HomeMy WebLinkAbout2641 OCEAN ST; ; 87-4; PermitLENDERt> z II DillO W WORKER'S COMPENSATION3°5 o?>IS;£ 3 ;c/i JJ' Oo>III l!S* 3 2°-£z9 3 ® n z. C -n5T J ~- — 30 H«S ° ^?5°~s? slo*DECLARATIONS OWNER/BUILDER CONTRACTOR—i i 1ISTRUCTION. WHETHER SPECIFIED HEREIN ORKEEP HARMLESS THE'CITY OF CARLSBAD AGAEXPENSES WHICH MAY IN ANY WAY ACCRUEGRANTING OF THIS PERMIT.2>cnf--H 1- >Cfi r~ CO AGREE TO SAVE INDEMNIFY ANDABILITIES, JUDGMENTS, COSTS ANDAID CITY IN CONSEQUENCE OF THEAPPLICANT'S STATURE * OWNER O CONTRACTOR^N <$u*&*-s kJhjU£#~ B¥ PHONE °nj
*5
1
SgS~en 2 S 5ml ( <E CAREFULLY EXAMINED THE COMPLETE!FY UNOER.PENALtY OF PERJURY THATARATIONS ARE TBOE AND CORRECT ANDD: TO COMPLY WITH ALL CITY. COUNTY§ -n> ;APPLICATION AND PERMITLL INFORMATION HEREONURTHER CERTIFY AND AGR0 STATE LAWS GOVEHNtN.=15C 11 O o
S'^S'SH T3 O O
Expiration Every permit issued by the BuilcCode shall expire by limitation and becomeauthorized by such permit is not commencecpermit, or jf th» bu tiding or work authonabandoned at any time after the work ts contng Official under trtenull and vo^d tf thewithin iBOdaystfOftted* by sueh pernrtttimenced for a oenod3rov(s»onsofthis>utidmg or workthe date of suchs suspended orof 180 days* AN OSHA PERMITJ 5' 0" DEEP AND DEj/ ST«UCTV»«S OVSS REQUIRED FOR EXCAVATIONS OVERMOLITION Ofl CONSTWiXTION Of* 3 STORIES IN HEIGHTrr
O
TOTAL FEES PAYABLEto
CO CREDIT DEPOSITTEMP OCCUPANCY (30 OAYSIo33OO TEMP POtE ?00 AMPSREMODEL ALTER PER CIRCUITS
-n
8CD
Ln
UD
LT
XX
1—
Omz
COm
-i
X
o
CO
CD
O
cx>
XCOcco0mSCOcc
GARAGEXT)X
AWNINGoo
CO
-ri
GO
CO
O
g
0o
coOOCOen
500m(S)cc
rtWCTOPMENT PROCESSING SERVS.~n
w
CO
CD
O
O
CD
COCQ
COcn
OELECTRICAL PERMIT - ISSUE0)
6
O
O
jBC3
-TJ OT
5 °v cn
>" rr
c;
S-
LDm
CO
O
8
0
O
CC
5t UMfilNtjCICD
O
O
1 —
rn
~n
m
GJ
f\->o
CO
CD
CDo
o0
0 TOTAL MECHANICALFIRESPR^rri
C/^
Oo
CO
o
oo
oo
CO
XX^
o3Ditt
»•
>
».»t1
STRONG MOTIONCOCD
en
UD
oo WATER SOFTNER3Dmi•a
i
?
1
33
C/>
O
03
o
0
do
o
CD
CD
CD
COINJ EACH VACUUM BREAKERMECH EXHAUST HOOD DUCTSoro
mXo
m
CD
CD
CO
CD
CD
CD
CD
COro EACH INSTAL . ALfER, REPAIR WATER PIPEm
Z
-n
C/)
Z
m
ac:o
MECHANICAL 00CO
CD
CDCD
O
CD
COroro
mXena-31O
-n
0
m
mO
oo
CO
CD
CDCD
CD
0
CO
OJ
mXOc/)U")V)msLT.BOILER/COMPRESSOR 3 15 HPTOTAL PLUMBING 00CO
CD
OO
QCD
O3
rvi EACH WATER HEATER AN UOR VENTBOILER/COMPRESSOR UP TO 3 HPz
o
mo
s
CO
o
Co
COCO EACH BUILDING SEWEROVER 100,000 BTUC/p
m
CO
0
oCD
CD
OO(V!
T-O
rnXXrn
INSTALL FURN DUCTS UP TO 100,000 BTUor.c
a
^
-Dm
33
S
\3
o
CO
CD
CD
O
CO
JOF=*
DHTlr~CV1BING PERMIT- ISSUE-
D-i
MECHANICAL PERMIT - ISSU-^
<S-SUMMARY/ACCOUNT NUMBERCENSUS TRACTPARKIMG SPACERES UNITSaD
O
Z^ o
n su
2 S
C/>Cm0
REDEVELOPMENTAREA>n ~DTYPECONSTI OCC LOADD S
z w
D S
/Vo/ l/a//rf t/n/«s Machine CertifiedD '
D
rI
mr
NUSTORIESS §
cTl
mg
1--
( .."1
f"» J 1 REMODEL DUPLEX^j
1
om01n^IPTION Of WORK 1Co, !(» ::rCJC3nu0
/ * "" *^ SS3UQOV S.U3NOIS3O<» 0'
3 I
fi iz wO) -am £
Z Oo z
It!1OWNER'S NAMEEleanor Desianon? >Ke
» 3»t :H
r-s
•*r 5
>l
^g
i
BUILDING SO. FOOTAGEOWNER'S PHONEJJ O•s ^j BLOCKHI.!? MarSUBDIVISIONi 12?1ASSESSOR PARCEL NO.203-1 4n-n<5Iff
P
CONTRACT ORSPHONE » \Si
si
ifsrowH2)D
HIO
w
en
p
DATE OF APPLICATION BUSINESS LICENSE #8/10/88 /^£/VALUATIONRenewPERMIT NUMBER87-4- RENCARLSBAD BUILDING DEPARTMENT APPLICATIOI^HfPt , ^ 2075 Las Palmas Dr., Carlsbad, CA 92009-1915 (619) 438-1161 i-iwii wi» « •_.White — Inspector Green — (1) Finance Yellow — Assessor Pink — Applicant Gold — Temporary File
SPECIAL CONDITIONSBUILDINGC>,S)>COtMECHANICAL^^*ELECTRICAL^^*r^S k_w *-
,PLUMBINGj^f^•nzr-CALL FOR FINAL INSPECTION WITEMS ABOVE HAVE BEE2? -ti>m •*O*TD ^^3jr-0^ni^OT> .' 3DOT33JS-Hm
•»
•'
i
'
'
p
/ '
-^
-
•
rf
•,
•
^VENTILATING SYSTEMS^
'HEAT — AIR COND. SYSTEMS'*$.&•naco"Oma3Jm-n3?zOVw MECHANICALD BONDING D POOL-^
j
~" —•G ELECTRIC SERVICE D TEMPORARY*•<Sf^•m ROUGH ELECTRIC|,*•&3 D ELECTRIC UNDERGROUND D UFFEIu^
\ i j
i
[
~ELECTRICALD WATER HEATER D SOLAR WATER«OCOHmCOiMfr*s.|_i.TUB AND SHOWER PANl^^w•fc?ffTi1T)cnOCOOZ i oTJocHn1mn:>HmfcH?\\UNDERGROUND D WASTE D WATE!JD D SEWER AND BUCO LJ PL/COPLUMBINGINTERIOR LATH & DRYWALL1^s\\ZCO1—HOzw;T;mO>^SCOO
Z
3D
. . |
,
D3 IO ~~ O-I.Xf> en.£.mnHI
Tlmi —D§rnOZO O T)O OO ~*3) -trn mrn f_nOZmO
O TlO XZ mOHS*m mm tomO EXTERIOR LATHt>/^\^5«<>^O w< Hm u31 CO "0 c0 3)"D >C/J r~~ O
O
ZO33m
HIT
o>
V
t
***
^
t
A/
-n3)>5m11U^^>O)1zQOO-nnCOm331VtocDO•n332m33aomr~Z£D:•-n T) 00O 3) OC o F§ H OH OOi -Z f-2T i>
T3 Om GUNITE OR GROUTMASONRYREINFORCED STEEL^^FOUNDATION^-*£.\mQ
^joz
o
135mm
00
m -n0
_•^ 2
Tj ^-0 ~0
33 Q
>s
CO
D
^m
•***. If
10
*-•-$/f
r^
n
oc.r
»^
A^
0r*»r
4
>»
-K7*fc0j j
re
*v *
*rl
oc
4-
nm
Dma
00
Tlm
>f~
ZCO
T)m0H
O
2co
2CO
m0
o33
CO
2
O-ImCO
~TImDZC/5"DrnoH
OZ
Xmn0•1-1JJ
O BUILDING•DmomCOT5mgo3 s^-s.\r-f-^rVIV^••^
1
LENDERf i DECLARATIONS }WORKER'S COMPENSATION OWNER/BUILDER CONTRACTORJ CT =;' ° S Bo — o -v<. =r 3 S O O ^ nS % > *o —I"i r o ,^Sxi-1 lr P!lfE!'§Si5 -2|f="^S So-oS.^ 3 ='gS" 3»-S_tI?^Sgl 1_j 3- Q. en — — B ^ J^ -c ^iiUlSi.^! liliSgMllS^g^lS^^^ai^^ ^'i^^^j^^'"!5 oSP lall^i*i!! f1 I
White — Inspector Green — (1) Finance Yellow — Assessor Pink — Applicant Gold — Temporary File
DEVELOPMENTAL
SERVICES
BUILDING DEPARTMENT
Date:
To:
6-9-87
David Bodine
26UI Ocean ST.
Carlsbad, CA. 92008
Cttp of Carteimb
2075 LAS PALMAS DRIVE
CARLSBAD, CALIFORNIA 92008-198?
TELEPHONE (619) 438-1161
PCtf 87-1 Dated
Remodel & Addition
EXPIRES: 7-6-87
1-6-87
Subject: Plan Check Expiration
Our records indicate that you have not obtained your building permit for which
you filed an application on the date shown above.
The provisions of Section 304(c) of the Uniform Building Code state:
Sec. 304(c) Expiration of Plan Check. Applications for which no permit is
issued within 180 days following the date of application shall expire by
limitation and plans submitted for checking may thereafter be returned to the
applicant or destroyed by the Building Official. The Building Official may
extend the time for action by the applicant for a period not exceeding 180
days upon written request by the applicant showing that circumstances beyond
the control of the applicant have prevented action from being taken. In
order to renew action on an application after expiration, the applicant shall
resubmit plans and pay a new plan check fee.
For your convenience, please check the appropriate box below indicating your
intentions and return this letter to the address above.
Project abandoned. I will pick up plans in 10 days.
Signature Date
Project abandoned, plans may be destroyed.
Signature Date
Maximum 180-day time extension requested for the following reason:
Signature c Date
If you have any questions, please contact the Carlsbad Building Department at
438-1161.
MARTIN ORENYAJC
Building Offici"
FINAL BUILDING INSPECTION
PUN CHECK NUMBER:
PROJECT NAME:
ADDRESS:
87-4 DATE: 7-31-89
2643 Ocean St.
PROJECT NO.:. UNIT NUMBER:
TYPE OF UNIT: duplex remodel
CONTACT PERSON: Richard Houk
. NUMBER OF UNITS:
. PHASE NO.:
CONTACT TELEPHONE:.753-1977
Bldg, En9' plan' Water, FifMf, Util
INSPECTED
BY:
DATE AUG. 2 4 1989
INSPECTED: APPROVED
INSPECTED
•BY:
INSPECTED
BY: v
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
. ^
DISAPPROVED
DISAPPROVED
DISAPPROVED
"9 f Carlsbad Municipal Water District
COMMENTS: Fnntnftflf»»<* nonartmont
(619)438-3367
CARLSBAD
MUNICIPAL WATER DISTRICT
ROT. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
FINAL BUILDING INSPECTION
PLAN CHECK NUMBER:
PROJECT NAME:
ADDRESS:
87-lf DATE: 7-31-89
2643 Ocean St.
PROJECT NO.:UNIT NUMBER:PHASE NO.:
TYPE OF UNIT: duptex NUMBER OF UNITS:
CONTACT PERSON- Richard Houk
CONTACT TELEPHONE:.753-1977
Bide;. En9» Ptan> Water, Fl««r, UtU
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
FINAL BUILDING INSPECTION
PLAN CHECK NUMBER:
PROJECT NAME:
ADDRESS: £
87-«DATE:
PROJECT NO.:. UNIT NUMBER:PHASE NO.:
TYPE OF UNIT: UU|>I«*X rfe»TUHk>t
CONTACT PERSON: KlCFtarU
NUMBER OF UNITS:
CONTACT TELEPHONE:.753-197?
UUI
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
DATE ^
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
PPROVED
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
FINAL BUILDING INSPECTION
PLAN CHECK NUMBER:
PROJECT NAME:
ADDRESS:
87-*DATE:
Oc*an St.
PROJECT NO.:
TYPE OF UNIT:Utml«x remoetel
. UNIT NUMBER:PHASE NO.:
CONTACT PERSON:.
CONTACT TELEPHONE:.
. NUMBER OF UNITS:
H0UK
753-1f7?
UtU
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
DATE If A
INSPECTED: /(/^V—
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
FINAL BUILDING INSPECTION
PLAN CHECK NUMBER:
PROJECT NAME:
ADDRESS:
PROJECT NO.:
TYPE OF UNIT:
CONTACT PERSON:.
CONTACT TELEPHONE:.
87-4
DATE:7-31-89
264$ Ocean St.
. UNIT NUMBER:. PHASE NO.:
duplex remodel NUMBER O(= UN|TS;
Richard Houk
753-1977
Bldg, Eng, Fire, Plan, Water, Utilities
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED: AU6. 2 4 1989 APPROVED
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
Cartobad Municipal Water District
(619)438-3367
-
0"\
kII
!^(c?r§nu/7r5?LJZI \^ I *•* LJ \L/ ' ~
AUG-1 19«y
r^
V
CARLSBAD
MUNICIPAL WATER DISTRICT
f?s;
*£
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
FINAL BUILDING INSPECTION
87—4 7-31—aoPLAN CHECK NUMBER: DATE: "*' 8S*
PROJECT NAME:
ADDRESS: 264| Ocean St.
PROJECT NO.: // VOL) UNIT NUMBER: PHASE NO.:
TYPE OF UNIT: duplex remodel Nl..MRFRnFI,MIT.<,
Richard HoukCONTACT PERSON:.
753—1977CONTACT TELEPHONE:
Bldg, Eng. Fire, Plan, Water, Utilities
COMMENTS:
INSPECTEDi
BY: Wy/^^tfryre^CH^ INSPECTED: " l"~ L u / APPROVED V DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
INSPECTED DATE
BY: INSPECTED: APPROVED DISAPPROVED
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
FINAL BUILDING INSPECTION
PLAN CHECK NUMBER:
PROJECT NAME:
ADDRESS:
PROJECT NO.:
TYPE OF UNIT:
CONTACT PERSON:.
CONTACT TELEPHONE:.
87-4
DATE:
264| Ocean St.
. UNIT NUMBER:
duplex remodel NUMBER OF UNITS:
. PHASE NO.:
Richard Houk
753-1977
Qldg, Eng, Fire, Plan. Water, Utilities
INSPECTED
BY:
INSPECTED
BY:_
INSPECTED^
BY:.
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
PLAN CHECK NUMBER:
PROJECT NAME:
ADDRESS:
PROJECT NO.:
TYPE OF UNIT:
CONTACT PERSON:.
CONTACT TELEPHONE:.
FINAL BUILDING INSPECTION
87-H
DATE:7-31-89
2$4| Ocean St.
UNIT NUMBER:
duplex remodel NUMBER OF UNITS:
. PHASE NO.:
Richard Houk
7S3-1S77
Bldg, £ng. Fire, Plan, Watar, Utilities
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
FINAL BUILDING INSPECTION
PLAN CHECK NUMBER:
PROJECT NAME:
ADDRESS:
PROJECT NO.:
TYPE OF UNIT:
CONTACT PERSON:
CONTACT TELEPHONE:.
87-4
DATE:7-31-89
2641 Ocean St.
. UNIT NUMBER:. PHASE NO.:
duplex remodel NUMBER OF UNITS:
Richard Houk
753-1977
Bldg, Eng, Fire, Plan, Water, Utilities
INSPECTED
BY:
INSPECTED
BY:
INSPECTED
BY:
DATE
INSPECTED:
DATE
INSPECTED:
DATE
INSPECTED:
APPROVED
APPROVED
APPROVED
DISAPPROVED
DISAPPROVED
DISAPPROVED
COMMENTS:
Rev. 1/86 WHITE: Suspense BLUE: Water District GREEN: Engineering CANARY: Utilities PINK: Planning GOLD: Fire
CORRECTION NOTICE
ADDRESS:
D APPROVED PLANS SHALL BE ON JOB SITE
BUILDING
D FOUNDATION
D REINFORCING STEEL
D MASONRY
D GROUT-GUNITE
D FLOOR AND CEILING FRAME
D SHEATHING
D FRAME
D EXTERIOR LATH
D INSULATION
D INTERIOR LATH OR DRYWALL
PLUMBING
D UNDERGROUND PLUMBING
D UNDERGROUND WATER
D ROUGH PLUMBING
D TOP OUT PLUMBING
D SEWER AND PL/CO.
B OR SHOWER PAN
GAS TEST
D WATER HEATER
ELECTRICAL
D TEMPORARY SERVICE
D ELECTRIC UNDERGROUND
D ROUGH ELECTRIC
D POOL BONDING
D ELECTRIC SERVICE
D UFER GROUND
D G.F.I.
D SMOKE DETECTOR
MISCELLANEOUS
D PLENUM AND DUCTS
D COMBUSTION AIR
D CONDITIONED AIR SYSTEMS
D SOLAR
D GRADING
D POOL
D PATIO
D SIGN
D OTHER
TIME:_
DATE:2^0 -
INSPECTOR
CITY OF CA
BUILDING INSPECTI
PHONE
Note: Final Inspection Required
BAD
DEPARTMENT
SUBJECt
RAPID LETTER
TO
t-t 1-1) &<Lc-fCe--iA4L/
Jim** 5"/&.
X>7
, JHUM .ENGINEERING, INC.
7818 QUEBRADA CIRC4I
CARLSBAO, CALIFORNIA 92009
6t£944-1836
DATE
w ^. //y
CL-I
SIGNED
DATE
SIGHED
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92123
(619) 560-1468
DATE: cTan -
JURISDICTION:
PLAN CHECK NO: dfa ^ #1 - <4 Cgxv SET; JL
PROJECT ADDRESS; £<Le>4*3 £>c *A^ VT
PROJECT NAME; A -
APPLICANT^
JURISDICTION -^
PLAN CHECKER
FILE COPY
UPS
DESIGNER
The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes. •
I—| The plans transmitted herewith will substantially comply
I I with the jurisdiction's building codes when minor deficien-
cies identified are resolved and
checked by building department staff.
D The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
(~~) The applicant's copy of the check list has been sent to:
• Esgil staff did not advise the applicant contact person that
plan check has been completed.
I| Esgil staff did advise applicant that the plan check has
— been completed. Person contacted:
Date contacted: _ Telephone #
^,
REMARKS; tDVNfcOy v^ojL^. ± TC^r »Aa.l>v< -^\^.<. 4 ^aft>.c»N< ca> \»uj<r-
\f \A \/ttt\t A .
Enclosures;
ESGIL CORPORATION
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 208
SAN DIEGO, CA 92123
(619) 560-1468
DATE:
JURISDICTION:
PLAN CHECK NO:
PROJECT ADDRESS;
PROJECT
oy
}* SET;
Or e_a^
AEELICANT
FILE COPY
UPS
DESIGNER
D
D
D
| j
' — '
The plans transmitted herewith have been -corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified _ ' are resolved and
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
Hook. _ P.O. /box 3oJ>S"" _
( 763 -)
[ 1
Esgil staff did not advise the applicant contact person that
plan check has been completed.
Esgil staff did advise applicant that the plan check has
been completed. Person contacted: _
Date contacted:
REMARKS : <,
Telephone #
toaljC.> ti
tT^ A IS
* Az.* if .SAa-g.Kvs
r-tYiSlan
By;Enclosures:
ESGIL CORPORATION
JURISDICTION;
PROJECT ADDRESS;
TO;<"g.cWd
Date /- \°\
6T .
i Cn. .
PLAN CORRECTION SHEET
Planf Check No. £to - >?7- 4
FOREWORD; PLEASE READ
Plan check is limited to technical requirements
contained in the Uniform Building Code, Uniform
Plumbing Code, Uniform Mechanical Code, National
Electrical Code and state laws regulating energy
conservation, noise attenuation and access for
the handicapped. The plan check is based on
regulations enforced by the Building Inspection
Department. You may have other corrections
based on laws and ordinances enforced by the
Planning Department, Engineering Department or
other departments.
The items circled below need clarification,
modification or change. All circled items have
to be satisfied before the plans will be in
conformance with the cited cades and regulations.
Per Sec. 303 (c), of the Uniform Building Code,
the approval of the plans does not permit the
violation of any state, county or city law.
A. PLANS
Please make all corrections on the original
tracings and submit two new sets of prints,
and any original plan sets that may have
been returned to you by the Jurisdiction,
to;.. -
To facilitate rcchccking. please identify,
next to each circled item, the sheet of
the plana upon vhich each correction on
this sheet has been made and return this
check sheet with the revised plans.
The following items have not been
resolved from previous plan reviews.
The original correction number has been
given for your reference. Please contact
me if you have any questions regarding
these items.
Data plans_recelved by plan checker *"
31
By
plan check completed \~ \<\ -
vuoJJLo-X A,
C0JUL
/•,;,<-/„-
Datet \-y\-%\
Prepared byt
Jurisdiction
VALUATION AND PLAN CHECK FEE
Bldg. Dept
PLAN CHECK NO. Qb~?l-4
BUILDING ADDRESS __
APPLICANT/CONTACT .
BUILDING OCCUPANCY
\-Wo\c-PHONE NO.
| H-i DESIGNER PHONE
TYPE OF CONSTRUCTION CONTRACTOR PHONE
BUILDING PORTION
^x •€. V * ^ ^ O»N^ / ^A -•
V^ (j Ht^j, \o^VovO_y
Air Conditioning
Commercial
Residential
Res. or Comm.
Pire Sprinklers
Total Value
BUILDING AREA
£>_V^
- '
VALUATION
MULTIPLIER
"7^-^/hr
'§
@
e • •
VALUE '
\<V5,t$ ce*,
•
— -
Building Permit Fee $.
Plan Check Fee $
COM MEN TSt
SHEET OF ^n 12/87
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 2O8
SAN DIEGO, CA 92123
(619) 56O-1468
DATE:
JURISDICTION:
PLAN CHECK NO:SET; IT
HECKERFILE COPY
UPS
DESIGNER
PROJECT ADDRESS;
PROJECT NAME;
DC.e*n
( _H<»»«liJio j-
D The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
_ The plans transmitted herewith will substantially comply
•I with the jurisdiction's building codes when minor deficien-
cies identified ^>eWj are resolved and_ _
checked by building department staff.
D The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
(~~) The applicant's copy of the check list has been sent to:
•j Esgil staff did not advise the applicant contact person that
plan check has been completed.
jj Esgil staff did advise applicant that the plan check has
— been completed. Person contacted:
Date contacted:
REMARKS : aft?),1 1 • •
Telephone #
*M.P io/ a
, Lf ,, VI
By;Enclosures;
ESGIL CORPORATION
PLAN CORRECT ION SHEET
"REWORD: PLEASE READ , V:
Ian check is limited to technical requirements
ontained in the Uniform Building Code, Uniform
lumbing Code, Uniform Mechanicaj. Code, National
lectrical Code and state laws regulating energy
mservation, noise attenuation and access for
~.c handicapped. The plan check is based on
jgulations enforced by the Building Inspection
Apartment. You may have other corrections
.sed on laws and ordinances enforced by the '..
.anning Department, Engineering Department or
•.her departments.
items circled belo* need clarification,
sdification or change. All circled items have '
3 be satisfied before the plans will be in
^nformance with the cited codes and regulations,
.r Sec. 303 (c), of the Uniform Building Code,
e approval of the plans does not permit the
olation of any state, county or city law.
PLANS
Please cake all corrections on the original
tracings and submit two new sets of prints,
and any original plan sets that may have
been returned to you by the jurisdiction,
)» (A • -^ ^ - I --•» *- J* — -— * ^
) To facilitate rechecking, please identify,
ne.it to eoch circled ite.-a, the sheet of
the plona upon which each correction on
this sheat has besn made ond return this
chcc^ sheet with tho revised plana.
The following itt-ms ha\e nut been
resolved from previous plan reviews.
The original correction number has been
given for your reference. Please contact
me if you have any questions regarding
these items.
ts plans received by plan checker */- J4
' plan check completed *-r -
ESGIL CORPORATION
9320 CHESAPEAKE DR., SUITE 2O8
SAN DIEGO, CA 92123
(619) 56O-1468
DATE:
JURISDICTION:
PLAN CHECK NO:
PROJECT ADDRESS;
PROJECT NAME;
SET:
5T".
(_
"APPLICANT
JRISDIC1]
CHECKER
IFILE COPY
QUPS
Pi DESIGNER
D
D
D
The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified are resolved and
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
•
The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
,\ oeA T^oAers ^<7V«X A/flr o/'^< 57". ,
II Esgil staff did not advise the applicant contact person that
— plan check has been completed.
Esgil staff did advise applicant that the plan check has
been completed. Person contacted; /Toe
<d O;Date contacted:
REMARKS:
Telephone #
By;Enclosures;
ESGIL CORPORATION
.R1SD1CTTON:Date -r-'^-
OOEC7 ADORE SS:_
: ,TW EC.'
ST. .
PLAN CORRECTION SHEET
anf Check No. ^&> ^ J 7 - V
"OREWORD: PLEASE READ
3lan check is limited to technical requirements
:ontained in the Uniform Building Code, Uniform
'lumbing Code, Uniform Mechanical Code, National
-Ilectrical Code and state laws regulating energy
Conservation, noise attenuation and access for
:he handicapped. The plan check is based on
regulations enforced by the Building Inspection
Department. You may have other corrections
^ased on laws and ordinances enforced by the
'lanning Department, Engineering Department or
3ther departments.
"he items circled below need clarification,
lodification or change. All circled items have
:o be satisfied before the plans will be in
-onformance with the cited codes and regulations.
-er Sec. 303 (c), of the Uniform Building Code,
-he approval of the plans does not permit the
iolation of any state, county or city law.
. PLANS
Please make all corrections on the original
tracings and submit two new sets of prints,
and any original plan seta that may have
been returned to you by the jurisdiction,to •' '
•J To facilitate rechecfcing, please identify,
next to each circled item, the sheet of
the plans upon which each correction on
this sheet hos been made and return this
check sheet «ith the revised plans.
The following iti-ms have not been
resolved from previous plan reviews.
The original correction number has been
given for your reference. Please contact
me if you have any questions regarding
these items.
plans received by plan checker <*/- / 4
jT~ - '
'ate _/ _ plan check completed *-/
i Trt
^%
-^Te ""I
2. 'j>^> v
A.-. Or
c a I-N —
-U . r^st
M,n
&.-SUT-L0 ^ C, -
s - ( oo C _ OKt? - 3") / "S-e-c.oi£j- b -
-s>\ » V-s .
C-SKT-O
(oo A -
o^O 5oH io
• 13.11-
x"1 t^V Cs^~'U^_ \ VN^ t rv r.,-.\ >v &
v>^
Datei -4 --^-yj
Prepared byt
PLAN CHECK NO.
Jurisdiction r *>
Bldg. Dept,
VALUATION AND PLAN CHECK FEE
BUILDING ADDRESS
APPLICANT/CONTACT Jc
BUILDING OCCUPANCY
. >•»
PHONE NO.
DESIGNER PHONE
TYPE OF CONSTRUCTION CONTRACTOR PHONE —
BUILDING PORTION
j£fi/> 5 ior>-<>
SzoTKuniTz
Air Conditioning
Commercial
Residential
Res. or Conun.
Fire Sprinklers
Total Value
BUILDING AREA
4 Irs.
VALUATION
MULTIPLIER
C/5.'8^kf
'§
@
@
VALUE
c?^>3.3^? (^
— '
Building Permit Fee $
Plan Check Fee $
C 0 H HE NTS:
. i o
SHEET OF
12/87
ESGIL CORPORATION
932O CHESAPEAKE DR., SUITE 2O8
SAN DIEGO, CA 92123
(619)560-1468
DATE:
JURISDICTION:
PLAN CHECK NO:r <TT
rURlSDICTjQN
JPLAN CHECKER
JFILE COPY
JUPSIDESIGNER
PROJECT ADDRESS:
PROJECT NAME: a
vr.
r. •
®The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
I—- The plans transmitted herewith will substantially .comply
I I with the jurisdiction's building codes when minor deficien-
cies identified are resolved and
checked by building department staff.
D The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
D The check list transmitted herewith is for your information.
The plans are being held at Esgil Corp. until corrected
plans are submitted for recheck.
D The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
(} The applicant's copy of the check list has been sent to:
|Bl Esgil staff did not advise the applicant contact person that
plan check has been completed.
jI Esgil staff did advise applicant that the plan check has
— been completed. Person contacted:
Date contacted:
REMARKS:
Telephone #
By:Enclosures;
ESGIL CORPORATION
ESGIL CORPORATION
932O CHESAPEAKE DR., SUITE 2O8
SAN DIEGO, CA 92123
(619) 56OI468
DATE:"]
JURISDICTION:
PLAN CHECK NO:
CITY OF CARLSBAD
m JURISDICTION^
PLAN CHECKER
c& y?-q cr
PROJECT ADDRESS:
PROJECT NAME:
FILE COPY
UPS
DESIGNER
• — .
I _ I
( [
D
D
q^.TT - _P)/«(E>LjCXlev^ir-
D The plans transmitted herewith have been corrected where
necessary and substantially comply with the jurisdiction's
building codes.
The plans transmitted herewith will substantially comply
with the jurisdiction's building codes when minor deficien-
cies identified _ ; _ are resolved and
checked by building department staff.
The plans transmitted herewith have significant deficiencies
identified on the enclosed check list and should be corrected
and resubmitted for a complete recheck.
The check list transmitted herewith is the jurisdiction's
copy for your information. The plans are being held at
Esgil Corp. until corrected plans are submitted for recheck.
The applicant's copy of the check list is enclosed for the
jurisdiction to return to the applicant contact person.
The applicant's copy of the check list has been sent to:
Jar st _ a.^ l-/4rA,»4 ST.
~a r Is bg
Esgil staff did not advise the applicant contact person that
plan check has been completed.
Esgil staff did advise applicant that the plan check has
been completed. Person contacted: >£a.y fi /*/>/? lord Afl
Date contacted:
REMARKS:
1/9.1/1)7 Telephone I _ 7J *? -
BY:ENCL:
ESGIL CORPORATION
PLAN CHECK HO. f/b FOREWORD: PLEASE READ
JURISDICTION: CITY OF CARLSBAD
.10:
S7".
PROJECT DATA
OCCUPANCY; ft-I _L M~l
BUILDING TJSK;
TYPE OF CONSIHUCi'lON;
ACTUAL AREA;
ALLOWABLE AREA: 6lXX> X Z
STORIES:
HEIGHT: tt
SPRINKLERS:
.OCCUPANT LOAD; ,36
REMARKS;
PLAN COKKKCl'lON SUKET
CITY Or CARLSBAD
APARTMENTS; WITHOUT HAMUCAPPED
Date plans received by jurisdiction; \ - (s -
Date plans received by Esgil Corp.;! - 1
Date initial plan check completed:
Applicant contact person; £0? &la-Ck
Tel. ;
Plan check is limited to technical requirements
contained in the Uniform Building Code, Uniform
Plumbing Code, Uniform Mechanical Code,
National Electrical Code and state laws
regulating energy conservation, noise
attenuation and access for the handicapped.
The plan check is based on regulations enforced
by the Building Inspection Department. You may
have other corrections based on laws and
ordinances enforced by the Planning Department,
Engineering Department or other departments.
Present California law mandates that
construction comply with Title 2k and the
applicable model code editions adopted, with or
without changes, by the various state agencies
authorized to propose building regulations for
enforcement at the local level. Code sections
cited are based on the 1982 UBC.
The above regulations apply to construction,
regardless of the code editions adopted by
ordinance at the local level.
The circled items listed need clarification,
modification or change. All items have to be
satisfied before the plans will be in
confonnance with the cited codes and
regulations. Per Sec. 303 (c), 1982 Uniform
Building Code, the approval of the plans does
not permit the violation of any state, county
or city law.
To speed up the recheck process, note on this
list (or a copy") where each correction item has
been addressed, i.e.. plan sheet.
specification, etc. Be sure to enclose the
marked up list when you submit the revised
plans.
NOTE: PAGE NUMBERS ARE NOT IN SEQUENCE AS PAGES BAYING NO ITEMS NEEDING CORRECTIONS WERE DELETED.
LIST NO. «0, CITY OT CARLSBAD, R-l APWTMENTS, EXEMPT FROM HANDICAPPED; WITH SUPPLEMENTS.
10/20/86
A. PLAHS .
(_ly Please make all corrections on the original
tracings and submit two new sets of prints, and
any original plan sets that may have been
returned to you by the jurisdiction, to:
Esgil Corporation, 9320 Chesapeake Drive,
Suite «08, San Diego, California 92123,
(619) 560-1468.
Please make all corrections on the original
''tracings and submit two new sets of prints, and
any original plan sets that may have been
returned to you by the jurisdiction, to:
The jurisdiction's building department.
Indicate on the Title Sheet of the plans,
the name of the legal owner and name of person
responsible for the preparation of the plans.
Section 302 (a) 7.
/thi
^ Provide a statement on the Title Sheet of
the plans that *M« project shall comply with
Title 24 and 1982 UBC, UMC, and UPC and
1984 NEC.
Provide the site address and a vicinity
sketch on the Title Sheet.
U.1 sheets of the plans and the first sheet
of the calculations are required to be signed by
the California licensed architect or engineer
responsible for the design. Please include the
California license number and the date the plans
are signed.
/' m
Indicate on the Title Sheet whether or not a
grading permit is required for this project.
Show on the Title Sheet all buildings,
structures, pools, walls, etc. included under
this application. Any portion of the project
shown on the site plan that is not included with
the building permit application filed should be
clearly identified as "not included" on the site
plan or Title Sheet.
Specify on the Title Sheet of the plans the
gross floor area of each element of this project
including dwelling, garage, carport, patio, deck
and balcony. Section 302 (c).
(\Q\ Provide a Building Code Data Legend on the
^itle Sheet. Include the following code
information for each building proposed:
/?-/ /A*-/Occupancy Group
Type of Construction _
Sprinklers: Yes or No
Stories 3
A/O
Floor Area £-/ ^
A/-/ i 1/00
Justification to exceed allowable area in
Table 5-C. ^>-ee beloO
Justification to exceed allowable height or
stories in Table 3-D.
v(. Provide a Building/Unit Schedule on the
'Title Sheet. Include the following:
a. Designation and area of each dwelling
unit type.
b.Number of each designated unit types
in each building (including
handicapped access units).
List any other occupancies or uses
included in each building, i.e.,
common laundry, common storage,
garage, rental office, etc.
'.<*Aa<. £-/ -for;
s.Te.
in '/»' Plus 'B' Tan.C ,-d.-3> buT /Z-l i /z u&c. .)
! ~TJT,s.,o l<\ Com All Provisions 0-f UAC. t-'Ttrrlin^ /Z -1 QCCofynC*
' u \S v
Jv P/e^^t.let. TA-t.[tOr* 3 &SJ A
i*A
2
2/13/86
1». The exterior wall of a Group M occupancy
/(maximum 3,000 sq. ft.) carport or garage, less
' than three feet to a property line or an
assumed property line, shall be one-hour fire-
rated construction. The wall shall have a
thirty inch parapet (see exception,
Section 1709 and Table 5-A.).
15. The exterior wall of a B-l occupancy
'carport or garage (Type V-M Construction), less
than twenty feet to a property line or an
assumed property line, shall be one-hour fire-
rated construction. When the exterior wall is
less than ten feet, a thirty inch parapet and
protected openings are required. When the
exterior wall is less than five feet, no
openings are permitted. Table 5-A.
Eaves over required windows shall be not
ess than thirty inches from side and rear
property lines. Section 504 (a).
Combustible projections located where
/openings are required to be protected shall be
heavy timber or one-hour construction.
Section 1710.
//inch
Projections may not extend more than twelve
inches into areas where openings are not
allowed. Section 1710.
yf. Projections over public property must
'comply with Chapter 45.
//thj
Projections may not extend more than one-
third the distance from the exterior wall to the
property line or one-third the distance from an
assumed vertical plane located where fire-
resistive protection of openings is first
required, whichever is least restrictive.
Section 504 (b).
Vi. Fire-resistive exterior wall construction
'shall be maintained through attic areas.
Section 4304 (c).
/•<hi«
When openings are required to be protected
"due to location on property, the sum of openings
shall not exceed fifty percent of the total area
of the wall in each story. Section 504 (b).
A covered passageway connecting separate
buildings must comply with the requirements for
an arcade, if the buildings are to be considered
as separate buildings. Section 509.
44. Exterior exit balconies cannot be located
/in an area where openings are required to be
protected. 'Section 3305 (i).
(45) Exterior stairways shall not project into
yards where protection of openings is required.
Section 3306 (n). •Sf>ei>'K\ jJorTE»*xT?r'«"- -
> <25 f&riC-rtTt (.°n £)r*«JO MarTfrrltS. 3^7^ *
Yards or courts serving as required exits
more than ten occupants must be at least ten
feet wide or have walls of one-hour construction
for a height of ten feet above the court or yard
grade. Openings shall be protected by
fire-assemblies having a rating of not less than
three-fourths-hour. Section 3301 definition and
Section 3311 (d).
/'reoi
Structural elements exposed in walls
'required to be fire-resistive construction due
to location on property must have the same fire-
resistive rated protection as the wall, or as
required for the structural frame for the type
of construction, whichever is greater. Table
17-A, Footnote 1, and Section 1702.
W. Openings for scuppers, mechanical equipment
/vents, foundation vents and similar openings are
not permitted in walls located where openings
are required to be protected. Table 5-A.
4
2/13/86
Two-hour area separation walls may
/terminate at the roof sheathing provided that:
a. Where the roof/ceiling framing
elements are parallel to the walls,
such framing and elements supporting
such framing shall be of not less
than one-hour fire-resistive
construction for a width of not less
than five feet on each side of the
wall. Section SOS (e) 3.
b. Where roof/ceiling framing elements
are perpendicular to the wall, the
entire span of such framing and
elements supporting such framing
shall be of not less than one-hour
fire-resistive construction.
Section 505 (e) 3.
lit. No openings in the roof are permitted
/within five feet of a two-hour area separation
wall if parapets are not provided.
Section SOS (e) 3.
Area separation walls, which separate
/portions of buildings having different heights,
may terminate thirty inches above the lower roof
level, provided the exterior wall for a height
of ten feet above the lower roof is of one-hour
fire-resistive construction with openings
protected by three-fourths-hour assemblies. As
an alternate the wall may terminate at the
sheathing of the lower roof, provided
roof/ceiling elements, if parallel to the wall,
are one-hour construction for a tan foot width
along the wall at the lower roof, and supporting
elements are one-hour; where the lower
roof /ceiling elements are perpendicular to the
wall, the roof/ceiling elements shall be one-
hour for the entire span, and supporting
elements shall be one-hour. Section SOS (e) 5.
Where different roof heights occur, no
openings in the lower roof are permitted within
ten feet of the area separation wall if parapets
are not provided. Section SOS (e) S.
X-Show the basis for the approved fire-
resistive construction elements for the area
separation wall, parapet, and ceiling assembly
if used in lieu of parapet i.e., item number in
Table 43-A, B, C or U.L. Directory, etc. (Note
that trusses require two layers of 5/8 inch Type
'X1, per Gypsum Fire Resistance Design Manual,
Item FC 5406).
Provide complete details of the area
separation wall(s) to show compliance with
Section 505 (e) 1-5.
//"PI
Provide a note on the plans stating:
"Plumbing and conduit penetrations of the area
separation wall shall be of copper or ferrous.
No plastic pipe may penetrate the area
separation wall". Section 4304 (e).
yo. Clearly show the maximum building height
'based on the definition in Section 409.
Clearly show if the lower level is a
basement or story, based on the definitions in
Section 403 and 420.
<VL. Plot the finish grade (adjacent ground
/level) on the elevations and dimension the
distance to the floor above for story
determination. See definition of grade,
Section 408.
(93) The height and number of stories cannot
exceed that shown in Table 5-D. Show the code
basis for the height/number of stories as shown.
a.lloMJ*<L 40'' fi-~l
*=$-
6
2/13/86
(94) On* additional story would be permitted
beyond that shown in Table 5-D. if the building
is sprinklered throughout and the sprinkler
system is not otherwise required by Section 506
(area) or Section 508 (subsitute for one-hour).
Section 507.
Towers, spires and steeples shall comply
Xtith Section 507, Exception 1.
V. nSSrOtSISim COKSocma-LOH
oOa. Group R, Division 1 occupancies more than
two stories in height, or having more than 3,000
sq. ft. of floor area above the first story
shall be not less than one-hour fire-resistive
construction throughout except as provided in
Section.1705 (b) 2.
j£
/is ri
~TKi dollou/in
Where one-hour fire-resistive construction
'is required, an approved automatic sprinkler
system may be substituted for the one-hour
construction, however, the fire sprinkler system
shall not waive or reduce fire-resistive
requirements for: occupancy separations,
exterior walls due to location on property, area
separation walls-, shaft enclosures, corridor
protection, stair enclosures, exit passageways,
type of construction separation per Section
1701 and atriums constructed in accordance with
Section 1715. Section 508.
(u)2). Provide details of the one-hour fire-
resistive construction. Include roof/ceiling
assemblies, floor/ceiling assemblies, wall
assemblies, post and beam assemblies, gable end
assemblies at attics, etc.
Chapter 4.3, ffrypfr 17.
(10. Maintain one-hour fire-resistive wall
construction at built-in wall fixtures and
behind bathtub and shower enclosures, mailboxes,
medicine cabinets, fire extinguisher cabinets,
electric panels exceeding sixteen sq. in. in
area, etc. Section W04 (e).
104. Detail and reference I.C.B.O. number or
/other approval for horizontal fire assembly
using trusses. Section 4303 (b) 8.
^05). Detail how fire-resistive wall and ceiling
protection will be maintained at all duct
penetrations such as at bathroom and kitchen
hood fans, laundry room fans and dryer vents.
Also detail recessed light fixtures. Show duct
openings in ceilings, regardless of size, have
approved ceiling fire dampers.
Section 4303 (b) 6.
uOfl. Roof/ceiling and floor/ceiling assemblies
must be of one-hour construction. Detail fire
assemblies on plans along with their I.C.B.O.
number or other ID number from the Fire
Resistive Design Manual published by the Gypsum
Assoc. or U.L. number or item number from
Table 43-C, U.B.C.
(lOJ. Detail water heater vents located inside
fire-resistive wall construction or within fire-
resistive shafts. Table 17-A; Section 1706 (a),
Section 4306 (j).
108. Detail pre-fabricated fireplace flues
within individual fire-resistive shafts and
specify fire-stopping around fireplace box
opening. Section 4304 (e).
UW). Clearly identify location and hourly
fire-resistive rating of vertical shafts on the
plans. Provide construction details showing
location of fire dampers and how fire
resistivity will be maintained at floors and
roofs. Section 1706.
im.
'i*t\vtm+
Note on plans that elevator doors must be
'constructed and installed in the same manner as
a -hour fire assembly,
even though elevator doors are not identified
with fire labels.
2/13/86
ll£ Detail column fir* protection per Table
'W-A in the U.B.C. and specify column impact
protection in garage areas per
Section W03 (b) 5. As a minimum, show a
twenty-two gauge steel jacket around each column
to a height of three feet above the ground for
impact protection.
Structural members such as beams
^/supporting more than one floor or roof must be
individually fire protected
(Section 4303 (b) 6). Detail required
protection, per Table 43-A or NRB-250, U.L. etc.
113. Clearly specify minimm thickness of walls
-and slabs to provide -hour fire-
resistive rating per Table 43-B and C. Clearly
specify •«•<"•* «•«• cover for bonded reinforcing at
fire-rated columns.
fire-rated beams. Clearly
specify mir •*'""''! cover for prestressed concrete
tendons per Section 4303 (c) 3.
(lU). Detail all plumbing and electrical
penetration at occupancy, area, corridor or
other fire separation walls as specified in
Section 4304 (e).
olSJL Detail all furred ceilings as required in
Section 4203. Show fire-retardant treated wood
where necessary. (.*-" \-~\-\ o°fPl»-"& ^KT. * I*)
Provide cross-section of one-hour
corridors serving an occupant load of ten or
more. Label corridors on plans as one-hour
corridors; specify on the plans all doors as
twenty-minute fire assemblies with self-closers
or automatic closers with smoke detectors, and
all windows as 1/4 inch wire glass in steel
frames and all duct penetrations to have fire
dampers. Section 3305 (g), Section 3305 (h).
1Z7 . Clearly label and identify on the plans
/the fire-resistive corridors, area separation
walls, shafts, occupancy separation walls and
floors, exit courts less than ten feet wide and
exit enclosures, along with their hourly
ratings. Section 302 (c).
6. OCCOPA1ICT
Storage or laundry rooms that are within
R, Division 1 occupancies, that are used
in common by tenants, shall be separated from
the rest of the building by not less than one-
hour fire-resistive occupancy separations.
Section 1202 (b).
O33. Provide a full one-hour occupancy
separation between R-l and M-l or B-l (M-l up to
3,000 sq. ft.) occupancies. Fire protection
only on the garage side applies only to R-3/M
occupancy separations, not R-l/M occupancy
separations. Table 5-B and Section 503 (d).'
13. Provide one-hour fire-resistive door
assemblies in the one-hour occupancy separation.
Section 503 (c). &«1mg<r» pexrk«»vr £ lwr>-.< rm
The required three-hour rated occupancy
separation between R-l and B-l occupancies may
be reduced to a two-hour rating when the B-l is
limited to the storage of passenger vehicles,
and the provisions of Section 702 are not
applicable (Table 5-B). The two-hour occupancy
separation may be further reduced to one-hour,
if the aggregate area of B-l occupancy within
the building does not exceed 3,000 sq. ft.
Section 503 (d).
(l3^f. Garages are not permitted to open into a
room used for sleeping purposes. Section 1104.
PafU'*< dim<«*nmfl on
iT f ^ ,-.-,,>, A >-«Jius .
8
2/13/86
yK. A B-l occupancy in the basement or first
'story may be classed as a separate and distinct
building for the purpose of area limitation,
limitation of number of stories and type of
construction, per Section 702, only if the
following conditions are met:
a. B-l is Type I construction.
b. B-l/R-1 are separated by a three-hour
occupancy separation.
c. B-l is restricted to passenger vehicle
storage, laundry rooms and mechanical
equipment rooms. (No storage,
recreation room, etc.).
d. The ••••*•!«•«» building height does not
exceed the limits in Table 5-D for the
least type of construction.
_-hour occupancy
Jfere
The Type I construction is required to
3/4 hour protected exterior wall openings
when located within twenty feet from a property
line, and no openings are permitted less than
five feet. Section 1803 (b).
All openings in floors forming a
/three-hour separation shall be protected by
vertical enclosures above and below the opening.
The walls of such enclosures shall be not less
than two-hour fire-resistive construction, and
openings therein shall be protected by a one and
one-half hour assembly. Section 303 (c), Tables
4.3 - A, B, C and Chapter 43.
Reparation is required between
occupancy and the ________^_^ occupancy.
Table S-B, Section 503 (d), Tables 43 - A, B, C
and Chapter 43.
139. Structural members supporting an occupancy
separation must have the same fire-resistive
rating as the separation. Table 5-B, Section
503 (b), Tables 43 - A, B, C and Chapter 43.
No openings are allowed in a four-hour
/fire-resistive occupancy separation wall.
Section 503 (c).
\UL. Openings in a three-hour fire-resistive
^separation shall be protected by a three-hour
assembly, and openings may not exceed twenty-
five percent of the length of wall in the story
and no single opening shall exceed 120 sq. ft.
Section 503 (c), Tables 43 - A, B, C and
Chapter 43.
A two-hour fire-resistive occupancy
/separation shall be not less than two-hour fire-
resistive construction. Openings shall be
protected by a one and one-half hour assembly.
Section 503 (c), Tables 43 - A, B, C and
Chapter 43.
O43). A one-hour fire-resistive occupancy
separation shall be not less than one-hour fire-
resistive construction. Openings shall be
protected by a one-hour assembly. Section 503
(c). Tables 43 - A, B, C and Chapter 43.
e>efiuten Parkin* J Z?>nin< rnt. SKT.it k> .
(14W. Occupancy separation wall penetrations
must be either ferrous or copper and fire-
stopped. Steel electrical outlet boxes, not
exceeding sixteen square inches per one hundred
square feet of wall, may be installed and shall
be separated by a horizontal distance of
twenty-four inches when on opposite sides of
a wall. Section 4304 (e).
9
2/13/86
145. Fire-resistive floors used for occupancy
Reparation shall hare openings .protected per.
Section 503 (c).
&9- Ducts penetrating one or two-hour. .
occupancy or area separation walls must have
fire dampers. A fire door is required for
three-hour~separations. Section 4306 (j).
14X Usable space under the first story, vhen
constructed of metal or wood, shall be protected
on the side of the usable space as required for
one-hour fire resistive wall and ceiling
construction and the door to the usable space
shall be self-closing, of nonconbustible
construction or solid wood core, not less than
1-3/4 inches in thickness. Section 1703.
Show the details and the basis for the
bating of the occupancy separation you propose,
i.e., item number in Table 43 - A, B, C; Gypsum
Fire-Resistive Design Manual; U.L., etc.
14^.Wall and floor/ceiling assemblies
separating dwelling units from each other and
from common space (such as corridors, laundry
rooms, common garages, service areas, etc.) must
have a listed rating of SIC 50 and IXC SO. Show
the- location of and provide details of the.
listed wall, and floor/ceiling assemblies, and
indicate the listing agency and listing .number .
for the tested ratings.
(Title 25, Chapter 1, Subchapter 1, Article 4,
Section 28) UBC Standard No. 35 (1-3) UBC
Appendix Chapter 35.
O&ty. Show the location of and provide details
of* the listed wall and floor/ceiling assemblies,
and indicate the listing agency and listing
number for the tested ratings.
O61). Show how penetrations of assemblies for
piping, electrical devices, recessed cabinets,
bathtubs, soffits or heating, ventilating or
exhaust ducts shall be sealed, lined or
insulated or treated to maintain the required
ratings.
Dwelling unit entrance doors from interior
'corridors together with their perimeter seals
shall have a STC rating of not less than 30.
103. R-l occupancy buildings, located in noise
'critical areas (CNEL contours of 60 dB) as shown
on the City or County's General Plan, require an
acoustical analysis showing that the proposed
building has been designed to limit noise in
habitable rooms to CNEL of forty-five dB. Where
windows must be closed to comply, it is
necessary to provide mechanical ventilation
capable of providing at least two air changes
per hour, provide design.
The Title Sheet or Site Plan should
clearly indicate if any portion of the project
is in a noise critical area (CNEL contours of 60
dB) as shown on the City or County's General
Plan. If no portion of the project is within a
noise critical area, provide a note on the Title
Sheet stating: "This project is not within a
noise critical area (CNEL contour of 60 dB as
shown on the General Plan".
Uo. In all occupancies, floors above the first
/story having more than ten occupants, shall have
not less than two exits, except only one exit is
required from a second floor area within an
individual dwelling unit. Two or more dwelling
units on the second story may have access to
only one common exit when the occupant load
tributary to the stairway does not exceed ten.
Section 3303 (a).
10
2/13/86
n7B. Exits should have a minimum separation of
one-half the nyivitrcna overall diagonal dimension
of the building or area served.
Section 3303 (c). ^ <zg' (u», f~A V/yV^/oor.)
^hei
The maximum number of required exits and
eir required separation must be maintained
until egress is provided from the structure.
Section 3303 (a).
Where a required exit enters a yard, the
must lead to a public way. Section 3301.
17u. Minimum exit court width is forty-four
'inches. Section 3311 (b).
Where required exits enter an exit court
/"(see definition, Section 404 and 3301), the exit
court must discharge into a public way or exit
passageway. The exits from the exit court shall
comply with Section 3311 requirements for width,
number, and protection of walls and openings.
116. Basements require two exits, except
/Basements in an individual* dwelling unit.
Section 3303 (a).
Total width of exits in feet shall be not
less than total occupant load served divided by
fifty. Tributary occupant load from basements
and stories above shall be per Section 3302 (b)
and the maximum width required for any story
shall be maintained.
IT/. No point in the building shall be more
man one hundred fifty feet (two hundred if
sprinklered) from an exterior exit, horizontal
exit, enclosed stairway or exit passageway,
measured along the path of travel. This may be
increased one hundred feet if the last one
hundred fifty feet is in a corridor. Section
3303 (d) (see exceptions).
U*. Double acting doors are not allowed when
'serving a tributary occupant load of more than
one hundred, or when part of a fire assembly, or
part of smoke and draft control or when equipped
with panic hardware. Section 3304 (b).
1?0. Exit doors from each unit should be a
minimum size of three feet by six feet eight
inches with a minimum door swing of ninety
degrees. Maximum leaf width is four feet.
Section 3304 (e) and (f).
Regardless of occupant load, a floor or
"landing not more than 1/2 inch below the
threshold is required on each side of an exit
door. In R-3, and individual units in R-l, a
maximum 7-1/2 inch drop may occur provided the
door does not swing over the drop.
Section 3304 (h).
Doors should not project more than seven
/Inches into the required corridor width when
fully opened, nor more than one-half of the
required corridor width when in any position.
Section 3305 (d).
Revolving, sliding and overhead doors are
not permitted as exit doors. Section 3304 (g).
W*. A door may open over a stairway landing
provided the door, in any position, does not
reduce the clear area of the landing, in any
direction of travel, to less than one-half the
required width of the stairway.
Section 3306 (g).
Change in width in an exit court shall be
.effected gradually by a guardrail at least
thirty-six inches high and making an angle of
not more than thirty degrees with axis of the
court. Section 3311 (b).
11
2/13/86
ttiffl. The handgrip portion of all handrails
shall be not less than 1-1/4 inches nor more
than two inches in cross-sectional dimension.
Handrails projecting from walls shall have at
least 1-1/2 inches between the wall and the
handrail. Section 3306 (j). 5>ioxj At&< h
209. Every stairway landing shall have a
/dimension, measured in the direction of travel,
at least equal to the stairway width.
Section 3306 (g).
£u). Openings in the exterior wall below or
within ten feet horizontally of an exterior exit
stairway in buildings over two stories shall be
protected by a self-closing assembly having a
three-fourths-hour rating, unless two separated
exterior stairways serve an exterior exit
balcony. Section 3306 (1). £arT/i7
To<ht.
J.
. ufftr
Corridors, and exterior exit balconies,
Serving ten or more occupants must be a minimum
of forty-four inches wide and seven feet high to
the lowest projection. Corridors serving R-3
and individual R-l units may be thirty-six
inches wide. Section 3305 (b).
When a corridor or exterior exit balcony
accessible to the handicapped, changes in
elevation shall be made by means of a ramp.
Section 3305 (f).
Corridors serving ten or more occupants in
R-l or thirty in other occupancies shall have
walls and ceilings of one-hour construction
except:
a. Corridors greater than thirty feet
wide when the occupants or areas
served by the corridor have an exit
independent from the corridor.
b. Exterior sides of exterior exit
balconies. Section 3305 (g).
216. One-hour fire-rated corridors shall have
aoor openings protected by tight-fitting smoke
and draft control assemblies rated twenty
minutes, except openings in interior walls of
exterior exit balconies. Doors shall be
maintained self-closing or be automatic closing
by action of a smoke detector per Section 4306
(b), doors shall be gasketed to provide a smoke
and draft seal where the door meets the stop on
sides and top. Section 3305 (h).
2*7. Total area of all openings, except doors,,
in any portion of an interior corridor, shall
not exceed twenty-five percent of the area of
the corridor wall of the room which it is
separating from the corridor.
Section 3305 (h).
Duct penetrations of fire-rated corridor
'alls and ceilings shall have fire dampers per
Section 4306 (j).
2iy. Viewports in twenty minute rated corridor
.doors cannot exceed one inch in diameter and
must have 1/4 inch thick glass and metal holder
that will not melt at 1700 degrees F.
Section 3305 (h).
Openings for rubbish or linen chutes shall
it be located in exit corridors or stairways.
Section 1706 (c).
Ml. Provide a complete architectural section
of the corridor, and exterior exit balcony,
showing all fire-resistive materials and details
of construction for all floors, walls, roof and
all penetrations. Section 3305 (g).
2/13/86
(253. Window area oust be at least 1/10 of the
floor area (minimum 10 sq. ft.) in £.fjv> f>'*t**
Section 1205 (a).
256. Openable window area oust be 1/20 of the
yrloor area (™-iT'i"»"« 1-1/2 sq. ft.) in bathrooms,
laundry rooms and similar rooms.
Section 1205 (a).
257. One-half of all required window area mustopenable in ___________^_______
258<, No habitable room, other than a kitchen
snail be less than seven feet in any dimension.
Section 1207 (c).
259. Show a seven foot, six inch
roiling height for habitable rooms other than
the kitchens. Section 1207 (a).
V-260". Show a seven foot niniaiim ceiling height
/for the kitchens, halls, corridors, laundry
rooms and bathrooms. Section 1207 (a).
261. Provide thirty inches clear width in water
/closet compartments and twenty-four inches
clearance in front of the water closet.
Section 511 (a).
262. Provide smoke detectors which will sound
/an alarm when actuated. Detectors must be
permanently wired in new construction but may be
battery operated in existing construction.
Section 1210.
Show location of fire extinguishers.
25 CAC.
Specify safety glazing for glazing in
hazardous locations such as glass doors, glazing
adjacent to such doors and glazing adjacent to
walking surfaces. Section 5406.
P65). Glazing, in the same wall plane as a door,
must belafety glazing if within 12" of the door
and less than 60" above the walking surface,
unless the glazing is leaded on faceted glass.
Section 5406 (d) 7. to.HcJQ.QS ,
266\ Glazing in shower and tub enclosures shall
be tempered, laminated or approved plastic
(including windows within 5 feet of tub or
shower floor). Section 5406 (d) 5. !-«. ....
N.
280. Fire-retardant roof cover is required for
/R~l occupancies which are more than two stories,
or have more than three thousand sq. ft. of
projected roof area, or where less than ten feet
from the extremity of the roof to a property
line or an assumed property line.
Section 3202 (b) and 3203 (e).
A Class fire-retardantyL
roof covering is required.
2^2. Specify roof slope.
223. Roof slope is not adequate for roof type
'specified. Table 32-B; Section 3203 (h).
Specify roof material and application,
'chapter 32.
16
2/13/86
&». Specify I.C.B.O. or U.L. approval number
for roof materials not covered in U.B.C., e.g.,
title, etc., Section 107. ^r roa^T.U.S -_
M. MASCMg
2S&. The iMvfii*™ slope for a fire retardant
/built-up roof, with rock or gravel surfacing, is
3 inches in 12 inches, Section 3203 (e) 2.
Xhe nrin-iimim slope for a fire retardant
ilt-up roof, with cap sheet surfacing, is 1/2
inch in 12 inches. Section 3203 (e) 3.
298. Specify minimum 1/4 inch per foot roof
/slope for drainage or design to support
accumulated water. Section 3207 (a), Section
2305 (f) and Section 2511 (d) 6.
Show roof drains and overflows.
/Section 3207.
Provide skylight details to show
/compliance with Sections 3401 and 5207 or
provide I.C.B.O. approval number.
(g9J). Plastic skylight must be separated from
each other by at least 4 feet.
Section 5207 (a) 6. /&*>/ $ra»->,~
D92). Show attic ventilation. Minimum vent area
is 1/150 of attic area or 1/300 of attic area if
at least 50% of the required vent is at least 3
feet above eave vents or cornice vents. Show
required area and area provided.
Section 3205 (c).
294. Provide a minimum 22" x 30" (or 30" x 30"
if equipment is in attic) attic access opening.
Section 3205 (c).
Provide fireplace construction details or
'note construction to be per attached fireplace
standard drawing. Chapter 37.
295". Show veneer support and connections in
/Seismic Zones 3 and 4, comply with Section 3002,
4, 5, 6, and Section 2515 (a) regarding ties and
#9 wire in horizontal joints or show
construction to be per attached sheet 30-1 or
30-2.
^9^. Show height and construction details of
all masonry walls. Chapter 24. for
WT), Note that cleanout openings shall be
provided at the bottom of all cells to be grout
filled over 4' in a single pour. Cleanout shall
be sealed before grouting, after inspection.
Section 2414 (a) 8.
188.Show floor and roof connections to masonry
/walls. Connection shall resist 200 pounds per
lineal foot or the actual design load, whichever
is greater. Cross grain tension or bending in
wood ledgers is not permitted.
Section 2312 (j) 3. A.
299. Provide details for damp proofing the
/foundation walls, below finish grade, where
useable space exists on the interior side of the
walls. Section 1707 (d).
Show a minima 2" airspace and flashing
/between planter and building walls.
Section 2516 (c) 7.
17
2/13/86
315. Show rafter ties. Rafter ties shall be
./spaced not more than 4 feet on center and be
just above the ceiling joists, where rafters and
ceiling joists are not parallel.
Section 2517 (h) 4.
3Z6.
/thai
Show rafter purlin baces to be not less
'than 45 degrees to the horizontal.
Section 2517 (h) 5.
/•^late
Show 1/2" minimm clearance between top
of interior partitions and bottom chord of
trusses. (To ensure loading will be as
designed).
128. Show double top plate with minima 48" lap
/splice. Section 2517 (g) 2.
3^. Show nailing will be in compliance with
/Table 25-Q.
320. Show or note fire stops at the following
/locations per Section 2516 (f):
a. in concealed spaces of stud walls and
partitions, including furred spaces,
at the ceiling and floor levels and at
10 foot intervals along the length of
the wall.
b. at all interconnections between
concealed vertical and horizontal
spaces, such as occur at soffits,
drop ceilings and cove ceilings;
c. in concealed spaces between stair
stringers at the top and bottom of
the run and between studs along and in
line with the run of stairs if the
walls under the stairs are unfinished;
and
d. in openings around vents, pipes,
ducts, chimneys, fireplaces and
similar openings which afford a
passage for fire at ceiling and floor
levels, with noncombustible
materials.
(321. Show stud size and spacing. Maximum
allowable stud heights; bearing wall; 2x4 and
2x6 max. 10' ; non-bearing: 2x4. max. 14' , 2
x 6 max. 20'. Table 25-R-3.
. 5-tc,'$- o^shT- iff- _
(32. Studs supporting two floors, a roof and
ceiling must be3x4or2x6at 16" o.c.
Table 25-R-3.
023. Note an A.I.T.C. Certificate of Compliance
for glued laminated wood members shall be given
to the building inspector prior to erection.
Section 306 (f).
324. Detail all post to beam and post to
/footing connections and reference the detail to
the plan. Section 2516 (m).
325. Detail shear transfer connections,
/including roof and floor diaphragms, to shear
walls. Section 2513.
(32$. Specify nail size and spacing for all
shear walls, floor and roof diaphragms.
Indicate required blocking. Maintain nmvi™™
diaphragm dimension ratios. (Tables 25 I, J,
K) and Section 4713 (d).
.-P. L-2.-L.-7
19
2/13/36
3Vf. Show 3" x V or 2" x 6" studs in first
/Story of three story building. Table 2S-R-3.
Via. Provide truss details and truss
/calculations for this project.
@2$. Provide roof framing plan and floor
framing plan. Section 302 (a) 7.
Provide framing sections through:
Section 320 (a) 7.
321. Specify all header sizes for opening over
'V wide. Section 2517 (g) 5.
332. Provide calculations for main vertical and
Horizontal framing members and post footings.
Section 302 (a) 7.
Provide calculations for lateral loads,
"shear panels, shear transfer and related.
Section 302 (9)'7.
O34. Show on the plans all structural
requirements developed in the structural
calculations.
the structu
(tfZ~J! q>*»
M6. Co
'masonry
'A' f. '
Columns and posts located on concrete or
floors or decks exposed to the weather
or to water splash or in basements and which
support permanent structures shall be supported
by concrete piers or metal pedestals projecting
above floors unless approved wood or natural
resistance to decay or treated wood is used.
Section 2516 (c) 4.
Individual concrete or masonry piers shall
''project at least 8 inches above exposed ground
unless the columns or posts which they support
are of approved wood of natural resistance to
decay or treated wood is used.
Section 2516 (c) 4.
Wood stud bearing walls, with studs at 2V
'o.c., require 3 ea. 2 x 4 or 2 ea. 2 x 6 or 2
ea. 3 x 4 top plates if supporting either floor
members or roof trusses that are spaced more
than 16" o.c. and do not bear within 5" of the
supporting stud. Section 2517 (g) 2.
338. Specify plywood grade and panel
identification index. Table 25-N.
330. When roof pitch is less than 3:12, design
ridge as a beam. Section 2517 (h).
If foundation cripple wall studs are less
IV framing shall be solid blocking.
Section 2517 (g) 4. M^J
(3AJ. Cripple wall studs exceeding 4. feet in
height shall be 3 inch by 4. inch or 2 inches by
6 inches when supporting 2 stories.
Section 2517 (g) 4. ^-fc <yn 5*e- f>lgn,
34Z. Show plywood sheathing over exposed eaves,
/or other weather exposed areas, is exterior
grade. Section 2516 (g) 3.
/.
'liiM
3. Show a weep screed at the foundation plate
line, on all exterior and stud walls to be
stuccoed. Section 4706 (e).
36"Show corridor width to be
/Section 3305 (b).
.-». Qr>' I OVtr A-g. - U -•*
rso.tsngP.rT-n;>>
Carry be
20
2/13/86
yfi. Specify truss layout for 30" x 30" attic
'access.
Ridges, hips, and valleys shall b« at
'least one size larger than supported rafters.
Section 2517 (h) 3.
/.
/tias
In open beam construction, provide strap
'ties across the beans at the ridge support.
Section 2501 (b).
Per soils report, note on the plan the
Soils classification? whether or not the soil is
expansive, and note the allowable bearing value.
Section 2905 (c).
•9. The foundation plan does not comply with
'the soil report recoonendation for thi« project.
Please review the report and modify design,
notes and details as required to show
compliance.
350. Provide notes on the foundation plan
/ttsting the soils report recommendations for
foundations, slab and building pad preparation.
351. The soils report recommends excavations be
/reviewed by soils engineer. Note on the
foundation plan that "Prior to the Contractor
requesting a Building Department Foundation
Inspection, the soils engineer shall advise the
building official in writing that:
1. the building pad was prepared in
accordance with the soils report;
2. the utility trenches have been
properly backfilled and compacted,
and;
3. the foundation excavations, formings
and reinforcements comply with the
soils report and approved plan".
351. Show height of all foundation walls.
Chapter 23.
3Sar. Show height of retained earth on all
foundation walls. Chapter 23.
m. If cut or fill slopes exist, show distance
fit foundation to edge of cut or fill slopes and
show steepness and heights of cuts and fills.
Chapter 29.
Note on plans that wood shall be 6"
above finish grade.
Section 2516 (c) 7.
35/. Note on plans that surface water will
/4rain away from building and show drainage
pattern and key elevations. Section 2905 (f).
Dimension foundation per U.B.C.
'able 29-A.
Floors
Supported* Steawall Width, Deotfr
1 6" 12" 12"
2 8" 15" 18"
3 10" 18" 2V
^Foundations may support a roof in addition to
the floors. Where only a roof is supported, use
foundation for one floor.
35^. Show foundation sills to be pressure
'treated, or equal. Section 2516 (c) 3.
359. Show foundation bolt size and spacing.
/Section 2907 (e).
180. Specify size, I.C.B.O. number and
/manufacturer of power driven pins. Show edge
and end distance and spacing. Section 306 (f).
U.as,. .^ iv»A t>«-C- . At
.^<.
*/V' £ 'c
21
2/13/86
yfi. If required by structural calculations,
/show size, iabedment and location of hold down
anchors on foundation plan. Section 2312 (f).
(5ra. If hold downs are required by
calculations, note on plan that hold down
anchors must be tied in place prior to
foundation inspection. Section 305 (e) 2.
Show adequate footings under all bearing
'walls and shear walls. Section 2907 (b).
36></ Show on the elevations, stepped footings
/for slopes steeper than 1:10. Section 2907 (c).
365. Show fir1 <•"• 18" clearance from grade to
yrottom of floor joists and minimum 12" clearance
'to bottom of girders. Section 2516 (c).
/366. Show pier size, spacing and depth into
^undisturbed soil. Table 29-A.
367. Show mtr•*"•"" underfloor access of
Xa" x. 2V. Section 2516 (c).
^6w. Show mJnimiB underf loor ventilation equal
to 1 sq. ft. for each 150 sq. ft. of underfloor
area. Openings shall be as close to corners as
practicable and shall provide cross ventilation
on at least two approximately opposite sides.
Section 2516 (c).
Specify that posts embedded in concrete
be pressure treated per UBC Std.
No. 25-12. Section 2516 (c).
All heating, ventilating, and cooling systems
and appliances shall comply with the Uniform
Mechanical Code.
(37p. Show the size, location and type of all
heating and cooling appliances or systems.
^TJI. Show source of combustion air to furnace,
per Qiapter 6, UMC. '" la"*r 4loorf>lan .
372. Every dwelling unit shall be provided with
heating facilities capable of maintaining a room
temperature of 70 degrees F. at 3 feet above the
floor in all habitable rooms. Show basis for
compliance. UBC Sec. 1211.
374. Show minimum 30" deep unobstructed working
/space in front of furnace. Section 505, UMC.
37jy. Note on plans, clearances to be per
manufacturer's listing. Section 504, UMC.
372T. Furnace shall not be installed under any
yttairway. Section 704, UMC.
3?e. Furnace shall not be installed in any
'bedroom, bathroom or in a closet or confined
space with access only through such room, unless
specified as direct vent appliance, enclosed
furnace or electric heating appliance.
Section 704 UMC.
3Z7. Show I.C.B.O. approval number for prefab
. •fireplace.
• 378. Show access to the attic or underfloor
'furnace to be m-in-i^im 30 inches by 30 inches.
Section 70S & 709 UMC.
n eJ. n vi
S 3*
3x4 TT
22
2/13/36
379. Mote that passageway to the attic furnace
'shall be unobstructed and have continuous solid
flooring not less than 2i» inches wide.
Section 708 UMC.
380. Show permanent electrical outlet and
'lighting fixture controlled by a switch for the
attic furnace. Section 708 UMC.
Show details to comply with Section 709
furnace under the floor, or Section 710 for
roof or outside furnace.
(38^. Note on plan: Gas vents and
noncombustible piping passing through three
floors or less shall be effectively draft
stopped at each floor or ceiling.
UBC 'Section 1706 (a) 6.
Ipb. Electrical receptacle locations and/or
/spacing is not adequate in __^__^^_____
Show at least one convenience outlet other
outlets for laundry, etc., outdoors, in
garages and basements: NEC Art. 210-52.
388. Note convenience outlets in bathrooms,
Outdoors, and in garages and basements (other
than for laundry and similar equipment) shall be
GFI protected, NEC Art. 210-8.
S.KUCBtTCM. fl9Hb NATTOHAI. WJCTUTCAt.
). Note electrical system ground to be
provided per NEC Art. 250-31.
I. PinBHHG (1982 UIHfUKM PUMBUI
All wiring shall comply with the National
Electrical Code.
83). Show, on the plan the amperage of the
electrical service, the location of. the service
panel and the location of any sub-panels.
^38*. Provide a single line diagram and load
/calculations including:
a. Wiring method employed.
b. Sizes of all conductors, switches,
circuit breakers, fuses, and
conduits.
c. Approximate length of service
feeders.
MB. Show location of all electrical
receptacles.
§9JJ. Show water heater size, type and location
on plans. UPC Section 1310.
Show source for providing combustion air
fuel burning water heater. If wall opening
in an enclosure are used, at least one-half of
the required opening area shall extend into the
upper twelve inches of the enclosure and one-
half within the lower twelve inches. UPC
Section 1307.
392. Fuel combustion water heater shall not be
/installed in bath or bedroom or in a closet
opening into bath or bedroom.
UPC Section 1309.
Provide adequate barrier to protect water
/neater from vehicle damage. UPC Section 1310.
PI/
i n S *7T*T <±r^~t h*. ^StSf.
>* A Pt-f/tn
23
2/13/86
y£. Show I and P Valve on water heater and
'show route of discharge line to exterior.
UPC Section 1007 (e).
Provide dryer vent to outside.
Section 1903.
39/f. Note on the plan that hose bibbs and lawn
/Sprinkler systems shall have approved backflow
prevention devices. UPC Section 1003.
397. Show stall shall accommodate a 30" circle
/tad have a minimum floor area of l,02fc sq. in.
UPC 909 (d).
19ff. Provide an 18" raised platform for any FAU
/water heater, or other device in the garage,
which may generate a flame or spark, UMC Section
SOS, UPC Section 1310 (a).
State regulations (California Admin. Code)
require that the design satisfy one of the
attached alternative energy packages or submit
calculations. The law also requires that many
mandatory conservation items be satisfied.
^Torrni
394. Show on the Title Sheet of the plans, the
'required elements of the alternative energy
package that was selected, and next to each
element show how you are complying with each
element. If calculations were used, provide
similar data on the plans.
t&S. The plan sheet showing the required
Xelements of the selected energy package, and
listing the design elements showing compliance
with that selected package, must be signed by
either **frw owner or a licensed prof essior""!«
i.e., architect, engineer or contractor. A
design professional must note his/her state
license number. Section 1W)3 of Title 20.
Show on the plans the "R" value for the
, floors, ceiling and related areas.
0. Show double glazing as per Energy Design,
on Glazing Schedule. J>er- e^
feoa. Show on the plan how shading requirements
are satisfied. <,<><. ttn/^- ft -\ <"* Of 'S •-
Ww. The plans are not in compliance with the
energy conservation compliance package selected
or design calculations provided. Show on plans
conformance as follows:
g\TK<<rir><»
Pe w
W>5. Specify on the building plans all of the
/mandatory energy conservation requirements as
listed on the enclosure titled, "Mandatory
Energy Conservation
(j06^ Show the size, type, make, model and
location of the space heating (or cooling)
system and provide energy calculations if the
output BTU/Hr. exceeds <t5,000.
e^*«^y
servationEnergy conservation design should be for
/Zone . See attached energy packages.
408'. See additional corrections, or remarks, on
^attached sheet.
2/13/86
CXBLSBAD B-l SUPPLEMENT
42^. Show details for waterproofing masonry
/ walls below grade where Interiorr finished floors exist (City Policy No.
80-8).
All new residential buildings, including
additions, require a soils report. Please
submit two copies.
18.04.260 Section 3802(b)5 and 6 added
- Automatic Fire Extinguishing Systems.
Section 3802(b) of the Uniform Building
Code is amended by the addition of Subpara-
graphs 5 and 6 to read:
"5. In all buildings, which are two or
more stories In height and where the
floor level of one or more stories
or a basement lies below the lowest point
of vehicular access for fire department
apparatus, as determined by the Fire Chief.
"6. In all buildings, where the aggregate
floor area of all floors exceeds 10,000 square
feet.
EXCEPTIONS: (1) Where a four-hour rated area
separation wall with no openings or
penetrations therein has been constructed
such that no aggregate floor area
between such walls exceeds 10,000
square feet.
(11) Where a sprinkler system has
' been approved and installed according to
the Carlsbad Fire Department Standards
for Residential Sprinkler Systems.
This shall apply only to residential
occupancies of Type V construction
and the sprinkler system does not qualify
the buildings for the area increaseor substitutions cited In Chapter 5
of this building code.
(ill) In residential occupancies
of Type V construction, two adjacenttwo-hour rated fire walls, with no
openings, except one approved penetra-
tion for utilities, will be permitted.
The walls must conform to all provisionsof the most recently adopted Uniform
Building Code and be approved by
the Building Official and the Fire Chief*.
Parapets are not required when a four-hourwood wall is constructed to avoid install-
ing a sprinkler system required only
by City Ordinance. If the wall is
also serving as a U.B.C. required sep-
aration wall, parapets are required unless
the. code specified constructions, in -
lieu of parapets, is provided.
The Fire Department has ruled, and Marty
has concurred that a planned unit development,
with property lines between (R-3) must
conform to the 10,000 sq. ft. sprinkler
ordinance, even though these individual
units have two - one hour walls on each
side.
New residential units must be pre-plumbed
for future solar water heating. Note
"two roof jacks must be installed" where
the water heater is in the one story
• garage and directly below the most south
facing roof (City Ordinance No. 8093).
Note "two 3/4" copper pipes must be in-
stalled to the most convenient future
solar panel location when the water heateris not in a one story garage and is not
directly below the most south facing
roof. (City Ordinance No. 8093).
All piping for present or future solar
water heating must be Insulated when
in areas that are not heated or cooled
by mechanical means (City Policy).
Condensate drains must connect to a wet
trap as dry traps are not permitted.(Memo 1/14/83).
P. * T. valves cannot drain to an upright
sink basin; they must drain.to floor
drain, floor sink or to the outside
(Memo 2/2/83).
Show fans are duct type; City Policydoes not permit ductless fans.
The use of flexible metal conduit asa grounding means must comply with City
Policy 84-36.
Note horizontal feeders in multiple occupancy
combustible frame dwellings, except duplexes,
shall be installed underground or outside •
the building unless approved by the BuildingOfficial (City Policy 84-37) .
UFER Ground is required (City Policy).
Show the ampere rating of the electrical
service.
Roraex is not permitted in industrial
buildings.
No wiring is permitted on the roof of
a building and wiring on the exterior
of a building requires approval by the
Building Official.
Type NM and Type NMC may be used in resi-
dential construction not exceeding two
stories and three story residential struc-
tures if the Building Official approves.
Provide single line if service exceeds
200 amps.Electrical sub-panels cannot be in concealed
locations (City Policy 80-10).
Condominium units, either R-l or postage
stamp R-3's, less than 1,000 sq. ft.
must have minimum 60 amp service andthose over 1,000 sq. ft. must have min-
imum 100 amp service (City Policy 83-33).
Provide details of roof drains to show
compliance with City Policy 84-35.
All structures require fire retardant
roof covering.
In other than single family dwellings,wood beams supporting more than one floor
or one roof in a fire-rated floor ceiling
assembly must be individually protected
per MRB-2SO, or be changed to steel pro-
tected per Table 43-A, or may be fire
retardant treated heavy timber or glu-lam,
or the area can be sprinklered in.lieu
of the fire rating (Memo 12/6/83) .
In' type V-lhr we get the 1-hr on the
structural beams and columns supporting
the exit system.
Floor drains must have auto-prime (City
Policy). .
Polybutylene and C.P.C.V. piping for
residential hot or cold water piping
is not. permitted (City Policy) Memo 1/26/82).
For R-l occupancy City Ordinance 9792
requires single car garages have minimum
clear area 12x20; double garage needsminimum 20x20. No washing machines,
etc. in clear space.
The jurisdiction has contracted with Esgil
Corporation located at 9320 Chesapeake Drive,
Spite 208, San Diego, California 92123;
telephone number of 619/560-1468, to perform the
plan check for your project. If you have any
questions regarding these plan check items,
please contact
at Esgil Corporation.
Thank you.
Enclosures:
^ fgfb/T ^£o<v,r*>e^<
25
2/13/86
Dateil-IS-27 CITY OF CARLSBAD
Prepared byi
^At>e£ VALUATION AND PLAN CHECK FEE
PLAN CHECK NO. ^ ?7-4
BUILDING ADDRESS ^lt>4\ i 3Ce><^5 OCe^n ST.
p Bldg. Dept.
B^Esgil
APPLICANT/CONTACT £o-/ &lad<- t*r<L PHONE NO. IM^-c^S^
BUILDING OCCUPANCY }Z-\ /M-l
TYPE OF CONSTRUCTION -5Z*J
BUILDING PORTION
/ / r)e<A) t \
i /y)£*iS j
{/.; (/; n£\ $ f-tfa, C (JrtffW/
bi £ fA. %jt* &* ' **^
&*(Ct>*/
£,v/r*are^fre>rr«,J<J>\<^f
Air Conditioning
Commercial
Residential
Res. or Comm.
Fire Sprinklers
Total Value
BUILDING AREA
/7H $
$0* +
4^0 *
^4£
ftfJ^iJ (f>
DESIGNER PHONE —
CONTRACTOR
VALUATION^MULTIPLIER'
53^- ^
'
&r^LyL>
JJ^~ 17
•
2^tf^
lJ^/%*
8
0
e • •
PHONE
VALUE
J&L&*3~ llttin
'
41&3& **&0 b4-
&L4f&' 7*J-$O
t
<fy*tf ^^l
<
A'^b&'lt&y-
iti^tov
Fee Adjusted To Reflect D Energy Regulations (Fee x 1.1)
Q Handicapped Regulations (Fee x 1.065)
Building Permit Fee $ . * blzlZr^So ^1
Plan Check Fee $ $ ^/^ -*S7 0l£.
COMMENTS; ^ All Fifv^rta A«~tP*r APpl \C«s»>T ^"S**. <,,T4 pla^-,— 5>KT. * 1 "^
8/4/82
0)4->ro
O
X
CQ
0)
JV
<0(X Reviewed By: Date0)
mD
X
CQ
•o
0)
0)
o:
Date: 4/Z8/Q&
Plan Check No. ^7—^ ^
Project Address: 26,^3 (.
Project Name: f^E<>M/^ k
Field Check Date:
ENGINEERING CHECKLIST
LEGEND
/
lev ^*L
Ja&}*> ST (L\)
^/MO£.I_ ^^
1,2,3
By:
LEGAL REQUIREMENTS
Site Plan
Item Complete
Item Incomplete -
Your Action
Needs
Number in circle
indicates plancheck
number that deficiency
was identified
n a
D
1.
2.
a n
a a
3.
4.
Provide a fully dimensioned site plan drawn to scale. Show: North
arrow, property lines, easements, existing and proposed
structures, streets, existing street improvements, right-of-way
width and dimensioned setbacks.
Show on Site Plan: Finish floor elevations, elevations of finish
grade adjacent to building, existing topographical lines, existing
and proposed slopes, driveway and percent (%) grade and drainage
patterns.
Provide legal description of property.
Provide assessor's parcel number.
PERMITS REQUIRED
Grading
a n
a a
a a
D a
a n
a a
a a
a a
nan
D a
5. Grading permit required. (Separate submittal to Engineering
Department required for Grading Permit).
6. Grading plans in plan check PE .
7. Need the following completed prior to building permit issuance:
A. Grading plans signed.
B. Grading permit issued.
C. Grading completed.
D. Certification letter and compaction reports submitted.
E. Grading inspected and permit signed off by City Inspector.
8. Right-of-Way Permit required for work in public right-of-way
(e.g., driveway approach, sidewalk, connection to water main,
etc).
9. Industrial Waste Permit application required. To be filled out
completely and returned to Development Processing.
FEES REQUIRED
D D
n D
a a
ODD
n D
n D
a
REMARKS:
10. Park-in-Lieu fees required.
Quadrant: , Fee Per Unit: ~, Total Fee:
11. Traffic impact fee required.
Fee Per Unit: -- , Total Fee:
12. Bridge and Thoroughfare fee required.
Fee Per Unit: — , Total Fee:
13. Public facilities fee required.
14. Facilities management fee required. Fee:
15. Additional EDU's required:
Sewer connection fee:
16. Sewer lateral required:
O.K. to issue:Date:
If you have any questions about any of the above items identified on this plan
check, please call the Development Processing Department at 438-1161.
4
1
Q)
+J(0
Q
>.
CQ
T30)5
.2
(Va:
<1>+JreO
• *
X
CQ
•a0)
.2'>
<U
Of
a)
+^n>a
>»CQ
T30)
V
'>0)oi
v- «N ro
=**==«!*
O U Oa. a. Q.
a a
a
D
PLANNING CHECKLIST
Plan Check No. 87~4 K£V Address 26^3 Oe&to
Type of Project and Use QjR£x-
|?-3Zone Use Allowed? YES
/^
NO
Setback: Front O/C Side Q/C Rear
Facilities Management Zone
School District: San Dieguito
Carlsbad
Encinitas
Discretionary Action Required
Environmental Required
Landscape Plan Required
Comments
YES \K.
YES ^
YES
San Marcos
NO
NO
NO
Type
Coastal Permit Required
Additional Comments
YES NO
OK TO ISSU DATE 4/29/38
PLAN CHECK NO.
ZONE:
>.9)
9)••*
<9&
2toQ
DD_
(0
u(V
ucro
01 g
.E t
2 c
3 -CQ
Q.
SCHOOL DISTRICT:
SETBACKS: FRONT
TYPE OF PROJECT AND USE
SAN DIEGUITO ENCINITAS CARLSBAD X SAN MARCOS
Q SIDE REAR
DISCRETIONARY ACT IONS ;^Tp9 &5- VI
REDEVELOPMENT PERMIT REQUIRED:
LANDSCAPE PLAN COMMENTS; |\Hft"
ENVIRONMENTAL REQUIRED:
COASTAL PERMIT REQUIRED: YES V
ADDITIONAL COMMENTS:
NO
OK TO ISSUE;
ENGINEERING
LEGAL REQUIREMENTS
LEGAL DESCRIPTION VERIFIED?
EASEMENTS:
APN CHECKED?
RIGHT-OF-WAY
DRAINAGE:
IPROVEMENTS:
riELD
PERMITS REQUIRED
GRADING: /1//A-
GRADING COMPLETION CERTIFIED: U)A
DRIVEWAY: TUS^^M' <& 1^tu^po3" INDUSTRIAL WASTE: ts|(A
FEES REQUIRED
PARK-IN-LIEU QUADRANT; mIV t FEE PER UNIT; L)|Ar TOTAL FEE; U/ A-
P»F.F.;^^yTRAFFIC IMPACT FEE PER UNIT; jjJ/4 TOTAL FEE; Q|A
FACILITIES MGMT. FEE: i 'BRIDGE & THOROUGHFARE
SEWER FEE (CONNECTION); XJ IA l^x'iA^. SEWER LATERAL; £
'E ADDITIONAL COMMENTSsRy IOrc»^
Q OK TO ISSUE:_
:DPD6:10/24/86
DATE:7
FILE: WORK
DOC: SHEET
FUTURE IMPROVEMENT AGREEMENT WORKSHEET
1. Parcel No.
(APN#)
2. "City", and CDvi/Jl \\ "^ racLi^
(Owner of Property)
,£.« & *7 " 'ty-t3. Property Owner has applied to city for \,£.« & *7 " 'ty-t&P &5~/ 7
n\ ' fr " - ~>- I > (Project f )V" lei A i ^(~o*nts5/p M £££e>l un p*-
4. Code of City and ^fe-P-TJ^- M _ $57^ attached hereto.
(Conditions - Resolution)
5. condition of approval of this PC & 7'4 /6l)P£>Si7\ and
(Project f)
6. requeted said re g 7 ' 4 /S&PQS' > 7 _ be granted by
(approval of Project #)
7. approval of said (r C QJ--4-/ "S&T Q$- l~/ desires to enter
(Project #)
8. Section 1 . Property Owner for vv )<
(Street Name)
9. Section 2. approval of said Tfcl ^)7 " ^ ISDP&S-H is granted.
(Project #)
10. before ___^_________________-_______________-_____—^______ °r within
(Min. 1 yr. from date of agreement)
11. contract is TZjn'lnsJartw&e unted r,Jejt $
Estimate)(Estimate)
12. Section 3. in the amount of 3& 7O~ plus any future
($ Estimate)
13. Section 9. (Legal description of property)
14. Section 10.
Improvements Estimated Costs
Subtotal $
+ 15SS Engineering Contingency $ _ <3 I O
TOTAL COST $ 2JJTt?
T
1200 ELM AVENUE
CARLSBAD, CA 92008-1989
City of Carte&afc
FIRE DEPARTMENT
PAGE1 OF
(619)438-5523
PROJECT jj^pj^y
ARCHITECT
OWNFR
OCCUPANCY K- 5 CONST
PSPRINKLERED [^TENANT IMP.
PLAN CHECK REPORT
/
ADDRESS £t,y/ ? j3&y
ADDRESS
ADDRESS
]/",**' TOTAL SO. FT. ty 3 ? O
? n
APPROVED
X
DISAPPROVED
PLAN CHECK#
<*' ~? _. L /ft I *•/
jC ^/" /J
PHONE
PHONE
STORIES Mr
APPROVAL OF PLANS IS PREDICATED ON CONFORMING
TO THE FOLLOWING CONDITIONS AND/OR MAKING
THE FOLLOWING CORRECTIONS:
1.
2.
3.
4.
5.
6.
7.
PLANS, SPECIFICATIONS, AND PERMITS
Provide one copy of: floor plan(s); site plan; sheets
Provide two site plans showing the location of all existing fire hydrants within 200 feet of the project.
Provide specifications for the following:
Permits are required for the installation of all fire protection systems (sprinklers, stand pipes, dry chemical, halon,
COz, alarms, hydrants). Plan must be approved by the fire department prior to installation.
The business owner shall complete a building information letter and return it to the fire department.
FIRE PROTECTION SYSTEMS AND EQUIPMENT
The following fire protection systems are required:
D Automatic fire sprinklers (Design Criteria: )
D Dry Chemical, Halon, COz (Location: )
D Stand Pipes (Type:
D Fire Alarm (Type/Location:
Fire Extinguisher Requirements:
]^One 2A rated ABC extinguisher for each
extinguisher not to exceed 75 feet of travel.
D An extinguisher with a minimum rating of
sq. ft. or portion thereof with a travel distance to the nearest
to be located:
D Other:.
8. Additional fire hydrant(s) shall be provided.
EXITS
9. Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.
10. A sign stating, " This door to remain unlocked during business hours" shall be placed above the main exit and
doors
11. EXIT signs (6" x 3/i" letters) shall be placed over all required ex lit s and directional signs located as necessary to
clearly indicate the location of exit doors.
GENERAL
.X 12. Storage, dispensing or use of any flammable or combustible liquids, flammable liquids, flammable gases and
hazardous chemicals shall comply with Uniform Fire Code.
13. Building(s) not approved for high piled combustible stock. Storage in closely packed piles shall not exceed 15 feet
in height, 12 feet on pallets or in racks and 6 feet for tires, plastics and some flammable liquids. If high stock pil-
ing is to be done, comply with Uniform Fire Code, Article 81.
. 14. Additional Requirements.
/ To .'
5 7T
.15. Comply with regulations on attached ^he^t(s).
-,-^f f sjf / .,'/-•*"'Plan Examiner.—r*—' ' &•' l^'
Report mailed to architect
Date-
.Met with . Attach to Plans
* OF CARLSBAD -» AGENT BILL
AB#_8684-jLL
MTQ-7/15/afi
DEPT CA_
TITLEftPPROVAL OF APPEAL OF PLANNING
COMMISSION DENIAL OF AN ADDITION
TO A DUPLEX AT 2643 OCEAN STREET
DEPT. HP.
CITY ATTYk/Z^
CITY
occQ-Q.
O1_l
o
RECOMMENDED ACTION:SDP 85-17/V-373
If Council concurs your action is to approve Resolution No,
granting the appeal and approving SDP 85-17/V-373.
ITEM EXPLANATION
The City Council at your meeting of July 1, 1986 directed the City
Attorney to prepare documents granting the appeal and approving
SDP 85-17/V-373. The attached resolution contains findings and
conditions of approval as recommended by the Planning Department.
The City Council should satisfy itself that the findings and
conditions accurately reflect your intentions in the matter, that
they state facts found by you to be true, and that they adequately
explain your reasons for granting the appeal and approving
SDP 85-17/V-373.
EXHIBIT
Resolution No. F&9/ i approving the appeal.
SAN DEGUTTO SOILS, INC.
4407 MANCHESTER AVE., SUITE 101
ENCINITAS, CA 92024
(619) 753-8997
May 22, 1985
Mr. and Mrs. David Brodien
2643 Ocean Street
Carlsbad, California 92008
SDS 7560
Subject: Limited Soil Investigation for a Proposed Second Story
Addition Located at 2641 and 2643 Ocean Street,
Carlsbad, California
Gentlemen:
In accordance with your request, we have completed a limited soil
investigation of the area beneath the proposed second story
addition. The purpose of this investigation was to determine the
size of the existing footings, establish an allowable soil bear-
ing value and to express our opinion regarding the suitability of
the existing structure to receive the proposed addition. It is
our understanding that the new addition is to go over the exist-
ing residence and west into the planted slope in the backyard
area.
Our on-site observations made on May 8, 1985, revealed the fol-
lowing information. The parcel is a westerly sloping lot
situated in Carlsbad, California. The existing two bedroom
residence appears to be founded in native soil, although no grad-
ing plans were available for our review. This home is a single
story, wood-frame structure with raised floor.
The hand dug excavation completed on the west, side of the
residence revealed the existing footing to be founded on
sandstone, typical of the Baypoint Formation. The footing was
measured to be 14 inches wide at the base and 12 inches below ad-
jacent finish grade. A soil sample was obtained beneath this
footing. Please refer to Plate No. 1.
A direct shear test was performed to determine the failure en-
velope based on yield strength. The shear box was designed to
accommodate a sample having diameters of 2.375 inches or 2.50
inches and a height of 1.0 inch. Samples were tested at dif-
ferent vertical loads and at saturated moisture content. The
shear stress was applied at a constant rate of strain of ap-
proximately 0.05 inches per minute. The results of these tests
are presented below:
Angle of Internal Friction
Apparent Cohesion
37°
60 psf
Page Two
Based on the above site observations, the condition of the exist-
ing home, and the results of the shear test, it is our opinion
that the second story addition may be constructed as proposed.
For the existing footings an allowable soil bearing value of 2100
pounds per square foot may be used for design. We suggest that
the roof rafters and floor joists be placed perpendicular to each
other in order to distribute the new loads more evenly around the
existing structure. Further, please refer to Pleite No. 2 for
foundation and retaining wall constraints. It should be realized
that some minor distress may appear after the new addition is
placed as the new loads are redistributed into the existing
structure, but no structural damage is anticipated.
Retaining walls and Lateral Loads
The foundation for the proposed retaining structures should con-
sist of spread footings founded in the firm native soils or com-
pacted fill. Firm natural ground is defined as soil having an
in-situ density of at least 85% of its maximum dry density.
Footings may be designed for an allowable bearing pressure of
2100 psf.
We recommend that retaining walls not restrained from movement at
the top and required to support lateral earth pressures due to
differential soil height be designed for an equivalent fluid
pressure of 30 pcf where the retained earth within 5 feet of the
wall is non-expansive. Retaining walls restrained from movement
at the top, such as basement or structural walls, should be
designed for an equivalent fluid pressure of 40 pcf where the
retained earth within 5 feet of the wall is non-expansive.
These pressures are based on horizontal ground surface
conditions, and adequate drainage to prevent buildup of hydros-
tatic pressure in the backfill.
To provide resistance for lateral loads, we recommend that pas-
sive pressure be assumed equivalent to a fluid pressure of 470
pcf for footings and shear keys founded in cut formational soils
or properly compacted fill soils. The upper 12 inches of
material in areas not protected by floor slabs or pavements
should be included in design for passive resistance to lateral
loads. This lateral pressure is based on the assumption that the
ground surface adjacent to the footing is nearly horizontal for a
minimum distance of 10 feet from the face of the footing or three
times the height of the surface generating passive pressure,
whichever is greater.
SAN DEGU1TO SOUS, INC.
SDS 7560
Page Three
In calculation of frictional resistance to lateral loads, we
recommend using a value of 0.4 as the allowable coefficient of
sliding friction between concrete and the underlying soil. If
combined frictional and passive lateral resistance are utilized
in design, the friction coefficient should be reduced to 0.3.
Backfill placed behind walls should be compacted to not less than
90% of maximum dry density using light compaction equipment. If
heavy equipment is used, the walls should be appropriately
braced. Expansive or clayey soils should not be used for back-
fill material within a distance of 5 feet from the back of the
wall. The retaining structure should not be backfilled until the
materials in the wall have reached an adequate strength.
If you should have any questions regarding this report, please do
not hesitate to contact this office at your convenience. This
opportunity to be of professional service to you is greatly
appreciated.
Sincerely,
SAN DIEGUITO SOILS, INC.
E. N. Ketchum, R.C.E. 26267
President
ENK/cj
cc: (2) Submitted
SAN DEGUITO SOUS, INC.
The Pacific Ocean
D
T-2
woo
o
r-l
1
Existing Residenc &
»oo
0
Sf
iH
Existing
Garage
Ocean St. 50.00'
SAN DIEGUITO SOILS, INC.
4407 MANCHESTER AVE.. SUITE W7
ENCINITAS, CA 92024
(619) 7534997
Site Map
T.S.S.JOB NO. ?560
DATE 5/23/85 PLATE
New Addition
Existing Residence
Underpin exis
ftg. if new loads Backfill to be
are applied. compacted to at
least 90%.
•Exist. Blockwall
New Retaining Walls
Concrete Slab
SAN DIEGUITO SOILS, INC.
4407 MANCHESTER AVE.. SUITE 107
ENCINITAS, CA 82024
(619) 753-6987
SITE PLAN - Cross Section
BY T.S.S.
DATE 5/23/85
JOB NO. 756Q
PLATE
'
_
M
X
CL
UJ
Q
1-
2-
3-
—
4-
5-
6-
7-
8-
10-
««
IUa
>
UJ_i
OL
5
<
M
A.
A
z
0
^i O
o i« w(0<_lu
SM
"^s
SM
TRENCH NUMBER 1
ELEVATION
DESCRIPTION
TOPSOIL: (8")
Brown silty sand with
roots
BAYPOINT FORMATION:
Tan silty medium sand
Bottom
•
H u
Z ECUI =
OC f.
et O
< 2
moist
^
moist
V
z z t
ill UI (Amm
* « Z^ UIeu 55 Q
* .0 °
loose
medium
\ dense
»•• X
Ml
UI —
° I
a:o
_/
UI E
W UI
o Z
Z 0 'o
-
zUI o
-J a.in s* Su
_
MM
—
—
—
—
—
__
^T ^
/ ^
^V<U
^
?
&
SAN DIEGUITO SOILS, INC.
4407 MANCHESTER AVE., SUITE 107
ENCINITAS. CA 92024
(619) 753-6997
SUBSURFACE EXPLORATION LOG
BY TSS JOB NO. 756Q
DATi 5/8/85 PLATE 3
*
zt-
CL
UJo
1_
2-
3-
4-
5-
6-
7-
8~
9~
10-
^v SAMPLE TYPEA
D
A SOILCLASSIFICATIONSMs
SM
TRENCH NUMBER 2
ELEVATION
DESCRIPTION
TOPSOIL: (8")
Brown silty sand with
roots
S i '
BAYPOIMT FORMATION:
Tan silty medium sand
Bottom APPARENTMOISTUREdamp
f
damp
\^APPARENTCONSISTENCYOR DENSITYloose
medium
dense DRY DENSITYIpctIx MOISTURECONTENT 1%)RELATIVECOMPACTIONS)—
•—
—
^ \
f ^
^^€$&
SAN DIEGUITO SOILS, INC.
4407 MANCHESTER AVE., SUITE 107
ENCINITAS. CA 92024
(619) 753-6997
SUBSURFACE EXPLORATION LOG
BY TSg JOtNO.?560
DATE 5/8/85 PLATE 4
SCHOOL FEE COMPLIANCE CERTIFICATION
(Government Code Section 53080(b))
This form shall be used to determine the amount of school fees for a project and
to verify that the project applicant has complied with the school fee requirements.
No building permits for the projects shall be issued until the certification is signed
by the School District and returned to the Building Department of the City of Carlsbad.
PROJECT INFORMATION (To be completed by the applicant)
Project Address: 3L^\ ^ 1£V3 o*.f~* vr~
Project Applicant: ^/A K
Project Type: ^Residential/No . of Dwellings _ Commercial _ Industrial
'Phased Project: _ Yes _ No.
Building Permits are for entire project _ Yes _ No.
Square feet of covered or enclosed space o?OOO fo __ .
Plan check or Building Permit No. 87 "^""
Official checking form <^Wl \L^i/ Date /A//f7
INFORMATION VERIFICATION (To be completed by the project applicant)
I, David H. Brodine ' declare under penalty of perjury under
the Laws of the State of California that I am the project applicant for the project
listed above and that the foregoing information is true and correct.
Executed this 14 thday of September , 198_7_, at Carlsbad ,
California.
FEE CERTIFICATION (To be completed by the School District)
X Applicant has complied with fee requirement under Government Code 53080.
Project is subject to an existing fee agreement.
Project exempt from Government Code 53080.
Final Map approval and construction started before September It 1986.
(other school fees paid)
Other - .
School District Official:
DATE
_
NAME (PRINT) PHONE NO.
TITLE
Costa Real
Municipal Water District
5950 El Camino Real, Carlsbad, CA 92008
Telephone: (619)438-2722
Engineering Dept: 438-3367
July 10, 1987
City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Attention: Carol Neu
Finance Department
Subject: Direct Connection Surcharge/
Front Line Charge For Water Service
Project: SDP 85-17/V-373-Brodine (Blackford)
Westside of Ocean Street Btwn Beech
& Cypress - CRMWD Project No. 85-C-155
A.P.N.: 203-140-10
Pursuant to Resolution No. 439 of Costa Real Municipal Water
District adopted on July 20, 1983, the subject project will be
required to pay a direct connection surcharge of $183.00. This
amount will be collected at the time of the issuance of a
building permit.
Please contact the undersigned for any questions.
Sincerely,
_„---
Robert Greaney //
District Engineer
RB:sja
cc: Ray Miller, City of Carlsbad, Building Department
Tom Brammell, General Manager, CRMWD
Other: David Brodine
2643 Ocean Street
Carlsbad, California 92008