the plans that controls and operating mechanisms shall comply with the requirements of Section 1117B.6. • SIGNAGE 13. Per Section 1011.8, tactile exit signs shall be required at the following locations: A Wherever basic CBC provisions require exit signs from a room -or area to a corridor or hallway. The tactile exit sign shall have the words, "EXIT ROUTE." b) Each grade -level exit door. The tactile exit sign shall have the word, "EXIT." c) Each exit door that leads directly to a grade -level exterior exit by means of a stairway or ramp. The tactile exit sign shall have the following -words as appropriate: i) "EXIT STAIR DOWN." "EXIT RAMP DOWN:' iii) "EXIT STAIR UP." iv) "EXIT RAMP UP." d) Each exit door that leads directly to a grade level exterior -exit by means of an exit enclosure or an exit passageway. The tactile exit sign shall have the words, "EXIT ROUTE." e) Each exit door through a horizontal exit. The tactile exit sign shall have the words, "TO EXIT." 14. Where permanent identification is provided for rooms and spaces, raised letters shall also be provided and - , shall be accompanied by Braille. Section 111713.5. 15. Provide a note on the plans stating that the signage requirements of Section 111713.5 will be satisfied. 16. Tactile stair level identification signs (complying with Section 1117B.5.1) shall be located at each floor level landing in all enclosed stairways in buildings two or more stories in height to identify the floor level. At the exit discharge level, the sign shall include a raised five -pointed star located to the left of the identifying floor level. Section 1020.1.6. - • COUNTERS AND TABLES 17. Where fixed or built-in counters or tables are provided for the public, and in general employee areas, 5% (but never less than one) must be accessible. Section 1122B.1. 18. The tops of tables and counters shall be 28" to 34" from'the floor. Where a single counter -contains more than one transaction station, such as a retail sales counter with multiple cash register stations, at least 5% (but never less than one of each type of station) shall be located at a section of counter that is at least 36" long and no more than 28" to 34" high. Section 1122B.4. 19. Where counters are used for distribution of goods/services, or have -cash resisters, at least one of each type shall have a portion of the counter, which is at least 36" in length with a maximum height of 34 inches. Section 1122B.5. • GROUP M OCCUPANCIES 20. "Show -or note that the proposed general sales, display and office areas are accessible, per Section 11106.1, as follows: a) Work stations are located on accessible levels. b) The customer side, of sales or checkout stations are accessible. c) Employee work -areas are sized and arranged to provide access to employees in wheelchairs. d) Checkstands shall provide: i) A 36" aisle on the,customer side of the checkstand. ii) Where quick checkstands are provided, Z1 shall be accessible. iii) Where regular checkstands are provided, the number of accessible checkstands shall be as follows, per table 11 B-2: a) �1 but s4 regular total =1 accessible. b) Z5 but :58 regular total = 2 accessible. c) z9 but 515 regulartotal = 3 accessible. d) >15 regular total = 3, + an additional 20%, accessible. e) Accessible checkstands shall provide a clear check-out aisle width of 36" with an adjoining counter 538" above finished floor. Note that they will always be open and be identified by a sign clearly visible to -those in wheelchairs. f) All circulation aisles and ,pedestrian ways shall be sized according to functional requirements and z j �:36" in clear width. g) Per Section 1117B.8, z1 fitting room or dressing room -for male and female customers shall be provided at each area.as follows: i) Entry doors shall,provide: a) >32" clearance. b) �_>18" strike edge. ii) The room dimension shall be >_60" in width and length. No door shall encroach into this required space. iii) Show a 24" x 48" bench: a) Fixed along the wall at the 48" dimension. b) Mounted >17" but 519". h) All point -of -sale machines, used by customers for the primary purpose�of executing transactions between the business entity -and the customer shall .comply with Section 111713.7 for ATM and point of sale machines. a. r CARLSBAD 10-0216 FEB. 16, 2010 [DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: CARLSBAD PLAN CHECK NO.: 10-0216 PREPARED BY: ALI SADRE DATE: FEB. 16, 2010 BUILDING ADDRESS: 2555 EL CAMINO REAL BUILDING OCCUPANCY: M TYPE OF CONSTRUCTION: II-B BUILDING PORTION AREA ( Sq. Ft.) Valuation Multiplier Reg. Mod. VALUE ($) Remodeling 106958 Air Conditioning Fire Sprinklers TOTAL VALUE 3,743,530 Jurisdiction Code - 'cb (By Ordinance I Bldg. Permit Fee by Ordinance Plan Check Fee by Ordinance T Type of Review: CI Complete Review. ❑ Repetitive Fee Repeats Comments: ❑ Structural Only ❑ Other ❑ Hourly Hr. @ Es011 Fee $9,270,891 $6,026.08 $5,191.70 Sheet 1 of 1 macvalue.doc + PLANNING/ENGINEERING APPROVALS PERMIT NUMBER CB 10-0216 DATE 2/5/10 ADDRESS 2555 El Camino Real RESIDENTIAL ADDITION- POOLISPA MINOR (07,000.00) TENANT IMPROVEMENT RETAINING WALL. VILLAGE, FAIRE OTHER Interior Remodel PLAN ENGIN COMPLETE OFFICE BUILDING NER Chris S DATE 2/5/10 EER(WzkV�-e-�DATE v /v II:�AD6IIN�COUNTED JPLANNING/ENGINEEDING APPROVALS Carlsbad Fire Department Plan Review Requirements Category: TI , COMM Date of Report: 03-04-2010 Name: DAN HARRIS Address: 17992 MITCHELL. SOUTH IRVINE CA 92614 Permit #: CB 1002.16 Job Name: JC PENNY: 106,958SF INTERIOR Job Address: 2555 EL CAMINO REAL CBAD Reviewed by: BLDG. DEPT Cod -INCOMPLETE The item you have submitted for review is incomplete. At this time, this office cannot adequateiree.n4m—t-n rewje4v.4adataVUjUQcomDlianRg with the a licable codes and/or standards.. Please review carefully all comments attached. Please resubmit the pans ith changes "clouded", to this office for review and approval. Conditions: Cond: CON0003884 [NOT MET] *** Bubble All Changes**** 1. Add 2007 edition of California Fire Code. 2. Sheet GS 101 Add the following or similiar to Fire Departent or General Notes ares: "(If required) Complete plans and specifications for fire alarm systems, fire extinguishing systems, including automatic sprinklers and wet and dry standpipes; inert/halocarbon systems and other special types of automatic fire protection systems and appurtenances thereto shall be submitted to Carlsbad Fire Department for review and approval PRIOR to installation. (CFC 901.2)" 3. Provide egress plan. with occupant loads calculated for both floors. 4. Indicate whether or not storage configurations will change. If like for like exchange, just indicate. 5. Show emergency egress lighting and exit signage in -relation to egress plan for both floors seperate from other details. Entry: 02/26/2010 By: cwong Action: CO Cond: CON0003892 [MET] 71 3- ease cite -that exiting shall comply with CBC 402.4.3.1 ***** "APPROVED: THIS PROJECT HAS BEEN REVIEWED AND APPROVED FOR THE PURPOSES OF ISSUEANCE OF A BUILDING PERMIT. THIS APPROVAL IS SUBJECT TO FIELD INSPECTIONS, ANY REQUIRED TESTS, FIRE DEPARTMENT NOTATIONS, CONDITIONS IN CORRESPONDENCE AND COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS.. THIS APPROVAL SHALL NOT BE HELD TO PERMIT OR APPROVE ANY VIOLATION OF THE LAW. Entry: 03/04/2010 By: cwong A, fion: AP m 4_0 EaiyC� v SAN DIEGO REGIONAL acce HAZARDOUS MATERIALSQUESTIONNAIRE OFFICE USE ONLY UPFP# HV# BP DATE t d Business Name �C �' Busines ct C Telephone # 57 hv► >nC.. OL 2 —17 Project Address i � ity r Q State Zip ` 2 i 5.4p � 2 /oav •Mailing Address City State Zip Code Plan File# VVl . Project Contact alrA0140. C -$v; er5 Telephone # 1-15 7 i nu ruuuwmg-quesuons represent the racnity"s activines, wu t tut@ specitic project description. PART'I: FIRE DEPARTMENT — HAZARDOUS MATERIALS -DIVISION: OCCUPANCY CLASSIFICATION: Indicate -by circling the item, whether your business will use, process, or .store any of the following .hazardous materials. If any -of the items are circled, applicant must contact the Fire Protection Agency with Jurisdiction prior to plan,submittal. 1. 'Explosive or Blasting Agents 5. Organic'Peroxides 9. Water Reactives 13. Corrosives 2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards & Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These. 4.-Flammable Solids 8. Unstable Reactives 12. Radioactives Call (619)-338-2222 prior to the issuance of a building permit. occ-W, r / FEES ARE REQUIRED. Expected Date of Occupancy: YES 0 1. ❑ is - your business listed on the reverse side of this form? (check all that apply). 2. ❑ Will your business dispose of Hazardous Substances or Medical Waste in any amount? 3. ❑ Will your'business store or handle Hazardous Substances in quantities equal -to orgreater than 55.galions, 500 pounds, 200 cubic feet, or carcinogenstreproductive toxins in any quantity? 4. ❑ Will your business use an existing or install an underground storage tank? '5. ❑ 0 Will your -business store or handle Regulated Substances.(CaIARP)? -6. ❑ Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)? If the answer to any of the :go, CA 92101. ❑ CaIARP Exempt Date Initials ❑ CaIARP Required Date Initials ❑ CaIARP Complete Date Initials PART III: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT: If the answer to any of the questions below is yes, applicant must contact the Air Pollution Control District (APCD), 10124 Old Grove Road, San Diego, CA 92131-1649, telephone (858) 586-2600 prior to the issuance of a building or demolition permit. Note: if the answer to questions 3 or 4 is yes, applicant must also submit an asbestos notification form to the APCD at least 10 working days prior to Commencing demolition or renovation, except- demolition or renovation of residential structures of four units or less. Contact the APCD for more information. YES i. ❑ Will the subject facility or construction activities include operations or equipment that emit or are capable of emitting an air contaminant? (See the APCD factsheet at h#tD:/lwwwsdancd.orQCnfo/facts/oermit_pdf, and the list of typical equipment requiring an APCD permit on the reverse side of this from. Contact APCD if you have any questions). 2. ❑ ❑ (ANSWER ONLY 1F QUESTION 1 IS YES) Will the subject facility be located -within 1,000feet of the outer boundary of a school (K through 12)? (Public and private schools may be found after search of the California School 'Directory at http://www.cde.ca.uov/-re/sd/,, or contact the appropriate school district). 3. X ❑ Will there be renovation that involves handling of anyfdable asbestos materials, or disturbing any material that contains non -friable asbestos? 4. ❑ 'Will there be demolition involving -the removal of a load supporting structural member? Briefly describe b siness activities: Briefly describe proposed project: �2e-Fti, � �clare under I of ry that to -the best of my knowledge and belief the responses made herein are -true and correct. Name of owner Agent Signature of Owner or Authorized Agent Date ,FOR OFFICIAL USE ONLY: FIRE.DEPARTMENT OCCUPANCY CLASSIFICATION: .BY: DATE: I EXEMPT OR NO FURTHER INFORMATION REQUIRED RELEASED FOR BUILDING PERMIT BUT -NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY COUNTY-HMD APCD COUNTY-HMD APCD COUNTY-HMD APCD Con ,\0 ro` o\` C o(,D�ate Ire 1ts`v0 of at�� HM-9111 {04/07) 4,10" 2ato „ 11,9 County of San Diego— DEH•— Hazardous Materials Division CB100216 2555 EL CAMINO REAL JC PENNY: 106,958SF INTERIOR REMODEL 4 br! !:v s�d�v�o cdvsr,�uc. ,51NCe- l/ae%e of 400 ,51f 11da11( la, &Cat7IOW Cf& I 3 (z l io - "To sco; C �-} , \vl�s� FC 3► b l - PW � �sc1' L u i A 3-046 &VJ,�14 CV Approved Date B BUILDING — zz-/ o PLANNING ENGINEERING :,I/ (D /0 FIRE (J ( 0 HazMat APCD Health Forms/Fees Sent Rec'd Due? By Encina Z. /Q Z . I a Y N Fire Y N HazHealthAPCD /0 Y N PE&M ip Y N School Y N Sewer Y N Stormwater Y N Y N CFD: Y (5, LandUse: ImpArea: FY: Factor: PFF: Y N Comments Date Date Date Date Building ,� 1 tp 1 f� If3 Planning Engineering Fire (C7 Need? N ❑ Done - 6a3 Done ❑ Done ❑ Done ❑ Done Application Complete? Y N By: Fees Complete? Y N By: