Loading...
HomeMy WebLinkAbout2600 ARGONAUTA ST; ; 80-961; Permitc I. t h INSPECTION VALIDATED i BUILDING 0 FOUNDATION 0 REINFORCING STEEL n MASONRY 0 GROUT. GUNITE 0 FLOOR AND CEILING FRAME 0 SHEATHING 0 FRAME 0 EXTERIOR LATH 0 INSULATION 84 FINAL 0 INTERIOR LATH OR DRYWALL PLUMBING 0 UNDERGROUND PLUMBING 0 UNDERGROUND WATER 0 ROUGH PLUMBING 0 TOP OUT PLUMBING 0 SEWER AND PL/CO 0 TUB OR SHOWER PAN 0 GAS TEST n WATER HEATER J& FINAL ELECTRICAL 0 TEMPORARY SERVICE 0 ELECTRIC UNDERGROUND 0 ROUGH ELECTRIC 0 POOL BONDING 0 ELECTRIC SERVICE 0 CEILING HEAT U G.F.I. FKE DETECTOR FINAL MISCELLANEOUS 0 PLENUM AND DUCTS 0 COMBUSTION AIR 0 PATIO 0 SIGN 0 GRADING 0 DRIVEWAY 0 CONDITIONED AIR SYSTEMS 0 REFER PIPING FINAL READY FOR INSPECTION: 0 MONDAY OTUESDAY 0 WEDNESDAY O THURSDAY 0 FRIDAY 0 A.M. 0 P.M. SPECIAL INSTRUCTIONS ” &@@* REQUESTED BY PHONE NO. PERSON TAKING REPORT ___~~ ~~ - _. "_ . ... I.. - . . ..., , CARLSBAO. CALIFORNIA 9- 1200 ELM AVENUE To: Seymour Canter PC# 80-961 Additim Dated: 1-12-81 " 2600 Argmauta 81-139 Po01 Carlsbad, CA. 92008 4-14-81 Subject: Wlildiq Permit Expiration Dear sir: Our records indicate that your building permit will wire by limitation of time on 10-14-81 . . The provisions of UBC Section 303(d) state: (d) Eqiration. Every permit issued by the building official urder the provisions of this code shall expire by limitation and keccme null and void if the building or work authorized by such pennit is not cxmn-end within 180 days fm the date of such permit, or if the building or wrk authorized by such permit is suspended or abandoned at any time after the mrk is cxmmen& for a period of 180 days. Before such wrk can be recomnenced, a new permit shall be first obtained so to do, and the fee therefor shall be one-half the munt required for a original plans and specifications for such mrk; ard provided Further that such sus- new permit for such work, provided IKI changes have been mde or will be made in the pension a- akadonment has mt exceeded one year. Any permittee holding an unexpired permit may apply for an extension of the time within which he my cmmence mrk LIIY~~L. that permit when he is unable to ccrmWCe work within the time required by this section for gd and satisfactory reasons. building official may extend the time for action by the permittee for a pericd not exc&ing 180 days upon written request by the permittee showing that circumstances beycxd the control of the permittee have prevented ac+Aon on a permit after expiration, the j,+mittee shall pay a new fuil permit fee. action from being taken. No permit shall bs exterded molethan once. In order to renew Please check below indicating your intentions and return this letter to us. - Project abandoned. New permit will be obtained prior to carmencing Work. -. 180. day time extension requested. NOTE: spate letter for an extension request and reason for such must acccprrpany this form. If you have any question, please contact the Carlsbad wlilding Department at 438-5525. - INTERDEPARTMENTAL INFORMATION SHEET BUILDING DEPARTMENT DATE : BUILDING ADDRESS: a-*4a* u qn c- d bo u I-, / , ' '21 c04'60 -/O bEC 1 0 ~0 "- FLANNING DEPARTMENT n. UNITS ALLOWED UNITS PROVIDED PARKING SPACES REQUIRED PROVIDED % COVERAGE ALLOWED PROVIDED BUILDING HEIGHT ALLOWED PROVIDED FRONT SETBACK: SIDE SETBACK: REAR SETBACK: ALLOWED PROVIDED INTRUSIONS I 1:ANDSCAPE & IRRIGATION PLAN COMMENTS: * ENVIRONMENTAL PROTECTION REQ: ~~~p~ DATE ENGINEERING DEPARTMENT %* C@. R.O.W. INDUSTRIAL WASTE IMPROVEMENTS SEWER CONNECTION DRIVEWAY LOCATIONS GRADING PERMIT EASEMENTS DRAINAGE LEGAL DESCRIPTION ADDITIONAL COMMENTS / aLrd4hJ 752, ./9 . I E : DATE \L-\bb OK TO FINAL DATE " FIRE DEPARTMENT SPRIIiKLING SYSTEM FIRE PROTECTION EQUIP. FIRE ALARMS EXITS FIRE HYDRANTS LOCATION ADDITIONAL COMMENTS OK TO ISSUE: DATE OK TO FINAL DATE .. - IER DEPARTMENT AEQUIREMENTS OF APPROPRIATE DISTRICTS MET DATE