Loading...
HomeMy WebLinkAbout2577 GARDEN HOUSE RD; ; CB043031; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-19,~04, Residential Permit Permit No: CB043031 Job Address:. Permit Type: Parcel No: Valuation: Occupancy Group: 08/19/2004 # Dwelling Units: Bedrooms: Project Title: Applicant: Building Inspection Request Line (760) 602-2725 2577 GARDEN HOUSE RD CBAD RESDNTL Sub Type: 2131704500 Lot#: $296,571.00 Construction Type: Reference #: Structure Type: 3 Bathrooms: GARDENSIDE@BRESSI PH 1 -PLN 5 3272SF LIV,626SF GAR,20SF PORCH SFD 381 NEW CT02-14 SFD 3.5 Owner: Status: Applied: Entered By: Issued: Inspect Area: Orig PC#: Plan Check#: ISSUED 07/20/2004 KMT Plan Approved: 08/19/2004 TP PC03-66 GREYSTONE HOMES 101 5973 AVENI DA ENCINAS CARLSBAD CA 92009 760-804-7700 9313 08/19/04 0002 01 CGP Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee Reel. Water Con. Fee $1,153.32 $0.00 $749.66 $0.00 ($59.97) $29.66 $2,436.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,999.00 D5/8 $0.00 $0.00 Meter Size Add'I Reel. Water Con. Fee Meter Fee SDCWAFee CFD Payoff Fee PFF PFF (CFD Fund) License Tax License Tax (CFD Fund) Traffic Impact Fee Traffic Impact (CFD Fund) Sidewalk Fee PLUMBING TOTAL ELECTRICAL TOTAL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Housing Credit Fee Master Drainage Fee Sewer Fee Additional Fees TOTAL PERMIT FEES Total Fees: $20,387.66 Total Payments To Date: $0.00 Balance Due: / t, ~ ~nspector: , FINAL APPROV6L Date: 3 k t/2 l Clearance: $0.00 $140.00 $2,004.00 $2,848.90 $5,397.59 $0.00 $0.00 $0.00 $660.00 $0.00 $0.00 $140.00 $60.00 $74.50 $0.00 $0.00 $0.00 $0.00 $1,735.00 $20.00 $20,387.66 $20,387.66 NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020{a}, and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service lees in connection with this project. NOR DOES IT APPLY to any f es/e i n f w i h v r i I Tl E imil hi r hi h h s f limi i n h h rwi 02 20387-66 City of Carlsbad Bldg Inspection Request For: 03/21/2005 Permit# CB043031 Title: GARDENSIDE@BRESSI PH 1 -PLN 5 Description: 3272SF LIV,626SF GAR,20SF PORCH Type: RESDNTL Sub Type: SFD Job Address: Suite: 2577 GARDEN HOUSE RD Lot 381 Location: APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: CD Description Act Comment Inspector Assignment: TP --- Phone: 7608013398 Inspector: e Requested By: ROBERT Entered By: KAREN 11 Fig/Foundation/Piers (· t!"c.---______________________ _ _t12_ _______ £_ ____________ ~ Associated PCRs/CVs lns12ection Histo01 Date Description Act lnsp Comments 03/03/2005 37 Temp. Occ.rrents/Circus AP TP METER REL 01/07/2005 17 Interior Lath/Drywall AP PC 01/07/2005 18 Exterior Lath/Drywall AP PC 01/07/2005 23 Gas/TesVRepairs NR PC 01/06/2005 17 Interior Lath/Drywall NR TP 01/06/2005 18 Exterior Lath/Drywall NR TP 01/03/2005 16 Insulation AP TP 12/29/2004 16 Insulation NR TP 12/28/2004 84 Rough Combo AP PC 12/27/2004 14 Frame/Steel/Bolting/Welding NS PC 12/07/2004 13 Shear Panels/HD's AP PC 12/06/2004 13 Shear Panels/HD's NS PC 11/22/2004 15 Roof/Reroof AP TP 11/19/2004 15 Roof/Reroof NR TP 10/08/2004 11 Ftg/Foundation/Piers AP TP 10/08/2004 12 Steel/Bond Beam AP TP 09/27/2004 21 Underground/Under Floor AP TP