HomeMy WebLinkAbout2625 Wadsworth St; ; CBR2016-0264; RecycleCcityof
Carlsbad
RESIDENTIAL GREEN
BUILDING CODE
STANDARDS MANDATORY
MEASURES
CERTIFICATION
CHECKLIST
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
8-51
This form, signed and completed, and all receipts for the recycled materials shall be
submitted to the Building Inspector prior to Rnal Inspection.
Site Developmen~
4.106.2 A plan is developed and implemented to manage storm water drainage during construction.
4.106.3 The site shall be planned and developed to keep surface water away from buildings.
Construction plans shall indicate how site grading or a drainage system will manage all surface water
flows.
Energy Efficiency
4.201.1 Low-rise residential buildings shall meet or exceed the minimum standard design required by
the California Energy Standards.
Water Efficiency and Conservation
Indoor Water Use .... .-'U·
4.303.1 Indoor water use shall be reduced by at least 20 percent using one of the following methods:
1. Water saving fixtures or flow restrictors shall be used.
2. A 20 percent reduction in baseline water use shall be demonstrated.
4.303.2 When using the calculation method specified in Section 4.303.1, multiple showerheads shall not
exceed maximum flow rates.
4.303.3 Plumbing fixtures (water closets and urinals) and fittings (faucets and shower heads) shall
comply with specified performance requirements .
. Outdoor Water Use
4.304.1 Automatic irrigation systems controllers installed at the time of final inspection shall be weather-
based.
Enhanced Durability and Reduced Maintenance
4.406.1 Joints and openings. Annular spaces around pipes, electric cable!,, conduits or other openings
in plates at exterior walls shall be protected against the passage of rodents by closing such openings
with cement mortar, concrete masonry or similar method acceptable to the enforcing agency.
Construction Waste Management Plan
4.408.1 A minimum of 50 percent of the construction waste gen.erated at the site is diverted to recycle or
salvage. Recycled material receipts from approved recyclers must be attached to this form.
4.408.2 Where a local jurisdiction does no! have a construction and demolition waste management
ordinance, construction waste management plan, per form B-59, shall be submitted for approval to the
enforcino aQencv.
Bui'iding .Maintenance and ,Operation
4.410.1 An operation and maintenance manual shall be provided to the building occupant or owner.
Environmental Quality
t=ir,p_la~es "
4.503.1 Any installed gas fireplace shall be a direct-vent sealed-combustion type. Any installed
woodstove or pellet stove shall comply with US EPA Phase II emission limits where applicable.
Woodstoves, pellet stoves and fireplaces shall also comply with applicable local ordinances.
Mandatory
(X)
(X)
(X)
(X)
7/01/2011
(X)
7/01/2011
(X)
7/01/2011
(X)
(X)
(X)
(X)
(X)
(X)
n ...... "'"'',.,::
Pollutant Control
4.504.1 Duct openings and other related air distribution component openings shall be covered (X )
during construction.
4.504.2.1 Adhesive, sealants and caulks shall be compliant with VOC and other toxic compound (X)
limits. (X )
4.504.2.2 Paints, stains and other coatings shall be compliant with voe limits. (X)
4.504.2.3 Aerosol paints and coatings shall be compliant with product weighted MIR limits for
ROC and other toxic compounds. ' (X )
4.504.2.4 Documentation shall be provided to verify that compliant VOC limit finish materials
have been used. (X)
4.504.3 Carpet and carpet systems shall be compliant with voe limits.
4.504.4 50 percent of floor area receiving resilient flooring shall comply with VOC-emission limits (X)
defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or
be certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. (X )
4.504.5 Particleboard, medium density fiberboard (MDF) and hardwood plywood used in interior
finish svstems shall comolv with low formaldehyde emission standards.
Interior Moisture Control
4.505.2 Vapor retarder and capillary break is installed at slab on grade foundations. (X )
4.505.3 Moisture content of building materials used in wall and floor framing is checked before (X )
enclosure.
Indoor Air Quality and Exhaust
4.506.1 Exhaust fans which terminate outside the buildino are provided in everv bathroom. (X)
Environmental Comfort
4.507.1 Whole house exhaust fans shall have insulated louvers or covers which close when the (X)
fan is off. Covers or louvers shall have a minimum insulation value of R-4.2.
4.507.2 Duct systems are sized, designed, and equipment is selected using the following
methods: (X)
1. Establish heat loss and heat gain values according to ACCA Manual J or equivalent.
2. Size duct systems according to ACCA 29-D (Manual D) or equivalent
3. Select heating and coolina eauipment according to ACCA 36-S (Manual S) or eauivalent.
Installer and Special Inspector Qualifications
702.1 HVAC system installers are trained and certified in the proper installation of HVAC (X)
systems.
702.2 Special inspectors employed by the owner must be qualified and able to demonstrate (X)
competence in the discipline thev are inspectino.
I, as the professional responsible for this project, certify that, to the best of my knowledge, the mandatory items
listed on this form have been incorporated into the project in order to comply with Title 24, Part 11 of the 2013
California Green Building Standards. All receipts for recycled materials have been attached to this form.
Project Address: J._lc as-Wad S «).l)C. ./--i.1. 51. Plan Check Number: ]>c It.. -~. \ 1.
~ --. SMl~j_S Print Name: ..(C\~ Signed:
License Number: {o '8 3~ ?> Date:
B-51 Page 2 of 2 Rev. 11/15
CCityof
Carlsbad
WASTE MANAGEMENT
PLAN
8-59
Owner: To \\ f,fh+h~r 5 Homo Contractor:
Development Services
Building Division
1635 Faraday Avenue
760-602-2719
www.carlsbadca.gov
Job Address: cPGJ f' (,iJo.J.~ WO!' fk > f Phone Number: 9 '4 9 -3 \CC)-ID \oG
Permit#: C'B llat>ila -oa&,':{ Ll os l ~ "'S. '0
Estimated Cost of Project: $ __ :)...._.~ ... -""'--iir-=i:2.-u ______ _
Type of Project: ~w Construction D Remodel or T.I. D Residential D Commercial D Demolition
~heckall~atap~~ OOther --------------------~~--------
Non-hazardous construction waste generated during the course of this project shall be recycled and/or salvaged for re-use at a
minimum of 50% per CALGreen Sec. 5.408.1. Failure to comply may result in a penalty fee up to $1,000. For projects which
consist of mainly equipment and/or racking, that have a combined weight of-new construction disposal that does not exceed 2
lbs per square foot of building area affected by this permit, may be deemed to meet the 50% minimum requirement upon
approval of Building Department.
ALTERNATIVE FORMS o·F COMPLIANCE: (ff selected, do not complete Tables 1 & 2 below)
D Construction waste shall not exceed 2 lbs. per sf. of area. All receipts shall be provided to the Building Official prior to
final. (This option not applicable for most construction projects.)
Square feet of construction area X 2 lbs. = lbs. of allowable waste.
D I plan on using a WASTE MANAGEMENT roll-off bin. All receipts shall be provided to the Building Official prior to final.
Ta ble 1 -Estimated Waste_ (To be filled out prior to permit issuance -refer to example on Page 2.)
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED Wa!;te Hauling Company or Re-Use Method
Asphalt/ Concrete
Brick/ Masonry
cardboard
Drywall
Landscape Debris
Lumber/ Wood
Metals
Mixed Waste
Trash Garba e
Other:
TOTAL lbs:
Estimated Percentage to be Re-Used or Recycled ] 5 %
Official Use Only
D Plan Approved D Plan Denied D Project Valuation Approved
Reviewed/ Approved by: ________________ _
Page 1 of 2
Table 2 -Actual Waste (To be completed atter construction.)
MATERIALS
Asphalt/ Concrete
Brick/ Masonry
Cardboard
Drywall
Landscape Debris.
Lumber/ Wood
Metals
Mixed Waste
Trash Garba e
Other:
TOTAL lbs.:
lbs. of waste taken to
LANDFILL
5
lbs. of waste
RE-USED or RE.CYCLED
0
Actual Percentage Re-Used or Recycled_--=5----=\c~ __ %
Official Use. Only
Waste Hauling Company or Re-Use Method
(complete only if different than Table 1)
D 50% Goal Achieved D 50% Goal Not Achieved D Alternative Compliance Achieved Penalty Paid $ ______ _
Reviewed/ Approved by: _________________ _
EXAMPLE: Use the following example as a guide to completing this form.
MATERIALS lbs. of waste to be taken to lbs. of waste to be
LANDFILL RE-USED or RECYCLED
Asphalt I Concrete 0 2000
Brick I M~sonry iOO . 450
Cardboard 0 1-50
Drywall 0 50
Landscape Debris 0 i20
Lumber I Wood · 500 0
Metals 300 200
Mixed Waste .. i500 0
Trash I Garbage 300 0
Other: PooL Cil,{Vl,tte 0 .°JOO
TOTAL lbs.: 2700 3f?J-O
Percentage to be Re-Used or Recycled 59 %
Formula:
Total Re-used or Recycled X 100 = % Re-Used or Recycled
(Total Combined Waste)
Waste Hauling Company or Re-Use Method
A"B.G H-Cil,(L[V\,C\ Go.
WM I R.e-L,\£eo. "B.rLc~ QV1,-S[te
A"B,G H-Cil,(LLV1.-o. Go.
A"B.G H-Cil,(LL~ Go.
Ml,(Lcl1eo. c: R£-l,(Se1i\ QVl,-sLte
waste MC1vi.,ao.eV1A..e111,t
WM I A"B.G HC!l,(Lt~
WM
WM
L,\£e1i\ cis c.yl,{sl1e1il "B.ase oVl,-.stte
J •
3870 X 100 = 59% Re-Used or Recycled
(2700 + 3870)
Since.59% exceeds the minimum requirement of 50%, this plan complies.
Page 2 of 2
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
54 Ticket#: 1543134
Weighmaster: arangmi
(760) 603-0153 In: January 20, 20,17
333367 -RUBIO CONSTRUCTION SERVICES INC Out: January 20, 2017 26341 JEFFERSON AVE STE#G
MURRIETA, CA 92562 Vehicle : A35639
Contract: INDUSTRIAL-GATE 2
GROSS 34,260 Scale In
TARE 27,840 Tare Out
NET 6,420
Tracking Qty: 0.00
Qty Unit Description
3.21 TN MSW
Origin: CARLSBAD 100%
Signature:
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$66.00 $211.86
Tax
$0.00
Total
Paid
Change
7:43 am
7:43 am
Total
$211.86
$211.86
$0.00
$0.00
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
(760)603-0153
54 Ticket#: 1553228
Weighmaster: juareom
In; February 14, 2017
333367 -RUBIO CONSTRUCTION SERVICES INC Out: February 14, 2017 26341 JEFFERSON AVE STE#G
MURRIETA, CA 92562 Vehicle: a10101
Contract: COMM-GATE Yr. 200
GROSS 20 ,180
TARE 16,360
NET 3,820
Tracking Qty: 0.00
Qty
1. 91
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
Scale In
Tare Out
100%
Ref:
BOL:
INBOUND
INVOICE
-Rate Extension
$66.00 $126.06
Tax
$0.00
Total
Paid
Change
7:14 am
7:14 am
Total
$126.06
$126.06
$0 .00
$0.00
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008
54 Ticket#: 1559578
Weighrnaster: gomezda
(760)603-0153 In; March 01, 2017
333367 -RUBIO CONSTRUCTION SERVICES INC Out: March 01, 2017 26341 JEFFERSON AVE STE#G
MURRIETA, CA 92562 Vehicle : a10101
Contract: COMM-GATE Yr. 200
GROSS 19,220 Scale In
TARE 16,360 Tare Out
NET 2 ,860
Tracking Qty: 0.00
Qty
1. 43
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
100%
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$66.00 $94.38
Tax
$0.00
Total
Paid
Change
10:31 am
10:31 am
Total
$94.38
$94.38
$0.00
$0.00
Escondido Resource Recovery
1044 W Washington Ave
Es~ondido, CA 92025
i7t,!Zl) 7·~-5-3203
Cu.st ome 1· ... : Ticket: 43288
Date:· 03/ l 7 I 1 7
RUBIO CONSTRUCTION SERVI
26341 JEFFERSON AVE, #G
M!..iRRIETTqr CA '32562
C: rim m G L; :. t y Ra·te
lrn 7:49
Out: 8~~2
INVOICE
9999 / Trr.ici< =
Co·~~iner: ·
Z. .PRo ut 2 ~ 015 ii
/ . .-.-:ori gin~ 01f. Escondido r) . ,·. ~· :' ;/
:1 ~~i =HAUL REFUSE
[Sr~ss(In): 54,260.
Uni-ts
12.88 7A·. Jl,!21 per TON
V!OLETP.
l ' .cs Scl#.t TarE 28,500. lbs Scl#l Net: 25,7f...lZJ. lbs]
-l TOTAL DUE
Driver
S53:r12
1·1uu JYUV<.w~.u.u .t\U CHULA VISTA, CA 91911
()-
400212 -RUBIO CONSTRUCTION SERVICES INC
26341JEFFERSON AVE STE#G
MURRIETA, CA 92562
fVC,J..';:J.lUUCl-.J'-'-..._ • ··----..1 .
' In:
. " .. -Out:
r . ~:Tehicle:
Ref:
BOL:
April 06 , 2017
April 06, 2017
A41577
Contract: GATE RATE
GROSS 24,320
·19 ,300
_____ S,_q20.
TARE
NET
Scale In --·
Tare Out INBOUND
INVOICE
Tracking Qty: 0.00
Qty Unit Description
2.51 TN · MSW
Origin: CHULA VISTA
1. 00 ENVIRONMENTAL. FEE
1. 00 FUEL RECOVERY FEE
Signature:
·~
Rate
$83.50
100%
1 $16.25
5.35
Extension
$209 .59
$16.25
$11. 21
Tax
$0 .00
$0.00
$0.00
I;. ..... .-. .. ·-.;,j
Total
Paid
Change
8:10 am
8:10 am
Total
$209 .59
$16.25
$11.21
$237.05
$0.00
$0 .00
54 Ticket #: 1589504
PALOMAR TRANSFER
5960 EL CAMINO REAL
CARLSBAD, CA 92008 Weighmaster: gomezda
(760)603-0153 In: May Q4, 2017
' 333367 -RUBIO CONSTRUCTION SERVICES INC Out:
26341 JEFFERSON AVE STE#G May 04, 2017
MURRIETA, CA 92562 Vehicle: a35720
Contract: COMM-GATE Yr . 200
GROSS 20,300 Scale In
TARE 16,800 Tare Out
NET 3,500
Tracking Qty: 0.00
Qty
1. 75
Unit Description
TN MSW
Origin: CARLSBAD
Signature:
100%
Ref:
BOL:
INBOUND
INVOICE
Rate Extension
$66.00 $115.50
I
I /
, .. /
Tax
$0 .00
To'
!
i i
7:18 am
7:18 am
./
Total
$115. 50
I
AGRISCAPE, ·,Ne. 1 087°30 ~
37760 Borel'Road :l
Murrieta, CA 92563 j
. (951) 696-0651 DATE 2 I d 2 _20 __J_:J ' f ~-E-~=e=o-F_R=o=~~-~~~;~--'R~=~-u..,_~=-b,._:t_JJ..
1
~-JLio""·_('"J;~.;...l~-1~-1~.::..C=~-7\~_:k=''"""'=<.._,=....,_f=..,..~=·t-_:()=_.=c ..... ±=~:'=-l?=---l\)--~~~~:~:-:l .... me.1-::~::~::;~:::~::~::~:;·=~==-=·j ==·~
t 1 -,~~-, D CASH ~
Y-,\. D., CHECK By ___________ ...:._____ '.J
D CHARGE Thank You I ~
•N w•>kj
AMOUNT OF ACCO.JNT
' THIS PAYMENT
BAIANCEDUE
• •r,:, \c: :>4 •t:hb< •:A:•2 Ti:: ic'&• Ori!'·.;,· "iitloi·
·--~,,_..,,.,,.,,..._ .. ~----------:·------~r--····.:.'""·~ .... ,., .. ,..,,=-,·~-~---· . -. . ------~·--:-. . ~ ----~
I'
BY-.· .. __,_,_. ~--~~'::=~~
l-_.....;....;;._;;/~>e-_---_.· ___ -_. _,,.~· . ..__~----_···-··--~--------Thank You!
P.O.
76 SAND & GRAVEL
CONCRETE & ASPHALT RECYCLE
POBOX965
BONSALL, CA 92003
SALES: (760) 497-6041
JOB# DATE . I <,.,[• IL 1-"A·,''···L -l, -. \·~. \ ,,
COMMERCIAL RESIDENCE TIME /
NAME
. .-\~-~ ~ \ :.:·\ \.
,,1 !
/ '· I L, C·f).--\..
CITY OF ORIGIN
JOB LOCATION
---PU !TRAILER rlATBED BOBTAIL 110-~~EEL I END DUMP l1 & T .,.,.,
MATERIAL '1 /' I l \ .
LOAOCOUNT i'-··\ lx \ t ; ~ '. '-.. ·.
1
/'<. ~,· .I-
# LOADS
2
7'
\'l,
. _l .' .. . ·, .. · ·~/ I ·'
SIGNATURE
3 4 5
Zc.-c
X PRICE
, ,•/
/ I
All bills due upon presentation.unless otherwise
arranged in advance. Open acoounts subject to
1 1/2% month, charge after 30 days unpaid
balance.
6
·-·
7 8 9
OTHER CHARGES
$
.... -;
.I , •..
: '; .,· ~. .
... ":,
TOTA[ .
TRUCK#
10
76 SAND & GRAVEL is not responsible
for damage to vehicle while being loaded
or unloaded In yard.
JOB COPY