HomeMy WebLinkAbout2621 ACUNA CT; ; CB970373; PermitBUILDING PERMIT Permit No: CB970373
04/01/97 10: 04 Project No: A9700518 Page 1 of 1 Development No:
Job Address: 2621 ACUNA CT suite:
Permit Type: RESIDENTAL ADD/ALT
Parcel No: 215-491-14-00 Lot# :
Valuation: 30,000 Construction Type: VN
Occupancy Group: Reference#: Status: PENDING Description: ADDITION OF DECK AND OFFICE Applied: 02/27/97 Apr/Issue:
Entered By: MDP.
Appl/Ownr : JOHNSON, GARY 619 633-3750
998 WINDSOR CREEK
CARDIFF, CA. 92007
". ~ ~~~~ ~~~
*** Fees Required *** *** Fees Collected & Credits ***
""""""""""""""
-
Fees : 508.00
""""""_"""""""""""""""-
Adjustments: .oo Total Credits: .oo Total Fees: 508.00 Total Payments: 189.00 Balance Due: 319.00
Fee description Units Fee/Unit Ext fee Data _"""""""""""""""""""""""""""""""""""""
Building Permit 285.00 Plan Check 185.00 Strong Motion Fee 3.00 * BUILDING TOTAL 473.00 Enter layn for Electric Issue Fee > 10.00 Y
Enter nYlo for Remodel > 10.00 Y * ELECTRICAL TOTAL 20.00 Enter for Mechanical Issue Fee> 15.00 Y * MECHANICAL TOTAL 15.00
DATE: 01/02/98
TO: JOHNSON, GARY
998 WINDSOR CREEK
CARDIFF, CA. 92007
PLAN CHECK EXPIRATION
ADDRESS: 2621 ACUNA CT PC# CB970373 DATE: 02/27/98
You have applied to have your plans checked on the date shown
above, and you have not obtained your building permit.
The provisions of Section 304(d) of the Uniform Building Code
state:
"Section 304(d) Expiration of Plan Review
Applications for which no permit is issued within one year following the date of application shall expire by limitation, and
may thereafter be returned to the applicant plans and other data submitted for review
or destroyed by the Building Official.
In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee."
Please check the appropriate box indicating your choice and return this letter to the BUILDING DEPARTMENT.
- PROJECT ABANDONED. I WILL PICK UP PLANS WITHIN 10 DAYS.
- PROJECT ABANWNED. PLANS MAY BE DESTROYED.
If you have any questions, please contact the Building Department at (619) 438-1161 extension 4331.
RAENETTE ABBEY Building Department
2075 Las Palmas Drive - Carlsbad, California 92009 - (619) 438-1161
PERMIT APPLICATION
CITY OF CARLSBAD BUILDING DEPARTMENT
2075 Las Palrnas Dr., Carlsbad CA 92009
(760) 438-1161
FOR OFFICE USE ONLY 77 -3 13
PLAN CHECK NO.
EST. VAL. 3q ad
Plan Ck. Deposit \ k7*
Validated By
Date ZfL? I $',
A
Name Address City Statelzip Telephone #
State License X License Class City Business License #
Designer Name Address City Statelzip Telephone
4. i plan to provide portions of the work. but I have hired the following person to coordinate, supervise and provide thn major work (include name I address I phone number I contra~tors license numberl:
5. I will provide some of the work, but I have ContmRed (hired) the following persons to provide the work indicated (include name I address I phone number I type
of work):
EsGil Corporation
DATE: MARCH 27, 1997
JURISDICTION: Carlsbad
PLAN CHECK NO.: 97-373
0 PLAN REVIEWER
0 FILE
SET11
PROJECT ADDRESS: 2621 Acuna Ct.
PROJECT NAME: DAVID JENKINS SFD ADDITION
x The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's ***** codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's ****" codes
when minor deficiencies identified below are resolved and checked by building department
staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
rA The applicant's copy of the check list has been sent to:
Esgil Corporation staff did not advise the applicant that the plan check has been completed,
0 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person 0 REMARKS:
By: Sergio Azuelalre
Esgil Corporation 0 GA 0 CM 0 EJ PC
Enclosures:
trnsmtl.dot
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
.
EsGil Corporation
DATE: March 12, 1997
JURISDICTION: Carlsbad
PLAN CHECK NO.: 97-373
0 APPLICANT
0 PLAN REVIEWER
0 FILE
SET I
PROJECT ADDRESS: 2621 Acuna Ct.
PROJECT NAME: DAVID JENKINS SFD ADDITION
0 The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's ****"** codes.
0 The plans transmitted herewith will substantially comply with the jurisdiction's tm*m** codes
when minor deficiencies identified below are resolved and checked by building department
staff.
0 The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
[XI The check list transmitted herewith is for your information. The plans are being held at Esgil
Corporation until corrected plans are submitted for recheck.
0 The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
[XI The applicant's copy of the check list has been sent to:
Gary C. Johnson
988 Windsor Creek, Cardiff, CA 92007
Esgil Corporation staff did not advise the applicant that the plan check has been completed.
[7 Esgil Corporation staff did advise the applicant that the plan check has been completed. '
Person contacted: Telephone #:
Date contacted: (by: 1 Fax #:
Mail Telephone Fax In Person
[7 REMARKS:
By: Sergio Anrela Enclosures:
Esgil Corporation
GA 0 CM 0 EJ 0 PC 03/03 trnsmtl.dd
9320 Chesapeake Drive, Suite 208 + San Diego, California 92123 + (619) 560-1468 + Fax (619) 560-1576
Carlsbad 97-373
March 12, 1997
PLAN REVIEW CORRECTION LIST
SINGLE FAMILY DWELLINGS AND DUPLEXES
ROJECT ADDRESS: 2621 Acuna Ct.
LOOR AREA: 275 SF office STORIES: 1
HEIGHT:
E PLANS RECEIVED BY DATE PLANS RECEIVED BY
ESGIL CORPORATION: 03/03
PLAN REVIEWER: Sergio Azuela
FOREWORD (PLEASE READ):
This plan review is limited to the technical requirements contained in the Uniform Building
Code, Uniform Plumbing Code, Uniform Mechanical Code, National Electrical Code and state
laws regulating energy conservation, noise attenuation and access for the disabled. This plan
review is based on regulations enforced by the Building Department. You may have other
corrections based on laws and ordinance by the Planning Department, Engineering
Department, Fire Department or other departments. Clearance from those departments may be
required prior to the issuance of a building permit.
Present California law mandates that residential construction comply with Title 24 and the
following model codes: 1994 UBC (effective 12/28/95), 1994 UPC (effective 12/28/95), 1994
UMC (effective 2/23/96) and 1993 NEC (effective 12/28/95).
The above regulations apply to residential construction, regardless of the code editions
adopted by ordinance.
The following items listed need clarification, modification or change. All items must be satisfied
before the plans will be in conformance with the cited codes and regulations. Per Sec. 106.4.3,
1994 Uniform Building Code, the approval of the plans does not permit the violation of any
state, county or city law.
To speed up the recheck process. please note on this list (or a COPY) where each
correction item has been addressed. i.e.. plan sheet number, specification section, etc.
Be sure to enclose the marked up list when vou submit the revised plans.
LIST NO. 1, GENERAL SINGLE FAMILY DWELLINGS AND DUPLEXES WITHOUT SUPPLEMENTS (1994 U6C) r3fom.dot
I
Carlsbad 97-373
March 12, 1997
PLANS
1. Please make all corrections on the original tracings, as requested in the
correction list.
Submit three sets of plans for commerciallindustrial projects (two sets of plans
for residential projects). For expeditious processing, corrected sets can be
submitted in one of two ways:
the City of Carlsbad Building Department, 2075 Las Palmas Drive, Carlsbad, CA
92009, (619) 438-1 161. The City will route the plans to EsGil Corporation
and the Carlsbad Planning, Engineering and Fire Departments.
2. Bring one corrected set of plans and calculationslreports to EsGil
Corporation, 9320 Chesapeake Drive, Suite 208, San Diego, CA 92123, (619)
560-1468. Deliver all remaining sets of plans and calculationslreports directly to
the City of Carlsbad Building Department for routing to their Planning,
Engineering and Fire Departments.
NOTE: Plans that are submitted directly to EsGil Corporation only will not
be reviewed by the City Planning, Engineering and Fire Departments until review
by EsGil Corporation is complete.
1. Deliver all corrected sets of plans and calculationslreports directly to
2. All sheets of plans must be signed by the person responsible for their
preparation. (California Business and Professions Code).
3. Plans, specifications and calculations shall be signed and sealed by the
California state licensed engineer or architect responsible for their preparation,
for plans deviating from conventional wood frame construction. Specify
expiration date of license. (California Business and Professions Code). fi
structural sheets IS4 and S-5 are missinal.
4. Specify on the Title Sheet of the plans the gross floor area of each element of
this project, including dwelling, garage, carport, patio, deck and balcony. Section
106.3.3.
0 FIRE PROTECTION
5. Show locations of permanently wired smoke detectors with battery backup:
a) inside each bedroom.
b) Centrally located in corridor or area giving access to sleeping rooms.
c) In rooms adjacent to hallways serving bedrooms, when such rooms have
a ceiling height 24 inches or more above the ceiling height in the hallway.
NOTE: Detectors shall sound an alarm audible in sleeping areas of the unit.
Section 31 0.9.1.
6. When the valuation of a room addition or repair exceeds $1,000, or when
sleeping rooms are created, smoke detectors shall be provided per the above,
except that smoke detectors added at existing construction need only be battery
powered. Section 310.9.1.2. Show smoke detector on plans.
Carlsbad 97-373
March 12, 1997
7.
8.
9.
IO.
11.
12.
GENERAL RESIDENTIAL REQUIREMENTS
Glazing in the following locations should be of safety glazing material in accordance
with Section 2406.4 (see exceptions):
a) Fixed and sliding panels of sliding door assemblies and panels in swinging
doors other than wardrobe doors.
b) Fixed or operable panels adjacent to a door where the nearest exposed edge
of the glazing is within a 24-inch arc of either vertical edge of the door in a
closed position and where the bottom exposed edge of the glazing is less
than 60 inches above the walking surface.
EXITS, STAIRWAYS, AND RAILINGS
Guardrails (Section 509.1):
a) Shall be installed at balconies or porches more than 30" above grade or
b) Shall have a height of 36'.
c) Shall be detailed showing adequacy of connections to resist the
horizontal force prescribed in Table 16-B.
d) Openings between railings shall be less than 4".
floor below. Around the Jacuzzi area.
ROOFING
Specify roof slope.
Specify roof material and application. Chapter 15.
Specify on the plans the following information for the roof materials, per Section
106.3.3:
a) Manufacturer's name.
b) Product namelnumber.
c) ICBO approval number, or equal.
Provide skylight details to show compliance with Sections 2409 and 2603, or
specify on the plans the following information for the skylight(s), per Section
106.3.3:
a) Manufacturer's name.
b) Model namelnumber.
c) ICBO approval number, or equal.
Carlsbad 97-373
March 12, 1997
CONCRETE AND MASONRY
13. Show height and construction details of all masonry or concrete walls. Chapters
21 and 19. Show it on plans at the Jacuzzi area.
14. Show minimum underfloor access of 18" x 24". Section 2317.3.
15. Show minimum underfloor ventilation equal to 1 sq. ft. for each 150 sq. ft. of
underfloor area. Openings shall be as close to corners as practical and shall
provide cross ventilation on at least two approximately opposite sides. Section
231 7.7.
CARLSBAD S.F.D. 8 DUPLEX SUPPLEMENT
16. All structures require a Class B roof covering, except room additions. If a room
addition covers all of the existing building (2nd story addition), then the above
exception doesn't apply.
MISCELLANEOUS
17. Plans provided were incomplete please provide a complete set of plans.
Include the window schedule, finish schedule, electrical outlets, roofing, etc.
18. Provide a positive connection between the new and the existing framing.
To speed up the review process, note on this list (or a copy) where each correction
item has been addressed, Le., plan sheet, note or detail number, calculation page, etc.
Please indicate here if any changes have been made to the plans that are not a result
of corrections from this list. If there are other changes, please briefly describe them
and where they are located in the plans.
Have changes been made to the plans not resulting from this correction list? Please
indicate:
Yes 0 No 0
The jurisdiction has contracted with Esgil Corporation located at 9320 Chesapeake
Drive, Suite 208, San Diego, California 92123; telephone number of 619/560-1468, to
perform the plan review for your project. If you have any questions regarding these plan
review items, please contact Sergio hela at Esgil Corporation. Thank you.
Carlsbad 97-373
March 12, 1997
VALUATION AND PLAN CHECK FEE
JURISDICTION: Carlsbad PLAN CHECK NO.: 97-373
PREPARED BY: Sergio Azuela DATE: March 12, 1997
BUILDING ADDRESS: 2621 Acuna Ct. David Jenkins SFD addition
BUILDING OCCUPANCY: R3 TYPE OF CONSTRUCTION: VN
TOTAL VALUE
IXI 1991 UBC Building Permit Fee 0 Bldg. Permit Fee by ordinance: $ 284.50
1991 UBC Plan Check Fee 0 Plan Check Fee by ordinance: $ 184.93
Type of Review: Complete Review 0 Structural Only 0 Hourly
0 Repetitive Fee Applicable 0 Other:
Esgil Plan Review Fee: $ 147.94
Comments:
Sheet 1 of 1
macvalue.doc 5196
.
.-
BUILDING PLANCHECK CHECKLIST
PLANCHECK NO.: CB 97- 3 73
PROJECT DESCRIPTION: + ACCL
ASSESSORS PARCEL NUMBER: z~r-~lq~. 14 EST. VALUE: 30) 000
ENGINEERING DEPARTMENT '' 7r-4 fc' 182. APPROVAL DENIAL
The item you have submitted for review has been
approved. The approval is based on plans,
Please see
submittal: therefore any changes to these items after
marked wit b ake necessaly corrections to plans
attached report of deficiencies
information and/or specifications provided in your
this date, including field modifications. must be
or specifications for compliance with applicable
reviewed by this office to insure continued
codes and standards. Submit corrected plans andlor specifications to this office for review.
d
conformance with applicable codes. Please review
carefully all comments attached, as failure to comply
with instructions in this report can result in
suspension of permit to build.
A Right-of-way permit is required prior to
construction of the following improvements:
I
I
ENGINEERING AUTHORIZATION TO ISSUE BUILDING PERMIT
ATTACHMENTS
Dedication Application
Dedication Checklist
Improvement Application
Improvement Checklist
ENGINEERING DEPT. CONTACT PERSON
Name: David Rick
City of Carlsbad
Future Improvement Agreement Address: 2075 Las Palmas Dr., Carlsbad, CA 92009
Grading Permit Application
Grading Submittal Checklist
Right-of-way Permit Application
and Information Sheet
Right-of-way Permit Submittal Checklist
Sewer Fee Information Sheet
Phone: (619) 438-1161, ext. 4324
A4
BUILDING PLANCHECK CHECKLIST
0 iT 3R0'
SITE PLAN
P 1. Provide a fully dimensioned site plan drawn to scale. Show:
ji North Arrow
Existing & Proposed Structures
Property Lines
Easements kC; ("J4'
Existing Street Improvements Right-of-way Width & Adjacent Streets
Driveway widths & +,
&dp SidPJ4ULLs 7 pi 0 Show on site plan:
inage Patterns
xisting Topography
@J
isting & Proposed Slopes
0 3. Include note: "Surface water to be directed away from the building foundation at a
2% gradient for no less than 5' or 2/3 the distance to the property line (whichever
is less)." [Per 1985 UBC 2907(d)5]
On graded sites, the top of any exterior foundation shall extend above the
elevation of the street gutter at point of discharge or the inlet of an approved
drainage device a minimum of 12 inches plus two percent." [Per 1990 UBC
2907(d)5]
4. Include on title sheet:
A. Site address
B. Assessor's Parcel Number
C. Legal Description
For commerciallindustrial buildings and tenant improvement projects, include:
total building square footage with the square footage for each different use,
existing sewer permits showing square footage of different uses (manufacturing,
warehouse, office, etc.) previously approved.
EXISTING PERMIT NUMBER DESCRIPTION
Page 1 of 4
J BUILDING PLANCHECK CHECKLIST
3RD4 DISCRETIONARY APPROVAL COMPLIANCE
0 5. Project does not comply with the following Engineering Conditions of approval for
Project No.
ci 0
tl 0
0 6. All conditions are in compliance. Date:
DEDICATION REQUIREMENTS
0 7. Dedication for all street Rights-of-way adjacent to the building site and any storm
drain or utility easements on the building site is required for all new buildings and
for remodels with a value at or exceeding $ , pursuant to Carlsbad
Municipal Code Section 18.40.030.
Dedication required as follows:
Dedication required. Please have a registered Civil Engineer or Land Surveyor
prepare the appropriate legal description together with an 8 '/2" x 11" plat map and submit with a title report. All easement documents must be approved and signed by owner(s) prior to issuance of Building Permit. Attached please find an application form and submittal checklist for the dedication process. Submit the completed application form with the required checklist items and fees to the Engineering Department in person. Applications be accept by mail or fax.
GfP
Dedication completed by: Date:
IMPROVEMENT REQUIREMENTS
P 8a. All needed public improvements upon and adjacent to the building site must be constructed at time of building construction whenever the value of the 30,004 construction exceeds $ q0, eo , pursuant to Carlsbad Municipal Code
05. Section 18.40.040.
Public improvements required as follows:
Attached please find an application form and submittal checklist for the public improvement requirements. A registered Civil Engineer must prepare the appropriate improvement plans and submit them together with the requirements on the attached checklist to the Engineering Department through a separate plan check process. The completed application form and the requirements on the checklist must be submitted in person. Applications by mail or fax are not accepted. Improvement plans must be approved, appropriate securities posted and fees paid prior to issuance of building permit.
Improvement Plans signed by: Date:
Page 2 Of 4
o:YIBR*R~No\"~~~"~~~~~P.ndu*cuIlB~l FmnOR.dc.2 Rn ,-
BUILDING PLANCHECK CHECKLIST
1 ItJ 2nd' 3rd"
o o D 8b. Construction of the public improvements may be deferred pursuant to Carlsbad
Municipal Code Section 18.40. Please submit a recent property title report or
current grant deed on the property and processing fee of $ so
we may prepare the necessary Future Improvement Agreement. This agreement
must be signed, notarized and approved by the City prior to issuance of a
Building permit.
Future public improvements required as follows:
D o P 8c. Enclosed please find your Future Improvement Agreement. Please return
agreement signed and notarized to the Engineering Department.
Future Improvement Agreement completed by:
Date:
D 0 0 8d. No Public Improvements required. SPECIAL NOTE: Damaqed or defective
improvements found adiacent to buildinq site must be repaired to the satisfaction
of the Citv Inspector prior to occupancv.
GRADING PERMIT REQUIREMENTS
The conditions that invoke the need for a grading permit are found in Section
11.06.030 of the Municipal Code.
0 0 D 9a. Inadequate information available on Site Plan to make a determination on grading
requirements. Include accurate grading quantities (cut, fill import, export).
0 D 0 9b. Grading Permit required. A separate grading plan prepared by a registered Civil
Engineer must be submitted together with the completed application form
attached. NOTE: The Gradinq Permit must be issued and rough grading
approval obtained prior to issuance of a Buildinq Permit.
/ Grading Inspector sign off by: Date:
do 0 9c. No Grading Permit required.
BUILDING PLANCHECK CHECKLIST
3d'
0
O
a
0
14.
15.
MISCELLANEOUS PERMITS
IO. A RIGHT-OF-WAY PERMIT is required to do work in City Right-of-way and/or
private work adjacent to the public Right-of-way. Types of work include, but are
not limited to: street improvements, tree trimming, driveway construction, tieing
into public storm drain, sewer and water utilities.
Right-of-way permit required for:
11. A SEWER PERMIT is required concurrent with the building permit issuance. The
fee is noted in the fees section on the following page.
12. INDUSTRIAL WASTE PERMIT is required. Applicant must complete Industrial
Waste Permit Application Form and submit for City approval prior to issuance of a
Permit.
Industrial Waste permit accepted by:
Date:
13. NPDES PERMIT
Complies with the City's requirements of the National Pollutant Discharge
Elimination System (NPDES) permit. The applicant shall provide best
management practices to reduce surface pollutants to an acceptable level prior to
discharge to sensitive areas. Plans for such improvements shall be approved by
the City Engineer prior to issuance of grading or building permit, whichever
occurs first.
&No fees required
0 Required fees are attached
Additional Comments:
0;T. ad rela)A,h m11 aritiwd UJ ~roosd. ??ea, 54.4
hd uIro.t%.*rk "'71 a'n-ercd YO ~=*/k* uw4d. avh or La Wse o~~oY,P~ &;/;Kc I
I
PLANNING DEPARTMENT
BUILDING PLAN CHECK REVIEW CHECKLIST
Plan Check No. CB 97- 377 Address 2 62/ AuNR 6
Planner V~J I~/LC Phone (61 9) 438-1 161, extension (-h U' $
s
54
CFD (in/@# Circl
ccc [XI Item Complete
L 4
.J
APN: 21 f-%'SrC-/b/
J Type of Project and Use: l2-03 A bb/d zzz Zone: &Facilities Management Zone: 6
I
"a a"
Ilf property in, complete SPECIAL TAX CALCULATION WORKSHEET prowded by Buildmg
0epanment.I
i;Zl Pi? Leaend
$kf
dn 0 Environmental Review Required: YES - NO & TYPE
0 Item Incomplete - Needs your action
DATE OF COMPLETION:
Compliance with conditions of approval? If not, state conditions which require action.
Conditions of Approval
0 Discretionary Action Required: YES - NO &TYPE
APPROVAL/RESO. NO. DATE
PROJECT NO.
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval
/ do 0 ' Coastal Zone AssessrnentlCompliance
Project site located in Coastal Zone? YES - NO&
If NO, proceed with checklist; if YES, proceed below.
Determine status (Exempt or Coastal Permit Required):
If Exempt, proceed with checklist; if Coastal Permit required, hold building permit until Coastal
Permit issued.
Coastal Permit Determination Form already completed? YES- NO
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #:
-
Follow-Up Actions:
1 ) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum
2) Complete Coastal Permit Determination Log as needed.
Floor Plans).
lnclusionary Housing Fee required: YES - NO&
(Effective date of lnclusionary Housing Ordinance - May 21, 1993.)
Site Plan:
1. Provide a fully dimensional site plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width. dimensional setbacks and existing
topographical lines.
2. Provide legal description of property and assessor's parcel number.
Zoning:
1. Setbacks:
Front: Required 70 ' Shown >2u
Int. Side: Required 10 ' Shown 10 '
Street Side: Required - Shown -
Rear: Required 2 o ' Shown 20'
2. Lot Coverage: Required dk@g Shown
3. Height: Required kWr Shown /&'
4. Parking: Spaces Required 'L Shown 3
Guest Spaces Required Shown
Additional Comments
I
.. r- ','
r. STRUCTURAL CALCULATIONS. .
i
DATE: FEBRUARY 6,1997
I
r .i r.
r
PROJECT: JENKINS RESIDENCE
2621 ACUNA COURT
CARLSBAD, CA 92009
OWNER: DAVID JENKINS
. ' 2621 ACUNACOURT
CARLSBAD, CA 92009
DESIGNER .' CLIFF MILLS DESIGN
GARY JOHNSON
140 ENCINITAS BLVD., SUITE 319
ENCINITAS, CA 92024-3768
JOB NO.: 97023 ;. . . ,
NOTE THESE CALCULATIONS ARE INVALID LESS BEARING A WET STAMP & SIGNATURE
1
1
1
1
1
I
I
1
1
1
1
1
1
1
1
1
-
CHECKED BY DATE
TABLE OF CONTENTS i
SUBJECT ! SHEET'
DESIGN CRITEPJA ___.._._.__._..... i .............................................................................................. .) .....................
LOADS ......................................................... '1 .................................................................................................... - '
2
r 3
VERTICAL ANA~YSISDESIGN ..__........... ............................... ~ ...................................................... ............ fl
FOUNDATIONS/RETAINING WALLS .._._ .................................................................................... 10-4
LATERAL ANALYSISDESIGN ....................................................................................................................... lk
DETAILS ....................................................... ............................................ .............................. : ......................... tu?
17
LQ 6496 Weathen Place - Suite 200
San Dlego. Callforma 92121
619.535.9111 ~wr 619.535.1989 F-
JOE 9 1 0x7
snm NO. 'L OF 43
CALCUUTED BY DATE
cnEwm BY DATE
SCALE
DESIGN CRITERIA
c.
GOVERNING CODE: UBC 1994
CONCRETE: F',= 2000 PSI, NO SPECIAL INSPECTION REQD.(U.N.O.)
MASONRY: ASTM c90, F,=l5oo PSI, NO SPECIAL INSP~CTION REQD w.N.o.)
MORTAR: ASTM C270, F',=1800 PSI, TYPE S
GROUT: ASTM C476, F',=2000 PSI
REINFORCING STEEL: ASTM A615, F = 40 KSI FOR#; AND SMALLER
!
.I;
,
ASTM A615. FY= 60 KSI FOR #4 AND LARGER (U.N.O.)
STRUCTURAL STEEL: ASTM A36, F = 26 KSI (STRUCTURAL SHAPES & PLATES)
: ASM A500, &RADE B, Fy46 KSI (STRUCTURAL TUBING)
ASTM A53, GRADE B, Fy= 35 KSI (STRUCTURAL PIPE)
WELDING: E70 SERIES-TYP., E90 SERIES FOR A615 GRADE 60 REINFORCING BARS SHOP WELDING TO BE DONE IN AN APPROVED FABRICATOR'S SHOP
FIELD WELDING TO HAVE CONTINUOUS SPECIAL INSPECTION 1
SAWN LUMBER: DOUGLAS FIR LARCH, ALLOWABLE UNIT STRESSES AS PER UBC, CHAPTER 25
GLULAMS: DOUGLAS FIR OR DOUGLAS FINHEM i '
24F-V4 FOR SIMPLE SPAN CONDITION
24F-V8 FOR CANTILEVER CONDITION 5
SOIL:
ACTIVE SOIL PRESSURE
ALLOWABLE BEARING PRESSURE = PSF - PCF
ACTIVE SOIL PRESSURE(RESTRAMED) - - - PCF
-
PASSIVE SOIL PRESSURE
SOIL DENSITY
COEFFICIENT OF FRICTION
$ EXISTING NATURAL SOIL PER UBC TABLE'18-I-A
SOIL CLASSIFICATION
SOILS REPORT BY
DATED
LOVELACE ENGINEERING
StNCcUnlR&glIdTUI924"
san Dlego. cdllo* 97.121 '. 619.535.9111 PhDN 619.535.1969
.. .. ... : .......... ..... ..j ..._.. >:. ...,.. .. -
i ROOF
DEAD LOAD:
ROOFING ( 64 RKF ) 5. 0 PSF
SHEATHMG ..................... ................................................................. : ................................................. 1.5
RAFTEWCEILING JOISTS OR TRUSSES ........................................................................................... 4.0
INSULATION ........................................................................... +...... .................................................... 1.5
DRYWALL ..................................... 5 ..................................................................................................... 2.5
OTHER (ELEC., MECH.. MISC.) ............................................................................................. ........... - 0.5
.- c
t ............................................................................................................
TOTAL DEAD LOAD: f7/ .O PSF
LIVE LOAD: '.k - .O PSF
TOTAL LOAD: 53.0 PSF
,
FLOOR
DEADLOAD: ,~ "%" r~.,.,~$r-, I:.:: '? 7 ,, : DUG
FLOORING( d' ) ................................................................................................................ \ 2.0 PSF
LT. WEIGHT CONC ................................................................................................................. : ........... 'G .O
SHEATHING ............................................................................................................................. i ........... 2.0
JOISTS 3.5
DRYWALL ............................................................................................................................................ 2.5
OTHER (ELEC., MECH., MISC.) ......................................................................................................... 3.0
TOTAL DEAD LOAD: 5F.O PSF
LIVE LOAD (RESl6ENTIAL USE PER UBC CHAFTE.R 16): 40.0 PSF
78.0 PSF
i ...................................................................................................................................................
TOTAL LOAD:
-
j
EXTERIOR WALL
STUDS .................................................................................................................................................. 1.0 PSF
DRYWALL ......................................................... ; .................................................................................. 2.5 !
INSULATION ........................................................................ : ............................................................... 1.5
EXTERIOR FMISH ( WP. 5WrQ ................... ; ................................................................................... .G .O
OTHER (MISC,) .................................................................................................................................... - 1.0
TOTAL LOAD: j2 .O PSF
3 ..
INTERIOR WALL
STUDS ........................................................................................ L .......................................................... 1.0 PSF
DRYWALL ............................................................................................................................................ 5.0
OTHER(M1SC.) .................................................................................................................................... 1.0
* TOTAL LOAD . - .- 7.0 PSF .
L
L
L
L
1
1
1
nB 1
1
1
1
1
I
1
1
1
1
1
-
CALCULATED BY OATE
San Olga. CalllornLa 9212 I 619.535.9111 Rm 619.535.1989 mx CHECKED BY DATE
VERTICAL ANALYSlSlDESlGN
*'..'.',.,' & ,.,, ,, .. . .,.. ;
Lovelace Engineering, Inc. 6496 Weathers Place. Suite 200 San Dlego, CA 92121 (PHN) 61 9-535-91 11 (FAN 619-535-1989 910~3
Oate: 01129197 Page: 5,'.
SINGLE SPAN BEAM ANALYSIS
ROOF HIP BEAMS RB-1
:SPAN DATA MEMBER DATA
Center Span - 11.00 ft 1:lnertia - Left Cantilever - 0.00 ft E:Elastic Modulus - 1600000 psi
1.000 in4 All distances for load locations refer to left support. Neg (1.') distances
Right Cantilever - 0.00 ft End Fixity PinlPin means load is on left cantilever UNIFORM LOADS TRAPEZOIDAL LOADS
CONCENTRATED LOADS # 1: 0.198klft @ Left, 0.083klft @ Right, Start @ 2.50ft - > 11.00ft
ff 1 - 0.24Bk at 2.50ft
APPLIED MOMENTS
i, SUMMARY
Moments Shears Max. Span Moment Max. Mom. Location
- 2.37 k-ft Left Support - 5.08 ft Right Support
Min. Span Moment - .O.OO k-ft
- 0.72 k
Min. Mom. Location - 11.00 ft Left Support -
Max @ Left Support - 0.00 k.ft Right Support - 0.72 k
0.72 k
Max @ Right Support - 0.00 k-ft MAXIMUM MOMENT - 2.37 k-ft Between Supports @ X - 0.00 ft, M - 0.00 k.ft, V - 0.715 k, Defl. - 0.000 in
Deflections - 0.72 k Max. @ Span - .31.934 in at 5.41 ft
Reactions
lluery Values 1
0.20 0.08 nmln- -0.Oor"I. ll.00,t
nm.i - L.1711-L . 5.m n -0.00 2""
0m.r - 0.00 ,n . 0.011 't -0.7L O"F-u
*-.x - 0.72 XI@. . 0.00 ,I
"rnl" * -0.71 *4.>. ll.00 7%
t t *ml""1191,.* sa,, n.oa
1 1 .,8.93 11.00 I? I I
00 1.11 s.7 5.5 7.1 9.2 /?.a
-
V4.483 lcl 1983.95 ENERCALC Lovelace Engineering, KW0601024 -
" " .. .
LOVELACE ENGINEERING SHEET NO. 6 OF"--
S".pdllllCl4"
6496 Weathen Place. Safe 200
San Dlego. CaKornla 92121 619.535.9111 619.535.1989Fu
JOB 470z-3
CALCULATED BY DATE
CHECKED BY DATE
i
N N t+ a 8 h -r c
-9- u.
1
L
L
L
L
L
L
1
1
1
1
1
1
1
1
I
1
1
1
"
LOVELACE ENGINEERING SHEET NO. 7 OF 43
SVUCWA mdna 24 E-W m=h
6496 weathen Place. StlItC 200
San Dlego. Wornla 92121 619.535.9111 FT.- 819.5351989 Fhr
JOB 47az3
CALCULATEDBY DATE
CHECKED BY DATE
<.
I '* = - - " IN4 RFmn
USE: L 4 z
OR 3
MARK-, SPAii= - FT. . 1 0 UNIFORM LOAD
W,=
W,=
P,=
P,=
RL=
R,=
Vu= = LBS
Mw= - - FT-LBS
I,,,,= = IN4
- - PLF
- PLF
- LBS
- LBS
- LBS
- LBS
-
-
-
-
-
USE: X GRADE: CAMBER: HARDWARE:
OR 1
W,= = PLF
W,=
P,=
P,=
R,=
R,=
VMAX'
"AX=
MARK.-, SPAN= -FT. 0 UNIFORM LOAD
- - PLF
- LBS
- LBS
- LBS
- LBS
- LBS
- FT-LBS
-
-
-
-
-
-
I,,,,= I IN4
USE: ;E:
OR X -CAMBER: HARDWARE:
I L !
L
L
L
1
L
1
1
I
1
1
1.
I
1
1
1
1
1
-
LOVELACE ENGINEERING SHEET NO. 8 Of 43
SC,,,.S-JD~IW~TI~Z~G=W~
€496 Wealhen Place. suite 200
San Dlego. CalUom&92121 619.535.9111 Ra 619.535.1989 mx
JOB 9 1 "Z,
CALCUMTED BY DATE
CHECKED BY DATE
LEVEL: 9-
MEMBERS: %LaM 5
L
P,= - - LBS
Wp
P,=
P,=
RL=
R,=
",Ax=
"Ax=
I,,,.*=
OR X GRADE: CAMBER: HA-E:
/ - - PLF - LBS - LBS - 244 (0 LBS - LBS
-
-
- ,, -
Z44b -\"."/W)('L49) - - 14 I LBS
= 4.71% FT-LBS - - IN4
USE: \-L
MARK:-, SPAN= -FT. 0 UNIFORM LOAD
W,=
W,=
- - PLF
- PLF -
P,= - - LBS
LOVELACE ENGINEERING SHEET NO. 9 OF 43
sv~~lvll on~i .nd nu= 24 E-W ~.lru
64496 Weafh- Place * Sulte 200
San Dlego. Wornla 92121
619.535.9111 Ra 619.535.1989 Fax
JOB 9101-3
CALCULATED BY DATE
CHECKED EY DATE 1
L
I
L
1
1
L
L
1
1
1
I
1
I -
OR -:
MARK:-, SPAN= -FT. 0 UNIFORM LOAD
I,
R, = - - LBS
I,,,,=
"" - - IN4
USE: X GRADUER HARDWARE:
OR 3
MARK:-, SPAN= -FT 0 UNIFORM LOAD
W,= - - PLF
W,= - - PLF
USE: X CRADE: CAMBER HARQlYARE:
OR ;E:
. L -. .- .
LOVELACE ENGINEERING
sIN&~.ndnuc2~~mdyw
6496 weathen Pk - sulte 200
spn Dlgo. Wornla 92121
619.535.9111 Ra 619.535.1989 FLU
JOB 97023
SHEET NO. f0 OF 43
CALCULATEOBV OAT€
CHECKED BY DATE
SCALE
1
1
1
1
1
1
1
1
1
1
1
FOUNDATIONS
t .:
ALLOWABLE BEARJNG PRESSURE, q= 1-6 PSF (PER DESIGN CRITERIA)
CONTINUOUS PEWMETER & BEARING WALL FOOTINGS:
Location: - ( OWL 47.-7 CoNVhT.>"lhC)
LE W,= -
Width Req'd= W,/q x 12= -
USE: e WIDE X -!E!! DEEP WITH 1 # S TOP & BOTTOM
Location: - W,= PJ .E
Width Req'd= W,/q x 12= M
USE: __ "WIDEX"DEEPWITH-#- TOP & BOTTOM
ISOLATED SPREAD FOOTINGS:
MARICF- \ !
p= FV-1) = 1540 LBS
A,,.,= Plq x 144= 229 SOpJ
USE:WSQUARE x =DEEP WITH 2 '# 5 EACH WAY (3" CLEAR FROM SOIL) I MAWF- 'L
I USE:Z.SQUARE x FDEEP WITH '2 # 5 EACH WAY (3" CLEAR FROM SOIL)
1
1
1
'! L
; 1
"I
1
1
1
1
1
1
1
1
1
1
1
LOVELACE ENGINEERING spumrnl~~dnllez4fa~~
6496 Wesfhen Place - Sulk 200
San Dlega. Wornla 92121 619.535.9111 Ra 619.535.1989k
JOB 91 023
snEET NO.
CALCULATED BY ~ DATE
CHECKED BY DATE
A,.,= P/q x 144= 640 SOIN
USE:ESQUARE x WDEEP WITH iL # T EACH WAY (3" CLEAR FROM SOIL) '.
MARK: F-
P= LBS
AEq.d= P/q x 144= so IN
USE:LSQUARE x "DEEP WITH-#- EACH WAY (3" CLEAR FROM SOIL)
MARKF-
P= LBS
AXqld= Pfq x 144= so IN
USE:"SQUARE x "DEEP WITH # EACH WAY (3" CLEAR FROM SOIL)
MARK: F-
;
A,,,,= P/q x 144= so IN
USE:"SQUARE x 'DEEP WITH # EACH WAY (3" CLEAR FROM SOIL)
MARK: F-
A,.,= P/q x 144= so M
USE:"SQUARE x IDEEP WITH # EACH WAY (3" CLEAR FROM SOIL)
Lovelace Enaineerina. Inc. 6496 Weathe& P1ace;'Suite 200 San Die 0, CA 92121 (PHN) 679-535-9111 IFAXI 619-535-1989
Date: 02/05/97
CANTILEVERED RETAINING WALL DESIGN
Retained Height = 2.00ft Axial DL on Stem
Uall Ht. above Soil = 4.00ft Axial DL on Stem
Toe Width = 1 .OO ft .... Eccentricity - 0.00 in Add'l Lateral Load
Heel Width = 1.67 ft Surcharge over Toe = 0'.0psf Dist to Load Start
Total Fwting Width = 2.67ft Surcharge over Heel 0.0psf Dist to Load End
Key Depth
Fwting Thickness = 12.00 in Note: Toe Surcharge Resists Overturning
= 0.00 in Note: Heel Surcharge Resists Overturning
Key Width = 0.00 in SOIL DATA
Toe to Key Dist. = 0.00 ft Allowable Bearing
FtgISoil Friction = 0.30 ..... Max Press. - 0.0 pcf Footing Width - 0.00 in
Soil to Neglect
0.00 ft = 0.00 in . .... Slope Press.
Lateral Pressure = 245 # Backfill Slope
0.0pcf Ftg. CL to Wall 0.00 ft
- Passive Pressure = 281 U Passive Press. = 250.0 pcf . . .AbovelBelow: Ct/-1 - Friction
0.0 ft
Add'l Force Required = 0.OU Soil Ht over Toe 6.00 in
Pressure il Toe = 871.2 psf Soil Press. Mutt. Toe
Pressure il Heel = 0.0psf By ACI Eq 9-1 = 1220
Heel f'C 2000 psi
Allowable Press.
0 psf Fy = 60000 psi = 1000 psf Mu-Upward
Ecc. of resultant
= 531 61 ft-# Min. As Percent
= 5.68 in Mu-Downward
= 0.0012
= 144
Max. Shear il Toe = 2.47psi Mu-Design
261 ft-# Omit SP Under Heel ? No
Max. Shear il Heel = -0.93 psi One-way Shear: U 4 il 19.61
Allow. Ftg Shear
17.54 in o/c
Factors of Safety:
= 76.03psi Actual 2.5 0.9psi U 5 il 30.39 27.19 in o/c
Overturning
Allowable = 76.0 76.Opsi # 6 il 43.14
= 2.45 :I Cover over Rebar = 3.50 2.50 in U 7 il 48.00
38.60 in o/c
48.00 in o/c
Sliding = 2.52 :I 'd'
RU = Mu/bd"2 =
= 8.50 9.50 in U 8 il 48.00
6.0 2.5 psi U 9 il 48.00
48.00 in o/c
48.00 in o/c
- WALL E FOOTING DATA - VERTICAL LOADS LATERAL LOADS - 0 plf Lateral Load Acting on - 0 plf Stem Above 'Soi 1 = 27.60psf e = 0.00plf - - 0.00 ft - 0.00 ft
ADJACENT FOOTING - - 1oW psf Vertical Load - 0.ou 8:
SLIDING CHECK Active Lateral
-
I 30.0 pcf Load Eccentricity I - - - - - - - - 0.0 :I Vert. Position of Ftg. - -
= 338 U Soi 1 Density = 110.0pcf Spread Footing ? No - -
SUMMARY FCOTING DESIGN - -
= 388 -2w ft-# Toe Heel
- -
- SUMMARY OF FORCES E MOMENTS
Overturning Moments -
Origin of Force.. . U ft f t-u # ft ft-#
Active Soil Press. = 135.0 l.w 135.0 0 0 0
Soil over Heel - 0 0 220.7 2.17
Soi 1 over Toe
0 = -33.8 0.50 -16.9 55.0
478.6
0.50
Sloped Soil il Heel = 27.5
0
Adjacent Ftg. Load = 0.0
0 0 0.0 0.00
0.00
0.0
Surcharge Over Heel = 0.0 0.0 0.00 .
0
0.0
0 0 0.0 0.00 0.0
Surcharge over Toe = 0.0 0.00 0.0 0.0 0.00
Axial Load on Uall
0.0
Load il Proj. Wall
0 0 0.0 0.W = 110.4
0
5.00 552.0
0.0
0 0 0
Averaged Stem Wts. =
Added Lateral Load = 0.0
0 0 0 450.0 1.33 600.0
0.00 0.0 0 0 0
Footing Weight - - 0 0 0 4w.5 1.34 534.7
Key Weight
Vertical Component
0 0 0 0.0 0.00 0.0
Resisting Moments
-
- -
- -
of Active Presswe 0 0 0 0.0 0.00 0.0
Totals = 211.7 # 670.1 ft-# 1126.2 U 1640.8 ft-#
Resisting Totals Used For Soil Pressure
(Vert. Component of Active Pressure Rerovedl
1126.2 U 1640.8 ft-#
(wntinued on next page ....
V4.403 (c) 1983-95 ENERCALC Lovelace Engineering, KU0601024
Lovelace Engineering, Inc. 6496 Weathers Place. Suite 200 San Die 0, CA 92121' (PHN) 679-535-9111 (FAX) 619-535-1989
CANTILEVERED RETAINING WALL DESIGN
,.
(. . . . .continued)
STEU SUMMARY
Top Stem: From 6.00 ft to Top of Wall
f'm= 15W.Opsi, Fs= 24OOO.Opsi
LDF= 1.00, n= 25.78
Wall Ut.= 75.00psf, Bar Embed= 12.0in
Solid Grouted, No Spec. Insp.
Mactual = 0.0 <= 603.lft-U
Vactual = 0.00 <= 19.36psi
Interaction Value = 0.000
8.00in Uasonry ul U 5 6l 16.Win, d= 3.75in
Second Stem From 5.00ft to 6.00ft
8.Win Masonry wl U 5 a 16.00in, d= 3.75in
f'm= 15OO.Opsi, FP= 24OOO.Opsi
LDF= 1.00, n= 25.78
Solid Grouted,,No Spec. Insp.
Uall Ut.= 75.00psf, Bar Embed= 12.0in
Mactual = 13.8 <= 603.lft-#
Vactual = 0.30 <= 19.36~4
Interaction Value = 0.023
Third Stem From 4.00ft to 5.00ft
f'm= 15OO.Opsi, Fs- 24OOO.Opsi
LDF= 1.00, n= 25.78
Uall Ut.= 75.Wpsf, Bar Embed= 12.0in
Solid Grouted,,No Spec. Insp.
Mactual = 55.2 <= 603.lft-U
Vactual = 0.61 <= 19.36psi
Interaction Value = 0.092
8.Win Masonry VI U 5 16.0Oin, d= 3.75in
Fourth Stem From 2.Wft to 4.00ft
8.00in Masonry wl U 5 6l 16.00in, d= 3.75in
f'm= 15W.Opsi, Fs= 24000.0psi
LDF= 1.00, n= 25.78
Solid Grouted,,No Spec. Insp.
Uall Ut.= 75.Wpsf, Bar Embed= 12.0in
Mactual = 220.8 <= 603.lft-U
Vactual = 1.21 <= 19.36psi
Interaction Value = 0,366
Bottom Stem From O.OOft to 2.OOft
8.00in Masonry wl U 5 a 16.00in, d= 3.75in
f'm= 15OO.Opsi, Fs= 24WO.Opsi
LDF= 1.W, n- 25.78
Solid Grouted,,No Spec. Insp.
Wall Wt.= 75.00psf, Bar Embed= 6.0in
Mactual = 481.0 <= 603.lft-U
Vactual = 1.83 <= 19.36psi
Interaction Value = 0.798
V4.483 (c) 1983-95 ENERCALC Lovelace Engineering, KW0601024
L
Lovelace Engineering, Inc. 6496 Weathers Place, Suite 200 San Die 0, CA 92121 PHN) 6?9-535-9111 IFAX) 619-535-1989 97v25
..
RESTRAINED RETAINING WALL DESIGN
"- 14/43
~~
Retained Soil Ht. = 3.00 ft Fwting Thickness = 12.00 in Allow. Soil Bearing = q 0.67ft Active Fluid Press
1000 psf
Ht. Above Top Support = 0.00ft Heel Width
65 pcf
Dist: Ftg. To Top Suppopt 3.00ft Total Footing Width =
1.33 ft Design Fluid Press
2.00 ft Backfill Slope
= 65.00 pcf
Total Wall Height = 3.00 ft Passive Lateral = 250.0psf
Fixity 3 Base of Wall =
VERTICAL LOADS
0 X Key Depth
Key Uidth
= ' 0.00 in Soil Density = 110.0pcf - 0.00 in Soil Ht Over Toe -
Axial DL on Stem = 0.0plf Key Dist. to Toe
7.00 in
Axial LL on Stem = 0.0plf .... Eccentricity = 0.00 in Pressure 3 Toe = 610.0psf Ecc. of Resultant
Surcharge over Toe = 0.0psf Pressure a Heel
2.21 in
= 175.9 psf Kern Distance - -
Surcharge over Heel = 0.0 psf Allowable Press.
4.W in
LATERAL LOADS Sliding F.O.S. = 1.61 :I 3 Toe - = 1000.0 psf Fwting One-way Shear:
Lateral Load Acting on
0.00 psi
3 Heel
AtLouable Shear
0.00 psi
Add'L Lateral Load = 0.0plf at Top of Wall
= 76.0psi
.... Top Ftg to toad staf? 0.00 ft Additional Restraint .... Top Ftg to toad staf? 0.00 ft Req'd at Bottom = 0.0 #
WALL DATA FOOTING DATA SOIL DATA - -
Toe Width - - - - - 0.00 :I
- - - - 0.00 ft
1 SUMMARY - -
-
Stem above soil = 0.0 psf Restraint Force Req'd - 96.8 # Fwting Overturning
Stability Ratio = 3.44 :I
- SLIDING CHECK a BASE - FWTING DESIGN
FtgISoi L Friction
Soil Press. Mutt. Toe Heel
= 0.300
flc
by ACI 9-1 = 854 246 psf Fy
Soi L to Neglect = 0.00 in MU - Upward = 176
Factor of Safety = 1.61 :I Mu - Downward
69 ft-# Min. Asteel X = 67 148ft-#
- Passive Pressure = 313.4# One-Way Shear:
Lateral Pressure = 341.7# MU - Design 109 -79 ft-# Rebar Choices
- Friction Pressure = 235.8# Actual = 0.0 0.0psi #4 a , 15.87 15.87 in
Addn't Force Req'd = O.O#
Cover over Rebar = 3.00 3.00in
#5 a
#6 a
RU = Mulbd' =I 1 psi #7 a 34.92 34.92 in
47.62
As Req'd = 0.15 0.15 in2 #8 a 47.62 in
48. 00
#9 a 48.00 in
48.W 48.W in
= 2000 psi = 60000 psi = 0.W14X
Toe Hee L
ALLOvlt.85 = 76.0 76.0psi 24.60 24.60 in
Stem Material : Masonry NOTE !! Maximum Moment Occurs at 1.28 ft above Top of Footing
Em = f'm * 750 TOP .8 Ht .6 Ht .4 Ht .2 Ht Bottom
n : Modular Ratio = 25.78 OK
Allowable Fa = 149.8 Dist. above Ftg 3.00
OK OK OK OK
2.00
OK
1.50
Nominal Walt Thick. = 8.00 in Bar Size 4.00 4.00 4.00 4.00
1.28 0.50 0.00 ft
4.00
f'm
4.00
FS
= 1500 psi Rebar Spacing 16.0 16.0 16.0 16.0 61 .O 61 .O in
= 24WO psi Rebar Location Center Center Center Center Center Center
Load Duration Factor = 1.00 Rebar 'd' Dist. 3.75
No Inspection Required
3.75 3.75 3.75 3.75 in
Tension Face
3.75
Front
Grout ALL Cells
Front
Moments: Actual
Front
0
Front Front
85 108 111 73 0 ft-#
Front
Use Lightweight Block Allowable 521 521 521 521 276
Shears: Actual 1.1 0.7 0.3 0.0 1.2
276 ft-#
Allowable 27.4
2.0 #
27.4
Wall Weight 78.00
27.4 27.4 27.4
78. W 78.03 78.00 78.00
27.4 #
78.00 psf
Masonry Stem Data.....
Interaction Value 0.017 ' 0.186 0.234 0.241 0.297 0.034
Actual fa
Actual fb
STEM DESIGN DATA STEM SECTION DESIGNS
2.6 3.4
2.6 40.4
3.8
51.5
4.0 4.7
52.9 58.3 0.0 psi
5.1 psi
V4.483 (c) 1983-95 ENERCALC Lqvelace Engineering, KW0601024
LOVELACE ENGINEERING SHEET NO. I' OF 45
sIrucl~~uld7WcU"
6496 weather3 Place * sultc 200 San Dkgo. CaWorrda 92111 619.535.9111 Ra 619.535.1989 *
,OB 91OZ3
CALCULATED BY DATE
CHECKED BY DATE
SCALE
:,: ............................
LATERAL ANALYSlSlDESlGN ADDW~ ONby]
,.
AREA:
SEISMIC LOAD:
SEISMIC ZONE __ 4 EXPOSURE- R BASIC WIND SPEED=7OMPH
i WMD LOAD:
z= 0.4 C,= .bz ,TABLE234 171
I = 1.0, STANDARD OCCUPANCY
C = 2.75 L Qs= 12.6 PSF
W = TOTAL SEISMIC DEAD LOAD I = 1.0, NON-ESSENTIAL FACILITY
i Cq=n, TABLE 23-H /Nsl'*rl*d
Rw= 0 P = (Ce) (Cq) (Q;)(I) = ID . !& PSF
ROOF WEIGHT:
DIAPHRAGM= ( 324 ' )( 1'5 T5F-1 421t LBS
EXTERIOR WALL WGT.(TNB. TO DIAPHRAGM)= (4sL)(~D%)C1t w:) Z~SV LBS
INTERIOR WALL WGT.(TRIB. TO DIAPHRAGM)= LBS
TOTAL WEIGHT TNB. TO DIAPHRAGM= 7092 LBS
FLOOR WEIGHT:
DIAPHRAGM= LBS
EXTERIOR WALL WGT.(TRIB. TO DIAPHRAGM)= LBS
INTERIOR WALL WGT.(TRIB. TO DIAPHRAGM)= LBS
TOTAL WEIGHT TRIB. TO DIAPHRAGM= - LBS
FLOOR WEIGHT:
DIAPHRAGM= LBS
EXTERIOR WALL WGT.(TRIB. TO DIAPHRAGM)= LBS
INTERIOR WALL WGT.(TRIB. TO DIAPHRAGM)= LBS
TOTAL WEIGHT TRIB. TO DIAPHRAGM= LBS
TOTAL DEAD LOAD, W= 7042 LBS
BASE SHEAR, v= ZIl: w = 1337 w= 1'300
RW
y;" I700 lbs/5M + F 4. I P~F
-. . . . -. .. ._ II.. "_ " - . ...
LOVELACE ENGINEERING SHEET NO. Ib OF 43
s(nut-~ .nd nue 24
6496 Weathers PIae - Sulte 200
San Dlego. Calllamla 92121 619.535.9111 phorv 619.535.1989~e
JOB 71-3
CALCULATED BY DATE
CHECKED BY DATE
SCALE
c
- - FLOOR SHEARWALLS
NA DIRECTION
L+TERAL LOAD, vx=4-
LINE A
TRIB. AREA, TA= CWX+ 4 )/+z * Ibt FT.~
LOAD @THIS LEVEL= x TA)= 664 LBS.
LOAD, ROOF LEVEL= LBS.
LOAD, -LEVEL= LBS.
TOTAL LOAD= LBS.
SHEARWALL LENGTH, L= 13 FT.
v= /TAL)= 51 PLF
ti
-
USE: (I) Pkp $f~~~cI~LL SGNliDd
OVERTURNING:
SHEAR PANEL LENGTH= FT, /OK. BY INSPECTION
OT MOMENT= FT-LBS
RES.MOMENT= FT-LBS
NET MOMENT= FT-LBS
UPLIFT= LBS
USE:
LINE 0
TRIB. AREA, TA= LbZ FT.~
LOAD @THIS LEVEL= x TA!= LBS.
LOAD, ROOF LEVEL= LBS.
LOAD, -LEVEL= LBS.
TOTAL LOAD= (ob4 LBS.
SHEARWALL LENGTH, L= 7- Z .5 ' f s FT
v= (TAIL)= 13'5 PLF
-
USE: (I )
<
OVERTURNING:
OT MOMENT= c 2.5 > l 1,; PFN 9' 1 - 2.7 9 3 FT-LBS
RES.MOMENT- FT-LBS
NET MOMENT= 294 7 FT-LBS
SHEAR PANEL LENGTH=^.^ FT, O.K. BY INSPECTION -
UPLIFT= 2497 / =-L- - - 1496 LBS
USE: Ex IT L 4rb V-7 UI UDZA AND f a% NW 4x.b Iv.w.- 7 P"r
u/ HPZA t S5'TRIb
.. .. ....
6496 Wcathcn Place - Sate 200
San Dlego. Callforma 92121 619.535.9111 phau 619.535.1989~~
CALCUUTED BY DATE
CHECKED BY DATE
SCALE
- FLOOR SHEARWALLS E DIRECTION
LATERAL LOAD, vx=4-
TRIB. AREA, TA= Wz FT.*
LOAD @ THIS LEVEL= x TA)= 664 LBS.
LOAD, ROOF LEVEL= LBS.
LOAD, -LEVEL= LBS.
TOTAL LOAD= bb4 LBS.
SHEARWALL LENGTH, L= B FT.
v= (TAIL!= e3 PLF
-
OVERTURNING:
SHEAR PANEL LENGTH= FT, J O.K. BY INSPECTION
OT MOMENT= FT-LBS
RES.MOMENT= FT-LBS
NET MOMENT- FT-LBS
UPLIFT= LBS
LOVELACE ENGINEERING SHEET NO. 1% OF 43
s"dcwpdTluc%~.+"
6496 weathen Place - suite 200
Sari Dlcgo. Calllornla 92121 619.535.9111 Rm 619.5351963Ih.
JOB 91vz3
CALCULATEDBY DATE
CHECKED BY DATE
SCALE
DETAILS
NOTE TO PLANCHECKER THIS SECTION CONTAINS THE FOLLOWING INFORMATION (IF APPLI-
CABLE TO THIS PROJECT) FOR YOUR USE IN CHECKING THE PLANS: r:
FRAMING PLANS: RAFTER, HEADER, BEAM, POST & HARDWARE CALLOUTS
FOUNDATION PLAN: FOOTING & HOLDOWN CALEOUTS
SHEARWALL LINE LOCATIONS
SHEARWALL SCHEDULE :
SPECIAL INSPECTION LIST
SHEARWALL CALLOUTS
FRAMING AND FOUNDATION STRUCTURAL NOTES
- I. :-' : .,.., /,
LOVELACE ENGINEERING SHEET W. fq OF 43
smNnh-.ndnu=m"+.
6496 Weathers Place * Sate 200 San Dtcgo. CaUfomla 92121 CHECKED BY
619.535.9111 PhDw 619.535.1989 h
JOB '77023
1 CALCULATED BY DATE
DIT€
SCALE
1
L
L
L
1
1
1
1
L
L
1
1
1
1
1
1
-
i.
FRAMING NOTES
1.
2.
3.
4.
5.
6.
7. '
ROOF SHEATHING SHALL BE:
1/2" PLYWOOD EXPOSURE 1 INDEX 2410 *:
8d COMMON NAILS @ 6" olc B.N.
8d COMMON NAILS @ 12" olc F.N.
B.N. APPLIES TO ALL SUPPORTED PLYWOOD EDGES AT:
PLYWOOD EDGES
PERIMETER WALLS
SHEAR WALLS
FLOOR SHEATHING SHALL BE:
~~ ~
19/32" APA RATED STIJRD-I-FLOOR, T & G, 24" O.C. SPAN RATING, EXPOSURE 1
10d COMMON NAILS @ 6" OK B.N.
B.N. APPLIES TO ALL SUPPORTED PLYWOOD EDGES AT:
10d COMMON NAILS @lo" OIC F.N.
PLYWOOD EDGES
PERIMETER WALLS
SHEAR WALLS i
ALL RAFTERS, JOISTS & HEADERS SHALL BE DOUGLAS FIRLARCH #2 GRADE.
ALL BEAMS SHALL BE DOUGLAS FIR LARCH #I GRADE.
ALL HANGERS SHALL BE SIMPSON "U HANGERS.
ALL ROOF HEADERS SHALL BE 4x4 U.N.O.
PROVIDE DOUBLE JOISTS @ SIDES &ENDS OF ALL ROOF OPENINGS.
i
FOUNDATION NOTES
1. ALL ANCHOR BOLTS TO BE 518" DIAMETER x 10" LONG @ 72" olc UNO. ON PLANS
OR SHEARWALL SCHEDULE.
2~ ALL ANCHOR BOLTS. HOLDOWN ANCHORS & DOWELS MUST BE IN PLACE PRIOR TO _. .~~~~~ ~ ~ ~
CALLING FOR FOUNDATION INSPECTION. ~,
3. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 2000 PSI.
4. CONTINUOUS EXTENOR PERIMETER AND CONTINUOUS INTERIOR BEARING WALL
FOOTINGS SHALL BE AS FOLLOWS :
A) SUPPORTING ONE FLOOR AND A ROOF:
12" WIDE x 12" DEEP INTO NATIVE SOIL OR 90% COMPACTED FILL WITH
(I) #5 REINFORCING BAR 3" FROM THE TOP & BOTTPM OF THE FOOTING.
IS" WIDE x 18" DEEP INTO NATIVE SOIL OR 90% COMPACTED FILL WITH
(1) #5 REINFORCING BAR 3" FROM THE TOP & BOTTOM OF THE FOOTING.
B) SUPPORTING TWO FLOORS AND A ROOF:
5. CONCRETE SLAB SHALL BE A MINIMUM OF 3 ID" THICK WITH 6"x6"-W1.4xW1.4 WELDED
WIRE FABRIC IN THE CENTER AND UNDERLAIN WITH 4" OF CLEAN SAND.
NOTE: THE ABOVE SPECIFICATIONS SHALL APPLY UNLESS NOTED OTHERWISE ON THE
DRAWINGS.
- -. L
LOVELACE ENGINEERING
scrund DM .nd nu= z.4 kw uvlrv
€496 Weathers Place - Sulte 200 san Dlego. callfornla 92121 619.U5.9lll phorv 619.535.1989fhx
I
I
1
1
1
1
1
1
1
1
1
I
J
I
I
I )
L
L
L
L
L
L
1
1
1
I
I
I
I
1
-
LOVELACE JOS ENGINEERING
"C-=WlMdNlcl4"
Spn Dlgo. Cdfornla 92121 6136 Wcathm Place Sum 200
619,535.9111 Ra 619.535.1983 Ibr
9702'3
SWEET NO. zz OF 4-3
CALCUUTEO BY OAE
CHECKEO,W OATE
6- 7'
8 TYP. WALL CONSTRUCTION
LOVELACE ENGINEERING SHEET NO. '5 OF 43
structYnlDcalgC,.ndntlc24"
6496 Weathers Place * Sulte 2W San Dlcgo. Calllamia 92121
619.535.9111 phoru 619.535.1989~~
JOB 9702,
CALCUUTEO BY OAT€
CHECKEO BY 12/16/95 DATE
CONNECTION DETAIL
WRC0014
i
i
. . ..
i
NOTE :
.WECTION ONLY. FOR EAM OETAIL
TU115 DETAIL IS FOR "EAR TR+FR
'PLEASE 5EE ARCU. Dm.
i
i
J
b35 FER WEAWLL -ED.
DCUBLE TOP PLATES
U
SHEAR PANEL F€R PLAN \ 2x STUD5 I6'0.C.
,
-I SHEAR TRANSFER DETAIL
WRS0024 .. .. .
. . ., *I,.; ,. ,. .I . .
- . .-
LOVELACE ENGINEERING SHEET NO. z5 OF 45
JOB 970z3
I
Sh~tmyplD~.nd'TulcZ4~~
6496 Wcathm Place * Sultc 200
619.935.9111 Aa 619.535.1989Fb.
CALCULATED BY DATE
CHECKED 0V DATE 10/25/95 SanDlego.caluo~92121
i
<. 4
S
DBL. TOP PLATES
SIMPSON 'Bc'
CONNECTION DETAIL
WRC0051
- - ~."""".I."""".""."".
LOVELACE ENGINEERING SHEET NO. OF 45
6496 Weathers Place * Sulk 200 San Dkgo. Calllamla 92 12 1 02/07/96 619.535.9111 phw 619.535.1989 FOX
JOB .4 7 DZ3
Svuclurpt Dm uld TlUc 24 And-
CALCUUTEOBY DATE
CHECKED BY DATE
4x POST
.
F.N.
E.N.
E.N.
<
I *I b
I
I
/I UEADER (OW
-7-
I *I t 1- \I I
.I
I I
I
BEAH PER PLAN
SHEAWALL
PER PLAN
4x POST \.I E.N.
Zx SNDS I6'O.t. 2- I
.I
SHEARWALL DETAIL
WOO13
J
J
J
J
1
J
3INEERING SHEET NO.
SvUclunl Ddgn snd TlUc 24 GI= Andpb
CALCULATEDBY 6496 Weathers Place Sulte 200
Sm Dlego. Cnltfornla 92121
DATE
619.535.9111 Phone 619.535.1989Fol CMECKEO BY DATE
SCALE
! .. "
3x6 P.T. SILL PLATE W/ NCHCf? WLTS PER SEAWALL
ECUED .
1
-
2x STUDS Ib"0.t.
,-PER SHEAWLL SCHED.
2x BOT. PLATE W I6d
PLTWD. SHEATWE
JOIST PES PLAN,
PNT JOIST THAT DO NOT HAVE
10' CLR TO GWDE RUST BE Df. .2 FFE55UFE EATED
JOIST PES PLAN,
PNT JOIST THAT DO NOT HAVE
10' CLR TO GWDE RUST BE Df. .2 FFE55UFE EATED
; l"0" 11
CONT. FOOTING DETAIL
F000I
LOVELACE ENGINEERING SHEET NO. 3v OF 43 J08 97°z3
S(ructursl nnd 'rille 24 En- Andm
6496 Weathers Place - Sulk 200 San Dlego. Callfomla 92121 619.535.9111 phone 619.535.1989~a~
CALCUlATED BY DATE
CHECKED BY DATE
1-
1 1 L
1
1
1
1
1
1
1
1
1
1
1
1
1
1
97023 LOVELACE ENGINEERING snm NO.
suuctunl ~cde ~d nu* 24 ~nvgy ~SJ~IS
6496 Weathers Place - Sultc 200 San Dlcgo. Calllamla 92 121
619.535.9111 phone 619.535.1989 F-
CALCULATED BY DATE
CHECKED BY DATE
SCALE
..
LOVELACE ENGINEERING
s(ructulpl ~e- .nd nu* 24 - A,UI~~S
6496 Weathers Place - Sultc 200
San Dlcgo. Callfomla 92121 619.535.91 11 Aar 619.535.1989 Far
JOB
SHEET NO. 32 OF
CALCULATED BY DATE
CHECKED 8V 09/20/95 DATE
5' TCUC C.M.U. WALL W/ *5 (MRT.) BARS * 16'0.C. 4 *S (UCRIZ.) BARS *Zt'O.C. (SOLID GRMIT)
I-\" '5 DOWELS * 16'0.C.
RETAINING WALL
FRI.10041
- i
1
1
1
1
1
1
1
I
I
1
1
L
L
L 1 -
P 6496 Weathen Place * Sulte 2co San Dlego. CdUarnla 92 12 I
619.535.9111 ~lmr 619.535.1989 pa
JOB 77025
SHEET NO. 33 OF 4'5
WLCUUTED BY ME
CHECKED BY DATE 11/11/95
SCALE
1 2s-0' 1 1 1
RETAINING WALL
FRw005I . ~ ". W
. .. . .. .
1
1
1
i
1
1
1
I
1
I
I
1
1
1
1
1
-
i <
'4 DOWELS TO
-El*. (24' EA. WAY)
MATCU CM.U. MRT.
SLAB PER
WATER PROOFING
ARCU. DWGS. SIRPIPSON 'W MEMBRANE PER
C.H.U. LULL PER
ETAINIffi LULL
WOOD FLOOR TO SLAB
WS0104
b
?
"""
T
EXlSj'G. FOOT'C-.
4 STErWALL EXIST'G. FOOT'G.
NEW FOOT'C. TO EXIST'C.
FF0043
LOVELACE JOB ENGINEERING
SUUCtUd~dNlCZ4"
6496 Weathen Place Sate 200 San Dlgo. callfomla92121 619.535.9111 Ra 619.535.1989 Fb. CHECKEDBV DATE
97027
SHEET NO. A OF ' 7
CALCULATED BV DATE
... /,.
" - .~
LOVELACE JOB ENGINEERING
97 027
S~DsUpdTWe24Eny~ SHEET NO. 37 OF "-
6496 WeathaY plarr sate 200 San Dlcgo. CaWornIa92121 619.535.9111 619.535.1989~ CHECKEOBY DATE
CALCULATED BY DATE
.......
i
... -
' .i ... .. .. .......
.. ...
,_ .. ..
..
+
.......
I
-.
i
.. ..
LOVELACE JOB ENGINEERING
s-w.ndnllca4mmvm
6496 Weathen Place Sdte 200 San Mego. CallIOmta 92121 619.535.9111 M 619.535.1989- CHECKED 81 DATE
91 027
SHEET NO. '38 Of 43
CALCULATED 0Y DATE
. ..
" -
LOVELACE JOB ENGINEERING
6496 weathen Place. Sunc 200 CALCULATED BY
017 -7
- SHEET NO. 91 OF 43 s=u'ywsn.ndm24-?Y."- -
San Dlego. Califomta 92121
DATE
619.535.9111 Rlav 619.535.1989 Ibr CHECKED BY DATE -
SCALE
LOVELACE JOB ENGINEERING
s~~~ntlcz4~~nnly.u
e496 wcathen Place - SUIk 200 san otego. wornla 92121
619.535.9111 Rw 619.535.1989 ibr CHECKED BY DATE
91 -7
SHEET NO. 0,-
CALCULATED BY DATE
SCALE
LOVELACE JOB ENGINEERING
S"dNc24"
S496 Weathers Place * Sulk 200
San Dlego. Wornla 92121 619.535.9111 Rw 619.535.1989 h CHECKED BY DATE
97 02-5
, SHEET NO. A OF 4'
CALCULATED BY DATE
LOVELACE JOB 017 2%3
ENGINEERING s~runl~.ndntlca4eneTgv~
64% Weathcn mace * sum 200 CALCULATED BY DATE san DkgO. C3.wO~92121
SHEET NO. 4% OF 43
619.535.9111 Rm 619.535.1989 Fu CHECKED BY DATE
..
I. ,,.;
c
" .
LOVELACE JOB ENGINEERING
Strvrmnl~dntlcURl"
6496 Weathen Place SUI- 200 San Dlego. Califomla 92121 619.535.9111 M 619.535.1989h CHECKED BY DATE
q-loz~
SHEET No. e3 OF 4-5
CALCULATED BY DATE
.. ..
TITLE 24 ENERGY CALCULATIONS
.. -
DATE: FEBRUARY25, 1997
PROJECT: JENKINS RESIDENCE
: 2621 ACUNA COURT
, CARLSBAD, CA 92009
._
..
OWNER: DA VID JENKINS
2621 ACUNA COURT
CARLSBAD, CA 92009
DESIGNER; . , CLIFF MILLS DESIGN .
I40 ENCINITAS BL VD., SUITE 31 9
ENCINITAS, CA, 92024-3768, ,
,.
JOB NO. : 97023A " . ..
,. .
.. ..
64% Weathers Place
Suite 200 .%I Diego, California 92121
619.535.9111 phon;
' 619.535.1989 /ax
'. 4- u
.
\