HomeMy WebLinkAbout2582 GLASGOW DR; ; CB163453; RecyclePLAn1 -
1 Goy zq
(47 City of WASTE MANAGEMENT
Development Services
Building Division
Carlsbad PLAN
B9
1635 Faraday Avenue
760-602-2719
•www.carlsbadca.gov
••
Owner:To 11 BeC51-wev-S qoivvei Contractor:9%01($rok-Vver s 1-10-fite,r
ac-Asclo 1D12-Job Address:w Phone Number:CitIC1 —3 to -16 (49
Permit #:CISIC2A3 Estimated Cost of Project:$11 2-
1 tO6 •00
Type of Project It New Construction Remodel or T.I.El Residential D Commercial 0 Dertiolition
(check all that apply)0 Other
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000.For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon
approval of Building Department.
•ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
0 Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. =lbs. of allowable waste.
l plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.)
lbs.of waste to be taken to lbs. of waste to beMATERIALSLANDFILLRE USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt /Concrete •54114 Cara_Vel 16?ima#G1e lye.•
Brick/Masonry 4740 1442-aCide 1.4c
Cardboard 244.Act klo RiketLeoe airover.d.Drywall t
Landscape Debris .S %CO*4fd tea 4POLO ueepLumber/Wood —pirisFe
Metals es6.)„brio Rfesowte flecavedy.-__
Mixed Waste iSe".„„ei:tha gaarD tare let u
•Trash /Garbage 1-4A.Ck cn.1
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled_.
I certify that the information provided herein, to the best of my knowledge, is true and correct.
•
•Contractor or Owner (print narrie)Si1A‘‘AIS
•-3 4—CA t7
Contractor or Owner (signature)Date
Official Use Only
0 Plan Approved 0 Plan Denied 0 Project Valuation Approved
Reviewed /Approved by:
Page 1.of 2
Table 2 -Actual Waste (To be completed after construction.)
lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method •
MATERIALS LANDFILL RE-USED or RECYCLED (complete only if different than Table 1)
Asphalt/Concrete 1 690 SA^J1)/rPAYa.AS-PON—I
Brick /Masonry Pjlt2.600 SQtjC CIZAveL
Cardboard C)707 ••K's cintitsa.--to 2.-z.P._Le'Reaanzr
Drywall l5 1Q -0 .L.A nib c_a./
Landscape Debris -6.%5 .1-1 Q-.SSC.oc.bId -1-2_,C-sot.).•R(ve -ki
Lumber/Wood CI 1
(')2 .
.44R-r•SCd..-PC-
Metals 0 2_6 .12*
Mixed Waste 6)75
2._.Bot &ER la_
Trash /Garbage 13CO (-4 A/b 4-171.--L,
Other:
TOTAL lbs.:Li,t i "2,‘.g 9 q
Actual Percentage Re-Used or Recycled 6.I %
Official Use Only
0 50% Goal Achieved 0 50% Goal Not Achieved 0 Alternative Compliance Achieved Penalty Paid $
Reviewed /Approved by:
EXAMPLE:Use the following example as a guide to completing this form.
lbs.of waste to be taken to lbs.of waste to beMATERIALSLANDFILLRE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt./ Concrete --•..s 0 .2000 A13:•C.H-ct ix.LCIA..01 Co.
Brick / Masonry •'...•100 450 WM /Re-t4sect -ri.cie.ow-site
Cardboard -.'0 •150 idc1C.t-hRu.1-i-KLA Co.
Drywall ••:.•0 .50 •ASC i-ta ulf.K.c1 Co.
Landscape Debris .
'0 120 mvichect R..e-used °K.-site
Lumber / Wood -500 0 Waste ma wacienteKt
Metals .
'
•...300 200 WM /Ag.c Haik1.1-Kg
Mixed Waste .„_:1500 ••0 •WM
Trash /Garbage •300 0 WM
Other. PODL Ciu.wite 0 _500 Rseci as Crushed Base ow-site
TOTAL lbs.:2700 3270
Percentage to be Re-Used or Recycled 59 %
Formula:
Total Re-used or Recycled X 100 =% Re-Used or Recycled
(Total Combined Waste)
3870 X 100 =59%Re-Used or Recycled
(2700 +3870)•
Since 59% exceeds the minimum requirement of 50%, this plan complies.
Page 2 of 2
I
12*E4127.AGRISCAPE, INC.107083.'
.37760 Borel Road--z-4,+-,Murrieta. CA 92563 ,..2-
1:!
•(951) 696-0651 •
DATE 11 /..0 20 _
.
1 .i RECEIVED FROM RA) b I 0 C.()*4 C 11 S.1-i //ft/44 .
,.................L..
.
14.•
'
.
W 'Ruck 1 lime .
0 CASHAMOUNTOfACCOUNT?
.
•.
THIS PAYMENT 0 CHECK
,BY
BALANCE DUE ..'0 CHARGE '.Thank You!
.•
1
AGRISCAPE, INC.107224•37760 Bore( Road
Muffled, CA 92563
(951) 696-0651
•DATE I]((20 (Ce9
los )
(
..
..
dRECEIVED FROM Jel \•-'S $
ge.
am
For UJ OCA)
W Truck *TIrne •
:
CC ..
AMOUNT OFACCOUNT0 CASH
..
THIS PAYMENT 0 CHECK
BY
BALANCE DUE 0 CHARGE •Thank You!•
..•....
1.
1
................. ....................
AGRISCAPE, INC.10776737760 Borel Road
Murrleta. CA 92563
(951) 696-0651
DATE jf'"/i 4f 20 f /..'
101°
RECEIVED FROM \U 3 10 VA SltudiCi4.---...._.7.Ns
Far .,ur ..
W Truck*Time
.
CC .
AMOUNT OF ACCOUNT 0 CASH
THIS PAYMENT 0 .CHECK
d
By
BALANCE DUE 0 CHARGE Thank You!::
1 .
76 SAND & GRAVEL I
CONCRETE & ASPHALT RECYCLE ]
PO BOX 965 i
BONSALL, CA 92003 i
SALES: (760) 497-6041
P.O.JOB #DA-
I-•
:
--,.'I t .:i •I
I I
CASH CHECK CHARGE 'COMMERCIAL RESIDENCE TIME
NAME -.--;---i --,
i .
tz.-k...,.c .i..,•••._1CI,
I CITY OF ORIGIN
II)
JOB LOCATION isss.f '
sk ,t k
..,1:Th .,:.
PU TRAILER FLATBED BOBTAIL 10-WHEEL END DUMP T & T I
31
1
_.
MATERIAL
1
.
LOAD COUNT
I 1 2 3 4 5 6 7 8 9 10
\,'
I
1
.
!3
!I
# LOADS X PRICE -OTHER CHARGES
11--s.
.---$!/--_:.----;-.
f?....,..
TOTAL
{.4
I
4.I „
..1V_.c,'-:•--
1-L.•
,:.SIGNATURE -/TRUCK #
All bills doe-upon preSentation unless otherwise 76 SAND '& GRAVEL is not responsible -r -
arranged in advance. Open accounts subject to for damage to vehicle while being loaded
1 112% month, charge after 30 days unpaid or unloaded in yard.
balance.
I
0 1 q -.-41
JOB COPY
J.....Ne7.:....-
r _.
1
76 SAND & GRAVEL
CONCRETE & ASPHALT RECYCLE
PO BOX 965
BONSALL, CA 92003 :
SALES; (760) 497-6041 •.
P.O.JOB*DATE 1 i --
-1
CASH CHECK CHARGE COMMERCIAL RESIDENCE TI
NAME ,e-----t
=
CITY OF ORIGIN
JOB LOCATION if
PU TRAILER FLATBED BOBTAIL 10-WHEEL END DUMP T & T
MATERIAL /7.\1 •
LOAD COUNT _
1 2 3 4 5 6 7 8 9 -10..
------,
1
i
1
{1
1 -1 '7--'-':=-•-
-"--"-
1 ----
I .# LOADS X PRICE OTHER CHARGES
$\i -..............
•1._-•I .
1
-.
".-
/---.;TOTAL./i /,,.,•
'/,7 /..--;t /:(,.e----.•I-0 -'1C ik
SIGNATURE .TRUCK #
All bills due upon presentatiorrbnless otherwise 76 SAND & GRAVEL is notresponsible 2 -:arranged in advance. Open accounts subject to for damage to vehicle while being loadedi1.1/2% month, charge after 30 days unpaid or unloaded in yard.
balance.
01930
JOB COPY
—_—__-_,---
i
_-76 SAND & GRAVEL 1
CONCRETE & ASPHALT RECYCLE
PO BOX 965
BONSALL, CA 92003
SALES: (760) 497-6041
•PO.JOB #DATE
CASH CHECK CHARGE COMMERCIAL RESIDENCE TIME
1NAME
'"‘..::•-,,,,
CITY OF ORIGIN
JOB LOCATION
PU TRAILER FLATBED BOBTAIL 10-WHEEL END DUMP T & T/
MATERIAL N,,t --=(7.---'fIc .f--7LOAD COUNT '--.‘_.--•_.•'t..—.
1 2 3 4 5 6 7 8 9 10
:
s,c..
,,•.i.r•-:-'17-S N? (7-,,-'--•
-'-
_......1 _-..-
•# LOADS 'X PRICE OTHER CHARGES
---,$\S
TOTAL
\.
•
vf ?'".7.•'...
SIGNATURE -TRUCK #.!.
••Alt bills:due upon presentation. unless.ptherwise '76 SAND & GRAVEL is notresponsible
arranged in advance. Open accounts subject to•for damage to vehicle while being loaded r-
1 1/2% month, charge after 30 days unpaid or unloaded in yard.:-balance.
0193?
JOB COPY •
(
1
76 SAND & GRAVEL
1 ,-CONCRETE & ASPHALT RECYCLE
I •
I
if PO BOX 965 ..:
1 BONSALL, CA 92003
SALES: (760) 497-6041 •
•
P.O.
I
.JOB #DATE•-
t.;....
I CASH CHECK CHARGE COMMERCIAL RESIDENCE TIME
I
.
.•
i NAME 1i...---
::::',•i ....-,r.,,_.C.Y"""--.2 :
CITY OF ORIGIN
JOB LOCATION ..,•,i •i
I 1
PU TRAILER FLATBED BOBTAIL 10-WHEEL END DUMP T &T 1
.Ps:.•--]
t MATERIAL
I
./._..
•.1 Tic>.
1LOAD COUNT
1 2 3 4 5 6 7 ---'15-------------6----10
I 1
i 7:-......
1
1
1 ..
i
,--;
.,
,
,1
i
1 /
.1
.I # LOADS X PRICE .OTHER CHARGES ••.
1
$.eCAL....
I
I C TOTAL
1 ...e .....:
r
1
SIGNATURE ..TRUCK #')
1i)
1
--•All bills due_upon-presentation unless otherwise .-76 SANDA GRAVEL is not responsible.•'..-1
!arranged in advance. Open accounts subject to for damage to vehicle while being loaded •'.
•:.
1 1/2% month, charge after 30 days unpaid or unloaded in yard.
balance.
01963
JOB COPY
54 Ticket #:1532410
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD,CA 92008 Weighmaster:padilan
(760)603 -0153 In:December 21,2016 11:58 am
333367 -RUBIO CONSTRUCTION SERVICES INC Out:December 21,2016 11:58 am26341JEFFERSONAVESTE#G
MURRIETA,CA 92562 Vehicle:A22219
Ref:
Contract:COMM-GATE Yr.200 BOL:
GROSS 37,360 Scale In
TARE 28,480 Tare Out INBOUND
NET 8,880 INVOICE
Tracking Qty:0.00
Qty Unit Description Rate Extension Tax Total
4.44 TN MSW $66.00 $293.04 $0.00 $293.04
Origin:CARLSBAD 100%
Total $293.04
Paid $0.00
Change $0.00
Signature:
54 Ticket #:1540541
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD,CA 92008 Weighmaster:arangmi
(760)603 -0153 In:January 13,2017 1:27 pm
333367 -RUBIO CONSTRUCTION SERVICES INC Out:January 13,2017 1:27 pm26341JEFFERSONAVESTE#G
MURRIETA,CA 92562 Vehicle:a40908
Ref:
Contract:INDUSTRIAL -GATE 2 BOL:
GROSS 23,900 Scale In
TARE 18,900 Tare Out INBOUND
NET 5,000 INVOICE
Tracking Qty:0.00
Qty Unit Description Rate Extension Tax Total
2.50 TN MSW $66.00 $165.00 $0.00 $165.00
Origin:CARLSBAD 100%
Total $165.00
Paid $0.00
Change $0.00
Signature:
54 Ticket #:1547443
PALOMAR TRANSFER5960ELCAMINOREAL Weighmaster:RAMOSALCARLSBAD,CA 92008
(760)603 -0153 In:January 31,2017 11:12 am
333367 -RUBIO CONSTRUCTION SERVICES INC Out:January 31,2017 11:12 am26341JEFFERSONAVESTE#G
MURRIETA,CA 92562 Vehicle:a40908
Ref:Contract:COMM-GATE Yr.200 BOL:
GROSS 24,340 Scale In
TARE 18,900 Tare Out INBOUND
NET 5,440 _INVOICE
Tracking Qty:0.00
Qty Unit Description Rate Extension Tax Total
2.72 TN MSW $66.00 $179.52 $0.00 $179.52
Origin:CARLSBAD 100%
•
Total $179.52
Paid $0.00
Change $0.00
Signature:
54 Ticket #:1548325
PALOMAR TRANSFER
5960 EL CAMINO REAL Weighmaster:ARANGLOCARLSBAD,CA 92008
(760)603 -0153 In:February 02,2017 7:56 am
333367 -RUBIO CONSTRUCTION SERVICES INC Out:February 02,2017 7:56 am26341JEFFERSONAVESTE#G
MURRIETA,CA 92562 Vehicle:a40908
Ref:
Contract:INDUSTRIAL-GATE 2 BOL:
GROSS 26,160 Scale In
TARE 18,900 Tare Out INBOUND
NET 7,260 INVOICE
Tracking Qty:0.00
Qty Unit Description Rate Extension Tax Total
3.63 TN MSW $66.00 $239.58 $0.00 $239.58
Origin:CARLSBAD 100%
•
Total $239.58
Paid $0.00
Change $0.00
Signature:
Escondido Resource Recovery
1044 W Washington Aye
p Escondido,CA 92025 INVOICE
(760)745-3203
Customer:1203 Ticket:33673 In:13:24 Truck:10259/0000Date:02/23/17 Out:13:24 Container:
'Route:08611
RUBIO CONSTRUCTION SERVI Origin:086 Carlsbad
26341 JEFFERSON AVEv #G '
.MURRIETTA,CA 92562
Extended
Commodity Units Rate Charge
11 SELFHNJL REFUSE'2.35 74.00 p6r TON 1 173. 90
[Gross (In):21, 540v' lbs Sol#2 Tare 16,840.lbs Sol#R Net:49700.lbs ]
/
TOTAL DUE 173.90
'
'
ANGEL V.D
'.
'k
!`
/
`
Escondido Resource Recovery
1044 W Washington Ave
Escondido,CA 92025 INVOICE
(760)745-3203
Customer:1288 Ticket;36154 In:14:14 Truck:10259/00690
Date:03/01/17 Out:14:15 Container:
'Route:01611
`RUBIO CONSTRUCTION SERVI Origin:016 Es
26341 JEFFERSON AVE,#8
MURRIETTA,CA 92562
'Extended
.Commodity Units Rate Charge
.11 SELFHAUL REFUGE 3.66 74.00 per TON 270.84
:[Gross(In):24v160.lbs Man Wt Tare 16,840.lbs Stared Net:7,320.lbs ]
'
TOTAL DUE 270.84
'
'.
VIOLETA 'Driver
`
'|
/
,
'