Loading...
HomeMy WebLinkAbout2582 TOWN GARDEN RD; ; CBR2020-0893; PermitPrint Date: 06/04/2020 Permit No: CBR2020-0893 Residential Permit Building Permit Finaled Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: 2582 Town Garden Rd BLDG-Residential 2131306300 $0.00 Work Class: Lot #: Reference #: Cogen Status: Applied: Issued: 04/28/2020 04/28/2020Construction Type:PermitFinal Close Out: Closed - Finaled MColl Plan Check #:Project Title: Inspector: Orig. Plan Check #: Bathrooms: Bedrooms: # Dwelling Units: Description:AUSTIN: ADD ENERGY STORAGE TO EXISTING PV SYSTEM (E-REVIEW) Final Inspection:06/04/2020 Contractor: TESLA ENERGY OPERATIONS INC 901 Page Ave Attn: Licensing Fremont, CA 94538-7341 844-837-5201 Owner: COOWNER AUSTIN SCOTT & HANNA ELIZABETH 2582 Town Garden RdCARLSBAD, CA 92009 AMOUNTFEE PLUMBING, ELECTRICAL, AND MECHANICAL PERMIT $175.00 Total Fees:$175.00 Total Payments To Date:$175.00 Balance Due:$0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. 1635 Faraday Avenue, Carlsbad CA 92008-7314 ï 760-602-2700 ï 760-602-8560 f ï www.carlsbadca.gov Building Division Page 1 of 1 Russ Clapton8225 Mercury CtSan Diego CA92111619-538-6485rclapton@tesla.comTesla Energy Operations 8225 Mercury Ct San Diego CA 92111 619-538-6485rclapton@tesla.com888104BLOS 12278032582 Town Garden RdCA92009Scott Austin2582 Town Garden Rd415-912-9564scottie.a@gmail.comAdding 13.5kWh Energy Storage (1-ACPW2) to (E) PV SystemAdding 13.5kWh Energy Storage (1-ACPW2) to (E) PV SystemXCBR2020-08934/28/2020 XZurich AmericanXWC-1074583-0210-31-204-28-204-28-20 Building Permit Inspection History Finaled PERMIT INSPECTION HISTORY for (CBR2020-0893) BLDG-Residential 04/28/2020Application Date:Permit Type:Owner:COOWNER AUSTIN SCOTT & HANNA ELIZABETH Cogen 04/28/2020Work Class:Issue Date:Subdivision:CARLSBAD TCT#02-14 BRESSI RANCH UNIT#01 12/01/2020Expiration Date:Status: IVR Number: 26140 Closed - Finaled 2582 TOWN GARDEN RD CARLSBAD, CA 92009-3059 Address: Scheduled Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection InspectionActual Start Date 05/28/2020 05/28/2020 BLDG-35 Solar Panel 128641-2020 Failed Michael Collins Reinspection Incomplete COMMENTS PassedChecklist Item BLDG-Building Deficiency 1st stop, not per Line diagram No COMMENTS PassedChecklist Item BLDG-Building Deficiency 1st stop, not per line diagram No BLDG-Building Deficiency 2nd stop, not per line diagram.No BLDG-Final Inspection 128640-2020 Failed Michael Collins Reinspection Incomplete COMMENTS PassedChecklist Item BLDG-Building Deficiency No BLDG-Electrical Final 1st stop, not per line diagram No COMMENTS PassedChecklist Item BLDG-Building Deficiency No BLDG-Building Deficiency 2nd stop, not per line diagram.No BLDG-Electrical Final 1st stop, not per line diagram No BLDG-Electrical Final No 06/04/2020 06/04/2020 BLDG-35 Solar Panel 129300-2020 Passed Michael Collins Complete COMMENTS PassedChecklist Item BLDG-Building Deficiency 6/04/20,Yes BLDG-Building Deficiency 1st stop, not per line diagram No BLDG-Building Deficiency 2nd stop, not per line diagram.No BLDG-Final Inspection 129299-2020 Passed Michael Collins Complete COMMENTS PassedChecklist Item BLDG-Building Deficiency No BLDG-Building Deficiency 6/04/20, Release emailed to SDGE Yes BLDG-Building Deficiency 2nd stop, not per line diagram.No BLDG-Electrical Final Yes BLDG-Electrical Final 1st stop, not per line diagram No BLDG-Electrical Final No Thursday, June 4, 2020 Page 1 of 1