HomeMy WebLinkAbout2612 Wadsworth St; ; CBR2016-0270; Recycle{city of
Carlsbad
Owner:
WASTE MANAGEMENT
PLAN
8-59
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Job Address: 6)'9 tJ [µg,ol <;. U)c.(-\:"'1 5 + Phone Number:_q_'t_q~-~3~l~D_-_l_()_~_q~----
Permit#: CB\l.90 l~ "O,) 70 Estimated Cost of Project: $ sa '!:, f D53 . H> .
Type of Project: r}rNew Construction D Remodel or T.I. D Residential D Commercial D Demolition
~heckallthatapp~) OOther -----------------------------~
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Table 1-Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED Waste Hauling Company or Re-Use Method
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
· Metals
Mixed Waste
Trash Garba e
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled S(p %
Contractor or Owner (signature) Date
Official Use Only
D Plan Approved D Pl,rn Denied D Project Valuation Approved
Reviewed/ Approved by:, ________________ _
Page 1 of 2
Table 2 -Actual Waste (To be completed after construction.)
MATERIALS
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash Garba e
other:
TOTAL lbs.:
lbs. of waste taken to
LANDFILL
Actual Percentage Re-Used or Recycled
Official Use Only
lbs. of waste
RE-USED or RECYCLED
£1 %
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
D 50% Goal Achieved D 50% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ ______ _
Reviewed/ Approved by:. _________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt I Concrete 0 2000
Brick I Masonry 100 450
Cardboard 0 150
Drywall 0 50
Landscape Debris 0 120
Lumber I Wood 500 0
Metals 300 200
Mixed Waste 1500 0
Trash I Garbage 300 0
Other: "PooL c.;uV1..Cte 0 ~00
TOTAL lbs.: 2700 3g70
Percentage to be Re-Used or Recycled 59 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
Waste Hauling Company or Re-Use Method
A'fsC t-tciuLLV1..v1 Co.
WM I Rt-l/\.Seo( "tsrfolz OVv-sLte
A'fsC t-tciuLLV\..a Co.
A1sC t-tciuLLV1..v1 Co.
MuLcJ1eo! c; Rt-useo( OVv-sLte
wciste M£i1V1..lilC\eV1A.eV1..t
WM I A'fsC t-tciuLLVvg
WM
WM
l/\.Seo( lils crusviec!. 'fslilse DVv-sLte
3870 X 100 = 59% Re-Used or Recycled
(2700 + 3870)
Since 59% exceeds the minimum requirement of 50%, this plan complies.
Page 2 of 2
·":"'·
BY
---------··-· -----------Thank You!
... :.~~~ .'
--~---------------------------=..-------------------
BY· fffe/dlz K
-------------------Thank You!
54 Ticket#: 1543134
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008 Weighmaster: arangmi
(760)603-0153 In: January 20, 2017
333367 -RUBIO CONSTRUCTION SERVICES INC Out: J 20 2017 26341 JEFFERSON AVE STE#G anuary 1
MURRIETA, CA 92562 Vehicle: A35639
Contract: INDUSTRIAL-GATE 2
GROSS 34,260 Scale In
TARE 27 ,840 Tare Out
NET 6,420
Tracking Qty: 0.00
Qty
3 .21
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
100%
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$66.00 $211.86
Tax
$0.00
Total
Paid
Change
7:43 am
7:43 am
Total
$211.86
$211. 86
$0.00
$0.00
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
54 Ticket #: 1553228
Weighmaster: juareom
(760)603-0153 In: February 14, 2017
333367 -RUBIO CONSTRUCTION SERVICES INC Out: February 14, 2017 26341 JEFFERSON AVE STE#G
MURRIETA, CA 92562 Vehicle : a10101
Contract : COMM-GATE Yr. 200
GROSS 20,180
TARE 16,360
NET 3,820
Tracking Qty: 0 .00
Qty
1. 91
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
Scale In
Tare Out
100%
Ref:
BOL:
INBOUND
INVOICE
-Rate Extension
$66.00 $126.06
Tax
$0.00
Total
Paid
Change
7:14 am
7:14 am
Total
$126.06
$126.06
$0.00
$0.00
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
54 Ticket#: 1559578
Weighrnaster: gomezda
(760)603-0153 In: March 01 , 2017
333367 -RUBIO CONSTRUCTION SERVICES INC Out: March 01 , 2017 26341 JEFFERSON AVE STE#G
MURRIETA, CA 92562 Vehicle: al0101
Contract: COMM-GATE Yr. 200
GROSS 19,220 Scale In
TARE 16,360 Tare Out
NET 2,860
Tracking Qty: 0.00
Qty
1. 43
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
100%
Ref:
BOL :
INBOUND
INVOICE
Rate Extension
$66 .00 $94.38
Tax
$0.00
Total
Paid
Change
10:31 am
10:31 am
Total
$94 .38
$94.38
$0.00
$0 .00
Es condido Resource Recovery
1044 W Washington Ave
Es=cndido, CA 92025
i7f,lZ!) 7,'.1,5·-32l?J3
1203 Ti,C'ket: L~3288
RUBIO CONSTRUCTION SERV I
26341 JEFFERSON AVE, #G
MURfHETF-1~ CA 9256;=:
Da·Ct? :· 03/ ! 7 I 1. 7
Units R.;:d; e
In: 7: 49
Out: e,: 02
;.Nl)OICE
.. / Tr r.1c k ~ 9'YJ? Co1fa i n~H': ·
.f~:~out2~ 01511
,·.:··-Origin: @1E Esc,::>ndidc; f-r ·j / '
Ext~ n d'.ffrj .
··~\ .. •.:'::, . Ch2.r-§;e·,;· .. :
:1 ~~; ~HAUL REFUSE 12.88
[Sr~ss (In> ~ 54,260. lbs Scl#1
7 £1.·. IZi~~t per TON 953. i';~'\_:.
VIOLETP.
Tare 28,500. lbs Scl#l Net: 25, 7f.,1Zl. ltnJ
. t
TOTAL DUE
Driv i?r
lfUU l'IJ}\./<.W.l:',LL t\U CHULA VISTA, CA 91911
() -
400212 -RUBIO CONSTRUCTION SERVICES INC
26341JEFFERSON AVE STE#G
MURRIETA, CA 92562
Contract: GATE RATE
vvc,l..'.::fJ..LUlU+..J '-............ •. ---·-J -
' In: April 06,
.,
Out: April 06,
~Jehicle: A41577
Ref:
BOL:
GROSS 24,320 Scale In -..
TARE 19,300 Tare Out
NET -----5, q20.
Tracking Qty: 0.00
Qty Unit Description
2 .51 TN MSW
Origin: CHULA VISTA 100%
1. 00 ENVIRONMENTAL FEE 1
1. 00 FUEL RECOVERY FEE
·~., ·' .. I. _.·.,-,1,J
Signature:
INBOUND
INVOICE
Rate Extension
$83.50 $209.59
$16.25 $16 .25
5.35 $11. 21
2017
2017
Tax
$0.00
$0.00
$0 .00
Total
Paid
Change
8 :10 am
8:10 am
Total
$209 .59
$16.25
$11.21
$237 .05
$0 .00
$0.00
54 Ticket #: 1589504
PALOMAR TRANSFER
5960 EL CAMI NO REAL
CARLSBAD, CA 92008 Weighmaster: gomezda
(760)603-0153 In: May 04, 2017
333367 -RUBIO CONSTRUCTION SERVICES INC Out :
26341 JEFFERSON AVE STE#G May 04 , 2017
a35720 MURRIETA, CA 92562 Vehicle:
Contract: COMM-GATE Yr. 200
GROSS 20 ,300 Scale In
TARE 16,800 Tare Out
NET 3,500
Tracking Qty: 0 .00
Qty
1. 75
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
100%
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$66.00 $1l5.50
f
/
Tax
$0 .00
i ,
To'
7 :18 am
7 :18 am
Total
$115 . 50
I
/ /
I .,
I '
I
' . AGRISCAPE, INC . 108730 j
37760 Borel Road l Murrieta, CA 92563 /.;;2 1 (951) 69&0651
DATE :2 2o_LJ. .l I
1 l-1 'R ub'Q l D. u,.<; -f ~ t 2 c+1 D tv ·I . 0.! RECEIVED FROM $1 i I j
; -l,{)Qfl l ~ 'M , For (1;p-,M ·, v • Truck# nme
; c ··-· '.i ; ., . ·-~~ D CASH J : AMOUNT OF ACCOJNT t "-.\.
Thank Youl J
.l
j
! . \
r
La.
THIS PAYMENT D, CHECK
BA1ANCE DUE D CHARGE
ht :, 7 :t: -'rs ... .,, .. ,
. -.. ,_ ·--·-·-----·-·---·-·-------~ ........ _, __ .---·· ... ·---------..
__ s_v:·_,·----~--'~ __ p ___ ~-~---~-~-•~_:_;_~-~-~~~-j-~--~--~----Th~nkTou!
' .
P ..
CHECK
NAME
76 SAND & GRAVEL
CONCRETE & ASPHALT RECYCLE
POBOX965
BONSALL, CA 92003
SALES: (760) 497-6041
JOB#
CHARGE COMMERCIAL RESIDENCE TIME
\ . \
. \""-.. l..~..-.\~ . . i z__ C :'Q.,. l.
CITY OF ORIGIN
JOB LOCATION ? ..
J : \
' -< L .C}'( \c
,. ... -~ .... _._-..., . -' --..
PU rRAILER rLATBED BOBTAIL 110-~~EEL I END DUMP I T & T
.,...·"\,
MATERIAL ', \ 1 /'
LOAD COUNT i'-~·\ \ :.,.~ t ; !, ~-.
1 2 3 4 5 6 7 8 9
/'< .7' --
~\2 • '1 \ (....,
#LOADS X OTHER CHARGES
$
TOTA[
/ . .,
•• ~I' •• J 'i .• : /
SIGNATURE TRUCK#
10
All bills due upon presentation_unless otherwise
arranged in advance. Open accounts subject to
1 1/2% month, charge after 30 days unpaid
balance.
76 SAND & GRAVEL is not responsible
for damage to vehicle while being loaded
or unloaded In yard.
JOB COPY