Loading...
HomeMy WebLinkAbout2555 Glasgow Dr; ; CBRA2016-0039; RecycleLo,,#. 55 Ccityof Carlsbad RESIDENTIAL GREEN BUILDING CODE STANDARDS MANDATORY MEASURES CERTIFICATION CHECKLIST Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov B-51 Site ~~velopment 4.106.2 A plan is developed and implemented to manage storm water drainage during construction. 4.106.3 The site shall be planned and developed to keep surface water away from buildings. Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. 4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by the California Energy Standards. inaoefW«lter u!;e -· ·· ---· · · ·--r, ,. ~,-~-- ........ .::..4,k~ . ---:.. . . ... ... .. _ .. _ ,, • .. . .;, ·•. ..; .. ~ .. 'It ...,.-i,1·?...,..-· • . ~,.,.. ~ 4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods: 1. Water saving fixtures or flow restrictors shall be used. 2. A 20 percent reduction in baseline water use shall be demonstrated. 4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not exceed maximum flow rates. 4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall comply with specified performance requirements. Outdoor Water Use · · ~· •• ... • • .. ........... 1 '--~ .-..· •.• ; ... ' •• 4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather- based. E~hanced Durability and ~edlic~cl Miintenance l.,·.• . 4.406.1 Joints and openings. Annular spaces around pipes, electric cable~. conduits or other openings in plates at exterior walls shall be protected against the passage of rodents by closing ·such openings with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. 4.408.1 A minimum of 50 percent of the construction waste gen_erated at the site is diverted to recycle or salvage. Recycled material receipts from approved recyclers must be attached to this form. 4.408.2 Where a local jurisdiction does not, have a construction and demolition waste management ordinance, construction waste management plan, per form B-59, shall be submitted for approval to the enforcing aaencv. Building Maintenance and Operation • ,\·. • ' • ' • ';',:,Jy',;;.'-! ... • . • • ~ •,, • '. 4.410.1 An operation and maintenance manual shall be provided to the building occupant or owner. '..PJfandato ...... --· . -· ,ry (X) (X) (X) (X) 7/01/2011 (X) 7/01/2011 (X) 7/01/2011 (X) (X) (X) (X) {X) )~-1.~fr<>nmerital Qualify .. . ......... -~·-' . .. '.'" .• ... ~Fireplaces __ _ 4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable. Woodstoves, Pellet stoves and fireplaces shall also complv with applicable local ordinances. 8-51 Page 1 of2 (X) Rev. 11/15 Pollutant Control .. 4.504.1 Duct openings and other related air distribution component openings shall be covered during construction. . . (X) 4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC an_d other toxic compound (X) limits. (X) 4.504.2.2 Paints, stains and other coatings shall be compliant with voe limits. (X) 4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for ROG and other toxic compounds. ' (X) 4.504.2.4 Documentation shall be provided to verify that compliant voe limit finish materials have been used. (X) 4.504.3 Carpet and carpet systems shall be compliant with voe limits. 4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (X) defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or be certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. (X) 4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior finish systems shall comply with low formaldehyde emission standards. Interior Moisture Cpntrol .. -..... . -~ -"I 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X) 4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X) enclosure. Indoor Air Quality and Exhaust 1--..-·-, . _. _,__..,._~ 4.506.1 Exhaust fans which terminate outside the building are provided in everv bathroom. (X) ,. ' Environmental Comfort • . .. 4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (X) fan is off. Covers or louvers shall have a minimum insulation value of R-4.2. 4.507.2 Duct systems are sized, designed, and equipment is selected using the following methods: (X) 1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent. 2. Size duct systems according to ACCA 29-D (Manual D) or equivalent 3. Select heating and cooling equioment according to ACCA 36-S (Manual S) or equivalent. ·-. :-,• .-'~ --,.. .. ,, "!-! ..--. :-• ~ . . ·-. --· ·"'-Installer and Special lnsp~ctor Qualifications .. r•,-.••'• 702.1 HVAC system installers are trained and certified in the proper installation of HVAC (X) systems. 702.2 Special insp~ctors employed by the owner must be qualified and able to demonstrate competence in the discipline they are insoectina. (X) I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2013 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: 2555 &~ovJ D'i: Plan Check Number: ·pa0D:Ji;/J Print Name: ~.o-~S-~~ n~ Signedk' License Number: c;; "3 ~ ~ \iate: q / 5/ 17 i,- 8-51 Page 2 of2 Rev. 11/15 C tityof Carlsbad owner: WASTE MANAGEMENT PLAN 8-59 Contractor: Development Services Building Division 1635 Faraday Avenue 760-602-27]$ www.carlsbadca.gov Job Address: [.5~5 Phone Number: q 'f Ci -3 l t> .. \ t) la <j Estimated Cost of Project $ 5'/ ef ) I 'f • • Type of Project: ~ New Construction D Remodel or T.I. D Residential O Commercial O Demolition ~h~kallthatappM D~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 50% per CALGreen S~. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of· new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS 0°F COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area X 2 lbs. = lbs. of allowable waste. D I plan on using a WPSTE MANAGEMENT roU-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estim ated Waste_ (T_o be filled out prior to permit issuance -refer t~ example on Page 2.) MATERIALS lbs. of waste to betaken to lbs. of waste to be LANDFILL RE-USED or RECYCLED Wa$1:e Hauling Company or Re-Use Method Asphalt/ Concrete Brick/ Masonry cardboard D_rywall Landscape Debris Lumber I Wood Metals Mixed Waste Trash Garb e Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled,_ __ ~ ___ % Official Use Only D Plan Approved D Plan Denied D Project Valuatlon Approved Reviewed/ Approved by:. _________________ _ Page 1of2 Table 2 -Actual Waste (To be completed atter construction.) MATERIALS Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash Garba e other: TOTAL lbs.: Official Use. Only lbs. of waste ta ken to LANDA LL lbs. of waste RE-USED or RE;CYCLED Waste Hauling Company or Re-Use Method ( complete only if different than Table 1) D 50% Goal Achieved D 50% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _ ...,.,..:....:: ____ ~~ Reviewed/ Approved by=--:::::::...~ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be tak~n to lbs. of waste to be LANDFILL RE-USED or RECYCLED Asphalt/ Concrete •. .. 0 2000 Brick:/~my . " WO 450 Cardboard C 0 150 Drywall . . . 0 . 50 LandSGape Debris 0 1.20 Lumber I Wood 500 0 Metals .,. 300 2[)0 Mixed Waste ' '-· .. 1500 . . 0 Trash I Garbage 300 0 Other: Pool c;uV\..Lte 0 1}00 TOTAL lbs.: 2J-OO 3f?J-O Percentage to be Re-Used or Recycled 59 % Formula: To~Re-used or RecycJed X 100 = % Re-Used or Recycled (Total Combined Waste) Waste Hauling Company or Re~Use Method AlsC HtH,<.Ltv\,c; Co. WM I Re-used Bn.c~ 0111,-stte A:SC t-tciuLL•A,., co. AlsC t-tci uLLll\,lA Co. Mulched c; R£-used OVv-sLte wciste Mei V\..ClCle~eV\,t WM I AlsC 1-tC!uLt~ WM WM used et.s crushed lsetse 011v-sLte 3870 X 100 = 59% Re-Used or Recycled (2700 + 3870) Since.59% exceeds the minimum requirement of 5(?%, this plan complies. Page 2 of 2 .• . I . . . · · . AGRISCAPE, INC. -. · . . · ~nro Borel Rood Munielg.. CA 9'2563 · . · . ·(95D 696-0651 . · : .... . . . . . . ~. b :. /l { ! !; ~~;;J k'°: 10 L;on~ · I V . . . :· .. ; .·1hdt· . . : .. ' ,_ .1-2111~~ ;..,· .• ;., , ·' • ·cih <-;-· · ,i.e :. ·£: ·· · , ">._--,·. ·· -·~ we:. , . s·t ···• ,-. ·'. -.•_" ii f , ••• C " l . . ~ i ! ., i i l i ! i ! r i· I I ;: . ' i k '." f" I . f • I I ! .. i ' 1 ! ' ,. ! . 76 SAND & GRAVEL CONCRETE & ASPHALT RECYCLE POBOX965 BONSALL, CA92003 SALES: (760) 497...QMl . . ' ·. :- P.O. NAME · CllY OF ORIGIN JOB LOCATION ( "\ ~ l · \"" . -n ('\X-\ ~De-\., .. PU ITRAU:A laAlBED BOBTAL LOAD COUNT 1 2 3 ··-/ ){ = ~1. ,; " 1-\\L '. --.r I k: #LOADS x . ,i 1! . ·1 . I'.' l ,, ·'-' I / {)._l..cJ /. f r ·,,.~/(/ .r~ ·• T ..... _ I ..; MAlERIAI.. 4 5 -. 20C:- PRICE I ', , . . .,; .. -,. f DAlE , ' • . , t , I { ~ q I I RESIDENCE lflME i .,,.. .. '-.. 110-WHEB. ":-IEN9DUMP IT&T i 't ... ~-~(. ... . }~-\. .. _(. 6 7 8 9 ..-: OTHER CHARGES TOTAL lRUCK# 10 AN bills due upon presentation unless o1herwlse arranged in advance. Open accounts subject to 1 112% month, charge after 30 days unpaid balance. . 76 SAND & GRAVEL Is not responsible ·for damage to vehicle while being loaded or unloaded In yard. · JOB.COPY .. ~ . ! j· 1-i !" i· i l ! ! i I I i . t / ,_ I ! t· ! . i I f I l I I ! ' I l I I- .#LOADS SIGNATURE -76 SAND & GRAVEL CONCRETE&ASPHALTRECYCLE POBOX965 BONSALL, CA 92003 SALES: (760) 497-6041 RATBED ENDDUMP T&T J . _. ' . :' 3 X -t .., ..., .. '· .... 4 9 r/.-(o 10 o~r CHARGES_. s [DOD. o D ..... J .. ' .•· ! ·a ,-FnTAL f I f.'i.7 ~' --. \~ TRUCK# An bills due upon presentation unless otherwise arranged in ~-Open accounts suti;ect to 1 1/2% month, charge after 30 days unpaid 76 SAND & GRAVEL is not responsible for damage to vehicle while being loaded or unloaded in yard. balance. . JOB COPY PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 "'760) 603-0153 333367 -RUBIO CONSTRUCTION SERVICES INC 26341 JEFFERSON AVE STE#G MURRIETA, CA 92562 Contract: COMM-GATE Yr. 200 GROSS 30,800 Scale In TARE 27,620 Scale Out NET 3,180 Tracking Qty: 0.00 Qty 1.59 Origin: Signature; Un_i t Description TN MSW CARLSBAD 100% ·. 54 Ticket :fl:: 15989i.? ~ Weighmaster: padilan In: May 24, 2017 01.lt: May 24, 2017 Vehicle: CD Ref: rubio BOL: INBOUND INVOICE Rate Extension $66.00 $104.94 ., ·. --. --· -· "'~- Tax $0.00 Total Paid Change Total $104.94 $104.94 $0.00 $0. 00 · PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 54 Ticket i: 1623586 Weighmaster: gomezda 760)603-0153 In: July 15, 2017 333367 -RUBIO CONSTRUCTION SERVICES INC out: July 15, 2017 A43288 26341 JEFFERSON AVE STEtG MURRIETA, CA 92562 Vehicle: Contract: INDUSTRIAL-GATE 2 GROSS 33,820 Scale In TARE 29,900 Tare Out NET 3,920 Tracking Qty: 0.00 Qty 1.96 Origin: Signature: Unit Description TN MSW CARLSBAD 100% Ref: BC)L: INBOUND INVOICE Rate Extension $67. 30 $131. 91 Tax $0.00 Total Paid Change 8:45 am 8:45 am Total $131. 91 $131. 91 $0.00 $0.00 PALOMAR TRANSFER 5960 EL CAMINO REAL "CARLSBAD, CA 92008 54 Ticket #:1575216 Weighmaster: ARANGLO · (760)603-0153 In: April 04, 2017 333367 -RUBIO CONSTRUCTION SERVICES INC out: ·1 04 2017 26341 JEFFERSON AVE STE#G Apr;i. ' MURRIETA, CA 92562 Vehicle: a40908 Contract: INDUSTRIAL-GATE 2 GROSS 24,500 TAREi ... 1:_;~!..~00 . · NET 5, 6qo Tracking Qty: 0.00 Qty Unit Description 2.80 TN MSW Origin: CARLSBAD Signature: Scale In 'rare Out . .. · .. -. . . ..._ __ ""---:-.-.. 100% Ref: ·-·.- BOL: INBOUND. ----·ntv:0±-€£:·. -~-::: . -· . Rate Extension $6'6.00 $184 .80 ---.-.. ·- Tax $0.00 . ·-' .· Total . Paid Change 8:09 am 8:09 am Total · $184.80 .. --- $184.80 $0.00 $0.00 E$Cb~dido Resource .Recovery !~44 W Washingto~ Av a ~scond ido~ CA 92025 . 760 i 7 45-3203 ·cu:..-t oaer: 1203 T icket; RUBIO CONSTRUCTIO~ SERVI 26341 JEFFERSON AVE, #G MU~RIETTA, CA 92562 ~omraodity ll SF.LFHAUL REFUSE Det e; Units [Gross<In): 34,280. lbs Man -Wt ANGEL · V. 3272 07/20/17 Tl. !?J0 p;n-· Tare 29,000. I n: ..... 8::50 ,9 :50 lNiJOICE Truck: 10951/0000 Contcdner: Route: <U611 Origin : 016 Escondid TOTAL DUE 203.28 Dri ver I ' ,_ : ..... ,.·, ·.t':· 1: ,(,"'I. "{i.g··-~·. -,-.,-.... · .. ·., 273( -• r .. ., ., -·< .·.. ~ .... i:,, , ... d .,. . ~ l i i .l i 1 i ! l j ! r i· ~ ! ;: . I ! ~-v. r I I ! .· L I i I !' ~ P.O. NAME · CITY OF ORIGIN 76 SAND & GRAVEL CONCRETE & ASPHALT RECYCLE POBOX965 BONSALL, CA92003 SALES: (760) 497-'041 · ·. -.. ,. .. '-.. l.! ( \ ' l \e-·.. -/--\ f'\ '( \ .:,. DC' \.,. . JOB OCATION PU ,~ LOAD COUNT 1 2 ··v ;( /\. ' ,"li ·1-\ \/_ -"\ (. . ' . IF.tAlBED B08TAR. 3 MATERIAL 4 5 -. __,Lr-r··. v---· 'I,;-110-WHEB. ,EH~OUMP r&T ,-· .. _ f·-t .. _(. , . ; 7 ;·~(. . ... \.~ 6 7 8 9 ..: \ 10 #LOADS X . PRICE OTHER CHARGES ,i ,'I· ;;!, -·1 . //f /p ., .. ' ~ bJ 1 · r r v · ~-1 ·; ..--.. T ~ -r.,,r SIGNATURE.-" All bills due upon presentation unless otherwise arranged In advance. Open accounts subject to 1 1fl% month, charge after 30 days unpaid balance. . TOTAL ,.--.... :1 ~ ~ ~L~'-!,_ . ~ r7 . ·--TRUCK# 76 SAND & GRAVEL Is not responsible for damage to vehicle while being loaded c,r unloaded In yard. · JOs·coPY .• . '· t i ! I I · I· I ! i i !. P.O. i i I r I i I i -76 SAND & GRAVEL CONCRETE & ASPHALT RECYCLE POBOX965 ·BONSALL, CA92003 SALES: (760) 497-6041 i h ' ; ' • JOB LOCATION ~ .. n v1~ --J ! . . . V[": Ii.A A I ·· . , '-"'\..V I i PU TRAILER RAlBED BOBTAIL ENDDUMP T&T ! j i i: i I I ' I ;. ; i-i ! i · i I l . . ! I . ! t· I I l. ,. 1- 1 .· . _.,..~ <;. .I LOADS SIGNATURE .. >'. . ~-•. · .: .. . · .... ':' X -t..., .., ...... . ' 5 6 7 8 9 PRICE .·:,l .. ~ .-· TRUCK# 10 I I I All bils due upon presentation unless otherwise arranged In ~-Open accounts subject to 1 1/2% month, charge after 30 days unpaid balance. . 76 SAND & GRAVEL is not responsible for damage to vehicle whlJe being loaded or unloaded in yard. .·, 'i ·.} • :; -1 * .j . -s { ~ . 1 ·, J ' :, ·1 -~ ] .i -J .. I i I I l I ------.. :~.r.r~~-nc-~--.. J .... ~-\ii&;.·..)~, d 1-. JOB COPY . 1 ! :: S: · 54 Ticket i: 1598~ ~ PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 Weighmaster: padilan .:.:. ... - · ''760) 603-0153 .333367 -RUBIO CONSTRUCTION SERVICES INC 26341 JEFFERSON AVE STE#G MURRIETA, CA 92562 Contract: COMM-GATE Yr. 200 GROSS 30, 800 Scale In TARE 27, 620 Scale Out NET 3,180 Tracking Qty: 0.00 Qty 1.59 Origin: Signature'. Un_i t Description TN MSW CARLSBAD 100% In: May 24, 0qt: May 24, Vehicle: CD Ref: rubio BOL: INBOUND INVOICE Rate Extension $66.00 $104.94 ., ·. -·. 2017 2017 ~-- Tax $0.00 Tota l Paid Change ~-, 12 ·.,59 pm "" . '. ,- 1',-21·pm Total $104.94 $104.94 $0.00 $0. 00 · ,' I PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 760)603-0153 54 Ticket t: 1623586 Weighma.ster: gomezda In: July 15, 2017 333367 -RUBIO CONSTRUCTION SERVICES INC out: 26341 JEFFERSON AVE STEJG July 15, 2017 A43288 MURRIETA, CA 92562 Vehicle: Contract: INDUSTRIAL-GATE 2 GROSS 33,820 Scale In TARE 29,900 Tare Out NET 3,920 Tracking Qty: 0.00 Qty Unit Description 1.96 TN MSW Origin: CARLSBAD 100% Signature: Ref: BOL: INBOUND INVOICE Rate Extension $67. 30 $131. 91 Tax $0.00 Total Paid Change 8:45 am 8:45 am Total $131. 91 $131. 91 $0.00 $0.00 PALOMAR TRANSFER 5960 EL CAMINO REAL "CARLSBAD, CA 92008 54 Ticket #:1575216 Weighmaster: ARANGLO · (760)603-0153 In: April 04, 2017 3333 67 -RUBIO CONSTRUCTION SERVICES INC Out: · 7 26341 JEFFERSON AVE STE#G Apr,1.l 04, 201 MURRIETA, CA 92562 Vehicle: a40908 Contract: INDUSTRIAL-GATE 2 GROSS 24,500 TARE _·. 1 '. }-~!_?OO . . NET 5, 6qO Tracking Qty: 0.00 Qty Unit Des~ription 2.80 TN MSW Origin: CARLSBAD Signature: Scale In Tare Out . --·---.. .....__ __ ---=-.--. 100% Ref: BOL: INBOUND. ---<rnvrueE:-.. ~--.:: ... -' Rate Extension $66.dO $184.80 ·- . :... .. Tax $0.00 . ·-· .· Total , Paid Change 8:09 am 8:09 am Total · $184 .80 $184.80 $0.00 $0.00 Escb~dido Resource .Recovery 1~44 W Washington Ave ·r:::scond ido~ CA 92025 .760i 745-3203 ., 1203 Ticket ; 3872 In: 8:50 Out: 8 :50 Dats; 0.7/20 /17 RUBI O CONSTRUCTIO~ SERVI 263·41 JEFFERSON AVE, #G MU~RIETTA, CA 92562 Camraodity Units :2 SELFHAUL REFUSE 2.€.4 [Gross(In): 34,280. lbs Man -Wt Ra~e 77. !?.!0 per Tare 29,0©0. .......... INVOICE Truck: 10951/©000 Container: Route: 01.611 Origin ~ 016 Escondid TOTAL DUE 203.28 ANGEL · V. Dri ver ;,