HomeMy WebLinkAbout2654 GARDEN HOUSE RD; ; CB042018; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
07-23-2004 Residential Permit Permit No: CB042018
Building Inspection Request Line (760) 602-2725
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
07/23/2004
2654 GARDEN HOUSE RD CBAD
RESDNTL Sub Type:
2131500600 Lot#:
$280,465.00 Construction Type:
Reference#:
SFD
171
NEW
CT02-14
Status:
Applied:
Entered By:
# Dwelling Units: Structure Type: SFD Issued:
Bedrooms: 4 Bathrooms: 3.5 Inspect Area:
Project Title: HEATHER CT@ BRESSI MODEL PLN 2 Orig PC#:
3019 SF LIV,676 SF GAR, 154 SF DECK, 341 SF PORCH Plan Check#:
Applicant:
GREYSTONE HOMES
101
5973 AVENIDA ENCINAS
CARLSBAD CA 92009
760-804-7700
Building Permit
Add'l Building Permit Fee
Plan Check
Add'l Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
BTD #2 Fee
BTD #3 Fee
Renewal Fee
Add'l Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'l Pot. Water Con. Fee
Reel. Water Con. Fee
$1,104.04
$0.00
$717.63
$0.00
$0.00
$28.05
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
D5/8
$0.00
$0.00
Owner:
Meter Size
Add'l Reel. Water Con. Fee
Meter Fee
SDCWAFee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnLieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
ISSUED
11/25/2003
SB
Plan Approved:
07/23/2004
PC03-64
$0.00
$140.00
$2,004.00
$2,126.95
$5,104.46
$0.00
$0.00
$0.00
$640.00
$0.00
$0.00
$182.00
$60.00
$94.00
$0.00
$0.00
$0.00
$0.00
$1,735.00
$0.00
$19,371.13
Total Fees: $19,371.13 Total Payments To Date: $0.00 Balance Due: $19,371.13
7234 07 /23/04 00()2 OJ. 0::
CGF" 19371,,13
Inspection List
Permit#: CB042018 Type: RESDNTL SFD HEATHER CT@ BRESSI MODEL PLN 2
3019 SF LIV,676 SF GAR, 154 SF DECK, 3
Date Inspection Item Inspector Act Comments -----·--
11/29/2006 89 Final Combo PC AP
11/29/2006 89 Final Combo RI model conversion
11/17/2006 17 Interior Lath/Drywall PC AP GARAGE CONVERT. NO ONE ON SITE
TO SIGN CARD
11/15/2006 84 Rough Combo RB AP FROM SALES OFFICE BACK TO
GARAGE
11/13/2006 84 Rough Combo RB NR FROM SALE OFFICE BACK TO GARAGE
02/08/2005 89 Final Combo RB PA OK FOR MODEL USE ONLY
02/03/2005 89 Final Combo RB NR ON CO, -OK TO GIVE GAS METER
02/02/2005 89 Final Combo RB co
01/04/2005 39 Final Electrical RB AP EMR
12/30/2004 39 Final Electrical RB CA
12/03/2004 82 Drywall/Ext Lath/Gas Test PC AP
12/02/2004 14 Frame/Steel/Bolting/Weldin RB CA
12/02/2004 16 Insulation RB CA
11/30/2004 16 Insulation RB AP
11/30/2004 84 Rough Combo RB AP
11/24/2004 14 Frame/Steel/Bolting/Weldin PY PA
11/22/2004 84 Rough Combo BN NR
11/18/2004 15 Roof/Re roof RB AP
11/17/2004 15 Roof/Reroof RB NR WAITED 10MIN FOR SUPER TO SHOW
THEN LEFT
11/12/2004 15 Roof/Re roof RB CA STOP WORK ORDER BY ENG
10/28/2004 15 Roof/Reroof RB co NOT PER PLAN
10/25/2004 13 Shear Panels/HD's RB AP
10/25/2004 15 Roof/Reroof RB NR
10/12/2004 13 Shear Panels/HD's RB CA
10/12/2004 15 Roof/Reroof RB NR
09/17/2004 81 Underground Combo RB AP
09/14/2004 21 Underground/Under Floor RB AP
09/14/2004 22 Sewer/Water Service RB PA SEWER OK -NEED 12IN DEPTH FOR
WATER
09/07/2004 15 Roof/Re roof RB CA HOUSE BURNED DOWN
09/03/2004 15 Roof/Reroof RB CA BY PH@2PM
08/31/2004 15 Roof/Reroof RB NR NO PENETRATIONS RAN OR TRUSSES
STAMPED
08/06/2004 81 Underground Combo RB AP
08/05/2004 81 Underground Combo RB co
07/29/2004 21 Underground/Under Floor RB AP HAS B.W.V.
07/29/2004 22 Sewer/Water Service RB CA AP ON 7/28
07/28/2004 21 Underground/Under Floor RB co ADD 2IN CLEANOUT
07/28/2004 22 Sewer/Water Service RB AP HAS B.W.V.
07/27/2004 21 Underground/Under Floor RB co MISSING DUAL WASTE
07/27/2004 22 Sewer/Water Service RB co
Friday, December 01, 2006 Page 1 of 1
' m City of Carlsbad Bldg Inspection Request
For: 11/29/2006
'
Permit# CB042018 Inspector Assignment: RB ---
Title: HEATHER CT@ BRESSI MODEL PLN 2
Description: 3019 SF LIV,676 SF GAR, 154 SF DECK, 341 SF PORCH
Type: RESDNTL Sub Type: SFD
Job Address:
Suite:
Location:
2654 GARDEN HOUSE RD
Lot 171
APPLICANT GREYSTONE HOMES
Owner: MODEL HOMES PARTNERS L L C
Remarks: model conversion
Total Time:
Phone: 7608013406
Inspector:
Requested By: MICHAEL RICE
Entered By: CHRISTINE
CD Description
19 Final Structural
j}}/!_Comment
29 Final Plumbing
39 Final Electrical
49 Final Mechanical
Comments/Notices/Holds
Associated PCRs/CVs Original PC# PC03-64
PCR04172 ISSUED WISTERIA PL@BRESSI-MODEL FRAME; REVISIONS (ARCH/STRUCT AND PT)
lns~ection Histo[Y
Date Description Act lnsp Comments
11/17/2006 17 Interior Lath/Drywall AP PC GARAGE CONVERT. NO ONE ON SITE TO SIGN CARD
11/15/2006 84 Rough Combo AP RB FROM SALES OFFICE BACK TO GARAGE
11/13/2006 84 Rough Combo NR RB FROM SALE OFFICE BACK TO GARAGE
02/08/2005 89 Final Combo PA RB OK FOR MODEL USE ONLY
02/03/2005 89 Final Combo NR RB ON CO. -OK TO GIVE GAS METER
02/02/2005 89 Final Combo co RB
01/04/2005 39 Final Electrical AP RB EMR
12/30/2004 39 Final Electrical CA RB
12/03/2004 82 Drywall/Ext Lath/Gas Test AP PC
12/02/2004 14 Frame/Steel/Bolting/Welding CA RB
12/02/2004 16 Insulation CA RB
11/30/2004 16 Insulation AP RB
11/30/2004 84 Rough Combo AP RB
IOIL • Tit-TINO, ut( SOUTHERN CALIFORNIA SOIL & TESTING, INC.
6280 RIVERDALE STREET, POST OFFICE BOX 600627, SAN DIEGO, CA 92160-0627
Phone (6 I 9) 280-4321, FAX (619) 280-4717
17599
SCS& T FILE NO. r! LI I 7 ? I{,
P. 0. NO.: _________ _
I C I I I PL I I I NC I I I FIX I I PAGE __ OF_/ __
FIELD INSPECTION REPORT FOR: 0 REINFORCED CONCRETE •REINFORCED MASONRY •WELDING •FIREPROOFING
D a.c. CONCRETE D ROOFING/WATERPROOFING.,• P.T. CONCRETE/STRESS• EPOXY ANCHORS D H.S. BOLTING D
PROJECT TITLE: ,i I PHASE#: DSA FILE NO.: DSA APP. NO.:
I I r-,.,.-~I J,,· ,....,..,,L, r ,.,. /.-.? -,-.
PROJECT ADDRESS: --.:?, f ']_/,. CZ/ ~ ~p";-,,,::-/1 / ,.,,. ~ C , _ PERM7 NO.:
ARCHITECT: ENGINEER:
!. /-'JI-It /J~,,, I"
I --/-
PLAN FILE NO.:
1:1'
GENERAL CONTRACTOR: SUB CONTRACTOR: ' ,
LOCATION OF WORK INSPECTED: f
MATERIAL CLASSIFICATION: /.!.s,},.__,..,.. _/
DATE: DESCRIPTION OF WORK INSPECTED: TIME ARRIVED:
,_ ,--~ ,r .IJ ,r '-,.<-r ✓ r ( 7 ,,. ~ ('.;, J" I -
II. / "},·J -rr J
A ,
., i • / -
-, ,,, !! ~---~,, • .-, ' / A--1 le._ /1,, /
A I I~
,r
/ i'""? / L
TIME DEPARTED_; ,, ~z
I
..... L
,~
# I
-. /-, ~, 'T"r ~
'.-11.// r,,...
I-.,./)
,
---.../A..., /t':" I / -
I
C
UBC I hereby certify that I have inspected the above reported work. Unless noted
otherwise, the work inspected is to the best of my knowledge in compliance with the
approved plans, specifications and applicable sections of the governing building laws.
Inspector Initials--------~'------
DSA I hereby certify thal't'ha~e inspected the above reported work in accordance with the
requirements of the DSA approved documents. Sampling and testing were conducted in
accordance with the requirements of the DSA approved documents. The work inspected ,
complies with the DSA approved documents.
Yes: No: Inspector Initials:
.
I P.E. REVIEW:
/
/
INSPECTORS SIGl'lATURE / J
r ,.._,J .,1...._,. ·"-
REGISTRAflON No'.
,-' ·s,~RINTl!l'lDENTS Sl1N.ATURE CJ --
L gn.ture aulhorlze•,r· above work.
SCST 110 Rev, 10/03
FOOTING OBSERVATION SUMMARY
· Leighton and Associates, Inc.
A LEIGHTON GROUP COMPANY
Project Name: BllL<S 1 J?r.,.u;. tt Date:
Location: {~, ~.8Jtt>{J,, Project No.:
Plan File No.: Permit No.:
Referenced Geotechnical Report(s):
17}/JtJ? • 1)3,1
Unit/Phase/t9,l(s): 17 I
I ,J]i,Qcurt l't:$-WA:l>El> pq41cT oF /Lal,</trtf <I FwE' /d;9ul'tlb, htoM'l lAT tJ(Twlet.lllra -l J>tl, t t..,rs_
p,..1,,, -1~ q1, /.# 1 /3lfAMI ll!&t(ul 1 l'..Att#~ T~.A#-o~-1(,,, e.A:µ.,(Ml> ,('A 4/'Ulc ~7,Jbt>.,_
Observation Summary
ZWH Initials
'tjc,/A + Date
z wtt Initials
91,-,/0 + Date V f
ZWH
'lp-i/44:
Initials
Date
Z£Jl::I Initials
q ln/oJt Date '
A representative of Leighton and Associates observed onsite soil conditions. Soil conditions at
the site are substantially in conformance with those assumed in the geotechnical report.
A representative of Leighton and Associates observed and measured footing excavation
depth/width. Footing excavations extend to proper depth and bearing strata and are in general
conformance with recommendations of the geotechnical report.
A representative of Leighton and Associates measured footing setback from slope face. The
setback was in general accordance with the recommendations of the geotechnical report.
Notes to Superintendent/Foreman
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended.
Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an
extended period of time and the contractor should schedule accordingly.
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e.,
heavy rain, etc.), we should be contacted to perform additional site observations.
Note to Building Inspector
1. Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading.
Date
White -File Yellow-Client Gold -Field 3930 R/0403
TOOli!]
File: 2409.05
September 17, 2004
CITY OF CAR.l.SBAD
Building Department
.1635 Faraday Avenue
Carlsbad, CA 92008-7314
SUBJECT: Bressi Ranch-Model, PA-8 Re-Form Certification
To Whom It May Concern:
ProjcctDesign Consultants has field verified the form positions shown on the plot plans for
Lot 171 of the above-referenced project. Upon our review of the survey data collected on
September 16, 2004 the house footprints conform horizontally and within ±0.l' vertically
to the approved design.
Sincerely,
William R. Dick
Chief Operations Officer
IS 5276 exp. 12/31/05
i'Ol A Slrl .. "t't, Suite-800
Sun Diego, Californis"t 92101
619-235-6471 Tel
f,19-234-0349 fax
T:\$URV£Y\2409'FOJWCER1LE'l"'lER'240~JiC-M'odeb1'tl-lr.limncc,t.iloc
9SLZtCZ6l9 XYd zo:oT !Hd tO/Ll/60
971009-031
Lot Number PT Category Type Lot Number PT Category Type
PA-8 Model Lots
--::gory 2) 169 Category 2 Cn1
170 Category 2 172 Category'..!
PA-8 Phase 1 Lots
180 Category I 187 Category 2
181 Category 1 188 Category 2
182 Category 2 189 Category 2
183 Category 2 190 Category 2
184 Category2 191 Category 2
185 Category 2 192 Category 2
186 Category 2 193 Category 2
If you have any questions regarding this letter, please contact this office. We appreciate this
opportunity to be of service.
Respectfully submitted,
LEIGHTON AND ASSOCIATES, INC.
~fw~Gl612
Director of Geology
Distribution: (2) Addressee
(2) Greystone Homes, Attention: Jordon
-2 -Leighton
February 3, 2005
City of Carlsbad
Building Department
1200 Carlsbad Village Dr.
Carlsbad, CA 92008
LENNAR
Quallly Vallle /11leg111}.
Re: Request for gas meter releases for the model home only at Heather Court (P A-8)
To Whom It May Concern,
Lennar Homes is requesting the release of gas meters for the purpose of testing and
confirmation of equipment functions in the homesite. The homesite will not be occupied
prior to receiving a building final from the City of Carlsbad. Thank you very much for
your cooperation.
Sincerely, -~,-~
Brad Houghton
General Superintendent
Lennar Homes
1525 Faraday Avenue, Suite 300 • Carlsbad, CA 92008
Main: (760) 918-7700 • Fax: (760) 804-7716 • lennarfamily.com