HomeMy WebLinkAbout2590 El Camino Real; ; CBC2019-0497; PermitCommercial Permit
Print Date: 01/10/2020
Job Address:
{city of
Carlsbad
Permit No: CBC2019-0497
PermitType:
2590 El Camino Real
BLDG-Commercial
1670302900
$30,000.00
Work Class: Tenant Improvement Status: Closed -Finaled
10/17/2019
11/06/2019
Parcel No: Lot#:
Valuation: Reference#:
Occupancy Group: Construction Type:
# Dwelling Units: Bathrooms:
Bedrooms: Orig. Plan Check#:
Plan Check#:
Project Title:
Description: SPEEDWAY: REMOVE & REPLACE 4 EXISTING FUEL DISPENSERS
Owner:
VANDERBURG REAL ESTATE HOLDINGS LP
BUILDING PERMIT FEE ($2000+)
BUILDING PLAN CHECK FEE (BLDG)
Po Box 592809 C/0 Tesoro
SAN ANTONIO, TX 78259
ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL
MECHANICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL
SB1473 GREEN BUILDING STATE STANDARDS FEE
STRONG MOTION-COMMERCIAL
Total Fees: $S71.00 Total Payments To Date: $571.00
Applied:
Issued:
Permit
Fina led:
Inspector: PYork
Final
Inspection: 1/10/2020 3:32:59PM
Contractor:
DIMAGGIO MAINTENANCE INC
Po Box 1637
CARLSBAD, CA 92018
760-722-9002
Balance Due: $0.00
$278.00
$194.60
$43.00
$45.00
$2.00
$8.40
Please take NOTICE that approval of your project includes the 11lmposition11 of fees, dedications, reservations, or other exactions hereafter
collectively referred to as 11fees/exaction.11 You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov
(city of
Carlsbad
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check CY:)Lbl.019-6G
Est. Value j;P:X,, 00:)-
PC Deposit
Date ~f()""---.,_J ---'-:f_-_._f-1-9--
Job Address 2 59 C ~t... G A µ\ I\J D \2i::-/:l('L
Tenant Name: <S p e~ 0 \,-\, .A.-'i
Suite: ____ APN: __________ _
CT/Project#: __________ Lot#:. ___ _
Occupancy: _________ Construction Type: ____ Fire Sprinklers: yes/ no Air Conditioning: yes/ no
BRIEF DESCRIPTION OF WORK: t?: G-VY\ 0'1 E:, <\: tz~pLAvt. 4-E:,')( lb T · FUEL-Q l 2:>f!=-JSf tz $
VAL4\:'30 1Cii:JO
D Addition/New: ___________ New SF and Use, ___________ New SF and Use,
____ Deck SF, Patio Cover SF (not including flatwork)
D Tenant Improvement: _____ SF,
_____ SF,
Existing Use ______ Proposed Use ______ _
Existing Use Proposed Use ______ _
0 Pool/Spa: ____ SF Additional Gas or Electrical Features? ____________ _
D Solar: ___ KW, __ Modules, ___ M ounted, Tilt: Yes/ No, RMA: Yes/ No, Panel Upgrade: Yes/ No
D Plumbing/Mechanical/Electrical Only: __________________________ _
D Other: --------------------------------------
APPLICANT (PRIMARY)
Name: ,._ 4 's. ~ 1tJ ~tg. t r-J 4
Address: 28'-{ OS Sit✓ opJ /ZI?
C,4-iJy,O rJ
City: C:::ou>-170-2 State: c..A-Zip: '] I 3 6]
Phone: w0/--ZS -4 -goo
Email: A ✓A /<'!A 19 A 12 E✓<,_, trJ'GG{<. • CorvJ
DESIGN PROFESSIONAL
Name: _________________ _
Address: ________________ _
PROPERTY OWNER
Name: 1}::$0~
Address:\~ \Oo rc-l O'A ~v.Joc p PkuJ'1
Citv :cSM/ Af\JTo-1'/1 Ci State:TX Zip:c~2--S'f
Phone: '2/()-u:i~4:> -fo"'L'B L.f
Email: ___________________ _
CONTRACTOR BUSINESS
Name: 07fY1f¥A.<q I O /Yl g 1"'1"1-,r,Jc
Address: 2~o 3 IN O U2)7J:;'j <S-r
City: ________ State: ___ Zip: ___ _ City: C<::..EA N.S I t? S State: CY,-Zip: Cf2£J $ ~/
Phone: ]61{) _7--z._1_. 9 D92-Phone: ________________ _
Email: _________________ _ Email: ___________________ _
Architect State License: ___________ _ State License: 88 Wo6) f us. Licen~:. ______ _
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its
issuance, also requires the applicant for such permit to file a signed statement that he/she is licensed pursuant to the provisions of the Contractor's License Law
{Chapter 9, commending with Section 7000 of Division 3 of the Business and Professions Code} or that he/she is exempt therefrom, and the basis for the alleged
exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500}).
1635 Faraday Ave Carl sbad, CA 92008
B-2
Ph: 760-602-2719 Fax: 760-602-8558
Page 1 of 2
Em ail: Building@carlsbadca.gov
Rev. 06/18
( OPTION A): WORKERS'COMPENSATION DECLARATION:
I hearby affirm under penalty of perjury one of the following declarations:
D I have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued.
D I have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: I V c:S <b F TI..pt;;; Ll/1>-S.7
Policy No. l:l[SI) £0 '1 r 7 ~ <P'-'"L._ Expiration Date: ' -IT , 2p
D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to be come
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful, and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition th to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONTRACTOR SIGNATURE:
( OPTION B ): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason:
D I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work
himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within
one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
D I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
D I am exempt under Section ________ Business and Professions Code for this reason:
1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. D Yes D No
2. I (have/ have not) signed an application for a building permit for the proposed work.
3. I have contracted with the following person (firm) to provide the proposed construction (include name address/ phone/ contractors' license number):
4. I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name/ address/ phone/
contractors' license number):
5. I will provide some of the work, but I have contr · (hired) the following persons to provide the work indicated (include name/ address/ phone / type of work):
DATE: /{) -/7 -7
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: _____________________ _ Lender's Address: _____________________ _
ONLY COMPLETE THE FOLLOWING SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY:
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention
program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act ? D Yes D No
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? D Yes D No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? D Yes D No
IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE
REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES ANO THE AIR POLLUTION CONTROL DISTRICT.
APPLICANT CERTIFICATION:
I certify that I have read the application and state that the above information is correct and that the information on the plans is accurate. I agree to comply with all
City ordinances and State laws relating to building construction.
I hereby authorize representative of the City of carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP
HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF
THE GRANTING OF THIS PERMIT.OSHA: An OSHA permit is required for excavations over S'O' deep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit iss,l!ed by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized
by such permit is not commenced within 180 days from the date of eh permit or if the building or work authorized by such permit is suspended or abandoned at any time
after the work is commenced for a period of 180 days (Section .4.4 Uniform Building Code).
APPLICANT SIGNATURE:
1635 Faraday Ave Carlsbad, CA 92008
B-2
Ph: 760-602-2719 Fax: 760-602-8558
Page 2 of 2
Email: Building@carlsbadca.gov
Rev. 06/18
PERMIT INSPECTION HISTORY REPORT (CBC2019-0497)
Permit Type: BLDG-Commercial Application Date: 10/17/2019 Owner: VANDERBURG REAL ESTATE
HOLDINGS LP
Work Class: Tenant Improvement Issue Date: 11/06/2019 Subdivision: PARCEL MAP NO 00184
Status: Closed -Finaled Expiration Date: 07/08/2020 Address: 2590 El Camino Real
IVR Number: 22518 Carlsbad, CA 92008-1201
Scheduled Actual Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Date Start Date
0111012020 01/10/2020 BLDG-Final 115913-2020 Passed Paul York Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Electrical Final Yes
BLDG-Fire Final 115872-2020 Passed Felix Salcedo Complete
Checklist Item COMMENTS Passed
FIRE-Building Final Yes
January 10, 2020 Page 1 of 1
DATE: 10/29/2019
JURISDICTION: City of Carlsbad
PLAN CHECK#.: CBC2019-0497
✓• EsG1I
A SAFEbuil\ Company
SET: I
PROJECT ADDRESS: 2590 El Camino Real
PROJECT NAME: Speedway Remodel
□ APPLICANT
□ JURIS.
IZJ The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
D The plans transmitted herewith will substantially comply with the jurisdiction's codes
when minor deficiencies identified below are resolved and checked by building department staff.
D The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information. The plans are being held at EsGil
until corrected plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
D The applicant's copy of the check list has been sent to:
IZJ EsGil staff did not advise the applicant that the plan check has been completed.
D EsGil staff did advise the applicant that the plan check has been completed .
.. Bei:son contacted: Telephone#: . . \
· -~ t'contacted: lolfi 1 c.,, (by: iL-1 Email:
Telephone Fax In Person
ARKS: Fire Department approval is required.
By: David Yao
EsGil
10/21/19
Enclosures:
9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576
City of Carlsbad CBC2019-0497
10/29/2019
[DO NOT PAY -THIS IS NOT AN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: City of Carlsbad
PREPARED BY: David Yao
PLAN CHECK#.: CBC2019-0497
DATE: 10/29/2019
BUILDING ADDRESS: 2590 El Camino Real
BUILDING OCCUPANCY:
BUILDING AREA Valuation
PORTION ( Sq. Ft.) Multiplier
speedway remodel
Air Conditioning
Fire Sprinklers
TOTAL VALUE
Jurisdiction Code cb By Ordinance
-------·-------·--.
Bldg. Permit Fee by Ordinance ..,
---·-~
Pia~ C_hec_~ Fe-; by ~~dina~~~ _ -~ .;l
Type of Review: Complete Review
D Other
Reg. VALUE
Mod.
per city
D Structural Only
D Repetitive Fee
-:_-.., ] Repeats 0 Hourly
EsGil Fee
..._ ___ _.,Hr. @ *
Comments:
($)
30,000
30,000
$181.02r
Sheet of
A & S En • • 1neenn , Inc.
Planning Engineering Project Management
28405 Sand Canyon Road, Suite "B", Canyon Country, CA 91387 Ph: 661 .250.9300 Fax: 661.250.9333
October 8, 2019
City of Carlsbad Building Division
1635 Faraday Ave., Carlsbad, CA 92008
Phone #760-602-2719/Fax #760-602-2719
Attn. Building Plan Check Counter
Re: Speedway #68801-2590 El Camino Real, Carlsbad CA 92008
Fire Permit, Dispenser Replacement.
Dear Building Plan Check Counter,
Attached please find the following documents we would like to respectfully submit to
your office for review in order to obtain Building Permit/ Approved Plans for proposed
upgrades/modifications to be performed at subject site;
• Contractor's Documents for DiMaggio Maintenance Inc. company that will
perform proposed upgrades/modifications.
• Four (4) Sets of Plans, Stamped, Signed & Sealed for review/approval.
We would also like to respectfully request expedite review for this project as well. Upon
receipt & review of documents submitted to your office, please advise, feel free to
contact me at robertv@asengineer.com or by phone at 661.250.9300 should you have any
questions or require additional documents/information.
Thank you, greatly appreciate your assistance on this project & look forward to obtain
Building Permit/ Approved Plans for this project.
Sincerely,
Robert C. Velasco
SAN DIEGO REGIONAL
HAZARDOUS MATERIALS
QUESTIONNAIRE
Business Contact
City
flE"'rL.-CArzJ.u /3A l ')
State
CA
Telephone#
2 re -4,,z.~ -~ z t)
·Zip Code APN#
'1 Z ()o 'i?..
Plan File#
The following questions represent the facility's ctivlties, NOT the specific project description.
PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for proiects within the City of San
Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. If any of the items are circled,
applicant must contact the Fire Protection Age~cy with jurisdiction prior to plan submittal. ~ I='
Occupancy Rating: Facility's Square Footage (including proposed project): r J::' f VE D
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. <N@tiHfflWI l;jilficj[dS
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None oM"Ml5'V /~
4. Flammable Solids 8. Unstable Reactives 12. Radioactives \..
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS D1t\i16N1 (HM~: .If th~ answer-..fo any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 110, ffleg~~123.
Call (858) 505-6700 prior to the issuance of a building pem,it. '
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 0 CalARP Exempt
1.
2.
3.
4.
5.
6.
7.
8.
YES NO (for new construction or remodeling projects) /
123, O Is your business listed on the reverse side of this fom,? (check all that apply). Date Initials 0 Bl Will your business dispose of Hazardous Substances or Medical Waste in any amount?
~ 0 Will your business store or handle Hazardous Substances in quantities greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
□ □ □ □ ~
i Will your business store or handle carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
~ Will your business use or install a Hazardous Waste Tank System (Title 22, Article 1 0)?
0 Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or realer than 1,320 allons? California's Above round Petroleum Stora e Act. .
0 CalARP Required
I
Date Initials
0 CalARP Complete
I
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT APCD: Any YES* answerr_"fflquires'a stamp from APCD 10124=0kt-0Jove Road, San
Diego, A 92131 a cdcom sd un .ca. ov (858) 586-2650). [*No stamp required if Q1 Yes and d? Yes an~J .:rlb6.!0Ur:iwtng questidns are intended
to identify the majority of air pollution issues at the planning stage. Projects may require additional me1sures not identifiect.p11t11ese questions. Fo comprehensive
requirements contact APCD. Residences are typically exempt, except -those with more than one building• on the propert9; 1!lingle buildings wit more than four
dwelling units; townhomes; condos; mixed-commercial use; deliberate burns; residences forming part fa larger project. rexcludes garages & sm II outbuildings.]
1.
2.
3.
4.
5.
6.
YES NO
§ I
□
□
□
Will the project disturb 160 square feet or more of existing building materials? OCT I 8 '::J
Will any load supporting structural members be removed? Notification may be requir~d 10 working days prior to commencing de~olition.
(ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been perforrff~Y-a Certified Asbestos Consultant or te Surveillance
Technician? .::HECK.
(ANSWER ONLY IF QUESTION 3 IS YES) Based on the survey results, will the proj83tfjj tyfb anv,,a_~besti~ ontaining material Notification
may be required 10 working days prior to commencing asbestos removal. • ·• ·, · ,. -~-·
Will the project or associated construction equipment emit air contaminants? See the reverse side of this form or APCD factsheet
(www.sdapcd.org/info/fact.s/permits.pdf} for typical equipment requiring an APCD permit.
(ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda
Briefly describe business activities:
~A STKT!~
Briefly describe proposed project:
(2.G-mC\J~~ LA.e£ v-'lc}q<S
I 6 I I 7
Date
FOROFFICAL FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: _______________________________ _
BY: DATE: I I
RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
APCD COUNTY-HMO APCD COUNTY-HMO APCD
ox 2D.h'. exempts businesses from completing or updating a Hazardous Materials Business Pian. Other permitting requirements may still apply.
HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division
LIST OF BUSINE;,SES WHICH REQUIRE REVIEW AND APPROVAL FROM THE COUNTY OF SAN DIEGO
DEPARTMENT OF ENVIRONMENTAL HEALTH -HAZARDOUS MATERIALS DIVISION
Check all that apply:
AUTOMOTIVE
0 Battery Manufacturing/Recycling
0 Boat Yard
D Car Wash
D Dealership Maintenance/Painting
D Machine Shop
D Painting
D Radiator Shop
D Rental Yard Equipment
D Repair/Preventive Maintenance
D Spray Booth
D Transportation Services
D Wrecking/Recycling
CHEMICAL HANDLING
D Agricultural supplier/distributor
D Chemical Manufacturer
D Chemical Supplier/Distributor ·
D Coatings/Adhesive
D Compressed Gas Supplier/Distributor
D Dry Cleaning
D Fiberglass/Resin Application
ijl.Gas Station
tJ Industrial Laundry
D Laboratory
D Laboratory Supplier/Distributor
0 Oil and Fuel Bulk Supply
D Pesticide Operator/Distributor
CHEMICAL HANDLING
D Photographic Processing
0 Pool Supplies/Maintenance
D Printing/Blue Printing
D Road Coatings
D Swimming Pool
D Toxic Gas Handler
0 Toxic Gas Manufacturer
METAL WORKING
0 Anodizing
0 Chemical Milling/Etching
0 Finish-Coating/Painting
D Flame Spraying
0 Foundry
D Machine Shop-Drilling/Lathes/Mills
D Metal Plating
D Metal Prepping/Chemical Coating
D Precious Metal Recovery
0 Sand Blasting/Grinding
D Steel Fabricator
D Wrought Iron Manufacturing
AEROSPACE
D Aerospace Industry
D Aircraft Maintenance
D Aircraft Manufacturing
OTHERS AND MISCELLANEOUS
0 Asphalt Plant
D Biotechnology/Research
D Chiropractic Office
D Co-Generation Plant
0 Dental Clinic/Office
D Dialysis Center
D Emergency Generator
D Frozen Food Processing Facility
D Hazardous Waste Hauler
D Hospital/Convalescent Home
D Laboratory/Biological Lab
0 Medical Clinic/Office
0 Nitrous Oxide (NO.) Control System
D Pharmaceuticals
0 Public Utility
D Refrigeration System
D Rock Quarry
D Ship Repair/Construction
D Telecommunications Cell Site
D Veterinary Clinic/Hospital
D Wood/Furniture Manufacturing/Refinishing
ELECTRONICS
D Electronic Assembly/Sub-Assembly
D Electronic Components Manufacturing
D Printed Circuit Board Manufacturing
NOTE: THE ABOVE LIST INCLUDES BUSINESSES, WHICH TYPICALLY USE, STORE, HANDLE, AND DISPOSE OF HAZARDOUS SUBSTANCES.
ANY BUSINESS NOT INCLUDED ON THIS LIST, WHICH HANDLES, USES OR DISPOSES OF HAZARDOUS SUBSTANCES MAY STILL REQUIRE
HAZARDOUS MATERIALS DIVISION (HMO) REVIEW OF BUSINESS PLANS. FOR MORE INFORMATION CALL (858) 505-6880.
LIST OF AIR POLLUTION CONTROL DISTRICT PERMIT CATEGORIES
Businesses, which include any of the following operations or equipment, will require clearance from the Air Pollution Control District.
CHEMICAL
47 -Organic Gas Sterilizers
32 -Acid Chemical Milling
33 -Can & Coil Manufacturing
44 -Evaporators, Dryers & Stills Processing
Organic Materials
24 -Dry Chemical Mixing & Detergent Spray
Towers
35 -Bulk Dry Chemicals Storage
55 -Chrome Electroplating Tanks
COATINGS & ORGANIC SOLVENTS
27 -Coating & Painting
37 -Plasma Arc & Ceramic Deposition Spray
Booths
38 -Paint, Stain & Ink Mfg
27 -Printing
27 -Polyester Resin/Fiberglass Operations
METALS
18 -Metal Melting Devices
19 -Oil Quenching & Salt Baths
32 -Hot Dip Galvanizing
39 -Precious Metals Refining
ORGANIC COMPOUND MARKETING
(GASOLINE, ETC)
25 -Gasoline & Alcohol Bulk Plants & Terminals
25 -Intermediate Refuelers
26 -Gasoline & Alcohol Fuel Dispensing
COMBUSTION
34 -Piston Internal -Combustion Engines
13 -Boilers & Heaters (1 million BTU/hr or larger)
14 -Incinerators & Crematories
15 -Burn Out Ovens
16 -Core Ovens
20 -Gas Turbines, and Turbine Test Cells & Stands
48 -Landfill and/or Digester Gas Flares
ELECTRONICS
29 -Automated Soldering
42 -Electronic Component Mfg
FOOD
12 -Fish Canneries
12 -Smoke Houses
SO -Coffee Roasters
35 -Bulk Flour & Powered Sugar Storage
SOLVENT USE
28 -Vapor & Cold Degreasing
30 -Solvent & Extract Driers
31 -Dry Cleaning
ROCK AND MINERAL
04 -Hot Asphalt Batch Plants
05 -Rock Drills
06 -Screening Operations
07 -Sand Rock & Aggregate Plants
08 -Concrete Batch, CTB, Concrete Mixers, Mixers
&Silos
10-Brick Manufacturing
OTHER
01 -Abrasive Blasting Equipment
03-Asphalt Roofing Kettles & Tankers
46 -Reverse Osmosis Membrane Mfg
51 -Aqueous Waste Neutralization
11 -Tire Buffers
17 -Brake Debonders
23 -Bulk Grain & Dry Chemical Transfer & Storage
45 -Rubber Mixers
21 -Waste Disposal & Reclamation Units
36 -Grinding Booths & Rooms
40 -Asphalt Pavement Heaters
43 -Ceramic Slip Casting
41 -Perlite Processing
40-Cooling Towers -Registration Only
91 -Fumigation Operations
56 -\JVINTP (1 million gal/day or larger) & Pump
Station
NOTE: OTHER EQUIPMENT NOT LISTED HERE THAT IS CAPABLE OF EMITTING AIR CONTAMINANTS MAY REQUIRE AN AIR POLLUTION
CONTROL DISTRICT PERMIT. IF THERE ARE ANY QUESTIONS, CONTACT THE AIR POLLUTION CONTROL DISTRICT AT (858) 586-2600.
HM-9171 (08/15) County of San Diego -DEH -Hazardous Materials Division
{ Cicyof
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
8-50
Development Services
Building Division
1635 Faraday Avenue
(760) 602-2719
www.carlsbadca.gov
This checklist is intended to assist building permit applicants identify which Climate Action Plan (CAP) ordinance
requirements apply to their projects. The completed checklist must be included in the building permit application. It may be
necessary to supplement the completed checklist with supporting materials, calculations or certifications, to demonstrate
full compliance with CAP ordinance requirements. For example, projects that propose or require a performance approach
to comply with energy-related measures will need to attach to this checklist separate calculations and documentation as
specified by the ordinances.
NOTE: The following type of permits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
..i1 If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required by ordinance,
an explanation must be provided to the satisfaction of the Building Official.
..i1 Details on CAP ordinance requirements are available on the city's website .
..i1 A CAP Building Plan template (form B-55) shall be added to the title page all building plans. This template shall be
completed to demonstrate project compliance with the CAP ordinances. Refer to the bui lding application webpage and
download the latest form.
Project Name/Building
Permit No.:
Property Address/APN:
Applicant Name/Co.:
Applicant Address:
Contact Phone:
____,_6~f'---"'EEP-=""-....;;;;._W_A:'::j-+--------BP No.: C6C£C) Qr--cxfl T:
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
,J; t:t-✓ ~A.J rx>f~~
t:..+ 'b B'&i ,JtSeT<-J>J;q
Contact Phone:
Contact Email:
1
A I. t s· t -----i=:;:2::P2~=--------Date·. 1 D -11 ,,.. / 9 pp 1can 1gna ure: 1,, -1-
8-50 Page 1 of 6 Revised 08/19
City of Carlsbad Climate Action Plan Consistency Checklist
Use the table below to determine which sections of the Ordinance Compliance checklist are applicable to your project.
For alterations and additions to existing buildings, attach Building Permit Valuation worksheet.
Building Permit Valuation (BPV) from worksheet:$3 0 1CXJ<J
Construction Type
D Residential
□ New construction
□ Additions and alterations:
□ 8PV < $60,000
□ BPV <!: $60,000
□ Electrical service panel upgrade only
□ 8PV <!: $200,000
~ Nonresidential
□ New construction
Alterations:
□ 8PV <!: $200,000 or additions ~ 1,000
square feet
□ 8PV <!: $1,000,000
□ <!: 2,000 sq. ft. new roof addition
Checldlat Item
Mates:
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area is residential use
2A, 3A, 18, 2B,
4A 38,4A
NIA NIA All residential additions and alterations
1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
only
*Multi-family dwellings only where interior finishes are removed
1A,4A* 18, 4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
1 B, 2B, 3B, 4B and 5
18, 5
18,2B,5 Buildin_g alterations of<!: 75% existing gross floor area
28,5 1 B also applies if BPV <!: $200,000
Checklhe appropriate boa,...., alndapplicallanl ..... lams, nlp1Mde11CJP9.111ng011bllallorl8nldoaffinallon■MCIII~
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) sections 18.21.155 and 18.30.190, and the California Green Building Standards Code (CALGreen) for
more information when completing this section.
A D Residential addition or alteration ?: $60,000 building pennit valuation.
See CMC section 18.30.190.
Year Built Single-family Requirements
□ Before 1978 Select one:
□ Duct sealinQ □ Attic insulation □ Cool roof
□ 1978 and later Select one:
□ Lighting package □ Water heating Package
□ Between 1978 and 1991
□ 1992 and later
□ NIA _________ _
□ Exception: Home energy score ~ 7
(attach c:ertification) .
Multi-family Requirements
□ Attic insulation
Select one:
□ Duct sealinQ □ Attic insulation □ Cool roof
Select one:
□ Lighting package □ Water heating package
B. a Nonresidential* new construction or alterations?: $200,000 building pennit valuation,
( or additions?: 1,000 square feel IZl_N/A
Updated 8/15/2019
I
2
City of Carlsbad Climate Action Plan Consistency Checklist
See CMC 18.21.155 and CALGreen Appendix A5, Division A5.2-Energy Efficiency.
AS.203.1.1 Choose one: D .1 Outdoor lighting D .2 Warehouse dock seal doors
D .3 Restaurant seNice water heating (comply with California Energy Code section 140.5, as amended) D N/A -----------D .4 Daylight design PAFs D .5 Exhaust air heat recovery
AS.203.1.2.1
Choose one as applicable: D .95 Energy budget D .90 Energy budget D N/A
AS.211.1 ..
D On-s~e renewable energy D N/A
AS.211.3**
D Green power (if offered by local utility provider, 50% minimum renewable sources) D N/A
AS.212.1
D Elevators and escalators D N/A
AS.213.1
D Steel framing D N/A
* Includes hotels/motels and high-rise residential buildings
.. For alterations ~ $1,000,000 BPV and affecting > 75% existing gross floor area, or alterations that add 2,000 square feet of new roof addition: comply
~h CMC 18.30.130 instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building pennit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. Notes: 1) High-rise residential buildings are. subject to nonresidential photovoltaic
requirement (28 below) instead. 2) If project includes installation of an electric heat pump water heater pursuantto CMC 18.30.150(8)
(high-rise residential) or 18.30.170(8) (low-rise residential), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use additional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) / 1,000 + (1.15 x #d.u.)
*Formula calculation where CFA = conditional floor area, #du= number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
Exception
D
D
D
D
kWdc
8. D Nonresidential new construction or alterations ~$1,000,000 8PV and affecting ~75% existing floor area, or addition that increases roof
area by ~2,000 square feel Please refer to CMC section 18.30.130 when completing this section. Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
D Gross Floor Area (GFA) Method
GFA:
D If < 10,000s.f. Enter: 5 kWdc
Min. System Size:
D If ~ 1 O,OOOs.f. calculate: 15 kWdc x (GFA/10,000) **
__ kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
D Time-Dependent Valuation Method
Updated 8/ I 5/20 19 3
City of Carlsbad Climate Action Plan Consistency Checklist
Annual TDV Energy use:**• ______ x .80= Min. system size: _____ kWdc
***Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A D Residential and hotel/motel new construction
Please refer to CMC sections 18.30.150 and 18.30.170 when completing this section.
D For systems serving individual dwelling units choose one:
D Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
D Heat pump water heater AND PV system .3 kWdc larger than required in CMC section 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 ( c) 14 (low-rise residential)
D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
D Exception:
D For systems serving multiple dwelling units, install a central water-heating system with all of the following:
D Gas or propane water heating system
D Recirculation system per CMC 18.30.150(8) (high-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
D Solar water heating system that is either:
D .20 solar savings fraction
D .15 solar savings fraction, plus drain water heat recovery
D Exception:
B. D Nonresidential new construction
Please refer to Carlsbad Ordinance CMC section 18.30.150 when completing this section.
D Water heating system derives at least 40% of its energy from one of the following (attach documentation):
D Solar-thermal D Photovoltaics D Recovered energy
D Water heating system is (choose one):
D Heat pump water heater
D Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
D Exception:
Updated 8/15/2019 4
City of Carlsbad Climate Action Plan Consistency Checklist
4. Electric Vehicle Cha in
A. D Residential New construction and major alterations*
Please refer to Carlsbad Ordinance CMC section 18.21.140 when com letin this section.
□ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE Ready parking space required □ Exception :
□ Multi-family residential· □ Exception ·
Total Parking Spaces EVSESpaces
Proposed Capable Ready
Calculations: Total EVSE spaces = .10 x Total parking (rounded up to nearest whole number)
EVSE Installed = Total EVSE Spaces x .50 (rounded up to nearest whole number)
EVSE other= Total EVSE spaces-EVSE Installed
(EVSE other may be "Capable," "Ready" or "Installed.")
Installed Total
*Major alterations are: (1) for one and two-fami~ dwellings and townhouses with attached garages, alterations have a building permit valuation ;,; $60,000
or include an electrical service panel upgrade; (2) for multifami~ dwellings (three units or more without attached garages), alterations have a building permit
valuation ;,; $200,000, interior finishes are removed and significant site work and upgrades to structural and mechanical, electrical, and/or plumbing
systems are proposed.
B D Nonresidential new construction (includes hotels/motels) □ Exception ·
Total Parking Spaces EVSE Spaces
Proposed Capable I Ready I Installed I Total
I I I
Calculation: Refer to the table below:
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
□ 0-9 1 1
□ 10-25 2 1
□ 26-50 4 2
□ 51-75 6 3
□ 76-100 9 5
□ 101-150 12 6
□ 151-200 17 9
□ 201 and over 10 oercent of total 50 oercent of Required EV Spaces
Updated 8/15/2019 5
City of Carlsbad Climate Action Plan Consistency Checklist
5. D Transportation Demand Management (TOM): Nonresidential ONLY
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employ~enerated ADT.
City staff will use the table below based on your submitted plans to determine whether or nor your permit requires a TOM plan. If TOM is applicable to your
permit, staff will contact the applicant to develop a site-specific TOM plan based on the pemiit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Emp ADTfor
first 1,000 s.f.
EmpADTI
1000 s.f.1
Office (all)2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousin 4
1 Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 1 (JlhEdition
13
11
4.5
3.5
3
1
2 For all office uses, use SAN DAG rate of 20 ADT/1,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample calculations:
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. 8,334 sf/ 1,000 x 4.5 + 8 = 46 Em lo ee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my pemiit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance.
Applicant Signature: _________________ _ Date: _____ _
Person other than Applicant to be contacted for TOM compliance (if applicable):
Name (Printed): _________________ _ Phone Number: -----
Email Address: __________________ _
Updated 8/1 5/2019 6
1, ~ t •
t :s-ii !> I ..
i t • w ~ !
51 I .
+
_J
<(
w
er:: I
0 z
2
<(
01
_J w
--+
30'
0 ..,
w ,-w o;:
s·
U>-z <( 0 3: Uw ~~ FO
V, x w
~ "-' o;: U,:: z _J 0 <( u ;o
"i!s ~ vi
V, x w
w ,-w
'f 5~ I . I I 5 >-I
, ~~ I z"' F o
V, x w
I
I. I ;!?
I
COMM E RCIAL
\ EXISTING PLANTER j
~
~
<==> -~
§ .,,. ~
PRO PE R TY
rr---'.','
~II ~
EXISTING
BUILDING
{]
0
DIRECTIONAL ARROW/
GRAPHIC SCALE
N
w
E
s
10 20 30
■■■■·--
GRAPHIC SCALE
1" ; 10·-o·
VICINITY MAP
·◊· !
w.llsF8f90 ....
C>0 --o .... s
II
0 <>-...,.
• [fill 6'-·----o'°
11 t,J;i·~-1:! "-' •
RE\IISIONS I BY
&
&
&
&
&
&
&
&
fr,,
&
,-z .., w ..,
:::, .,,
w a, " I <( 0 z ,n <( N :::,
z -2 ~ ~ .t;ro ._
CD U :::::>w ~
8 ~~5 ~ ~ <..?5~"~ a. zuoCO ·-W -4:1"18 [ est:)~;;~
(I) W~z< I ~ Z ~OU~ ~ (3~~>--N
Z 6 <r:i!:-;::-w z U z lO
I
I
I
_ _J
I '1',.o,.o ,9,
C>?v
s.,,.110:. ol' c
J'l)'9 ~r1~6
~ I'''"'"'"' e C> ca,,;
lZ ~ ".,.,..,. .......... _..,..,..
i (/):~s~
z v,"" 1ollz.,.,6 w zo>-z I )<! <CvZ o ...J CO <t I C..NUO...
-----=-
I I~ II~.
EXISTING CONCRETE
DRIVEWAY
40'
e II e f I
EXISTING
UNDERGROUND
TANKS (TYP. OF 2)
EXISTING PLANTER
EXISTING CONCRETE
SIDEWALK
~ MARBON RO~_D-
01/,
I ISS, ~() 6;,.
u¢'D .-
EXISTING CONCRETE
DRIVEWAY
. I ~
L 4o· 7
6y, >-,-
o;:
w
a.
0
o;:
a.
_J
<( -u
o;:
w
:,;
:,;
0
u
0
0 N
;110 ()/~. q(/
'f/ () ~&'.,·
6 '0'1)
SCOPE OF WORK
CD REMOVE EXISTING FUEL DISPENSERS
I \ 1/<o1.9
-~
@ INSTALL NEW (3+0) GILBARCO 700S FUEL
DISPENSERS.
@ DISCONNECT & RECONNECT ALL EXISTING
SHEAR VALVE & ELECTRICAL FOR
PRODUCT & VAPOR.
0 DISCONNECT AND RECONNECT EXISTING
BALANCE PHASE II EVER HANGING
HARDWARE (I.E. NOZZLE, SWIVEL.
CO-AXIAL HOSE. CO AXIAL WHIP HOSE &
BREAKAWAY COUPLING).
® UPGRADE EXISTING VEEDER ROOT
SOFTWARE FROM 1.02 TO 1.05 INCLUDING
A COLD START.
NOTES:
EXISTING DISPENSERS' FOOT PRINT TO
REMAIN THE SAME. EXISTING UDC
CONFIGURATION TO REMAIN THE SAME. ti Lil
f -I
= i
f"o ;;;~ z.,-, _.,. i:to ~~§ :i <( ,0
@5~ ~~~ :l!!i"'"-N I!.,., ~
CBC2019-0497
2590 EL CAMINO REAL
SPEEDWAY REMOVE & REPLACE 4 EXISTING FUEL
DISPENSER'S
1670302900
10/17/2019
CBC2019-0497
>-,_ -
!
i i
!
! l
f l
I t :
I
I
NEW
MUL Tl-PRODUCT
GILBARCO 700S
FUEL DISPENSER
BLENDER 3+0
N.T.S. ffi NEW DISPENSERS
DISCONNECT & RECONNECT
EXISTING SHEAR VALVE FOR
NEW DISPENSERS.
DISCONNECT & RECONNECT
EXISTING ELECTRICAL
N.T.S. ffi DISPENSER PAN DETAILS
tlQJI.:
DISCONNECT AND
RECONNECT
EXISTING HANGING
HARDWARE.
HIGHEST POS DEVICE
EXISTING 6"
DISPENSER
ISLAND
DISPENSER
FRAME
(/) t-· 1~ X W < er ~ 5
~ 8 "' er
Q
ITEM
NO.
0
(2)
EQUIPMENT DESCRIPTION
NEW DISPENSER (BLENDER 3+0)
SOFTWARE
ACCESSIBILITY TO PUBUC BUILDINGS. PUBLIC ACCOMMODATIONS, COMMERCIAL BUILDINCS AND PUBLIC HOUSINC
I I H-308.3.2 Obslrucled hieh rt.ach. Where a clear floor
or ground space allows a parallel approach to an element
and the high side reach is over an obstruction, the height of
the obstruction shall be 34 inches (864 mm) maximum and
the depth of the obstruction shall be 24 inches (610 mm)
maximum. The high side reach shall be 48 inches (1119
mm) maximum for a reach depth of 10 inches (254 mm)
maximum. Where the reach depth ex.ceeds 10 inches (254
mm), the high side reach shall be 46 mches (1168 mm)
maximum for a reach depth of 24 inches (610 mm) maxi•
mum.
Exc.eptions:
1. The top of washing machines and clothes dryers
shall be permitted to be 36 inches (914 mm) max•
imum above the finish floor.
2. Operable parts of fuel dispensers shall be permit-
ted to be 54 inches (/ 372 mm) maximum mea-
,11
1--;~
t'JCUR[ 11 B-308.).1 UNOBSTRUCTED SIDE REACH
~If
(a)
sured from the surface of the vehicular way
where fuel dispensers arc installed on existing
curbs
118-308.4 Suunted reach ranges for children, Where
building elements such as coat hooks, lockers. or operable
parts are designed for use primarily by children, the sug-
gested dimensions of Table 118-308.4 shall be permitted.
These dimensions apply to either forward or side reaches
TA.BLE IIB-J08.4
SUCCESTED DIMENSIONS FOR CHILDREN'S USE ------------·--
SUO(!tsrrn ll.,ACII R.A:",GF..S tUR c1111.mu::-. ACU:JTilkOUGll ll
Forw1rd or .... .... ....
Sid~ Ruch J and -4 5 through 8 9 through 11
High 361nc.he, 401nchn 44 inchc,
(nwomum) (914mm) (1016mm) (1118mm) ·-201nc:hcs 18inc:hc, ]6 1nc:hn
(m1t'tlmum) {S08mm) (457 mm) (406mm)
J J 8--309 Operablt parts
JI B-309.1 General. Operable parts shall comply with Sec-
tion // B-309.
JI B-309.2 Clear floor space. A clear floor or ground space
complying with Section /1B-305 shall be provided
JI 8-309.3 Height. Operable parts shall be placed with one
or more of the reach ranges specified in Section //B-308
J 18-309.4 Oper11ion. Operable pans shall be operable with
one hand and shall not require tight grasping, pinching, or
twisting of the wrist. The force required to activate operable
parts shall be 5 pounds (22.2 N) maximum.
Exception: Gas pump nozzles and electric vehicle con-
nector5 shall not be required to provide operable parts that
have an activating force of 5 pounds (22.2 N) maximum.
(b)
flGURE 118--308.J.2
08.ffRUCTED IIICII SlO[ REACI-I
548 20" CALIFORNIA BULLDL~G CODE
N.T.S. ffi DISPENSER OPERABLE PARTS
MANUFACTURER MODEL OTY. SUPPLIED BY
GILBARCO ENCORE 700S (NNI) 4 OWNER
VST 1.05 1 OWNER
NOTE: ALL EQUIPMENT TO BE INSTALLED BY CONTRACTOR
REVISIONS I BY
&
&
&
&
&
&
&
&
&
&
>-z ,,., w ,,.,
~ ,,., w a, '-' I < 0 z u") < N
~
z "' Q e . t-CD ~ ugw ~ s ~~s ~ a::. z U') I..&.. < C::,o ·" frj ~ u~~ O ~ o:.:00~~ Wzcr. m
V> W-z< I
z Z ffioU g :5 c,~~►N
o.. z0«gc~ wzuz1.0 ijf :~se ~(/)z ~
1o'dz.,.,ow z a>-z ~~:s~~~ 0..NUO...
i--LU LU 0,:
~ -I I a-
i--0 "':; zv, _.,,.
~:i::o .,. o.g ->-so ~<'6
025(,l
f ~E~. "' ~ en .. "' "" LU LU ~ 6 C) :i:: < 0..
ORA~ ,.
_,
"'"' -.,o oco N 0 0, ;;;.,
~u
uci -'"' "'a, oo~ ., 0,"' .,.,,.,
«>"'U
"'~ "'"' g:S ,_ 0 <I)<
CHECKED
~
09/10/2019
SHT. TITLE DETAIL SHEET
JOB N.YMBER
SHEET
01 ·~--------------------------------J.__ _____________________________________________________ _
" ~
! '
f
The industry's most trusted dispenser
Secure \'IIUr competitive odvontoge and increase profits with Gilborco Veeder·
Roors Encore 700 S-your best dispenser investment f01 today ond tomorrow.
High~ secure, powerful CRIN~ electronics build o flexible and innovative
plorlorm for your changing forecourt morl.eting and payment needs. Enjoy peoce
of mind with o leading foundation that is h~h~ secure today and upgrodeoble
to meet the payment security and technology needs of tom01row.
Technology with a human touch .
Encore~
700 S
> Reliable
Gillarca's proven and tim~tested
design guarontees mast forecourts and
\Wiest ronge of conditions
> FlexUtv Enc018 700 S offers most configurations
ond options to fit your forecourt
> EMV-Ready
The industry's mast secure Encore
700 S is the cornerstone of Gilbarco's
EMv@' slite of products
> Easy Servke
Engineered with easy occess and quick
looltime for servicing and maintenance
> Rim Media
Encore 700 S runs a variety of
marketing and rich multimedia programs
including Applause TV at the pump.
> Coanectivity
(,~LBARCO __
~-
N.T.S.
Options. Uptime. Reliability.
Proven design guarantees uptime.
Yoo get the best of Gilborco's fieid-j)roven fo:ore~ 700 S series:
> fomili01 ATM~tyle customer interface
> f u II range of olternolive fuel O!)tions
> lnduitry's most com111ehensive warranty
Enhanced, upgradeable security.
Yoo'i be™'fit from Gilborco's ~obal EMV8 leadellhip ond experience, including
the ~rgest instolled base of EMV-fueling pay ~n~ ~ North Americo. The
Payment Cord Industry Uooneaded Payment lermiool (PCHIPTI and EMVe
certified plodorm in Encore 700 S include:
> FlexPoy' Encrypting PIN Pod (EPP) to piotect PIN dato
> FlexPoy' Secure (o,d Reoder (SCRJ lo encrypt co,d dote
> EMva certification (requires sohwore and EMV~ Chip ond PIN reeder
upgrodefor EM~ tronsoctions*)
> PCHIPI certification
> Secure Controller to protect the entire electronics plorl01m
• llolt.ln5fld011L'INIIJAYf'~-rt.USEM'i4's.e:l<rDIDiantt)'ltbt.l~tli~\115111_
Encore® 700 S Specifications
Regulora,1 Go,ernrnenral App<a,als Prote\so,
Superior merchandising improves profits.
Encore" 700 S gives yoo ~-tools to dorm, permle, ond motil<Jte yru ft.El
rustom8fl lo cooie mle yoor stcre ml wt hq,ermiiin ~. througl:
> flexible content monogement O!)tions, with the induitry leading Ap~ouse
metchandi~ng system
> Superim imoge c~rity, resolution and video pert01monce
> 5.7" color screen 01 standard ID! dear, effective commUflicotion
> 10.4" color upgrade option IOI maximum impoct
Platform far continued grow1h.
Encore" 700 S provides o strong foondotion IOI growth with powerful, future
ready electronics to suppo,t voor innovation needs, such os mobile poymen~,
enhanced ~yolty, expanded me•chonrtrsing and other opplicotions:
> Enhanced opplicotions proressor 101 lutu!e growth
> Enhanced CRIN06 memory for improved oppl"Kotion speed
> CAT-5 connectivity for utimote flexibility
> UL, cUl
> /Aeolurement Cooodo. Weigh~ & Meollres. FCC
> PCI PEO 1.x
> Up to 71Q-MHz ARM 1.8 (01e 101 enhanced
(RIND opplicolioos speed
> (~!ete Enc01e 5 Bezel
> S.7'0VGA00.4''16Aupgrodeoplionouillel
> Door switches to notify the POS to limi1 occess
> PCI UP! 1.x
> EMV" Compotible
fnv1ronmcnlol
> · 30°( to +55°(
> A cabinet 01 keypad heater option ~ OY011oble to
ovoid ice occumulotion.
> Up to S1Q-MHz DSP Core for high pert01monce
oooio and lideo copo!ility
> Secure PfOCl!S10< for doto encr1Ption and
tomper responsiveness
> Memory:
and prevent tompemg'
> Ke'/ componen~ toot sett-disable in rhe event
of tompering
> High Speed Graphic Thermal Pmter
> Encrypted Pu_lse_, (-'op_tiofdl _____ _
> NANO flash: S l 1AIB
> ODR SRMI: 156 MB
> eMMC: 4GB ''Olc.r,.,,Jo11
fl,-ll'~011~111t:"il!Odt-m«,-.Jdlirc,lfl' Elii'C.f'Jf itt,.l,r,e_ 'i'n:.e do-ow tt•11nes,
n.i'!!f '"'~ ~u~t m,:i~ .. 1~··'.~·Jn\i"ec'~.,.\,~.$i"-'~=·~·.,,.21•,r!jf'~Ji~~~.
ffi NEW DISPENSER SPEC SHEET
REVISIONS I BY
&
a':.
&
&
&
&
&
&
&
&
>-z "' w "' :::; "' w "' c.., r <( 0 z "' <( N :::;
z -Q ~ ;..: . 0cn _,
m U::::>w ~
o Z f">::: x w -(/)::, < ~ 0 av:"~ a. z uoro•-w _ <ng ~ n::: 0 00) n w z o::: (7) ~ ~~~(32, :5 -w>--~
0. ~~~~-wzU zu:)
i l/):~s~
z Vl "" ra'1lz ,o 5 w Z O >-Z I j<(«<tZO ....J<O<t I 0.NUQ..
~ -I CD CD a-
[;j
1-:.i ~~ "'oo zv, _.,.
~6° .,. -8 ,... >-'° S<so $;15~ I ~~~ .,, ~
r.i5 .. "' "" Ll.l tJJ ~ z 0 0 0 :i: < 0..
a ~:ri w N :~ o:O: ~g
V) <
i -D2
I t :
I
I
DRAWN
ER
CHECKED
~
09/10/2019
SHT. TITLE
OETAL SHEET
J08 NYUBER
SHEET
•