HomeMy WebLinkAbout2606 DAVIS AVE; ; CB092190; Permit03-30-2010
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units1
Bedrooms:
Project Title:
Applicant:
JAMES CHINN
858 255-5063
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit Permit No: CB092190
Building Inspection Request Line (760) 602-2725
2606 DAVIS AV CBAD
RESDNTL
1552711000
$33,048.00
0
0
Sub Type:
Lot#:
Construction Type:
Reference #:
Structure Type:
Bathrooms:
RAD
0
VN
CRAWFORD RES-324 SF FAMILY RM
ADDITION-1ST FLOOR
Status:
Applied:
Entered By:
Plan Approved:
Issued:
Inspect Area:
Orig PC#:
Plan Check #
ISSUED
12/29/2009
RMA
03/30/2010
03/30/2010
Owner:
CRAWFORD FAMILY TRUST 02-06-03
2606 DAVIS AVE
CARLSBAD CA 92008
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
HMP Fee
Pot. Water Con. Fee "~"~""
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
Green Bldg Stands (SB1473) Fee
Bl)H-j
$313.44
$0.00
$203.74
$0.00
$0.00
$3.30
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
ATTACHED
$000
$0.00
$0.00
$0.00
$1.00
Meter Size
Add'l Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF (3105540)
PFF (4305540)
License Tax (3104193)
License Tax (4304193)
Traffic Impact Fee (3105541)
Traffic Impact Fee (4305541)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing InLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$20.00
$33.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$574.48
Total Fees:$574.48 Total Payments To Date:$574.48 Balance Due:$0.00
Inspector:
FINALAPRROVAL
Date: ^' ? / *Clearance:
NOTICE: Please take NOTICE that approval of your project includes the Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as "fees/exactions.' You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired.
01-14-2010
Job Address:
Permit Type:
Parcel No:
Valuation:
Reference #:
Project Title:
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Permit/Project No: SW100008
Fee Summary Listing
2606 DAVIS AV CBAD
SWPPP
1552711000
$0.00
CB092190
CRAWFORD FAMILY
324 SF ROOM ADDITION
Lot#:10
Status: PENDING
Applied: 01/14/2010
Entered By: LO
Applicant:
CRAWFORD FAMILY TRUST 02-06-03
2606 DAVIS AVE
CARLSBAD CA 92008
760-729-2662
Owner:
CRAWFORD FAMILY TRUST 02-06-03
2606 DAVIS AVE
CARLSBAD CA 92008
Fee Desc
SWPPP INSPECTIONS
SWPPP PLAN CHECK
Total Fee
208.00
49.00
Payments
.00
.00
Balance Due
208.00
49.00
Total Fees to Date:$257.00
Balance Due to Date:$257.00
CITY OF
CARLSBAD
Building Permit Application
1635 Faraday Ave., Carlsbad, CA 92008
760-602-2717 / 2718 / 2719
Fax: 760-602-8558
www.carlsbadca.gov
JOB ADDRESS SUITE#/SPACE#/UNIT#
CT/PROJECT#
DESCRIPTIONS WORK], Include Square Feet of Affected Area(s)
<=>.?-*
EXISTING US PROPOSED USE GARAGE (SF)PATIOS (SF)DECKS (SF)FIREPLACE
YES D #
AIR CONDITIONING
YES D NO If
FIRE SPRINKLERS
YES D NOP
CONTACT NAME (H Different Fom Applicant)APPLICANT NAME
ADDRESS ADDRESS
CITY STATE ZIP
PHONE FAX FAX
EMAIL EMAIL
O»A*/e CONTRACTOR BUS. NAME
ADDRESS ADDRESS
STATE CITY STATE ZIP
FAX PHONE FAX
EMAIL EMAIL
DESIGNER NAME & ADDRESS CLASS CITY BUS. LIC.#
(Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct, alter, improve, demolish or repair any structure, prior to its issuance, also requires theapplicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contractor's License Law (Chapter 9. commending with Section 7000 of Division 3 of theBusiness and Professions Code) or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to acivil penalty of not more than five hundred dollars ($500)).
WORKERS COMPENSATION
Workers' Compensation Declaration: / hereby affirm under penalty of perjury one of the following declarations:
D I have and will maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the work for which this perm it is issued.
G I have and will maintain workers' compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy
number are: Insurance Co. Policy No. Expiration Date
This section need not be completed if the permit is for one hundred dollars ($100) or less.
G Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of
California. WARNING: Failure to secure workers' compensation coverage is unlawful, and shall subject an employer to criminal penalties and civil fines up to one hundred thousand dollars (4100,000), in
addition to the cost of compensation, damages as provided for in Section 3706 of the Labor code, interest and attorney's fees.
J&> CONTRACTOR SIGNATURE OAGENT DATE
OWNER-BUILDER DECLARATION
/ hereby affirm that I am exempt from Contractor's License Law for the following reason:
Q I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's
License Law does not apply to an owner of property who builds or improves thereon, and who does such work himself or through his own employees, provided that such improvements are not intended or offered for
sale. If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
H I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of
property who builds or improves thereon, and contracts for such projects with contractors) licensed pursuant to the Contractor's License Law).
D I am exempt under Section Business and Professions Code for this reason:
1.1 personally plan to provide the major labor and materials for construction of the proposed property improvement. G Yes O No
2.1 (have / have not) signed an application for a building permit for the proposed work.
3.1 have contracted with the following person (firm) to provide the proposed construction (include name address/ phone /contractors' license number):
4.1 plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work (include name / address / phone /contractors' license number):
5.1 will provide some of the work, but I have contracted (hired) the following persons to provide the work indicated (include name / address / phone / type of work):
COMPLETE THIS SECTION FOR N O N - R E S I D E N T I A L BUILDING PERMITS ONLY
Is the applicant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505,25533 or 25534 of the
Presley-Tanner Hazardous Substance Account Act? O Yes n No •
Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? G Yes 0 No
Is the facility to be constructed within 1,000 feet of the outer boundary of a school site? H Yes D No
IF ANY OF THE ANSWERS ARE YES, /
EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name Lender's Address
APPLICANT C'EfrriFICATIO-N
I certify that I havered the application and state that the above informadon is correct and that the infomiatkin on the plans is
I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property for inspection purposes. I ALSO AGREE TO SAVE, INDEMNIFY AND KEEP HARMLESS THE CITY OF CARLSBAD
AGAINST ALL LIABILITIES, JUDGMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST SAID CITY IN CONSEQUENCE OF THE GRANTING OF THIS PERMIT.
OSHA: An OSHA permit is required for excavations over SPteep and demolition or construction of structures over 3 stories in height.
EXPIRATION: Every permit issued by the BuildireiOfficia/indk the provisions of this Code shall expire by Irritation and become null and void if the building or work authorized by such permit is not commenced within
180 days from tte date of such pOTBtrriWbatfu^^
^APPLICANT'SSIGNATURV--^ L^Jc Vvto/L/^ "~ DATE
City of Carlsbad Bldg Inspection Request
For: 07/07/2010
Permit* CB092190
Title: CRAWFORD RES-324 SF FAMILY RM
Description: ADDITION-1ST FLOOR
Inspector Assignment: RB
Type:RESDNTL Sub Type: RAD
Job Address: 2606 DAVIS AV
Suite: Lot: 0
Location:
OWNER CRAWFORD FAMILY TRUST 02-06-03
Owner: CRAWFORD FAMILY TRUST 02-06-03
Remarks:
Phone: 7607292662
Inspector:/ //£/*—-^
Total Time:
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By: WAYNE
Entered By: CHRISTINE
Act Comments
Comments/Notices/Holds
Associated PCRs/CVs Original PC#
CV040614 CLOSED Z-2 MOTORHOMES IN YARD;
Inspection History
Date Description Act Insp
06/30/2010 89 Final Combo CO RB
05/21/2010 17 Interior Lath/Drywall PA RB
05/21/2010 18 Exterior Lath/Drywall AP RB
05/18/2010 13 Shear Panels/HD's WC RB
05/18/2010 16 Insulation AP RB
05/12/2010 13 Shear Panels/HD's WC TP
05/12/2010 14 Frame/Steel/Bolting/Welding AP TP
05/12/2010 34 Rough Electric AP TP
05/12/2010 84 Rough Combo WC TP
05/07/2010 13 Shear Panels/HD's AP RB
05/07/2010 15 Roof/Reroof WC RB
05/06/2010 13 Shear Panels/HD's CO RB
05/06/2010 14 Frame/Steel/Bolting/Welding CO RB
Comments
MISSING S.D. IN BDRMS
MISSING D.W. ON GRG SIDE OF GRG
PER RB CORR
SEE NOTICE ATTACHED
City of Carlsbad Bldg Inspection Request
For: 05/06/2010
Permit* CB092190
Title: CRAWFORD RES-324 SF FAMILY RM
Description: ADDITION-IST FLOOR
Inspector Assignment: RB
Type:RESDNTL Sub Type: RAD
Job Address. 2606 DAVIS AV
Suite: Lot: 0
Location:
OWNER CRAWFORD FAMILY TRUST 02-06-03
Owner: CRAWFORD FAMILY TRUST 02-06-03
Remarks:
Phone: 7606226778
Inspector-
Total Time:Requested By: CARLOS
Entered By: CHRISTINE
CD Description Act Comments
14 Frame/Steel/Bolting/Welding
34 Rough Electric
Comments/Notices/Holds
04/16/2010
04/16/2010
04/16/2010
04/14/2010
Associated PCRs/CVs Original PC#
CV040614 CLOSED Z- 2 MOTORHOMES IN YARD;
Inspection History
Act Insp Comments
WC RB
PA RB SEE NOTICE
WC TP
WC TP
AP TP
Date Description
05/03/2010 14 Frame/Steel/Bolting/Welding
05/03/2010 15 Roof/Reroof
11 Ftg/Foundation/Piers
13 Shear Panels/HD's
66 Grout
11 Ftg/Foundation/Piers AP RB
CMU FND
FTGS ONLY
Janws A. Chinn, Architect
2120 Jimmy Darante Blvd.. Suite 114
Del Mar. CA 92014
•Phone (858) 755-5863
Email :jim@designbuildinc.com
5-2-10
Building Inspector
City of Carlsbad
RE: Crawford Addition
2606 Davis Ave.
Carlsbad, California
Dear Sir,
It has been brought to my attention that the roof sheathing that was installed has an index number
of (24/16) rather than the specified index of (32/16).
This is an acceptable change since the rafters are at 16" o.c., the sheathing with the (24/16) index
is okay for a 24" rafter spacing.
If you have any questions, feel free to contact me.
Thank you.
James Chinn
NOTICECITY OF CARLSBAD (760) 602-2700
BUILDING DEPARTMENT 1635 FARADAY AVENUE
DATE TIME
LOCATION 1 \ <ys£
-T
€
_, - _,
FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE?
FOR FURTHER INFORMATION, CONTACT
YES
BUILDING INSPECTOR CODE ENFORCEMENT OFFICER ®
City of Carlsbad Bldg Inspection Request
For: 05/12/2010
Permit* CB092190
Title: CRAWFORD RES-324 SF FAMILY RM
Description: ADDITION-IST FLOOR
Inspector Assignment: RB
Type:RESDNTL Sub Type: RAD
Job Address: 2606 DAVIS AV
Suite: Lot: 0
Location:
OWNER CRAWFORD FAMILY TRUST 02-06-03
Owner: CRAWFORD FAMILY TRUST 02-06-03
Remarks: ANCHOR BOLT INSPECTION
Phone: 7606226778
Inspector;--
Total Time:Requested By: CARLOS
Entered By: CHRISTINE
CD Description
13 Shear Panels/HD's
Act Comments
Comments/Noticej/Holds
Comments
SEE NOTICE ATTACHED
Associated PCRs/CVs Original PC#
CV040614 CLOSED Z-2 MOTORHOMES IN YARD;
Inspection History
Date Description Act Insp
05/07/2010 13 Shear Panels/HD's AP RB
05/07/2010 15 Roof/Reroof WC RB
05/06/2010 13 Shear Panels/HD's CO RB
05/06/2010 14 Frame/Steel/Bolting/Welding CO RB
05/06/2010 15 Roof/Reroof AP RB
05/06/2010 34 Rough Electric AP RB
05/03/2010 14 Frame/Steel/Bolting/Welding WC RB
05/03/2010 15 Roof/Reroof PA RB SEE NOTICE
04/16/2010 11 Ftg/Foundation/Piers WC TP
04/16/2010 13 Shear Panels/HD's WC TP
04/16/2010 66 Grout AP TP CMU FND
04/14/2010 11 Ftg/Foundation/Piers AP RB FTGS ONLY
CITY OF CARLSBAD
BUILDING DEPARTMENT
DATE
(760) 602-2700
1635 FARADAY AVENUE
TIME
LOCATION
PERMIT NO.
///
C
r-r
/ c <f ^
FOR INSPECTION CALL (760) 602-2725. RE-INSPECTION FEE DUE?
FOR FURTHER INFORMATION, CONTACT _
YES
BUILDING INSPECTOR
PHONE
CODE ENFORCEMENT OFFICER
City of Carlsbad Bldg Inspection Request
For: 05/03/2010
Permit* CB092190 Inspector Assignment: RB
Title: CRAWFORD RES-324 SF FAMILY RM
Description: ADDITION-1ST FLOOR
Type:RESDNTL Sub Type: RAD
Phone: 7606226778
Job Address: 2606 DAVIS AV
Suite: Lot: 0
Location: Inspector:
OWNER CRAWFORD FAMILY TRUST 02-06-03
Owner: CRAWFORD FAMILY TRUST 02-06-03
Remarks:
Total Time: Requested By: CARLOS
Entered By: CHRISTINE
CD Description Act pomments
14 Frame/Steel/Bolting/Welding
. e.
Comments/Notices/Holds
Associated PCRs/CVs Original PC#
CV040614 CLOSED Z- 2 MOTORHOMES IN YARD;
Inspection History
Date Description Act Insp Comments
04/16/2010 11 Ftg/Foundation/Piers WC TP
04/16/2010 13 Shear Panels/HD's WC TP
04/16/2010 66 Grout AP TP CMU FND
04/14/2010 11 Ftg/Foundation/Piers AP RB FTGS ONLY
NOTICECITY OF CARLSBAD (760) 602-2700
BUILDING DEPARTMENT 1635 FARADAY AVENUE
DATE ^ ^ ' ^ TIME.
LOCATION
PERMIT NO.
e.
FOR INSPECTION CALL (760) 602-2725, RE-INSPECTION FEE DUE? I I YES
FOR FURTHER INFORMATION, CONTACT ___________________
PHONE
CODE ENFORCEMENT OFFICER
City of Carlsbad
Public Works
BUILDING PLANCHECK CHECKLIST
Engineering
DATE:
BUILDING ADDRESS:
PROJECT DESCRIPTION:
ASSESSOR'S PARCEL NUMBER:
PAvfC
PLANCHECK NO.:
- *2i(—lO
ENGINEERING DEPARTMENT
APPROVAL
The item you have submitted for review has been
approved. The approval is based on plans,
information and/or specifications provided in your
submittal; therefore any changes to these items after
this date, including field modifications, must be
reviewed by this office to insure continued
conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
D A Right-of-Way permit is required prior to
construction of the following improvements:
DENIAL
Please see"fhe Nattached report of deficiencies
marked wifhD^Make necessary corrections to plans
or speculations for compliance with applicable
codes and standards. Submit corrected plans and/or
specifications to this office for review.
By:Date:
By:
FOR OFFICIAL USE ONLY
IGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
Date:
ATTACHMENTS
D Dedication Application/Checklist
D Encina Wastewater Screening Survey
D Encroachment Application/Checklist
Q Final Map (Reference)
D Grading Plan Application/Checklist
D Improvement Application/Checklist
D Neighborhood Improvement Agreement
D Right-of-Way Permit Submittal Checklist
and Information Sheet
D Storm Water Compliance Forms
[] Other
ENGINEERING DEPARTMENT CONTACT PERSON
Name: Linda Ontiveros
City of Carlsbad
Address: 1635 Faraday Avenue, Carlsbad, CA 92008
Phone: (760) 602-2773 Fax: (760) 602-1052
Email: Llnda.Ontlveros@carlsbadca.gov
CFD INFORMATION
Reference No(s): .
Lot No.:
Recordation:
Subdivision/
Carlsbad Tract:
1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (76O) 602-2720 • FAX (76O) 602-8562
BUILDING PLANCHECK CHECKLIST
RD3'
D
D
D
SITE PLAN
1. Provide a fully dimensioned site plan drawn to scale. Show:
A. North Arrow
B. Existing & Proposed Structures
C. Existing Street Improvements
Property Lines
A.
B.
C.
D.
rr
F. Right-of-Way Width & Adjacent Streets
G. Driveway widths
H. Existing or proposed sewer lateral
I. Existing or proposed water service
J. Existing or proposed irrigation service
Show on site plan:
Drainage Patterns
1. Building pad surface drainage must maintain a minimum slope of one
percent towards an adjoining street or an approved drainage course.
2. ADD THE FOLLOWING NOTE: "Finish grade will provide a minimum positive
drainage of 2% to swale 5' away from building."
Existing & Proposed Slopes and Topography
Size, type, location, alignment of existing or proposed sewer and water service (s)
that serves the project. Each unit requires a separate service, however, second
dwelling units and apartment complexes are an exception.
Sewer and water laterals should not be located within proposed driveways, per
standards.
3. Include on title sheet:
A. Site address
B. Assessor's Parcel Number
C. Legal Description
For commercial/industrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
BUILDING PLANCHECK CHECKLIST
• ST ,ND RD3
D
DISCRETIONARY APPROVAL COMPLIANCE
4a. Project does not comply with the following Engineering Conditions of approval for
Project No.
4b. All conditions are in compliance. Date:
DEDICATION REQUIREMENTS
Dedication for all street Rights-of-Way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ 17.000 . pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows: h-WUWl<^ <^•
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 Vi" x 11" plat map and
submit with a title report. All easement documents must be approved and signed
by owner(s) prior to issuance of Building Permit. Attached please find an
application form and submittal checklist for the dedication process. Submit the
completed application form with the required checklist items and fees to the
Engineering Department in person. Applications will not be accept by mail or fax.
Dedication completed by:Date:
IMPROVEMENT REQUIREMENTS
D 6a. All needed public improvements upon and adjacent to the building site must be
constructed at time of building construction whenever the value of the
construction exceeds $ 82.000 . pursuant to Carlsbad Municipal Code Section
18.40.040.
Public improvements required as follows:
Attached please find an application form and submittal checklist for the public
improvement requirements. A registered Civil Engineer must prepare the
appropriate improvement plans and submit them together with the requirements
on the attached checklist to the Engineering Department through a separate plan
check process. The completed application form and the requirements on the
checklist must be submitted in person. Applications by mail or fax are not
accepted. Improvement plans must be approved, appropriate securities posted
and fees paid prior to issuance of building permit.
Improvement Plans signed by:Date:
BUILDING PLANCHECK CHECKLIST
ST1
D
NO2
D
RD3'
D
IMPROVEMENT REQUIREMENTS continued
6b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $441 so we may
prepare the necessary Neighborhood Improvement Agreement. This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit.
Future public improvements required as follows:
D D
D D
6c. Enclosed please find your Neighborhood Improvement Agreement (NIA). Please
return agreement signed and notarized to the Engineering Department.
Completed by:Date:
6d. No Public Improvements required. SPECIAL NOTE: Damaged or defective
improvements found adjacent to building site must be repaired to the satisfaction
of the City Inspector prior to occupancy.
D D D
ODD
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
15.16.010 of the Municipal Code.
7a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities in cubic yards (cut, fill import,
export). This information must be included on the plans.
7b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Grading Permit must be issued and rough grading
approval obtained prior to issuance of a Building Permit.
Grading Inspector sign off by:Date:
7c. Graded Pad Certification required. (Note: Pad certification may be required even
if a grading permit is not required.)
7d .No Grading Permit required.
7e. If grading is not required, write "No Grading" on plot plan.
R«v 2/02/M
BUILDING PLANCHECK CHECKLIST
RD3
D
MISCELLANEOUS PERMITS
RIGHT-OF-WAY PERMIT
8. A Right-of-Way permit is required to do work in City Right-of-Way and/or private
work adjacent to the public Right-of-Way. Types of work include, but are not
limited to: street improvements, tree trimming, driveway construction, tying into
public storm drain, sewer and water utilities. To see requirements, visit our
website: www.carlsbadca.gov/engineering
Right-of-Way permit required for:
D D D INDUSTRIAL WASTE PERMIT
9. If your facility is located in the City of Carlsbad sewer service area, you need to
contact the Carlsbad of Carlsbad, Development Services Division, located at
1635 Faraday Avenue, Carlsbad, CA 92008. City Staff can provide forms and
assistance. You may telephone (760) 602-2750 for assistance
D D
D
D D
NPDES PERMIT
10. Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first.
STORM WATER COMPLIANCE
10a. JS Requires Project Storm Water Permit:
Tier I/Tier II (Requires SWPPP) - Please complete attached forms
No threat - Please complete attached Storm Water Exemption form
DEVELOPMENT FEES
11. a Required fees afe-€rttacheth<5-W
Q More information needed
Q No fees required
BUILDING PLANCHECK CHECKLIST
3RD WATER METER REVIEW
D 12a. Domestic (potable) Use
Ensure that the meter proposed by the owner/developer is not oversized.
Oversized meters are inaccurate during low-flow conditions. If it is oversized, for
the life of the meter, the City will not accurately bill the owner for the water used.
• All single family dwelling units receive "standard" 1" service with 5/8" meter.
• All residential units that need to be fire sprinkled receive a 1" meter. See
Carlsbad Municipal Code Section 17.04.230 for Automatic fire extinguishing
systems criteria.
• If owner/developer proposes a size other than the "standard", then
owner/developer must provide potable water demand calculations, which
include total fixture counts and maximum water demand in gallons per minute
(gpm). Once the gpm is provided, check against the "meter sizing schedule"
to verify the anticipated meter size for the unit.
• Maximum service and meter size is a 2" service with a 2" meter.
• If a developer is proposing a meter greater than 2", suggest the installation of
multiple 2" services as needed to provide the anticipated demand, (manifolds
are considered on case by case basis to limit multiple trenching into the
street).
NOTE: Upon declaration of Drought Response Level 3 condition, no new
potable water service shall be provided and no new temporary meters or
permanent meters shall be provided. See Ordinance 44 for more information.
D D D 12b. Irrigation Use (where recycled water is not available)
All irrigation meters must be sized via irrigation calculations (in gpm) prior to
approval. The developer must provide these calculations. Please follow these
guidelines:
• If the project is a newer development (newer than 1998), check the recent
improvement plans and observe if the new irrigation service is reflected on
the improvement sheets. If so, at the water meter station, the demand in
gpm may be listed there. Irrigation services are listed with a circled "I", and
potable water is typically a circled "W". The irrigation service should look
like:
STA1+00 Install 2" service and
1.5: meter (estimated 100 gpm)
If the improvement plans do not list the irrigation meter and the service/meter
will be installed via another instrument such as the building plans or grading
plans (w/ a right of way permit of course), then the applicant must provide
irrigation calculations for estimated worst-case irrigation demand (largest
zone with the farthest reach). Typically, the landscape consultant has
already reviewed this if landscape plans have been prepared, but the
applicant must provide the calculations to you for your use.
BUILDING PLANCHECK CHECKLIST
1ST 2ND 3RD WATER METER REVIEW continued
12b. Irrigation Use (continued)
Once you have received a good example of irrigation calculations, keep a set
for your reference. In general the calculations will include:
Hydraulic grade line
Elevation at point of connection (POC)
Pressure at POC in pounds per square inch (PSI)
Worse case zone (largest, farthest away from valve
Total Sprinkler heads listed (with gpm use per head)
Include a 10% residual pressure at point of connection
In general, all major sloped areas of a subdivision/project are to be irrigated via
separate irrigation meters (unless the project is only SFD with no HOA). As long as
the project is located within the City recycled water service boundary, the City is in
the process of switching these irrigation services/meters to a new recycled water line
D 12c. Irrigation Use (where recycled water is available)
Recycled water meters are sized the same as the irrigation meter above.
• If a project fronts a street with recycled water, then they should be
connecting to this line to irrigate slopes within the development. For
subdivisions, this should have been identified, and implemented on the
improvement plans. Installing recycled water meters is a benefit for the
applicant since they are exempt from paying the San Diego County
Water Capacity fees. However, if they front a street which the recycled
water is there, but is not live (sometimes they are charged with potable
water until recycled water is available), then the applicant must pay the
San Diego Water Capacity Charge. If within three years, the recycled
water line is charged with recycled water by CMWD, then the applicant
can apply for a refund to the San Diego County Water Authority
(SDCWA) for a refund. However, the City of Carlsbad cannot guarantee
the refund. The applicant must deal with the SDCWA for this.
D D 13. Additional Comments:
DOC# 2009-0532013
RECORDING REQUESTED BY:
Fidelity National Tlfe Company of California
£scm»No.s 09-7783 0»-SG
Looted*.; CAWTW31-093WXXM-00007767M
TttteNo.:09-77S708ilC
When Recorded Malt Document
and Tax Statement To:
Wayne E Crawford
2606 David Avenue
Carlsbad, CA920tt:
SEP 24,2009 8:00 AM
OFFICIAL RECORDS '
SAN DIEGO COUNTY RECORDER'S OFFICE
DAVID L BUTLER, COUNTY RECORDER
FEES: 12.00
OC: OC
PAGES:
APN: 155-27MO -«*e£ ABOVE THIS UNE FOR RECORDER'S USE
GRANT DEED
Oty Transfer Tax is $ 0.00
The undersigned frantorfs) dedare(s)
Documentary transfer tax is $ RT CODE #11930 into trust
[ ] computed on full value of property conveyed, or
[ ] cofuouted on full value less value of Itens or encumbrances remairang at time of sate,
[ ] Unincorporated Area City of Carlsbad,
FOR A VALUABLE CONSIDERATION, receipt of which Is hereby acknowledged, Wayne E Crawford and Diane K
Crawford, husband and wife as joint tenants
hereby GRANT(S) to Wayne E Crawford and Diane K Crawford, as Co-Trustees of their successor trustee under the
Crawford Family Trust dated February 6,2003
the IbUcrwing described real property In the City of Carlsbad, County of San Diego, State of California:
SEE EXHIBITS" ATTACHED HERETO AND MADE A PART HEREOF
DATED: September :15,2009
State of California
County of
On
'A^t
E Crawford
It I . Notary Public -S&SjewS^_±
personally appeared Diane K Crawford
of satisfactory evklence to be thejbscribedto the within Instrumentxecutedthe:
by his/IsVor the entity
the instrument.behalf ofi _
I certify under PENALTY OFPEWURY under the laws of the State ofCalifornia that the forugoing paragraph fe*ue and correct.
""•/WITNESS my hand
Signature
^ ^
.(Seal)
Notary PvOHc. Caflfomta
Son Diego County
%Comnv fMpbmOct l(, 2009
.MAIL TAX STATEMENTS AS DIRECTED ABOVE
FO-213 (Rev 12/07)GRANT DSD
09-7M70MB
CAWTWJM931-0004-0000776708
7MtN».l OtttiWMMJC
EXHIBIT "A"
THE LAND REFERRED TO HEREIN BELOW IS STUATO IN THE OTY OF CAMSBAD, COUNTY OF SAN WESO, STATE
OP OUJPOWOA, AND IS OESCWBH) AS FOLLOWS!
Lot to Of ttwwfe Pw^ In tte Oty of Carlsbad, County of San Otego^ State cfCaHbmfa,«3COKJlng to Map Hereof No.
3382, ffled in the OWce of the oaunly Mcordar of San Dtago County, February 24,1956.
APN: 155-271-10
T /T -aava 0206 6B^ 09i JOT ST'SO
|
BBWT1 -m d
9 g as 5=
3 -in<g»»s?a~;-a'»»-5-"-|3-gis.aa.~.£35r3«£ o *^ =3S =-»3rn =3. e3
i8
3
H
8
•8
i
p•ai«
s?o
o
70m
i
n
Ito
0
ti The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project.activity description boxes provided for that purpose and place a check in the box immediately to the left of thepractices (BMPs) from the list located alon the top of the form. Then place an X in the box at the place where Ifor each of the selected BMPs selected from the list. For Example - If the project includes site access across <that applies such as "Stabilized Construcion Ingress/Egress" under Tracking Control. Follow along the "Site Aplace an X in the box where the two meet. As another example say the project included a stockpile that you in"Cover with Plastic" in the blank column under the heading Erosion Control BMPs. Then place an X in the boTo learn more about what each BMP descriotion means, vou mav wish to review the BMP Reference Handoutadded activity description. For each activity descrribed, pick one or more best managementre activity row intersects with the BMP column. Do this for each activity that was checked off andin, then check the box to the left of "Site Access Across Dirt". Then review the list for something:cess Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column andend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write inx where "Stockpiling" row intersects the new "Cover with Plastic" column,prepared to assist applicants in the selection of anoronriate Rut Manao»m»,,i Pr^ti,.,. mi,,,,.r^Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add anv other activitv descriptions in the blank\
I
05
8
5 '
^
1
i
?
X
*
^2
f
I
Tl
!
^
X
3
\
X
Slucco/MortarWorktf
/\
x
1 1
tf
tfi
X
'1rf'^StockpilingK
*
5"
X
>^S?
a
1
X CASQA Designation -»Construction ActivityEC-7
EC-8
EC-9
EC-11
SE-1
SE-3
SE-4
SE-5
SE-6
SE-7
SE-8
SE-10
TR-1
TR-2
NS-1
NS-3
NS-7
NS-8
WM-1
WM-2
WM-3
WM-4
WM-5
WM-6
WM-8 Best Management Practice(BMP) Description -»Geotextiles & Mats
Wood Mulching
Earth Dikes and
Drainage Swales
Slope Drains
Silt Fence
Sediment Trap
Check Dam
Fiber Rons
Gravel Bag Berm
Street Sweeping and
Vacuuming
Sandbag Barrier
Storm Drain Inlet
Protection
Stabilized Construction
Ingress/Egress
Stabilized Conslrucion
Roadway
Water Conservation
Practices
Paving and Grinding
Operations
Potable Water/Irrigation
Vehicle and Equipment
Cleaning
Material Delivery and
Storage
Material Use
Stockpile Management
Spill Prevention and
Control
Solid Waste
Management
Hazardous Waste
Management
Concrete Waste
Management Erosion ControlBMPsSediment Control BMPsTrackingControl BMPso> 2
||Waste Management and MaterialsPollution Control BMPs
DD
D
D
D
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB09-219Q Address 2606 Davis Avenue
Planner Chris Sexton Phone (760)602-4624
APN: 155-271-10
Type of Project & Use: addition Net Project Density:. 1.0 DU/AC
Zoning: R-1 General Plan: RLM Facilities Management Zone: 1
CFD (in/out) #_Date of participation: Remaining net dev acres:.
Circle One
(For non-residential development: Type of land used created by this permit:
Legend: [x] Item Complete Q Item Incomplete - Needs your action
Environmental Review Required: YES Q NO Q TYPE
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval:
Discretionary Action Required: YES D NO D TYPE
APPROVAL/RESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES Q NO Q
CA Coastal Commission Authority? YES Q NO Q
If California Coastal Commission Authority: Contact them at - 7575 Metropolitan Drive, Suite 103,
San Diego, CA 92108-4402; (619) 767-2370
Determine status (Coastal Permit Required or Exempt):
Habitat Management Plan
Data Entry Completed? YES D NO D
If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and
assess fees in Permits Plus
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type
impacted/taken, UPDATE!)
Inclusionary Housing Fee required: YES Q NO Q
(Effective date of Inclusionary Housing Ordinance - May 21,1993.)
Data Entry Completed? YES Q NO D
(A/P/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N,
Enter Fee, UPDATE!)
H:\ADMIN\Template\Building Plancheck Review Checkiist.doc Rev 4/08
Site Plan:
Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements,
existing and proposed structures, streets, existing street improvements, right-of-way width,
dimensional setbacks and existing topographical lines (including all side and rear yard slopes).
Provide legal description of property and assessor's parcel number.
n
Policy 44 - Neighborhood Architectural Design Guidelines
D 1. Applicability: YES D NO D
D 2. Project complies: YES D NOQ
Zoning:
1. Setbacks:
Front:
Interior Side:
Street Side:
Rear:
Top of slope:
Required 2ff_ Shown 227"
Required 5'8" Shown 7'9"
Required 101 Shown 12'3"
Required 116: Shown 11'8"
Required Shown
2. Accessory structure setbacks:
Front:
Interior Side:
Street Side:
Rear:
Structure separation:
Required
Required
Required
Required
Required
Shown
Shown
Shown
Shown
Shown
3. Lot Coverage:Required <40% Shown 34%
4. Height:Required <30' Shown <30'
D
5. Parking: Spaces Required 2 Shown 3
(breakdown by uses for commercial and industrial projects required)
Residential Guest Spaces Required Shown
Additional Comments
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTE
H:\ADMIN\Template\Building Plancheck Review Checklist.doc Rev 4/08
San Diego, CA, 2009-2010 -155-271-10-00, 2606 DAVIS AVE, CARLSBAD CA 92008-1453, Sheet: 1 of 2
iss . iw.n
plil3.o —-,BdosiS3
|!
Pi- W:si$3Ntj
-J'-
BLK
IT/
in
Z7I
tff
CHANGES
OLD
tJSJ-044,
t4,tS
II
04*.
astf?
NEW
18
IKXIflUt
JHrt
&*
14 Lit
YR
1)
fo•ft
fflt
aw •* t=
lisa
CUT
'8/fc if
IS.
ItL
co
O O CO
!<"-'
o —• C-H — CO,
50Qito
O
w
QO)«O
- O
CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 1 of 5)
Alternative Component Package Method: (check one)D _D (Alternative)
Package C and Package D choices require HERS rater field verification and/or diagnostic testing (see CF-1R page 3)
For Package D Alternative see Appendix B Table 151-C Footnotes 8-14 in the Residential Compliance Manual (RCM)
GENERAL INFORMATION ,
Total Conditioned Floor Area (CFA) 3^- 'ft2
Average Ceiling Height: \ ft
Check Applicable Boxes
Building Type: (check one or more) * Single Family Multifamily Addition Alteration
(If adding fenestration fill-out WS-4R, Fenestration Maximum Allowed Area Worksheet and see Section 8.3.2
for Additions and 8.3.3 for Alterations in me RCM.)
s^
fP(fromWS-4R)
tCf> ft2 (from WS-4R)
Maximum Allowed Total Fenestration Area
Maximum Allowed West Facing Fenestration Area
Number of Stories: f Number of
Floor Construction Type: Si
Front Orientation: ^*D North / Soi
/
from True North and circle one).
D RADIANT BARRIER (check box if required in climate zones 2.4. 8-15")
Flqgwtarcle one or both)
West: All Orientations (input front orientation in degrees
OPAQUE SURFACES INCLUDING OPAQUE DOORS
Component
Type (Wall,
Roof, Floor,
Slab Edge,
Doors)
Frame
Type
(Wood or
Metal)
Cavity
Insulation
R-Value
Continuous
Insulation
R-Value
Assembly U-
factor (for wood,
metal frame and
mass
assemblies)'
Joint
Appendix
IV
Reference
Location
Comments
(attic, garage,
typical, etc.)
-Vi
1) See Joint Appendix IV in Section IV.2, IV. 3, and IV.4, which is the basis for the U-factor criterion. U-factors can not exceed
prescriptive value to show equivalence to R-values.
2) This column is for the Inspector to verify installation of roof radiant barrier.
Residential Compliance Forms December 2005
CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 2 of 5)CF-1R
Project Tide Date
FENESTRATION PRODUCTS - U-FACTOR AND SHGC
S D FENESTRATION MAXIMUM ALLOWED AREA WORKSHEET WS-4R -must be included for New
Construction, Additions, and Alterations.
Fenestration
#/Type/Pos. (Front,
Left, Rear, Right,
Skylight)
&£e*»-p
&!>*-*-uvrr•£j(jv\\*fi:J
Orien-
tation,
N, S, E, W1
(&f*^\
UJ^T
^^C^rI3&t£pfl[
Area
(ft2)o
<Z^s>
*&*>
4*
U-factor2
- ^/L.4*-. 4^
.4^
U-factor
Source3 SHGC4
. <*
£
, *
<.
'O
•0
'-e>
-*>
SHGC
Source5
Exterior
Shading/Overhangs6' 7
^boxifWS-3Ris
included
Daaaa
0
D
1) Skylights are now included in West-facing fenestration area if the skylights are tilted to the west or tilted in any direction when
the pitch is less than 1:12. See §151(f)3C and in Section 3.2.3 of the Residential Manual.
2) Enter values in this column from either NFRC Certified Label or from Standards Default Table 116-A.
3) Indicate source either from NFRC or Table 116-A,
4) Enter values in this column from NFRC or from Standards Default Table 116B or adjusted SHGC from WS-3R.
5) Indicate source either from NFRC, Table 116B or WS-3R
6) Shading Devices are defined in Table 3-3 in the Residential Manual and see WS-3R to calculate Exterior Shading devices.
7) See Section 3.2.4 in the Residential Manual.
HVAC SYSTEMS
Heating Equipment
Type and Capacity
(funaacc, beat pump, boiler, etc.)
f=£*v4
Minimum
Efficiency
(AFUEorHSPF)
*\O'*\
Distribution
Type and Location
(ducts, attic, etc.)
OuLcrr^
Duct or Piping
R-Value
P--4--2-
Thermostat
Tvpe
<*C&i»Ac.fc.
Configuration
(split or package)
Cooling Equipment
Type and Capacity
(A/C, heat pump, evap.
cooling)^/ywi '
Minimum
Efficiency
EER)
Distribution
Type and Location
Cducts, attic, etc.)
Duct or Piping
R-Value
Thermostat
Type
Configuration
(split or package)
Residential Compliance Forms December 2005
CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 3 of 5) CF-1R
Project Title C^Jf^^^0^^ £^&^ fJXM Date \ 2_Y214-/CT*f
SEALED DUCTS and TXVs for Alternative Measures)
A signed CF-4R Form must be provided to the building department for each home for which the following are required.
Sealed Ducts (all climate zones) (Installer testing and certification and HERS rater field verification required.)
TXVs, readily accessible (climate zones 2 and 8-15 only)
(Installer testing and certification and HERS Rater field verification required.)
Refrigerant Charge (climate zones 2 and 8-15 only) (Installer testing and certification and HERS Rater field
verification required.)
OR
D Alternative to Sealed Ducts and Refrigerant Charge /TXVs (See Package D Alternative Package Features for
Project Climate Zone in the RM Appendix B Table 151-C, Footnotes 7-14.
OR
No ducts installed.
D New ducts from existing space conditioning equipment, not exceeding 40ft. in length.
n
For additions and alterations, duct systems that are not documented to have been previously sealed as confirmed
through field verification and diagnostic testing in accordance with procedures in the Residential ACM Manual.
Duct systems with more than 40 linear feet in unconditioned spaces shall meet the requirements of Section 150(m)
and duct insulation requirements of Package D.
WATER HEATING SYSTEMS
n Check box if system meets criteria of a "Standard" system. Standard system is one gas-fired water heater per dwelling
unit. If the water heater is a storage type, 50 gallons is the maximum capacity and recirculation system is not allowed.
D Check box when using Preapproved Alternative Water Heating table, Table 5-4 in Chapter 5 in the Residential
Manual. No water heating calculations are required, and the system complies automatically.
n Check box if system does not meet criteria of "Standard" system, and does not comply with the Preapproved
Alternative Water Heating fable. In this case, the Performance Method must be used and must be included in the
submittal.
D | Check box to verify that a time control is required for a recirculating system pump for a system serving multiple units
Systems serving single dwelling units (See RM Table 5-4, Alternative Water Heating Systems for recirculation requirements)
Water Heater
Type/Fuel Type
£&-5p« <^A-S
Distribution
Type
-f^t-j
Number
in System
\
Rated
Input1
(kWor
Btu/hr)
Tank
Capacity
(gallons)
Energy
Factor1 or
Thermal
Efficiency
Standby1
Loss (%)
Tank
External
Insulation
R-Value
System serving multiple dwelling units (See Residential Manual Section 5.3.3)
Water Heater
Type
Distribution
Type
Number
in System
Rated
Input1
(kWor
Btu/hr)
Tank
Capacity
(gallons)
Energy
Factor1 or
Thermal
Efficiency
Standby1
Loss (%)
Tank
External
Insulation
R-Value
1) For small gas storage water heaters (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance, and heat pump water heaters, list
Energy Factor. For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency, Thermal
Efficiency and Standby Loss. For instantaneous gas water heaters, list Rated Input and Thermal Efficiencies.
Pipe Insulation (kitchen lines > 3/4 inches) All hot water pipes from the heating source to the kitchen fixtures
that are % inches or greater in diameter shall be thermally insulated as specified by Section 150 (j) 2 A or 150 (j) 2 B.
Residential Compliance Forms December 2005
CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 4 of 5)
Project Tide ^^^-^T^^^O fc^OirpUevJ
CF-1R
Date \~Z. f-z£f(J°r
SPECIAL FEATURES REQUIRING BUILDING OFFICAL or HERS RATER VERIFICATION
Indicate which special features are parts of this project The list below only represents special features relevant to the prescriptive method.
(Check Applicable boxes)
Category
Building Official
Verification of
Special Features
HERS Rater
Verification
HERS Rater
Diagnostic
Testing Measure
Ducts
D
D
D
100% of ducts in cravvtepace/basement
Buried ducts
Diagnostic supply duct location, surface area, and R-value
Duct increased R-value
Duct leakage
Ducts in attic with radiant barriers
Less than 12 ft. of duct- outside conditioned space
Non-standard duct location
Supply registers within two ft of floor
D
Envelope
n
Air retarding wrap
Cool roof
Exterior shades
High thermal mass
Inter-zone ventilation
Metal framed walls
Non-default vent heights
Quality insulation installation
Radiant barrier
Reduced infiltration (blower door). May also require mechanical ventilation.
Solar gain targeting (for sunspaces)
Sunspace with interzone surfaces
Vent area greater than 10%
HVAC Equipment
D
Adequate air flow
Air conditioner size
Air handler fan power
High EER
Hydronic heating systems
Mechanical ventilation
Refrigerant charge
Thermostatic expansion valve (TXV)
Zonal control
Water Heater
Combined hydronic
High EF for existing water heaters
Non-NAECA water heater
Non-standard water heaters (wh/unit)
Water heater distribution credits
Residential Compliance Forms December 2005
CERTIFICATE OF COMPLIANCE: RESIDENTIAL (Page 5 of 5) CF-1R
Date
Special Remarks
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and specifications needed to comply with Title 24,
Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This
certificate has been signed by the individual with overall design responsibility. The undersigned recognizes that
compliance using duct design, duct sealing, verification of refrigerant charge and TXVs, insulation installation
quality, and building envelope sealing require installer testing and certification and field verification by an
approved HERS rater.
Designer or Owner (per Business and Professions Code) Documentation Author
Tide/Finn:Titfe/Finn:
Address:Address:
Telephone:Telqphone:
License*: "
Enforcement Agency
Residential Compliance Forms December 2005
MANDATORY MEASURES SUMMARY: RESIDENTIAL (Page i of 2) MF-1R
ProjectTitle Date
Note: Low-rise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More
stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*) below. When this
checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component
performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only.
Instructions: deck or initial applicable boxes or check N A if not applicable and included wife the permit application
documentation.
DESCRIPTION
Building Envelope Measures:
* §150(a): Mrnirrmm R-19 in wood frame ceiling insulation or equivalent U-factor in metal frame ceiling.
§150(b): Loose fill insulation manufacturers labeled R- Value:
* § I 50(c): Minimum R-l 3 wall insulation in wood trained walls or equivalent U-tactor in metal frame walls (does not apply
to exterior mass walls).
* §150(d): Minimum R-l 3 raised Boor insulation in framed floors or equivalent U-factor.
§ 1 50(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs.
1 . Masonry and factory-built fireplaces have:
a. closcable metal or glass door covering the entire opening of the firebox
b. outside air intake with damper and control, flue damper and control
2. No continuous burning gas pilot lights allowed.
§150(f): Air retarding wrap installed to comply with §151 meets rwyiiremenls specified in the ACM Residential Manual.
§150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only.
§1 50(1): Slab edge insulation - water absorption rate for the insulation material alone without facings no greater than 0.3%,
water vapor permeance rate no greater than 2.0 perm/iinch.
§118: Insulation specified or installed meets insulation installation quality standards. Indicate type and include CF-6R
Form:
§116-§117: FcnestratioDPnxiucts,ExtcnorDo<^,ai^Infi}tratkji/Exffltiation Controls.
1 . Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field-rabncated) have label with certified U-factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification.
3 . Exterior doors and windows weather-stripped; all joints and penetrations caulked and sealed.
Space Conditioning, Water Heating and Plumbing System Measures:
§1 10-§1 13: HVAC equipment, water beaters, showerheads and lancets certified by tbe Energy Commission.
§150(h): Heating and/or cooling loads calculated in accordance with ASHRAE,SMACNA or ACCA.
§ 1 S0(i): Setback thermostat on all applicable Iv-atmg and/or cooling systems.
§1500: Water system pipe and tank insulation and cooling systems line insulation.
1. Storage gas water heaters rated with an Energy Factor less than 058 must be externally wrapped with insulation
having an installed thermal resistance of R-12 or greater.
2. Back-up tanks for solar system, unfired storage tanks, or other indirect bot water tanks have R-12 external insulation or
R-16 internal insulation and indicated on flic exterior of the tank showing the R-value.
3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Tmckness:
1 . First 5 feet of hot and cold water pipes closest to water heater tank, non-recirculating systems, and entire length
of recircubting sections of hot water pipes shall be insulated to Table 150B.
2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and
indirect bot water tank shall be insulated to Table 150-B and Equation 150-A.
4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A.
NA
s
a
sr
a
a
&
&
&
&
&
&
n
n
n
n
EK
n
n
CK
OB'
E/
tiry
De^ers
a/
n
B/
D
D
D
n
n
n
^
^^1
GX
W
CK
D
g/& Eifiii
D H|g|
D •— "n
a
D
n
Residential Compliance Forms December 2005
MANDATORY MEASURES SUMMARY: RESIDENTIAL (Page 2 of 2) MF-1R |
DESCRIPTION
Space Conditioning, Water Heating and numbing System Measures: (continued)
5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind.
6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in
conditioned space.
7. Solar water-heating systems/collectors are certified by the Solar Rating and Certification Corporation.
NA
v'
D
CK
&
inMWBMMiy
KJBB5a|§Designer [paSiffimj
SH^ip^^i
r— i f^HmSia
BSiSr™""^^^™****
* §150(m): Ducts and Fans |
1. An ducts and plenums installed, sealed and msulated to meet the requirement of fee CMC Sections 601, 602,603,604,605
and Standard 6-5; supply-air and return-air ducts and plenums are insulated to a minmum installed tevd of R.-4.2 or enclosed
entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct-closure system that meets the
applicable requirements of TJL 181, TJL 181A,orUL 181B or aerosol sealant that meets the requirements of UL 723. If
mastic or tape is used to seal openings greater t""i 1/4 inch, the combination of mastic and cither mesh or tape shall be used.
2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other th«a
sealed sheet metal, ducj board or flexible duct shall not be used for conveying conditioned air. Building cavities and
support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause
reductions in the cross-sectional area of toe ducts.
3 . Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes
unless such tape is used in combination with mastic and draw bands.
4. Exhaust fan systems have back draft or automatic dampers.
5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated
6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture, equipment
maintenance, and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water
retardant and provides shielding from solar radiation that can cause degradation of the material.
7. Flexible ducts cannot have porous inner cores.
D
&
D
D
CK"
D
D
^BJB^SgwIPI
D
D'
^GHH
H5BRraH||JMHa
^Hi> MJw!iift™fflm
EK
§ 1 1 4: Pool and Spa Heating Systems and Equipment
1 . A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the
heater, weatherproof operating instructions, no electric resistance heating and no pilot light
2. System is installed with:
a. at least 36" of pipe between filter and beater for future solar heating
b. cover for outdoor pools or outdoor spas
3. Pool system has directional inlets and a circulation pump time switch.
§115: Gas fired fen-type central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously
burning pilot light (Exception: Non-electrical cooking appliances with pilot < 150 Btu/hr)
§118(i): Cool Roof material meets specified criteria
GK n
BT
&1&
U
&
D
D
D
&
Residential Lighting Measures:
§150(k)l : HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as
outlined in Table 1 50-C, and do not contain a medium screw base socket (E24/E26). Ballast tor lamps 13 watts or greater
are electronic and have an output fiequency no less than 20 kHz
§1 500c)l : HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table
150-C, luminaire has factory installed HID ballast
§150(k)2: Permanently installed taminaircs in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as
determined in § 1 30 (c), of permanently ™yta11"<* imnirmire.* jn kitchens may be in luminaiics that are not high efficacy
luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy
§150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms and utility rooms shall be high efficacy
luminaires. OR are controlled by an occupant sensor(s) certified to comply with Section 1 19(d) that does not turn on
automatically or have an always on option.
§ 1 50(k)4: Permanently installed luminaires located other than in Iritahens, bathrooms, garages, laundry rooms, and utility
rooms shall be high efficacy luminaires (except closets less than 70ft2): OR are controlled by a dimmer switch OR are
controlled by an occupant sensor that complies with Section 1 19(d) that does not turn on automatically or have an always
on option
§150(k)S: Luminaires that are recessed into msiilatrd ceilings are approved for zero clearance insulation cover (1C) and are
certified airtight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals.
§150(k)6: Luminaires providing outdoor tighHng xnA permanenflv mounted to a residential building or to other buildings on
the same lot shall be high efficacy hiinimiiRv (not inducting ^g^^^g around swimming pools/water features or other
Article 680 locations) OR are controlled bv occupant sensors with integral photo control certified to comply with Section
119(d).
§150(lc)7: Lightn^ fOT paikmg tots fOT 8 or mere veMdes sriaU ha^^ 130, 132, and 147.
Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 1 30, 1 31, and 146.
§1500c)8: Permanently installed Iffitmg in the enclosed, non-dwelling spaces of low-rise residential buildings with four or
more dwelling units shall be high efficacy luminaires OR are controlled by occupant sensor(s) certified to comply with
Section 119(d).
D
a
D/
a/
a
a
a
B'
ef
Residential Compliance Forms December 2005
FENESTRAT1ON - MAXIMUM ALLOWED AREA WORKSHEET WS-4R
Project Title
FENESTRATION PRODUCTS - NEW CONSTRUCTION- NEW BUILDINGS
Use this table for new building construction to account for total building % of fenestration.
A
#/Type/Pos.
(Front, Left,
Rear, Right,
Skylight)
8
Orientation
North
South
East
West
Totals
C
Total
Fenestration,
West Facing
Area(f^L
rV\ " \
D
Total Fenestration for
N, S, E Orientations
Area (ft2)
N
E
CFA(ft2)
F
Total Percent of
West Facing
Fenestration1
(C/E)xlOO%
'X x -'..ft >.,-.. «., , ..-.•«-{
G
Total % of
Fenestration2
Including West
(D/E)xlOO% + F
1) If west facing area exceeds 5% of CFA in climate zones 2,4, and 7-15, the performance approach must be used
2) If total percent of fenestration exceeds 20% including West facing orientations then performance approach must be used. West facing area includes
skylights tilted to the west or tilted in any direction when the pitch is less than 1:12 for Package D only.
FENESTRATION PRODUCTS - NEW CONSTRUCTION- ADDITIONS
Dless than 100 ft2, Pi-ess than or Equal to 1000 ft2, D Greater 1000 ft2
A
#/Type/Pos.
(Front, Left,
Rear, Right,
Skylight).^-ij\wr
^KTT~
y&*e>**\u^*-
B
Orienta-
tion
North
South
East
West*
C
Proposed
Addition's
CFA1'2-3
^2^
t>Z-Aiz-t
i>2~4-
D
Proposed
Addition's
Fenestration
Area (ft2)4
^Iff
t>
•2>j&
E
FenesUtfUon
Area Removed to
make way for
Addition (ft2)2
-G&
F
Total Area
Added
Fenestration
(B-E)4*-*>&>
0
-Z£*
Total
G
Total % of West Facing
FeneslraUon
(G/Q x 100%
v -—
"- ** -* \, v, vs
-&*£,: ~"*< ,>v.' :i:.^
H
Total % of
Fenestra-
tion2-3-4
(F/QxlOO%
IL,$
H.O
&
-87*wr-'St:
1) Additions <100 sf are allowed to install up to 50ft2 of fenestration and are exempt from the 5% west facing and 20% maximum total area
limits and shall meet the U-factor and SHGC requirements of Package D. See Table 8-2 in the Residential Manual Note: Leave columns E, F,
G,H, and I blank.
2) Additions <1,000 ft2, the maximum net allowed fenestration is 20% and may be increased additionally to by the amount of glazing removed in
the wall that separates the addition from the existing house. However, the total West facing fenestration can not exceed 5% of the proposed
addition's CFA including skylights orientated in any direction and tilted with a pitch of < 1:12. Column G can not exceed 5% and Column H can
not exceed 20%.
3) Additions >1,000 ft*, must meet Package D requirements. See Table 8-2 and Table 151-C in Appendix B of the KM or use Performance Approach.
4) The 5%west orientation restrictions are only for Climate zones 2,4, and 7-15; for Climate Zones 2,4 and 7-15 enter zero (0) in column E.
FENESTRATION PRODUCTS; ALTERATIONS
A
Existing
CFA
(fl2)
B
Existing
Orientation
North
South
East
West
Total
C
Existing
Area
(ft2)
D
Removed
Orientation
North
South
East
West
Total
E
Removed
Area
(ft2)
F
Proposed
Installed
Orientation
North
South
East
West
Total
G
Proposed
Installed
New Area
(02)
H
Total Net
Fenestration
(ft2)
(C-E+G)
I
Total % of
Fenestra-tion '
(H/A)xlOO%
Max of 20%
1) When 50 ft2 or more of fenestration area is added to an existing building, then the fenestration must meet the requirements of Package D.
2) The area requirement for the total fenestration area for the whole building, including the added fenestration, must not exceed 20%.
Otherwise, the Performance Approach must be used. See Section 8.33 in the RM for further details.
Residential Compliance Forms December 2005
STANDARDS TABLE 151-C ALTERNATIVE CQM&QNENT PACKAGE D
Climate Zone
BUILDING
ENVELOPE
Insulation
minimums1
Ceiling
Wood-frame
walls
"Heavy mass"
walls
"Light mass'
walls
Below-grade
walls
Slab floor
perimeter
Raised floors
Concrete raised
floors
Radiant Barrier
FENESTRATION
Maximum U-
factor2
Maximum
Solar Heat Gain
Coefficient
(SHGC)3
Maximum total
area
Maximum West
facing area
THERMAL MASS'
SPACE-HEATING5
Electric-resistant
allowed
lfgas,AFUE =
If heat pump,
HSPFS =
SPACE-COOLING
SEER =
If split system,
Refrigerant
charge
measurement or
Thermostatic
Expansion valve
DUCTS
Duct sealing
Duct Insulation
WATER-HEATING
1
R38
R21
2 3 4 5 6 (^ 7^)
R30 R30 R30 R30 R30 R30
R13 R13 R13 R13 R13 R13
8
R30
R13
9
R30
R13
10
R30
R13
11
R38
R19
12
R38
R19
13
R38
R19
14
R38
R21
15
R38
R21
16
R38
R21
(R4.76) (R2.44) (R2.44) (R2.44) (RZ44) (R2.44) (R2.44) (R2.44) (R2.44) (R2.44) (R4.76) (R4.76) (R4.76) (R4.76) (R4.76) (R4.76)
NA
RO
NR
R19
R8
NR
0.57
NR
20%
NR
NR
No
MIN
MIN
MIN
NR
REQ6
R-6
NA NA NA NA NA NA
RO RO RO RO RO RO
NR NR NR NR NR NR
R19 R19 R19 R19 R19 R19
R8 RO RO RO RO RO
REQ NR REQ NR NR NR
0.57 0.67 0.67 0.67 0.67 0.67
0.40 NR 0.40 NR NR 0.40
20% 20% 20% 20% 20% 20%
5% NR 5% NR NR 5%
NR NR NR NR NR NR
No No No No No No
MIN MIN MIN MIN MIN MIN
MIN MIN MIN MIN MIN MIN
MIN MIN MIN MIN MIN MIN
REQS NR NR NR NR NR
REQ' REQ10 REQ" REQ10 REQ10 REQ10
R-6 R-6 R-6 R-6 R-4.2 R-4.2
NA
RO
NR
R19
RO
REQ
0.67
0.40
20%
5%
NR
No
MIN
MIN
MIN
REQ8
REQ9
R-4.2
NA
RO
NR
R19
RO
REQ
0.67
0.40
20%
5%
NR
No
MIN
MIN
MIN
REQ9
REQ9
R-6
NA
RO
NR
R19
RO
REQ
0.57
0.40
20%
5%
NR
No
MIN
MIN
MIN
REQ12
REQ12
R-6
NA
RO
NR
R19
R8
REQ
0.57
0.40
20%
5%
NR
No
MIN
MIN
MIN
REQ12
REQ12
R-6
NA
RO
NR
R19
R4
REQ
0.57
0.40
20%
5%
NR
No
MIN
MIN
MIN
REQ12
REQ12
R-6
NA
RO
NR
R19
R8
REQ
0.57
0.40
20%
5%
NR
No
MIN
MIN
MIN
REQ"
REQ13
R-6
NA
RO
NR
R19
R8
REQ
0.57
0.40
20%
5%
NR
No
MIN
MIN
MIN
REQ"
REQ"
R-8
NA
RO
NR
R19
R4
REQ
0.57
0.40
20%
5%
NR
No
MIN
MIN
MIN
REQ
REQ
R-8
NA
R13
R7
R19
R8
NR
0.55
NR
20%
NR
NR
No
MIN
MIN
MIN
NR
REQ8
R-8
System shaH meet Section 151 (f) 8 or Section 151 b
2005 Standards Tables 151-B and 151-C 8-6
Notes to Standards Tables 151-B and 151-C
1. The R-values shown for ceiling, wood frame wall and raised floor are for wood-frame
construction with insulation instated between the framing members. For alternative
construction assemblies, see Section 151 (f) 1 A. The heavy mass wall R-value in
parentheses is the minimum R-value for the entire wall assembly rf the wall weight exceeds
40 pounds per square foot. The light mass waB R-value in brackets is the minimum R-value
for the entire assembly if the heat capacity of the wall meets or exceeds the result of
multiplying the bracketed minimum R-value by 0.65. Any insulation installed on heavy or
light mass walls must be integral with, or installed on the outside of, the exterior mass. The
inside surface of the thermal mass, including plaster or gypsum board in direct contact with
the masonry wall, shall be exposed to the room air. The exterior wall used to meet the R-
value in parentheses cannot also be used to meet the thermal mass requirement.
2. The installed fenestration products shall meet the requirements of §151 (f) 3 and §151 (f) 4
3. The installed fenestration products shall meet the requirements of Section 151 (f) 4.
4. If the package requires thermal mass, the thermal mass shall meet the requirements of
Section 151 (f) 5.
5. Automatic setback thermostats shall be installed in conjunction with all space-heating
systems in accordance with Section 151 (f) 9.
6. HSPF means "heating seasonal performance factor."
7. Electric-resistance water heating may be installed as the main water heating source in
Package C only if the water heater is located within the building envelope and a minimum of
25 percent of the energy for water heating is provided by a passive or active solar system or
a wood stove boiler. A wood stove boiler credit shall not be used in Climate Zones 8,10, and
15, nor in localities that do not allow wood stoves.
8. As an alternative under Package 0 in climate zones 1 and 16, glazing with a maximum 0.42
U-factor and a 90% AFUE furnace or a 7.6 HSPF heat pump may be substituted for duct
sealing. AH other requirements of Package 0 must be met.
9. As an alternative under Package D in climate zones 2,8, and 9, glazing with a maximum
0.38 U-factor and maximum 0.31 SHGC may be substituted for duct sealing and either
refrigerant charge measurement or a thermostatic expansion valve. All other requirements of
Package D must be met.
As an alternative under Package D in climate zones 3,5,6 and 7, glazing with a maximum
0.42 U-factor may be substituted for duct sealing. All other requirements of Package D must
be met.
11. As an alternative under Package D in climate zone 4, glazing with a maximum 0.38 U-factor
and maximum 0.36 Solar Heat Gain Coefficient may be substituted for duct sealing. All other
requirements of Package D must be met
12. As an alternative under Package 0 in climate zones 10,11, and 12, glazing with a maximum
0.38 U-factor and maximum 0.31 Solar Heat Gain Coefficient, and a minimum 13.0 SEER
space cooling system may be substituted for duct sealing and either refrigerant charge
measurement or a thermostatic expansion valve. All other requirements of Package D must
be met.
13. As an alternative under Package D in climate zone 13, glazing with a maximum 0.38 U-
factor and maximum 0.31 Solar Heat Gain Coefficient, and a minimum 15.0 SEER space
cooling system may be substituted for duct sealing and either refrigerant charge
measurement or a thermostatic expansion valve. All other requirements of Package D must
be met
14. As an alternative under Package D in climate zone 14, glazing with a maximum 0.38 U-
facfor and maximum 0.31 Solar Heat Gain Coefficient, and a minimum 16.0 SEER space
cooling system may be substituted for duct sealing and either refrigerant charge
measurement or a thermostatic expansion valve. All other requirements of Package D must
be met.
2005 Standards Tables 151-B and 151-C B-7
^
^? ??l ^
>g o8> 5
!o• ;0
8 u rs>"I «' v> S
no
^
f
2 2
:i
i^^is.
»
X
^5s
D
Q