HomeMy WebLinkAbout2635 GATEWAY RD; ; CB072909; Permit04-30-2008
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Commercial/Industrial Permit Permit No
Building Inspection Request Line (760) 602-2725
CB072909
Job Address
Permit Type
Parcel No
Valuation
Occupancy Group
Project Title
2635 GATEWAY RD CBAD
COMMIND Sub Type
2131910600 Lot#
$23251040 Construction Type
Reference #
PAD B 4 640SF SHELL
COMM
0
VN
Applicant
MIKE MERRILL
1717KETTNERBLVD
STE 100
SAN DIEGO 92101
619-814-0080
Status ISSUED
Applied 11/19/2007
Entered By JMA
Plan Approved 04/30/2008
Issued 04/30/2008
Inspect Area
Plan Check# PC 07-64
Owner
LNR BRESSI COMMERCIAL INC
C/0 LENNAR PARTNERS
4350 VON KARMAN AVE #200
NEWPORT BEACH CA 92660
Building Permit
Add'l Building Permit Fee
Plan Check
Add I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park Fee
LFM Fee
Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot Water Con Fee
Meter Size
Add'l Pot Water Con Fee
Reel Water Con Fee
$104313 Meter Size
$0 00 Add'l Reel Water Con Fee
$678 03 Meter Fee
($433 00) SDCWA Fee
$0 00 CFD Payoff Fee
$4883 PFF (3105540)
$1 856 00 PFF (4305540)
$000 License Tax (3104193)
$000 License Tax (4304193)
$000 Traffic Impact Fee (3105541)
$0 00 Traffic Impact Fee (4305541)
$0 00 PLUMBING TOTAL
$0 00 ELECTRICAL TOTAL
$000 MECHANICAL TOTAL
$7,702 00 Master Drainage Fee
D1 Sewer Fee
$0 00 Redev Parking Fee
$0 00 Additional Fees
HMP Fee
TOTAL PERMIT FEES
$000
$225 00
$718800
$12,302 50
$4 231 69
$000
$000
$000
$9 750 00
$000
$6300
$61000
$4200
$000
$510840
$000
$000
$000
$50,41558
Total Fees $50,41558 Total Payments To Date $50,41558 Balance Due $000
Inspector;/.
FINAL APPRCMAL
Date 2A1/0 7 Clearance
NOTICE Please takeWOTICffthat approval of your project includes the Imposition of fees dedications reservations > other exactions hereafter collectively
referred to as fees/exactions You have 90 days from the date this permit was issued to protest imposition of these fee.-, > xactions If you protest them you must
follow the protest procedures set forth in Government Code Section 66020(a) and file the protest and any other required ir-tormation with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3 32 030 Failure to timely follow that procedure will bai csny subsequent legal action to attack
review set aside void or annul their imposition
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity
changes nor planning zoning grading or other similar application processing or service fees in connection with this proiec' NOR DOES IT APPLY to any
fees/exactions of which YOU have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired
Page 1 ot 1
Janean Hawney - Bressi Ranch Village Center
From:
To:
Date:
Subject:
Attachments:
"Michael Elliott" <mikeelhott2@cox net>
"Chnster Westman" <cwest@ci carlsbad ca us>, "Pete
Dreibelbis" <pdrei@ci carlsbad ca us>, "Michele Masterson"
<mmast@ci carlsbad ca us>, "Meghan Jacobson"
<mjaco@ci carlsbad ca us>, "Christine Wauschek"
<cwaus@ci carlsbad ca us>, "Janean Hawney"
<Jhawn@ci carlsbad ca us>, <jjusrus@schmidtdesign com>,
<dplasch@grantgc com>
02712/2009 6 25PM
Bressi Ranch Village Center
182A - Bressi Ranch Village Center - Inspl doc
Bressi Ranch Village Center
Project Number CT 06-24
Drawing Number 452-9L
Building A - 2641 Gateway Road - CB072908
Building B - 2647 Gateway Road - CB0729>0
Pad B - 2635 Gateway Road - CB072909^
Building C - 2653 Gateway Road - CB072911
Building E - 2669 Gateway Road - CB072915
Landscape inspection comments are attached
Approved - Permit cards for buildings A, C and E and Pad B were signed
Jfet. -4pPr0ve4? JPermit card for building B was not signed
file IIC \Documents and Settmgs\jhawn\Local Settmgs\Temp\XPgrpwise\4994698FGW- 02/13/2009
City of Carlsbad
Final Building Inspection
Dept Building Engineering Planning CMWD St Lite Fire
Plan Check #
Permit*
Project Name
Address
Contact Person
Sewer Dist
Inspected ,
Bv _>
Inspected
Bv
Inspected
Bv
Comments
PC 07-64
CB072909
BRESSI VILL PAD
SHELL BLDG
2635 GATEWAY RD
DAVID OBRIEN
CA
UJ
^
B 4 640 SF
Phone 7604451279
Water Dist CA
Date
Inspected 7, l3'0^
Date
Inspected
Date
Inspected
Date
Permit Type
Sub Type
Lot 0
Approved A
Approved
Approved
02/11/2009
COMMIND
COMM
Disapproved
Disapproved
Disapproved
City of Carlsbad
Final Building Inspection
K^r^J
Dept Building Engineering Planning CMWD
Plan Check #
Permit #
Project Name
Address
Contact Person
Sewer Dist
Inspected /)
Bv fa
Inspected
Bv
Inspected
Bv
Comments
PC 07-64
CB072909
BRESSI VILL PAD B 4 640 SF
SHELL BLDG
2635 GATEWAY RD
DAVID OBRIEN Phone 7604451279
CA Water Dist CA
X7 Date / /ft/ j-l 1
\£u* Inspected Z/*f /*?r-r y /
Date
Inspected
Date
Inspected
StLite Fire
Date 02/11/2009
Permit Type COMMIND
Sub Type COMM
Lot 0
Approved *^ Disapproved
Approved Disapproved
Approved Disapproved
City of Carlsbad Bldg Inspection Request
For 02/11/2009
Permit* CB072909
Title BRESSIVILL PAD B 4,640 SF
Description SHELL BLDG
Inspector Assignment PY
2635 GATEWAY RD
Lot 0
Type COMMIND Sub Type COMM
Job Address
Suite
Location
OWNER LNR BRESSI COMMERCIAL INC
Owner
Remarks
Phone 7604451279
Inspector
Total Time
CD Description
19 Final Structural
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Requested By DAVID OBRIEN
Entered By CHRISTINE
Act Comments
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC 07-64
PCR08043 ISSUED BRESSI RANCH VILLAGE CENTER DHI-THRI-D TRUSS SUBMITTAI. ALL BUILDINGS
PCR08044 ISSUED BRHSSI RANCH VILLAGE CENTER REV TO 13 PAGES( DELTA 4) PLUMBING/ELEC
PCR08089 ISSUED BRESSI RANCH V1LL CEN BLDG E DELETE PARAPET ADD MANSARD ROOK
PCR08095 ISSUED BRESSI RANCH VILLAGE CENTER ADD DRAIN LINOS FOR FIRE SPRINKLER RISER
Inspection History
Date
10/20/2008
10/20/2008
09/05/2008
08/21/2008
08/21/2008
08/21/2008
08/21/2008
08/18/2008
08/13/2008
08/11/2008
Description
23 Gas/Test/Repairs
39 Final Electrical
17 Interior Lath/Drywall
14 Frame/Steel/Bolting/Weldmg
24 Rough/Topout
34 Rough Electric
44 Rough/Ducts/Dampers
18 Exterior Lath/Drywall
1 1 Ftg/Foundation/Piers
66 Grout
Act
AP
PA
AP
AP
AP
AP
NR
AP
PA
AP
Insp
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
Comments
EMR
light pole ftgs (9)
TRASH ENCLOSURE
City of Carlsbad Bldg Inspection Request
For 10/20/2008
PermiW CB072909
Title BRESSI VILL PAD B 4,640 SF
Description SHELL BLDG
Inspector Assignment PY
Sub Type COMM
2635 GATEWAY RD
Lot
Type COMMIND
Job Address
Suite
Location
OWNER LNR BRESSI COMMERCIAL INC
Owner
Remarks
Phone 7604451279
Inspector
Total Time Requested By DAVID OBRIAN
Entered By CHRISTINE
CD Description
39 Final Electrical
Act Comments
Comments/Notices/Holds
Date
09/05/2008
08/21/2008
08/21/2008
08/21/2008
08/21/2008
08/18/2008
08/13/2008
08/11/2008
08/07/2008
07/02/2008
07/02/2008
06/23/2008
06/16/2008
06/13/2008
05/19/2008
05/19/2008
Associated PCRs/CVs Original PC# PC 07-64
PCR08043 ISSUED BRESSI RANCH VILLAGE CENTER DEFFERED TRUSS SUBMITTAL ALL BUILDINGS
PCR08044 ISSUED BRF.SS1 RANCH VILLAGE CENTER REV TO 13 PAGES( DELTA 4) Pl.UMBING/ELEC
PCR08089 ISSUED BRESSI RANCH VILL CHN BLDG E DELETE PARAPE'T ADD MANSARD ROOF
PCR08095 ISSUED BRESSI RANCH VILLAGE CENTER ADD DRAIN LINES FOR FIRE SPRINKLER RISER
Inspection History
Description Act Insp Comments
17 Interior Lath/Drywall
14 Frame/Steel/Bolting/Weldmg
24 Rough/Topout
34 Rough Electric
44 Rough/Ducts/Dampers
18 Exterior Lath/Drywall
11 Ftg/Foundation/Piers PA PY light pole ftgs (9)
66 Grout AP PY TRASH ENCLOSURE
11 Ftg/Foundation/Piers AP PY TRASH ENCLOSURE FTG
ROOF DRAINS24 Rough/Topout
83 Roof Sheathing/Ext Shear
15 Roof/Reroof
13 Shear Panels/HDs
13 Shear Panels/HDs
11 Ftg/Foundation/Piers
31 Underground/Conduit-Wiring
Act
AP
AP
AP
AP
NR
AP
PA
AP
AP
PA
AP
AP
AP
CO
AP
AP
Insp
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
PY
JM
PY
PY
REQUIRES 3IN FRAME
CITY OF CARLSBAD
ELECTRIC AND GAS METER CLEARANCE
INTER-DEPARTMENT
ADDRESS
Bit. PaJL A
S E O Ser
Reason, If
ELECTRIC
yice Equipment Only
Denied
METER J,
COMMERCIAL \T
RESIDENCE /
NEW SERVICE \/
RELOCATE
TSPB
TEMP P/P
UP-GRADE
TEST METER
IRR PEDESTAL
YES
NO
NO
GAS METER
COMMERCIAL
RESIDENCE
TEST METER
Building Inspector Signature / Da/
Called In By ae
YES
NO
Time
Time
Called In To
CO Insulation, LP - Escondido (874)
2061 Aldergrove Ave
Escondido, CA 92029
Insulation Certificate
Insulation is installed in the structure described below as follows
Work Area
Attic Area - Wire
Demising Walls
Sound walls
Exterior Walls and Rim Joists
Attic Area - Batts
Attic Area Batts
Item Installed
ISW17G Wire 17 Gauge 1/4 MI Spool
R-ll 16" x 96" Unfaced - CertaSound - Batts
R-ll 24' x 96" - Unfaced - CertaSound - Batts
R-19 15 25" x 48" Unfaced - Batts
R-30 16" x 48" - Unfaced - Batts
R-30 24" x 48" Unfaced - Batts
Sq Feet
4400
1 260
0
3 140
4400
4400
^Fiberglass blow has no settling factor for R-values
Job Name BRESSI RANCH VILLAGE CENTER
Lot No PAD B
Job Address EL FUERTE AND GATEWAY STREET
CARLSBAD, CA 92008
Date Completed October 14, 2008
Insulation By
IVlTd
www mtglmc com
Corporate -v-
2992 E La Raima Ave Ste A
Anaheim, CA 92806
Tel 7146322999
Fax 7146322974
Dispatch 8004912990
San Diego/Imperial Couii
7313 Carroll Rd Ste G
San Diego, CA 92121
Tel 8585373999
Fax 858 537 3990
Dispatch 8888445060
MTGL Project #
Permit #
Report!
\ M 1 ^ A 1
Inland Empire14467 Me<r«Jran Pkwy, Bldg 2-ft
Riverside, CA 92518
Tel 9516534999
Fax 9516534666
Dispatch 800 491 2990
DAILY INSPECTION
REPORT
DSA/CITYFile#.
PG DF
DSA/OSHPDAPPL*.
DSA/LEA#
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non-compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
PROJECT NAME DATE I
$"/
.A?TIME ARRIVED TIME DEPARTED
j \
TRWELENGINEER TIME LUNCH TIME
CONTRACTOR
\
SUB CONTRACTOR
goCU
INSPECTION ADDRESS ADDRESS OF PROJECT
TYPE OF INSPECTION
D ENGINEERED FILL
D FOUNDATION
Q BACK FILL
D BATCH PLANT
D PT CONCRETE
D SHOTCRETE
[^CONCRETE
D MASONRY
IH HIGH STRENGTH BOLTING
D WELDING
D SHOP WELD
D FIREPROOFING
D ANCHOR/DOWEL
D NDE FIELD
D NDE SHOP
D CEILING WIREnan
DSA/OSHPD/PROJECT
APPROVED DOCUMENTS
AVAILABLE
APPROVED PLANS Y£J N D
SOIL REPORT Y D N n SPECS YL>Na
APPROVED SHOP DRAWING Y n N D
RIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MATERIAL TEST REPORTS)IAL T
(
CONTRACTORS EQUIPMENT/ MANPOWER USED
EA GRID LINES PIECES INSPECTED
V\
Pi
.StpUCTURAL NOTES DETAIL T)R RFIS USED
\J
KS INCLUDING MEEVNGS
^>y»^pfl /
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
THE WORK WAS$ WAS NOT D
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT
approved documents
MATERIAL SAMPLING WAS^ WAS NOT D N/AD
Performed in accordance with DSA/OSHPD/PROJECT approved documents
THE WORK INSPECTED METH DID NOT MEET n
THE requirements of the DSA/OSHPD/PROJECT approved documents
Samples taken .
Weather £ JQi-'Hy Temp Jt"^
cc Project Architect
Structural Engineer
DSA Regional Office
School District
Contractor
Building Department
Owner
Signature of Special Inspector
Print Name
Certificatio
Verified
Corporate
2992 E La Raima Ave Ste A
Anaheim CA 92806
Tel 7146322999
Fax 7146322974
San Diego/Imperial C
7313 Carroll Rd Ste G
San Diego CA92121
Tel 8585373999
Fax 8585373990
ounUr Inland Empire
14467 Meridian Pkwy Bldg 2-A
Riverside, CA 92518
Tel 951 653 4999
Fax 951 653 4666
www mtglmc com Dispatch 800 491 2990
MTGL Project * \Hl M A"* °
Permit# C $>O "? 2, Qo
Report* PG DF
q
Dispatch 8888445060
DAILY INSPECTION DSA/CITV
REPORT
DSA/LB
Dispatch 800 491 2990
File*
PDAPPL#
\f
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non-compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
P^™\ $Lav,cJu U»
£dd M too
ENGINEER
CONTRACTOR
INSPECTION fflDRES
TYPE OF INSPECTION
D ENGINEERED FILL
D FOUNDATION
D BACK FILL
DSA/OSHPD/PROJECT
APPROVED DOCUMENTS
\\GO> £^c
iXnPV
D BATCH PLANT
D PT CONCRETE
D SHOTCRETE
[^CONCRETE
AVAILABLE
APPROVED PLANS Y3
DATE . 1^ r / /^» /tTllflE ARRIVED
TRAVEL TIME
SUBCONTRACTOR
ADDRESS OF PROJECT
LJ MASONRY
D HIGH STRENGTH BOLTING
D WELDING
D SHOP WELD
, SOIL REPORT YG ND
ND
> J^
^^i.
C FIREPROOFING
D ANCHOR/DOWEL
D NDE FIELD
• J NDE SHOP
TIME DEPARTED
LUNCH TIME
D CEILING WIRE
&r ft& gr. ^
LJ '
D
SPECS Yd ND
APPROVED SHOP DRAWING YLJ ND
MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MATERIAL TEST REPORTS)
(Vi V*\ ^ J-OtTcJ^^ \ \ CJL \ - V &f ol n ^I V
CONTRACTORS EQUIPMENT / MANPOWER USED
4REA GRIDUNBS PIECES INSHECTED , _ fS V
(V) «iK£ I ACT *r) -" r OtNv^fAfX^^ ^* d^OOTtt^Cv
9
STRUCTURAL NOTES DETAIL OR RFIS USED
*
REMARKS INCLUDING MEETINGS
^ IvMPPfA.o*-^ oP H>c miU\U^'0 * ol fe*
!&(,. \\), P\<?\ i/sf-o/'tA'^vCi J-e*' Wfcvc i >al P* (.A?{n J-& / iy^oEifi,/1 j.
^ tlc/x/fi^^.^o
l^^^^eA ^y^n^
>/ |J0 ^^
i fctf ^TGSP
I5r (S>/i^«»^ fcS-CjA
a^ttfli OPX A/cU'l
^/o^a^^c^i" /S3v^.
^ /^ ^6 '
f \
> *
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
!
J
THE WORK WAS p WAS NOT D
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT
approved documents
MATERIAL SAMPLING WASH WAS NOT G N/AI 1
Performed in accordance with DSA/OSHPD/PROJECT approved documents
cc Project Architect Contractor
Structural Engineer Building Department
DSA Regional Office Owner
School District
THE WORK INSPECTED MET Of DID NOT MEET D
THE requirements of the DSA/OSHPD/PROJECT approved documents
Samples taken
Weather JL>**jr\y Temp SO
Certification
Verified
Corporate
2952 E La Raima'Ave Ste A
Anaheim, CA 92806
Tel 7146322999
Fax 714 632 2974
San Diego/Imperial Cou
7313 Carroll Rd Ste G
San Diego CA92121
Tel 8585373999
Fax 858 537 3990
Inland Empire
14467 Meridian Pkwy, Bldg 2-A
Riverside, CA 92518
Tel 951 653 4999
Fax 951 653 4666
wwwmtglmccom uispatcn BUU 4«i zsau
MTGL Protect # \ M Z ^ A ? O
Permit* ( (lO Tl (\\J>
Report t PG DF
Uispatcn 8BH844SL
DAILY INSPECTIO
REPORT
t>u uispaicn ouu 4» i ^aau
__ DSA/CITYFile#N
DSA/OSHPDAPPL#
DSA/LEA#
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non-compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
PROJECT NAME
ISf /•'/y'Sl V» G\ls\ fA"»
ARCHITECT . »
/~Vv\C* r* WC^VAC/V
ENGINEER6-5 }T
CONTRACTOR/*/£* V
INSPECTION ADDRESS
TYPE OF INSPECTION D BATCH PLANT
D ENGINEERED FILL D PT CONCRETE
D FOUNDATION D SHOTCRETE
D BACK FILL D CONCRETE
DSA/OSHPD/PROJECT AVAILABLE
APPROVED DOCUMENTS APPROVED PLANS Y D
MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR M;
oo^fVrVe mi ]x i* $-j7 T ^ (
DATE i )
^T / 1 W / '> / I ' /-'TIME ARRIVEDSIT / 1 ^^/ tX t\ ^^x
TRAVEL TIME
SUB CONTRACTOR
ADDRESS OF PROJECT
D MASONRY
D HIGH STRENGTH BOLTING
D WELDING
D SHOP WELD
SOIL REPORT YD ND
ND
ITERIAL TEST REPORTS) .
SvA<9<X\iV J ^4 ?QO f*
'i TIME DEPARTED
• M ^
LUNCH TIME
£^ V
D FIREPROOFING D CEILING WIRE
D ANCHOR/DOWEL D
D NDE FIELD D
D NDE SHOP D
SPECS YD ND
APPROVED SHOP DRAWING Y D N D
^/Wrv>x i to U*JA ' wuv 7
CONTRACTORS EQUIPMENT / MANPOWER USED ~
AREA GRID LINES PIECES INSPECTED
r 1 f v" LJ=»lt iW\*S\ -i-OOTVv
^iVx^o, ^j\C»Uo^ ^-T>J> ^n^, ^Jic^oo ^|
\ * A
f f I O-A'A^b /ifO trv't^l 'L-
0 * *** \ -s \ ^
STRUCTURAL NOTES DETAIL OR RFIS USEDS 0 >L
REMARIS, IHCLUDme MEETINGS
V G A-o lT *V\ P M f\*/\ i^Ji.) * f A-\ O V\
cy ), „ ^bv5 1*^ t« ^ P /- ^
o( ^ov^cvrVc' piAc.jTi^
.^y, f^l- ,.J, Vft,
AiWp 4 ^L, _ X^)
'
X" J J i X^ /f^Oi-l l.J> (r fl/X*t Ot-i /^^ ' °f
/
/L ^) I- 8)f (iQ-t 1), 1 \ /
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
THE WORK WAS $B WAS NOT D
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT
approved documents
MATERIAL SAMPLING WAS SJ WAS NOT D N/A H
Performed in accordance with DSA/OSHPD/PROJECT approved documents
cc Project Architect Contractor
Structural Engineer Building Department
DSA Regional Office Owner
School District
THE WORK INSPECTED METH DID NOT MEET D
THE requirements of the DSA/OSHPD/PROJECT approved documents
Samples taken *Z J€ V O / ^/
Weather JUt^t^y Temo Jf'/) " h
Signature of Special Inspector
Print Name
CertificationJL
Verified by _?1
PROJECT DESIGN CONSULTANTS 70! B Si KM I Si I I I Snu
s,\\ DM (,o I "A IJ2HH
hilt 2 > i (14- ] 1 M
dig 2 14 ciV|g IA\\V\\ \\ I K0|l:.t I Ml.SIC,\ COM
File 321905
May 13,2008
CITY OF CARLSBAD
Building Department
1635 Faraday Avenue
Carlsbad CA 92008-731 4
SUBJECT Bressi Ranch Village Center - Form Certification for Butlding Pad B
To Whom It May Concern
Project Design Consultants has field verified the form positions, for Building Pad B as shown on
Sheet 6 of the Grading and Erosion Control Plans of the abefve-referenced project Upon our
review of the survey data collected on May 13, 2008 the building footprint conforms horizontally
and vertically within ±0 1-feet to the approved design
Sincerely,
Lawrence D Naiman, LS
Associate
LS5163, Exp 6/30/09
R \WP\CONTRACT\3200\3219 05_FormCert_Pad B PA 15 doc
HHC.O IIIOKMX Tl MFC'l'l A HAKI KSM . I I)
IV1TG,
www mtghnc com
MTGL Project*.
Permit #
Corporate
2992 f La Raima Ave^te A
Anaheim, CA 92806
Tel 7146322999
Fax 714 632 2974
Dispatch 800 491 2990
San Diego/Imperial &
7313 Carroll Rd Ste G
San Diego, CA 92121
Tel 8585373999
Fax 858 537 3990
Dispatch 8888445060
Inland Empire
14467 Meridian Pkwy.Bldg 2-A
Riverside, CA 92518
Tel 951 653 4999
Fax 951 653 4666
Dispatch 800 491 2990
*f A t
Report if
DAILY INSPECTION
REPORT
DSA/CITY File #_
PG DF
DSA/OSHPDAPPL#.
DSA/LEA#
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non-compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
UECT NAME DATE"
TIME ARRIVED
\ \
R*EL
TIME DEPARTED
ENGINEER TR*EL TIME LUNCH TIME
r SUB CONTRACTOR ,—(Zod F*.
INSPECTION ADDRESS DDRESS OF PROJECT
TYPE OF INSPECTION
D ENGINEERED FILL
D FOUNDATION
D BACK FILL
D BATCH PLANT
n PT CONCRETE
D SHOTCRETE
SrCONCRETE
G MASONRY
Q HIGH STRENGTH BOLTING
G WELDING
D SHOP WELD
D FIREPROOFING
D ANCHOR/DOWEL
D NDE FIELD
D NDESHOP
D CEILING WIREn
D
D
DSA/OSHPD/PROJECT
APPROVED DOCUMENTS
AVAILABLE
APPROVED PLANS
SOIL REPORT YD ND
N D
SPECS YL>N a
APPROVED SHOP DRAWING Y D N D
RIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MATERI
fr X\T-<t?
IAL
(
TEST REPORTS)
CONTRACTORS EQUIPMENT/ MANPOWER USED
EA
a
V\'
1- -
SRUCTURAL NOTES DETAIL TDRRFIS USED
*
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
THE WORK WAS f£ WAS NOT D
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT
approved documents
MATERIAL SAMPLING WAS^ WAS NOT D N/AD
Performed in accordance with DSA/OSHPD/PROJECT approved documents
cc Project Architect Contractor
Structural Engineer Building Department
DSA Regional Office Owner
School District
THE WORK INSPECTED METD DID NOT MEET n
THE requirements of the DSA/OSHPD/PROJECT approved documents
Samples taken
Weather Qi~fy Temp 7>
Signature of Special Inspector
Print Name
Certificatu
Verified by
jr.-
www mtglmc com
MTGL Project #
Permrti C t>O
Corporate
2992 E La Palma Ave Ste A
Anaheim, CA 92806
Tel 714 632 2999
Fax 7146322974
Dispatch 800 491 2990
San Diego/Imperial Coui
7313 Carroll Rd Ste 6
San Diego, CA 92121
Tel 858 537 3999
Fax 858 537 3990
Dispatch 888 844 5060
*mP^Inland Empire
14467 Meridian Pkwy,
Riverside, CA 92518
Tel 951 653 4999
Fax 9516534666
Dispatch 8004912990
2-A
DAILY INSPECTION
REPORT
DSA/CITYRIe#
Report #_PG DF
DSA/OSHPD APPL f.
DSA/LEA#
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non-compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
PROJECTNAME 3J-TIME ARRIARCHJTECT.TIME ARRIVED TIME DEPARTED
ENGINEER TRAVEL TIME LUNCH TIME
CONTRACTOR SUBCONTRACTOR
INSPECTION ADDRE ADDRESS OF PROJECT
TYPE OF INSPECTION
D ENGINEERED FILL
D FOUNDATION
D BACK FILL
D BATCH PLANT
D PT CONCRETE
D SHOTCRETE
SfcCONCRETE
Q MASONRY
D HIGH STRENGTH BOLTING
D WELDING
C SHOP WELD
D FIREPROOFING
D ANCHOR/DOWEL
D NDE FIELD
LJ NDE SHOP
D CEILING WIRE
aa
DSA/OSHPD/PROJECT
APPROVED DOCUMENTS
AVAILABLE /
APPROVED PLANS Y £ ND
SOIL REPORT YG ND SPECS Yd ND
APPROVED SHOP DRAWING Y D N D
MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MATERIAL TEST REPORTS)
CONTRACTORS EQUIPMENT / MANPOWER USED
STRUCTURAL NOTES DETAIL ORRFISUSED
KS HKLUDIHG
5" •Sf>&t\ <-< i
. K'oVc .^lil1-^4 )
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
THE WORK WAS p WAS NOT D
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT
approved documents
MATERIAL SAMPLING WASQ WAS NOT D N/AD
Performed in accordance with DSA/OSHPD/PROJECT approved documents
cc Project Architect Contractor
Structural Engineer Building Department
DSA Regional Office Owner
School District
THE WORK INSPECTED MET[y DID NOT MEETO
THE requirements of the DSA/OSHPD/PROJECT approved documents
Samples taken
Weather -Tu,-^V Temp Ko'F
Signature of Special Inspector
Certification
Verified b1
Corporate
2992 E La Raima*Ave Ste A
Anaheim, CA 92806
Tel 7146322999
Fax 7146322974
San Diego/Imperial Cou
7313 Carroll Rd Ste G
San Diego, CA 92121
Tel 8585373999
Fax 858 537 3990
\iafjr Inland Empire
14467MeridianPkwy.Bldg 2-A
Riverside, CA 92518
Tel 951 653 4999
Fax 9516534666
www mtglmc com Dispatch 800 491 2990
MTGL Proiect # \MZ^A?i3
Permit* ( ^O "71 (\\J>
Report if PG DF
Dispatch 88884^
DAILY INSPECTI
REPORT
15060 Dispatch 8004!
__. DSA/CITY File #ON
DSA/OSHPDAPPL#
DSA/LEA#
}1 2990
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
PROJECT NAME
Rf /ysAi V,<XLA CM
ARCHITECT. . .
£V\. \ C* r * W &Jf v\ C/v
ENGINEER
CONTRACTOR
INSPECTION ADDRESS
TYPE OF INSPECTION D BATCH PLANT
D ENGINEERED FILL D PT CONCRETE
D FOUNDATION D SHOTCRETE
D BACK FILL D CONCRETE
DSA/OSHPD/PROJECT AVAILABLE
APPROVED DOCUMENTS APPROVED PLANS Y D
DATE isJ \ *
TIME ARRIVED
TRAVEL TIME
SUBCONTRACTORPo<A
}?<.TIME DEPARTED
>» \ T . i? *> /*>-»,
LUNCH TIME
&^v
ADDRESS OF PROJECT
H MASONRY
n HIGH STRENGTH BOLTING
D WELDING
n SHOP WELD
SOIL REPORT YG NH
ND
D FIREPROOFING D CEILING WIRE
D ANCHOR/DOWEL D
D NDE FIELD D
n NDE SHOP D
SPECS YD ND
APPROVED SHOP DRAWING Y D N D
MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MATERIAL TEST REPORTS) .
£ov^cyr Ye mi x » XT? T f* { S^iP^v* * v ) ^ £00 f* i~r" '* ' V
CONTRACTORS EQUIPMENT / MANPOWER USED '
AREA GRID LINES PIECES INSPECTED
C* i_ /s fl 1^ -i V P_^ ^\ (^ *& \ S "^ V* t^l A fc^ fA C\ T "* O \/\ ^-
^oit v^v\ £ooViv,
V 7
^V.xi*. \ J|c,Uo-
o/rA <£> (" i-^ r C- \
\
I J{Mffr £l£ /^V) 6fV| (A
5 j / ^ jTp )
^ A
£_
~~'~
STRUCTURAL NOTES DETAIL ORRFISUSEDs 0 A.
I|^I|,M«^M* ^ | p , r ^ o ^
V^iAcc' (fteoi/r V^r/tov' v* et\ Jk
cy)t^M^s it,^- e^^prts*
ot / ^cvrVf oUcr
_ofe^,,. ^Jr v
*\ , \ / P -4 -£X> |. , .n <y, /^
/ O
r^AA«\i»*r
— A / ^ x /^ lo<. ( M- B) < ( 1<
^D /or
J^loV '-/
f1-t ->)
'
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
THE WORK WAS $ WAS NOT D
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT
approved documents
MATERIAL SAMPLING WAS « WAS NOT D N/A D
Performed in accordance with DSA/OSHPD/PROJECT approved documents
cc Project Architect Contractor
Structural Engineer Building Department
DSA Regional Office Owner
School District
THE WORK INSPECTED METB DID NOT MEET D
THE requirements of the DSA/OSHPD/PROJECT approved documents
Samples taken 1 J€ ^ O/ C1
Weather J^t^l^ Temp 4 " /"-
Signature of Special Inspector
Print Name
Certification
Verified by
www mtglinc com
MTGL Project #
Permit I *" (
Report # _
Corporate
2982 E La, Raima AveSte A
Anaheim, CA 92806
Tel 7146322999
Fax 7146322974
Dispatch 800 491 2990
San Diego/Imperial Cou
7313 Carroll Rd Ste G
San Diego, CA 92121
Tel 8585373999
Fax 858 537 3990
Dispatch 8888445060
HIIHf^"^Inland Empire
14467 Meridian Pkwy.Bldg 2-A
Riverside, CA 92518
Tel 951 653 4999
Fax 951 653 4666
Dispatch 8004912990
t->
O°\
DAILY INSPECTION
REPORT
DSA/CITYFile#
PG DF
DSA/OSHPDAPPL#.
DSA/LEA# _
Special Inspection Reports must be distributed to the parties listed below within 14 days of the inspection Reports of non compliant conditions must be distributed immediately
Separate reports shall be prepared for each type of special inspection on a daily basis Each report shall be completed and signed by the special inspector conducting the inspection
ftJECTNAME3>'DATE3ATE1 .
S I I (.
ARI
c/y
TIMEARRIVED
6 QOe.*-,
TIME DEPARTED
ENGIN TRAVEL TIME LUNCH TIME
CONTRACTOR SUBCO
Ft-W
INSPECTION ADDRESS ADDRESS OF PROJECT
TYPE OF INSPECTION
D ENGINEERED FILL
D FOUNDATION
D BACK FILL
D BATCH PLANT
D PT CONCRETE
D SHOTCRETE
D CONCRETE
D MASONRY
Li HIGH STRENGTH BOLTING
LJ WELDING
:i SHOP WELD
D FIREPROOFING
D ANCHOR/DOWEL
D NDE FIELD
Q NDE SHOP
D CEILING WIREaaa
DSA/OSHPD/PBOJECT
APPROVED DOCUMENTS
AVAILABLE
APPROVED PLANS Yd NEJ
SOIL REPORT YD ND SPECS YD NH
APPROVED SHOP DRAWING Y D N D
MATERIALS USED BY CONTRACTOR (INCLUDE RESEARCH REPORT NO OR MATERIAL TEST REPORTS)
CONTRACTORS EQUIPMENT/ MANPOWER USED
ARE
STRUCTURAL iSJIETAIL OR RFIS USED
IMCLUDIHG itVKc.1J *
V^g /xooVeci 5W\
ft ce
REWORK AS PERCENT OF ALL WORK TODAY PERCENT PROJECT COMPLETE
THE WORK WAS i> WAS NOT D
Inspected in accordance with the requirements of the DSA/OSHPD/PROJECT
approved documents
MATERIAL SAMPLING WASD WAS NOT D N/AD
Performed in accordance with DSA/OSHPD/PROJECT approved documents
cc Project Architect Contractor
Structural Engineer Building Department
DSA Regional Office Owner
School District
THE WORK INSPECTED MET Df DID NOT MEET D
THE requirements of the DSA/OSHPD/PROJECT approved documents
Samples taken
Weather JL, -* ,-. -f Temp o
Signature of Special Inspector
Print Name
Certification
Verified by
3' 3/k/?y>, ;L*&&^:
FOOTING OBSERVATION SUMMARY
Leighton and Associates, Inc
A LEIGHTON GROUP COMPANY
Project Name
Location
Plan File No
Date
Project No
S- \ 2. -
Permit No Unit/Phase/Lot(s)r> -
Referenced Geotechnical Report(s)
Observation Summary
Initials
Initials
S-ii-ovDate
Initials
Date
Initials
A representative of Leighton and Associates observed onsite soil conditions Soil conditions at
the site are substantially in conformance with those assumed in th£ geotechnical report
A representative of Leighton and Associates observed and measured footing excavation
depth/width Footing excavations extend to proper depth and bearing strata and are in general
conformance with recommendations of the geotechnical report
A representative of Leighton and Associates measured footing setback from slope face The
setback was in general accordance with the recommendations of the geotechnical report
Notes to Superintendent/Foreman A"
1 Footing excavations should be cleaned of loose debris and thoroughly moistened just-prior to placing
concrete '^V
2 Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended
Consult the geotechnical report for presoaking recommendations We note that.elayey soils may take an
extended period of time and the contractor should schedule accordingly ^ "
3 In the event of a site change subsequent to our footing observation and pnor to concrete placement (i e ,
heavy ram, etc), we should be contacted to perform additional site observations
Note to Building Inspector
1 Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading
S-IZ-OST
For Leighton and Date
White - File Yellow - Client Gold - Field 3930 R/0403