Loading...
HomeMy WebLinkAbout2601 AVENIDA DE ANITA; ; CB122380; Permit02-12-2013 Job Address Permit Type Parcel No Valuation Occupancy Group # Dwelling Units Bedrooms Project Title City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit Permit No CB122380 Building Inspection Request Line (760) 602-2725 2601 AVENIDA DE ANITA CBAD RAD Status ISSUED 0 Applied 11/09/2012 NEW Entered By LSM Plan Approved 02/12/2013 Issued 02/12/2013 0 Inspect Area PB PCI 20069 Plan Check # RESDNTL 1670306400 $29,100 00 Sub Type Lot# Constuction Type Reference # Structure Type Bathrooms Ong PC # VILLA REAL APTS- RE LEVEL FOUNDATION THIS PERMIT FOR OBSERVATION ONLY - THE CITY DOES NOT GUARANTEE THIS SYSTEM WILL RESOLVE THE PRESENT PROBLEM 0 0 Applicant MIKE MOLINARO Owner HELIX ASSCS 212 AGATE AV NEWPORT BEACH 714-612-0971 CA 92662 305 HIHILL WAY EL CAJON CA 92020 Building Permit $309 22 Meter Size Add'l Building Permit Fee $0 00 Add'l Reel Water Con Fee $0 00 Plan Check $216 45 Meter Fee $0 00 Add'l Plan Check Fee $0 00 SDCWA Fee $0 00 Plan Check Discount $0 00 CFD Payoff Fee $0 00 Strong Motion Fee $2 91 PFF (3105540) $0 00 Park in Lieu Fee $0 00 PFF (4305540) $0 00 Park Fee $0 00 License Tax (3104193) $0 00 LFM Fee $0 00 License Tax (4304193) $0 00 Bndge Fee $0 00 Traffic Impact Fee (3105541) $0 00 Other Bndge Fee $0 00 Traffic Impact Fee (4305541) $0 00 BTD #2 Fee $0 00 Sidewalk Fee $0 00 BTD #3 Fee $0 00 PLUMBING TOTAL $0 00 Renewal Fee $0 00 ELECTRICAL TOTAL $0 00 Add'l Renewal Fee $0 00 MECHANICAL TOTAL $0 00 Other Building Fee $0 00 Housing Impact Fee $0 00 HMP Fee $0 00 Housing InLieu Fee $0 00 Pot Water Con Fee $0 00 Housing Credit Fee $0 00 Meter Size Master Drainage Fee $0 00 Add'l Pot Water Con Fee $0 00 Sewer Fee $0 00 Red Water Con Fee $0 00 Additional Fees $0 00 Green Bldg Stands (SB1473) Fee $1 00 Fire Sprinkler Fees $0 00 Green Bldg Stands Plan Chk Fee $0 00 TOTAL PERMIT FEES $529 58 Total Fees $529 58 Total Payments to Date $529 58 Balance Due $0 00 Inspector FINAL APPROVAL Date 2- Z7^/1 Clearance NOTICE Please take NOTICE that approval of your project includes the "Imposition' of fees, dedications, reservations, or ottier exactions hereafter collectively refen'ed to as "fees/exactions" You tiave 90 days from ttie date ttiis pemit was issued to protest imposition of ttiese fees/exactions If you protest ttiem, you must follow ttie protest procedures set fortti in Government Code Section 66020(a), and file the protest and any other required information with the City Manager (or processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition You are hereby FURTHER NOTIFIED that your nght to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any tees/exaction? of which vou have previously be^n given a NOTICE similar to this, or as to which the statute of limitations has previously othenjvise expired