HomeMy WebLinkAbout2571 MUIRFIELDS DR; ; CB062178; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
05-24-2013 Residential Permit Permit No: CB062178
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
2571 MU1RFIELDS OR CBAD
RESDNTL Sub Type: SFD
lot#: 6
Constuction Type: VN
Reference#: CT02-19
Structure Type: SFD
Bathrooms: 3.5
Status: ISSUED
Applied: 07/24/2006
Entered By: RMA
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
2132500600
$597,464 _ 00
1
4
Plan Approved: 05/22/2013
Issued: 05/22/2013
Inspect Area:
Project Title:
Orig PC#: PC040107
MAGNOLIA ESTATES-PLAN 1-PHS 4
Plan Check#: pc060044
4985 SF,1088 SF GAR,156 SF PORCH
Applicant:
BARRATT AMERICAN INCORPORATED
5950 PRIESTLY
CARLSBAD, CA 92009
760-431-0800
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Green Bldg Stands Plan Chk Fee
$2,034.34
$0.00
$1,322.32
$0.00
($105.79)
$59.75
$5,728.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,174.00
01
$814.00
$0.00
??
??
Total Fees: $37,607.92 Total Payments to Date:
Inspector:
Owner:
MAGNOLIA PARTNERS, LLC
STE 212
1094 CUDAHY PL
SAN DIEGO CA 92100
Meter Size
Add'I Reel. Water Con Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee {4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
Fire Sprinkler Fees
TOT AL PERMIT FEES
$37,607 92 Balance Due:
Clearance:
01
$0.00
$220.00
$6,901.00
$3,152.96
$10,873.84
$0.00
$0.00
$0.00
$2,390.00
$0.00
$0.00
$224.00
$110.00
$91.50
$0.00
$0.00
$0.00
$0.00
$1,701.00
($5,083.00)
??
$37,607.92
$0.00
NOTlCE: Please take NOTICE that approval of your project includes the 'lmposit\on" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.' You have 90 days from the date this pennit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infonnation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or servlce fees in connection with this project. NOR DOES IT APPLY to any
f f hi . I . N T . 'I . h .
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
05-22-2013
Storm Water Pollution Prevention Plan (SWPPP) Permit
Permit No:SW110095
Job Address:
Permit Type:
2571 MUIRFIELDS DR CBAD
SWPPP Status:
Parcel No: 2132500600 Lot#: 6 Applied:
Reference #:
CB#:
Project Title:
Applicant:
CT020019
CB062178
MAGNOLIA EST ATES-PHASE 4 &
BUILDOUT
MAGNOLIA PARTNERS L L C
1094 CUDAHY PL #212
SAN DIEGO CA 92110
Emergency Contact:
JOHN COLUCCI
619 997-6456
SWPPP Plan Check
SWPPP Inspections
Additional Fees
TOTAL PERMIT FEES
Entered By:
Issued:
Inspect Area:
Tier:
Priority:
Owner:
MAGNOLIA PARTNERS L L C
1094 CUDAHY PL #212
SAN DIEGO CA 92110
ISSUED
03/10/2011
RMA
05/22/2013
1
L
$0.00
$54.00
$0.00
$54.00
Total Fees: $54.00 Total Payments To Date: $54.00 Balance Due: $0.00
lnspe·ction List
Permit#: CB062178 Type: RESDNTL SFD
Date lnspecti<>n Item Inspector
08/27/2014 19 Final Structural
08/27/2014 89 Final Combo PD
08125/2014 19 Final Structural
08/25/2014 89 Final Combo PO
03/10/2014 29 Final Plumbing PD
03/10/2014 39 Final Electrical PD
02/27/2014 22 Sewer/Water Service PD
12/05/2013 82 Drywall/Ext Lath/Gas Test PD
11/06/2013 84 Rough Combo PD
08/20/2013 13 Shear Panels/HD's PD
08/20/2013 15 Roof/Reroof PD
07/09/2013 11 Ftg/F oundation/Piers PD
06/21/2013 21 Underground/Under Floor PD
Friday, August 29, 2014
Act
RI
AP
RI
NR
AP
AP
AP
AP
AP
AP
AP
AP
AP
MAGNOLIA EST ATES-PLAN 1-PHS 4
4985 SF, 1088 SF GAR, 156 SF PORCH
Comments ·---···-----·-·· ·--· ·-· ----
Page 1 of 1
w
CHRISTIA1'' WHEELER
F N t; I N l. F ll I N C
COMPRESSIVE STR EN GTil TEST RliS LJLTS
Job Name: ~ CWE#:
Job Address: 2571 1\foirftckls Dr., Carbbml, C\ Permit#:
Contractor: Magnolia Partners Architect:
Subcontractor: Four Corners Concrete Engineer:
Test Location: Lot 6 cast end of slab Supplier:
Req. Strength: 4500 psi Mix#:
Date Sampled: 7-10-13 Admixture(s):
Date Received: 7-11-13 Truck#:
Sampled by: JS Mix Temp:
Tested by: MD/NS Slump:
Sample Type: Concrete Min in Mixer:
Sample# Date Tested Age (days) Area (sq. inches)
7550 7-17-13 7 12.566
7551 8-7-13 28 12.566
7552 8-7-13 28 12.566
7553 8-7-13 28 12.566
2130270
CB 062178 Plan File#:
Case Group
!ITK
Superior
371'-45
2556 Ticket#: 112142
88° Air Temp: 80°
5" % Air:
45 Unit Wt
Maximum Load Comp. Strength Failure Type
(lbs) (psi)
49,930 3,970
79,860 6,360
80,630 6,420
81,550 6,490
.. The sampling, handling, curing and compressive strength testing were performed by Ch11st1an Wheeler Eng111eenng 1n accordance with the applicable ASTM standards. No
other warranties express or implied.
Distribution:
magnoliapartncrs@gmail.com
eg@f<>Urcorncrsconcrcte.com
City of Carbbad
Supplier
Reviewed by:
Michael B. Wheeler, ACE #45358 ✓
3980 llomc Avenue ♦ San Diego, CA 92105 ♦ 619-550-1700 ♦ FAX 619-550-1701
·w
CHRJSTIAN WHEELER
I N (; 1 N I I R. I N (,
COMPRESSIVE STRENC,Tll Tl~ST RESULTS
Job Name:
Job Address:
Contractor:
Subcontractor:
Test Location:
Aeq. Strength:
Date Sampled:
2571 Muirfid<ls Dr., Carlsbad, C\
i\Iai-,n1olia l1artncrs
Four Corners Concrete
Lot 6 west end of slab
45UU psi
7-10-13
CWE#:
Permit#:
Architect:
Engineer:
Supplier:
Mix#:
Admixture(s):
2130270
CH 062178 Plan File#:
Case Group
IITK
Superior
37P-45
Date Received: 7-11-13 Truck#: 293 Ticket#: 112136
Sampled by: JS Mix Temp: 88° Air Temp: 80°
Tested by: :\ID/NS Slump: ..:J_1/,'' %Air:
Sample Type: Concrete Min in Mixer: 45 Unit Wt:
Sample# Date Tested Age (days) Area (sq. inches) Maximum Load Comp. Strength Failure Type
(lbs) (psi)
7546 7-17-13 7 12.566 54,370 4,330
7547 8-7-13 28 12.566 71,780 5,710
7548 8-7-13 28 12.566 71,790 5,710
7549 8-7-13 28 12.566 72,180 5,740
The samphng, handling, cunng and compressive strength tesang were performed by Chnstlan Wheeler Engmeenng 1n accordance with the applicable ASTM standards. No
other warranties express or implied.
Distribution:
magnoliapartners@gmail.com
cg@fourcomcrsconcrctc.com
City of Carlsbad
Supplier
Reviewed by:
~~
Michael B. Wheeler, ACE #45358 ✓
3980 llome ,\venue ♦ San Diego, CA 92105 ♦ 619-550-1700 ♦ F,\X 619-550-1701