Loading...
HomeMy WebLinkAbout2604 EL CAMINO REAL; C; CB951192; PermitI BUI L D I •N G PERMIT Permit No: CB951192 10/10/95 14:54 - - Project No: A9501767 Page 1 of 1 - Development No: - Job Address: 2604 EL CAMINO REAL Suite: C Permit Type: COMMERCIAL TENANT IMPROVEMENT 4056 10/10/95 000.1 01. 02 Parcel No.: Lot#: C--PRMT 71Q.cc Valuation: 62,568 Oupàncy Group: Reference#: Description: WALLS,CEILING.,ELECT & PLUMBING BNJOUR BAGEL CAFE Appl/Ownr : JENKINS CONSTRUCTION 251'N VINEWOOD #D Construction Type: VN Status: ISSUED Applied: 09/01/95 Apr/Issue: 10/10/95 Entered By: RMA 619-432-0782 L,LjL\JL)iL)L) L.M ::1U. 4 *** Fees Required *** Fees Collected & Credits ( A 44~ - Adjustment:: .00 Total Fees: /97-2-.o0 253.00 . I BalanceD't)e:\ . 719.00 Fee description -______ Data Building Permit - . \ ,,t. 473.00 Plan Check ..- 1 307.00 Strong Motion Fee I . 13.00 * BUILDING TOTAL ' . f 793.00 Enter 'Y" for Plunbing Is'u Fde > / . - 20.00 Y Each Plumbing Fixt're,or T\ra-p > 7 / - 7.00 49.00 Each Install/RePairVWater Line > 1/ - ..7.0 7.00 Each Water Heater and/or Vent > ' 1 7.00 7.00 * PLUMBING TOTALS \ (- N., INCORPORATED 83.00 19 2 Enter "Y' for ElectricIssu . 10. 0p Y Enter 'Y' for Remodel\ fl,..> 10.00 1 * ELECTRICAL TOTAL f/I o 0 •• - 20.00 Enter '1' for Mechanical Issue Fe e>. •• 15.00 1 Install Furn/Ducts/Heat Pumps > 1 9.00 9.00 Each Exhaust Fan > 8 6.50 52.00 * MECHANICAL TOTAL . . 76.00 - - - I F L APPROVAL INSP. _DATE4. I JPVLEARANCE CITY OF CARLSBAD 2075 Las Palmas Dr., Carlsbad, CA 92009 (619) 438-1161 PERMIT APPLICATION City of Carlsbad BuiLding Department 2075 Las Patmas Dr., CarLsbad, CA 92009 (619) 438-1161 I. PERMIT TYPE From List I (see back) give code of Permit-Type: --------------------------------------------------------- For Residential Prolects Only: From List 2 (see back) give Code of Struciure-Type: PLAN CHECK NO. EST. VAL PLAN cIK 3480 01?/01/95 0001 01 02 C-PRMT 253.00 Net Loss/Gain of Dwelling Units PROJECT INFORMATION FOR OFFICE USE ONLY AddressQ601/ E/ / Building or Suite No. Nearest Cross Street O)'iYoUf& ktL e4F(- CHECK BELOW IF SUBMITTED: EnergyCaicsD 2 Structural Calcs 02 Soils Report DiAddressed Envelope DESCRIPTION OF WORK 'r ' £'-. /14, C ar /' "Z3' ,E/C1r, 'Cc p/LA ,i14 / '5 ',.- SQ. FT. # OF STORIES / # OF BEDROOMS # OF BATHROOMS NAME (last CIfl "II name first) ( ADDRESS lican WNIAI.1 P terent [rom appt) CITY STATE C..c1€ ZIP CODE 9) /0 B DAY TELEPHONE 65'87 r, ,,.s' , NAME (last name first)5) to? ,'o,Y ADDRESS 96 ) 9 S' y 48 CITY Z ) kc, STATE Clg, ZIP CODE 9 DAY TELEPHONE 4/ - 5. PROPERTY OWNEf( " ,7cs( ADDRESS/S0 A/or(-1 'i1 -'6Y-s NAME (last name first) CITY STATE f' ZIP DAY TELEPHONE 0. W141IiALIUK NAME (last name first) C3i k,'u' CC,,IP, ADDRESS à/ 4% 'k/ecJOa,f tj CrI'' gGrc Ot?c/ido STATE(fW, ZIP CODE7) W 9 DAY TELEPHONE — o 84 STATEUC. #41<-71ta LICENSE CLASS CITY BUSINESS UC. # DLSRiNLK INAMt tiast name rirsi) , 'wu'tt.ss c. , ,>, .6p( ', 'C) CITYS,Jt STATEC/ ZIP CODE ge,)In DAY TELEPHONF STATE UC. # WORKERS' COMPENSATION Workers' Compensation Declaration: I hereby aFFirm that I have a certiFicate of consent to sell-insure issued by the Director ot Industrial Relations, or a certificate of Workers' Compensation Insurance by an admitted insurer, or an exact copy or duplicate thereof certified by the Director of the insurer thereof filed with the Building Inspection Department(Section 3800, Lab. C). I C414001 INSURANCE COMPANY POUCY NO./3/(9 E(PATION DATE Certiticate oF Exemption: I certify ilat in the perlormance oF the work for which this permit is issued, I shall not efirploy any person in any manner so as to become subject to the Workers' Compensation Laws of California. SIGNATURE DATE OWNIER-BUILl)ER DECLARXI1ON (Jwner-Builder Declaration: I hereby atlirm that I am exempt From the Contractor's License Law [or the tollowing reason: 0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale.). 0 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant to the Contractor's License Law). O I am exempt under Section Business and Professions Code for this reason: (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9, commencing with Section 7000 of Division 3 of the Business and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars [$500]). SIGNATURE DATE COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY: Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? DYES Q NO Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? O YES. NO Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? DYES VNO IF ANY OF THE ANSWERS ARE YES A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED AFTER JULY 1, 1989 UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CX)N1110L DISTRICT. CONSTRUCtiON LENDING AGENCY 1 hereby aFFirm that there is a construction lending agency [or the perFormance oF the work [or which this permit is issued (Sec 3097(i) Civil Code). LENDER'S NAME LENDER'S ADDRESS APPUCANT (..FJt.ICAflON I certity that I have read the application and state that the above inFormation is correct. I agree to comply with all City ordinances and State laws relating to building construction. I hereby authorize representatives of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE it) SAVE INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CI1Y IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA. An OSHA permit is required for excavations over 5'O" deep and demolition or construction of structures over 3 stories in height. Expiration. Every permit issued by the Building Official under the provisions of this Code shall expire by limitation and become null and void if the building or work authorized by suchfiermit is not commenced within 365 days from the date of such permit or if the building or work authorized by such permit is suspended or band ed at fter the work is commenced for a period of 180 days (Section 303(d) Uniform Builgjjng Code) DATE: APPUCANTS SIG 0 __7jile OW: Applicant PINK Finance : 0 2 ktr+c-roA Si' F !JUp fl41P!C'IOI1 .5 S OATZ _/?A/i INSPECTOR PERMIT 0 PLAHCX 0 JOB ADDRESS 2,6 .- TIMZ M.*IVI: - -TIfl LZAVZ:____________ CD t.VL 0!3*XP?IO$ ACT CONTS - - - - - - - - - CITY OF CARLSBAD INSPECTION REQUEST PERNIT# C8951192 FOR 11/14/95 DESCRIPTION: WALLS,CEILING,ELECT & PLUMBING BNJOUR BAGEL CAFE TYPE: CTI JOB ADDRESS: 2604 EL CANINO REAL APPLICANT: JENKINS CONSTRUCTION CONTRACTOR: OWNER: REMARKS: MW/YATES/683-1944 PAGER SPECIAL INSTRUCT: TOTAL TINE: CD LVL DESCRIPTION INSPECTOR AREA TP PLANCK# CB951192 0CC GRP CONSTR.-TYPE VN STE: C LOT: PHONE: 619-432-0782 PHONE: PHONE: INSPECTOR ACT COMMENTS 14 ST Frame/Steel/Bolting/welding ,O/2 7L ê 34 EL Rough Electric 7 h/A/ e 't€ ***** INSPECTION HISTORY ***** DATE DESCRIPTION ACT INSP 110895 Interior Lath/Drywall AP 'TP 110695 Rough Electric - AP TP 110695 Rough/Ducts/Dampers AP TP 110695 Frame/Steel/Bolting/Welding AP TP 102495 Interior Lath/Drywall AP TP 102495 Frame/Steel/BoIting/We1ding CO TP 101895 Frame/Steel/Bolting/Welding AP. TP 101895 Rough Electric AP TP 101695 Frame/Steel/Bolting/Welding CO TP 101695 Rough/Topout CO TP 101695 Rough Electric CO TP 101395 Underground/Under Floor AP tP 101395 Underground/Conduit-Wiring AP. TP 101395 Rough/Topout AP TP COMMENTS HARD LID AREA CEILING LITES @ HARD LID 2 DUCTS @ HARD LID HARD LID WALLS '4 HARD LID PER REV PLAN WALLS/NEED DETAIL FOR CEILING WALLS SEE JOB CARD SEE JOB CARD SEE JOB CARD U/FLOOR CONDUIT SUPPORT @ VENTS ESGII Corporation Trojessiona(fPI4n Review Engineers DATE: October 9, 1995 JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1192 SET: III PROJECT ADDRESS: 2604-C El Camino Real PROJECT NAME: Bonjour Bagel Cafe TI 13 APPLICANT 9:~ JURIS. U FIRE N REVIEWER U FILE The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. Fj The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Esgil Corporation staff did not advise the applicant that the plan check has been completed.. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: ) Telephone #: REMARKS: The designer stated that the City would review the .pIans for compliance with Appendix C of the UPC. Please verify. () f< — P By: Kurt Culver Enclosures: Esgil Corporation GA CM GP PC log trnsmtl.dot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 • (619) 560-1468 • Fax (619) 560-1576 EsGil Corporation TrofessionalP&zn Review Engineers DATE: October 3, 1995 0 APPLICANT RIS. U FIRE JURISDICTION: Carlsbad U PLAN REVIEWER .0 FILE PLAN CHECK NO.: 95-1192 SET: II PROJECT ADDRESS: 2604-C El Camino Real PROJECT NAME: Bonjour Bagel Cafe TI The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's codes. The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck.. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Designtech 2635 Camino del Rio South, # 310 San Diego 92108 Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: • ) Telephone #: REMARKS: By: Kurt Culver • Enclosures: Esgil Corporation GA LI CM []GP LI PC 9/26/95 trnsmtl.dot 9320 Chesapeake Drive, Suite208 • San Diego, California 92123 • (619) 560-1468 • Fax (619) 560-1576 Carlsbad 95-1192 II October 3, 1995 RECHECK PLAN CORRECTION LIST JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1192 PROJECT ADDRESS: 2604-C El Camino Real SET: II DATE PLAN RECEIVED BY DATE RECHECK COMPLETED: ESGIL CORPORATION: 9/26/95 October 3, 1995 REVIEWED BY: Kurt Culver FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and disabled access. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department or other departments. The following items need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303 (c), 1991 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. Please make all corrections on the original tracings and submit two new sets of prints to: ESGIL CORPORATION. To facilitate rechecking, please identify, next to each item, the sheet of the plans upon which each correction on this sheet has been made and return this sheet with the revised plans. The following items have not been resolved from the previous plan reviews. The original correction number has been given for your.. reference. Please contact me if you have any questions regarding these items. Please indicate here if any changes. have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located on the plans. Have changes been made not resulting from this list? UYes UNo Carlsbad 95-1192 II October 3, 1995 2. All sheets of the plans must be signed by the person responsible for their preparation. 4. Someone inked-in a note calling for tempered glazing by the new door. 'Please show this on the originals. PLUMBING, MECHANICAL AND ENERGY CORRECTIONS PLAN REVIEWER: Glen Adamek PLUMBING (UNIFORM PLUMBING CODE) 3. Show that water heater is adequately braced to resist seismic forces. UPC, Section 1310. The detail shown on the plans is insufficient. The lateral loading will go into a wall that doesn't have adequate bracing itself! 5. Provide calculations to show compliance with UPC, Appendix C, as per Mike Peterson of the City of Carlsbad (Minimum Plumbing Facilities). ENERGY CONSERVATION 8. Correct the tracked lighting wattages. The plans show 26 feet of 'double track' for a total of 52 feet of track. Per the CEC the minimum wattage is 45 watts per foot of track, or 2340 watts. Not 600 watts used for fixtures C & D. Please correct. The revised lighting does not comply. Note: If you have anyquestions regarding this plan review list please contact Glen Adamek at (619) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. ( I EsGil Corporation Professional Plan Review Engineers DATE: September 12, 1995 JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1192 PROJECT ADDRESS: 2604-C El Camino Real PROJECT NAME: Bonjour Bagel Cafe TI 0 FIRE IMWER U FILE SET: I The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's *********** codes. The plans transmitted herewith will substantially comply with the jurisdiction's ********** codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. The applicant's copy of the check list has been sent to: Designtech 2635 Camino del Rio South, # 310 San Diego 92108 Esgil Corporation staff did not advise the applicant that the plan check has been completed. Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Date contacted: (by: ) Telephone #: REMARKS: By: Kurt Culver Enclosures: Esgil Corporation GA CM GP fl PC 9/5/95 trnsmtl.dot 9320 Chesapeake Drive, Suite 208 • San Diego, California 92123 4 (619) 560-1468 • Fax (619) 560-1576 Carlsbad 95-1192 September 12, 1995 PLAN REVIEW CORRECTION LIST TENANT IMPROVEMENTS PLAN CHECK NO.: 95-1192 JURISDICTION: Carlsbad IOCCUPANCY: B-2 USE: Restaurant TYPE OF CONSTRUCTION: V-N ACTUAL AREA: -1738 ALLOWABLE FLOOR AREA: n/c STORIES: n/c HEIGHT: n/c SPRINKLERS?: ? REMARKS: DATE PLANS RECEIVED BY JURISDICTION: 9/1/95 DATE INITIAL PLAN REVIEW COMPLETED: September 12, 1995 OCCUPANT LOAD: -33 DATE PLANS RECEIVED BY ESGIL CORPORATION: 9/5/95 PLAN REVIEWER: Kurt Culver FOREWORD (PLEASE READ): This plan review is limited to the technical requirements contained in the Uniform Building Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state laws regulating energy conservation, noise attenuation and access for the disabled. This plan review is based on regulations enforced by the Building Department. You may have other corrections based on laws and ordinances enforced by the Planning Department, Engineering Department, Fire Department or other departments. Clearance from those departments may be required prior to the issuance of a building permit. Code sections cited are based on the 1991 UBC. The following items listed need clarification, modification or change. All items must be satisfied before the plans will be in conformance with the cited codes and regulations. Per Sec. 303 (c), 1991 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To speed up the recheck process, please note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet number, specification section. etc. Be sure to enclose the markedup list when you submit the revised plans. LIST NO. 40, TENANT IMPROVEMENTS WITHOUT SPECIFIC ENERGY DATA OR POLICY SUPPLEMENTS (1991UBC) tiforw.dot Carlsbad 95-1192 September 12, 1995 1• Please make all corrections on the original tracings and submit two new sets of prints, to: Esgil Corporation, 9320 Chesapeake Drive, Suite #208, San Diego, CA 92123, (619) 560-1468. Plans and calculations shall be signed by the California state licensed engineer or architect where there are structural changes to existing buildings or structural additions. Please include the California license number, seal, date of license expiration and date plans are signed. Business and Professions Code. PROVIDE STRUCTURAL DETAILING FOR THE NEW OPENINGS IN THE EXTERIOR WALL. Identify existing walls to be removed, existing walls to remain and proposed new walls. Identify bearing walls, non-bearing walls, and shear walls. ShOw safety glazing in the following locations, per Section 5406(d): a) Where the nearest edge of glazing is within a 24-inch arc of either side of a door' in a closed position (unless there is an intervening wall between the door and the glazing or if the glazing is 5'-0" or higher above the walking surface). Roof mounted equipment must be screened and roof penetrations should be minimized (City Policy 80-6). In addition to the circle/triangle symbol to be used on the restroom door, provide the Braille signage on the wall. next to the door, per Title 24. See next sheet for PME corrections. To speed up the review process, note on this list (or a copy) where each correction item has been addressed, i.e., plan sheet, note or detail number, calculation page, etc. Please indicate here if any changes have been made to the plans that are not a result of corrections from this list. If there are other changes, please briefly describe them and where they are located in the plans. Have changes been made to the plans not resulting from this correction list? Please indicate: Yes El No El Carlsbad 95-1192 September 12, 1995 10. The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468, to perform the plan review for your project. If you have any questions regarding these plan review items, please contact Kurt Culver at Esgil Corporation. Thankyou. PLUMBING, MECHANICAL AND ENERGY CORRECTIONS PLAN REVIEWER: Glen Adamek . PLUMBING- (UNIFORM PLUMBING CODE) Provide complete water line sizing calculations, including the water pressure, pressure losses, water demands, and developed pipe lengths. Provide gas line plans and calculations, showing pipe lengths and gas demands. UPC. Section 1219. Show that water heater is adequately braced to resist seismic forces. UPC, Section 1310. Show P & T valve on water heater and detail drain line route from P & T valve to the exterior. UPC Section 1007(e). Provide calculations to show compliance with UPC, Appendix C, (Minimum Plumbing Facilities). New or relocated water closets and associated flushometer valves, if any, shall use no more than 1.6 gallons per flush and shall meet performance standards established, by the American National Standards Institute Standard Al 12.19.2. H & S Code, Section 17921.3(b). Detail the backflow protection of water connection to carbonator. UPC, Section 1003(s). . ENERGY CONSERVATION Provide complete energy designs' for the proposed changes in envelope, lighting, and mechanical systems. Provide the completed ENV-, LTG-, and MECH- forms showing Energy compliance. On the plans clearly show the wall and roof insulation locations, thickness, and R-values, as per the energy design. - Show bi-level lighting controls as per Title 24, Part 6, Section 131(b). Carlsbad 95-1192 September 12, 1995 Show the daylit areas and required daylit area lighting controls for lighting in daylit areas. Title 24, Part 6, Section 131(c). Detail required exterior lighting controls. "Exterior lighting controlled from a lighting panel within the building shall be controlled by a directional photocell or astronomical time switch that automatically turns off exterior lighting when daylight is available." The completed andsigned ENV-1, LTG-1, and MECH-1 forms must be imprinted on the plans. Note: If you have any questions regarding this plan review list please contact Glen Adamek at (619) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. ELECTRICAL PLAN REVIEW PLAN REVIEWER: Chuck Mendenhall Specify the wiring method you intend to Use for this project (i.e., EMT, Metal Flex, NMC etc.). Show the location of all panels. NEC 110-16,240-24,300-21. Provide multiple switch light controls so that the lighting can be reduced by one half in a uniform pattern. The switches must be located within sight of the lights which they control. (CCR) Title 24, Sec 131 a-b Note on the plans that all conduit penetrations of the cooler box must have a moisture seal as per NEC article 300-7(a). Note: If you have any questions regarding this electrical plan review list please contact Chuck Mendenhall at (619) 560-1468. To speed the review process, note on this list (or a copy) where the corrected items have been addressed on the plans. Carlsbad 95-1192 September 12, 1995 VALUATION AND PLAN CHECK FEE JURISDICTION: Carlsbad PLAN CHECK NO.: 95-1192 PREPARED BY: Kurt Culver DATE: September 12, 1995 BUILDING ADDRESS: 2604-C El Camino Real BUILDING OCCUPANCY: B-2 TYPE OF CONSTRUCTION: V-N BUILDING PORTION BUILDING AREA VALUATION VALUE (sq. ft.) MULTIPLIER ($) TI 1 1738 1 36 1 62568 Air Conditioning Fire Sprinklers TOTAL VALUE 62,568 UBC Building Permit Fee: UBC Plan Check Fee: Comments: $ 473.00 $ 307.45 Sheet 1 of 1 valuefee.dot I V - V V • V j V City of ",,Carlsbad r IIsII.I_I_1lIlT.I_].J1l4i.I.JiiU V V '• > BU1LDING PLANCHECK CHECKLIST DATE PLANCHECK NO CB • BUILDING"ADRESS: , PROJECT DESCRIPTION: c4p ASSESSOR's PARCEL NUMBER EST ALUE \J ENGINEERING DEPARTMENT - DENIAL V V V APPROVAL V Please see the attached report of deficiencies marked The Item you have submitted for review has been with 0 Make necessary corrections to plans or approved. The approval Is based on plans, information specifications for compliance with applicable codes and V V and/or specifications provided in your submittal; therefore standards. Submit corrected plans and/or specifications V any changes to these Items after this date, including field to this office for review. V V V V V V modifications, must be reviewed by this office to insure V V V continued conformance with applicable codes. Please V V V V V review carefully all comments attached, as failure to V comply with Instructions in this report can result In By: Date suspension of permit to build.. ElARight-of.Wy ermit is required prior to construction By: V Date:_________ V of the following improvements:. V V By: V V Date:__________ V V V E ERING AUThQIZA11ON TO ISSUE UN.OING PEMtT BY___ZL Zi 'V V I V4V ATTACHMENTS V VVV V V ENGINEERING DEPT. CONTACTS PERSON V V V V V (V Li Dedication Application [=1 Dedication Checklist V 0 Improvement Application V V V V V Improvement Checklist V NAME:. V : [J Future Improvement Agreement V V City of Carlsbad V El Grading Permit Apllcation ADDRESS 2075 Las Palmas Dr Carlsbad CA 92009 [] Grading Submittal Checklist V VV PHONE (619) 438-1161, Ext.' V ' • 0 Right of Way Pér,:nit Application' V V S V V V V V V V El Right of Way Permit Submittal Checklist V V V V and Information Sheet D5 S V V. Sewer Fee Information Sheet - V V VS S A-4 V S V •V .- S S - P:\D0CS\CHKLST\8P0301.FRM S VS - V V". V REV 05/11/94 S S - - 2075 Las Palmas Dr. • Carlsbad, CA 92009-1576. (619) 438-1161 • FAX (619) 438-0894 - BUILDING PINCHECK CHECKLIST SITEPLAN /,I , 'dv/ 3rd' 0 1. Provide a fully dimensioned site plan drawn to scale. Show: North Arrow D. Property Lines Easements Existing & Proposed Structures E. Easements Existing Street Improvements F. Right-of-Way Width & Adjacent Streets MJ 0 0 2. Show on site plan: . Drainage Patterns C. Existing Topography , Existing & Proposed Slopes A 0 3. Include note: Surface water to be directed away from" the building foundation at a 2% gradient for no less than 5' or. 2/3 the distance to the property line (whichever is less)." [Per 1985 UBC 2907(d)5]. - On graded sites, the top of any exterior foundatioi shall extend above the elevation of the street gutter at point of discharge or the inlet of an approved drainage device • a minimum of 12 inches plus two percent' (per 1990 UBC 2907(d)5.). I2i 0 0 4. - Include on title sheet . Site address Assessor's Parcel Number Legal Description Forcommercial/indüstriaI buildings and tenant improvement projects, include: Total • building square footage with the square footage for each different use, existing sewer permits showing square footage of different uses (manufacturing, warehouse, office, etc.) previously approved. '• - EXISTING PERMIT NUMBER DESCRIPTION • I - I / P:D0CS\CHKLS1\BP0001FR1Y1 • Pagel of 4 • - - - REV 05/11/94 BUILDING PLANCHECK CHECKLIST. DISCRETIONARY APPROVAL COMPLIANCE W 2ndl 3rdv' . . . )J 0 0 5. Project does not comply with the following Engineering Conditions of approval for Project No. Conditions were complied with by: Date:__________________ DEDICATION REQUIREMENTS 0 0 6. Dedication for all Street Rights-of-Way adjacent to the building site and any storm (p4' drain or utility easements on the building site is required f0ra11 new buildings and for remodels with a value at or exceeding $ , -pyrsuant to Code Section 18.40.030. Dedication required as follows: Attached please find an application. form and submittal checklist for the dedication. process. Provide the completed application form and the requirements on the checklist at the time of resubmittal. Dedication completed by Date:__________ IMPROVEMENT REQUIREMENTS j? 0 0 . 7a. All needed public improvements upon and adjacent to the building site must, be I ' constructed at time of building construction whenever the value of the construction exceeds $ -pursuant to Code Section 18.40.040. Public improvements required as follows: Please have a registered Civil Engineer prepare appropriate improvement plans an1 submit them together with the requirements on the attached checklist for a separate plancheck process through the Engineering Department. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of permit. Attached please find an application form and submittal checklist for the public - improvements requirements. Provide the completed application form and the requirements on the checklist at the time of resubmittal. . Improvement Plans signed by: . Date: - P:\DOCS\CHKLST\BP0001.FRM Page 2 of 4 - REV 05/11/94 BUILDING PLANCHECK CHECKLIST 1 SW 2nd/ 3rd' 0 0 0 7b. Construction of the public improvements may be deferred pursuant to code Section 18.40. Please submit a recent property .titlé report or current grant deed on the property and processing fee of $____________________ so we may prepare the necessary Future Improvement Agreement. This agreement must be signed, notarized .and approved by the City prior to issuance of a Building Permit. Future public improvements required as follows:_______________________________ Improvement Plans signed by: Date:__________ 0 0 0 7c. Enclosed please find your Future Improvement Agreement. Please return signed and notarized Agreement to the Engineering Department. Future Improvement Agreement completed by:_______________________________ Date:___________ /CO1 0 7d. No Public Improvements required. SPECIAL NOTE: Damaged or defective me uily inspector prior to occupancy. GRADING PERMIT REQUIREMENTS - The conditions that invoke the need for a grading permit are found in Section 11.06.030 of the Municipal Code. 0 0 0 8a. Inadequate information available on Site Plan to make a determination on grading requirements. Include accurate grading quantities (cut, fill import, export). O 0 0 8b. Grading Permit required. A separate grading plan prepared by a registered Civil Engineer must be Submitted together with the completed application form attached. NOTE: The Grading Permit must be issued and rough grading approval obtained prior to issuance of a Building Permit. ; Z0IFJ Grading Inspector sign off by: Date: 8c. No Grading Permit required. - P:\DoCS\cHKLST\BP000I .FRM Page 3 of 4 REV 05/11/94 BUILDING PLANCHECK CHECKLIST MISCELLANEOUS PERMITS 2nd%/ 3rdv' - )4J 0 0 A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-Way ánd/or private work adjacent to the public Right-of-Way. Types of work include, but are not limited to: Street improvements, trees, driveways, tieing into public storm drain, sewer, and water utilities. Right-of-Way permit required for A separate Right-of-Way permit issued by the Engineering Department i required for the following: '4 0 0 1005 A SEWER PERMIT is required concurrent with the building permit issuance. The fee is noted in the fees section on the following page. El 0 ii. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial Waste Permit Application Form and submit for City approval prior to issuance of a - Permit. Industrial waste permit accepted by: Date: 4 ' . • P:\DOCS\CHKLST\BP0001.FRM Page 4 of 4 REV 05/11/94 PLANNING QiEOU1ST Plan Check No. Address '6I. / &av~40 i/c Planner DAVID RICK Phone 438-1161 ext. 4328 (Name) APN: N1 Type of Project and Use Zone C 2- Facilities Management Zone D(in/i#' cuelI ([F property in, cornpFete SPECIAL TAX CALCULATION WORKSHEET provided by Building Department.) Lègd Item Complete Item Incomplete . Needs your action 1, 2, 3 Number in circle indicates plancheck number where deficiency, was identified Environmental Review Required: YES - NO DATE OF COMPLETION:.__________________________________________ Compliance with conditions of approval? if not, state conditions which, require action. Conditions of Approval Discretionary Action Required: YES - NO TYPE APPROVAL/RESO. NO. .' DATE: PROJECT NO. OTHER RELATED. CASES: Compliance -with conditions of approval? If not, state conditions which require action. Conditions of Approval California Coastal Commission Permit Required: YES - NO DATE OF APPROVAL: . . San Diego Coast District, 3111 Camino Del Rio North, Suite 200, San Diego, CA. 92108-1725 (619) 5218036 - Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval Inclusionary Housing Fee red: YES NO (Effective date of (nclusionaxy Housing Ordinance - May 21, 1993.) Site Plan D 1. Provide a fully dimensioned site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, sweets, existing sweet improvements, right-of-way width, dimensioned setbacks and existing topographical lines. 2. Provide legal description of property, and assessor's parcel number. Zoning- 17 0 0 Setbacks: Front: Required •: Shown • Ent. Side: Required Shown • Street Side: Required Shown • Rear: Required Shown 0 0 0 Lot coverage: . Required Shown .0 0 0 Height: Required • • Shown O 0 C] Parking: Spaces Required Shown Guest Spaces Required Shown 0 0 0 Additional Comments - 01< TO ISSUE AND ENTERED APPROVAL INTO COMPUTERL__L-" DATE PLNCKFRM onsumer Food Protection Plan Check and Construction Unit PLAN CORRECTION SHEET OFFICE USE ONLY Intake Date 16? S Act. Code. IC .QJ City/Count 6 y Route Code Field PC Staff c4tL1 Plan Check#E 7( EST. NAME gO VAOUVgQCCEST. TYPE S C6f-) ice SITE ADDRESS OO'+ E( aw. t'oec( *C_ c,TjY v/ &_JIP c 0 OWNER/BUILDER PtQ 7Gk 5 -1/\ 1kskTc'cdcc PHONE MAILING ADDRESS 0 Sikc A:v cm AVCQd('~~Ip GENERAL CONTRACTOR j P/U CONTACT \iO.4 V\ PHONE START DATE PHONE 71 Mo/Yr PLANS: APPROVEDfDSPPOED-LAN CHECKER DATE (Circle One) (SIg%ature) Est. RECHECK Time APPOINTMENT DATE ENV. HEALTH OFFICE (S.D.) EAST CO. ENV. HEALTH OFFICE SAN MARcOS OFFICE 1255 Imperial -Ave.-3rd Flr 151. Van Houten Ave. Ste. B 338 Via Vera Cruz San Diego, CA 92186 El Cajon, CA 92020-4429 San Marcos, CA 92069 (619) 338-2222 (619)441-6666 (619) 471-0730 DHS:EHS-886 (8/91) JUL-264 WED 1546 CITY OF CARLSB1) COMM DE FAX No, 433U -. INDUSTRIAL WASTE DISCHARGE PERMIT APPLiCATION Iiv ij1 - --=--------- - - - - . - - , - - - - - - -=---- --- . - -- - -- -. - - BUSINESS NAME - D7— ? srrE ESSL b 142I. - &HI t1O 2 i4d OCA CONTACT PERSOPI (atbusinéss) - - - PHONE NUMB Typo of BusJneS (thø all that appty) O Agricultural 0 Government 0 Photo Lab DAssembly 0 L.aboratozy -. 0 Retail O AutomoWe 0 Laundry Service Station .0 0 C1emcal Handling 0 Manufacturing 0 Warehouse / . o Electronics 0 Meici ' Food 0 Metal Work - - • Dolfice DESOJIIBE WASTE OThER ThAN DQMESflC (Chemicals, PrLiculates, etc DESCRIBE BUSINESS A Ct 1j GlIE14ERAL OF ONSfrE WASTEWATER P R O C E S S I N G ( c h e m i c a l & p l ` W s i c a l c n s t c s L . ; business presently in operation at site DYES 15 NO • bs Wastewatèr Discharge Permit been apçfled.Ior through the Encina Water Authority? DYES ONO pplicant'sNarn&_ • -- Tide Phone Please Print •• . - ency: - - • - -: ---- - gnature: _ _-.• Da__ . Date ~rtatuff of '—NOTEXEMPT forwarded to Endra.._-. — , ,23 co 4I oil £°16185 Leo WATER CALCS. F.T. F.V. TOTAL F1)CflJRE UNITS DEMAND FLOW (GPM) . STREET MAIN PRESSURE (PsIG) S 6 ..• . METER LOSS (PSI) .. STATIC LOSS OR CAIN (PSI) RESIDUAL PRESSURE REQUIRED (Psi) . . 20 PRESSURE REGULATOR LOSS (PSI) 1 3 BACKFLOW PREVENTER LOSS (PSI) . 1 ,3 SUB—TOTAL LOSSES (PSI) 5 ( PRESSURE AVAiLABLE FOR FRICTION (PSI) . S 11 .ACTUAL LENGTH OF STEM (FT.) . .. . M.-,. DEVELOPED, LENGTH (25X--OF #11) ...............- . --AVERAGE PRESSURE DROP (LB/1oo) #10 DIVIDED BY #12X100 .... S PIPE SIZE SCHEDULE . S IZE (IN.) GPM F.T. F.U. F.V. F.U. 1/2 ,:.. 3/47 . 1-1/4" So EC> (3 1-1/2" 2" 2)5 350 2W 2-1/4" 2-1/2" 4.00R 1A1_ C.LBôcD PL4ZA, SDOfl-4 I I