HomeMy WebLinkAbout2640 OBELISCO PL; ; 77-7915; PermitMODEL MO.
BUILDtG PERMIT APPLItt-'10N'
City of CARLSBAD, CALIFORNIA 92008
Applicant to complete numbered spaces only. Phone 729-1181 Permit No.
JOB ADDR ESS ' , A '*W 'v
PARCEL NUMBER
LEGAL 1 DESCR.
LOT NO.
671
BLK"/ C ~T'
ATTACHED SHEET I
BOOK 1. RAPE PAR
OWNER MAIL ADDRESS ZIP PHONE
2 vi rq 0 v 1-47.3 -4or, a
CONTRACTOR MAIL ADDRESS PHONE STATE LIC. NO. C.ITY LIC. NO.
3
ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO.
4 , '? mdfev 6 — ENGINEER MAIL ADDRESS PHONE LICENSE NO.
5
COMPENSATION INS. CARRIER MAIL ADORE
S
BRANCH
6
USE OF BUILDING
oe
NO. BDRMS NO. BATHS—:3
8 Class of work: 9KNEW 0 ADDITION 0 ALTERATION El REPAIR MOVE El REWOVE
9 Describe work:
10 Changeofusefrorn
7
Change of use to
I I Valuatibn of work: $ PLAN CHECK FEE PERMIT FEE $47SO.
SPECIALCONDITIONS: Type o:y
Const . Art
c
Oc upanP4, Group
MICRO FILM FEE
Size of B I d 90,; OM
(Total) Sq.
No.of
Stories
Max.
Occ. Load .4t
f
Fire
Zone
use
Zone
Fire sprinklers
Required 0Yes RNO APPLICATION ACCEPTED BY-
DATE
PLANS CHECKED BY
,- A PRO"
U ANCE BY
r - ~AT E~;
174 f
Dwelling, Units
OFFSTREET PARKING SPACES:
No, 4P 1 ON o.
Covered A jSq. Ff!;7'/- pen
NOTICE
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB-
ING, HEATING, VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID 11~ WORK OR CONSTRUC-
TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS,OR IF
CONSTRUCTION OR WORK ISSUSPENDED OR ABANDONED FOR A
PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COM-
MENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND,KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN. OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING
—CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
7,
Special Approvals Required Received Not Require~T7
PLANNING DEPT.
HEALTH DEPT.
FIRE DEPT.
SOIL REPORT
OTHER (Specify)
ENGINEERING DEPT.
WATER DEPT.
SIGNATURE OF CONTRAIC',TOR OR AUTHORIZED AGENT (DA TE)
I SIGNATURE OF OWNER (IF OWNERBUILDER) (DATE)
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH
T OTAL FEES $
79?., $-Ov
INSPECTOR
INSPECTION RECORD
DATE REMARKS "INSPECTOR
FOUNDATIONS:
SET BACK
"TRENCH
REINFORCINd,,,.,A';,Z^,
FOUNDATION WALL &'
WEATHER, PROOFING'~
CONCRETE SLAB."
FRAMiNG-%
INT. LATHING OR DRYWALL.
.EXT. LATHING
-MASONRY-
w
_.;FINAL.--
USE'SPACE- BELOW FOR NOTES, FOLL-OW-UP,,,,ETC. -
j
------ 77-
-T.
r 71 ell U i 2z
t
N 'G, 'A PE 4 PLU MBI R-MIT PPit--] C;,, ON, ; C f CALIFORNIA 92008,"' Itj 0
Applicant to cof~plete,, numbered sp'aces only.' Phond 729-1181 ~P~rmif N A'
JOB ADnR ESS
LEGAL
DESCR
LOT .0.
0!,7/. &
OLK
(, go Pv
OWNER MAIL ADDRESS - ZIP PHONE
2 1 :
Vir 730k _T_ V AltQ V /-14 ?5,6 0 QV i7Wq ~e- 0 11 NAR *
CONTRACTOR MAIL ADDRESS PHONE STATE. L I C. -NO; CITY LIC. NO.
3 Al
"ARCHITEC,T OR DESIGNER. MAIL ADDRESS PHON E LICENSE NO.
4 AP"AA WrIa 212 127P Al,+,) 7Jr- 20,7 4.
,ENGINIfER MAIL ADDRESS PHONE LICENSE NO.
5
C?!.~RENSATI ON (NS. C
,
ARRIER MAIL ADDRESS
. . BRANCH
USE OF BUILDING
7
8, bass"of work: Ij?NtW El A001TION _E] ALTERA'TIOW 13 REPAIR
9~ -Describe work'
PERMIT FEES
TNo. Type of Fixture or Item Fee
SPECIAL CONDITIONS: -WATER CLOSET (TOILET) $ ly
BATHTUB
L 4VATORY (WASH BASIN)
'~'HOWER
ITCH K EN SINK & OISP.
DISHWASHER
~APPLICATION A ,go BY CCEP,~ PLANS CHECKEO BY LAUNDRY~TRAY A PEE D F OR ISSUANCE BY-
`P
ROVI
A T.
CLO:EHES WASHER
All D~ TE WATE~IR HEA TER 51
NOTICE YRINAL.
THIS PE RMIT BECOMES NULL O~ND VOI DTF WOR-K 08 CONSTRUC- ~i,-'ORINKING FOUNTAIN TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS,OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR -ABANDONED FOR A FLOOR—SINK OR DRAIN
'PERIOD'OF 120 DAYS AT ANY TIME AFTER WORK-IS COM- SLOP SINK MENCED.-
GAS SYSTEMS: NO. OUTLETS ~'I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED.THIS
WATER PIPING & TREATING EQ~!P. APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT,
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS
TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, -THE GRANTING OF A PERMIT. DOES NOT WASTE INTERCEPTOR
PRESUME TO GIVE AUTHORITY TO, VIOLATE- OR CANCEL THE
PROVISIONS OF ANY OTHER STATE-OR LOCAL LAW REGULATING VACUUM BREAKERS
CONSTRUCTION OR THE PERFORMANCE 'OF CONSTRUCTION. LAWN SPRINKLER SYSTEM
SEWER NUMBER CLEANOUTS
CESSPOOL
SEPTIC TANK & PIT 457_~, ROOF DRAINS 7
SI*GNATURE OF CONTRACT'Oft-OR AU.TKORIZED AGENT I ATE)
S CE $k
"J" SIGNATURE OF 0~14ER (IF OWNER BUILDERV T T A U F E E 11-
WAEN PROPERLY ~IALIDATED (IN TI-IiS~SPACE) THIS,IS YOUR PERMIT
PLAN CHECK VALIDATI.ON CK. M.O. CASIH~. PERMIT.VALIDATION CK. M.O. CASH
f
INSPECTOR
. 1. - A E x rt-, -., .." , P L 1c U., I L
200
A 0. 11 E-C T R1 C m
AR AD, .._-,.C1ty,bfC.. LS CALIFORN
-Appficantt~ comip'leten*umbered spaces only. Phone.729-1181 Permit No.
JOB ADDRESS
06~7L 1.6.XZ6? Pt_
LEGAjL DESCR.
LOT NO.
7/
BLK. TRACT/
(C)SEE ATT;~HEDSHEET) W y
OWNER MAIL ADDRESS
2 Vj'o~ -V JZ~P23 ' 9 Ell
CONTRACTOR MAIL ADDRESS
3
PHONE STATE LIC. NO. CITY LIC, NO*
3f As
ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. 4
ENGINEER MAIL ADDRESS PHONE LICENSE NO.
5
,-COMPENSATION INS; CARRIER MAIL ADDRESS BRANCH
'PSE OF BUILDING
B.. Clais of work:, [@/NEW .13 ADDITION CD ALTERATI,~~ REPAIR
9 Describe work:
PERMIT. FEES
SWIMMING POOL WIRING,
'No. Each Fee
SPECIAL CONDITIONS;
NO I NCREPLSE~ I N SERVI CE
NEW AQNSTRUCTION,-'. FOR EACH
AMPERE§OF MAIN SERVICE, SWITCH, APPLICATION ACqqPTED DY~ HECKED BY: APPROVED FbR ISSUANCE BY,:- A /R-St'~76R' BREAKER
lie,
NEW SERVIC 11.
DIE EXISTING
N
BLDG.
FOR, EA. - &P t& E OF INCREASE
IN MA).N SE C GE, SWITCH, FUSE NOTICE. 0. 1 4, THIS PERMIT BECOMES NULL-AND VOID I F WIDOW11OR 0'bN_STRUC- OR. PR,,EAKEIt1 TION AUTHORIZED IS NOT COMMENCED WITHtN 120 OAYS,OR IF
CONSTRUCTION OR WORK IS SUSPENDED OR AQANQONED FOR A E'~Dlt; ALTERATION, NO CHANGE .PERIOD OF' 120, DAYS -AT ANY TIME 'AFTER-WORK IS COM-
MENCED.- SERVICE, FOR EA. AMPERE OF <,
I HEREil'y CERTIFY THAT I HAVE READ AND EXAMINED THIS NCREASE APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK'WILL BE COMPLIED WITH WHETHER SPECIFIED
-HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR'CANCEL THE TEMP. SERVICE UP TO AND. INCLQD-
PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING ING 200 AMP. CONSTRUCTION OR THE PERFORMANCE OF- CONSTRUCTION.
TEMP. SERVICE OVER' 200 AMP.
PER J~00
SIGNATURE OF -CONTRACT R AUTHORIZED AGE NT (DATE) ISSUANCE FEE __T
,OTAL-,F _EES -------- -- _~~413AT OF OWNER,(IF OWNER BUILDERr I ~ I - : hM , . -~ '. " .- 1, , ; t -1:WHEN.PR0PER Ly.yAu DATED IIN THIS ~04CE)_,-YHIS IS"YOUWPE Ilr~
PLAN CHIECK VALIDATION CK. M.O. CASH ',,~,"-PIERMIT VALIDATION' CK. M.O. CASH
=7
I : INSPECTOR
eAt,- Y
.4 A
Mzao,
ME -AL PERMIT APPLICATION."
City R LS'B AD' ~'~'C 008 t N n 1, " of CA" A,L I F6 041A "9-2*' i1permi -*,' " A. _~q 7 titO' COMD16te numb'e*Lre~ sDaces onIV." P~Onc
JOB ADDR M
LOT N`0- K__ TR A C S~F ATTACH
r
EET)
/S.
OWNER ~MAIL ADDRES~_ Z,I P PHONE e
__4 _0
c N'
0 1A 5~kc_to MAIL A61ESi
3
PHONE Jw!a
X.0 "~f R't 1444rIftT -0 RrO E!N~G-q 'r--*'VON E '--LNNSE WO.*
4
ENGINEER" MAIL ADDRESS PHONE LICENSE NO.
5
LENDER" MAIL ADDRESS .4 BRANCH
6
USE O-F BUILDING
8 -Class of work: 7.. El ADD ITION El ALTERATION El REPAIR
9 Describe work:
4W
Type of Fuel: oil 11 Nat. Gas El LPG. 0
PERMIT FEES
SPECIAL CONDITIONS:,. No. Type'of Equipment Fee
Air Cond. Units-H.P. Ea. Y"
Refrigeration Units-H.P.
Boilers -H.P. Ea.
Gas Fired A.C. Units-Tonnage Ea.
Forced Air Systems-B.T.U. & M Ea.
APPLICATION ACCEPTED'BY:: P ANS CHECKED BY, APPROVED FOR ISSUANCE BY: 136viiFy Systerns-B.T.U. M Ea.
77 Floor Furnaces-B.T.U. Mr
Wall Heaters-B.T.U. M
NOTICE aters-B.T. M
Evaporative Coolers THIS PERMIT!BECOMES'NULL AND VOID IF WORK OR CONSTRUC. R
U C
-TION AUTHORIZED IS NOT.COMMENCED WITHIN 60 DAYS, OR IF Clothes Dryers R
I ,'CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A R A
Ventilation Fan PERIOD4 OF 120 DAYS- AT ANY TIME AFTER WORK IS COM
I HER EBY CERTIFY-THAT'I HAVE READ AND EXAMINED T Is APPLICATION AND KNOW THE SAME TO BE TRUE AND CORR . T..
MENCED. Range Hood
OM
ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING Is ndling Unit- Air Ha C.F.M.
Incinerator TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFI D HEREIN OR -NOT, THE GRANTING OF A PERMIT DOES N T' PRESUME TO -GIVE AUTHORITY TO VIOLATE OR CANCEL T PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATIN CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION:-
-e.'I'd-NN*UR'E4'.'OF"Ci3N'tk'&CTOFi- R AUTHORIZED AVNT (DA-TE)- CO'
PERMIT
TOTAL FEE $1 ~T.Ii_,) SIGNATURE OF OWNER or OWNER BUILDER) (CATE)
WHEN PROPERLY VALIDATED, (IN THIS SPACE) T141S IS YOUR PERMIT
,PLAN CHECK VALIDATION CK. M.O. :'CASH PERMIT VALIDATION M.O. CASq CK.
INSPECTOR
K!, ~'
REQUEST TIME:
',,~OR- IN$PECTION
INSPECiOEI ~aA PERM'IT NO. DATE:
. i VOWNER
ADDRESS 4 0 0
I ELECTRICAL I
0 FOUNDATION
ED REINFORCING STEEL
ED MASONRY.
0 GROUT - GUNITEA r *
ED FLOOR AND CEILING FRAME.,
0 SHEATHI~G
ED F R AM E
0 EXTERIOR LATH;
0 INSULATION
ED INTERIOR LATH OR DF~YWALL,
/-~~F I N A L
El TEMPORARY SERVICE
F-1 ELECTRIC UNDERGROUND'
0_06UGH ELECTRIC
POOL BONDING
0 ELECTRIC SERVICE—
0 CEILING HEAT..
ED G.F. I.
-~~-ZMFINAL
I - PLUMBING I MISCELLANEOUS I
El UNDERGROUND PLUMBING
0 UNDERGROUND WATER
E:l ROUGH PLUMBING
0 TOP -OUT PLUMBING
ED SEWER AND PL/CO
I--] TUB OR SHOWER PAN
ED GAS TEST
E:1LWAT_EB HEATER
IZI- FINAL
[:1 PLENUM -AND DUCTS
E:l COMBUSTION AIR
EJ PATIO
0 SIGN
~D dRADING
DRIVEWAY-
ED CONDITIONED AIR SYSTEMS
--p
PIPING
1~plpll FINAL
READY FOR INSPECTION: DMONDAY OTUESDAY OWEDNESD~t~tj.HURSDAY \ 0 FRIDAY
b A.M.
.0 P.M.
SPECIAL INSTRUCTI
\~/ I i~l
REQUESTED BY C-V I 23~ PHONE Nd.
PERSON TAKING REPORT
REQIJEST R JNSPECTION
I N'l CT 0 R PERMIT-NO.
OWNER
ADDRESS
BUILDING
[I FOUNDATION
0 REINFORCING STEEL
ED MASONRY
E:l GROUT - GUNITE
0 FLOOR AND CEILING FRAME'
SHEATHING
E-1 FRAME
ED EXTERIOR LATH
0 INSULATION
0 YERIOR LATH OR'DRYWALL
FINAL
PLUMBING
ED UNDERGROUND PLUMBING
EJ UNDERGROUND WATER
El ROUGH PLUMBING
E:) TOP OUT PLUMBING
ED SEWER AND P L/CO
El TUB-OR SHOWER~ PAN
ED GAS TEST
E: I T HEATER
TE
7WA
Cl 'FINAL L
READY FOR INSPECTION: < ONDAY 0 TUESDA
A.M.
P.M.
SPECIAL INSTRUCTIONS
TIME:
DATE:
ELECTRICAL
0 TEMPORARY. SERVICE
E:l ELECTRIC UNDERGROUND
E:) ROUGH, ELECTRIC
ED POOL BONDING
ED ELECTRIC SERVICE
0 CEILING HEAT
El SMOKE DETECTOR
&-~FINAL
MISCELLANEOUS
PLENUM AND DUCTS
OMBUSTION AIR
ATIO
SIGN
GRADING
D'RIVEWAY
~O,CONDITIONED AIR SYSTEMS
REFER- PIPING
HNAL
w NWA'Y OTHURSDAY OFRIDAY
REQUESTED BY PHONE NO.-
PERSON TAKING REPORT
71
n
ALPHA LABORATORIES"' INC.
SOIL& FOUNDATION ENGINEERING
1735- PROJECT HO:
August 31 ''1977
_V i cto.r'. Jeve rmov
~'-1~87'~ Ooqu:,,ta Drive'
OIL
SUBJECT: 'rftist~6~e%ontent, or 5.~bgrade 11_6t '6" I'O'b'e I i's co Pike,
L A~a`~d " s 1-..ln i t No" L a, Cos t 1, C-~ I i fo-rfi i b ow
Dear:'Si
A
Per.you"r r.equest,_ a rep,reser,itatii~e.of -our"~-i..r~ vi.sited the subject, site io
soils*,within the buildinq , det,ermi ne, 'the, moi sture content *O'f 'the subd~ade
area..
The test results are as fol lows:'
'SAMPLE DATE OF 'SAMPLE- DEPTH..
ON BEL OW FlN1,5H GRADE DRY WE ttH- 100A. TEST..~
Lot.
Qbel i,sco - P ],ace. 81 .3 0 -,77 2 0,.5
0 U' n laboratory teses i re, i cabe -,that -,tbe s ubgrade The u Its of. r -F! c i'd a'd soills.
a ve, been. properly rro i stened.,
We -reco"Mmend that the s u r f i'c " a I soiis'be'ke -st cond;.t -he pt i n' a'moi ion"up until
time of c6n6rete p.Iacen1en`.a'_1d -hat -construction con t i J ue a's 's.c'hedbled. n
if Yo u `q av,e any questions, ple -se -contact. thls~'6ffi6e_ a
of service is sincere'iy appreciated.'_,,
R-spect f.,A 1.+V.,s ubmi tted,
ALPHA "_A-30RATOR1 11:5, 1 N C .
~4.
-C. Wood, RCE 1077
'.CIJ1W.-TD:bi —
7895 Convoy Court, Sap Diego." California 9211111 . 7.14 292.-0660
INTERDEPARTMENTAL INFORMATION SKEET
RECEIV Ai
B U-1 L D I NG,; DEPA:,R~TMENT DATE:'
tUILDING J ADD RESS 2 14,97,
_J~
Buildkv OPP ft
,,'PLANNING.I.DEP.ARTMENT
JN
ZONE LOT SIZE~ LOT WIDTH
UNITa-ALLOWED UNITS PROVIDED
iARKING ~SPACES REQUIRE D PROVIDED
%i' ~OVERgGE-ALLOWED PROVIDED
BUIL,DING;HEIGHT ALLOWED PROVIDED
FRONT SETBACK:~~, .-_"SIDE SETBACK: REAR SETBACK:
ALLOWED
PROVIDED'--
INTRUSI ONS
'LANDSCAPE,& IRRIGATION PLAN COMMENTS:
ENVIRONMENTAL PROTECTION REQ:,.,-.4
ADDITION~L COMMENTS:
OK'TO ISSUE: OK TO 'FINAL DATE 51-:0-76
ENGINEERING, DEPARTMENT 614177
'oolt'oo
~
R. 0. W. INDUSTRIAL WASTE IMPROVEMENTS )QdeQ~;'
SEWtR CONNECTION DRIVEWAY,LO CATIONS_C~,;Poo
GRADING PERMIT EASEMENTS DRAINAGE
LEGAL DESCRIPTIONZ4;& Z. (::5*
-A D D I T 10 N. A L C 0 M M E N T S
/7
OK TO I S.S U E' DATE 2 '_.'PWl~_-vU OK TO FINAL DATE- - F-A r~
FIRE DEPARTMENT
SPRINKLING. SYSTEM FIRE PROTECTION EQUIP.
FIRE ALARMS EXITS
FIRE HYDRANTS LOCATION.
ADDITIONAL COMMENTS
0 K TO ISSU4~~ E OK TO FINAL DATE
vo*~
77
D1 ARTMJT _WATER P
T REQUIR 4 TS F A RIATE~~D RICTS T DATE PeIpp
BENTON ENGINEERINGt INC.
FOUNDATIONS APPLIED'SOIL MECHANICS
6717 CONVOY COURT
SAN DIEGO, CALIFORNIA 92111
PHILIP HENKING BENTON
TELEPH ' PRPSIDIENT CIVIL FNGINKIER
September 10,, 1973
La Costa Land Company
Costa Del Mar Road,
Rancho La Costa,- California 92008
-S bject: Project No. 71-3-24D ly
.,Grading Permit No. L'5970~'
Final Report on Compacted Filled Ground
And Classification of Soil Conditions
Lots 585 to 665, inclusive
712 to 7171 inclusive
725, 726, 728, 729
736, 737i 739
740 -and 742
And Certain Street Areas
La Costa Meadows Unit No. 4
Carlsbad, California
Gentlemen:
This is to report the results of' tests and observations made In order to inspect the compaction of
filled ground placed.on certain areas of Lots 585'to 665, inclusive, -712 to 717, inclusive',
725, 726, 728, 729, 736, 737, 739, 740, and 742 'and certain street, areas of Lo Costa Meadows
Unit No. 4 in Carlsbad, California. Jhe fills were placed during the period between March 171 1971 and May 10, 1973. Certain lots of this subdivision were not graded during the above period
l and,the-classification of the expansivesod'. conditionspresented herein pertains only to_those
lots, graded to level buildi,ng pods.during this initial site development'..
The'appr1oximate areas, and depths of filled ground placed under;our inspection in accordanc Is
with, the approved spec'ificati6ris.-are shown on the attached Drawing No. 1, entitled '.,Location
of Compacted Filled Ground." The grading plan used"for the placement of filled gmund,was
preparedby Rick Engineering Company and approved May 18, 1971.
The approximate loco
'
tions at which the tests were taken and the final test results pre presented
on pages T-1 - to T-19, inclusive, under the "Table of Uit Results.'! The- laboratory determiri.;.;.
of,thei maximum dry'densities and optimum moisture contentsof the major fill materials
are-presented on pages T-20 and Tr-21, under the "Laboratory Test Results." Some of the maxi-
densities shown in the "Table of Test Results" were combinations of thesei, The tests
were taken during theweekly periods indicated on the following page.
R
-Proj0ct_No..714-24D Septem6er 10,, 1973
La Co*Sta'.1Meddows Unit, No. 4
Test NuFn6eqr Week, Ending
I to 16,- Inclusive.. March~,20',1971.
17 (to 38~, !nclusive Marc'h'27,, 1-971
39 to 43: Inclusive Ap il.. - 10, 1971 n r
Inclusive r -1971 44 to 451; Mldy,~ 8,
46 and 47 Mq,~ 15, 1971
48 to _50,"Inclusive", July' 17, 1971.
51 to 9,5rAnclusive March, 4' 1972
96, to 138, Inclusive March 11, 1972
.139 to 167,1 ihcluiive~ March 18, 1972'
168 to 220.1, clusive'., Ma rc' h 2 5, 1972.
..221: to 273,~ lnc'luiive-. Aprii 1: - 1 , 1972
JUSiVe , April 8, 1972 274 to,328,-' nc
15, 1972 329 to 391 inclusive
392 to 452,~ inclusive April 22,1972
453 to.500i, inclusive April 29, 1972
501, to 572,,' Inclusive May, 6,' 1972
573 to 580i': inclusive. May. 13, ~19.72
581 to 615,; Inclusive Ma, 20, 1972
Inclusive June' 10, 1972 616 to 626.,
627 and 628 Jmne 17f 1972
629 to 632,,., inclusive Jul 29, 1972 Y
633 to 636,:'. Inclusive May 51
6.37 and 638- May 12,1973
"T h-e'final tesul ts oflestsdind. o6serv'atlons Indicate that the c . o mp
I
acted. fillbd,ground has 6een.
placed at 90 percent of-the.maximum dry density or greater.' ':It;has 6een determiried~:that the.
fill Materials, compacted to 90.percent of the maximum dry density, have a safe - 6earing.val ue~
of 1.930 pounds per square: foot for one foot wide continuous. footings founded at a,m'in mum
depth and placed ffire feet 6.r.'mdre inside the top of compacted. -filled ground slope' si If fdotlin'gs
are placed -closer to the Is` sed slopes than 5'feet'ihside_th'~:top,bf compacted filled ground XPO
'slopes, these should 6e deepened one foot 6elow a 1 1/2 h zonkil to lvertical line projecte'd
outward and downward fro.m a' point 5 feet h6rizontally:.insid6 theJop of compacted filled
ground slopes. . Tests indi6ate,that- the compacted filled ground is';bdequate to saii.sfadtorily.....',
support- the proposed wood frame dwellings witho.ut,detrimeitcillitittleinentsi,,
lay, silty clayand,sandy clay soilswere placed itn.the upper three feet In certain: Expansive c
compacted fill areas and also exist in the upper three feet 66low.11nished'grade In-certain cut.-
areas. The final classifications ofthe soil conditions existing' on. the le* I " ded lot areas ve gra
are presented. on the f6.1,11owing,page'.
e
ri
DENTON ENGINEERING. INC.
Project No'. -71-3-24D September 10, 1973
La.,Costo Meadows Unit'No. 4
type A - Critically Expansive $oils
Lots
585,' 665 to inclusive 7.
713 to 717, inclusive
739, 740 and 742
In order to minimize possible damaging effects due to differential movements of these poteni-
tially expansive soils, the following special.design and precautions ate recommended:
I -...Avoid the use of isolated" interior piers. Use continuous interconnected
reinforced footings throughout, and place these at a minimum depth of.'
24 inches below the lowest adjacent 'exterior final- ground surf6ce. Where.
ir~-place rock Conditions exist.at shallower depths- ~then less de.pth.of ex-
cavation is permissible to a minimum of 12 inches*
2. Reinforce and interconnect continuously with steel bars all interior and
exterior footings with one 05 bar at 3 inches above the bottom of the
footings and one 0,5 bar plated 1 1/2 inchesbelow the top of, the stems
of the footings.
3* Raised wooden floors'that span between continuous footings are best.. or
use.concrete slabs reinforced wi.th at least 6x6_10/10 welded'Wire fabric.
~A minimum of 4 inches of crushed rock 3/4 to I inch -in size. should be
piaced beneath all concrete slabs and covered with a moisture barrier.
Two,,inches of clean sand should then be placed over the.-, oisifure barrier in
and be'low the bottom'of the slob.
.4. Separate garage 'slobs from perimeter footings by a 1/2 inch thickness 'f 1 0
const 'ction felt or equivalent, to allow independent movement of garage - r)u
.Slabs relative to.perimeter footings i Assure complete sepa* ration by,extend-~;
ing the fi.lt,',over the,full-depth'of.the front.,thickened edge of the garage
slab~'' Al off'the garage doorstops, at, least 1/2 inchabovd.: so _Jhe slob.,
5 Provide positive drainage away from all perimeter footings with a vertical
fall of at I,e,ast,.5 inches in a horizontal distance:of 5 feet outsidelhe house
walls.
BENTON ENGINEERING, INC.
Prolect No. 71-3-24D T-1
La'Cbsto "Meadows Unit No. 4'
TAB LE OF TEST~RESULTS
Approx- Depth Maximum
imate of Fill FieW Dry D ry Test Location, at Test Moisture Density., Density Percent
No. Lot No. in Feet % dry wt I bAu f t lb/cu ft Compaction Remarks
1, 715 .2 16.8' 1 10~2 120.6 91.5
2 716 1 12.0 109, 2 117.4 93.0
3 714 3 9.4 100.3 110.7- 90.7
715 6 14.3 102.1 112.8- 90.6
5 '714- 71 14.1 97.0 106.7 91A
6 715 10 .13.2 107.8 115.3 93.5 1
7 717 3 9.3 112.6 121.4 92.7
8 714, 11 .12.3 110.5 94.1
9 716 5 11.1 108'. 2 117.4 92.1
10 .715 14 12.5 109.4 1. 17.4 93.2
11 15 12.2 103.0 111.0 92J
12 717 7 17.3 101.7 111.; 9 90.9
13 715, 18 17.0 102. 5 111.9 91.6
.14 716 17.6 111.9 90.6
15 714 19 '1 4.8 .,112.-9 124.1 90.9
16 717 11 13.0 99.4 ,113.7 -87.5 Reworked
17. 717 ~11 16.8 104.0- 1113. 71 91.1 6 Ch-ecklon #11
18 - 715 22 15.3 104.9 111-7 92.2
19., 716 13 17.1 115.3 90.4
20 714 23 15.8 103.5 113.7 91.0
21 717 '15 .15.8 105.1 1 15A 91.1
22 715 26 16.1 103.71 113.7- 91.3
23 713 1 13.7 102.5 113.7 90.2
24. 716 17 14.7 101.2 91.2
25 717 19 13.5 105.4
111 * .0
115.3 91.5
26 716 21 15.8 106.2 ..,116.8 91.0
27. -717 23 .16.4 106.7 117.4 90.8
28 714 '27 9.1 98.4 113.7 86.6 Reworked
7.29-- 714 27 1 2.. 9 103'. 0 - 113.7 90.6 Check on #2;
30- 715 30 12.1 106.0 115.3 92.0
31 716 25 .:11.9 104.8 115.3 190.8
32 717 27 13.3 102.9 113.7 90.6
33 713 0 .,;5 12A 106 ..8 1,15.3 92.6
34 714 31 12.0 121.8 137.8 '92.8,
35 M 34' 12.3 109.1 119.4 -91.3
.36 713 9 13.6 102.6 113.7 90.3
37 .716 29 3'. 3 107.7 117.4 91.8
38 714 35 13.8- 101.4' 11 2A 90.4
585 3 .17.9 103.0 113
"
7 90.0
40, .585 5 16.5 110.2 121.4 90.8
b
BENTON. ENGINEERING, INC.
No.. 71 ~3-241)', T4
L~`Itosta` Meadows Unit No. 4'
TA$1k,0P,:TEST,RE.SULTS (CONT.)
Approx- De 'th p maximum-:'--~
imate of -Fil I Field' Dry Dry..
Test Location at Test Wsture Density Density Percent..
Lot'No.. in Feet % dry zwt: lb/cu ft lb/cu ft Comp6efien - m*"*rks ke a
41 685 7 12.8 1-12.0 121.4 92.2
42 717 35 13.6 162.8 1 Ij.7 90.6
43 .586' 3 13.4 106.0 117.4 90.3
44' 585 11 14.8 101.3 111.0 91.:2
45 586 7 17.0. 106 e 8 116.'- 1, 92....1 1
School Pro p - 2' 15-0.: 994 109.3 90.4
N . Side-
Schoo I Prop. 4 20..8 103.0 109.3 94.1
N. S ide
585 15 -12.2 113.7 1 15. 6' 98.5
586 11 13.1 107.9 115.3' 91-5
50, 585' 119 .10.8 I09o9 IM3 95.` 3
51 648 2 18.5 110.2 120.2 91,6
52 650 3 3.,,8 127o9 137.8 92 . '8
53 65.1. 9.7_ 107.0 119.0. 90.0 1
54. 649' 6..9 106.0 go..I
655 z 2 M91.1 121.8 126 5 96.4
56, E I F ue rte St.1 2 16.0 113.2 120.2 94,1,
Ste 63+00
57 653 2 IM 109.3 120.2-`.~. 91.-.0
58 654, 1 9.2 106-.4 117.1 4,;` 90.',7
59 652 1 14.0 119.2 132'i I M3..
60. 656 13A 114.9 126'. 5 90.8
61: E I F ue rtie St. 4 '12.8 108.0 120.2 90 -0
Ste. 63+00
62 El Fudrte Sto .,,2 I ]:`,i. 3 1 10~4 120.2 92 0
Ste. 65+00
63 654 - .5 14.2 119.0 126.5 94.1
64 634 2 16.8 1119.0 93.3.,.
.05 633 4 16.7 110.0 119A 92-0 5
66 El Fuerte St. -6 14.0 10 7. 9 11 Bo4.. 91 i:-O
Ste. 63+00
67 665 .4 13..7 118.8 126..5 94o.o.,; 68 655' 6 14.7 1204 128.1 94.1.
69. 665- 8 16.5 122. 1 128~. 1 95.3
.70 El Fuerte St. 6 14.2 119.3 128'. 1 93.2
Ste.' 65+00
71 592 2 9~7 119.5 126. 94.
72 592 4 -5 10... 120.7 126 5 95' 5
73 El Fuerte St.. 8 15.7 108.4 120.2 9M
Ste. 63+00
Finished Grade
BENTON ENGINEERING, INC.
Project No~ 71-3;;-24D. `-T' 3
L~ CestdWeadows Unit- No. _4
'TABLE OF.-T.EST RESULTS" (CONT.)
Approx- Depth
Imate of rF III field Dry Dr* y
-Test Locatfo'n .'at Test-. Moisture Density Denslty-__ Percent
No. 'Lot No. In Is F 'et 0/6,,dry wt I b/c " ft u I b/c u, ft: *R m Compaction e
74 E I' Fuerte St 10 13.2 112.1 123. 90,4
Sta. 63+00
75 E I Fuerte St. 14.6 117.1 12~. 5~ 9.2.6
S t a" . 65400 4:
76 665 12 11'. 3 120.7 131. 4 91.8
77 656 8 1112. 113.3 '123.5 71.9
.78 El FUe
,
rte, St. ~14 11.8 118.5 126.5 93.7
St6.. 65 400
79 64.9 8 181.9 108.3 120.2 90.1
80 641. :1 19
.
1 108, 1 120.2 9.0.0
81. 634 6 ~14.6 116.8 123.5 94.6
82 635 '.2 15.,6 117.1 123.5 94.8
83: 8 15.5 114.14 123.5 92...T.
S4 '.642 1 113.2 120'.2 94.4
.85 E I Fu-e rte St. 12,
14,
*
4
13.7 115.7 '123.3 -9.3.:.9
S t "'a" . 63-fOO
86, E-I f.uerte St 1,14 13.5 1- 106A 117.4 g..'l 9
Sta. 63+0V
87 '640, 1 11.6 30.2 137.8 94.6
88 .655 10 .8.6 132.2 137,8 96..Q
89 E 1. Fuerte St. 16 A 126.2 132.1 95,5
St 6. 63+00
90 E[.%fuerte 'St. 18 11.6 122-.21 132,11 .92 4
-S'to 63+00
91 E] Fuerte St. 20. 11.2 124.2 04.1
Sta~-63400
92 EtFu606 -St.. 22 11.1 122.5 132.1 92.8
Std.. 63+00
93 - 592' 6 12.8 122.5 -128.4 .95.3
.94 .591 I~ 12.7 -122.4 128.4 -95 .
.95 692 10 10's:9 125.0. 95.2
96 '747 1 16. 1 110.6 120.2 91. 9,_
:97 .747 3 14.5'. mg.3 120.2, 91.0
98 .747 19. 1 106.6 '115.7. -92.1
99 747 :7 18.6. 10&Z 115.7 .'.921.1
100 '747' 9 12.5 104.111. -1 -15;3 '90.3
101 '747 11 14.7. 108.3 117.4 92.2
102 586 15 16..'5 107.1 -115.3 92.9
587 2 '10.. 4 102.-9 110, 6 93.0'
104 717t: 31 .15...9 - -1:1,2.3 117-4 '95.A
BENTON ENGINEERING. INC.
4. -3-24D o; 71 T-4
Lo Cdsta" Meadows Unit. No. 4:
TABLE. SICOINT.)
I 4prox- Depth.
Imate dfill F141d Dr y Dry
Test Location at Test )&iiturId Densif y Denisify P6r,cent,
No- Lot'No-. in Feet, y W % dr" 1 b/c U fj u .ompaction" Rdffidks
105 587 4, :15.7 119.5 126.5 94.5
1~06 AJ iima.st. 2 19.8 120..2 92'. 8
Sic. 24-M
588 14.1 10 9'. 3 120.2 91.0,
.108 586 i 7~ 1.7.7 110.7 120; 2 92
log.. 5V 11.2 107.7 115.8 911
ilO 'S 7. .11 .' 7 105.9 1 15.1 91.5
I) V Alisima' St .,)06'6 120.2 88.6 R worked e
Sic. 24-+00,
.1.1.2 711 13, -5 110;5 1 -M9 93; 0
71.3 . 715 38 .12A, 104;9 115.; 7 .90-7
1.1.4r 71.4, 39 12.4 A06.7 118.9 90.0.
1 ~716 33 14.9 108.- 3 418,,9 91. .2
-11-16 El"Fuerte St. 24 15. 4 198.J. 120.2 90. 0.'
d '63+ Oor to.
E-1 Ouerfw St. 20 l j . 4 10.0 J~3.2- -91.7
'Sta. 63+00',
-j,lB 58 8 6 15.1 107.6 117.2 91.3.
1,19 587.' 14 126.6 1 3~. 8 91-
120 588 10 6.3 128-0 137.'0 93. 0
121 Allisma.St. 6 L6 120-2 132.1 91.0 Check on 01
. I St.a. 24+00
122 580 :, - * 1 4, 5:2 .129.9 1 137.8 4 9 .2:
1,
1
23 7.,] '16.1 107' .0 118.0 go. 7
124" - 4:: 71
.
43 16J-~ 10'7. 1 i 18.0, 90.8
1,25 7-1 42, 15.1 115.9 1 1~6.5 91.7,
126 71 37 ',15-.5 114 .-3 126.5 90.4
~127 -711 35 15.0 119 -,2,:'' - 126.5 94.3
~8 '586 19" 15.3. 120. 0' -.132. g,
'588 - 14 7.0 1.117.2. 130.1 :90.0
PO 589 - 8 16.2, 1 M. 3 130'. f 90.9,
',1.31 ~89 - - 12 .15 * 7", I- I "
-1 IT .8 , I 130. 90.5
I j2 .742 131 - J3 .6. 123.2,,,
33 742 15 116 122 - 6' 132--1 92.8
~14 Alisma St. 2 :18.6 112.2 .120.2 93.4
Sic'. 15+00
588 12'., 3 115.3 126.5 91.2
;:136 589 -2 15. fl 4 1. 0 126.5 90.2
37 587 -18 15.5 107- .1 18.0 91
138, Allsmo St. 5 16-6 108.7 1 MO 92., 1'.
Sic. 15+00
BIENTON ENGINEER.I?4G. INC.
Project No T-~5
Costa adowVU1niit;:No. 4
TABLE OF~ TEST RE5ULTS'(CQ.NTi)
Appro.x.' .,.Depth Maximum
Fill- - Field -Dry bry
Test -
imdte
Locaflon at Test Moisture Density Density Percent
No'. Lot No.,-' In Feet., % d wt lb/cu'ft I f t Coin action, :Re.m*erks
30" 588 22 13.2 109~9 120.2 91.3
140,' 607 2 15.3~ '-.'110. 4 120.2 1
141, Alisma St. .2 16.7 .111.6 120.2 92.-.7
Sta. 17+00
142 740 2 MO 111.9 120.2 93_1
143 .739 6 17.2 117.2 -128.4 91-.4
44, -737 2 14.9 '116.. 2 126.5, 92.0
..145. 740 6 16.4 111.1 .120.2 .92.4
1:46- Alisma St.' 9 14.0 -8 1117. 126.5- 03.0
$to 15+00
10 '59.1 .5 13.2: 117.9 129.4 .91.8
592 4 16.8 114.1 '126.5 90,2
-~597 1 12.6 .94.4 110.6 e r 85.4 Riv~oiked
150 Obelisco St.' IL2 120.2 .90.6
Sta.' 6+25
-15-1 Obells6o St. 4 15.5 1106.7 118.4 ~90..O
-S-ta. 6+25
152 591 9 16.5 104.~ 6 115.5 110'. 4
-1 5~ 597' 1 19.1 1,11.8, -110.2 93.-0 Che ck on 0145
-164 .592 18 16.2 106.8 115J 02.4'
1~5 _596, 2, 16.4 112.6 123.2 91-4
2 '2-1 4 113.3
J 7 5 598 2 '16.7 106.2 115 iJ 11 9
''158 -713 21 19.'5 101.8 111.~ 91.5
.1 52 2.3 '18..g 103.5 11 4.~ 2 -00'
-:i, 160. ,626 10.3 119.3 ' 132.1 .90i.3
-16.1 598 :6 16.2 .114.6 -93.0
~162 - .593 3 J '14.8, 114.5 -,.93.0.
163 591 13 15.8 1211.7 132.1 92.1-
..164 592 .22 16.9 116.6 t128.2 OLO
-598 10 13.5 122.9 -.132.1 -93.~O
166 .691 u 15 i4 '109.3 1-19.0
167 V5 6 .123.2 0.
6 1 8 - 3. .150. 7 :124.0 ~132.1 ~94,10
11,69 ~625 ..12.6 117. 7 ,128.2 '91. 9
-60 4 16'. ' 108.7 115~.6 .94.1
.171 644 123.;8 93.)
112 643 1-1 105..6 115.6.. 91;*4
-1 73- .648 6 11.7 110.3
174 6424''., 5 11.9 .1-12.-5 118.9' -94.7
175 641 ..5 13.4: 112'7 118. 9' 94.8
BIENTON ENGINEERING. INC.
NO'-.*:' 71-3-24D T!--~6
L~ Costa' Meadows, Unit-'No.' 4-,
-TAB LE OFTE ST, RE S U S, ONLY LT,
tic
Appirox- be p ma x1rhu" m
imate off il I F W ld Dry Dry
Test' Location" at Ust. Mois'ture Density Nthiitly Pe'rcdnt.
N 0~ 0 Lot No. In Fe 4, e W dry t lb/~u ft 16/6 u ft., ~'C rhpqdt.idn tks 0 emb
176'.' 646 2' 15.7, -109.6 .117 -A 03.3
77; 642' 9 9.8 110.1 118.9 92.6
178 640 3 12.41 108A 118.'9 91.3-
179.... 638 2 10.2 112.1 .122.3 91.&
160'. 643 5. 17.3 102.7 118.9 86.5 Reworked
643 .5 8.7 -.122.3 .92.'6 Check on..11'
182 651 6 14.7 109.2 120.2 90.~ 9
183; '649 12 13.4 106; 7 .116.1 92.0
.-184- El Fuerte St. 28 -3 102.8. 1 T6. 1 8M Reworked
%--Sta~.--63+00
185; E I Fuerte Sf~ A -14.3 109.7 116.1 9410~ Check on #1
S a 63+00
186 El Fuerte St; 30 13.1 .110.3 .122.0 90.4
Sta'. 63+00
1871. E [Fuerte St. 32 114.1 122.0 93.6
Sta. 63+00
655- 10 9.7 115.0 122.0 94.3
189. 664 4 10.1 113.9 .1 22'. 0 93.2
-190:' .'6~4-' 9 12.1 7 108.1 .1 0.1
191, 653,
- 4 12.1 108.3 .116.1 93 `4
663: '2 12.4 111.2. 122.0 .11. 3
191; 8 11.5 105.3 116.1 90.71,,
194'- 648'
.10 8.4- 106.2 11707 M 3
195 650' 7 13.4 110.6 122..0 9007
196. 646' 61 10.5 109.0 .1.16.1 93 i.9
197 647, 12 14.4 107.7 t..1119.0 .90.5
645' - 3 12.:0 111.8 122.0 91 -6
199 6-40 9 '17.0 102.7 112.5 90.4
200,.. 643*- 9 13.1 107.3 TI 7.4. 91.4
201 655 14 8.0 117ti .122.0 -96.0,
202 656 17 12.9 112. 6 122.0 92.3
203 665 16- 13.9 110.0--, 11.9.7. :92.6
204 '649 16 .16.3 109A 122.0:. 90 :1
20~ 653 6 13.2 112.0 122.0 OL9.
'El'Fuerte St. '.'2 12. -112.4 -122. 3' .92.0.
Sta'. 67+00
El Fuerte St. .:36 12.4 109.3 1'.] 9. 7 91.4
Sta.'*,63+00
208.' 649 20 10.7 110. 0 122.'0, 91.5
209 E I Fuerte St. 40 .12,* 5 .114.0 -122.0, 93.5
Sta. 63+00-
BENTON ENGINEERING. INC.
Pr6iect No. 71-3-24D 'T -7
Ld Cosfa~ Meadows Unit No. 4z~
TAB LE OF TE St RESULTS.(CONT,)
A PProx-- Depth 'Max libum
imate off i I I ',Field Dry D ry.
Test Locat I n 0 at Test Moisture Density 'Density Per nt ce
.,No Lbt No* in Feet %6 dry wt u I b/c ft. I b/6u, ft.,.' Compaction' Remar6-
210 646 1 0., 13.0 -, 104.8 116.1 90-3
2 11. 652 5 14.1 J, 107.6 1 17A 91.6.
2.1.2.1 6512 9 10. Y, 113,0., 1100*7 94.'5 ..,,213, E 1. Fuerte.-St. 1.0 9 107.5 119~5. -.90.0.
Sta. 65+00,
214 E I F rte St. ue -44 ',-16 & H1.9 123.0. 9.1. 0
.Sta.. 63+00
215 665 20. 1.8 110.3 122.0 '90-.~
648 14 5' :11463 122.0 93- 1,
217. '641, 9 7# 4,, 115.2 127.0 94. 6"
218 6.40 13 14.6 .113.7 122.3 92.9
219 64-, 18 11 1 110.8 122.D -90 8
220 641: 13 -7 11. 109.8 122. 0 90.0,
221 649 13 13.6 111.2 122.0. 91.2
222 643 13 0 11:1 0 112.4 122-.0 92.2,
223 647 .16 12.1 122. 92.7~
224 642 17 '15.9 108.0 119.Q 90.8
d225.~. .644, 5 15J 1,10.4 12 2.0 90.6
226: 645,,-, 7 16.2 1 08.6 118.8. 91..-5:
664: 1 42 105.6 116.1 90.7
E I Fuertis St'. 48, 16.5 111 i2 118A 93. 9-
Sta. 63+00,
:~-.229 655 18* -2 120 .114.0 122.0 93.5
230~ 599': :2 -13.5 111.4" 122.0 91.4,
.-'231 599 41 '14.5 118.1. 1263 93' .5,
.232 600 15 6 110 6 122 Q - 9006
233 592 26, 12.0 1.13.2 122.0 102.
234- Argonaota Pl. 2 1,001 117.2 .122 0 9.6.2
I'Sta. 3~00
2~5 ArgonaOtd K. 2 1112.6 122.0 92.3
Sio, 11+00
236 -Argon'.au:ta -Pl. 4 9.8 111.9 '11 22. 0 .9
Sta. 12+00,.
Argonauta, Pl. 2 18.8 108.7 116.1. 93.4
Sta. 1349V
238 Ba'bi Ionia $i 2 .10.4 107.4 119'.0' .90.2
St :. 23+00 a
Babi Ionia St. 2 17.7: 109.0 .1 1611~ 1 93 -9
Sta.-,24+00
240 Argonauta P.A. 16.0. 110.11 116.0 95 0
S -14+00
Finished, Grade".
'BENTON ENGINEERING. INC.
Pr
-
oject No. 71-'3-24D T-8
ld Costa- Meadows Unit No..4'
TABLE Of- TEST RE.SULTS (C-O'NT.).
Approx- Pepth: Maximum,
imate offill' ie Field Dry Dr
Test. Location at- Test Moisture Density Density -Percent
No.. Lot No..: in Feet % dry wt lb/cult lb/isuft- Compac ti6n
Babilonia'St. 2 13.8 109.6 116.7 94-0
Sta,. 20+00
Babilonia St. 2 15.0 122.0 91.2.
Sta. 14+00
243 'Ba6 1 Ionia St. 2 13.9 .111.9 122.0 91.7
Sta 24+00
244 Babi Ionia. St." 2 11.8 - 102.2 113.5 Z 90.3
Sta.~ 10+00"
245 a Babiloni St. 4 11A 105.7 116.0 .'91-: 0
Sta.- 9+00
2.46:. Babil6nia St. 2- 13 ~O 107.4 116.0 92. 7 -
Sta.~ 8+00,
247. Bab.ilo'nia St. 12.2 108.2-, 1.14.0 93vil 4..
Sta. 8+00
248 Babilonic St,. .2 13.8. 104.2 1.16 0-' 90.0
Sta., 6+0 0
249 Babilonla St. 8 13.6 106i9 1.16.0 '92.. 0
Sta. 9+00
250.' Babi Ionia, St. 4 12.5 114..4 120.2. 96. V.
Sta. 11+00
251' Bo6i Ion ia, St. 6. 14A 104.9 116.0 90.4:
Sta. 10+00
Babilonia.St. -2- '103. 4 1,13.5 qj.. 2-
Sta. ~ 5+00
253 Ba'bi Ionic St. 3 10 105.7 116A 91.1
Sta. 4+00--
254' Babilonia St~ 4 10.1 1044.4- 116.0 90*1
Sta./. 7+00',
255, Babilonia St. 8 13. 7' .103.3, 91.2
Sta. 10+00
.256 Babilon'id Sts 10 14.4 109.9 122.0 90..0
Sta. 10+00-
.257 Babilonid 'St. 2 7.4 113.9 122.10 93.3
12+00 'Sta-,-
258 Obolisco -Pl. 2 10.6 104.4 116.0 90.1
- S 1+00 to.
259 Obel isco Way 2 1.1.0 104.8 114. 0 90..2
Sfa.-, 21 +00
260 Obelisco St. 6. 14.6 .122.0 90.7
Sta. 6+25
Finished Grade
,BENTON ENGINEERING. INC.
Project No. 71-3-24D. J-9
la Costa"Moddews Unii-.Noe" 4,
q w TA B LFOF TE STRE S U LTS..(C 0 NT
Approx a um. Am
Imate of Fil,l:,: F le ld Dry Dry
Test Locatien at Test 'Mollsture 'Density. Density Percent
No. Lot -No. in ~f ee,t 'X6 dry.. v t - lb/cu ft, lb/cv,ft Compaictle: n' Remo(ks
261 Argonauta St. 12. 11.51 115-5 122.0 '94*7
Stb 6 '7+50
.262 Argonouto St. 4 11.0 107.9 116X 93.0
Sta. 74-50
~2.63 599 16.1 104A, 116.0' 90.0.
'Argonauta St. 6''Y',. 15.8 122.0 123.8 98.7
Sta. 7+50
265 600' 15.2 106.0.1 116.1 91.
266 597 5 -10'.6 119.0 90.8
267- ~596 6 10 .5 109.2~ 1 91.0
-268 593 11 9.4 105.7 -116.0 91'.0 -
269 21, 13.2 1 15, 5 123.2 93.6
270 592 30. .,13.6 1-5.1 123.2 93.4
271 Obe I isco St. ..2 11.3 1,06-.7 .116.0. 91..9
Sta. 13+00
272. 14 12.4. 1-1 3~. 0 122.0 92.
273'. '5 -1 9~ 25 IQ5. 8' 117',5 9.0.0
274 -- 593 15 15.5 103.7." 115.0
595-. 4, M& 108.2 119.0 go . 9
276 626 5- 11.8 106.2 i J 6. O~ 9-1 . 6~,
277 .590 1 15.2 106.9 116.0 92.1.
278 625 18 11.8 , .113.0, 122'. 0 _92.6
279 Babi-lonla St. `2 14.7 106.0 .-116.0- 91'e 4
St'a. 18+00''
280 A~gonauta $t. - 8 14.2 10M 116.0 91.0', St
-281 592 34 0 08 3~~ Al 9. 0
282 -.'.526 9 M3- 109.6 1,19.0, 92.0
591-, 29 3 106.3 -115.8 92-*- 1
284 593 .19 -16.9 106.2 116.0 - 91.6.
.590 5 13J , 104'. 1 116.0 90.1
286 594 4 -12.7 103.8 116.1 8 0 2 R6Wo'rked
287 625 22 11.1 .113.5 91.2
288 592 38, 9 8' IM4 116.1 94.3
~289 El:,Fu'erte St. ~52 10.7~ ]MV, 02.0 94.4
Sta.,:43+00
290 597 9 105.9 116.1. 91.1
2' 1 E I F ue rte. Pu m .15..5 '109.7 120.2 91.1..
Station
-292 E I Fuerte Pump 4, 15.1 111.2 120'2 92'. 5
Station
BENTON ENGINEERING. INC.
Pro jiact.`N~~ 714-241) T-10
La'Costa: Nlea'dows:Unit No.. 4
TABLE OF-TEST RESULTS (CONLY.2
Approx- Depth Maximurei
im'qte of Fill-, Dry. bry!'
'Test" Location at Testr~ Wsiture Density, Density 'Percent
Noo Lot No. InFeet. % dry,, wt- lb/cu ff~ Ab/cu-W Compactioini; ..Remarks
293 601 3 10.3 117.3 126o5, 92.8.
294 599 12 13' 1, -1105.8 116.1 91.0
295 'Babilanla St. 4 ..12.3 109.0 1119o.0 91 61
Stao 13+00
296' 601. 7 10.8 118o0- 122.01 96.7
297 594 4: 10* 1 110o4 -0 116. Check n, 0286 96.2 0
298 596 10 13.9 114.2 122.0 93.7
299 602 2., ''17.1'. .106.1.. 116.0 91.-o5'
300 621 2 10A. 106.4''. 116.0 91.0.
310V E I Fuerte Pump 6. 16.9 110.0 120.2' 91-4
StaticIn
302 El Fuerte Pump' 8 17.3 108.8 120.2 90.13
Statipri i
~,303 607 2- 12.1 106.6 116.1 91. 7'
304 589 20. 17.4 102o3 .113o5 90.3
305 607 4 17.4- 106.3 1161.
X 91 6 6'
306 589:. 24. 17.0 103.0, 113.5. 90.8
'307 Inter. Corinfla 2, 11.6 108.0 i 19.0 906 7*
Argo'nauta Sts.
308 589 28 13A 108.3 11900 91.0,
309. Anttr~ Corintia -6 9.3 105.:6 11900. 880-7-- Reworked
& Argonauto Sts.
310 .607 8 18.2 105o5 114.2 92.3
607,,''~~' 12 14.8 104.6 116.0 .90..11
312 608- 2 M6 104.8 116~ 1: 90-1
313 607 .16 16ol. 110.9. 121o] 9164
314' 606 4 9.8 119.0 96.2
315 608 6. 13.3 106.8. 112i,2 95oO
316, -607; 20 14.2., 105.1 116.1, -6 90.
317 '606 8 904. 110.2 119.0 92.7:
318 608.1 117 105.7 116ol 9160.1
31.9 , 606, 12 9.16, 11M I i9.0 92.9.
320 637- 2 13.3~ 101o3 1.12.2
32.1 636 2 13.9 1 U. I 120o2 97i, 4
322 635 6 12.9- 108.2 119.0. 91A
323 636 6 18.8 101.6. 112o2', 9Oo4
324 635- 10 107o] 114.2 93.8.
325': 636"" 10 15. 1, 105.2 .114.2 9262,
326 637 6 17'4' 103.3 114.2 90.4..
327 .,639' 4 12.5 107.7 114o2 94.1
641 17 14.5 107.5 116.1 92..6
BENTON ENGINEERING. INC.
Pro*14p'ct*, No., 7U-3-24D T:71 I
a,Costa Meadows Unit, No.; 4
TAB LE OF TEST RESULTS (CONT.)
Approx- Depth Maximum
Imate of Fill Fielld Dry Dry
Test Location at Test Wsture Density Density, Percent,
No. Lot No. -in Feet dry wt' lb/cu f1t lb/cu ft Com action Remark, p
329 635 14 .21.8 M5 109.5 91.0
330 636 14 16.3 100,'6 111.3 90.2
.33 V -608 14, .12.3 106.1 116.0 91.5..
332 6 21.4 99.9 111.0 .90;0,
333 .608 18 13.2 107,5 11744 .91.5
334 -609 .2 9.5 124.3 .132il 94.1
335 635 .18 -20.2 105.6 u 6i; 1 90.8,'_
336, 609'' 6 .9
* 6
125.1 132.1 94 7
'337 636 18' ...16.6 111 3 91 &.7
338 - 434 10. 106~.6 .1 17i. 4
339 '635. 22 119.9' 102.01 113.3 90.01,
i340 633 12 16.8 %.9 109.8, 90'.1
341 636, 22 16.6 112.0 '4 117. 95.3
342. 334 14 20.11 '100.
1
11 L 3 90..0
343 .633 16 11.0 109.3, -116.1 ~,I--M2
344 637 .14 .12.6, 105i.0 -1-16i 1 90!-5
.345 -.619 11.9 108..3 120.2 - -.90.1
-7-1 346 -.638 10 '17~3 107. 7 11 7~ 4 ..:..91. 7 -
347 %639'. 8 13.2 10M' -117.4~ ..92.2
348' -.639 .12 13A 10M .1-17.4
349 641 17 16i8 101.3~ 1-11.3 ~.91.0
350- 637 .18 170 3 106.8" 117.4 91.0
351 642 21 16.5 101.0 11:1 i.3 90.7
352 605 2' 7.6 113.8, ~121.4 93.8
353 '616: 4 11.9 123.3 91.9
354 641 21 1302 11M .1174.4 93.7
.355 64,4 0 1 1
.
El
I 05.7 116.1 90.9
356 -.643 17 M. 0 114.0 122.3 93.2
357 -605 6 15J 116.2 126,5 91.9
358 641 '25 .15.3 '109.0 117A 92.8:
359 642 25 16.8 .108i.2 117.4 92.2
360 665 24. 13.7 -111 3 123.3
361' 642 29 12.8 114.0 122.0 -93.5
362 643- 1309 107.3 :119.0. 90A
.363. 633 20 '.11.1 .115.3 122.0 941.5
364 635 26 1768 106.31 . 17. 4 90.5
-365 .665 28 15.1.1 -.119.1, 1.32.1 90.2
366 638 14 13.4 111.3 122.0~ 91i3.
367 644 13 .13.2 105.0' 116.1 90.5
368 Corinna St. 2 .14.2 .107. 1~ 11 7.4 91.2
Sta. 2+00
BENTON ENGINEERING, INC.
-project:No. 71-3-24D- T- 12
La Costa 10eadows Unit-No 4
TABLE,OF-TEST RESULTS .(CONTJ
Approx- Depth maximum
imate off i I i Field Dry Dry
Test L~oc'dtion at Test Wolsture Density Density Percent
No Lot No. in Feet % dry.wt :lb/cu'ft -11:I/cuft -Compaction 'Re'marl~
369 643 25 14.0 108.3~- 117.4 3
3710 '639 16 10.2 110.1 122.0-- 90.3
371 665 32 10.5 124~3 132. 1 94.2
372 590 .9, 12.2 108.2 119.0 91.0
373 664 12 13.2 123.0' 132.1' 93.2
.374 31 11.7 107.5 1.17.4* 9 1.6
644 17 13.3. 108.3' W.4 92.3
V6 624 2 15.6' 110.7 122.0 90.8
377 622 13.9 111.4, 119.0 W.6
378 *621 6 1409 111.81 122.0 ~],J
V9 664 16 16.3 122 .7 13201 M. 8
~80 664 .18 14.4 123.6 '132- - 1 '03.'7'
381 -623 .4 12.4' 11 2.3' ]~'4 95.6
.382 .6214-. 6 15.2 108.2, 117.4
38~3 622. 6 13.1 _110.4 117.4 94.1
.384 El Fuerte. Pump 10 13.0 109.9,-, 120.2 9.1 A
t n' S dtio
385 El--Fuerte Pump 12 13.8 121J 132.1 -.91.7
386_ E I Fuerte Sr. 2 1.3.9, 121.3 132.1
'Sta. 61+00
387 651 - 13.1 122.0 95.8
654 13 15.0 116.3 126.5 02.0.
.389 621 10 13.0 104.0 114.8 90.7
390 622 12.9 103. ' 6 114.8 90.2
391 623 8 13.9 112.,5 122.0 92.2
392 654 17 ]L3 113.2 123.3 91 .8
655 22 *2 IL .115. 6 12 6.5 1 9-43
394 614. 4 14.8 111.6 91,.-6
195 664 22 14.8 127.2 137.8 92'3 1 0
396 615 2 10.0 '8 109. 119.6 -9
397 653 8 12.0 114i3 122.0 .93.1.8
398 -E I Fuerte St. ~4., 15.6 -116,3 126.5 92.0
Sto. 61+00
399 656: 16 12.0 111.1+ 119.6 93.0
400 655 26 11.8' 113.7 122.0 .9&2
401 1 656 20., .14.8 IM? ~,122.0. -94.5
655 30 11.6 108.7 119.6 9LO
403 656 24 12.8 109-.4 IM6 9L7
404 614 2 13.5 .109.8 117.7 93.3
405 644 19 18.7 98S* 113.5~ 86.8 Reworked'
BENTON ENGINEERING. INC.
C Pro le " t -No. `71-3-24D f6-13
Cost'a ea ''M idows Unit:No.
TABLE 01'JESTIESULTS (CONT.)
Approx- Depth' Maximum
imate of Fill Field Dry Dry
Test Loc ation at Test Moisture Density Density, Percent,
No. Lot No,. :in Feet % dry t w Ib/cu f, t -.1 b/c u f t p n Com actie K.erhorl
406 653 10 12.2- 113,T .112.0 92.9
407 650,1.. 11 1108 113.2. 122.0 92, 9.
.408 653 14 16.0 122.0 90.1
409 652 14.1 104o* 116.0 910. 2
410 651, 14 11.4 107.1- 116.0 92A*
411, 650 - .15 9.9 .116.0, 124.2 9M.-
412 651- 1 8 11.5 115.Z~ 122.0~ 94o5
413 648 22-1 11.4 118.8~ 122. d' 97.4-
414 Elfuerte 14 1441 111.1 122.3 .90.8,
Pump. Station
415 El"Fuerte- 16 .11.8 112.4 122.3 92'0
Pump Station
'41:6 643 31 T42, 104.5, 116.0 90.1v
417 El Fuerte St.. 2 12.1 2 117.3 130.0, 90.3-
Sta. 59+00
418 593 .23 10.8 106.9. 116.0 92.
419 11, Fuerti Ptjrhp 20 12.8 117A .1.301.0 90.4
Station j
.420 .597-:-- 15.6 107.4, 119.6 90.0
421 643 2~* 12.9 108.41 .119.0 91.1
422 641 28 14.3 - 109 6 119.0 92. 1 -
.423 590 11.5 11.3 111.6 122.'0 91.5
424 591 32.5 -16-2 111.4 122.0 .91. 4
425, -592 39.5 12:5 .107.3 U 6'. 1 92.51
426 594 8 16.2 1:10.6 118.8 93.2
427 595 7* 13.0. 110.0* 119.0 92; 5,:
.428 597 15 * 13.2 108.0 119'0 90.8
429 596 12 * 12.7 114* 1'. 0 122oO 93.4'
430. 598 14 -16.9 106.8 117.4 00"9
431 625 241* 12..1 07 2 116.1 92.3
432 620 2r 13.0 109 8.. 122.0- '90.0
.433 619 .8 13. 0_~ 111.0 122o3 90.8-
9" 17 12.6 109-3 117.6 9L-,6
435 638 16 14-9 1Q8.2- 119.6 90.7
-436, 640: 21.5 * 13.6 1124'~ 122.0 :91
437 637 22.5 * 12.5 , ",98.8.-. 113.5 87. 1 Reworked
438 -636 -26 15
*
4 107.5,', .119.6 90.0 ,
439 605 10, .14.1 10807- 120.2 90; 4,,:
44o., school Prop.i .4 -11.8 U 3, 1 122.0. -9208
S. E., ~C' orner.
441 634., 18.5 8.7 119i5 126.5 94.5'
442 633 22 11.8, 104.4 116.0 90.1
Finished Grade'
BENTON ENGINEERING, IN C.
Project No. 71-3'24D 4
La Cos~q Meadows Unit No
TAB LE OF TE ST RE S U LTS (CO NT.)
Appr.ex!v.~ "Depth Maximum
Amate Of F~i.l I "Field Dry Dry
Test Location at Test. Moisture Density- Density Percent
No. Lot No~. infeet /o dry- wt I Ib/cu ft 'Ib/OU ft Compact,.-ion RemaO
.443' 609 8*, '13.5 11 VoIr 123.3 90.~ 1,
444 635, 28 12.1 103-08 116.0 89.5 Reworked ..445,.. 597 - 14 14.6 1.05.7. 116.1 - 91,11
446, . .600 9.5.* , .13.5 106.8: '116.1 02.0
447 -61-9 8 12.3 111. 3' 122.0 91. 3
448 601 9 13.5 120.1 -.98. 5
'449 620, 6' 11 . 9' 115.5 , .122.3, 94.4,
4,50 .602 3 10.4-~ 103 A, 11 4.8. .90.2
451, *603' 2.5 U.. 11,1 . 7~' 122,.0 91 o 6'
452 .619 .12 14.7 , 120.2 132o t 91.0,
453 586 21 1~ '12.4 112.3 1221.7. 91. 6,
454 587. '20.5 11.7- 119.7, 126.5 '94.6
455 U6 11 13 0 116.0~ 122. 0' 95.2
456 '627 2. 12.7 105.7 -116. 1 91.1
457 647 20~ 10.9 10~.5 116.0 94.4
458 El Fuerte St. -6 12o2 116.0 126. V- ~.91.8
459 627 4 '13.1 , 103.1- 114.2 90.8
460, 627., 61 15.2. -98o2 -85.9 Rework.ed,,~'
461 '617,1 2 18.1 104.2 116. 0 :90.0
462 589 29 11.1 112.0 122.0 01.8
463 588 26 10.0 116.2 126'5 91.8
464 Et Fuerte Pum 24 12.14 1,1-7oO, .126.5 .92,.5
S tgtio n,
465 627 -6 15.3 102.3 113.5 Check on
466 627 8. 12.5 103.2 114.2 90.4
467 627 10~~ .10.5 102. 3 113.5' 90._2
468 713 25-* -17.1 107o8l 119.0 90.2
469 714 45 10.5 119.1 126.5' 94.3
470' ~331 1 131.7 106.0 116.9 90.7
471 630 3 ,-16.31 -103.9 113.3 91.8
472; 630~ 5 17.01 102.7 -11 3.3'_ 90o,7
4731 '6~9~ 1 14.0- 106 i.6 , 116. 0 ~91.9 ;
474 ;.628 1 17.7 .1041.4 116. f ~~90. 1
475 628 14.9 110,3 '122.3 W, 2
476 609. 10.1 13.0 120-.2. .126.5 95.2
477~ 610 15.9. 112'6~9. 120.2. 93. ~8
478 623 -1.0 .13..2 1.16.2 122 95.3
479 609 .12 15.5 114.9 IM'2,)\-~` 93.8
48,0. 624 8 -15.9 , 102.4 113.5 90.3
Finished -Grade
PENTON'ENGINEERIkIM., INC.
Peojecf ~No.`71-3-24D T 15
La Co0a Meadows Uhit'No. 4`
TAB LE OF TEST, RESULTS (CONT.)
4prox_ Depth Maximum
Imate OfFill 'held, bry Dry Jest.:' Location at Test' Moisture Density Densit y:. e P ident" No. Lot-No. In Feet % dry wt lb/cu ft I b/ t t~ ft Compa e'tbDn;*:'R-'mt6. e
48 T'I 610 4 15.2 1 IC 1 126i.5 - 9002- 482. 6 13 2 '15.7 109.4 .117.4 93.3
483 613 4. 7.,9: '108.3 90.7 484. 613 6 12.8.- 113.5- 122.0, 93.1 4185 613 8 .11.1 114.5 .12200 9309 486-', 646 18 14.1 112.0 122.0 91:.8 487 2 1 18.3 102.4- 113 0'2 90.6 488.. 645 11 18.4 105.5 .116.1 90'.9 489,-..,- 645 15 14.7 '113.5 122.0. 93.1 490 645 17 15.5 109A 119.6 91 5"" 491%..- 62Q' .10 14.8, 115. 1 123.3 91A 492 604 2 14.1 117.1 12665 92.6 4.93 611 18.3- 1111.3 1.2363 90.4 494: 620 14 14.6, 120.2 126.5. .915.1 663 `6 14.0 109.1 116.0, 94;2 496 - 6.17 10.5 115.0 122.0 94.3 497 8 T. 1 116.8 122.0
498 663, 10 10.8' 107.7 119'.6 .0 900 499'. 663 12 15.1 100.2 111 X. 90A -50 0 6163 14 11 6 119.3 12260 97: 9
501* 619 .20 16.7 119.4 126.:5 94A
.502 663 .16 12,0 _115.7 94.7 503 662 .2 16.2 116.9 93A. 504 661. 1 18.9 -
108..5
, 103.0 1.12.8' 91.4
505 662 .4 16.8 .109.5 111.4., 93A 506 ~6 K. 1 122.2 132 1 924 507 .604 .4, 10.1. 118.0 1260'5 9304, - 508-- 629 5 108.3 116.9 9267 509- 628 -_5 ~13.9 108.7 116i.0 93; 6,
510' 660 '2 15.3 111.9 122.0 91- 7,
511 630 7 12.1 .120.4. 122.0 98:7 512:. 662 6.1 12.3 113.3 116.1 97.6 5.13 659, 14.1 126.5 93.0',:, 514 6159. 16.0 105.7 11208 9&8
515 658 11.1.8r 122.0 91-5 516 659 5 12.4 120.0 122.:0 98.3
517-' 658 3 18.8 102.8 112.8, 91.2
518, 658, 5, 19.1, 109.6 1 12'. 8 97.3,
19 458 7 1905 102.4 1118 0 91.1 520' 657 2 17.1 1.05.5 1 U .2 941P 7
Finished Grade
BENTON ENGINEFRING. INC.
Project No. 71-3-24D T4 16.
U3 ~:Cost'a M eQ8QWSr:Unit,.No.4
TABLE 0FJEST.RESUL JS (t-ONT:4)
Approx- Depth maxipl.um
"'Imate, of Fill Field Dry Dry
Test Location at Test Moisture Density Density 'Percent
No. ~pf No. Infest % dry wt ib/cu,ft lb/ou ft,,. Compacition, RemQrks
521 '631 3 15A .111.5 1. 1 16bQ 96.1
.522 647, 22.5 12.0 109.6 1 17.4 93.31
- 523,~ 618 4 11.8 114.2 122,0 93.7
524 ~,:-632 2 17.4 108.5- 113
-
.6 95.5
'525. 614 6 17.4 110.9 119*.6 92.8
526. 1.657 4 16.7 101.3 112.8 90.Q,
527 '657 6 17 2. 108.2, U 2.8 - 96.3
582 657 10 1609 108.1 112.8 ?6.2.
529. c 001 4 20.0- 104.6 -111' .2. 94.0
5~ 0,
Proper,t y
FS.
~6 _16.`1 165.9 1.12.8. 93.9.,
531 roF -E. Corner 8 20.0 .09.71 112,8 ReWorked
532 620 18 17.'4 115. 126.5. gi.4
533. 611" - 4 .12.7~ 1.2 6A 132. 1" '95.4.
534 614 8 14.1 11602 122.0' .95A 9
5j5 619' .24 10.) 11102''l, 119.6 91*2
~536 616 2.5
'
-8.6 116.5 122.0 95.5
537 Obelisco St. 8 11.7 105.4 116.1 90, 7 S to 6+25
538 060 1 JSCO 2 11.3 11500~' 126.5 .91,0. Sta: 8+25
539 Obelisc,o St. .4 * . IIJ.41 117.1, 126.5 92.7. Sto' 8+25
540 648 24 * 15.0 119.0 92.5 -
541 -649 24.5 19.2- 106.61 112.8~ 94e 7
542, 650 20 10.9 117.5 122. ;0 96.3
54-3 651 20 1402 111.4 :122.0 9T.A.
544 627, 12 14.8 113.2, 122.0 92.9
545., 620 22 18.8 107.6 112.8 95.5.,
546 613 123 10 3 - 115.5 122.0 94.7.
547 612 3*; 20.'0 108.9 115.7 94.2
548 645' .19' 13.7 11M 119.6 ..930-6
549~ 646 20.5 * -14.7 :103.1 114.5 90.3
550 652 17.5 * 12.9. U 6.8 122.0 95.7
551 653, 16.5 * 12.8 11 IJ 115i,7 96.3
552 654 21.5 * RA 110.'2 116.0 915.-2.
553, 606 16 14.4 107.9 1.16 i, 1 92.7
24 1.4.6 114.7 12Z.0 93.9
618 8 2' 1 169A, 1 16.0~ 94.3
556 Corintio St. 6 .9.4 105.6 116.0 91.Q.
Sta. 2 +00,
557' 619 28 -17.4 107.3' 119.6 90.0.
M8 611, 4.5,* 16.8 105.2' '115.7 9 .2
559, 628 7 A 6.2 105.8 115.7 91.5
560 620- 26 18.4 105 8 116.1 91 . O~,
Finished Grade
BENTON ENGINEFRING. INC.
Pro, ject No. 71-3-24D 'T...'k 17
Lb Costa Meadows'Unit. No.A
TABLE, OF TEST RESULTS (CONT.)
Approx- Depth Maximum
imote. of Fill Field Dry Dry'
Test Location at'Test Mol.stu, re Density Density Percent
No. Lot No. In Feet % dry wt lb/cu,ft lb/cu ft Com acti p on, Remarks
561 610 17.12 108.4 115.7 93.9
562 655 32 15.3 104.8 113.2 92.3
563 '656 11.1 111.3 122.0 91.3
:564 618 12 10.2 .111.1 116' 90' 9 a 5'9
565 615 4 11.7, 115.2 122.0 940'6'
566 621 14 16.1 113.0 .119.6 94.6
L ''567 :'609 10.9 1 16 0'2 122.0 95.4 .568 608 22 1!f 1407 116.4 122.0 95.5
569 1604 6 13.5 106.1 115.8 91;8
570 1605 14 12.0 113.9 ..122.0 93 .4
32 .1-3.4 106.6 116.0 91.9
572 Inter. of 6 14.9 112.0 122.0 9.i,.g Check;an-A=
Corintia &
~'Argonauta Sts~,
573 -618 16 13.3 105.2 1 116.1.- 90.6
574, 619- '34 16.3 111.8 12260 91.5
575 Babilonia St. 4 - .12.8 1.14.2 115.4 990A
Stia. .15+00-
-.576 715 46'* 9.6 110.3 ,.:122.0 90.6,
577 Bo'bilonia St.. ;6' 10.0 112.8 116.0 97.2
Sta'. 14+00 -
578 665 36 15.2 111.6 122.0 91.51
Babilonia St. -3 107.8. ~115.3 93.4-
Sta. W00 r
580 664 24 * 15.8 111.6', 122.0 91 5
***,School Pr(506rty~-:- 8 * -13.1 107.1 116.1 92.3 Check on
661 18. 1~ 14.8. 107.8 119.6' 90.2
583 Obelisco St. 10 1, 16.'4' .10802 1 3.3 9369
Sta. 6 +25,,
584 662 8 15.2 110.6 -119.6 92.4
585 Ob6lisco St. -12. 15.6 109.9 115.3 95. V
Sta. 6+25
586 662 10.5 19.6 101.7 -109j~ 92.9
587 'Obelisco St. 14.8 .108.8 116.) 93.6
588
Sta. 6+25
661 '3. 19.3 107.0 112i.8 M 9
589 'Obelisco St. 16 11.1 113..8 .121.4 .9.3.%6
Sta. 6+25
590 661 5 .16.8 108.9 116J 93.6
*.'Fini shed Grade
S.E. Corner
BENTON E NGINEERING. INC.
P t rojec No. 771-3-24D T 18
~O.Costc...-Mead' s Unit No' 4 O,Wl
TAB LE OF TESTRESULTS (C 0 NT 0)
Approix- Depth Maximum
Imate of Fill Field Dry !D ry
Test Location ot;Test Moisture Density Density Percent,
-No. Lot. No. ln'-Feet:,~ %,dry wt lb/cu ft lb/cu ft.: Compact.ion Remarks
591 660 3.5 14.3 112.9. 122.0. 92.4
592 Obe I isco Way 3 12.8 1.13.91' 121-.6.- 9ji'7. -
Sta. 16+50
593 659 8 .16.0 108. 9~ 115~ 7 94.; 1
594. Babillonia St. 8 14.5 11.1.1 12.1.0- 91 .,!8'
Sta. 13+00
595 716 41 6.7 111.0: 117.4 '94.5
596 E I Fuerte St-0 6. Too rocky to test
Sta. 61+00
597 71-7 jg -9.8 110.7 11.7.4 94 2
.598 E I -Fuerte St. .81~ Too rocky to test
Sta. 61+00
.599 E I Fuierte St. 6 14.7 104.3 .116.0 90.0
Stai 67400
600 El Fuerte St. 10 14.6 103.6 114 2 90.5,
Sta.' 59+M
601 El Fuertb Pump '28 11.3 '120.2-. 9-1..4
Station
602 E I Fuierte St. 14 14.6 -107.6- 119.0 90.4 S
t 59+00.'
603 E I Fuerte Pump 32 '16.7 111.7 120..6 ..92.6
'Station
'604 E I Fuerte St. 18 12.7 109.2 120 .6.- 90-.7
Sta. 59+00:
605 El Fuerte St. 10 12.0 105.8 114.2 92.4
Sta.* 6 T+00
606 11 Puierte Pump .36 13.9 109.1 119.0 91.7
Station
607, E I Fuerte St~e 22 14.0 111.0' 121.4:' 91.4
Sta. 59-M
608 El Fuerte.St.; 12 9.7 112.6 120.6 93.4
Sta. 61
609 E I Fuerte St. 14 10.0 119.0 9L2
Sta. 61400
610 E I Ouerte Pump 39- 11.8 109.8: 120.2 91.1.
Station
6 11 1 13.5 112.3 A 92.5 -
612 4 12.1 104.5 115.6 90~5
613.,. 7 15.6 104.9 115.6 90..8
614,, 10 12.1 105.9 116.8:' 90. 7
615 .13 7.3 102..7 1 i2.8
Finished Grade,
Decilridge: easement, rearbf 16f-73-9
BENTON ENGINEERING. INC.
'Project No.,'971-3-24D T-I 9
La 1;vsta Meadows. Un It No. 4
TABLE OFTESTRESULTS ~(CONT'
Approx- Depth maximum
Imate of Fill Fle Id Dr'y D ry.
'Test Location dt Test Molstvre., Density Density Percent
Nob Lot Noe. In Feet 96 ry d 'wt lb/cu ft lb/cu ft Compaction' 11emarks
616 644 19-- 15.9 102.9 111.8 92.1 Ck on 0405
617 644 21.5 8.7 117.7 121.0 97.3
618 637 22.5 10.6 '116.8 121 '0 96. 6 Ck on #437
6,19':. ..'635 28 12.7 106.9 .116:0 - Ck. on #444
620 622 14' 13.3 109.0 94.0.
'621 742 17 170 0 119.6 126.5 94.6
622., 742 21 12.5 107. 1 118.9 90.2'
623 740 .8 14.5 111.1 120.2 92.4,
6?4 739 10 13.1 114.6 - 126.5 90.6
-625 737 41 112 111.6 123.3 90.4
.626, 2 M 126.5 91.9
621 1.6 -16.,6 1 9 ~03. 90.7
:628 620 30 13.5 106.6 116.0 92.0
429 Argonaufo St. :10 14.4 109*7 117.4. 93.1
Sta. 7+50
630 Bcbi Ionia St. .6 15.4 105.1 115.3 91.2
Sta. 6+00
-Babilonia St. 8 15.8 104.0 .115.3 90.1
~-Sta. 7+00
1632 Babilonia Sto -4 14*6 1106, 8 115.3 92.41
ta. S '+00
633", Obelisco ay '.2 12.7. 12-1.1 132.1 91.6
Opp. Lot 586
06elisco Way 2 j3.9 1,12.7. 123. 9.1.2.
Opp. Lot 587
635 ObeliscoWay 4 10.0' 419.6 132.1 90.4'
Opp. Lot 586
Obelisco'Way 4 11.3 119.2 132.1 90.2
Opp~ Lot 587
637 ObeliscoWay 6 '11.3 -121.2 132.1 91.8
Opp. Lot 587
638 Storm Drain 5 Above 146-7 120.0 126.51 94.9
Bet. Lots Pipe
633&634 ,
Finished Grade
D rainage easem.ent, rear -&737 of Lots-736...
DENTON ENGINEE"ING. INC.
:Prbject No. 71-3,441)
La 'Cost' ows d"Mead ' Unii-No. 4
LABORATORY TEST RESULTS-,
The maximum''dry densities and optimum moisture contents of the major-.,f il I -materials as deter-
mined by the A.S.T.M. D'1557-66T method, thdt,'U'ses 25 blows of a 10 pound rammer f6iling,
from a height of 18 inches on each of 5 e am -lay es in a 4 inch di e ter. 1A0 cubic foot compaction
C ylinder, are presented as follows:
Maximum -...Optimum Mois-
Dry Density tu Content. re
',Soi I Description' I b/cu ft, % dry-.Wt
Red-brown fine to medium sandy clay, 15.0
Yellow-brown silty flne tor medium sand with 116.0
sl I tstone chunks
Light,yellow.beown silty fine to medium sairid I I 1 0 -4. 15*
with siltstone
Brown silty fine to coarse sand with 30 to 137-08~ 8.4
40 percent gravel
Light green With streaks of rusty-brown silty clay 112.8 16.9
Light-brown with streaks of orange-brown silty 'lay C 120.6 1202
-medium brown f ine to medium, sandy ~day with 118.0 -12;4
f I ecks of rust
Light' yel I oW-brown streaks of gray silty.fihe to 117.41 3,* 1
medium. sand-with small chunks of siltstone
Brown f ine. to medium sand w ith flecks of yellow-gra y 120.2 05,
Red-brown silty clay 111*9- 15.3
Brown, fine sandy clay' (topsoil) with ~s' ica 119.0 11 5
Light 6live-gteen silty clay 116.9 -13.0
Light whitish-gray clayey silt with stre ks of 9 a 111..3 16.0
rust and yellow
Light yellow-brown slightl clayeyvery fine to y
fine sand with rusty' flecks-,of lime~
Light. to yell.ow-brown flecks.of whife"and rust 109 3 14' 0
-silty-clay-vith scattered fine to medium grains
'and,oc,dasional cemented chunks,
Light: gray with'some yellow slightly.'si.ity fine sand' 115.1 _13.7
Light olive-green"dayey slit' 109.0 16.2,
Medium. brown, f inle *sandy 'clay 119.0 13.2
Gray-brown si I ty clay 110.6 '16.7
Light.brown-y'el 16w.claye y* -,fine;sand - 116.8 12.,4
Brown% Ifin6sandy clay (topsoil) 1-18.9 .13.0
Medlum brown silghtly.silty fine to medium sand 121.4 A I i.3
withfew coarse grains
Light-to, medium brown clayey slit 106.7' 1704,
Iighr,yeil low.-": brown -silty, very fine.tofirie'sand .11303--l. 14.2
t w lth s eeaks of rust and I ime
7- 7
BENTON ENGINEERING_INC~_
I
Oject, No. 71-3-24D T
a I L C l"lo's a.,Meodows.Unit No'.
LABORATORY TEST RESULTS (CQNTq/)
maximum ptimum, -Mois,r
.:~Dry Dens;tY ture -Content
S6H.Discriptlen-, !b/cu ft.,* dry:wt,
Dark gray-black.fine sibndy~61a' withjIme y 115.6 M.8
Light with: yel 1 treaks*bf silty clay ,gray ow s 110.7 15.1
Light gray 'With yel.lbw streaks of -silty veryfine 116. 1 13,2. -
—to,fine sand: with yery slightly clai,binder
Light- brownfine sandy silU y 115.0. 13.;6
Medium brown f ine to medi " m sandy (clay u 126. 5, 9~4
w ith. scattered, grove I
:'Light brown silty fine:46'c6orie 'Sand with 119' 0
20 tq.20'percent gra've"l (D*G.),
Light gioy.-birown sl ightly si I ty fine siand 109.6: M41
(micdceous) .,(import)
Light' yellow-brown silty ery'f I nd to fine sand v 113.5— 1 V* &
Light brown-silty,Iqlay and.cemented churks,(flecks Wh ite) 10 9'OQ- 15 2
Light brown'slightly silty fine'to medium -sand 12 L, 0 10.0
GrPy-green silty clay 11 L2 ;13.6
Red-brown-ftne to coC'1rse-sapdy,'cjayvith gravel 1109.
Park gray-broWiv fine sandy clay 122.3 11.4
Li'ht y6llow-brown silt in' medlu s nd 9 y, F e to' m a 122.0 _1 1.0
Yellow-brown silty very-firie tofini'sand 116.0 :12.5
YelloW-brown silty v fi`eJo fine's n n a d 19.6' 12.4
with slight ~clq binder.
ellow~brown,iilty ver yy--fire to fine tand' 114.2 13 2
-Light, bray-br6wn:,silty fine sand with white-flecks 1 12.~ 2 15.2
BrOwn-gr6velly silty'fine to coarse sand 1.37,8 8.4
Red brown si fty c I py, I ~0. 2 U 5
Browm fine -to medium s nd' cla with scaffered'gr 1 P y Y, ave 126.5 9 4
PENTON ENGINEE,RING.. INC.,,
LEUCADIA COUNTY WATER DISTRICT
TER SERVICE APPLICATION-FOR S ETA
Phone No'. 753-1044 -Owner's Name: Victor-Jevremov
"Mailing Address: .13873 Boquita Drive.
Del Mar 92014
Service- Address: 62.6 ~O 0 b e 1 i s co cl-,-,~
Trnct Description: ..La Costa Meadows Unit #4 Lot 671
Single Fami ly 'No.. Units Type of Building: Connection Charge $600,00-
.611 .8 .'Saddle: Lateral Size: 4"
q
Ext ra footage: 0 Easement
@ Lateral Charge, -Extra depth: -------------
$600.00 Jotal
Amount Rec'd $-600..00-
How Paid ck*.#568'
Date Paid 6/24/77
Rec'd by S, Deibert.
The application*must be signed by the owner.(or his authorized representative) of the .
property,to be served. The total charges must be paid to the Distri~t at the time,the
application is -submitted.
If a service lateral is.required, it will be installed by the 'Leucad.ia County Water'
District. The service lateral is that part of. the. sewer
,
sy
,
stem that extends. from the*.
easement) -main collection line in-the street.(or to the point in the street.(at or near.
the app i licant's property line) where the service lateral.is'connected:to the applicant s
The 'is responsible for the -construction,-at the applicant's*-- building'sewer. applicanti.
expense, of the sewer pipeline (building sewer) from the applicant's plumbing to the
point in the street (or'easement) where a connection. is made to the service lateral.
The connection of the applicant's building sewer to the service lateral shall be made
by- the applicant at -his expense. -The connection must be made in conformity with the
District'.s 'specifications, rules and regulations; and IT MUST.BE'INSPECTED AND,APPROVED'
..BY THE DISTRICT BEFORE THE SEWER SYSTEM MAY BE USED BY THE APPLICANT.. THE APPLICANT, OR
CTION IS DESIRE. ..HIS AUTHORIZED REPRESENTATIVE,, MUST NOTIFY THE.DISTkICT AT THE TIME INSPE
ANY.CONNECTION MADE TO THE*SERVICE LATERAL OR COLLECTION LINE WITHOUT-PRIOR APPROVAL AND
..INSPECTION.BY THE DISTRICT WILL BE CONSIDERED INVALID AND WILL NOT BE ACKNOWLEDGED.
'After .connection is complete, the,property described above is subject to a monthly~:,.'.
..sewer service charge, billed bi-monthly in advance. Th&-.rate will be.governed by the
..use of the property, single family, multiple dwelling.or connercial. Non-payment of
service.charge is subject to a 5.% penalty per month, plus disconnection if
:..necessary-
-rmati s correi~t and.agrees to ..,The undersigned hereby agrees that the above.info, on.given i
..the conditions as stated:
7860 -6/24/77
Owner's.Siinature Date Account No.