Loading...
HomeMy WebLinkAbout2622 ARGONAUTA ST; ; 87-510; PermitDECLARATIONS LENDER I 11 WORKER'SCOYPENSATION OWNERLlUlLDER CONTRACTOM II In White - Inspector Green ~ (1) Flnance Yellow - Assessor Plnk ~ Applicant Gold temporary Flle DEVELOPMENT PROCESSING SERVICES DIVISION 2075 LAS PALMAS DRIVE CARLSBAD, CA 92009-4859 (619) 438-1161 MISCELLANEOUS FEE RECEIPT Appllcant PIaasa Prlnt And Flll In Shaded Area Only PLAN ID NO. 0024 09/23 0101 OfiHisc. 422.00 ADDRESS MAILING PLAN CHECK FEE WITHIN 180 DAYS, PLAN CHECK FEES IF THE APPLICANT TAKES NO ACTION ' 001-810-00-90-8821 . . . . . . - - - - - FEITED. CITY ZIP TEL. STATE I WILL ut run ~~ ~~ LICENSE NO. BUSINESS LICENSE NO. SUBDIYWON ' COT@) I LEGAL DESCRIPTIO'N 1 va OF HECK IF SUBMITTED: , / 2 ENERGY CALCS 2 STRUCTURAL CALCS I SENT TO APPLICANT DATE GIVEN/ DATE APPLICANT'S SIGNATURE DATE Whlte . Flle Yellow. Applicant Pink. Finance ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 208 SAN DIEGO. CA 92123 (619) -1468 DATE : - c /3. /a3 JURISDICTION: CARUPAD I FILE COPY PLAN CHECK NO: 87 - 510 SET: &,L PROJECT ADDRESS: 26u- &c;OnJWtA - PROJECT NAME: 93 48 The plans transmitted herewith have been corrected where necessary and substantially comply with the .jurisdiction's building codes. 0 with the jurisdiction's building codes when minor deficien- The plans transmitted herewith will substantially comply cies identified are resolved and checked by building department staff. 0 identified on the enclosed check list and should be corrected The plans transmitted herewith have significant deficiencies and resubmitted for a complete recheck. The check list transmitted herewith is for your information. plans are submitted for recheck. The applicant's copy of the check list is enclosed for the 0 The plans are being held at Esgil Corp. until corrected 0 jurisdiction to return to the applicant contact person. 0 The applicant's copy of the check list has been sent to: plan check has been completed. Esgil staff did not advise the applicant contact person that been completed. Person contacted: Esgil staff did advise applicant that the plan check has Date contacted: Telephone # REMARKS : Enclosures: ESmL -CORPORA'PTOM ESGIL CORPORATION 9320 CHESAPEAKE DR., SUITE 200 SAN DIEGO. CA 92123 (6 1 0) 560- 1468 PLAN CHECK NO: 87- SJO SET: Z 1 ..I ."UPS .". PROJECT ADDRESS: 4.CZ~dAu7h PROJECT NAME: 5m 0 necessary and substantially comply with the jurisdiction's The plans transmitted herewith have been corrected where building codes. The plans transmitted herewith will substantially comply 0 with the jurisdiction's building codes when minor deficien- cies identified are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies and resubmitted for a complete recheck. The check list transmitted herewith is for your information. plans are submitted for recheck. The applicant's copy of the check list is enclosed for the 0 identified on the enclosed check list and should be corrected @ The plans are being held at Esgil Corp. until corrected 0 jurisdiction to return to the applicant contact person. The applicant's copy of the check list has been sent to: &I5 WmRd &.iC7 4 /hIdkM fiLLePonk , ~mfi 9~02s '..-' 1-2 Esgil staff did advise applicant tha the plan check has been completed. Person contacted:, I /,I 0 /fl/')L?CCJ plan check has been completed. Esgil staff did not advise the applicant contact person that \ REMARKS : By : -i ESGIL CORPORAT~IN && Enclosures: Plan check is limited to technical requirementi contained in the Uniform Building Code, Uniform Plumbing Code. Uniform Mechanical Code. National conservation. noise attenuation and access for Electrical Code and state laws regulating energy regulationa enforced by the Building Inspection the handicapped. The plan check is based on Department. You may have other corrections based on law and ordinances enforced by the Planning Department, Engineering Department or other departments. modification or change. All circled items have I conformance with. the cited codes and regulations. to be satisfied before the plans will be in The items circled below need clarification, the approval of the plans does not permit the violation of any state, county or city law. Per Sec. 303 (c), of the Unirorm Building Code, I I i A. PLANS 1. Please make all correctiona on the original tracings and submit two new sets of prints, and any original plan acts that may have been returned to you by the jurisdiction, - 3. - next to ench clrclcd item, the shcct of this sheet haa been made snd rcturn thia the Phns upon bhich each correctlon on check ahect with tho revised plans. resolved from previous plan reviews. The fallwing items have not been The Original correction number has been given for your reference. Please contact me if You have any questions regarding these items. Date plana recsfved by plan Jlsckcr /-7-66 Date plan check cmplstsd /-/C-ffB bd BY ALL.% AU&L 1 I I ESGIL CORPORATION 9320 CHESAPEAKE DR.. SUITE 708 SAX DIECO. Ci\ 92173 (6 19) 560.I468 PROJECT ADDRESS: -22 &i'CtYMJPI'JI/~ PROSECT NAME : SED -~ The plans transmitted herewith have been corrected where building codes.. necessary and substantially comply with the jurisdiction's The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficien- cies identified checked by building department staff. The plans transmitted herewith have significant deficiencies and resubmitted for a complete recheck. identified on the enclosed check list and should be corrected are resolved and The check list transmitted herewith is the jurisdiction's Esgil Corp:until corrected plans are submitted for recheck. copy for your information. The plans are being held at The applicant's copy of the check list is enclosed for the jurisdiction to return to the applicant contact person. The applicant's co y of the check list has been sent to: L"nxI.5 ERLunlfid 14%- 5. AL7JRAs &39 F%4F7PCOK I CffLiF&'d/& %ze Esgil staff did not advise the applicant contact person that plan check has been completed. Esgil staff did advise applicant that the plan check has been completed. Person contacted: p~!&C-';1r>,?+P$ Date contacted: \d7 I In Telephone 8-723 - 0L49 REMARKS : AaroxtEcrIm~ v slnas IAIUu Am" Date plans received by jurisdiction: PLwmlIMp Plan check is limited to technical requiremMts contained in the Uniform Euilding Code, Uniform Plumbing Code, Uniform Mechanical Code, NatiOMl Electrical Code and state laws regulating energy handicapped. The plan check is ked on conservation, noise attenuation and access for the regulations enforced by the Building Inspection Department. You may have other corrections based on laws and ordinances by the Planning Department, Engineering Department or other departments. Resent California law mandates that residential model codes: construction comply with Title 24 and the following 1985 UBC (eff. 7/31/87) 1985 UPC (eff. 3/30/87) 1987 NEC (eff. 10/28/87) 1985 UMC (eff. 8/28/87) lhe abve regulations apply to residantial adopted by ordinance. construction, regardless of the code editions lhe circled items listed need clarification. modification or cbanga. All items hve to be with the cited codes and regulations. Per Sec. satisfied before the plans will be in conformance 303(c), 1985 Uniform Building Code, the approval of the plans does not permit the violation of any state, county or city law. To meed M the recheck urocess. note on this list lor a cwv) where each correction item has baan addressed Le.. ~lan sheet. specification. etc. Be sure to enclose the marlred M list when YOU submit the revised ulans. Date plans received by Esgil Corporation: 7 4-87 Date initial plan check completed: &7-S7 w. r4tr/=nl ANLC" Applicant ContllCt petaon: [ttm A/&?#d Telephone: 723 -0647 EJm: PAGKAllgBEImlclIm~AsPpIy;ILII~~m~"". List No. 63, Carlsbad Single Family Dwelling and hrplex With All Supplements. (1985 WC) - AdB Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to: Esgil Corporation, 9320 Chesapeake Drive, Suite 1208, SM Diego, California 92123, (619) 560-1468. (OIIIPL~TE ALL Puhu ReFt*d\)w Please make all corrections on the original tracings and submit two new sets of prints, and any original plan sets that may have been returned to you by the jurisdiction, to: 'he jurisdiction's building department. Indicate on the Title Sheet of the plans, the name of the legal owner and name of person responsible for the preparation of the plans. Section 302(a)7. Plans must be signed by the person responsible for their preparation. Plans, specifications and calculations shall be signed by the California state licensed engineer or architect responsible for their preparation. Specify expiration date of license, (California Business and Professions ELBVEAII Specify on the Title Sheet of the plans the gross floor area of each element of this project including dwelling, garage, carport, patio, deck and balcony. Section 302(c). plans that this project shall comply with Title Provide a statmnt on the Title Sheet of the 24 and 1985 UBC. UHC and UFC and 1987 HBC. Sutmit fully dimensioned plot plan drawn to scale showing location, size, and use of all existing and proposed structures on the lot. Identify property lines and show lot dimensions and all easeumts. Show location of all cut or fill slopes. Show finish floor elevations and show elevations of adiacent finish nrade. z.dl5E rm 5 ,Show drainage patterns- with minimMl slopes. alley to property line and distance from Indicate distance from canter line of street or property lines to proposed building. Section 302(c). Show on the title sheet all structures, pools, walls, etc. included under this application. Any portion of the project shown on the site plan that is not included with the building permit application filed should be clearly identified as "not included." IF APfLILA6L.S rn" i' I" I" . walls closer than 3 feet to property lines openings, and shall have 30 inch parapets when shall be one-hour rated construction, have no the building floor area exceeds 1,000 square feet on any floor. (Table 5-A, Section 1709 (a)). . Projections, including eaves, may not extend more than 12 inches into the 3 foot setback windows shall be not less UM 30 inches from fmm the property line. Eaves over required the side and rear pr erty lines. Section 1710 and Section 504 (3 and (b). . Plastic skylights shall not be installed within 8' of an exterior wall located where openings in such exterior wall are prohibited or required to be protected. Section 5207 (a) 7. f" ? 7- . Projections, including eaves, shall be one- hour fire-resistive construction, heavy tbber or of noncombustible material if they project into the 3' setback area from the property line. Section 1710. 5 . Show location of permanently wired smoke detector, centrally located in corridor or area giving access to sleeping room or abve stair if sleeping room are on upper level. Section 1210. A smoke detector shall be installed in the basement of dwelling units having a stairway which opens from the basement into the dwelling. Such detector shall be connected to a sounding device or other detector to provide an alarm which will be audible in the sleeping area. Section 1210. Rrm SIZILS. LleLc. VRuJMnml rn GtAzIE 7. Habitable rwms, other than kitchens, shall At least one room shall have not less than 120 contain at least 70 square feet of floor area. Section 1207 (b). square feet of floor area. . Window area mst be at least 1/10 of the floor area and a minh of 10 square feet per . Sleeping rwp shall have a window or exterior Section 1205 (a). Appears to be deficient in door for emrgency exit. Sill height shall not exceed 44" above the floor. The window must have an openable area of at least 5.7 square feet with the minimum openable width 20" and the minh openabla height 24". Section 1204. Openable window area in habitable rooms must be square feet. In bathrooms, laundry rooms and 1/20 of the floor area and a minh of 5 similar rooms 1/20 of area is re uired and mink is 1.5 sq. ft. (Section 1205 ?a)). At least 112 of the conmon wall must be open and have an opening not less than 25 sq. ft. if light and ventilation is being supplied from an adjacent ram. Section 1205 (a). Required windows shall not open into a roofed porch unless the ceiling height is at least 7 feet, the longer side is at least 65% open, and the porch abuts a street, yard or court. Section 1205 (a). Provide mechanical ventilation capable of providing five air changes per hour in bathrooms, water closet compartments, laundry rooms and similar moms if required openable -fJ&/5tBwrz APtA BF M&XX ?Y?W windows m Mtpmided. Section 1205 (a). No habitable mom, other than a kith, shall be less than 7'0" in any dimension. Section 1207 (c). Show that ailin# height for habitable roms is a minimum of 7'6 . Section 1207 (a). Show ceiling height for laundry moms, hallwys, corridors, and bathrooms is a minhnnn of 7'0'. Section 1207 (a). Dimension on the plans the 30" clear width for water closet coqartmenta and 24" clearance in fmnt of water closet. Section 511 (a). specify safety glazing for glazing in hazardous locations such M glass doors, glazing adjacent surfaces. Section 5406. to such doors and glazing adjacent to WaWnE Glazing, in the same wall plane M a door, must be safety glazing if within 12" of the door and less than 60" above the walking surface, unless the glazing is leaded or faceted glass. Section 540 (d) 6.W1~J0od 6 AmALflrfT-N Glazing in shower and tub enclosures shall be tempered, laminated or approved plastic (including windows within 5 feet of tub or shower floor). Section 5406 (d) 5. CrnIIL'1 L .J f e A mezzanine .is an intermediate floor and may not have a floor area exceeding 33 113 percent of the total floor area in the room below. The mezzanine floor nust have a clear height of 7 feet, above and below, and must have the long side open to the room below except for posts and protective walls or railings not exceeding 42" in height. Section 1716. The loft you show does not comply M a mezzanine floor and is, by Uniform Building Code definition, a story. Section 1716. Floors above the second story shall have not less than 2 exits. Occupied roofs may hve OM exit if d occupied areas are less than 500 Square feet and 10ated M hi- than inrmediately above the second story. Section 3303 (a). Required exit doorways shall be not less than and shall be capable of opening at leart 90 36" in width and not less than 6'8" in height, degrees. Saction 3304 (e). Provide 36" high protective railing for porches, balconies, and open sides of stair landings. Openings betwfm railing shall be less UIM 6". Section 1711. Show how guardrail connection details are adequate to support 20 pounds per lineal foot at a right angle to the top rail. Table 23-B. Rovide stainay and landing details. Section 3306 (b) h (c). a. Hawh rise is 7" and minimum run is occupants, or serves an unoccupied roof, 11". b the stairs serves less than 10 mbimun. rise my be E" maximum and run 9" b. Minb headroom is 6'6". C. Minb width is 36". handrails per Section 3306 (J), shall satisfy the following: a. Rovide handrail for stairways with 4 or more risers. b. Handrail shall be 30" to 34" above the nosing of treads. e. The handgrip portion of handrail shall be not less than 1 114" nor more than 2" in cross-sectional dimension. Bvery stairway landing shall have a dimension, measured in the direction of travel, at least equal to the stairway width. Such dimension need not exceed 36 inches. Section 3306 (g), 3304 (i). A door may open inward at the top step of a stairway provided the top step is not more than 7 112" lower than the floor level. Section 3304 (h). Provide details of winding stairway complying with Section 3306 (d): a. Minimum tread is 6 inches at any pint and minimum 9 inches at a point 12 inches from where the treads are narrowest. b. Maximum rise is 8 inches. C. Minimum width is 36 inches. Provide spiral stairway details, per Section 3306 (f): a. Hinirrmm run is 7 1/2 inches meaaumd at a point 12 inches from where the treads are the narrowest. b. Maximum rise is 9 112 inches. E. Hinirrmm headroom is 6 feet 6 inches d. The tread muat provide a clear walking arm measuaing at least 26 inches from the outer edge of the supporting colum to the inner edge of the handrail. Spiral stairways may not be used for required exits when the area served is greater than 400 sq. ft. Section 3306 (f). Provide I.C.B.O. Research Report and rmmbsr for metal stairway, or submit plans and calculations and approved fabricator registered with the building department or note that the stairway fabrication plans shall be submitted to and approved by the building official prior to installation. P I". f f . In buildings over 2 stories in height, provide openings in the exterior wall below or witin 314 hour fire-rated assemblies for all An exit balcony with 2 separated stairways is 10 feet horizontally of an exterior stairway. exempt. Section 3306 (1). Openings in exterior walls below or within 10 feet, measuied horizontally, of an exterior assemblies having a Wee-fourths-hour fire stair shall be protected by self-closing fire protection rating when the stair serves a floor level having openings in two or more floors below it. An exit balcony with two separated stairways is exempt. Section 3306 (I). . Exterior stairways shall not project into the 3 foot set- from the property lines. Section 3306 (n). . The walls and soffits of the enclosed usable space under interior stairs shall be protected on the enclosed side as required for one-hour fire-resistive construction. Section 3306 (m). . Within units, show that corridors have a minimum width of 36 inches. Section 3305 (b). . Roof slope is not adequate for roof type specified. Table 32-B; Section 3203 (h). @ Specify roof material and application. Chsoter 32. Specify I.C.B.O. or U.L. approval mber for roof materials not covered in U.B.C., e.&, tile, etc. Section 107. 5l ? . The maximum slope for a fire retardant built- up roof, with rock or gravel surfacing, is 3 inches in 12 inches. Section 3203 (e) 2. . The minimum slope for a fire retardant built- up roof, with cap sheet surfacing, is 112 inch in 12 inches. Section 3203 (e) 3. . Specify minimum 1/4 inch per foot roof slope water. Section 3207 (a), Section 2305 (f) and for drainage or design to support accumulated Section 2511 (d) 6. 8111187 4 . Show roof drains and overflows. Section 3207. . Provide skylight details to show compliance with Sections 3401 and 5207 or provide I.C.B.O. approval -be+. Plastic skylights must be separated from each other by at least 4 feet. Section 5207 (a) 6. show attic ventilation. ninh vent area is 11150 of attic area or 11300 of attic area if at least 50% of the required vent is at least 3 feet above eave vents or cornice vents. Show required area and area provided. Section 3205 (c). E!hscmx Rovide fireplace construction details or note construction to be per attached fireplace standard drawing. Cha ter 37. f'LAiU lln9 DETRILS. I %(duLJ7 fCi&Y W/I~&-?L& LAbr ,976 Oe 15d ~ll eleuents supporting floor abe garage, including walls supporting floor joists, mst . have one-hour fire-resistive protection on the garage side. Section 503 (b) show 1 3/8" solid core self-closing door for openings between garage and dwelling. Section 503 (d). Garages are not permitted to open into a room used for sleeping purposes. Section 1104. h occupancy separation is not required between carport and residence, provided the earport is open on two or more sides end has no enclosed uses above. Section 503 (a) Exception 3. Show garage freming sections, size of header plate line, method bracinu RaraR9 front and over garage opening, lateral cross bracing at holddowns if required. Chapter 23. . Show anchored veneer support and connections - attached to wood in Seismic Zones 3 and 4, $NOTE: Haxb shear panel ratio of height-to- comply with Section 3006 (d)l and Section 2515 width is 3 1/2 to 1 Table 25-1.f'LYr)OW (a). Show ties and 19 wire in horizontal Cr:, i=&2 SW\ joints. . Doors may open into the garage only if the . show height and construction details of all floor or landing in the garage is not more than one inch lower than the door threshold. masonry walls. Chapter 24. Section 3304 (h). . Note that clsanart openings shall be provided at the bottom of all cells to be grout filled . Provide an 18" raised platform for any FAU, in accordance with Table 24-6. Cleanouts shall water heater, or other device in the garage which may generate a flame or spark. W be sealed before grouting, after inspection. Section 508, UPC Section 1310 (a). . Show floor end roof connections to masonry walls. Connection shall resist 200 pounds per lineal foot or the actual design load, whichever is greater. Cross grain tension or bending in wood ledgers is not permitted. - Per soils report, nota on the plan the soils classification, whether or not the soil is expensive and note the allowable bearing Sectioz 2310 & 23lZ-(j)3A. value. Section 2905 (c). 166. Provide details for damp proofing the foundation walls, below finish grade, where useable space exists on the interior side of the walls. Section 1707 (a). 87. Show a minimum 2" air SDllCe and flaahinn /~ ~ &tween planter and bUilding*wellS. ~ ~~~~~~ ~. Section 2516 (c) 7. Garage requires one-hour fire protection on the garage side of walls and ceiling comn to the dwelling. Table 5-B, Section 503 (d). . Ihe foundation plan does not comply with the + soils report recoxmadations for this project. Please review the report and modify design, notes and details as required to show compliance: @ Provide notes on the foundation plan listing the soils report recoomendation for foundations, slab and building pad Preparation. f, Provide a letter from the soils engineer confirming that the foundation plan, grading plan and specifications have been reviewed and that it has been determined that the reconmendations in the soils report are properly incorporated into the construction doclrments (when required by the soil report). The soils report recomends excavations be reviewed by soils engineer. Note on the foundation plan that "Prior to the contractor requesting a Building Department foundation building official in writing that: inspection, the soils engineer shall advise the 1. The building pad was prepared in accordance with the soils report, 2. The utility trenches have been properly backfilled and compacted, and 3. The foundation excavations. formings and report and approved plan." reinforcements comply with the soils . Show height of all foundation walls. Chapter . Show height of retained earth on all foundation walls. Chapter 23. If cut or fill slopes exist, show distance of -folmdation to edge of cut or fill slopes and Chapter 29. show steepness and heights of cuts and fills. Note on plans that wood shall be 6" rn- above fkrish grade. Section 2907 (a). Note on plans that surface water will drain away from building and show drabage pattern and key elevations. On graded sites, the top of any exterior foundation shall extend above the street gutter at point of discharge or the plus 2 percent. Section 2905 (f), 2907 (d) 5. inlet to a drainage device a minirmrm of 12" 9. Dimension foundation per U.B.C. Table 29A: 2 1 6" 12" 12" 6" 8" 15" 18" 3 7" 10" 18" 24" 8" *Foundations may support a roof in addition to the floors. Where only a roof is supported, use foundation for one floor. , Show foundation sills to be pressure treated, or equal. Section 2516 (c) 3. Show foundation bolt size and spacing. Section 2907 (f) . Specify size, I.C.B.O. number and manufacturer of power drlven pins. Show edge and end distances and spacing. Section 302 (c). If required by structural calculations, show size, imbedment and location of hold down anchors on foundation plan. Section 2312 (E), 302 (c). If hold downs ere required by calculations, note on plan that hold down anchors must be tied in place prior to foundation inspection. Seetion 305 (e) 1. Show adequate footings under all bearing walls and shear walls. Section 2907 (b). Show on the plans stepped footings for slopes steeper than 1:lO. Section 2907 (c). Show minh 18" clearance from grade to bottom of floor joists and minimum 12" clearance to bottom of girders. Section 2516 (c) 2. undisturbed soil. Table 29-A. Show pier size, spacing and depth into Snow minh underfloor access of 18" x 14". Section 2516 (c). Show mhhm underfloor ventilation equal to 1 =ea. openinea shall be as close to corners rq. ft. for each 150 sq. ft. of underfloor ventilation on at least two approxhtely as practicdble and shall provide cross opposite sides. Section 2516 (c) 6. be pressure treated per UBC Std. No. 25-12. Specify that posts embedded in concrete shall Section 2516 (c) 1. Show wall bracing. Every exterior wood stud wall and main cross partition shall be braced at each end at least evary 25 feet of length with 1 x 4 diagonal let-in braces or equivalent. Section 2517 (g) 3. Note cross bridging or blocking. Floor joists and rafters 12" or more in depth shall be not exceeding 8 feet, unless both edges are supported laterally by bridging at intervals held inline. Sec. 2506 (h), 2517 (a) 6. Show blocking at ends and at Supports Of floor joists, rafters and trusses at exterior Walls. Section 2517 (d) 3, 2517 (h) 6. Show double joists. Floor joists shall be doubled under partitions wing parallel with the Section 2517 (d) 5. Bearing partitions, perpendicular to joists, shall not be offset from supporting girders, baas, walls or partitions, more than the depth of the joist. Section 2517 (d) 5. Show rafter ties. Rafter ties shall be spaced not more than 4 feet on center and be just ceiling joists are not parallel. Section 2517 above the ceiling joists, where rafters and (h) 4- Show rafter purlin braces to be not less than 45 degrees to the horizontal. Section 2517 (h) 5. 0 106 Show 1/2" minimm clearance between top plate trusses. (To ensure loading will be as of interior partitions and bottom chord of - designed). &MU DETAIL^ % SEO-IMIL 0 splice. Section 2517 (g) 2. 107 show double top plate with minh 48" lap 1 8. Show nailing will be in compliance with Table 1 25-9. show or note fire stops at the following locations per Section 2516 (f): partitions, including furred apace', at In concealed spaces of stud walls and the ceiling and floor levels and at 10 foot intervals along the length of the wall; at all interconnections between concealed vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings; In concealed spaces &tween stair and between studs along and inline with stringers at tbe top and bottom of the nm the run of stairs if the walls under the stairs are unfinished; and in openings around vents? pipes, ducts, chimneys, fireplaces and sunllar openings and floor levels, with noncombustible vhich afford a passage for fire at celing materials. Show stud size and spacing. PLaXiap allovable maw. 10'; Non-baaring: 2 x 4 w. 14 , 2 x 6 stud heights: Bearing wall: 2 x4 and, 2 x 6 maw. 20'. Table 25-R-3. .. Studs supporting two floors, a roof and ceiling mst be 3 x 4 or 2 x 6 at 16" O.C. Table 25-R-3. Note on ~1:T.c. Certificate of Compliance for glued laminated wood members shall be given to the building inspector prior to installation. Section 306 (f). Detail all post-to-beam and post-to-footing connections and reference the detail to the plan. Section 2516 (m). 0- 114 Detail shear transfer connections. including mf and floor diaphrams, to shear walls. .. Section 2513. IPJ~XIOL s~knidwk~w w mf and floor diaphrams, to shear walls; Section 2513. IPJ~XIOL s~knidwk~w @ specify nail size and spacing for all shear walls, floor and roof diaphr-. Indicate required blocking. Maintain mxh diaphragm dimension ratios. [Tables 25 I, J. K and Section 4 13 (a)]. shd ~~ILP MATH~~L~ hJfJ Show 3" x 4" or 2" x 6" studs in first story NAILIN& hnEL(II& hoNb ~rhltc UtJgGf pE%7iiM of three story building. Table 25-R-3. 0 117 Provide truss details end tr .x Calculations for this project. identification numbers on the I-. ipecify truss plan. Section 302~). f 1 8. Rovide mf fram plan and floor framing lf. Provide framing sections thraugh n Section 302 (c). Provide calculations for main vertical end horizontal framing members and post footings. Section 302 (b).3 5,ze ,J<dbk.Ci -" I20 $2. Provide calculations for lateral loads, shear panels, shear transfer and related. Section 302 (b). / 1 1 3. Show on the plans all structural requirements developed in the structural calculations. Section 302 (c). (See colrments below or at end. ) 14. Columns and posts located on concrete or masonry floors or decks exposed to the weather or to water splash or in basements and which by concrete piers or metal pedestals projecting support penvrnent structures shall be supported above floors unless approved wood of natural resistance to decay or treated wood is used. Section 2516 (c) 4. 0 t f 125 Individual concrete or masonry piers shall project at least 8 inches above exposed ground unless the columns-or posts which they support are of approved wood of natural resistance to decay or treated wood is used. Section 2516 (c) 4. 1 6. show location of attic access with minima size 22" x 30". Section 3205. 11. Show draft separation for attic areas between '/?" index. Table 25-N. units in a duplex. Section 2516 (f). . Specify plywood grade and penel identification . iihen roof pitch is less than 3:12, design ridge as a beam. Section 2517 (h). '? 14" high, framing shall be solid blocking. . If foundation cripple wall studs are less than Section 2517 (9) 4. All heating, ventilating, and cooling Systems and applicances shall comply with the Uniform Mechanical Code. 1 7. Show the size, location and type of all 1 8. Show source of combustion air to furnace, per / Chapter 6, UMC. / heating and cooling appliances or systfm.9. Every dwelling unit shall be provided with heating facilitites capable of maintaining a room temperature of 70 degrees F. at 3 feet above the floor in all habitable moms. show basis for compliance. UBC, Sec. 1211. 0 . show minimum 30" deep unobstructed working space in front of furnace. Section 505, UHC. 141 Note on plans, "clearances to be per manufacturer's listing." Section 504, UMC. 1 2. Furnace shall not be installed in any bedroom, f' bathroom or in a closet or confined space with access only through such room unless furnace or electric heating applian, specified M direct vent applianc,. .lased Section 704 UMC. Show I.C.B.O. approval nmber ' .:cefab fireplace. . Show access to the attic or underfLur furnace to be minw 30 inches by 30 inches. Section 708 h 709 UMC. 0 132 Show plywood sheath- over exposed eaves, or Section 2516 (i). other weather exposed areas, is exterior grade. U3 Show a weep screed at the foundation plate line on all exterior stud walls to be stuccoed. Section 4706 (e). 4. Detail truss layout for 30" x 30" attic access, if required for equipment in the attic. 0 135 Ridges. hips, and valleys shall be at least one size larger than supported rafters. Section 2517 (h) 3-'jubrtl 1 6. In open beam construction, provide strap ties across the beams at the ridge support. Section ' 2501 (b). 1 5. Note that passageway to the attic furnace j shall be unobstructed and have continuous solid flooring not less than 24 inches wide. Section 708 UMC. ' fixture controlled by a switch for the attic 46. Show permMent electrical outlet and lighting furnace. Section 708 UHC. . Show details to comply with Sect .n 709 for furnace under the floor, or Secti . 710 for roof or outside furnace. 1 8. Note on plan: Cas vents and non-combustible or less shall be effectively draft stopped at UBC, Section 1706 (a) 6. each floor or ceiling. f piping, in walls, passing through three floors 9. Provide dryer vent to outside. W, Section 1903. All wiring shall comply with the National Electrical Code. service, the location of the service panel and 0. Show on the plan the amperage of the electrical the location of MY sub-panels. 1. Show location of all electrical receptacles. locations andlor spacing 0 0 0 153 Show at least one convenience outlet other than outlets for laundry, etc., outdoors,- and basements. NEC, Art. 210-52. 154 Note convenience outlets in bathrooms, kitchen counter top(s) within 6 feet of the kitchen sink, outdoors, and in RaraRes and basemmts shall be GFI Drotected. NEC, Art. 210-8. (other than for laundry and slmilar equipment) 155 Note electrical system ground to be provided per NEC, Art. 250-81. Show water heater size trpe and location on plans. UPC, Section* slow souzce for providing combustion air to fuel water heater. If wall openings in an enclosure are used, at least one-half of the required opening area shall extend into the upper twelve hches of the enclosure and one- half within the lower twelve inches. UPC, Section 1307. 8. Fuel combustion water heater shall not be installed in bath or bedroom or in a closet opening into bath or bedroom. UPC, Section 1309. 0 0 159. Provide adequate barrier to protect water heater from vehicle damage. UPC, Section 1310. 0. Shar T and P valve on water heater and show route of discharge line to exterior. UPC, Section 1007 (e). 161. Note on the plan that hose bibbs and lawn prevention devices. UPC, Section 1003(h) 6 sprinkler system shall have approved backflow (i). 1 2. Show shower stall can accommodate a 30" circle f and has a minimum floor area of 1,024 sq. in. UPC 909 (d). Show details of duplex cOmmOn (party) walls and floorlceiling assemblies to achieve a of 50 decibels and M Impact Insulation Class Sound Transmission Class (STC) rating in WallS (IIC) rating on floorlceiling of 50 decibels. Title 25. . Show how penetrations of assemblies for piping, electrical devices, recessed cabinets, bathtubs, soffits, or heating ventilating, or exhaust ducts shall be sealed, lined, or insulated to maintain required sound transmission rating. Title 25. . Provide insulation in walls and ceiling to achieve STC of 50 between garage and living area if garage use is not controlled by resident. Title 25. State regulations (California Mmin. Code) require that the design satisfy one of the attached alternative energy packages or suhpit calculations. The law also requires that many dtory conservation items be satisfied. Ihe designer shall provide an Energy Certificate of Compliance imprinted on the plans. This Certificate shall indicate the neeeded to comply with Orapter 2-53 of Title features and performance specifications 24. (1) The individual with overall responsibility for the design, & (2) The owner of the building or property shall sign the Certificate of Compliance. Title 20, Compliance Certificate Form. Section 1403 (a) 2. A. See the attached 1 7. show on the plans the "R" value for the walls, ! floors, ceiling and related ares. '? Glazing Schedule. . Show double glazing as per Energy Design, on 8111187 9 1dl I 1{2. The plans are not in compliance with the energy conservation compliance package selected or design calculations provided. Show on plans conformance as follws: Specify on the buil msndatory energy conservation requiremmts as all of the Enerw Conservation Rea listed on the enclosure titled, "Mandatory uirements". ~ ~~ dinp DlW 1 3. Show the size, type, make, model and location t provide heat loss calculations if the output of the space heating (or cooling) system and exceeds 45.000 BTuIHr. 7. See attached energy packages. +. Floor drains wt have auto-prime (city 146. Note exhaust fans Wnot be duetless type (City policy). policy). New residential units mst be pre-plumbed for Jack. mst be iMta1l.d" where the water heater future solar water heating. Note "two roof is in the one story garage and directly below the mst south facing roof (City Ordinance No. 8093). 8. Note "two 314" copper pipes must be installed location vhen the water heater is not in a one story garage and is not directly below the most south facing mof. (City Ordinance No. 8093). to the most Convdent future solar pane1 All piping for pruent or future solar water (city policy). heating mst be insulated when in areas that (LeB not heated Or Cooled by "1 mBM. 0. Incorporate the waterproofing details, on the f attached Policy 80-8, where interior living wall( s) . space occurs below grade at the masonry f information required by the attached 1 1. Show on the Title Sheet on the plans, the @ All new residential buildings, including additions, require a soils report. Please Developmtal Services Sheet 112383. subit two copies. d 3. Heavy timber framing, minimum 6" x 10" beams and mink 6" x 8" post, for the structural between the garage and living area above, is beam and column supporting the fire separation policy). acceptable if shown on the plans. (city . UBC Adopting Otdinance 8792 requires Fire 18.04.230). &ow compliance with UBC Section 3203(e). 185 City Ordinance 9792 requires two parking spaceslunit with clear area of. ZO'xZO' i.e. no washing machines, etc. Show compliance. LLaOlW, 16. Please see additional corrections, or remarks, D~NT mncm t% WLT on the following page. 0 ? The City of Carlsbad has contracted with Esgil Corporation located at 9320 Cnesapeake Drive, Suite 208, San Diego, California 92123; telephone number project. If you have any questions regarding these of 6191560-1468, to perform the plan check for your plan check items, please contact k, AMFIJ AdId / / at Esgil Corporation. If you have any questions regarding City Building permit procedures, please contact Carter Darnell at the City of Carlsbad, 1200 Elm Avenue., telephone 6191438-1161. Thank You. BRc1osures: I Dater IO-I-&Z CITY OF CARLSBAD Prepared by! a Bldg. Dept. L. P \ (kt\\ hlca VALUATION AND FMN CHECK FEE 0 Esgil PLAN CHECK NO. Pa- TI0 BUILDING ADDRESS 7m .z Mf+%\AcTTA AP?LICANT/CONTACT PHONE NO. BUILDING OCCUPANCY E-3 / Ih -I DESTCNER PHONE TYPE OF CONSTRUCTION d-d CONTRACTOR PHONE Air Conditioninr 1 1 I Commercial e Residential 1 I4 Res. or Comm. I Fire Sorinklers 147 7LS To tal Value c Building Permit Foe S $ %la so Plan Check Fee $ I 524. "07 Plans received by Esgil after July 31, 1987 shall have permit and plan check fees calculated per 1985 UBC. ENGINEERING CHECKLIST Date: /O- 6 -87 Plan Check No. 87- S/ 0 Project Address: 2622 Item Incomplete - Needs Your Action 1,2,3 Number in circle indicates plancheck number that deficiency was identified Site Plan 1. Provide a fully dimensioned site plan drawn to scale. Show: North arrow, property linesnasements, existing and proposed eets, existing st-improvemelrra,rtgnr-ot-way on Site Plan: Finish floor elevations, elevations of finish $%*$di:i;sioned setbacks. - - grade adjacent to building, existing topographical lines, -existing and proposed SI ent (%I grade and drainage tterns. .f& 1. 1 v 3. Provide legal description of property. 4. Provide assessor's parcel number. PERMITS REQUIRED Grading 5. Grading permit required. (Separate submittal to Engineerins Department required for Grading Permit). 6. Grading plans in plan check PE ,?.67&7 . 7. Need the following completed prior to building permit issuance: A. Grading plans signed. B. Grading permit issued. C. Grading completed. D. Certification letter and compaction reports submitted. E. Grading inspected and permit signed off by City Inspector. 8. Right-of-Wav Permit r ired for work in public right-of-wa) etc). (e.g., (driveway appro , sidewalk, connection to water main, -" 9. Industrial Waste Permit application required. To be filled OU' completely and returned to Development Processing. FEES REQUIRED 10: Park-in-Lieu fees required. Quadrant: , Fee Per Unit: , Total Fee: - 1 1. Traffic impact f rec+ujred. Fee Per Unit: , Total Fee: 4t670 e . 1: 2. Bridge and Thoroughfare fee required. Fee Per Unit: #530 , Total Fee: $kV? 3. Public facilities fee required. 4. Facilities management fee required. Fee 5. Additional EDU's required: Sewer connection fee: 1 16. Sewer lateral required: ,(f%Jo O.K. to issue: Date : If you have any questions about any of the above items identified on this plan check, pleese.se)(-.the Development Processing Department at 438-1161. ddd PLANNING CHECKLIST Plan Check No. 87-510 Address Z&Z2 &@,worn Type of Project and Use SFD Zone R- I - /SO- Use Allowed? YES Setback: Front = Side OK Rear & Facilities Management Zone 6 School District: San Dieguito Encinitas & No- - - Carlsbad San Marcos & - Discretionary Action Required YES - NO Type - Environmental Required YES 2 NO - /WW /+'dfl *&?//,e Q&uwa &J Landscape Plan Required YES x NO - Comments Coastal Permit Required YES Additional Comments ~ .. LC.; -, .. - EVACUATION REPORT Flllng Cnlcgory: FASTENEilS-Slccl Gum1 PIJICJ ,.' JZ ". -.. '.- .. .. TADLE NO. I-ALLOWAOLE LOA0 IN POUNDS PEll SQUAllC INCH 01: PLATE CONTACT AIIEA RAMONA LUMBER CO., JNC. . 414 - 11th STREET RAMOPJA, CA 92065 ' ((519) 783-1080 ,n n . , . . . - . . ,\ r . ~- . . ~. LGT a- 3 -7 /- grn6.E G' 4' 3' s 3' 6' Y' 6' 3' Y' 3' 6' ROOF RAF'TERS BEAM WITH UNIFORM LOGDING REAM LOCATION 1 - 4 - 6 L'f'*AN 1- W/LF v MA%. I.1 b 250 REQUIRED AREA HEQU IRED SECT I ON Rt IRED I (DL+LL) REPLJIRED I (LL ONLY) 7561 1125 = 11.942ll SO IN =9 = 16.19921 = 19:4;923 BEAM WITH UNIFORM LOADING BEAM LOCATION '2 -3 - 5 7 REOUIRED AREA HEDUIRED SECTION REQUIRED I (LL ONLY) RE(3UIRED I (UL+LL) BECIM WITH UNIFORM LOADING - E.-. It:+,# I LOCATION 8 = 7.894737 SO IN =4 A-zw yxd = 5.759814 = 4.7998167 bEAM WITH UNIFOFiM LOAUING BEAM LOCATION 14 - 5PAN L W/LF V MAX. i'l b 1513 450 575 [;;EOUIfqED AREA REQUIRED SECTION REGU:[RED I (LL ONLY! = 5.4 REQUIRED I iDL+LL) = 9.719614 = 7.719614 = 7. 10526; SC IN BEAM WITH UNIFORll LOADING HEAM LOCkT ION 1.8 - I 9 . SPAN L W/LF V. 4 ;DEI ha)&? rIc;x. M 600 HF- IIRED AREA = 9.473684 sa IN KEL!UIRED SECTION REOUIRED I (LL ONLY) = 4.8 REOUIHED I (DL+LL) = 7.199824 = 5.759814 4xY YYY END OF PROGRAM P 20 XI' A"AT F:OOF EXT. WALL EXT. l4AL.L EXT. WALL FL.I:iCIR O'lHER I IJT. WAL.L H ?: I 9 4' ld 0 CL: 0 CI ............... ... ... " .- - - " - ... .. .- I" WHLL i'10 r 7 1. 4 .. ,.I 0 FT 15 b 4 /+ 13 0 0 .- .... - ............ " r . .- i r G' 4l 3' 3 3' 6' 9' 6' 3' Y' 3' 6' 1 .. ...I - ..... 4 5 BEAM WITH UNIFaKM LOADING BEAM LOCATION 1 - 4 - 6 SPAN L W/LF V mx. PI 6 250 750 1125 REOUIRED AREA REOLJIRED SEC'TION =9 .= 11.84211 SO IN RF~JIRED I (LL ONLY) Rt AIRED I (DL+LL) = 19:4;923 = 16.19921 BEAM WITH UNIFORM LOADING BEAM LOCATION '2 -3 - 5 7 EEQUIRED AREA f;!EDUIRED SECTION F:EC?UIRED I (LL ONLY) REQUIRED I (DL+LL) BEFM WITH UNIFOHM LOADING BEAM LOCATION 8 = 7.894737 SD IN = 4.799807 = 5.759814 =4 J"2xy om 4x6 SPAN L W / L.F V MAX. M 6 640 REOUIFtED AREA = JQ. 315.77 so IN RECIU I RED SECT I ilN - - 23. 04 REOUIRED I (Ll. ONLY) F:E!!UIF:ED I (DL+Ll.) = 48.57855 = 41.47G348 1920 2880 BF-A!I WITH UNIFOHM LOiiDINII; KEUUIRED AREA BEAM LJI TH UN I FORt'! LOAD I NG LOCATION 9 SPAN L WiLF 0 MAX. M 7 640 750 7- , LO .-. REIXJIRED AREA HEUIJIRED SECTION PED:J IRED I (DL+LL.) liEC7UIRED I (LL 0NL.Y) = 6.074816 = 15.1571 Si2 IN - - 5.76 - - 5.18581 BEAM L.1 I TH UN I FORIN LflAD I NG BEAM LOCATION 14 10 REWIRED SECTION = 5.4 REOUIHED I (LL OtdLY) = ?. 719614 F:ECIIJI RED I i DL+LL. ) = 9.719614 BEAM WITH IJNIFORM LOADING HEAM L.OCAT ION la - I 9 . SPAN L W/LF V rwx. M -4 X0B RI JIRED AREA REQUIRED SECTION REQUIRED I (LL ONLY) = 4.8 REQUIRED I (DL+LL) = 7.199824 6Q0 = 9.473684 sc! IN 600 = s.zwa14 BEAM 1JITt.i UNIFORM LOAD REAM LOCATION la2 - fl I NG &-A+ EXT. WALL EXT. WALL EXT. WALL FL.OOR INT'. WALL OTHER TOTAL lJF:.pEF< LCjArjS HT TG UPPER EL! FCJFiCE. EL! StiE4RiLF LIPLIFT ROOF EL! St.iEAF:/LF UPLIFT 4864 d 114Q # 540 44 0# 0# 0# 0 *l 6544 # D.- D.f ROOF EX T. L4ALL EXT. WALL EXT. GJALL FLOOR Iwr. LML.L. OTHER LIPPER LOADS TOTAL. 1.i.r TO IJPPES EO FORCE EO SHEAR/LF UPL I FT H ;: 10 6 0 4 0 0 W L Ibi I" - THEE LDS WIND AREA L 14 WALL NO &? F'T #PF LBS WALL NO ,- G EX'T. WALL ROOF EXT. WALL EX'T. LJALL I r,lT . LdAl..L FLUOR OTtiER TIJ'TAL - t+T TO UFF'ER I.JFPER LOADS EU FORCE EO SHEAR/LF UPLIFT H :x 15 4 4 4 I? 0 a I fiOOF EX.T. WALL EXT. bJAL-L EX'T. WALL FL.I)OR lIV1. WALL CI'.I't,ER TO'rAL UPPER LOAljS EC! FORCE EL! StiEAR/LF LJPL I F'T HT 'ro UPPER EVALUATION REPORT Rcporl No. 121 1 April. IMS flllng Cnlcgory: FASTENEflS-Slccl I;u~~cI Plalc3 ,- .. RAMONA LUMBER CO., JNC. 414 - 11th STREET RAMOM, CA 92065 ' (619) 789-1080 .. "--------71/ llr . YI c .. . c I ?. ? e L REPORT OF GEOTECHNICAL INVESTIGATION LOT 726. LA COSTA ARGONAUTA STREET CARLSBAD. CALIFORNIA PREPARED FOR: Charter Service Corporation 6994 El Camino Real , Suite 202 Carl sbad. California 92008 PREPARED BY: Southern California Sol1 6 Testing, Inc. Post Office Box 20627 6280 Ri verdal e Street San Diego, California 92120 October 21, 1987 Charter Service Corporation 6994 El Camino Real , Suite 202 Carlsbad, California 92008 SCS&T 8721162 Report No. 1 ATTENTION: Mr. John Millet SUBJECT: Report of Geotechnical Investigation, Lot 726, La Costa, Argonauta Street, Carlsbad, California. Gent1 emen : In accordance with your request, we have completed a geotechnical investigation for the proposed project. We are presenting herewith our findings and recomnendations. provided the recomnendations presented in the attached report are followed. In general, we found the site suitable for the proposed development If you have any questions after reviewing the findings and reconmendations contained in the attached report, please do not hesitate to contact our appreciated. office. This opportunity to be of professional service is sincerely Respectfully submitted, SOUTHERN CALIFORNIA SOIL AND TESTING, INC. Charles H. Christian, R.C.E. ly22330 Curtis R. Burdett, C.E.G. #lo90 SOUTHERN CALIFORNIA SOIL AND TESTING, INC . . . . . I . . . . . . . TABLE OF CONTENTS . PAGE Findings 2 Project Scope 2 Geologic Setting and Soil Description ............................ 3 Geologic Hazards 4 Groundwater 4 Introduction and Project Description ...................................... 1 Site Description ...................................................... 2 General Geology and Subsurface Conditions ............................. 3 Tectonic Setting ................................................. 3 General .......................................................... 4 Groundshaking .................................................... 4 Conclusions and Recomnendations ........................................... 5 General ............................................................... 5 Grading ............................................................... 5 Site Preparation ................................................. 5 Undercutting ..................................................... 6 ............................................................. .................................................................. ...................................................... ...................................................... .................................................. .................................................. Expansive Soi 1 s 6 Import Material 6 Surface Drainage ................................................. 7 Earthwork ........................................................ 7 Proposed Slopes ....................................................... 7 General .......................................................... 7 Foundations 8 Temporary S1 opes 7 General .......................................................... 8 Reinforcement .................................................... 8 Concrete S1 abs.on.Grade .......................................... 8 Foundation Excavation Observation ................................ 8 Earth Retaining Structures ............................................ 9 Active Pressure 9 Passive Pressure 9 Backfill ......................................................... 9 Factor of Safety ................................................. 9 Limitations ............................................................... 9 Field Explorations ....................................................... 10 Laboratory Testing ....................................................... lg ................................................. ........................................................... ................................................. .................................................. ATTACHlENTS FIGURE Figure No . 1 Site Vicinity Map . Follows Page 1 . . . PLATES Plate 2 Subsurface Exploration Legend Plate 1 Plot Plan Plate 3-4 Trench Logs APPENDIX . Reconrnended Grading Specification and Special Provisions . GEOTECHNICAL INVESTIGATION LOT 726, LA COSTA ARGONAUTA STREET CARLSBAD, CALIFORNIA INTRODUCTION AND PROJECT DESCRIPTION This report presents the results of our geotechnical investigation for the proposed sing1 e family residence, to be located on Argonauta Street, in the La Costa area of Carlsbad, California. The site location is shown on the following Figure Nuaber 1. It is our understanding that the site will be developed to receive a two- story structure of wood frame construction. Shallow foundations and a conventional slab-on-grade floor system are anticipated. Grading will consist of importing fill to develop a level building pad on the sloping terrain. It is anticipated that fill slopes will be constructed at a 2:l (horizontal to vertical) inclination or flatter and extend to a maximum height of about 27 feet. To assist in the preparation of this report we have been provided with a grading plan for La Costa Meadows Unit No. 4 prepared by Helaing Engineering, Inc. dated October 12, 1987. The site configuration, approximate topography and approxiaate locations of our subsurface explorations are shown on Plate Number 1 of this report. SOUTHERN CALIFORNIA SOIL AND TESTING. INC. SOUTHERN CALIFORWA LOT 726 SOIL & TCSTIWQ, INC. BY: CHC DATE: 10-16-87 8721162 Figure 1 SCSBT 8721162 October 21, 1987 Page 2 PROJECT SCOPE -. The investigation consisted of: surface reconnaissance, subsurface - explorations, obtaining representative disturbed and undisturbed samples, laboratory testing, analysis of the field and laboratory data, research of - available geological literature pertaining to the site, and preparation of this report. More specifically, the intent of this analysis was to: C) Explore the subsurface conditions to the depths influenced by the proposed construction. Evaluate, by laboratory tests, the pertinent engineering properties of the various strata which will influence the development, including their bearing capacities, expansive characteristics, and settl elnent potential. Describe the general geology at the site including possible geologic hazards which could have an effect on the site devel opment. Develop soil engineering criteria for site grading and provide design information regarding the stability of fill slopes. Address potential construction difficulties and provide recomnendations concerning these problems. Recolllnend an appropriate foundation system for the type of structure anticipated and develop soil engineering design criteria for the recomended foundation design. FINDINGS SITE DESCRIPTION The project site is a trapezium shaped lot that is located adjacent to and north of Argonauta Street in the La Costa area of the City of Carlsbad. The SCS(IT 8721162 October 21, 1987 Page 3 site is bounded on the west by a developed residential lot and on the north and east by undeveloped lots. Dimensions at the site are approximately 175 feet of frontage along Argonauta Street and approximately 115 feet along the rear with the depth ranging from approximately 185 feet to 215 feet. The site slopes gently to moderately to the north with differences in elevation from the front to the rear amounting to approximately 25 feet. No structures currently occupy the site but a sewer and storm drain easement exists along the northern and western property lines, respectively. The site has recently been cleared of vegetation. GENERAL GEOLOGY AND SUBSURFACE CONDITIONS GEOLOGIC SETTING AND SOIL DESCRIPTION: The project site is located in the Foothills Physiographic Province of San Diego County and is underlain by Jurassic-age metavolcanic rock, associated topsoils and subsoils, and artificial fill. The bedrock at the site consists of the dark gray, dense to very dense, fractured metavolcanic rock of the Jurassic-age Santiago Peak Volcanics. The topsoil/subsoil horizon developed on the bedrock consists of approximately one foot to three feet of brown, loose to medium dense, silty sand topsoil underlain by one foot to two feet of reddish brown and greenish brown, stiff, sandy clay subsoil. The artificial fill at the site is associated with Argonauta Street and the existing storm drain and sewer easements and consists of a few feet of brown to yellowish brown and greenish brown, humid, medium dense, clayey sand. TECTONIC SETTING: No faults are known to traverse the subject site and the faults mapped in the La Costa area are generally classified as inactive. However, it should be noted that much of Southern California, including the San Diego, area is characterized by a series of Quaternary-age fault zones which typically consist of several individual, en echelon faults that generally strike in a northerly to northwesterly direction. Some of these fault zones (and the individual faults within the zone) are classified as active while others are classified as only potentially active according to SCS(IT 8721162 October 21, 1987 Page 4 the criteria of the California Division of Mines and Geology. Active fault zones are those which have shown conclusive evidence of faulting during the Holocene Epoch (the most recent 11.000 years) while potentially active fault zones have demonstrated movement during the Pleistocene Epoch (11,000 to two million years before the present) but no movement during Holocene time. Fault zones that could possibly affect the site include the Rose Canyon and Coronado Banks to the west and the Elsinore and San Jacinto to the northeast. GROUNDWATER: Neither the groundwater table nor groundwater seepage conditions were encountered in our subsurface explorations and no major groundwater related problems are anticipated either during or after construction. However, it should be recognized that minor groundwater seepage problems may occur after development of a site even where none were present before development. These are usually cosmetic phenomena and are often associated with an increase in irrigation water, a change in permeability characteristics on the on-site materials, and an alteration of drainage patterns. Based on the results of our investigation, it is our opinion that the likelihood of seepage phenomena of sufficient magnitude to create nuisance problem is relatively low. It is further our opinion that if any of these seepage conditions do occur, they can most effectively be handled on an individual basis as they occur. GEOLOGIC HAZARDS GENERAL: The site is located in an area which is relatively free of potential geologic hazards. Hazards such as tsunamis, seiches, liquefaction, or landsliding should be considered negligible or nonexistent. GROUNDSHAKING: The most likely geologic hazard to affect the site is groundshaking as a result of movement along one of the major, active fault zones mentioned above. The maximum bedrock accelerations that would be SCYT 8721162 October 21, 1987 Page 5 attributed to a maxinum probable earthquake occurring along the nearest portion of selected fault zones that could affect the site are summarized in the following table. TABLE I Maximum Probable Bedrock Design Fault Zone Distance . Earthquake Acceleration Acceleration Rose Canyon 8 miles 6.0 magnitude 0.28 g 0.18 g Coronado Banks 24 miles 6.0 magnitude 0.10 g 0.07 g El si nore 24 mi 1 es 7.3 magnitude 0.22 g 0.15 g San Clemente 44 miles 7.8 magnitude 0.12 g 0.08 g Earthquakes on the Rose Canyon or Coronado Banks Fault Zones are expected to be relatively minor. Major seismic events are likely to be the result of movement along the El sinore or San Jacinto Fault Zones. CONCLUSIONS AND RECWENDATIONS GENERAL No geotechnical conditions were found which would preclude site development as presently planned. The only geotechnical concerns at this point are: 1) a relatively minor amount of existing fill near the front of the lot; 2) possible difficulty in excavating the seven-foot-deep cut in the southeast corner of the lot and the retaining wall footing excavation at that location; 3) the one to three feet of topsoil; and 4) the expansion characteristics of the topsoils. These conditions are addressed hereinafter. GRAD1 NG SITE PREPARATION: Site preparation should begin with the removal of a1 1 existing debris, vegetation and deleterious matter in the cut and fill SCS&T 8721162 October 21. 1987 Page 6 areas. All existing fills in the building pad and beneath proposed retaining walls should be removed to firm formational soils. All topsoils and subsoils in fill areas and building areas should be removed to firm formational soils. Prior to placing any fill, a 12-foot-wide key should be cut into the formational soils at the toe of the proposed slope. The key should be sloped into the hillside at a ratio of 12 horizontal to 1 vertical. The formational soils should be benched into as the fill increases in elevation such that the natural ground below the fill will be stai r-stepped. UNDERCUTTING: Although most of the building pad will be fill, a small portion of the pad at the southeast corner will be cut. In order to not found the structure on two dissimilar soils with entirely different settlement characteristics, we recomnend that the cut portion of the pad be undercut to a depth of three feet below finish grade for a distance of at least five feet outside of the building. Further, due to the extreme difficulty that we anticipate will be encountered in excavating the south retaining wall footings, we recomnend that the area below the footing be overexcavated to a depth equal to the depth of the footing or footing key, [if one is planned), and the material so removed replaced with compacted fill. This could result in cuts up to about nine feet below existing natural grade. Although we believe this depth of cut can be made with heavy construction equipment, it should be understood that it may be necessary to blast to make this excavation. IMPORT MATERIAL: All fill material imported should consist of granular soils with less than 30% smaller than the No. 200 standard sieve size, no more than 40% larger than 1/4-inch. and no material larger than 12 inches in maximum size. The import should have an expansion index, as determined by Uniform Building Code Standard 29-C, of less than 50. All import soil should be approved by Southern California Soil and Testing, Inc. prior to importing . EXPANSIVE SOILS: The topsoils and subsoils at the site are classified as moderately to highly expansive. These soils should not be allowed to exist SCSBT 8721162 October 21, 1987 Page 7 or to be placed within three feet of finish grade. In addition, the expansive soils should not be placed within 15 feet of the face of the fill slope. The foundation recomnendations presented in the following sections of this report take this recommendation into consideration. SURFACE DRAINAGE: It is reconmended that all surface drainage be directed away from the proposed structure and the top of slopes and, that ponding of water not be allowed adjacent to the foundation. EARTHWORK: All earthwork and grading contemplated for site preparation should be accomplished in accordance with the attached Recomnended Grading Specifications and Special Provisions. All special site preparation recomnendations presented in the sections above will supersede those in the Standard Recomnended Grading Specifications. All embankments, structural fill and fill should be compacted to at least 90% relative compaction at or slightly over optimum moisture content. Utility trench backfill within five feet of the proposed structure and beneath asphalt pavements should be compacted to a minimum of 90% of its maximum dry density. The maximum dry density of each soil type should be determined in accordance with A. S.T.M. Test Method 0-1557-78, Method A or C. PROPOSED SLOPES GENERAL: Proposed fill slopes will be constructed at a 2:l (horizontal to vertical) inclination or flatter and extend to a maximum height of 27 feet. This slope will be constructed of granular imported soils as specified above. Therefore it is our opinion that the slope will possess an adequate factor of safety with respect to deep seated rotational failure. TEMPORARY SLOPES: Temporary slopes for retaining wall construction may be constructed at an inclination of 0.5 horizontal unit to one vertical unit. The aforementioned inclination should be started at the toe of the slope. It is the contractor’s responsibility to provide for the safe support of temporary excavations. No surcharge loads should be placed within a distance from temporary excavations equal to its depth. SCS&T 8721162 - October 21, 1987 Page 0 FOUNDATIONS GENERAL: Based on the building pad being capped with at least three feet of nondetrimentally expansive soil, it is our opinion that shallow foundations may be utilized for the support of the proposed structure. The footings should have a minimum depth of 18 inches. A minimum width of 12 inches and 18 inches is recommended for continuous and isolated footings, respectively. A bearing capacity of 2000 psf may be assumed for said footings. This bearing capacity may be increased by one-third when considering wind and/or seismic forces. REINFORCEMENT: Both exterior and interior continuous footings should be reinforced with one X5 bar positioned near the bottom of the footing and one X5 bar positioned near the top of the footing. This reinforcement is based on soil characteristics and is not intended to be in lieu of reinforcement necessary to satisfy structural considerations. CONCRETE SLABS-ON-GRADE: Concrete slabs-on-grade should have a minimum actual thickness of five inches and be underlain by a four-inch thick blanket of clean, poorly graded coarse sand or crushed rock. The slab should be reinforced with No. 3 reinforcing bars placed at 36 inches on center each way. A four inch thick slab reinforced with 6"x6"-W1.4xW1.4 (6"x6'-10/10) welded wire mesh may be used in lieu of the above recomnendations. However, care should be exercised during construction to be certain that the mesh is properly placed approximately in the middle of the slab. Where moisture sensitive floor coverings are planned, a visqueen barrier should be placed on top of the sand or rock layer. A two-inch-thick layer of clean sand should be placed over the visqueen to a1 1 ow proper concrete curing. FOUNDATION EXCAVATION OBSERVATION: We recommend that all foundation excavations be observed prior to forming by a representative from this office to ascertain that the minimum foundation depths recomended have been achieved and that the soil conditions assumed are similar to those encountered. SCSElT 8721162 October 21, 1987 Page 9 EARTH RETAINING STRUCTURES -. PASSIVE PRESSURE: The passive pressure for the prevailing soil conditions a maximum of pressure of 2500 psf. The passive pressure may be increased soil may be assumed to be 0.40 for the resistance to lateral movement. When combining frictional and passive resistance, the latter should be reduced by one-third. - may be considered to be 350 pounds per square foot per foot of depth up to - one-third for seismic loading. The coefficient of friction for concrete to - - ACTIVE PRESSURE: The active soil pressure for the design of earth retaining structures with level backfills may be assumed to be equivalent - to the pressure of a fluid weighing 35 pounds per cubic foot for walls free to yield at the top (unrestrained walls). An additional 10 pounds per cubic foot should be added to the aforementioned values when considering 2.0:l (horizontal to vertical) sloping backfills. These values do not consider any other surcharge loading. All earth retaining structures should have adequate weep holes or a subdrain system to prevent the build-up of hydrostatic pressure behind the wall. BACKFILL: All backfill soils should be compacted to at least 90% relative compaction. Expansive or clayey soils should not be used for backfill material. The wall should not be backfilled until the masonry has reached an adequate strength. FACTOR OF SAFETY: The above values, with the exception of concrete to soils friction coefficient do not include a factor of safety. Appropriate factors of safety should be incorporated into the design to prevent the walls from overturning and sliding. LIMITATIONS The recomnendations and opinions expressed in this report reflect our best estimate of the project requirements based on an evaluation of the subsurface soil conditions encountered at the subsurface exploration SCST 8721162 October 21, 1987 Page 10 locations and the assumption that the soil conditions do not deviate appreciably from those encountered. It should be recognized that the performance of the foundations and/or cut and fill slopes may be influenced by undisclosed or unforeseen variations in the soil conditions that may occur in the intermediate and unexplored areas. Any unusual conditions not -. - - covered in this report that may be encountered during site development - make modifications if necessary. In addition, this office should be should be brought to the attention of the soils engineer so that he may advised of any changes in the project scope or proposed site grading so that it may be determined if the recoinnendations contained herein are appropriate. This should be verified in writing or modified by a written addendum. - - FIELD EXPLORATIONS - Four subsurface explorations were made at the locations indicated on the attached Plate Number 1 on October 1. 1987. These explorations consisted of trenches dug by means of a backhoe. The field work was conducted under the observation of our engineering geology personnel. - - The explorations were carefully logged when made. These logs are presented on the following Plates Number 3 and 4. The soils are described in accordance with the Unified Soils Classification System as illustrated on - - the attached simplified chart on Plate 2. In addition, a verbal textural description, the wet color, the apparent moisture, and the density or - consistency are provided. The density of granular soils is given as either very loose, loose, medium dense, dense, or very dense. The consistency of silts or clays is given as either very soft, soft, medium stiff, stiff, very stiff, or hard. Disturbed and undisturbed samples of typical and representative soils were obtained and returned to the laboratory for testing. -. SCST 8721162 October 21, 1987 LABORATORY TESTING Page 11 Laboratory tests were performed in accordance with the generally accepted Pmerican Society for Testing and Materials (A.S.T.M.) test methods or suggested procedures. A brief description of the tests performed is presented bel ow: a) CLASSIFICATION: Field classifications were verified in the laboratory by visual examination. The final soil classifications are in accordance with the Unified Soil Classification System. b) MOISTURE-DENSITY: Field moisture content and dry density were determined for representative samples obtained. This information was an aid to classification and permitted recognition of variations in material consistency with depth. The dry unit weight is determined in pounds per cubic foot, and the field moisture content is determined as a percentage of the soil's dry weight. The results are sumrized in the trench 1 ogs. c) COMPACTION TEST: The maximum dry density and optimum moisture content of typical soils were determined in the laboratory in accordance with A.S.T.M. Standard Test 0-1557-78, Method A. The results of these tests are presented below. CWPACTION TEST RESULTS Sampl e Number: T2 Q 2'-3' Description: m/GM Maximum Density: 116.0 psf Optimum Moisture: 12.5 % SCST 8721162 October 21, 1987 Page 12 d) EXPANSION INDEX TEST: An expansion index test on remolded samples was performed on representative samples of soils likely to be used as compacted fill. The test was performed on the portion of the sample passing the X4 standard sieve. The sample was brought to optimum moisture content then dried back to a constant moisture content for 12 hours at 230 +/- 9 degrees Fahrenheit. The specimen was then compacted in a 4-inch-diameter mold in two equal layers by means of a tamper, then trimmed to a final height of 1 inch, and brought to a saturation of approximately 5oX. The specimen was placed in a consolidometer with porous stones at the top and bottom, a total normal load of 12.63 pounds was placed (144.7 psf), and the sample was allowed to consolidate for a period of 10 minutes. The sample was all owed to become saturated, and the change in vertical movement was recorded until the rate of expansion became nominal. The expansion index test results is reported below as the total vertical displacement times the fraction of the sample passing the #4 sieve times 1000. CLASSIFICATION OF EXPANSIVE SOIL EXPANSION INDEX POTENTIAL EXPANSION 1-20 very low 21-50 1 ow 51-90 medium 91-130 high Above 130 very high EXPANSION INDM TEST RESULTS Sample Number: T3 8 3' Description: Sandy Clay ICL) Initial Moisture: 13.9 % Initial Density: 96.6 pcf Final Moisture: 33.2 X Expansion Index: 130 SCST 8721162 - October 21. 1987 Page 13 e) DIRECT SHEAR TESTS: Direct shear tests were performed to determine the failure envelope based on yield shear strength. The shear box was designed to accomodate a sample having diameters of 2.375 inches or 2.50 inches and a height of 1.0 inch. Samples were tested at different vertical loads and a saturated moisture content. The shear stress was applied at a constant rate of strain of approximately 0.05 inch per minute. The results of these tests are presented below. DIRECT SHEAR TEST RESULTS Sample Number: T2 B 2'-3' Description: Remolded to 90% Angle of Internal Friction: 36 degrees Cohesion Intercept: 315 psf SOUTHERN CALIFORNIA LOT 726 SOIL & TESTINQ,INC. BY: CHC DATE: 10-16-87 JOD NUYBIR: 87u Pu No. 1 SUBSURFACE EXPLORATION LEGEND UNIFIED SOIL CLASSIFICATION CHART SOIL DESCRIPTION GROUP SYMBOL TYPICAL NAMES . COARSE GRAINED, more than half of material is than No. 200 sieve s1ze. ;RAVELS CLEAN GRAVELS man half of GU :oarse fraction is ,ieve size but arger than No. 4 GP ,mailer than 3". GRAVELS WITH FINES GM of fines) (Appreciable amount GC ;ANDs CLEAN SANDS Ethan half of 'oarse fraction is .maller than NO. 4 SY SP iieve size. SANDS WITH FINES SM (Appreciable amount of fines) St I. FINE GRAINED. more than half of material is smaller than No. 200 sieve sire. SILTS AND CLAYS ML Liquid Limit CL less than 50 DL SILTS AND CLAYS mi Liquid Limit CH greater than 50 OH HIGHLY ORGANIC SOILS PT Well gradel Travels, gravel- sand mixtures, little or no Poorly graded gravel 5, gravel fines. fines. sand mixtures. little or no gravel-sand-silt mixtures. Silty gravels, poorly graded Clayey gravels, poorly graded gravel-sand, clay mixtures. Well graded sand, gravelly Poorly graded sands, gravelly sands, little or no fines. sands, litile or no fines. sand and silty mixtures. Silty sands, poorly graded Clayey sands, poorly graded sand and clay mixtures. fine sands. rock flour, sandy Inorganic silts and very mixtures with slight plas- silt or clayey-silt-sand ticity. Inorganic clays of low to clays, sandy clays, silty medium plasticity, gravelly clays, lean clays. Organic silts and organic silty clays or low plasticity. Inorganic silts, micaceous or diatomaceous fine sandy or silty soils, elastic silts. Inorganic clays of high plasticity, fat clays. Organic clays of medium to high plasticity. Peat and other highly organic soils. 7 - - Water level at time of excavation or as indicated US - Undisturbed, driven ring sample CK - Undisturbed chunk sample BG - Bulk sample SP - Standard penetration sample or tube sample SOUTHERN CALIFORNIA Lot 726 SOIL & TLSTINO, INC. DATE: 10-21-87 nv: CHC JOB NUMBER: 8721162 Plate No. 2 DESCRIPTION I I FILL TO 3.5 FOOT I Dry to I Medium Brown/Yellow Brown/Green Humid I Dense Brown, CLAYEY SAND (Fill for Road) I TOPSOIL, Brown to Light Red Brown, CLAYEY SILTY SAND Humid Dry to SUBSOIL Green Brown, SANDY CLAY Moist METAVOLCANIC ROCK, Dark Yellow Brown, Soft to Hard Humid Fractured Rock Loose to Med i urn Dense Stiff Dense Very Dense Refusal on Hard Rock TRENCH NUMBER 2 TOPSOIL Very Porous, Brown Dry Loose SILTY SAND SUBSOIL, Yellow Brown, CLAYEY SAND METAVOLCANIC ROCK Red to Yellow Brown, SOFT ROCK Moist Med i um Dense Moist/ Dense Humid Verv - > I- UI z- w- - 0;: a n > - - 113.6 114.5 107.5 - - 19.5 SOUTHERN CALIFORNIA SOIL & TESTINO,INC. .SUBSURFACE EXPLORATION LOG LOGGED BY: DATE LOGGED: CB ” JOB NUYBER: 8721162 Plate No. 3 TRENCH NUMBER 3 ELEVATION DESCRIPTION TOPSOIL, Brown, SILTY SAND leathering Surface Very Irregular, Hard Rock at Surface Adjacent to Trench Loose Moist Stiff 100.6 jUBS0IL Red Brown, SANDY :LAY Humid 4ETAVOLCANIC ROCK Dark iefusal TRENCH NUMBER 4 TOPSOIL, Brown, SILTY SAND Loose Moist Stiff SUBSOIL, Red Brown, SANDY CLAY/CLAYING SAND YETAVOLCANIC ROCK Dark Ye1 low Brown, Soft to Hard Humid Dense Very Dense Refusal .SUBSURFACE EXPLORATION LOG I SOUTHERN CALIFORNIA SOIL & TESTING,INC. 8721162 I Plate No. 4 I LOT 726, LA COSTA, ARGONAUTA STREET, CARLSBAD RECMENDED GRADING SPECIFICATIONS - GENERAL PROVISIONS GENERAL INTENT The intent of these specifications is to establish procedures for clearing, compacting natural ground, preparing areas to be filled, and placing and compacting fill soils to the lines and grades shown on the accepted plans. The recomnendations contained in the preliminary geotechnical investigation report and/or the attached Special Provisions are a part of the Recomended Grading Specifications and shall supersede the provisions contained hereinafter in the case of conflict. These specifications shall only be used in conjunction with the geotechnical report for which they are a part. No deviation from these specifications will be allowed, except where specified in the geotechnical soil report or in other written comunication - signed by the Soil Engineer. OBSERVATION AND TESTING - Southern California Soil and Testing, Inc., shall be retained as the Soil Engineer to observe and test the earthwork in accordance with these specifications. It will be necessary that the Soil Engineer or his - - representative provide adequate observation so that he may provide an opinion that the work was or was not accomplished as specified. It shall - be the responsibility of the contractor to assist the soil engineer and to keep him appraised of work schedules, changes and new information and data so that he may provide these opinions. In the event that any unusual conditions not covered by the special provisions or preliminary soil report are encountered during the grading operations, the Soil Engineer shall be contacted for further recomnendations. - If, in the opinion of the Soil Engineer, substandard conditions are encountered, such as; questionable or unsuitable soil, unacceptable SCST 8721162 October 21, 1987 Appendix, page 2 moisture content, inadequate compaction, adverse weather, etc., construction should be stopped until the conditions are remedied or corrected or he shall recomnend rejection of this work. Test methods used to determine the degree of compaction should be performed in accordance with the following American Society for Testing and Materials test methods: Maximum Density & Optimum Moisture Content - A.S.T.M. D-1557-78. Density of Soil In-Place - A.S.T.M. 0-1556-64 or A.S.T.M. D-2922. All densities shall be expressed in terms of Relative Compaction as determined by the foregoing A.S.T.M. testing procedures. PREPARATION OF AREAS TO RECEIVE FILL All vegetation, brush and debris derived from clearing operations shall be removed, and legally disposed of. All areas disturbed by site grading should be left in a neat and finished appearance, free from unsightly debris. After clearing or benching, the natural ground in areas to be filled shall be scarified to a depth of 6 inches, brought to the proper moisture content, compacted and tested for the minimum degree of compaction in the Special Provisions or the recanmendation contained in the preliminary geotechnical investigation report. All loose soils in excess of 6 inches thick should be removed to firm natural ground which is defined as natural soils which possesses an in-situ density of at least 90% of its maximum dry density. When the slope of the natural ground receiving fill exceeds 202 (5 horizontal units to 1 vertical unit), the original ground shall be stepped SCST 8721162 October 21, 1987 Appendix, page 3 or benched. Benches shall be cut to a firm competent soil condition. The lower bench shall be at least 10 feet wide or 1 1/2 times the the equipment width which ever is greater and shall be sloped back into the hillside at a gradient of not less than two (2) percent. All other benches should be at least 6 feet wide. The horizontal portion of each bench shall be compacted prior to receiving fill as specified herein for compacted natural ground. Ground slopes flatter than 20% shall be benched when considered necessary by the Soil Engineer. Any abandoned buried structures encountered during grading operations mist be totally removed. All underground uti1 ities to be abandoned beneath any proposed structure should be removed from within 10 feet of the structure and properly capped off. The resulting depressions from the above described procedures should be backfilled with acceptable soil that is compacted to the requirements of the Soil Engineer. This includes, but is not limited to, septic tanks, fuel tanks, sewer lines or leach lines, stonn drains and water lines. Any buried structures or utilities not to be abandoned should be brought to the attention of the Soil Engineer so that he may detennine if any special recomnendation will be necessary. All water wells which will be abandoned should be backfilled and capped in accordance to the requirements set forth by the Soil Engineer. The top of the cap should be at least 4 feet below finish grade or 3 feet below the bottom of footing whichever is greater. The type of cap will depend on the diameter of the well and should be determined by the Soil Engineer and/or a qualified Structural Engineer. FILL MATERIAL Materials to be placed in the fill shall be approved by the Soil Engineer and shall be free of vegetable matter and other deleterious substances. Granular soil shall contain sufficient fine material to fill the voids. SCST 8721162 October 21, 1987 Appendix. page 4 The definition and disposition of oversized rocks, expansive and/or detrimental soils are covered in the geotechnical report or Special Provisions. Expansive soils, soils of poor gradation, or soils with low strength characteristics may be thoroughly mixed with other soils to provide satisfactory fill material, but only with the explicit consent of the soil engineer. Any import material shall be approved by the Soil Engineer before being brought to the site. PLACIN6 AND CWPACTION OF FILL Approved fill material shall be placed in areas prepared to receive fill in layers not to exceed 6 inches in compacted thickness. Each layer shall have a uniform moisture content in the range that will allow the compaction effort to be efficiently applied to achieve the specified degree of compaction. Each layer shall be uniformly compacted to a minimum specified degree of compaction with equipment of adequate size to economically compact the layer. Compaction equipment should either be specifically designed for soil compaction or of proven reliability. The minimum degree of compaction to be achieved is specified in either the Special Provisions or the recommendations contained in the preliminary geotechnical investigation report. When the structural fill material includes rocks, no rocks will be allowed to nest and all voids must be carefully filled with soil such that the minimum degree of compaction recomnended in the Special Provisions is achieved. The maximum size and spacing of rock pemitted in structural fills and in non-structural fills is discussed in the geotechnical report, when applicable. Field observation and compaction tests to estimate the degree of compaction of the fill will be taken by the Soil Engineer or his representative. The location and frequency of the tests shall be at the Soil Engineer's SCS8T 8721162 October 21, 1987 Appendix, page 5 discretion. When the compaction test indicates that a particular layer is less than the required degree of compaction, the layer shall be reworked to the satisfaction of the Soil Engineer and until the desired relative compaction has been obtained. Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compaction by sheepsfoot rollers shall be at vertical intervals of not greater than four feet. In addition, fill slopes at ratios of two horizontal to one vertical or flatter, should be trackrolled. Steeper fill slopes shall be over-built and cut-back to finish contours after the slope has been constructed. Slope compaction operations shall result in all fill material six or more inches inward from the finished face of the slope having a relative compaction of at least 90% of maximum dry density or that specified in the Special Provisions section of this specification. The compaction operation on the slopes shall be continued until the Soil Engineer is of the opinion that the slopes will be stable in regards to surficial stability. Slope tests will be made by the Soils Engineer during construction of the slopes to detennine if the required compaction is being achieved. Where failing tests occur or other field problems arise, the Contractor will be notified that day of such conditions by written comnunication from the Soil Engineer or his representative in the fom of a daily field report. If the method of achieving the required slope compaction selected by the Contractor fails to produce the necessary results, the Contractor shall rework or rebuild such slopes until the required degree of compaction is obtained, at no cost to the Owner or Soils Engineer. L ( R-8/87 1 SCSElT 8721162 CUT SLOPES October 21, 1987 Appendix, page 6 The Engineering Geologist shall inspect cut slopes excavated in rock or lithified formational material during the grading operations at intervals determined at his discretion. If any conditions not anticipated in the preliminary report such as perched water, seepage, lenticular or confined strata of a potentially adverse nature, unfavorably inclined bedding, joints or fault planes are encountered during grading, these conditions shall be analyzed by the Engineering Geologist and Soil Engineer to determine if mitigating measures are necessary. Unless otherwise specified in the geotechnical report, no cut slopes shall be excavated higher or steeper than that allowed by the ordinances of the control 1 i ng governmental agency. ENGINEERING OBSERVATION Field observation by the Soil Engineer or his representative shall be made during the filling and compacting operations so that he can express his opinion regarding the conformance of the grading with acceptable standards of practice. The presence of the Soil Engineer or his representative or the observation and testing shall not release the Grading Contractor from his duty to compact all fill material to the specified degree of compaction. SEASON LIMITS Fill shall not be placed during unfavorable weather conditions. When work is interrupted by heavy rain, filling operations shall not be resumed until the proper moisture content and density of the fill materials can be achieved. Damaged site conditions resulting from weather or acts of God shall be repaired before acceptance of work. SCSBT 8721162 October 21, 1987 Appendix, page 7 RECOMENDED GRADING SPECIFICATIONS - SPECIAL PROVISIONS RELATIVE COMPACTION: The minimum degree of compaction to be obtained in compacting natural ground, in the compacted fill, and in the compacted backfill shall be at least 90 percent. For street and parking lot subgrade, the upper six inches should be compacted to at least 95% relative compaction. EXPANSIVE SOILS: Detrimentally expansive soil is defined as clayey soil which has an expansion index of 50 or greater when tested in accordance with the Uniform Building Code Standard 29-C. OVERSIZED MATERIAL: Oversized fill material is generally defined herein as rocks or lumps of soil over 6 inches in diameter. Oversize materials should not be placed in fill unless recomnendations of placement of such material is provided by the soils engineer. At least 40 percent of the fill soils shall pass through a No. 4 U.S. Standard Sieve. TRANSITION LOTS: Where transitions between cut and fill occur within the proposed building pad, the cut portion should be undercut a minimum of one foot below the base of the proposed footings and recompacted as structural backfill. In certain cases that would be addressed in the geotechnical report, special footing reinforcement or a combination of special footing reinforcement and undercutting may be required. I I I I I I I I I I I I I I I I I I I Lot 726 Reaidence Carlsbad Climate Zone #7 Chris Bachman, Designer Title 24 Energy Calculations Compliance Method - CALPAS. 3 September 16, 1987 Haynal i Company 350 E. Grand Ave, Ste. 204 Escondfdo CA 92025 (619) 743-5408 (714) 538-3673 .f LEUCADIA COUNTY WATER DISTRICT APPLICATION FOR SEWER SERVICE The application must be signed by the owner (or his representative) of the property to be served. The total charges must be paid to the District at the time the application is submitted. APPLICANT MUST SUBMIT EVIDENCE OF BUILDING PERMIT WITHIN 60 DAYS. FAILURE TO MAKE SUCH NECTION FEE LESS A $50 ADMINISTRATIVE FEE WILL BE REFUNDED. SUBMITTAL WILL RESULT IN AUTOMATIC CANCELLATION OF THE SEWER PERMIT. THE SEWER CON- A six-month construction period shall be provided and sewer service charges for the balance of the fiscal year shall be collected on the tax roll in same manner as property taxes. If the six-month construction period extends shall be collected at the time of application for sewer permits. Sewer service charges for subsequent fiscal years into the subsequent fiscal year, a prorated sewer service charge for that fiscal year shall be collected on the tax roll in the same manner as property taxes. The full sewer service charges for all subsequent years shall be collected on the tax roll in the same manner as property taxes. There will be no additional fee or refund if service actually com- mences on a different date. Such applicants shall be required to notify the District, on forms provided by the District, of escrow closing on The prorated sewer service charge shall not be required in those applications for sewer permits for subdivisions. individual properties within the subdivision. Sewer service charges shall commence upon close of escrow and will be the responsibility of the buyer. lateral is that part of the sewer system that extends from the main collection line in the street (or easement) to the If a service lateral is required, it will be installed by the LEUCADIA COUNTY WATER DISTRICT. The service point in the street (at or near the applicant's property line) where the service lateral is connected to the applicant's building sewer. The applicant is responsible for the construction, at the applicant's expense, of the sewer pipeline to the service lateral. (building sewer) from the applicant's plumbing to the point in the street (or easement) where a connection is made expense. The connection must be made in conformity with the District's specifications, rules and regulations; and The connection of the applicant's building sewer to the service lateral shall be made by the applicant at his IT MUST BE INSPECTED AND APPROVED BY THE DISTRICT BEFORE THE SEWER SYSTEM MAY BE USED BY THE APPLICANT. THE APPLICANT, OR HIS AUTHORIZED REPRESENTATIVE MUST NOTIFY THE DISTRICT AT THE TIME INSPECTION IS DESIRED. ANY CONNECTION MADE TO THE SERVICE LATERAL OR COLLECTION WILL NOT BE ACKNOWLEDGED. LINE WITHOUT PRIOR APPROVAL AND INSPECTION BY THE DISTRICT WILL BE CONSIDERED INVALID AND In the event unusual construction conditions occur, such as blasting, jack hammering hard rock, dewatering, etc., the applicant shall be liable for any cost over and above the established charge. The Inspection Deposit will be refunded upon the completion of satisfactory inspection of the connection to the District's sewer system. The Inspection Deposit shall not apply in those cases in which the applicant has paid plan check and inspection fees for a subdivision. OWNER'SNAME Charter Service Corp. MAILINGADDRESS: 6994 El Camin0 Real Carlsbad. Ca. 92009 SERVICE ADD PHONE NUMB ASSESSOR'SPARCELNO.: 71 5 - hm n7 TYPEOFBUILDING-NO./UNITSL - CONNECTION FEE: $ 2,500.00 LATERAL SIZE: 2 EASEMENT: EXTRAFOOTAGE:A$/Foot EXTRA DEPTH: A$/Foot LATERAL FEE INSPECTION DEPOSIT 50.00 PRORATED SEWER SERV. FEE 6 7.2 5 TOTAL 2.617.25 PAID BY: CASH CHECK#" stated. The undersigned hereby agrees that the above information given is correct and agrees to the conditions as 9-15-88 W.V.R. 18903 . Owner Signature Date Rec'd. By Account No. Ref 15 S. PERMIT 1 2075 LAS PALMAS DRIVE CARLSBAD. CA 92009-4859 (619) 438-1161 TELEPHONE &itp of UCarls'bab DEVELOPMENT PROCESSING SERVICES Date: October 4, 1988 T~: Chris Bachman PC#: 87-510 1455 S. Alturas #39 Fallbrook, CA 92028 Dated: 9/23/87 Subject: Plan Check Expiration Dear Sir: The plan check for your project at: 2622 Ar ta St has become null and void due to limitation of timE 9/23/8~ . The provisions of Section 304 (c) of the Uniform Building Code states: Sec. 304 (c) Expiration of Plan Check. Applications for which no permit is issued within 180 days followincl the date of aoDlication shail expire by limitation and plans submitt& for checking'may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan check fee. We will hold your plans for 10 days at our office for you to pick up, after which time they will be destroyed. If you have any questions, please contact the Carlsbad Building Department at 438-1161. MARTY ORENYAK Building Official M0:jb 2075 LAS PALMAS DRIVE CARLSBAD, CA 92009-4859 (619) 438.1161 TELEPHONE aitp of QLarIs’bab DEVELOPMENT PROCESSING SERVICES DIVISION DATE: September 2, 1988 TO: Chris Bachman 1455 S. .Alturas #39 PC#: 87-510 DATED: 9/23/87 Fallbrook, CA 92028 2622 Argonauta St PLAN CHECK EXPIRATION Our records indicate that you have not obtained your building permit for which you filed an application on the date shown above. The provisions of Section 304(c) of the Uniform Building Code state: Section 304(c) Expiration of Plan Check. Application for which no permit is issued within 180 days following the date of appli- cation shall expire by limitation and plans submitted for checking Official. The Building Official 3 extend the time for action by the thereafter be returned to the applicant or destroyed by the Building applicant for a period not exceeding 180 days upon written request by the applicant showing that circumstances beyond the control of the applicant have prevented action from being taken. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan check fee. For your convenience, please check the appropriate box below indicating your intentions and return this letter to the address above. Project abandoned. I will pick up plans in 10 days. Signature: Date : Project abandoned; plans may be destroyed. Signature: Date: Maximum 180-day time extension requested for the following reasons: Date: Signature: If you have any questions, please contact the Carlsbad Development Processing Section at (619) 438-1161. MARTIN ORENYAK Building Official