HomeMy WebLinkAbout2614 GARDEN HOUSE RD; ; CB044579; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
02-11-2005 Residential Permit Permit No: CB044579
Building Inspection Request Line (760) 602-2725 ... •
Job Address: 2614 GARDEN HOUSE RD CBAD
Permit Type: RESDNTL Sub Type: SFD Status:
Parcel No: 2131713000 Lot#: 417
NEW
CT02-14
Applied:
Valuation: $230,901.00 Construction Type: Entered By:
Occupancy Group:
02/11/2005
# Dwelling Units:
Reference #:
Structure Type: SFD Issued:
Bedrooms: 3 Bathrooms: 2.5 Inspect Area:
Project Title: GARDENSIDE@BRESSI PH 2 -PLN 4 Orig PC#:
2544SF LIVING,459 SF GARAGE, 119SF PORCH Plan Check#:
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$950.04
$0.00
$617.53
$0.00
($49.40)
$23.09
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
D5/8
$0.00
$0.00
Owner:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFD Payoff Fee
PFF
PFF (CFD Fund)
License Tax
License Tax (CFD Fund)
Traffic Impact Fee
Traffic Impact (CFD Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
ISSUED
12/03/2004
SB
Plan Approved:
02/11/2005
TP
PC03-66
PC04-137
$0.00
$160.00
$2,004.00
$2,848.90
$4,202.40
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$126.00
$60.00
$72.00
$0.00
$0.00
$0.00
$0.00
$1,735.00
$457.00
$19,301.56
Total Fees: $19,301.56 Total Payments To Date: $0.00 Balance Due: $19,301.56
Inspector: ~ FINAL APPR9VAL
Date: &'//$/()5'"
1713 02/11/05 0002 01
CGP
Clearance:
NOTICE: Please take NOTICE that approval oi your project includes the "Imposition" of fees. dedications, reservations, or other exactions hereaiter collectively
referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which 11ou have nreviouslv been niven a NOTICE similar to this or as to which the statute of limitations has nreviouslv otherwise exnired.
02
19301 .. 56
·city of Carlsbad Bldg Inspection Request
For: 08/12/2005
Permit# CB044579
Title: GARDENSIDE@BRESSI PH 2 -PLN 4
Description: 2544SF LIVING,459 SF GARAGE, 119SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
2614 GARDEN HOUSE RD
Lot 417
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time:
CD Description Act Comment
19 Final Structural !lL
29 Final Plumbing t= 39 Final Electrical
49 Final Mechanical
--··
Associated PCRs/CVs
lns12ection Histo!Y
Date Description Act lnsp Comments
08/11/2005 89 Final Combo NR BN
Inspector Assignment: TP ---
'"''''~'''
Inspector:
Requested By: ROBERT
Entered By: CHRISTINE
08/10/2005 89 Final Combo co PC 1) CLEAN OUT @ FRONT
07/20/2005 37 Temp. Occ./Tents/Circus AP PC EMR
06/2012005 82 Drywall/Ext Lath/Gas Test AP TP
06/17/2005 82 Drywall/Ext Lath/Gas Test NS TP
06/16/2005 82 Drywall/Ext Lath/Gas Test NR TP
06/09/2005 16 Insulation AP TP
06/06/2005 84 Rough Combo AP TP
06/03/2005 14 Frame/Steel/Bolting/Welding NR TP
05/19/2005 13 Shear Panels/HD's AP TP
05/18/2005 13 Shear Panels/HD's co TP N/COMP
05/12/2005 15 Roof/Reroof co PC CHECK HOP SUPPORT @ KIT AREA @ FRAME OK TO DRY IN ROOF
03/21/2005 11 Ftg/Foundation/Piers AP TP
03/21/2005 12 Steel/Bond Beam AP TP
03/03/2005 21 Underground/Under Floor AP TP
03/03/2005 22 Sewer/Water Service AP TP