Loading...
HomeMy WebLinkAbout2585 CARLSBAD BLVD; ; CBC2018-0508; Recycle{City of Carlsbad WASTE MANAGEMENT PLAN B-59 Owner: Chairman of the Board, Barry Shreiar Contractor: Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Job Address: 2585 Carlsbad Blvd. Phone Number: _________________ _ Carlsbad, CA, 92008 Permit#: Estimated Cost of Project: $ _____________ _ Type of Project: (check all that apply) D New Construction ll!J Remodel or T.I. □ Residential ll!J Commercial ll5I Other Addition to an existing building. iigDemolition Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 65% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 65% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) ll!I Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area 238 X 2 lbs.= 476 lbs. of allowable waste. !&I I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out prior to permit issuance -refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash / Garbal!e Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled, ______ % Contractor or Owner (print name) 08/31/2018 Contractor or Owner (signature) Date Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by:. _________________ _ Page 1 of 2 REV.01-2017 Table 2 -Actual Waste (To be completed after construction.) MATERIALS lbs. of waste taken to lbs. of waste Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED (complete only if different than Table 1) Asphalt/ Concrete Brick/ Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste Trash I Garbaee Other: TOTAL lbs.: Actual Percentage Re-Used or Recycled, ______ % Official Use Only D 65% Goal Achieved D 65% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ _______ _ Reviewed/ Approved by: _________________ _ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be taken to lbs. of waste to be Waste Hauling Company or Re-Use Method LANDFILL RE-USED or RECYCLED Asphalt / Concrete 0 3000 AlsC t-tcmll"n Co. Brick / Masoruy 100 '150 WM/ Re-1,1,5ed lsrlcR. ovc-slte Cardboard 0 1"'0 A" " ,_,_Cl L<LlvcC\ r'.n. Drywall 0 50 AlsC 1-tCIL<LlvcC\ Co. Landscape Debris 0 120 ML<Lc~ed "' Re L<Sed Ovc-slte Lumber/ Wood 500 0 WClste MCI vcCI C\tV1A.evct MetaJs 300 200 WM/ A"B,C. H-Cle<LlvcCJ Mixed Waste 1500 0 WM Trash / Garbage 300 0 WM Other: Pool <;e<vclte 0 ')DO 1,1,5ed CIS C.rns~ed lsC1se ovc-slte TOTAL lbs.: 2700 5,370 Percentage to be Re-Used or Recycled 6 7 % Formula: Total Re-qsed or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) 5370 X 100 = 67% Re-Used or Recycled (2700 + 5370) Since 67% exceeds the minimum requirement of 65%, this plan complies. Page 2 of 2 WASTE MANAGEMENT Think Green: Account Reconciliation Account#: Customer Name: Date: 150-70811 EL HEWITT CONSTRUCTION N 3127/2019 14:19 Fax Number Billing Address Email 818-889-0119 702 KINGS CROSS CT CARDIFF CA 92007-1314 ellio++-elhewitt.com ltom Dote Misc T 1222683 43374 0 lm,c• 1222683 43374 Q lnvolc• 1222683 43465 IVR-VISA Poym ent 1222683 T OUI 1224324 43405 0 lo•o,co 1224324 43465 IVR-VISA Payment 1224324 Total 1225953 43435 0 F1n.Chsr11e 1225953 43435 0 lo•o,co 1225953 43435 Q lnvo,c~ 1225953 43465 IVR-VISA Payment 1225953 T Ota 1 1227602 43465 IVR FEE F1n.Char~<1 1227602 43465 IVR ~ 1=.L PMT P~ym enl 1227602 43465 IVR-VISA Poymonl 1227602 43466 Q F,n.Chorg., 122760? 43466 0 lm,co 1227602 Total 1229274 43497 Q ln,.,olce 1229274 43497 Q lo•o,co 1229274 T oUI 1230929 43525 Q lnvo,ce 1230929 T .. ~., Grand Total Desc 45P 45R SLB 45P SLB LPC 45P 45R SLB IHF IHf-' SLB LPC 45R 05R 45R 45R Balance Due: 291.99 Amount -49.7 135.54 -85.84 0 65.58 -65.58 0 3 -36,14 135.54 -102.4 0 5 .5 -138.54 3 7 35.54 0 20.91 135.54 156.45 735.54 135.54 297 .99 I'·""' 1 ,,, ., I {cicyof NONRESIDENTIAL GREEN :ervices BUILDING CODE STANDARDS 1g Division MANDATORY MEASURES day Avenue Carlsbad CERTIFICATION CHECKLIST 0-602-2719 8-52 lsbadca.gov This form, signed and completed, and all receipts for the recycled materials shall be submitted to the Building Inspector prior to Final Inspection. Site Development Mandatory 5.106.1 Storm water pollution prevention plan. For projects of one acre or less, develop a Storm (X). Water Pollution Prevention Plan (SWPPP) that has been designed specific to its site, conforming to the State Storm water NPDES Construction Permit or local ordinance, whichever is stricter, as is required for projects over one acre. The plan should cover prevention of soil loss by storm water run-off and/or wind erosion, of sedimentation and/or of dusUoarticulate matter air oollution. 5.106.4 Bicycle parking and changing rooms. Comply with Sections 5.106.4.1 and 5.106.4.2; or (X) ij ~ meet local ordinance, whichever is stricter. 5.106.4.1 Short-Term bicycle parking. If the project is expected to generate visitor traffic, provide (X) ijlA permanently anchored bicycle racks within 200 feet of the visitor's entrance, readily visible to passers-by, for 5 percent of visitor motorized vehicle parking capacity, with a minimum of one two- bike capacity rack. 5.106.4.2 Long Term bicycle parking. For buildings with over 10 tenant-occupants, provide secure (X) ,4" bicycle parking for 5 percent of tenant-occupied motorized vehicle parking capacity, with a minimum of one space. 5.106.5.2 Designated parking. Provide designated parking for any combination of low emitting, (X) M~ fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.3.1. 5.106.8 Light pollution reduction. Comply with lighting power requirements in the California ( X) f\ w Energy Code and design interior lighting such that zero direct-beam illumination leaves the building site. Meet or exceed exterior light levels and uniformity ratios for lighting zones 1-4 as defined in Chapter 10 of the California Administrative Code, using the following strategies: 1. Shield all exterior luminaries or use cutoff luminaries (X) ~ 2. Contain interior lighting within each source (X) 3. Allow no more than .01 horizontal foot candle 15ft. beyond the site (X) tJ ~ 4. Contain all exterior lighting within property boundaries (X) N Exception: See part 2, Chapter 12, Section 1205.6 for campus lighting requirements for parking facilities and walkways. 5.106.10 Grading and paving. The site shall be planned and developed to keep surface water (X)~ away from buildings. Construction plans shall indicate how site grading or drainage system will manaoe all surface water flows. Water Efficiency and Conservation Indoor Water Use 5.303.1 Meters. Separate meters shall be installed for the uses described in Sections 503.1.1 (X)~ Ir through 503.1.3. 5303.1.1 Buildings in excess of 50,000 square feet. Separate sub-meters shall be installed as (X) Nlt\ follows: 1. For each individual leased, rented, or other tenant space within the building projected to consume more than 100 gal/day. 2. For spaces used for laundry or cleaners, restaurant or food service, medical or dental office, laboratorv or beautv salon or barber shoo oroiected to consume more than 100 aal/dav. 15.303.1.2 Excess consumption. Any building within a project or space within a building that is I projected to consume more than 1,000 gal/day. (X) llht I "' 8-52 Page 1 of 5 Rev. 5/17 ' 5.303 Percent savings. A schedule of plumbing fixtures and fixture fittings that will reduce the (X) ..i[A overall use of potable water within the building by 20 percent shall be provided (Calculate savings by Water Use Worksheets or utilize Table 5.303.2.3). 5.303.2.1 Multiple showerheads serving one shower. When single shower fixtures are (X) /II~ served by more than one showerhead, the combined flow rate of all the showerheads shall not exceed the maximum flow rates specified in the 20 percent reduction column contained in Table 5.303.2.3 or the shower shall be designed to allow only one showerhead to be in ooeration at a time. 5.303.6 Plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with_ the requirements listed As applicable for each type in items listed in Table 5.303.6. 1. Water closets (toilets) -flushometer type (X)f 2. Water closets (toilets) -tank type (X) 3. Urinals (X) 4. Public lavatory faucets (X) 5. Public metering self-closing faucets (X) 6. Residential bathroom lavatory sink faucets (X)~ 7. Residential bathroom lavatory sinks (X) 8. Residential showerheads (X) ~ii~ 9. SinQle shower fixtures served bv more than one showerhead (X) I Outdoor Water Use l 5.304.1 Water Budget. A water budget shall be developed for landscaping irrigation use. (X) IJ[I-\ 5.304.2 Outdoor potable water use. For new water service, separate meters or submeters shall be installed for indoor and outdoor potable water use for landscaped areas between (X) \JI~ 1,000 and 5,000 square feet. 5.304.3 Irrigation design. In new nonresidential projects with between 1,000 and 2,500 ' square feet of landscaped area (the level at which the MLO applies), install irrigation controllers and sensors which include the following criteria and meet manufacturer's recommendations. 5.304.1.1 Irrigation controllers. Automatic irrigation system controllers installed at the time of final inspection shall comply with the following: 1. Controllers shall be weather-or soil moisture-based controllers that automatically adjust irrigation in response to changes in plant's needs as weather conditions change. (X) ..i~ 2. Weather based controllers without integral rain sensors or communication systems that Asapplica~ account for local rainfall shall have separate wired or wireless rain sensors which connects or (X) t,,) i\ communicates with the controller(s). Soil moisture-based controllers are not required to have rain sensor input. Construction Waste Management Plan 5.408.1 Construction waste diversion. Establish a construction waste management plan or (X) ~ ~ meet local ordinance, whichever is more stringent. (X) I f\ 5.408.2 Construction waste management plan. Submit plan per this section to enforcement authority within the city. (x)M 5.408.1.4 Documentation. Provide documentation of the waste management plan (see form 8-59) that meets the requirements listed in Section 5.408.1.1 thru 5.408.1.3 and the plan is accessible to the enforcement authority. 5.408.3 Construction waste. Recycle and/or salvage for reuse a minimum of 50 percent of nonhazardous construction and demolition debris or meet local ordinance, whichever is more (X) ~lv\ stringent. Exceptions: 1. Excavated soil and land-clearing debris 2. Alternate waste reduction methods, developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist. 5.408.3 Excavated soil and land clearing debris. 100 percent of trees. Stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recvcled. B-52 Page 2 of 5 Rev. 5/17 Building Maintenance and Operation 5.410.1 Recycling by occupants. Provide readily accessible areas that serve the entire (X) ~,(t building and are identified for the depositing, storage and collection of nonhazardous materials for recycling. (X) i_1/4 5.410.2 Commissioning. For new buildings 10,000 square feet and over, building commissioning for all building systems covered by T24, Part 6, process systems and renewable energy systems shall be included in the design and construction processes of the building project. Commissioning requirements shall include items listed in Section 5.410.2. - (X)t/1~ 5.410.2.6 5.410.2.1 Owner's Project Requirements (OPR). Documented before the design phase of (X) /Jrt the project begins the OPR shall include items listed in Section 5.410.4. 5.410.2.2 Basis of Design (BOD). A written explanation of how the design of the building systems meets the OPR shall be completed at the design phase of the building project and updated periodically to cover the systems listed in Section 5.410.2.2. ( X) W., 5.410.2.3 Commissioning plan. A commissioning plan describing how the project will be commissioned shall be started during the design phase of the building project and shall include (X) A/fl items listed in Section 5.410.2.3. 5.410.2.4 Functional performance testing shall demonstrate the correct installation and (X) ~ff-operation of each component, system and system-to-system interface in accordance with the approved plans and specifications. 5.410.2.5 Documentation and training. A Systems manual and systems operations training (X) Nft: are required. 5.410.2.5.1 Systems manual. The systems manual shall be delivered to the building owner or (X) Nit\ representative and facilities operator and shall include the items listed in Section 5.410.2.5.1. 5.410.2.5.2 Systems operations training. The training of the appropriate maintenance staff (x>M~ for each equipment type and/or system shall include items listed in Section 5.410.2.5.2. 5.410.2.6 Commissioning report. A complete report of commissioning process activities undertaken through the design, construction and reporting recommendations for post construction phases of the building project shall be completed and provided to the owner or representative. (X) N~ 5.410.4 Testing and adjusting. Testing and adjusting of systems shall be required for buildings less than 10,000 square feet. (X) ~,/.\ 5.410.4.2 Systems. Develop a written plan of procedures for testing and adjusting systems. Systems to be included for testing and adjusting shall include, as applicable to the project, the (X) &,\., systems listed in Section 5.410.3.2. 5.410.4.3 Procedures. Perform testing and adjusting procedures in accordance with industry (X)~ best practices and applicable national standards on each system. 5.410.4.3 HVAC balancing. Before a new space-conditioned system serving a building or space is operated for normal use, the system should be balanced in accordance with the (X)W, procedures defined by national standards listed in Section 5.410.3.3.1. 5.410.4.4 Reporting. After completion of testing, adjusting and balancing, provide a final report (X) ~ of testing signed by the individual responsible for performing those services. maintenance instructions and copies of guaranties/warranties for each system prior to final inspection. 5.410.4.5 Operation and maintenance manual. Provide the building owner with detailed operating and maintenance manual 5.410.4.5.1 Inspection and reports. Include a copy of all inspection verifications and reports reauired bv the enforcina aaencv. B-52 Page 3 of 5 Rev. 5/17 Environmental Quality Fireplaces 5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-burning fireplace or a (X) AJ ~ sealed woodstove and refer to residential requirements in the California Energy Code, Title 24, Part 6, Subchapter 7, Section 150. AsApplica~ 5.503.1.1 Woodstoves. Woodstoves shall comply with US EPA Phase II emission limits. (X) Weather Resistance and Moisture Management 5.407.1 Weather protection. Provide a weather-resistant exterior wall and foundation envelope (X)~ as required by California Building Code Section 1403.2 and California Energy Code Section 150, manufacturer's installation instruction instructions or local ordinance, whichever is more stringent. 5.407.2 Moisture control. Employ moisture control measured by the following methods: (X)~ 5.407.2.1 Sprinklers. Prevent irrigation spray on structures. 5.407.2.2 Entries and openings. Design exterior entries and openings to prevent water intrusion (X)t\k" into buildinQs. Pollution Control 5.504.3 Covering of duct openings and protection of mechanical equipment during construction. At the time of rough installation or during storage on the construction site and until (X)~ final start up of the heating and cooling equipment, all duct and other related air distribution component openings shall be covered with tape, plastic, sheet metal or other methods to reduce the amount of debris or duct which may collect in the system. 5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly occupied areas of the buildinQ with outside and return air prior to occupancy that provides at least a MERV of 8. 5.504.4 Finish material pollutant control. Finish materials shall comply with Sections 5.504.4.1 through 5.504.4.6 5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on the project shall meet (X) ~ the requirements of the following standards: 1. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable or SCAQMD Rule 1168 voe limits as shown in Tables 5.504.4.1 and 5.504.4.2. 2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or caulking compounds (in units of product, less packaging, which do not weigh more than one pound and do not consist of more than 16 fluid ounces) shall comply with statewide voe standards and other requirements, including prohibitions on use of certain toxic compounds, of California Code of Regulations, Title 17, commencing with Section 94507. 5.504.4.3 Paint and coatings. Architectural paints and coatings shall comply with Table 5.504.4.3 5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings shall meet the Product- Weighted MIR limits for ROC in Section 94522 (a)(3) and other requirements, including prohibition on use of certain toxic compounds and ozone depleting substances (CCR, Title 17, Section 94520 et seq.). 5.504.4 Carpet systems. All carpet installed in the building interior shall meet the testing and product requirements of one of the standards listed in Section 5.504.4.4. 50504.4.4.1 Carpet cushion. All carpet cushion installed in the building interior shall meet the requirements of the Carpet and Rug Institute Green Label Program. 5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the requirements of Table 804.4.1. 5.504.4.5 Composite wood products. Hardwood, plywood, particleboard and medium density fiberboard composite wood products used on the interior or exterior of the building shall meet the requirements for formaldehyde as specified in Table 5.504.4. 5.504.4.5.2 Documentation. Verification of compliance with this section shall be provided as requested by the enforcing agency. Documentation shall include at least one of the following: 1. Product certification and specifications 2. Chain of custody certifications 3. Other methods acceptable to the enforcing agency (X)~ 5.504.4.6 Resilient flooring systems. Comply with the voe emission limits defined in the 2009 CHPS criteria and listed on its Low-emitting Materials List (or product registry) or certified under the FloorScore oroaram of the Resilient Floor Coverina Institute. B-52 Page 4 of 5 Rev. 5/17 • , Indoor Moisture and Radon Control 5.505.1 Indoor moisture control. Buildings shall meet or exceed the provisions of the California Buildin Code Title 24 Part 2, Sections 1203 Ventilation Cha ter 14.1. Air quality and Exhaust 5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces in buildings, meet the minimum requirements of Section 121 of the California Energy Code, CCR, Title 24, Part 6 and Chapter 4 of CCR, Title 8 or the applicable local code, whichever is more stringent. 5.506.2 Carbon DIOXIDE (CO2) monitoring. For buildings equipped with demand control ventilation, CO2 sensors and ventilation controls shall be specified and installed in accordance with the re uirements of the latest edition of the California Ener Code, Title 24, Part 6, Section 120.1. C 4 . Outdoor Air Quality 5.508.1 Ozone depletion and global warming reductions. Installations of HVAC, refrigeration and fire suppression equipment shall comply with Sections 5.508.1.1 and 5.508.1.2. 5.508.1 CFCs. Install HVAC and refrigeration equipment that does not contain CFCs. 5.508.1.2 Halons. Install fire suppression equipment that does not contain Halons. I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2016 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address: :Z:5£5 CAl2IS0~0 f:?\\11). (Af\SfJI\Q (A. Plan C eek Number (YzlZOl'o-Q5QI, Print Name: AAA!iN \.\twaE,S License Number: ~~._l_O_B_,_I o=---- B-52 Page 5 of 5 Rev. 5117