HomeMy WebLinkAbout2600 ARGONAUTA ST; ; 80-961; Permitc I.
t
h
INSPECTION VALIDATED
i
BUILDING
0 FOUNDATION
0 REINFORCING STEEL n MASONRY
0 GROUT. GUNITE
0 FLOOR AND CEILING FRAME
0 SHEATHING
0 FRAME
0 EXTERIOR LATH
0 INSULATION
84 FINAL
0 INTERIOR LATH OR DRYWALL
PLUMBING
0 UNDERGROUND PLUMBING
0 UNDERGROUND WATER
0 ROUGH PLUMBING
0 TOP OUT PLUMBING
0 SEWER AND PL/CO
0 TUB OR SHOWER PAN
0 GAS TEST n WATER HEATER J& FINAL
ELECTRICAL
0 TEMPORARY SERVICE
0 ELECTRIC UNDERGROUND
0 ROUGH ELECTRIC
0 POOL BONDING
0 ELECTRIC SERVICE
0 CEILING HEAT
U G.F.I.
FKE DETECTOR
FINAL
MISCELLANEOUS
0 PLENUM AND DUCTS
0 COMBUSTION AIR
0 PATIO
0 SIGN
0 GRADING
0 DRIVEWAY
0 CONDITIONED AIR SYSTEMS
0 REFER PIPING
FINAL
READY FOR INSPECTION: 0 MONDAY OTUESDAY 0 WEDNESDAY O THURSDAY 0 FRIDAY
0 A.M.
0 P.M.
SPECIAL INSTRUCTIONS ” &@@*
REQUESTED BY PHONE NO.
PERSON TAKING REPORT ___~~ ~~ -
_. "_ . ... I.. - . . ..., ,
CARLSBAO. CALIFORNIA 9- 1200 ELM AVENUE
To: Seymour Canter PC# 80-961 Additim Dated: 1-12-81
"
2600 Argmauta 81-139 Po01 Carlsbad, CA. 92008 4-14-81
Subject: Wlildiq Permit Expiration
Dear sir:
Our records indicate that your building permit will wire by limitation of time
on 10-14-81 . .
The provisions of UBC Section 303(d) state: (d) Eqiration. Every permit issued by
the building official urder the provisions of this code shall expire by limitation and keccme null and void if the building or work authorized by such pennit is not cxmn-end within 180 days fm the date of such permit, or if the building or wrk authorized
by such permit is suspended or abandoned at any time after the mrk is cxmmen& for a period of 180 days. Before such wrk can be recomnenced, a new permit shall be first
obtained so to do, and the fee therefor shall be one-half the munt required for a
original plans and specifications for such mrk; ard provided Further that such sus- new permit for such work, provided IKI changes have been mde or will be made in the
pension a- akadonment has mt exceeded one year. Any permittee holding an unexpired permit may apply for an extension of the time within which he my cmmence mrk LIIY~~L.
that permit when he is unable to ccrmWCe work within the time required by this section for gd and satisfactory reasons. building official may extend the time for action
by the permittee for a pericd not exc&ing 180 days upon written request by the
permittee showing that circumstances beycxd the control of the permittee have prevented
ac+Aon on a permit after expiration, the j,+mittee shall pay a new fuil permit fee.
action from being taken. No permit shall bs exterded molethan once. In order to renew
Please check below indicating your intentions and return this letter to us.
- Project abandoned. New permit will be obtained prior to carmencing Work.
-. 180. day time extension requested. NOTE: spate letter for an extension request and reason for such must acccprrpany this form.
If you have any question, please contact the Carlsbad wlilding Department at 438-5525.
- INTERDEPARTMENTAL INFORMATION SHEET
BUILDING DEPARTMENT DATE :
BUILDING ADDRESS: a-*4a* u qn c-
d bo u I-, /
, ' '21 c04'60 -/O bEC 1 0 ~0 "-
FLANNING DEPARTMENT
n.
UNITS ALLOWED UNITS PROVIDED
PARKING SPACES REQUIRED PROVIDED
% COVERAGE ALLOWED PROVIDED
BUILDING HEIGHT ALLOWED PROVIDED
FRONT SETBACK: SIDE SETBACK: REAR SETBACK:
ALLOWED
PROVIDED
INTRUSIONS I
1:ANDSCAPE & IRRIGATION PLAN COMMENTS:
*
ENVIRONMENTAL PROTECTION REQ: ~~~p~
DATE
ENGINEERING DEPARTMENT %* C@.
R.O.W. INDUSTRIAL WASTE IMPROVEMENTS
SEWER CONNECTION DRIVEWAY LOCATIONS
GRADING PERMIT EASEMENTS DRAINAGE
LEGAL DESCRIPTION
ADDITIONAL COMMENTS /
aLrd4hJ 752, ./9 . I
E : DATE \L-\bb OK TO FINAL DATE
"
FIRE DEPARTMENT
SPRIIiKLING SYSTEM FIRE PROTECTION EQUIP.
FIRE ALARMS EXITS
FIRE HYDRANTS LOCATION
ADDITIONAL COMMENTS
OK TO ISSUE: DATE OK TO FINAL DATE
..
-
IER DEPARTMENT
AEQUIREMENTS OF APPROPRIATE DISTRICTS MET DATE