Loading...
HomeMy WebLinkAbout2599 GLASGOW DR; ; CB162984; Permit1111111.11111111MINNIMI City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 08-05-2016 Residential Permit Permit No: CB162984 Building Inspection Request Line (760) 602-2725 Job Address:2599 GLASGOW DR CBAD Permit Type:RESDNTL Sub Type: SFD Status:ISSUED Parcel No:2081901100 Lot #:44 Applied: 08/04/2016 Valuation:$511,461.00 Constuction Type: 5B Entered By: SLE Occupancy Group:Reference #: CT130003 Plan Approved: 08/05/2016 # Dwelling Units:1 Structure Type: SFD Issued: 08/05/2016 Bedrooms:3 Bathrooms:3.5 Inspect Area: Orig PC #: PC150074 Plan Check #: PC160045 Project Title:THE BLUFFS: PHASE 1 -PLAN 1 3,282 SF LIV / 425 SF GAR / 499 SF PATIO Applicant:Owner: TOLL BROTHERS INC RANCHO COSTERA LLC 200 200 725 W TOWN & COUNTRY RD 725 W TOWN & COUNTRY RD ORANGE CA 92868 ORANGE CA 92868 760-720-5485 760-720-5485 Building Permit $2,073.26 Meter Size FS1 Add'I Building Permit Fee $0.00 Add'I Red. Water Con. Fee $0.00 Plan Check $1,451.28 Meter Fee $356.00 Add'I Plan Check Fee ($500.00)SDCWA Fee $4,963.00 Plan Check Discount ($116.10)CFD Payoff Fee $2,858.17 Strong Motion Fee $66.49 PFF (3105540)$9,308.59 Park in Lieu Fee $0.00 PFF (4305540)$0.00 Park Fee $0.00 License Tax (3104193)$0.00 LFM Fee $0.00 License Tax (4304193)$0.00 Bridge Fee $0.00 Traffic Impact Fee (3105541)$2,690.00 Other Bridge Fee $0.00 Traffic Impact Fee (4305541)$0.00 BTD #2 Fee $0.00 Sidewalk Fee $0.00 BTD #3 Fee $0.00 PLUMBING TOTAL $254.00 Renewal Fee $0.00 ELECTRICAL TOTAL $95.75 Add'I Renewal Fee $0.00 MECHANICAL TOTAL $122.96 Other Building Fee $0.00 Housing Impact Fee $0.00 HMP Fee $0.00 Housing InLieu Fee $0.00 Pot. Water Con. Fee $3,934.00 Housing Credit Fee $0.00 Meter Size FS1 Master Drainage Fee $0.00 Add.' Pot. Water Con. Fee $0.00 Sewer Fee $2,103.00 Red. Water Con. Fee $0.00 Additional Fees $0.00 Green Bldg Stands (SB1473) Fee $21.00 Fire Sprinkler Fees $0.00 Green Bldg Stands Plan Chk Fee $0.00 TOTAL PERMIT FEES $29,681.40 Total Fees:$29,681.40 Total Payments to Date:$29,681.40 Balance Due:$0.00 FINALTDVA177Inspector:Date:7 aet Clearance: NOTICE:Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions."You have 90 days from the date this permit was issued to protest imposition of these fees/exactions.If you protest them, you must follow the protest procedures set forth in Govemment Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030.Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project.NOR DOES IT APPLY to any fees/exactions of which you have previously been (liven a NOTICE similar to this. or as to which the statute of limitations has previously otherwise expired. • City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Storm Water Pollution Prevention Plan (SWPPP) Permit 08-05-2016 Permit No:SW160347 Job Address:2599 GLASGOW DR CBAD Permit Type:SWPPP Status:ISSUED Parcel No:2081901100 Lot #:44 Applied:08/05/2016 Reference #:Entered By:SLE CB#:CB162984 Issued:08/05/2016 Inspect Area: Project Title:THE BLUFFS: PHASE 1 Tier:1 Priority:L Applicant:Owner: TOLL BROTHERS INC RANCHO COSTERA LLC 200 200 725 W TOWN & COUNTRY RD 725 W TOWN & COUNTRY RD ORANGE CA 92868 ORANGE CA 92868 760-720-5485 760-720-5485 Emergency Contact: GREG DEACON 760-637-9083 SWPPP Plan Check $0.00 SWPPP Inspections $59.00 Additional Fees $0.00 TOTAL PERMIT FEES $59.00 Total Fees:$59.00 Total Payments To Date:$59.00 Balance Due:$0.00 FINAL APPROVAL DATE 6(71(7/7CLEARANCE SIGNATURE A141-- PERMIT INSPECTION HISTORY REPORT (CB162984) Permit Type:BLDG-Residential Application Date:08/04/2016 Owner:RANCHO COSTERA LLC - INACTIVE Work Class:Single Family Detached Issue Date:08/05/2016 Subdivision: Status:Closed -Finaled Expiration Date:08/11/2017 Address:2599 Glasgow Dr Carlsbad, CA IVR Number:716207 Scheduled Actual Date Start Date Inspection Type Inspection No.Inspection Status Primary Inspector Reinspection Complete 11/04/2016 BLDG-82 Drywall,002195-2016 Passed Andy Krogh Complete Exterior Lath, Gas Test, Hot Mop Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-17 Interior Lath-Drywall Yes BLDG-18 Exterior Lath and Yes Drywall BLDG-23 Gas-Test-Repairs Yes BLDG-Final 020255-2017 Passed Andy Krogh Complete Inspection Checklist Item COMMENTS Passed BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes 11/07/2016 11/07/2016 BLDG-17 Interior 000120-2016 Passed Paul Burnette Complete Lath/Drywall Checklist Item COMMENTS Passed. BLDG-Building Deficiency Yes 01/11/2017 01/11/2017 BLDG-Electric Meter 009344-2017 Passed Andy Krogh Complete Release April 17, 2017 Page 1 of 1 Inspection History: 08/22/2016:11-BLDG-Ftg/Foundation/Piers Approval Completed By PB ; 10/17/2016:13-BLDG-Shear Panels/HD's Approval Completed By PB ; 09/23/2016:15-BLDG-Roof/Reroof Approval Completed By AEK ; 08/08/2016:21-BLDG-Underground/Under Floor Approval Completed By PD ; 08/08/2016:22-BLDG-Sewer/Water Service Approval Completed By PD ; 10/26/2016: 84-BLDG-Rough Combo Approval Completed By AEK C0162984 2599 GLASGOW DR con.oc THE BLUFFS PHASE 1 -PLAN 1 RCuAildRLgSDBAiDn INSPECTION RECORD 3R.E28S2D SNFTLUV /425 SSFFD GAR /499 SF PATIO INSPECTION RECORD CARD WITH APPROVED Lot#44 TOLL BROTHERS INC PLANS MUST BE KEPT ON THE JOB El CALL BEFORE 3:30 pm FOR NEXT WORK DAY INSPECTION 0 FOR BUILDING INSPECTION CALL:760-602-2725 OR GO TO: www.Carlsbadca.gov/Buliding AND CLICK ON "Request Inspectio9" DATE:g-1160 If YES t.cit el it rye Jou')tOOt Di 1.1fin .aiiJiIII H n rItorrri r to!Fillip Hit kit .vt jr)) trio ph .)1 it dm it)11s .it tilt Irlrun ruttthr (art )0);Ott t 0.rit r)I )t I.to t)t)(t:55(0 '-rrrari to It ifgHII.ilectim elt )'1 brit )COPT'ur tt t rr rit NO 1:3 Required Prior to Requesting Building Final If CheckedYES Date Inspector Notes•Planning/Landscape 760-944-8463 Allow 48 hours CM&I (Engineering inspections(760438-3891 Call before 2 pm U/17/EIRNIIII INENFire Prevention 760-602-4660 Allow 48 hours Emu Type of Inspection Type of Inspection Cope $BUILDING Date Inspector coot.r ELECTRICAL Date inspector #11 FOUNDATION #31 0 ELECTRIC UNDERGROUND 0 UFER #12 REINFORCED STEEL "V #34 #093111ELECTRIC #66 MASONRY PRE GROUT #33 $i IC SERVICE 0TEMPORARY 1•••/1—'170GROUT0WALL DRAINS #35 PHOTO VOLTAIC #10 TILT PANELS #39 FINAL #11 POUR STRIPS cohort MECHANICAL #11 COLUMN FOOTINGS #41 UNDERGROUND DUCTS &PIPING #14 SUBFRAME 0 FLOOR 0 CEILING #44 0 DUCT&PLENUM 0 REF. PIPING #15 ROOF SHEATHING -*J -1 (1.v #43 HEAT-AIR COND. SYSTEMS #13 ETT. SHEAR PANELS "ae fjp #49 FINAL #16 INSULATION cocE 1 COMBO INSPECTION #18 EXTERIOR LATH #81 UNDERGROUND (11,12,21,31) #17 INTERIOR LATH&DRYWALL #82 DRYWALL,EXTIAN,GAS TES(17,18,23)JI*1.46 ASR. #51 POOL EXCA/STEEL/BOND/FENCE #83 ROOFSHEMIN, DUMAR (13,15) #55 PREPIASTER/RNAL #84 FRAME ROUGH COMBO (14,24,34,44)04C -( #1.9 FINAL #85 T-887(14,24,34,44) C oot PLUMBING Date ,Ar.et-tor 989 FINAL OCCUPANCY (19,29,39,49)-fir.-7 Aer.,fed( #22 0 SEWER & BL/C0 0 PL/C0 ''AitaitagaIll FIRE Date ins •=•r #21 UNDERGROUND DWASTE 0 WTR ••tr is #24 TOP OUT 0 WASTE 0 WTR A/SUNDERGROUND VISUAL #27 TUB &SHOWER PAN A/SUNDERGROUND HYDRO #23 0 GAS TEST 0 GAS PIPING A/S UNDERGROUND FLUSH #25 WATER HEATER A/SOVERHEAD VISUAL #28 SOLAR WATER A/S OVERHEAD HYDROSTATIC />16#29 FINAL A/SFINAL ae- co..STORM WATER F/A ROUGH-IN #800 PRE-CONSTRUCTION MEETING F/A FINAL #603 FOLLOW UP INSPECTION FIXED EXTINGUISHING SYSTEM ROUGH-IN (hos NOTICE TO CLEAN FIXED EXTING SYSTEM HYDROSTATIC TEST-"#607 WRITTEN WARNING FIXED EXTINGUISHING SYSTEM FINAL #609 NOTICE OF VIOLATION MEDICAL GAS PRESSURETEST #610 VERBAL WARNING MEDICAL GAS FINAL REV 1012012 SEE BACK FOR SPECIAL NOTES CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3 ) Project Name:Robertson Ranch: The Bluffs Enforcement Agency:City of Permit Number:CB162984 Carlsbad Dwelling Address:2599 Glasgow Drive City:Carlsbad Zip Code:92010 A. System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Location 03 Building Type from CF-1R Single family 04 Verified Low Leakage Ducts in Conditioned Space No,credit is not taken (VLLDCS)Credit from CF1R? 05 Verified Low Leakage Air Handling Unit Credit from Yes credit is taken CF1R? • 06 Duct System Compliance Category New B.Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)3.5 02 Heating Capacity (kBtu/h)62 03 Conditioned Floor Area served by this HVAC system (ft2)1641 04 Duct Leakage Test Condition Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 6.0 07 Air Handling Unit Airflow (AHUAirflow) Determination Cooling system method Method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage Rate (cfm)84 10 Actual duct leakage rate from leakage test measurement 37 (cfm) 11 Air Handling Unit Manufacturer Name N/A 12 Air Handling Unit Model Number N/A 13 Compliance Statement System passes leakage test Registration Number: 215-N6489698E-M2000002A-M20A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:12:20 2013 Residential Compliance Schema Version: 2013.1.007 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3 ) B.Duct Leakage Diagnostic Test 14 Notes C.Additional Requirements for Compliance The Low Leakage Air-handling Unit Model identified on this compliance document is included in the list of certified Low 01 Leakage Air-Handling Units published on the Energy Commission Website at: http://www.energv.ca.gov/title24/2008standards/special case appliance/supplemental listings/Low Leakage Air- Handling Unit Listing 2012-10-30.pdf (provide undated link). 02 System was tested in its normal operation condition. No temporary taping allowed. Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage 03 testing. OA ducts used for Central Fan Integrated (CFI)Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 04 All supply and return register boots were sealed to the drywall. 05 Building cavities were not used as plenums or platform returns in lieu of ducts. 06 If cloth backed tape was used it was covered with Mastic and draw bands. 07 All connection points between the air handler and the supply and return plenums are completely sealed. 08 Verification Status Pass -all applicable requirements are met 09 Correction Notes for this table The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.. D.Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. Registration Number: 215-N6489698E-M2000002A-M20A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:12:20 2013 Residential Compliance Schema Version: 2013.1.007 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3 ) Documentation Author's Declaration Statement 1.I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Lorena Pichardo d4-ee.e.vPecitair.4 Company:Date Signed: Energy Inspectors 2017-02-21 16:26:20 Address:CEA/ HERS Certification Identification (if applicable): 2570 South Miller Lane City/State/Zip:Phone: Las Vegas NV 89117 702-365-8080 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed-and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): AIREFORCE HEATING & AIR INC Responsible Builder or Installer Name:CSLB License: Michelle Sanchez HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) Tested HERS Rater Information HERS Rater Company Name: Energy Inspectors Responsible Rater Name:Responsible Rater Signature: Joseph Schwartz Ade,5CrteaVra Responsible Rater Certification Number w/this HERS Provider:Date Signed: CC2004506 2017-02-21 16:33:03 Digitally signed by CalCERTS.This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracyof the information. Registration Number: 215-N6489698E-M2000002A-M20A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CalCERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:12:20 2013 Residential Compliance Schema Version: 2013.1.007 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3 Project Name:Robertson Ranch: The Bluffs Enforcement Agency:City of Permit Number:CB162984 Carlsbad Dwelling Address:2599 Glasgow Drive City:Carlsbad Zip Code:92010 A. System Information 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Location or Area Served Location 03 Building Type from CF-1R Single family 04 Verified Low Leakage Ducts in Conditioned Space No,credit is not taken (VLLDCS)Credit from CF1R? • 05 Verified Low Leakage Air Handling Unit Credit from Yes credit is taken CF1R? 06 I Duct System Compliance Category New B.Duct Leakage Diagnostic Test 01 Condenser Nominal Cooling Capacity (ton)2.5 02 Heating Capacity (kBtu/h)62 03 Conditioned Floor Area served by this HVAC system (ft2)1641 04 Duct Leakage Test Condition Test final 05 Duct Leakage Test Method Total leakage 06 Leakage Factor 6.0 07 Air Handling Unit Airflow (AHUAirflow) Determination Cooling system method Method 08 Measured AHUAirflow This field or section is not applicable 09 Calculated Target Allowable Duct Leakage Rate (cfm)60 10 Actual duct leakage rate from leakage test measurement 37 (cfm) 11 Air Handling Unit Manufacturer Name N/A 12 Air Handling Unit Model Number N/A 13 Compliance Statement System passes leakage test Registration Number: 215-N6489698E-M2000003A-M20A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:14:51 2013 Residential Compliance Schema Version: 2013.1.007 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3 ) B.Duct Leakage Diagnostic Test 14 Notes C.Additional Requirements for Compliance The Low Leakage Air-handling Unit Model identified on this compliance document is included in the list of certified Low 01 Leakage Air-Handling Units published on the Energy Commission Website at: http://www.energy.ca.gov/title24/2008standards/special case appliance/supplemental listings/Low Leakage Air- Handling Unit Listing 2012-10-30.pdf (provide updated link). 02 System was tested in its normal operation condition. No temporary taping allowed. Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage 03 testing. OA ducts used for Central Fan Integrated (CFI)Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 04 All supply and return register boots were sealed to the drywall. 05 Building cavities were not used as plenums or platform returns in lieu of ducts. 06 If cloth backed tape was used it was covered with Mastic and draw bands. 07 All connection points between the air handler and the supply and return plenums are completely sealed. 08 Verification Status Pass -all applicable requirements are met 09 Correction Notes for this table The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table.. D.Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. Registration Number: 215-N6489698E-M2000003A-M20A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:14:51 2013 Residential Compliance Schema Version: 2013.1.007 CERTIFICATE OF VERIFICATION CF3R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3 ) Documentation Author's Declaration Statement 1.I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Lorena Pichardo erevre#4q/Pedtair%. Company:Date Signed: Energy Inspectors 2017-02-21 16:26:21 Address:CEA/HERS Certification Identification (if applicable): 2570 South Miller Lane City/State/Zip:Phone: Las Vegas NV 89117 702-365-8080 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): AIREFORCE HEATING & AIR INC Responsible Builder or Installer Name:CSLB License: Michelle Sanchez HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) Tested HERS Rater Information HERS Rater Company Name: Energy Inspectors Responsible Rater Name:Responsible Rater Signature: Joseph Schwartz a 4. 5C71-0. Responsible Rater Certification Number w/this HERS Provider:Date Signed: CC2004506 2017-02-21 16:33:03 Digitally signed by CaICERTS.This digital signature is provided in order to secure the contentofthis registered document, and in no way implies Registration Provider responsibility for the accuracyofthe information. Registration Number: 215-N6489698E-M2000003A-M20A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:14:51 2013 Residential Compliance Schema Version: 2013.1.007 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4 ) Project Name:Robertson Ranch: The Bluffs Enforcement Agency:City of Permit Number:CB162984 Carlsbad Dwelling Address:2599 Glasgow Drive City:Carlsbad Zip Code:92010 A. Ducted Cooling System Information 01 System Identification or Name System 1 02 System Location or Area Served Location 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3.5 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI)Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2017-02-10 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B.Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP installed and labeled consistent with Figure RA3.3-1 HSPP/PSPP Requirement C.Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate Traditional Flow Capture Hood according to procedure in verification.RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus Shortridge Instruments 03 Model number of Airflow Measurement Apparatus CFM-88L Certification Status of the Airflow Measurement Apparatus Certified by Manufacturer and listed on CEC Website at 04 Accuracy http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html Registration Number: 215-N6489698E-M2300002A-M23A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:16:30 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4 ) MCH-23a Forced Air System Airflow Rate Measurement -Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D.Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1225 03 Actual System Airflow Rate Measurement (cfm)1241 04 Compliance Statement:System airflow rate complies E.Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of 02 Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning 03 system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan 08 efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass -all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. Registration Number: 215-N6489698E-M2300002A-M23A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:16:30 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4 ) F.Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. Registration Number: 215-N6489698E-M2300002A-M23A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:16:30 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4 ) Documentation Author's Declaration Statement 1.I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Lorena Pichardo "..ovre#ca/P6 -eita.r4. Company:Date Signed: Energy Inspectors 2017-02-21 16:26:21 Address:CEA/HERS Certification Identification (if applicable): 2570 South Miller Lane City/State/Zip:Phone: Las Vegas NV 89117 702-365-8080 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): AIREFORCE HEATING & AIR INC Responsible Builder or Installer Name:CSLB License: Michelle Sanchez HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) Tested HERS Rater Information HERS Rater Company Name: Energy Inspectors Responsible Rater Name:Responsible Rater Signature: Joseph Schwartz 301619 cadelgi Responsible Rater Certification Number w/this HERS Provider:Date Signed: CC2004506 2017-02-21 16:33:03 Digitally signed byCaICERTS.This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracyof the information. Registration Number: 215-N6489698E-M2300002A-M23A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:16:30 2013 Residential Compliance Schema Version: 2013.1.008 -NOM CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 4 Project Name:Robertson Ranch: The Bluffs Enforcement Agency:City of Permit Number:CB162984 Carlsbad Dwelling Address:2599 Glasgow Drive City:Carlsbad Zip Code:92010 A. Ducted Cooling System Information 01 System Identification or Name System 2 02 System Location or Area Served Location 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 2.5 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI)Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2017-02-10 10 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement B.Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP installed and labeled consistent with Figure RA3.3-1 HSPP/PSPP Requirement C.Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate Traditional Flow Capture Hood according to procedure in verification.RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus Shortridge Instruments 03 Model number of Airflow Measurement Apparatus CFM-88L Certification Status of the Airflow Measurement Apparatus Certified by Manufacturer and listed on CEC Website at 04 Accuracy http://www.energy.ca.gov/title24/equipment_cert/ama_fas /index.html Registration Number: 215-N6489698E-M2300003A-M23A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:18:02 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 4 ) MCH-23a Forced Air System Airflow Rate Measurement -Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor D.Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)875 03 Actual System Airflow Rate Measurement (cfm)1102 04 Compliance Statement:System airflow rate complies E.Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Verification. The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of 02 Verification was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning 03 system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan 08 efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 09 Verification Status:Pass -all applicable requirements are met 10 Correction Notes: The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. Registration Number: 215-N6489698E-M2300003A-M23A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:18:02 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 4 ) F.Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. Registration Number: 215-N6489698E-M2300003A-M23A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:18:02 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-23-H Space Conditioning System Airflow Rate (Page 4 of 4 ) Documentation Author's Declaration Statement 1.I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Lorena Pichardo e.ozeico/Peate.44 Company:Date Signed: Energy Inspectors 2017-02-21 16:26:21 Address:CEA/HERS Certification Identification (if applicable): 2570 South Miller Lane City/State/Zip:Phone: Las Vegas NV 89117 702-365-8080 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed andsubmitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)approved by the enforcement agency. S.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): AIREFORCE HEATING & AIR INC Responsible Builder or Installer Name:CSLB License: Michelle Sanchez HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) Tested HERS Rater Information HERS Rater Company Name: Energy Inspectors Responsible Rater Name:Responsible Rater Signature: Joseph Schwartz 6144.5WWOWL* Responsible Rater Certification Number w/this HERS Provider:Date Signed: CC2004506 2017-02-21 16:33:03 Digitally signed by CalCERTS.This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-N6489698E-M2300003A-M23A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:18:02 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3 ) Project Name:Robertson Ranch: The Bluffs Enforcement Agency:City of Permit Number:CB162984 Carlsbad Dwelling Address:2599 Glasgow Drive City:Carlsbad Zip Code:92010 A. Ducted Cooling System Information 01 System Identification or Name System 1 02 System Location or Area Served Location 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 3.5 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI)Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2017-02-10 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement -Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C.Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3. 01 Actual Tested Watts 341 02 Actual Tested Airflow from MCH-23 (cfm)1241 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.27 05 Compliance Statement:System fan efficacy complies Registration Number: 215-N6489698E-M2200002A-M22A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:21:08 2013 Residential Compliance Schema Version: 0.51SDD CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3 ) D.Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan 05 efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass -all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E.Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. Registration Number: 215-N6489698E-M2200002A-M22A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:21:08 2013 Residential Compliance Schema Version: 0.51SDD CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3 ) Documentation Author's Declaration Statement 1.I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Lorena Pichardo e.o-reica/Pietta/r.4. Company:Date Signed: Energy Inspectors 2017-02-21 16:26:21 Address:CEA/HERS Certification Identification (if applicable): 2570 South Miller Lane City/State/Zip:Phone: Las Vegas NV 89117 702-365-8080 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): AIREFORCE HEATING & AIR INC Responsible Builder or Installer Name:CSLB License: Michelle Sanchez HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) Tested HERS Rater Information HERS Rater Company Name: Energy Inspectors Responsible Rater Name:Responsible Rater Signature: Joseph Schwartz fo.a9S'aefia.ra Responsible Rater Certification Number w/this HERS Provider:Date Signed: CC2004506 2017-02-21 16:33:03 Digitally signed byCalCERTS.This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracyof the information. Registration Number: 215-N6489698E-M2200002A-M22A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:21:08 2013 Residential Compliance Schema Version: 0.51SDD CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3 ) Project Name:Robertson Ranch: The Bluffs Enforcement Agency:City of Permit Number:CB162984 Carlsbad Dwelling Address:2599 Glasgow Drive City:Carlsbad Zip Code:92010 A. Ducted Cooling System Information 01 System Identification or Name System 2 02 System Location or Area Served Location 03 System Installation Type New 04 Nominal Cooling Capacity (tons) of Condenser 2.5 05 Condenser Speed Type Single Speed 06 Cooling System Zonal Control Type Not Zonal 07 Central Fan Integrated (CFI)Ventilation System Status Not a CFI system 08 System Bypass Duct Status No Bypass Duct 09 Date of System Airflow Rate Measurement 2017-02-10 10 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable watt meter MCH-22a Forced Air System Fan Efficacy Measurement -Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C.Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3. 01 Actual Tested Watts 472 02 Actual Tested Airflow from MCH-23 (cfm)1102 03 Required Fan Efficacy (watts/cfm)0.58 04 Actual Fan Efficacy (watts/cfm)0.43 05 Compliance Statement:System fan efficacy complies Registration Number: 215-N6489698E-M2200003A-M22A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:22:17 2013 Residential Compliance Schema Version: 0.51SDD 111010111.11.ftimii.m CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3 ) D.Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan 05 efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Verification Status Pass -all applicable requirements are met 08 Correction Notes The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met unless otherwise noted in the Verification Status and the Corrections Notes in this table. E.Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. Registration Number: 215-N6489698E-M2200003A-M22A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:22:17 2013 Residential Compliance Schema Version: 0.51SDD CERTIFICATE OF VERIFICATION CF3R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3 ) Documentation Author's Declaration Statement 1.I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Lorena Pichardo g -reitar9t:c741.44. Company:Date Signed: Energy Inspectors 2017-02-21 16:26:21 Address:CEA/HERS Certification Identification (if applicable): 2570 South Miller Lane City/State/Zip:Phone: Las Vegas NV 89117 702-365-8080 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): AIREFORCE HEATING & AIR INC Responsible Builder or Installer Name:CSLB License: Michelle Sanchez HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) Tested HERS Rater Information HERS Rater Company Name: Energy Inspectors Responsible Rater Name:Responsible Rater Signature: Joseph Schwartz feve/a.gaeave* Responsible Rater Certification Number w/this HERS Provider:Date Signed: CC2004506 2017-02-21 16:33:03 Digitally signed by CalCERTS.This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-N6489698E-M2200003A-M22A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:22:17 2013 Residential Compliance Schema Version: 0.51SDD CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 3 ) Project Name:Robertson Ranch: The Bluffs Enforcement Agency:City of Permit Number:CB162984 Carlsbad Dwelling Address:2599 Glasgow Drive City:Carlsbad Zip Code:92010 Title 24, Part 6, Section 150.0(o) Ventilation for Indoor Air Quality. All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings. Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/SHRAE Standard 62.2-2010. A. Dwelling Mechanical Ventilation -General Information 01 Dwelling unit name Robertson Ranch: The Bluffs 02 Building Type Single family 03 Project scope Newly constructed building Total Conditioned Floor Area of Dwelling Unit 3282 04 (For addition projects the conditioned floor area equals existing area plus addition area.) Number of bedrooms in dwelling unit 4 05 (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 06 Ventilation Operation Schedule Continuous 07 Whole-Building Ventilation Rate Calculation Method Fan Ventilation Rate Method (4.1.1) 08 Whole Building Ventilation System Type Standalone -Exhaust MCH-27a -Continuous Ventilation Airflow -Fan Ventilation Rate Method B.Whole-Building Continuous Ventilation -Fan Ventilation Rate Method 01 Required Continuous Whole-Building Ventilation Rate 70 02 Installed Continuous Whole-Building Ventilation Rate 108 C.Compliance Statement 01 Building passes continuous whole-building ventilation rate test Registration Number: 215-N6489698E-M2700001A-M27A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:24:56 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 3 ) D.Determination of HERS Verification Compliance All applicable sections of this document shall indicate compliance with the specified verification protocol requirements in order for this Certificate of Verification as a whole to be determined to be in compliance. 01 Complies: All specified verification protocol requirements on this document are met. Registration Number: 215-N6489698E-M2700001A-M27A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:24:56 2013 Residential Compliance Schema Version: 2013.1.008 CERTIFICATE OF VERIFICATION CF3R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 3 ) Documentation Author's Declaration Statement 1.I certify that this Certificate of Verification documentation is accurate and complete. Documentation Author Name:Documentation Author Signature: Lorena Pichardo „eovreica.Pied4.441- Company:Date Signed: Energy Inspectors 2017-02-21 16:26:21 Address:CEA/ HERS Certification Identification (if applicable): 2570 South Miller Lane Las Vegas /NV /89117 City/State/Zip:Phone: Las Vegas NV 89117 702-365-8080 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Verification is true and correct. 2.I am the certified HERS Rater who performed the verification identified and reported on this Certificate of Verification (responsible rater). 3.The installed features, materials, components, manufactured devices, or system performance diagnostic results that require HERS verification identified on this Certificate of Verification comply with the applicable requirements in Reference Appendices RA2, RA3, and the requirements specified on the Certificate of Compliance for the building approved by the enforcement agency. 4.The information reported on applicable sections of the Certificate(s) of Installation (CF2R) signed and submitted by the person(s) responsible for the construction or installation conforms to the requirements specified on the Certificate(s) of Compliance (CF1R)approved by the enforcement agency. 5.I will ensure that a registered copy of this Certificate of Verification shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections.I understand that a registered copy of this Certificate of Verification is required to be included with the documentation the builder provides to the building owner at occupancy. Builder Or Installer Information As Shown On The Certificate Of Installation Company Name (Installing Subcontractor, General Contractor, or Builder/Owner): AIREFORCE HEATING & AIR INC Responsible Builder or Installer Name:CSLB License: Michelle Sanchez HERS Provider Data Registry Information Sample Group Number (if applicable):Dwelling Test Status in Sample Group (if applicable) Tested HERS Rater Information HERS Rater Company Name: Energy Inspectors Responsible Rater Name:Responsible Rater Signature: Joseph Schwartz fif49645"Wteafir* Responsible Rater Certification Number w/this HERS Provider:Date Signed: CC2004506 2017-02-21 16:33:03 Digitally signed by CaICERTS.This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracyof the information. Registration Number: 215-N6489698E-M2700001A-M27A Registration Date/Time:2017-02-21 16:33:03 HERS Provider:CaICERTS CA Building Energy Efficiency Standards Report Version: 2013 Rev 1.008 Report Generated: 2017-02-21 16:24:56 2013 Residential Compliance Schema Version: 2013.1.008 111111 11111111111101111111111111 moimmors.rem RESIDENTIAL GREEN City of BUILDING CODE Development Services STANDARDS MANDATORY Building Division Carlsbad MEASURES 1635 Faraday Avenue CERTIFICATION 760-602-2719 CHECKLIST www.carlsbadca.gov B-51• Thls.foinn signed and 7i((1.'•"c1.4 41411 recellit§ for the ecycle %Tin.-_7 ;bet a be•-V.rt.•71"""Ir •14 02..:=,•••-••:s a.;t subinitte ;.- ;r"tBullding Inspector Priortolln itnAje.&-a• Site Development Mandatory 4.106.2 A plan is developed and implemented to manage storm water drainage during construction.(X) 4.106.3 The site shall be planned and developed to keep surface Water away from buildings.(x) Construction plans shall indicate how site grading or a drainage system will manage all surface water flows. Energy Efficiency 4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by (X) the California Energy Standards. Water Efficiency and Conservation Indoor Water Use 4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods:(X) 1.Water saving fixtures or flow restrictors shall be used.7/01/2011 2. A 20 percent reduction in baseline water use shall be demonstrated. 4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not (x) exceed maximum flow rates.7/01/2011 4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall (X) comply with specified performance requirements.7/01/2011 Outdoor Water Use 4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather-(x) based. Enhaficed Durability and Reduced Maintenance 4.406.1 Joints and openings. Annular spaces around pipes, electric cables, conduits or other openings " in plates at exterior walls shall be protected against the passage of rodents by closing such openings (X) with cement mortar, concrete masonry or similar method acceptable to the enforcing agency. ConstruotiohWaste Management Plan 4.408.1 A minimum of 50 percent of the construction waste generated at the site is diverted to recycle or (x) salvage. Recycled material receipts from approved recyclers must be attached to this form. 4.408.2 Where a local jurisdiction does not have a construction and demolition waste management (X) ordinance, construction waste management plan, per form B-59, shall be submitted for approval to the enforcing agency. Building Maintenance and Operation 4.410.1 An operation and maintenance manual shall be provided to the building occupant or owner.(X) Environmental Quality Fireplaces 4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable.(X) Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances. B-51 Page 1 of 2 Rev.11/15 NEM ft... Pollutant Control 4.504.1 Duct openings and other related air distribution component openings shall be covered (X) during construction. 4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC and other toxic compound (X) limits.(X) 4.504.2.2 Paints, stains and other coatings shall be compliant with VOC limits.(X) 4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for ROC and other toxic compounds.(X) 4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials have been used.(X) 4.504.3 Carpet and carpet systems shall be compliant with VOC limits. 4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (X) defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or be certified under the Resilient Floor Covering Institute (RFC!) FloorScore program.(X) 4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior finish systems shall comply with low formaldehyde emission standards. ••Interior Moisture Control 4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations.(X) 4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X) enclosure.•,.Indoor Air Quality and Exhaust 4.506.1 Exhaust fans which terminate outside the building are provided in every bathroom.(X ) Environmental Comfort 4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (x)f. fan is off. Covers or louvers shall have a minimum insulation value of R-4.2. 4.507.2 Duct systems are sized, designed, and equipment is selected using the following methods:(X) 1.Establish heat loss and heat gain values according to ACCA Manual J or equivalent. 2.Size duct systems according to ACCA 29-D (Manual D) or equivalent 3.Select heating and cooling equipment according to ACCA 36-S (Manual S) or equivalent. installer and Special Inspector Qualifications 702.1 HVAC system installers are trained and certified in the proper installation of HVAC (X) systems. 702.2 Special inspectors employed by the owner must be qualified and able to demonstrate (X) competence in the discipline they are inspecting. I,as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2013 California Green Building Standards. All receipts for recycled materials have been attached to this form. Project Address:aC9I Plan Check Number:CAW --(131?' Print Name:Signed:2:r-ktAANC:1—Z c5g/k/(S5S2)T License Number:Date:1//(7/ B-51 Page 2 of 2 Rev. 11/15 -0/."7