Loading...
HomeMy WebLinkAbout2630 PEPPERTREE WAY; ; CB140836; PermitCity of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-21-2014 Retaining Wall Permit Permit No: CB140836 Building Inspection Request Line (760) 602-2725 Job Address: Permit Type: 2630 PEPPERTREE WY CBAD RETAIN Status: Parcel No: Lot#: 0 Applied: Valuation: 2131504000 $4,771.00 Construction Type: 5B Entered By: Reference #: Project Title: Applicant: DIETRICH RESIDENCE: 249 SF RETAINING WALL PANETTI CONSTRUCTION CO., INC PO BOX 2725 DEL MAR CA 92014 760-944-1417 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Strong Motion Fee Green Bldg Standards (SB1473) Fee Renewal Fee Add'I Renewal Fee Other Building Fee Additional Fees TOTAL PERMIT FEES Plan Approved: Issued: Plan Check#: Inspect Area: Owner: STEVENSON SCOTT P 2630 PEPPERTREE WAY CARLSBAD CA 92009 Total Fees: $134.38 Total Payments To Date: $134.38 Balance Due: Inspector: FINALtPPROVAL Date: • J._ • f S_. Clearance: ISSUED 04/14/2014 JMA 04/21/2014 04/21/2014 $77.87 $0.00 $54.51 $0.00 $1.00 $1.00 $0.00 $0.00 $0.00 $0.00 $134.38 $0.00 NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Cocle Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIEO that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES ff APPLY to any f i n h vi ! N E imil r i r hi h f Ii i n h City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 04-21-2014 Storm Water Pollution Prevention Plan (SWPPP) Permit Permit No:SW140119 Job Address: Permit Type: 2630 PEPPERTREE WY CBAD SWPPP Status: Parcel No: 2131504000 Lot#: 0 Applied: ISSUED 04/14/2014 JMA 04/21/2014 Reference #: CB#: Project Title: Applicant: CB140836 DIETRICH RES: 249 SF RETAINING WALL PANETTI CONSTRUCTION CO., INC PO BOX 2725 DEL MAR CA 92014 760-944-1417 Emergency Contact: BRENDA PANETTI 760-944-5659 SWPPP Plan Check SWPPP Inspections Additional Fees TOTAL PERMIT FEES Entered By: Issued: Inspect Area: Owner: STEVENSON SCOTT P 2630 PEPPERTREE WAY CARLSBAD CA 92009 Tier: $52.00 $221.00 $0.00 $273.00 Total Fees: $273.00 Total Payments To Date: $273.00 Balance Due: FINAL APPROVAL DATE~ SIGNATURE_(_?::::___./~.....: E __ _ -- Priority: M $0.00 THE FOLLOWING APPROVALS REQUIRED PRIOR TO PERMIT ISSUANCE: ENGINEERING □BUILDING □FIRE □HEALTH 0 HAZMATIAPCD «,t ~ CITY OF PlanCheckNo. CB( 3h Est. Value CARLSBAD Building Permit Application 1635 Faraday Ave., Carlsbad, CA 92008 Ph: 760-602-2719 Fax: 760-602-8558 email: building@carlsbadca.gov www.carlsbadca.gov Plan Ck. Deposit JOB SUITE#/SPACEf/UNIT# # OF UNITS # BEDROOMS # BATHROOMS TENANT BUSINESS NAME CONSTR. TYPE OCC. GROUP DESCRIPTION OF WORK: Include Square Feet of Affected Area(s) Ltr\-J l2.-c,"l"~vi\·,>14 i:i-AU.. ~-lt&1n ~•~ l"O 4''l-i!u_ L~~ 8.4ct.,1;:":u._ '"\\L,t. i.4a_o ~ixi'\";l\ei f 120 eoSoeQ \\'.I .f:.~c..lc...,. 0 ~ t,JiU..l.. eetl. ~I:!, G>-><l"f S"\"~r..~~ ( ei12~;~c.i -:t"i"l OJ!),f(lJ EXISTING USE PROPOSED USE GARAGE (SF) PATIOS (SF) DECKS (SF) FIREPLACE AIR CONDITIONING YES□No□ FIRE SPRINKLERS YES□No□ YES[), APPLICANT N CITY PHONE FAX EMAIL ADDRESS CITY STATE ZIP ...,PTATE (...~. PHONE FAX FAX SAm EMAIL STATE UC.# (Sec. 7031.5 Business and Professions Code: Any City or County which requires a permit to construct. alter, improve, demolish or repair any structure, prior to its issuance, requires the applicant for such permit to file a signed statement that he Is licensed pursuant to the provisions of the Contractor's license Law {Chapter 9, commending with Section 7000 of Division 3 of the Busmess and Professions Code} or [hat he Is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars {$500}). WORKER$' COMPENSATION rs' Compensation Declaration: / hereby affirm under penalty of perjury one of the following declarations: ave and wlll maintain a certificate of consent to self-insure for workers' compensation as provided by Section 3700 of the Labor Code, for the performance of the wori( for which this pem1it is issued. ave and will maintain workers' compensatltj reauired by Section 3700 of the Labor Code, for the performace of the work. for which this pem1it is issued. My workers' compensation insuJlnC,lcarrier and policy nomber are, ln'"rance Co. S"J'A:lf <\-1',;). Pol;cy No. D~ \ 01,1{ · I ~ Exp;ration Date \ • \ • \ '::, J]lj§.Section need not be completed if the permit Is for one hundred dollars ($100) or less. LJ Certificate of Exemption: I certify that in the performance of the work for which this pefTTlit is issued, I shall not employ any person in any manner so as to become subject to the Workers' Compensation Laws of California. WARNING: Failure to secure w rs' compensation coverage is unlawful, and shall subject an employer to crimlnal penalties and cM1 fines up to one hundred thousand dollars (&100,000), In damag s s provided for In Section 3706 of the Labor code, Interest and attomey's fees. I hereby affirm that I am exempt from Contractor's License Law for the following reason: I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such work himselt or through his own employees, provided that such improvements are not intended or offered for sale, If, however, the building or improvement is sold within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale). □ □ □ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed pursuant lo the Contractor's License Law). I am exempt under Section _____ Business and Professions Code for this reason: 1. I personally plan to provide the major labor and materials for construction of the proposed property improvement. OYes 0No 2. I {have/ have not) signed an application for a building permit for the proposed work.. 3. I have conlracled with the following person (fim1) to provide the proposed construction (include name address/ phone/ contractors' license number): 4, I plan to provide portions of the work, but I have hired the following person to coordinate, supervise and provide the major work. (include name/ address I phone/ contractors' license number): 5. I will provide some of the work, but I have contracted (hired) the following persons to provide the wor1!; indicated {include name/ address I phone/ type of work.): ,.S PROPERTY OWNER SIGNATURE □AGENT DATE COMPLETE THIS SECTION FOR NON-RESIDENTIAL BUILDING PERMITS ONLY Is the applk:ant or future building occupant required to submit a business plan, acutely hazardous materials registration form or risk management and prevention program under Sections 25505, 25533 or 25534 of the Presley-Tanner Hazardous Substance Account Act? □ Yes □ No Is the applicant or future building occupant required to obtain a permit from the air pollution control district or air quality management district? □ Yes □ No Is the facility to be conslructed within 1,000 feel of the outer boundary of a school site? □ Yes □ No IF ANY OF THE ANSWERS ARE YES, A FINAL CERTIFICATE OF OCCUPANCY MAY NOT BE ISSUED UNLESS THE APPLICANT HAS MET OR IS MEETING THE REQUIREMENTS OF THE OFFICE OF EMERGENCY SERVICES AND THE AIR POLLUTION CONTROL DISTRICT. I certify that I have read the application and state that the above infonnatlon Is oolf8Ctand that the lnfonnatlon on the plans Is accurate. I agree to comply\Wth all City ordinances and 5t:lte laws relating tD builclng construction. I hereby authorize representative of the City of Carlsbad to enter upon the above mentioned property br inspectbn pu,poses. I ALSO AGREE TO SAVE, INDEMNIFY .A.ND KEEP HARMLESS THE CITY OF CARLSBAD AGAINST All UPBILITIES, JUOOMENTS, COSTS AND EXPENSES WHICH MAY IN ANY WAY ACCRUE AGAINST S<\ID CITY IN CCT;SEQUENCE OF THE GRANTING OF THIS PERMIT. OSHA: M OSHA pem11t is required for exca · ns over 5'0' deep and demolition orc:onstrucoon of structures Ove(3 stories in height. EXPIRATION: Every permit issu~the Build "al under the provisbns of this Code shall expire by Umltalion and become nul and vokl ~ the building Of v.ork authorized by such pefTTlit is not oommenCOO 'Mttlin 100 days from the date of such r if the ild Of ',',00(. uthorized by such permtt is suspended or abandoned at any time after the v.ork is oommenced for a perkxl of 100 days (Section 100.4.4 Uniform Building Code). ~ APPLICANT'S SIGNATU . DATE Lt -11..(- Inspection List Permit#: CB140836 Date Inspection Item 06/02/2015 69 Final Masonry 06/02/2015 69 Final Masonry 05/22/2014 66 Grout 05/19/2014 61 Footing Tuesday, June 02, 2015 Type: RETAIN Inspector Act RI PD AP PD AP PD AP DIETRICH RESIDENCE: 249 SF RETAINING WALL Comments Page 1 of 1 PLAN CHECK REVIEW TRANSMITTAL DATE: 04/15/14 PROJECT NAME: DIETRICH RESIDENCE PLAN CHECK NO: 1 SET#: ADDRESS: 2630 PEPPERTREEWY VALUATION/SCOPE OF WORK: CMU RETAINING WALL Community & Economic Development Department 1635 Faraday Avenue Carlsbad CA 92008 www.carlsbadca.gov PROJECT ID: CB 14-836 APN: ~is plan check 1e is complete and has been APPROVED by the / u,vision. By: r ~ A Final Inspection by the Division is required Yes ✓ No X This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. NOTE ONLY ITEMS THAT NEED CORRECTION/CLARIFICATION ARE MARKED X Plan Check Comments have been sent to: TONYPANETTl@GMAIL.COM You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. For questions or clarifications on the attached checklist please contact the following reviewer as marked: PLANNING \, ,·'>' 760-602-4610 ,','.,U f>tL:-,).(;:~4 Chris.Sexton@carlsbadca.gov Gina.Ruiz@carlsbadca.gov Remarks: I Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov Lin(J,1 On1u,,ros /GO 6U)-2773 Unda.Ontiveros@carlsbadca.gov Greg f~yan 760-602-466:J Gregory.Ryan@carlsbadca.gov Gindy Won~ /60-602-46(i;• Cynthia.Wong@carlsbadca.gov Dominic Fieri 760-602 11664 Dominic.Fieri@carlsbadca.gov 1 The location is unclea for the new roposed Add top ns cy's of prop sed fill be md wall. E-37 Any outsta11tling isst1£'S will be marked with an lXJ i\rlake the necessary corrections fur compliance 1-Pitli applicable codes 11nd st11ndr1rds. Su limit corrected plans and/or specifiwticms lo the Buildi1tg divisio1t.fin re-submittal to f-he Ellgineering dh.1isions, Items that conjimu to J'i'rmit requirements are marked with [ZJ 1. SITE PLAN Provide a fully dimensioned site plan drawn to scale. Show: ✓ North arrow ✓ Existing & proposed structures ✓ Property line dimensions ✓ Easements Show on site plan: ✓ Drainage patterns ✓ Existing & proposed slopes X ✓ yxisting topography ../ Retaining Walls (location and height) Indicate what will happen with soil excavated from pool area. lnc1uae on title sheet: I ✓ Site address ✓ Assessor's parcel number ✓.I Legal description/lot number Grading: Quantities of Cut Fill Import Export Project does not comply with the following engineering conditions of approval for project no: Conditions were complies with by: LOT NO. LOT 205 MAP NO 14774 REF. NO. CT 02-14 Page 2 of 4 Date: REV 6/2012 1 E-37 2. GRADING PERMIT REQUIREMENTS The conditions that require a grading permit are found in Section 11.06.030 of the Municipal Code. Inadequate information available on site plan to make a determination on grading requirements. Include accurate grading quantities in cubic yards (cut, fill, import, export and remedial). This information must be included on the plans. If no grading is proposed write: "NO GRADING" Grading Permit required. NOTE: The grading permit must be issued and rough grading approval obtained prior to issuance of a building permit. A separate grading plan prepared a registered civil engineer must be submitted together with the completed application form attached. No grading permit required. 3. MISCELLANEOUS PERMITS RIGHT-OF-WAY PERMIT is required to do work in city right-of-way and/or private work adjacent to the public right-of-way. A separate right-of-way issued by the engineering division is required for the following: Please complete attached right-of-way application form and return to the engineering department together with the requirements on the attached right-of-way checklist, at the time of resubmittal. Right-of-way permit and pool permit will be issued simultaneously, Page3of4 REV 6/2012 1 E-37 4. STORM WATER Construction Compliance ✓ Project Threat Assessment Form complete ✓ incomplete ✓ Requires Tier 1 Storm Water Pollution Prevention Plan. Please complete attached form and return (SW 1•-0119 ) Requires Tier 2 Storm Water Pollution Prevention Plan. Requires submittal of Tier 2 SWPPP, payment of processing fee and review by city. Post-Development (SUSMPI Compliance ✓ Storm Water Standards Questionnaire complete ✓ incomplete Project is subject to Standard Storm Water Requirements. See city Standard Urban Storm Water Management Plan (SUSMP) for reference. http•//www.carlsbadca.gov/business/building/Documents/EngStandsw-stds-vol4-ch2.pdf Project needs to incorporate low impact development strategies throughout in one or more of the following ways: Rainwater harvesting (rain barrels or cistern) Vegetated Roof Bio-retentions cell/rain garden Pervious pavemenVpavers Flow-through planter/vegetated or rock drip line Vegetated swales or rock infiltration swales Downspouts disconnect and discharge over landscape Other: 5. ADDITIONA OMMENTS , ow profile of proposed wall. 3. If over 30" a1 guatd 1a/l 1s required and combination cannot be over 42". 61/f.A/1-t_}-t..,-,,.. z. ~ed in ~ont 20' setback. _ C£, 'r f µ F~ W<LU-<f~" ~~ ;G___,lr Page 4 of 4 REV 6/2012 «t't> ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov To determine if your project is a priority development project, please answer the following questions: 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and public develo ment ro ·ects on ublic or rivate land. 2. Is your project creating or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? Th;s includes commercial, industrial residential mixed-use and ublic deve/o ment ro ·ects on ublic or rivate land. 3. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consum lion. 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside development project includes development on any natural slope that is twenty-five percent or greater. 5. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot. A parking lot is a land area or facility for the fem ora arkin or stora e of motor vehicles used ersona/1 for business or for commerce. 6. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the transportation of automobiles, trucks, motorc c/es, and other vehicles. 7. Is your project a new or redevelopment project that creates or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated now from the ro·ect to the ESA i.e. not commin /es with nows from ad·acent lands.' 8. Is your project a new development that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial C/assificaffon (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic (ADT) of 100 or more vehicles er da . 1 O. ls your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11 Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? YES NO /1 /1 ✓ ✓ v ✓ ✓ ✓ ✓ ✓ ./ If you answered "yes" to one or more of the above questions, you ARE a priority development project and are therefore subject to implementing structural Best Management Practices (BMP's) in addition to implementing Standard Stam, Water Requirements such as source control and low impact development BMP's. A Storm Water Management Plan (SWMP) must be submitted with your application(s) for development. Go to step 3 for redevelopment projects. For new projects, go to step 4 at the end of this questionnaire, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no" to all of the above questions, you ARE NOT a priority development project and are therefore subject to implementing only Standard Storm Water Requirements such as source control and low impact development BMP's required for all development projects. A Stam, Water Management Plan (SWMP) is not required with your application(s) for development. Go to step 4 at the end of this questionnaire, check the "my project does not meet PDP requirements" box and complete applicant information. E-34 Page 2 of 3 Effective 6/27/13 «'~ ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov To address post-development pollutants that may be generated from development projects, the City requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMP's) into the project design per the City's Standard Urban Stormwater Management Plan (SUSMP). To view the SUSMP, refer to the Engineering Standards (Volume 4, Chapter 2) at www.carlsbadca.gov/standards. Initially this questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'Standard Stormwater Requirements' or be subject to additional criteria called 'Priority Development Project Requirements'. Many aspects of project site design are dependent upon the storm water standards applied to a project. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the City. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A separate completed and signed questionnaire must be submitted for each new development application submission. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. In addition to this questionnaire, you must also complete, sign and submit a Project Threat Assessment Form with construction permits for the project. Please start by completing Step 1 and follow the instructions. \MJen completed, sign the form at the end and submit this with your application to the city. To determine if your project is a priority development project, please answer the following questions: 1. Is your project LIMITED TO constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: (1) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non-arodible permeable areas; OR (2) designed and constructed to be hydraulically disconnected from paved streets or roads; OR (3) designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets uidance? 2. Is your project LIMITED TO retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in accordance with the USEPA Green Streets guidance? YES NO If you answered "yes" to one or more of the above questions, then your project is NOT a priority development project and therefore is NOT subject to the storm water criteria required for priority development projects. Go to step 4, mark the last box stating "my project does not meet PDP requirements" and complete applicant Information. E-34 Page 1 of3 Effective 6/27/13 «~~ ~ CITY OF CONSTRUCTION THREAT ASSESSMENT WORKSHEET FOR DETERMINATION OF PROJECT'S PERCEIVED THREAT TO STORM WATER QUALITY E-33 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov CARLSBAD Construction Perceived SWPPPTier Construction Threat Assessment Criteria* Threat to Storm Water Level Qualltv Tier 3 -High Construction Threat Assessment Criteria □ Project site is 50 acres or more and grading will occur during the rainy season □ Project site is 1 acre or more in size and is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA High □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with Tier3 □ USDA-NRCS Erosion factors kr greater than or equal to 0.4) Site slope is 5 to 1 or steeper □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 □ through April 30). Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 -Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 3 High Construction Threat Assessment Criteria Tier 2 High Construction Threat Assessment Criteria □ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors k, greater than or equal to 0.4) High □ Site slope is 5 to 1 or steeper Tier 2 □ Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). □ Owner/contractor received a Storm Water Notice of Violation within past two years □ Site results in one half acre or more of soil disturbance Tier 2 -Medium Construction Threat Assessment Criteria Medium □ All projects not meeting Tier 2 High Construction Threat Assessment Criteria Tier 1 -Medium lnslli!Ction Threat Assessment Criteria □ Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, within or directly adjacent to an environmentally sensitive area (ESA) or discharges directly to an ESA □ Soil at site is moderately to highly erosive (defined as having a predominance of soils with USDA-NRCS Erosion factors k, greater than or equal to 0.4) Medium ~ Site slope is 5 to 1 or steeper Tier 1 Construction is initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). □ Owner/contractor received a Storm Water Notice of Violation within past two years □ Site results in one half acre or more of soil disturbance Tier 1 -Low lns~ection Threat Asse§sment Criteria Low □ All projects not meeting Tier 1 Medium Construction Threat Assessment Criteria Exempt -Not Applicable -Exempt *The c1ty engineer may authonze minor variances from the construct1on threat assessment cntena 1n special circumstances where it can be shown that a lesser or higher amount of stem, water compliance inspection is warranted in the opinion of the city engineer E-33 Page 1 of 1 REV 4/30/10 «'"" ~ CITY OF CARLSBAD STORM WATER COMPLIANCE ASSESSMENT B-24 Development Services Building Division 1635 Faraday Avenue 760-602-2719 www.carlsbadca.gov I am applying to the City of Carlsbad for the following type(s) of construction permit: ")if Building Permit □ Right-of-Way Permit 0 My project is categorically EXEMPT from the requirement to prepare a storm water pollution prevention plan (SWPPP) because it only requires issuance of one or more of the following permit types: Electrical Fire Additional Fire Alarm Fixed Systems Mechanical Mobile Home Plumbing Project Storm Water Threat Assessment Criteria* Patio/Deck Photo Voltaic Re-Roofing Sign Spa-Factory Sprinkler Water Discharge No Threat Assessment Criteria □ My project qualifies as NO THREAT and is exempt from the requirement to prepare a stonn water pollution prevention plan (SWPPP) because it meets the "no threat' assessment criteria on the City's Project Threat Assessment Worksheet for Determination of Construction SWPPP Tier level. My project does not meet any of the High, Moderate or Low Threat criteria described below. Low Threat Assessment Criteria My project does not meet any of the Significant or Moderate Threat criteria, is not an exempt permit type (See list above) and the project meets one or more of the following criteria: • Results in some soil disturbance; and/or • Includes outdoor construction activities (such as saw cutting, equipment washing, material stockpiling, vehicle fueling, waste stockpiling). Tier 2 -Moderate Threat Assessment Criteria D My project does not meet any of the Significant Threat assessment Criteria described below and meets one or more of the following criteria: • Project requires a grading plan pursuant to lhe Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, • Project will result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria: • Located within 200 feet of an environmentally sensitive area or the Pacific Ocean, and/or • Disturbed area is located on a slope with a grade at or exceeding 5 hortzontal to 1 vertical, and/or • Disturbed area is located along or within 30 feet of a storm drain inlet, an open drainage channel or watercourse, and/or • Construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). Tier 3 -Significant Threat Assessment Criteria D My project includes clearing, grading or other disturbances to the ground resulting in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, stockpiling, pavement removal, refueling and maintenance areas: and/or □ My project is part of a phased development plan that will cumulatively result in soil disturbance totaling one or more acres including any associated construction staging, equipment storage, refueling and maintenance areas: or, D My project is located inside or within 200 feet of an environmentally sensitive area (see City ESA Proximity map) and has a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-storm water discharge(s). I certify to the best of my knowledge that the above checked statements are true and co"ect I understand and acknowledge that even though this project does not require preparatton of a conatruction SWPP, I muat still adhere to, and at all times during construction activiUes for the permit type(s) check above comply with the storm water best management practices pursuant to Title 15 of the Carlsbad Municipal Code and to City Standard•. Project Address: Assessor Parcel No. *The City Engineer may authorize minor variances from the Storm Water Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher Construction SWPPP Tier Level is warranted. B-24 Owner!Owner's Authorized Agent Name: • 1\,t.~• Page 1 of 1 Title: '°"'lt1'C1'0ll... _/? d_rolect ID: LA' .,JI . Rev.03109 <<~ ~ CITY OF CARLSBAD STORM WATER STANDARDS QUESTIONNAIRE E-34 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the reviousl existin develo ment? If you answered "yes," the structural BMP's required for Priority Development Projects apply only to the creation or replacement of impervious surface and not the entire development. Go to step 4, check the "my project meets PDP requirements" box and complete applicant information. If you answered "no,· the structural BM P's required for Priority Development Projects apply to the entire development. Go to step 4, check the "m ro·ect meets PDP re ulrements" box and com lete a !leant infonnatlon. □ My project meets PRIORITY DEVELOPMENT PROJECT (PDP) requirements and must comply with additional stom,water criteria per the SUSMP and I understand I must prepare a Stam, Water Management Plan for submittal at time of application. I understand flow control (hydromodification) requirements may apply to my project. Refer to SUSMP for details. My project does not meet PDP requirements and must only comply with STANDARD STORMWATER REQUIREMENTS per the SUSMP. As part of these requirements, I will incorporate low impact development strategies throughout my project. Applicant Information and Signature Box Accessor's Parcel Number(s): Applicant TitleLQ-1\~~~ Date: This Box for City Use Only City Concurrence: NO By: • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) impaired water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their quivalent under the Multi Species Conservation Program within the Cities and County of San Diego; and any other equivalent environmentally sensitive areas which have been identified by the Copermittees. E-34 Page 3 of 3 Effective 6/27/13 1 «~ ~ CITY OF CARLSBAD STORM WATER COMPLIANCE FORM TIER 1 CONSTRUCTION SWPPP E-29 STORM WATER COMPLIANCE CERTIFICATE ✓ My project is not in a category of pem1it types exempt from the Construction SWPPP requirements ✓ My project is not located inside or within 200 feet of an environmentally sensitive area with a significant potential for contributing pollutants to nearby receiving waters by way of storm water runoff or non-stonn water discharge(s). ✓ My project does not require a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code) ✓ My project will not result in 2,500 square feet or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas that meets one or more of the additional following criteria; • located within 200 feet of an environmentally sensitive area or the Pacific Ocean; and/or, • disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or • disturbed area is located along or within 30 feet of a stoITTI drain inlet, an open drainage channel or watercourse; and/or • construction will be initiated during the rainy season or will extend into the rainy season (Oct. 1 through April 30). I CERTIFY TO THE BEST OF MY KNOWLEDGE THAT ALL OF THE ABOVE CHECKED STATEMENTS ARE TRUE AND CORRECT. I AM SUBMITTING FOR CITY APPROVAL A TIER 1 CONSTRUCTION SWPPP PREPARED IN ACCORDANCE WITH THE REQUIREMENTS OF CITY STANDARDS. I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO MINIMIZE THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO MINIMIZE THE EXPOSURE OF STORM WATER TO CONSTRUCTION RELATED POLLUTANTS; AND, (2) ADHERE TO, AND AT ALL TIMES, COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED BY THE CITY OF CARLSBAD. \\ f \O'I\-J ~-fi""-• OW~(SJ/O~R'S AG!=NT NAME (PRINT) OWNER( ~ -1y-,4 DATE E-29 STORM WATER POLLUTION PREVENTION NOTES 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION OF EROSION AND SEDIMENT CONTROL BMPS WHEN RAIN IS EMINENT. 2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 5. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGATE. 6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND MAINTAINED. SPECIAL NOTES Page 1 of 3 Development Services Land Development Engineering 1635 Faraday Avenue 760-602-2750 www.carlsbadca.gov PROJECT INFORMATION Site Address: 2.u'3o ~~~~Q,.):~:t'( ~ Assessor's Parcel Number: ______ _ ProjectlD 3cJJ/lf-l[':J Construction Permit No.: C1;:>c 4-P3b Estimated Construction Start Date ____ _ Project Duration ____ Months r- Emergency Contact: Name:~2.~-(\j)f\ ~t'\~::n:', 24 hour Phone:'lfoo G\41.\ SC, ~C\ ,__ Perceived Threat to Storm Water Quality ""'Medium D Low If medium box is checked, must attach a site plan sheet showing proposed work area and location of proposed structural BMPs For City Use Only SBAD 1 SWPPP Approved By: _-c-,•----- Date f(tr/tcf r +- REV 4/30/10 Erosion Control Tracking Non-Storm Water Waste Management and Materials Sediment Control BMPs Control BMPs BMPs Management BMPs Pollution Control BMPs C C C E E 0 0 0 "O ~ ., "O ., C u u C C> E C E "O * .. 0 C C> .. C s ~ '6 0. ., * ,,, E C> ~ ]l ~ 'E ·s "' C> .. ::; C> -g .9,! ,,,,,, C " .. C J!! Best Management Practice C: .... 0. ., ·" 'E C: C: ,,, C: ~ 5 CT ., C ~ ~ ! ... E ,,, ~ ID 0. -0 ., 0 ., ., w ·" .. ,,, ~ ., C> .. C: 0 ,,, ;;; ID ., J!! {BMP) Description ➔ ,,, <) ·" E C> o~ "O ,,, ::; ., (/) ,,, l~ ID ·~ 6 "O C> C: "O s: C ., ,,, ~ '5 i!! ~ E .. ~ .. "O >, 0 C: 0 ::, > ,,, ~ 5 g, 0 ID C> ., b!' .. .. J!! ~ 0 J!! ::; 0 C ., .. Cl:::; ., .. 0 ., "' "' il a: ~ gi ~ 3:: C> J!! . ·c. 'E' ., ~ "O " C: ., ., E "" ~ ID ;; ~ <> E~ ,. C: ;; ·" ·c ·c "" t; 0 0. "-'6 <) ., > I!! a "O :0 ~ :0 i ·;; ~ J!! * <) :!2 .. "·-., i!! C: " N C ., ~ .. i!! ~ ., " <> .. .s e '15f J'l 0 .. ., ::l! 1 ~ 0 .. 0 CJ WO en "' 0 u: CJ en~ "' "'a. (/) a: a. a. > ::; Cl) :,: 0 CASQA Designation ➔ 0 "' 'i' ~ ~ "' ,. "? '9 ~ :z 0 ~ ~ ;i; <'/ ~ 'i' i <'/ ,. "? '9 i ti 0 ti w w w w w w w ci: "' "' ~ ::; ~ ::; ~ w w w Cl) "' "' Cl) "' "' "' ,.. ,.. z z z z s: s: CJnstruction Activity w "' r-radina/Soil Disturbance . T renchina/Excavation ~ Stockoilina Drillina/Borina Concrete/Asphalt Saw cuttina Concrete flatwork Pavina Conduit/Pim> Installation Stucco/Mortar Work Waste Disnnsal Staaina1Lav Down Area Equipment Maintenance and Fuelina Hazardous Substance Use/Storaae Dewaterina Site Access Across Dirt other ClisO: Instructions: Begin by reviewing the list of construction activities and checking the box to the left of any activity that will occur during the proposed construction. Add any other activity descriptions in the blank activity description boxes provided for that purpose and place a check in the box immediately to the left of the added activity description. For each activity descrribed, pick one or more best management practices (BMPs) from the list located along the top of the form. Then place an X in the box at the place where the activity row intersects with the BMP column. Do this for each activity that was checked off and for each of the selected BMPs selected from the list. For Example -If the project includes site access across dirt, then check the box to the left of "Site Access Across Dirt". Then review the list for something that applies such as "Stabilized Construction Ingress/Egress" under Tracking Control. Follow along the "Site Access Across Dirt" row until you get to the "Stabilized Construction Ingress/Egress" column and place an X in the box where the two meet. As another example say the project included a stockpile that you intend to cover with a plastic sheet. Since plastic sheeting is not on the list of BMPs, then write in "Cover with Plasticn in the blank column under the heading Erosion Control BMPs. Then place an X in the box where the "Stockpiling" row intersects the new "Cover with Plastic" column. To learn more about what each BMP description means, you may wish to review the BMP Reference Handout prepared to assist applicants in the selection of appropriate Best Management Practice measures. The reference also explains the California Stormwater Quality Association (CASQA) designation and how to apply the various selected BMPs to a project. E-29 Page 2 of 3 REV 4/30/10 "<1 ~ CITY Of CARLSBAD PLANNING DIVISION BUILDING PLAN CHECK REVIEW CHECKLIST P-28 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.e:ov o,,;J}J:J/1 PROJECT NAMe PROJECT 10, PLAN CHECK NO: CB 14-0836 SET#: 1 ADDRESS: 2630 Peppertree Way APN: This plan check review is complete and has been APPROVED by the Planning Division. By: Chris Sexton A Final Inspection by the Planning Division is required D Yes [81 No You may also have corrections from one or more of the divisions listed below. Approval from these divisions may be required prior to the issuance of a building permit. Resubmitted plans should include corrections from all divisions. ~ This plan check review is NOT COMPLETE. Items missing or incorrect are listed on the attached checklist. Please resubmit amended plans as required. Plan Check Comments have been sent to: tonypanetti@gmail.com For questions or clarifications on the attached checklist please contact the following reviewer as marked: C8J Chris Sexton 760-602-4624 Chris.Sexton@carlsbadca.gov D Gina Ruiz 760-602-4675 Gina.Ruiz@carlsbadca.gov □ Remarks: □ Kathleen Lawrence 760-602-2741 Kathleen.Lawrence@carlsbadca.gov □ Linda Ontiveros 760-602-2773 Linda.Ontiveros@carlsbadca.gov □ □ Greg Ryan 760-602-4663 Gregory.Ryan@carlsbadca.gov □ Cindy Wong 760-602-4662 Cynthia.Wong@car(sbadca.gov □ Dominic Fieri 760-602-4664 Domi □ic.Fieri@carlsbadca.gov REVIEW#: 1 2 3 [8] DD [8] DD [8] DD P-28 Plan Check No. CB 14-0836 Address 2630 Peppertree Way Date 4-14-14 Review# 1 Planner Chris Sexton Phone (760) 602-4624 APN: 213-150-40-00 Type of Project & Use: retaining wall Net Project Density: DU/AC Zoning: P-C General Plan: RMH Facilities Management Zone: 1l CFD (in/out) #_Date of participation: __ Remaining net dev acres: __ (For non-residential development: Type of land use created by this permit: __ ) Legend: [8] Item Complete Environmental Review Required: DATE OF COMPLETION: D Item Incomplete -Needs your action YES D NO D TYPE Compliance with conditions of approval? If not, state conditions which require action. Conditions of Approval: Discretionary Action Required: APPROVAL/RESO. NO. PROJECT NO. OTHER RELATED CASES: DATE YES O NO O TYPE __ Compliance with conditions or approval? If not, state conditions which require action. Conditions of Approval: __ Coastal Zone Assessment/Compliance Project site located in Coastal Zone? YES D NO 0 CA Coastal Commission Authority? YES O NO D If California Coastal Commission Authority: Contact them at -7575 Metropolitan Drive, Suite 103, San Diego, CA 92108-4402; (619) 767-2370 Determine status (Coastal Permit Required or Exempt): Habitat Management Plan Data Entry Completed? YES O NO 0 If property has Habitat Type identified in Table 11 of HMP, complete HMP Permit application and assess fees in Permits Plus (NP/Ds, Activity Maintenance, enter CB#, toolbar, Screens, HMP Fees, Enter Acres of Habitat Type impacted/taken, UPDATE!) lnclusionary Housing Fee required: YES D NO D (Effective date of lnclusionary Housing Ordinance -May 21, 1993.) Data Entry Completed? YES O NO 0 (NP/Ds, Activity Maintenance, enter CB#, toolbar, Screens, Housing Fees, Construct Housing Y/N, Enter Fee, UPDATE!) Housing Tracking Form (form P-20) completed: YES D NO D N/A D Page 2 of 3 07111 Site Plan: □□□ □□□ Provide a fully dimensional site plan drawn to scale. Show: North arrow, property lines, easements, existing and proposed structures, streets, existing street improvements, right-of- way width, dimensional setbacks and existing topographical lines (including all side and rear yard slopes). Provide legal description of property and assessor's parcel number. City Council Policy 44 -Neighborhood Architectural Design Guidelines 1. Applicability: YES O NO 0 2. Project complies: YES D NOD Zoning: 1 . Setbacks: Front: Interior Side: Street Side: Rear: Top of slope: Required __ Shown __ Required __ Shown __ Required __ Shown __ Required __ Shown __ Required __ Shown __ 2. Accessory structure setbacks: Front: Required __ Shown __ Interior Side: Required __ Shown __ Street Side: Required __ Shown __ Rear: Required __ Shown __ Structure separation: Required __ Shown __ 3. Lot Coverage: Required __ Shown __ 4. Height: Required __ Shown __ 5. Parking: Spaces Required l Shown l (breakdown by uses for commercial and industrial projects required) Residential Guest Spaces Required __ Shown __ D D D Additional Comments 1) Please label the street name on the site plan as staff cannot determine where the front yard and rear yard is on the site plan. 2) Please label the front property line. Per the Carlsbad Municipal Code. walls. fences and shrubs cannot exceed 42 inches in the front yard setback. 3) Will the retaining wall include a guard rail? If so. the wall and uard rail cannot exceed 42 inches within the front aT,dE :VI~/ I'-\ ~ ~ OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER <J"' ,___,,., .. _,, P-28 Page 3 of 3 07/11