Loading...
HomeMy WebLinkAbout2571 MUIRFIELDS DR; ; CB062178; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 05-24-2013 Residential Permit Permit No: CB062178 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: 2571 MU1RFIELDS OR CBAD RESDNTL Sub Type: SFD lot#: 6 Constuction Type: VN Reference#: CT02-19 Structure Type: SFD Bathrooms: 3.5 Status: ISSUED Applied: 07/24/2006 Entered By: RMA Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: 2132500600 $597,464 _ 00 1 4 Plan Approved: 05/22/2013 Issued: 05/22/2013 Inspect Area: Project Title: Orig PC#: PC040107 MAGNOLIA ESTATES-PLAN 1-PHS 4 Plan Check#: pc060044 4985 SF,1088 SF GAR,156 SF PORCH Applicant: BARRATT AMERICAN INCORPORATED 5950 PRIESTLY CARLSBAD, CA 92009 760-431-0800 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee HMP Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee Green Bldg Stands (SB1473) Fee Green Bldg Stands Plan Chk Fee $2,034.34 $0.00 $1,322.32 $0.00 ($105.79) $59.75 $5,728.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $7,174.00 01 $814.00 $0.00 ?? ?? Total Fees: $37,607.92 Total Payments to Date: Inspector: Owner: MAGNOLIA PARTNERS, LLC STE 212 1094 CUDAHY PL SAN DIEGO CA 92100 Meter Size Add'I Reel. Water Con Fee Meter Fee SDCWAFee CFO Payoff Fee PFF (3105540) PFF (4305540) License Tax (3104193) License Tax (4304193) Traffic Impact Fee (3105541) Traffic Impact Fee {4305541) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnLieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees Fire Sprinkler Fees TOT AL PERMIT FEES $37,607 92 Balance Due: Clearance: 01 $0.00 $220.00 $6,901.00 $3,152.96 $10,873.84 $0.00 $0.00 $0.00 $2,390.00 $0.00 $0.00 $224.00 $110.00 $91.50 $0.00 $0.00 $0.00 $0.00 $1,701.00 ($5,083.00) ?? $37,607.92 $0.00 NOTlCE: Please take NOTICE that approval of your project includes the 'lmposit\on" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions.' You have 90 days from the date this pennit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required infonnation with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or servlce fees in connection with this project. NOR DOES IT APPLY to any f f hi . I . N T . 'I . h . City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 05-22-2013 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW110095 Job Address: Permit Type: 2571 MUIRFIELDS DR CBAD SWPPP Status: Parcel No: 2132500600 Lot#: 6 Applied: Reference #: CB#: Project Title: Applicant: CT020019 CB062178 MAGNOLIA EST ATES-PHASE 4 & BUILDOUT MAGNOLIA PARTNERS L L C 1094 CUDAHY PL #212 SAN DIEGO CA 92110 Emergency Contact: JOHN COLUCCI 619 997-6456 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Entered By: Issued: Inspect Area: Tier: Priority: Owner: MAGNOLIA PARTNERS L L C 1094 CUDAHY PL #212 SAN DIEGO CA 92110 ISSUED 03/10/2011 RMA 05/22/2013 1 L $0.00 $54.00 $0.00 $54.00 Total Fees: $54.00 Total Payments To Date: $54.00 Balance Due: $0.00 lnspe·ction List Permit#: CB062178 Type: RESDNTL SFD Date lnspecti<>n Item Inspector 08/27/2014 19 Final Structural 08/27/2014 89 Final Combo PD 08125/2014 19 Final Structural 08/25/2014 89 Final Combo PO 03/10/2014 29 Final Plumbing PD 03/10/2014 39 Final Electrical PD 02/27/2014 22 Sewer/Water Service PD 12/05/2013 82 Drywall/Ext Lath/Gas Test PD 11/06/2013 84 Rough Combo PD 08/20/2013 13 Shear Panels/HD's PD 08/20/2013 15 Roof/Reroof PD 07/09/2013 11 Ftg/F oundation/Piers PD 06/21/2013 21 Underground/Under Floor PD Friday, August 29, 2014 Act RI AP RI NR AP AP AP AP AP AP AP AP AP MAGNOLIA EST ATES-PLAN 1-PHS 4 4985 SF, 1088 SF GAR, 156 SF PORCH Comments ·---···-----·-·· ·--· ·-· ---- Page 1 of 1 w CHRISTIA1'' WHEELER F N t; I N l. F ll I N C COMPRESSIVE STR EN GTil TEST RliS LJLTS Job Name: ~ CWE#: Job Address: 2571 1\foirftckls Dr., Carbbml, C\ Permit#: Contractor: Magnolia Partners Architect: Subcontractor: Four Corners Concrete Engineer: Test Location: Lot 6 cast end of slab Supplier: Req. Strength: 4500 psi Mix#: Date Sampled: 7-10-13 Admixture(s): Date Received: 7-11-13 Truck#: Sampled by: JS Mix Temp: Tested by: MD/NS Slump: Sample Type: Concrete Min in Mixer: Sample# Date Tested Age (days) Area (sq. inches) 7550 7-17-13 7 12.566 7551 8-7-13 28 12.566 7552 8-7-13 28 12.566 7553 8-7-13 28 12.566 2130270 CB 062178 Plan File#: Case Group !ITK Superior 371'-45 2556 Ticket#: 112142 88° Air Temp: 80° 5" % Air: 45 Unit Wt Maximum Load Comp. Strength Failure Type (lbs) (psi) 49,930 3,970 79,860 6,360 80,630 6,420 81,550 6,490 .. The sampling, handling, curing and compressive strength testing were performed by Ch11st1an Wheeler Eng111eenng 1n accordance with the applicable ASTM standards. No other warranties express or implied. Distribution: magnoliapartncrs@gmail.com eg@f<>Urcorncrsconcrcte.com City of Carbbad Supplier Reviewed by: Michael B. Wheeler, ACE #45358 ✓ 3980 llomc Avenue ♦ San Diego, CA 92105 ♦ 619-550-1700 ♦ FAX 619-550-1701 ·w CHRJSTIAN WHEELER I N (; 1 N I I R. I N (, COMPRESSIVE STRENC,Tll Tl~ST RESULTS Job Name: Job Address: Contractor: Subcontractor: Test Location: Aeq. Strength: Date Sampled: 2571 Muirfid<ls Dr., Carlsbad, C\ i\Iai-,n1olia l1artncrs Four Corners Concrete Lot 6 west end of slab 45UU psi 7-10-13 CWE#: Permit#: Architect: Engineer: Supplier: Mix#: Admixture(s): 2130270 CH 062178 Plan File#: Case Group IITK Superior 37P-45 Date Received: 7-11-13 Truck#: 293 Ticket#: 112136 Sampled by: JS Mix Temp: 88° Air Temp: 80° Tested by: :\ID/NS Slump: ..:J_1/,'' %Air: Sample Type: Concrete Min in Mixer: 45 Unit Wt: Sample# Date Tested Age (days) Area (sq. inches) Maximum Load Comp. Strength Failure Type (lbs) (psi) 7546 7-17-13 7 12.566 54,370 4,330 7547 8-7-13 28 12.566 71,780 5,710 7548 8-7-13 28 12.566 71,790 5,710 7549 8-7-13 28 12.566 72,180 5,740 The samphng, handling, cunng and compressive strength tesang were performed by Chnstlan Wheeler Engmeenng 1n accordance with the applicable ASTM standards. No other warranties express or implied. Distribution: magnoliapartners@gmail.com cg@fourcomcrsconcrctc.com City of Carlsbad Supplier Reviewed by: ~~ Michael B. Wheeler, ACE #45358 ✓ 3980 llome ,\venue ♦ San Diego, CA 92105 ♦ 619-550-1700 ♦ F,\X 619-550-1701