Loading...
HomeMy WebLinkAbout2628 Gateway Rd; ; CBCA2017-0015; PermitPermit Print Date: 06/07/2019 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwe1Hng Units: Bedrooms: Project Title: 2628 Gateway Rd BLDG-Associated Permit Commerci 2132621900 $431,941.00 UPTOWN BRESSI RANCH Work Class: Lot#: Reference#: Construction Type: Bathrooms: Orig. Plan Check#: Plan Check#: Description: UPTOWN BRESSI: BUILDING E-7,300 SF RETAIL SHELL Applicant: SMITH CONSULTING ARCHITECTS NORMAN BARRETT 13280 Evening Creek Dr S San Diego, CA 92128-4101 858-793-4777 BUILDING PERMIT FEE ($2000+) BUILOING PLAN CHECK FEE (BLDG) BUILDING PLAN CHECK FEE (BLDG) Owner: BRESSI RETAIL LLC 130 Vantis Dr, 200 Aliso Viejo, CA 92656-2691 858-526-6655 COMMUNITY FACILITIES DISTRICT (CFD) FEE-NON-RES ELECTRICAL BLDG COMMERCIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION LOCAL FACILITIES MANAGEMENT ZONE (LFMZ) -ZONE 17 MECHANICAL BLDG COMMERCIAL NEW/ADD\T!ON/REMODEL PUBLIC FACILITIES FEES-inside CFO REFUND 5B1473 GREEN BUILDING STATE STANDARDS FEE SDCWA SYSTEM CAPACITY CHARGE 1-1/2" Displacement SEWER BENEFIT AREA FEES -H SEWER CONNECTION FEE (General Capacity all areas) SWPPP INSPECTION FEE TIER 1 -Medium BLDG SWPPP PLAN REVIEW FEE TIER 1-MEDIUM TRAFFIC IMPACT Commercial-Industrial w/in CFO WATER METER FEE 1-1/2" Displacement WATER SERVICE CONNECTION FEE 1-1/2" OISPLACEMENT-P WATER TREATMENT CAPACITY CHRG 1-1/2" Displacement Total Fees: $113,753.29 Total Payments To Date: New 2 DEV12023 VB PC2017-0015 $113,753.29 Status: Applied: Issued: Permit Finaled: Inspector: Final Inspection: Balance Due: (city of Carlsbad Permit No: CBCA2017-0015 Closed -Finaled 11/06/2017 04/19/2018 AKrog 6/7/2019 12:05:22PM $0,00 $1,804.60 $463.22 $1,263.22 $0.00 $89.00 $170.00 $2,920.00 $55.00 $7,861.33 $0.00 $18.00 $15,297.00 $4,254.88 $3,792.04 $238.00 $56.00 $56,721.00 $606.00 $17,721.00 $423.00 1635 Faraday Avenue, Carlsbad, CA 92008-7314 I 760-602-2700 I 760-602-8560 f I www.carlsbadca.gov PERMIT INSPECTION HISTORY REPORT (CBCA2017-0015) Permit Type: BLDG-Associated Pem1it Commercial Application Date: 11/06/2017 Owner: BRESSI RETAIL LLC Work Class: New Issue Date: 04/19/2018 Subdivision: Status: Closed -Finaled Expiration Date: 04/16/2019 Address: 2628 Gateway Rd Carlsbad, CA 92009 IVR Number: 7493 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete 06/13/2018 06113/2018 BLDG-16 060917-2018 Passed Andy Krogh Complete Roof/ReRoof (Patio) 07/02/2018 07/02/2018 BLDG-17 Interior 062839-2018 Partial Pass Andy Krogh Reinspection Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Single side at electrical and fire riser room Yes BLDG-24 062841-2018 Passed Andy Krogh Complete Rough/Topout 08/23/2018 08/23/2018 BLDG-18 Exterior 067896-2018 Partial Pass Andy Krogh Reinspectlon Incomplete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency Partial as noted on card Yes 09/12/2018 09/12/2018 BLDG-18 Exterior 069783-2018 Passed Andy Krogh Complete Lath/Drywall 09/13/2018 09/12/2018 BLDG-34 Rough 069784-2018 Paased Andy Krogh Complete Electrical Checklist Item COMMENTS Passed BLDG-Building Deficiency Torque test main switch gear an house Yes panel BLDG-Building Deficiency At noted on plans Yes 10/18/2018 10/18/2018 BLDG-Electric Meter 073668-2018 Passed Andy Krogh Complete Release 06/07/2019 06/07/2019 BLDG-Fina I 094098-2019 Passed Andy Krogh Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes BLDG-Fire Final 080886-2019 Scheduled Cindy Wong Incomplete Checklist Item COMMENTS Passed FIRE-Building Final No June 07, 2019 Page 2 of 2 PERMIT INSPECTION HISTORY REPORT (CBCA2017-0015) Permit Type: BLDG-Associated Permit Commercial Application Date: 11/06/2017 Owner: BRESSI RETAIL LLC Work Class: New Issue Date: 04/19/2018 Subdivision: Status: Closed -Finaled Expiration Date: 04/16/2019 Address: 2628 Gateway Rd Cansbad, CA 92009 IVR Number: 7493 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete 04/2312018 04/2312018 BLOG-12 Steel/Bond 066707-2018 Failed Andy Krogh ReinspecUon Complete Beam Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No 04/26/2018 04/26/2018 BLOG-12 Steel/Bond 056988-2018 Passed Andy Krogh Complete Beam 05/11/2018 05/11/2018 BLDG-16 067812-2018 Partial Pass Andy Krogh Reinspection Incomplete Roof/ReRoof (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Perimeter nailing ok to set parapet walls Yes 05/21/2018 05/21/2018 BLDG-34 Rough 058542-2018 Partial Pass Andy Krogh Reinspection Incomplete Electrtcal Checklist Item COMMENTS Passed BLDG-Building Deficiency At noted on plans Yes 05/25/2018 06/25/2018 BLDG-14 059214-2018 Failed Andy Krogh Reinspectlon Complete Frame/Steel/Bolting/ Welding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency Requires special inspection, hold downs No missing nuts, straps incomplete 06/04/2018 06/04/2018 BLDG-13 Shear 059827-2018 Partial Pass Andy Krogh Reinspection Incomplete Panels/HD (ok to wn,p) Checklist Item COMMENTS Passed BLDG-Building Deficiency First layer Yes BLDG-15 059826-2018 Passed Andy Krogh Complete Roof/ReRoof (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Perimeter nailing ok to set parapet walls Yes BLDG-Building Deficiency Diagonal bracing at Parapet walls Yes 06/06/2018 06/06/2018 BLDG-14 060085-2018 Partial Pass Andy Krogh Reinspectlon Incomplete Frame/Steel/Bolting/ Welding (Decks) Checklist Item COMMENTS Passed BLDG-Building Deficiency Exterior walls ok to sheet all but ones that Yes have plumbing BLDG-16 060086-2018 Partial Pass Andy Krogh Reinspectlon Incomplete Roof/ReRoof (Patio) Checklist Item COMMENTS Passed BLDG-Building Deficiency Roof as noted on card Yes June 07, 2019 Page 1 of2 ~ CARLSBAD Building Division INSPECTION RECORD @ INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB CBCA2017--0015 2628 GA TEWA y RO @ CALL BEFORE 3:00 Pm FOR NEXT WORK DAY INSPECTION @ FOR BUILDING INSPECTION CALL: 760-602-2725 OR GO TO: www.Carlsbadca.gov/Buildlng AND CLICK ON "Request Inspection" DATE: -(9-I(; UPTO\NN BRESSI BUILDlNG E -7,300 SF RETAIL SHELL "''' E. 2132621900 PC~17-0015 111612011 CBCA2017-0015 If ''YES" is checked below that Division's approval is required prior to.J~_sfulg a Final Building Inspection. If you have any questions please call the applicable divisions at the phone numbers provided below. After all required approvals are signed off-fax to 760-602-8560, email to bid ins ections@c_arlsbad~ or bring In a COPY of this card to: 1635 Faraday Ave., Carlsbad. STORM WATER PRECON MEETING REQUIRED 760-602-2725 Allow 24 hours IF MARKED "YES". APPROVAL REQUIRED PRIOR TO REQUESTING BUILDING Fire Prevention Planning/Landscape CM&I (Engineering Inspections) #12 REINFORCED STEEL #66 MASONRY PRE GROUT 0 GROUT D WALL DRAINS #10 TILT PANELS #11 POUR STRIPS #11 COLUMN FOOTINGS #l4 SUBFRAME D FLOOR D CEILING #15 ROOF SHEATHING #13 EXT. SHEAR PANELS #21 UNDERGROUND □WASTE D WTR #24 TOP OUT O WASTE WTR TUB & SHOWER PAN GAS TEST D GAS PIPING #2S WATER HEATER #2S SOLAR WATER BLDG-ANAL POOL EXCAV / STEEL PLUMBING #S3 ELEC /CONDUIT/WIRING EQUIP01£NTIAL BOND #S4 PR_, ar«D / FENCE/ AlARMS #155 ,:.ruo,,, .... #17 GUNITE BLDG-FINAL Date 760-602--4660 760-944-8463 760--438-3891 Ins Allow 48 hours Allow 48 hours Call before 2 pm #35 PHOTO VOLTAIC #38 SIGNS BLDG-FINAL CODE# COMBO INSPECTION UNDERGROUND (11,12,21,31) #82 DRYWALL,EXT LATH, GAS TES (17,18,23) #83 ROOF SHEATING, EXT SHEAR (13,15) #84 FRAME ROUGH COMBO (14,24,34,44) A/S UNDERGROUND VISUAL A/S UNDERGROUND HYDRO A/S UNDERGROUND FLUSH A/S OVERHEAD VISUAL A/S OVERHEAD HYDROSTATIC A/S FINAL F/A ROUGH-IN F/AFINAL FIXED EXTINGUISHING SYSTEM ROUGH-IN FIXED EXTING SYSTEM HYDROSTATIC TEST FIXED EXTINGUISHING SYSTEM FINAL MEDICAL GAS PRESSURE TEST MEDICAL GAS FINAL -----• • Date COl'YOFCARO REOUIREO Ins ector SEE BACK FOR SPECIAi. HOTES SEe S,.CJ< FOR SPECIAL NOTES /iiff MOORE TWINING Date: 04/25/2018 FIELD DAILY INSPECTION REPORT Client Name: Shea Properties Project Name: Bressi Ranch Retail Project Address: 2628 Gateway Road, Permit No: CBCA2017-0015 Plan Date: 05/19/2017 MTA Project Na.: D56624.01 Stare No.: Building E Carlsbad, CA 92009 Building Code: 2016 CBC Specification Date: 05/19/2017 Page 1 of 3 General Contractor: CSI Construction Subcontractor: Dicarlo Concrete Inc. Inspector: Osama Daoud Certification Number: ICC # 5098536 Exp. Dote: 04/14/2020 □ Building Pad □ Utilities □ Pavement Sub-grade □ Pavement Base □ Pavement AC □ PCC Pavements □ Off-Site Improvements o Sidewalks o Curb & Gutter I Foundations I Slab-On-Grade o Columns o Beams o Walls □ Trusses D Deck o Suspended Floors D Rao!□ Rack and Shelving □ Light Gauge Interior Walls/Framing □ Pre-Cast Concrete □ Other □ Sampling □ Earthwork Observation & In-Place Density Testing I Reinforcing Steel Inspection □ Concrete Sampling □ Concrete Placement Inspection (including saw-cut depth , CO monitoring, curing, etc.) o Batch Plant Inspection o Moisture Vapor Emission Testing D Floor Slab Relative Humidity Tes ting D Slip-Resistance Testing D Floor Flatness Testing D Gloss Measurements □ Joint Sealer Inspection □ Anchor Bolt/ Epoxy Inspection □ Field Welding Inspection □ Shop Welding Inspection □ NDT □ HS Bolt Tes ting □ Spray Fire Proofing Inspection and Testing □ Masonry Inspection □ Paint Thickness Testing □ Roof Inspection □ Coring □ Sample Pickup D Other Inspection Date: 04/25/2018 I Initial Inspection o Re-Inspection Weather: Clear Samples Taken o Yes I No Time Samples Taken: o Out-al-Scape Inspection or Testing Inspected rebar placement for the Building foundation and Slab-On-Grade at the area between A to Band from 1 to 2, the rebar installed for the wall footings around according to details 9A/S-701 & 1/S-701 & 14/S-701 & 2/S-701 & 15/S-701 Footing schedule & 10/S-701 Column schedule & 3/S-701 & 4/S-701 & 8/S-701 in the approved plan and also the rebar installed for Slab-On-Grade WI# 3@ 18" O.C.E.W. according to the information on sheet# S-E-1.0 in the approved plan for Retail Building E. Report Continued o Yes I No Work inspected as outlined in this report is, to the best of this inspectors knowledge, in conformance with the approved plans and specifications: Ill Yes □ No (If no, inspector shall complete and attach a Discrepancy Report). MTA Corporate address: 2527 Fresno Street, Fresno, CA 93721 (800.268.7021). Website: www.mooretwininq.com Inspector's Signature C:::,~&::22,, s / Date: 04/25/2018 Supervisor's Signature Date: We do not undertake the guarantee of construction nor do we relieve the contractor of his primary responsibility to complete the project in accordance with the plans and specifications. Our firm is not responsible for construction safety. Our selVices were performed in accordance with generally accepted standards and practices. This warranty is in lieu of all other warranties either expressed or implied. ,JMOORE TWINING Page 2 of 3 ----REINFORCING STEEL AND CONCRETE REPORT Date: 04/25/2018 ---------Project Name: Bressi Ranch Retail MTA Project No.: D56624.01 Store No.: Building E Inspector (Print): Osama Daoud Project Address: 2656 Gateway Road, Certification No.: ICC # 5098536 City, State: Carlsbad, CA 92009 Weather: Clear Client Name: Shea Properties ___ .:,_ _______ _ CSI Construction General Contractor: Approved Project Plans Dated: 05/19/2017 Specifications Dated: 05/19/2017 --------Code/Acceptance Standards: 2016 CBC Reference Section: -------------Bui Id in g Permit/ DSA No· CBCA2017-0015 .. IZJ REINFORCING STEEL @Footing □Sidewalk/ Curb □Tilt-up Wall Panels □Elevated Deck □Other: □Form Work □Vapor Barrier □Sub Grade □Anchors 0Uffer Ground Oother Grid Line / Location: The Building foundation and Slab-On-Grade at the area between A to B and from 1 to 2 for Retail Building E. □CONCRETE PLACEMENT 0 CONCRETE SAMPLING ONLY □Foundation 0 Sidewalk / Curb 0Tilt-up Wall Panels D Elevated Deck □Other: Supplier: Concrete Mix Design No.: Required Strength: Yards Placed: Method Placed: Consolidated By: Other: □Please see attached Concrete Sampling Data Report Discre ancies Issued: p @No C?'?f'Jl ~ ahas / Inspector Signature CORPORATE 2527 Fresno Street Fresoo, CA 93721-1804 (569) 268-7021 Fax 265-7126 D Yes (If es, see attached Discrepanc Re ort y y p ) CORONA 500 Harrington Street, Ste. It Ccrona, CA 92879 (951)898-8932 Fax 898-8974 MONTEREY 501 Ortiz Avenue Sand City, CA 93955 (831) 392-1056 f@( 392-1059 @Slab on grade □shear Walls 0 Reinforcing Steel □PIT Tendons □slab on grade 04/25/2018 Date SACRAMENTO 5675 Power Inn Road, Su~e c Sacramerto, CA 95824 (916)361-9477 Fa< 381-9478 Project Name: Sample Sample No. Type .fief MOORE TWINING Bressi Ranch Retail Truck# Ticket# MTAProjectNo.: D56624.01 CONCRETE SAMPLING DATA REPORT Batch Time Ambient Concrete Water Truck Slump Added Time em-·· Temp Temp OnelOJ Unit Weight Page~o1_3 __ Date: 04/25/2018 Air Sample Location Content C??rn0-aha, ✓ Osama Daoud 04/25/2018 Inspector Signature CORPORATE 2527 Fresno street Fresro, CA 93721-1E04 (559) 26S-7021 Fa~ 268-7126 Inspector Print CORONA 500 Harr1ngton Street, Ste. I I CCJ'ona, CA 92879 (951) 898-8932 F11X 898-8974 MONTEREY 501 Ort~ Avenue Sand City, CA 939:55 (831) 39::2.1056 Fit< 392-1059 Date SACRAMENTO 567!'1 Power inn Roaci, Suite c sacramerto. CA 9582d (916) 381-9477 Fa< 381-9478 {;iff MOORE TWINING Date: 6/26/18 FIELD DAILY INSPECTION REPORT Client Name: Shea Properties Project Name: Square at Bressi Ranch Project Address: 2628 Gateway Rd, Carlsbad, CA Permit No: CBCA2017-0015 Pion Dote: 11 /4/17 MTA Project No.: D56624.01 Store No.: na Building Code: 2016 CBC Specification Dote: 11/4/17 Page 1 of 2 General Contractor: CSI Inspector: Ethan Moore Certification Number: ICC 52144 78 Subcontractor: Campbell Certified Exp. Dote: 7 /4/19 □ Building Pod □ Utilities □ Pavement Sub-grade □ Pavement Bose D Pavement AC □ PCC Pavements □ Off-Site Improvements D Sidewalks D Curb & Gutter □ Foundations D Slob-On-Grode □ Columns □ Beams D Walls D Trusses D Deck □ Suspended Floors □ Roof □ Rock ond Shelving □ Light Gouge Interior Wolls/Froming □ Pre-Cost Concrete I Other canopy framing □ Sample Pickup □ Earthwork Observation & In-Place Density Testing □ Reinforcing Steel Inspection □ Concrete Sampling D Concrete Placement Inspection (including sow-cut depth , CO monitoring, curing, etc.)□ Post Tension Concrete D Moisture Vapor Emission Testing □ Floor Slob Relative Humidity Testing D Slip-Resistance Testing D Floor Flatness Testing D Gloss Measurements □ Joint Sealer Inspection □ Anchor Bolt/ Epoxy Inspection ■ Field Welding Inspection D Shop Welding Inspection D NDT □ HS Bolt Testing □ Spray Fire Proofing Inspection and Testing □ Masonry Inspection □ Non-Shrink Grout □ Roof Inspection □ Coring □ Nailing/Wood Framing Inspection □ Other Inspection Date: 6/26/18 Samples Token □ Yes I No Time Samples Token: I Initial Inspection D Re-Inspection □ Out-of-Scope Inspection or Testing Weather: sunny Welding was performed for the attachment of galvanized HSS "Eyebrow" canopy sections at Building E line 2 at A.5 and A.6. The canopy frames were welded to the HSS 5x5 columns at the openings. Per detail 17/S503, the HSS beams were welded to the columns using flare bevel welds. As allowed by RFI #87, the beams were welded on the top, bottom and front sides, because the back side was inaccessible do to wood framing in place. Welding was performed by the welder Jesse Barnett using FCAWwith E71T-8. The joints were marked "VTOK EM 6/26" in green. The canopy to column weld at 1-A.7 noted on 6/21/18 as having undercut was repaired today. Report ContlnuedlE!Yea0No Work inspected as outlined in this report is, to the best of this inspector's knowledge, in oonformance with the approved plans and specifications:IE!Yea0No (If no, inspector shall complete and attach a Discrepancy Report). MTA Corporate address: 2527 Fresno Street, Fresno, CA 93721 (800.268.7021). Website: www.mooretwining.com Inspector's Signature Date: 6/26/18 Supervisor's Signature Date: We do not undertake the guarantee of construction nor do we relieve the contractor of his primary responsibility to complete the project in accordance with the plans and specifications. Our firm is not responsible for construction safety. Our services were performed in accordance with generally accepted standards and prac1ices. This warranty is in lieu of all other warranties either expressed or implied. ... liiff MOORE TWINING FIELD WELDING INSPECTION REPORT Project Name Square at Bressi Ranch Store# na Date of Inspection 6/26/18 ------------------------Project Address 2628 Gateway, Carlsbad, CA Detail(s) 1715503 MTAProjectNo. _D_58_6_2_4_.0_1 _____ _ Approved PIMS _1_11_41_1_7 _____________ Speclllcatlons 11/4/17 lnspector(Pnnt) _E_lh_a_n_M_oo_re ____ _ Build"!JPermlt/DSANo. CBCA2017--0015 Process FCAW WELD/CONNECTION TYPES MEMBER/JOINT TYPES A> Affi Spot Weld DD Beam to Beam cu Plate to Column UC LOmple'8 nmsmmon Groove Weld ~ Beam to Column TA Tube Steel to Angle FB Flare i,ievel Groove Weld cc COiumn to COiumn TB Tube Steel to Beam N.D.T. T ,a ,w Fllo!Weld DB Deck to Beam AB Angle to Beam V Visual c"' netratlon 1,:,roove Weld Gusset Plate to cieam ,, ,ube I to I Ube ;:,tee I u, trasonic , esllng " ;:,teel ;:,tud '" Gusset Plate to CC lumn ·"' Joist to Girder ., IMagnettc ..-wnr~ Testing AA Angie to Angle RA Rebar to Angle o, Dye Penetran!T esting PB Plate to Beam AJ Angle to Joist Detail Weld/Connection MemberlJolnt Item N.D.T. Accept Reject In Complete Remarkdlotes Type Type Type p,....,. 17/$503 FB BC HSS canopy beam to HSS column at line 1-A.7 V X X 17/5503 FB BC HSS canopy beam to HSS column at 2-A.5 and 2-A.6 V X X Notes:---------------------------------------------------- Disaepancies Issued: @ No D Yes (tt yes, see attachoo Discrepancy Reporl) ~ ICC5214478 Inspector Signature =. ~A""W~S/~IC~C~Cefti,-,'llca,-ti~on~N~o-. ----------~ ,.,.,►,.,,,0,1,..i r .. ,,., u .,,,,_,,.,., , .. ,;~702' ,..;,,.,,,~-. ~-,..,., __ A,....., ~ •. .,,.., c .... ,,,. .. 1a,,, ..-:.1oes r,.,,0,1-,;s 6/26/18 Date filMOORE TWINING DEVIATION/ DISCREPANCY REPORT (Page __ of __ ) Item Number _____ _ Client Name: Shea Properties MTA Project No.: D56624.O1 Project Name: Square at Bressi Ranch Pad E Store No._ .. ____________ _ Project Address: (Street, City & State} '2628 Gateway. Carlsbad, CA Permit No. CBCA2O11-OO15 Building Code: .::2:.;O1.::6..:C.::B.::C __________ _ Plan Date: _1_11◄_1_11 ___________ Specification Date: _1_11◄_1_11 __________ _ General Contractor: CSI Subcontractor: Campbell Certified Inspector (Print): _E_tha_n_M_oo_re___________ ICC Certification Number: _,c_c_s_21_«_1_s ______ _ Inspection Date: 6121118 ICC Certification Exp. Date: _11_◄1_1_0 ________ _ Type: □ Building Pad □ Utilities □ Pavement Sub-grade □ Pavement Base □ Pavement AC □ PCC Pavements □ Sidewalks □ Curb & Gutter □ Off-Site Improvements □ Foundations □ Slab-On-Grade □ Columns □ Beams □ Walls □ Trusses □ Deck □ Suspended Floors □ Roof □ Rack & Shelving □ Sidewalks □ Curb & Gutter □ Light Gauge Interior Walls/Framing □ Pre-Cast Concrete I!! Other ... ca::.ncco::.:py __ 1ra ...... m __ 1ng=------------------ Locations (Define Location by Grid Lines or Intersections, etc.}: Building E line 1 atA.7 HSS canopy framing Deviation Description (Describe why the work deviates from the approved plans and specifications and reference the specific part of the plans such as the Sheet and Detail and/or the specific section of the specifications that the work did not comply): the weld connecting the HSS canopy beam to the south HSS column was found to have undercut Reference Documents: List and attach any reference documents that assist in describing the deviation such as sketches, photographs, e-mails, etc.: ___________________________ _ Action Required (such as Repair per plans and specifications, RFI, Repair as required by the Professional of Record, and Work in Progress}: _rec.pa_,_, ____________________________ _ Contractor Personnel Notified: _________ Signature: __________ Date: ___ _ Client Personnel Notified: Signature: Date: Inspectors' Signature: ~ Date Issued: 6121118 ---- Deviation Corrected? I!! Yes □ No Date Resolved: ..:.612.::6::.l:.:18'------Observed By: _E_th_an_M_oo_re ____ _ Corrective Action Taken? _we.::l.::d.:.:w.::as:.:re.:cpc:a::.ire:.:dc_ _________________________ _ Client Notified: Signature: Date: Inspectors' Signature: Date: 6126118