HomeMy WebLinkAbout2583 ARUNDEL AVE; ; CB050826; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Building Inspection Request Line (760) 602-2725
1 1-1 S--2OW Residential Perm it Permit No: CB050826
Job Address:
Permit Type:
Parcel No: Valuation:
Occupancy Group:
03/22/2005
# Dwelling Units:
Bedrooms: Project Title:
2583 ARUNDEL AV CBAD
RESDNTL SubType: SFD
2131702400 Lot #: 360
$4 1 4,166 .OO Construction Type: VN Reference #: CT0200014
1 Structure Type: SFD
5 Bathrooms: 4.5
CANTERBURY-BRESSI- PHASE 3 PLN 2- 4598 SF, 731 SF GAR, 154 SF PORCH
Status: ISSUED
Applied: 02/25/2005
Entered By: SB
Plan Approved:
Issued: 03/22/2005
Orig PC#: PC030074
Inspect Area: PS
Plan Check#: PC-05-13
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Owner:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Building Permit Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount Strong Motion Fee Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee Other Bridge Fee BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'l Pot. Water Con. Fee
Recl. Water Con. Fee
$1,516.76 $0.00 $985.89
$0.00
($78.87) $41.42 $2,436.00 $0.00 $0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00 $180.00 $2,999.00
D518 $0.00
$0.00
Meter Size Add'l Recl. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540) PFF (4305540) License Tax (31 041 93)
License Tax (4304193)
Traffic Impact Fee (31 05541)
Traftic Impact Fee (4305541) Sidewalk Fee PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee Housing InLieu Fee Housing Credit Fee Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00 $160.00 $2,461 .OO
$2,848.90
$7,537.82
$0.00 $0.00 $0.00
$660.00
$0.00
$0.00
$1 75.00 $60.00 $1 13.50
$0.00 $0.00 $0.00 $0.00 $1,735.00
$0.00
$23,831.42
Total Fees: $23,831.42 Total Payments To Date: $23,831.42 Balance Due: $0.00
FINAL APPROVAL/
Inspector: Date: e ?fi 05 Clearance:
NOTICE: Please take NOTICE that approval of your project includes the 'Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as 'feeslexactions." You have 90 days from the date this permit was issued to protest imposition of these feeslexactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
City of Carlsbad Bldg Inspection Request
For: 1 1 /30/2005
Permit# CB050826 Inspector Assignment: PS
Title: CANTERBURY-BRESSI- PHASE 3
Description: PLN 2- 4598 SF, 731 SF GAR, 154 SF PORCH
Type: RESDNTL SubType: SFD
Job Address: 2583 ARUNDEL AV
Suite: Lot 360
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks: AM PLEASE - ESCROW CLOSING
Phone:
Inspector: BE3
Total Time:
CD Description
19 Final Structural
Requested By: NA
Entered By: CHRISTINE
Act Comment
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Associated PCRs/CVs
Date
11/29/2005
11/28/2005
11/23/2005
11/16/2005
1 1 /I 512005
1011 712005
1011 3/2005
1011 212005
10/11/2005
1011 112005
10/11/2005
1011 112005
1010712005
lnswction History
Description
89 Final Combo
89 Final Combo
89 Final Combo
39 Final Electrical
32 Const. ServiceIAgricultural
82 DrywalllExt LathlGas Test
16 Insulation
84 Rough Combo
14 FramelSteel/BoIting/WeIding
24 Roughflopout
34 Rough Electric
44 RoughlDuctslDampers
84 Rough Combo
Act
NS
NR
NR
PA
NR
AP
AP
AP
co
AP
AP
AP
NS
lnsp Comments
PS RE FEE NOT PAID
BN RE-FEE
BN
BN EMR
PS RE-FEEDUE
BN
BN
BN
BN NEED FDN FIX
BN
BN
BN
PS
City of Carlsbad Bldg Inspection Request
For: 1 1 /I 5/2005
Permit# CB050826 Inspector Assignment: PS
Title: CANTERBURY-BRESSI- PHASE 3
Description: PLN 2- 4598 SF, 731 SF GAR, 154 SF PORCH
Type: RESDNTL SubType: SFD
Job Address: 2583 ARUNDEL AV
Suite: Lot 360
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time:
Phone: 7606441571
Inspector: ';5
Requested By: JUSTIN
Entered By: JANEAN
CD Description
32 Const. ServicelAgricuItural
Comments/Notices/Hold
Associated PCRsICVs
Inspection History
Date Description
1011 7/2005 82
1011 312005 16
1011 2/2005 84
10/11/2005 14
1011 1/2005 24
1011 112005 34
1011 112005 44
10/07/2005 84
10/06/2005 84
10/05/2005 84
10/04/2005 84
09/22/2005 13
09/21/2005 13
08/29/2005 15
06/02/2005 81
06/01/2005 81
05/31/2005 81
05/12/2005 21
DrywalVExt LathlGas Test
Insulation
Rough Com bo
Frame/SteeUBoltingANelding
Roughmopout
Rough Electric
RoughlDuctslDampen
Rough Combo
Rough Combo
Rough Combo
Rough Combo
Shear PanelslHDs
Shear PanelslHDs
RooWReroof
Underground Combo
Underground Combo
Underground Combo
UndergroundlUnder Floor
Act lnsp Comments
AP BN
AP BN
AP BN
CO BN NEEDFDNFIX
AP BN
AP BN
AP BN
NS PS
CO PS REINSPFEEDUE
NS PS
CA PS BYJASON
AP BN
CO BN NOT READY - REINSPECTION FEE DUE
AP BN
AP PS
NS PS
CO PS
AP BN
NO SI REPORT NO CONCRETE BOX FOR C.O. IN GARAGE
-?
BUILDING DEPARTMENT
OTICE (760) 602-2700
1635 FARADAY AVENUE
PERMIT NO.
FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE? @. YES
PHONE
@ CODE ENFORCEMENT OFFICER
iā
City of Carlsbad Bldg Inspection Request
For: 1 0/13/2005
Permit# CB050826
Title: CANTERBURY-BRESSI- PHASE 3
Description: PLN 2- 4598 SF, 731 SF GAR, 154 SF PORCH
Type: RESDNTL SubType: SFD
Job Address: 2583 ARUNDEL AV
Suite: Lot 360
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Inspector Assignment: PS
Phone: 760801 3480
Inspector: 6 0
Total Time:
CD Description Act Comment
Requested By: CLARK NELSON
Entered By: CHRISTINE
16 Insulation
Associated PCRs/CVs
Date
1011 a2005
1011 112005
1011 112005
1011 112005
1011 112005
10/07/2005
10/06/2005
10/05/2005
10/04/2005
09/22/2005
09/21/2005
08/29/2005
06/02/2005
06/01 12005
05/31/2005
0511 2/2005
Inspection Histotv
Description
84 RoughCombo
14 Frame/SteellBolting/Welding
24 Rougmopout
34 Rough Electric
44 RougWDuctdDampers
84 Rough Combo
84 Rough Combo
84 Rough Combo
84 Rough Combo
13 Shear PanelsIHDs
13 Shear PaneldHDs
15 RoofIReroof
81 Underground Combo
81 Underground Combo
81 Underground Combo
21 Underground/Under Floor
Act lnsp Comments
AP BN
CO BN NEEDFDNFIX
AP BN
AP BN
AP BN
NS PS
CO PS REINSPFEEDUE
NS PS
CA PS BYJASON
AP BN
AP BN
AP PS
NS PS
CO PS
AP BN
CO BN NOT READY - REINSPECTION FEE DUE
NO SI REPORT NO CONCRETE BOX FOR C.O. IN GARAGE
I' 10/10/2005 09: 49 7607449510
-,
s'
i
PAGE 02
City of Carlsbad Bldg Inspection Request
For: 06/0 /2005 OL
Permit# C6050826
Title: CANTERBURY-BRESSI- PHASE 3
Description: PLN 2- 4598 SF, 731 SF GAR, 154 SF PORCH
Type: RESDNTL SubType: SFD
Job Address: RUNDEL AV
Suite: Lot 360
Location:
OWNER GREYSTONE HOMES INC
Owner: GREYSTONE HOMES INC
Remarks:
Inspector Assignment: PS
Phone: 7606441 571
Inspector: %
Total Time: Requested By: JUSTIN
Entered By: CHRISTINE
/E Comment
CD Description
11 Ftg/Foundation/Piers 7L 12 SteeVBond Beam
21 UndergroundNnder Floor I
31 UndergroundKonduit-Wiring /-
Associated PCRs/CVs
Inspection History
Date Description Act lnsp Comments
05/31/2005 81 Underground Combo CO PS NO SI REPORT NO CONCRETE BOX FOR C.O. IN GARAGE
05/12/2005 21 UndergroundNnder Floor AP BN
27674
SOUTHERN CALIFORNIA SOIL & TESTING, INC.
6280 RIVERDALE STREET, POST OFFICE BOX 600627, SAN DIEGO, CA 92160-0627
Phone (619) 280-4321, FAX (619) 280-4717
SCS&T FILE NO. gcfn 39 y
I P.O. NO.:
/ f OF - I -1 171 PAGE ' I I I I 1 I
FIELD INSPECTION REPORT FOR: 0 REINFORCED CONCRETE 0 REINFORCED MASONRY 0 WELDING 0 FIREPROOFING
0 Q.C. CONCRETE 0 ROOFINGWATERPROOFING TRESS EPOXY ANCHORS H.S. mutts __
PHASE3 DSA FILE NO.: DSA APP. NO.:
,t
PLAN FlLE NO.: c- WOJECTADO~ESS: PERMIT NO.:
IBC I hereby certify that I
le work mspected is to
pecificatbns and
ispector Initials
SA I heceby certify that I have inspected the above reported work in accordance with the
quirements of DSA approved documents. Sampling and testing were conducted in
.dance with the requirements of the DSA approved documents. The work inspected
omplies with the DSA approved documents. 'es:-No:- Inspector Initials
noted othelwise,
.CST205 (REV 8104)
'd
FOOTING OBSERVATION SUMMARY
Leighton and Associates, lnc.
A LEIOHTON 6ROU? COYCANV
Project Name: E?&,gM ~ Date:
Location: rslrL .L &43 .e4 Project No.: VIOOF .ma
Plan File No.: Permit No.: Unit/Phase/Lot(s): -4 34 1
Observation Summary
-14 Initials
SA 7. /Date
A representative of Leighton and Assodates observed onsite soil conditions. Soil conditions at
the site are substantially in conformance with those assumed in the geotechnical report.
zwrct initials
5-27-dr Date
A representative of Leighton and Assodates observed and measured footing excavation
depthlwidth. Footing excavations extend to proper depth and bearing strata and are in general
conformance with recommendations of the geotechnical report.
Initials
Date
A representative of Leighton and Associates measured footing setback from slope face. The
setback was in general accordance with the recommendations of the geotechnical report.
rcc -
tc~d Initials
r-27-6 Date
Notes to SuperintendentlForeman
I. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended.
Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended period of time and the contractor should schedule accordingly.
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (Le.,
heavy rain, etc.), we should be contacted to perform additional site observations.
Note to Building inspector
1. Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading.
@ Leighton and Associates, Inc. ' Date
3930RlM
F -_ ..-
Rle: 2828.10
May 17.2005
Sm: Bressi Rmmcb lphast 3, PA-10
To Whom It May
tots 360 - 367,378,379, and Lots 384 - 393 of the abovMClaenced project. Upon our review of the survlcy data collected on May 10, 2005 the house footprints conform
horizontally and vertically within B.1ā to the appvcd design.
SfiKXrclY,
ā PfO~iC0nsUIt~ hius fieldvcrifiedtht formpositiane Jhawnontk plot plans for
-
principal I C.O.O. LS 5274mp. 12nyO5