Loading...
HomeMy WebLinkAbout2624 OBELISCO PL; ; CB152882; Recycle,(City of Carlsbad WASTE MANAGEMENT PLAN B-59 Contractor: Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov Owner: ftJao/llrm IPoM//{L2 Job Address: ai6aLJ /)be/4cz/2,PI Permit#: C/} } £:) RR:;2, PhoneNumber: 7',,& 9~/~¼,16 'a, -t.?CJ Estimated Cost of Project: $ ' e;L~ 0 0 0 ~} Type of Project: □ New Construction ~Remodel or T.I. □ Residential □ Commercial D Demolition (check all that apply) D Other ------------------------------- Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which consist of mainly equipment and/or racking, that have a combined weight of new construction disposal that does not exceed 2 lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon approval of Building Department. ALTERNATIVE FORMS OF COMPLIANCE: (If selected, do not complete Tables 1 & 2 below) D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to final. (This option not applicable for most construction projects.) Square feet of construction area _______ X 2 lbs."' ________ lbs.of allowable waste. D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final. Table 1 -Estimated Waste (To be filled out prior to permit issuance-refer to example on Page 2.) MATERIALS lbs. of waste to be taken to lbs. of waste to be LANDFILL RE-USED or RECYCLED Asphalt/ Concrete Brick/ Masonry cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste BUILDING DIVIS Trash Garba e Other: TOTAL lbs: Estimated Percentage to be Re-Used or Recycled ______ % I certi best of my kno"'4edge, is true and correct. -Le::- Official Use Only D Plan Approved D Plan Denied D Project Valuation Approved Reviewed/ Approved by: _________________ _ Page 1 of 2 Table 2 -Actual Waste (To be completed after construction.) MATERIALS Asphalt/ Concrete Brick / Masonry Cardboard Drywall Landscape Debris Lumber/ Wood Metals Mixed Waste lbs. of waste taken to LANDFILL Actual Percentage Re-Used or Recycled Official Use Only lbs. of waste RE-USED or RECYCLED Waste Hauling Company or Re-Use Method (complete only if differentthan Table 1) \, ~0% Goal Achieved D 50% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ ______ _ Reviewed/ Approved by:, __________________ _ EXAMPLE: Use the following example as a guide to completing this form. MATERIALS lbs. of waste to be token to lbs. of waste to be LANDFILL RE-USED or RECYCLED Asphalt / Concrete 0 2000 Brick / Masonry 1DO 450 Cardboard 0 150 Drywall 0 so Landscape Debris. ,. 0 120 Lumber/ Wood 500 0 Metals 300 200 Mixed Waste 1500 0 Trash/ Garbage 300 0 Other: 'PooL c;uv,.,Lte 0 900 TOTAL lbs.: 2700 32"]-0 Percentage to be Re-Used or Recycled 59 % Formula: Total Re--used or Recycled X 100 = % Re-Used or Recycled (Total Combined Waste) Woste Hauling Company or Re-Use Method ABC HCtuLLv,.,CI Co. WM/ Re-IA.Seti "Brfok, ov.--sLte A"E-C HciuLLt,\,O. Co. ABC /-tlluL[v,.,c,i Co. M uLcneti c; Re-us.eti Ov,.,-s.Lte wciste Mciv,,ciCJe..-'vte111.t WM/ AlsC /-tC!uL~v,.,g WM WM !A..Sed ets cv-us~ed lsCtse Ov,.,-s[te 3870 X 100 = 59% Re-Used or Recycled (2700 + 3870) Since 59% exceeds the minimum requirement of 50%, this plan complies. Page 2of 2 DIRT CHEAP DEMOLITION, INC. P.O. BQX 1.J.86 Estimate Date BO NIT A, CA 91908 LIC# 686879 6/12/2016 Name / Address Job name/Address MARYANNE MALEVICZ 2624 Obelisco Place Description PROVIDE LABOR AND MA TERlALS TO DEMO AND DISPOSE: 1) Remove solarium: 120 SF 2) Remove exterior siding, saving as much as possible for re-installation: 500 SF 3) Remove ceramic tile from floor of solarium: 120 SF "'*4) Sawcut OUTSIDE 12" OF AROUND perimeter of solarium: 44 LF 5) Break and remove concrete IN/ AROUND solarium: 48 SF 6) Remove portion of flagstone paving and 4" concrete sidewalk to north of kitchen for new footing, include 6 LF of sawcutting: 100 SF 7) Remove wood soffit siding from wider existing second story deck above kitchen: 40 SF **8) 1st floor kitchen north facing wall with all the windows that extends to about 3 ft of where the electric meter is located; STRIP NORTHEAST UPSTAIRS DRYWALL FOR NEW BATH; NORTH WALL WITH WINDOW, BOTTOM OF DECK NOTES: EXCLUDES work at interior, removal of exterior doors and windows, removal of structural framing, sawcut and break and remove for posls for new patio cover, etc. OWNER RESPONSIBLE FOR ANY NEEDED BOARDUPS, WEATHER PROTECTION OWNER TO REMOVE ANY DESIRED ITEMS PRIOR TO DEMO OWNER TO PROVIDE PORT-0-POTTY TOILET OWNER RESPONSIBLE FOR ALL WATER/GAS/ELECTRICAL LINE CAPPING & REP AIRS PAYMENT DUE UPON COMPLETION Total Phone# Fax# E-mail Web Site 619-426-9598 619--434-1425 dun@DIRTCHEAPDEMO.COM dirtcheapdemo.com Estimate# 5168 Total 4,886.00 $4,886.00 ·Thank you for your paymentl ·"'" ._ .. Your payment has been confirmed and should be reflected on your Waste Management account within three business days. RECEIVED JAN ta .. 1 CITY OF c;....;..;,_ .:::;.,.:.Ci BUILDING 01v1~11,.,;N , Customer ID/Ezpay ID: 00017-40132-13009 lnvoi.Qe Number: 0000000 Payment Amount: $61.09 Scheduled Payment Date: 24--0CT-16 Confirmation Number: 69819769163 . V-l S>6- 1 l td ~· · _ lb /u To r~ Y0':lr payment, or to access your Waste Management account, visit wm,cornfmYaccount -· ii:,, ... : .. ____ ,. Thank you for your paymentl Your payment has been conflnned and should be reflected on your Waste Management account within three business days. Customer ID/Ezpay ID: 00017~132-13009 Invoice Number: 0000000 Payment Amount: $ 61.09 Scheduled Payment Date: 17-0CT-16 ~ Confinnation Number: 69819528235 To review your·payment,,~r:'te· .. apss your Waste Management account. visit wm.com/myaccount ., .. ,.dalU .. ~. __ :,~-·~·· Your payment has been oonfumed and shOuk:t be ~ on yQur Waste Management_ account within three business days. Customer 10/Ezpay ID: 00017-40132-13009 · Invoice Number: OOQOOOO Payment Amount: $61.09 Scheduled Payment Date: : wmonline@wm.com ject: Your Payment has been Processed Date: Oct 3, 2016, 1;45:35 PM To: mamalewicz@yahoo.com ... •r:>~ /, • ,I. . ·~dwbauiiciar ' THINK GREEN! Thank you for your payment! Your payment has been confinned and should be reflected on your Waste Management account within three business days. Customer 1D/Ezpay ID: 00017-40132~13009 Invoice Number: 0000000 Payment·Amount: $132.24 . Scheduled Payment Date: 03-0CT-16 Conflnnatlon Number: 7 Your payment has.been confirmed and should be reflected on your Waste Manapment account within three business days. Customer ID/&pay ID: 00017-48132_;19009 - Invoice Number: 0000000 Payment Amount: $61.09 Scheduled Payment Date: 07-NOV-16 Confinnation-Number: 69820226353 . To review ~urpayment. or to access your waste Management account. visit watCO!DlmYIGCOYDJ '·--. ..._____ ............. Your payment has he'O~Qtnfirmed and should be reflected on your Waste · Managem~tilt1account within three business days. Customer 10/Ezpay ID: 00017-40132-13009 Invoice Number: OOOOOOQ Payment Amount: $ 61.09 Scheduled Payment Date: 14-NOV-16 )Jb;.~\tiew your payment, or to access your Waste Management account, visit ,.·. ., wm.com/myaccount ~ . . .