HomeMy WebLinkAbout2657 PARADISE RD; ; CB050058; PermitCity of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
02-08-2005 Residential Permit Permit No: CB050058
Building Inspection Request Line (760) 602-2725
Job Address: 2657 PARADISE RD CBAD
Permit Type: RESDNTL Sub Type: SFD Status: ISSUED
Parcel No: 2131412100 Lot#: 120 Applied: 12/03/2004
Valuation: $238,624.00 Construction Type: VN Entered By: RMA
Occupancy Group: Reference#: CT020014 Plan Approved:
02/08/2005
# Dwelling Units: Structure Type: SFD Issued: 02/08/2005
Bedrooms: 3 Bathrooms: 3 Inspect Area: TP
Project Title: WISTERIA-BRESSI-PLAN 2-PHASE 2 Orig PC#: PC030075
2468 SF,482 SF GAR
Applicant:
GREYSTONE HOMES
101
5973 AVENI DA ENCINAS
CARLSBAD CA 92009
760-804-7700
Building Permit
Add'I Building Permit Fee
Plan Check
Add'I Plan Check Fee
Plan Check Discount
Strong Motion Fee
Park in Lieu Fee
Park Fee
LFM Fee
Bridge Fee
Other Bridge Fee
STD #2 Fee
STD #3 Fee
Renewal Fee
Add'I Renewal Fee
Other Building Fee
Pot. Water Con. Fee
Meter Size
Add'I Pot. Water Con. Fee
Reel. Water Con. Fee
$974.68
$0.00
$633.54
$0.00
($50.68)
$23.86
$2,436.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,999.00
D5/8
$0.00
$0.00
Plan Check#:
Owner:
GREYSTONE HOMES INC
1525 FARADAY AVE #300
CARLSBAD CA 92008
Meter Size
Add'I Reel. Water Con. Fee
Meter Fee
SDCWA Fee
CFO Payoff Fee
PFF
PFF (CFO Fund)
License Tax
License Tax (CFO Fund)
Traffic Impact Fee
Traffic Impact (CFO Fund)
Sidewalk Fee
PLUMBING TOTAL
ELECTRICAL TOTAL
MECHANICAL TOTAL
Housing Impact Fee
Housing lnlieu Fee
Housing Credit Fee
Master Drainage Fee
Sewer Fee
Additional Fees
TOTAL PERMIT FEES
PC04-136
$0.00
$160.00
$2,004.00
$2,848.90
$4,342.96
$0.00
$0.00
$0.00
$660.00
$0.00
$0.00
$147.00
$60.00
$85.00
$0.00
$0.00
$0.00
$0.00
$1,735.00
$457.00
$19,516.26
Total Fees: $19,516.26 Total Payments To Date: $0.00 Balance Due: $19,516.26
Inspector:~
FINALA~VAL
Date o/;~T
1412 02/08/05 0002 01
CGF"
Clearance:
NOTICE: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively
referred to as ''lees/exactions." You have 90 days from the date this permit was issued to protest imposition ol these fees/exactions. If you protest them, you must
follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for
processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack,
review, set aside, void, or annul their imposition,
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection lees and capacity
changes, nor planning, zoning, grading or other similar application processing or service lees in connection with this project. NOR DOES IT APPLY to any
fees/exactions of which uou havo nrevious1,, been• iven a NOTICE similar to thi" or as to which the statute of limitations has nreviouslv otherwise exnired,
02
19516-26
~ w City of Carlsbad Bldg Inspection Request
For: 09/19/2005
Permit# CB050058 Inspector Assignment: TP ---
Title WISTERIA-BRESSI-PLAN 2-PHASE 2
Description: 2468 SF,482 SF GAR
Type: RESDNTL Sub Type: SFD
Job Address: 2657 PARADISE RD
Suite: Lot 120
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks: ROLL
Total Time:
Phone: 7608026714 ,,,_,,/2_
Requested By: CHRIS
Entered By: JANEAN
CD Description Act Comment
19 Final Structural AL
29 Final Plumbing
±= 39 Final Electrical
49 Final Mechanical
-------
Associated PCRs/CVs
lnsQection Histo[Y
Date Description Act lnsp Comments
09/16/2005 89 Final Combo NS TP ROLLED
08130/2005 39 Final Electrical PA TP MTR. REL.
08/3012005 89 Final Combo WC TP
07/07/2005 82 Drywal\/Ext Lath/Gas Test AP PC
06/30/2005 16 Insulation AP TP
06/27/2005 84 Rough Combo AP TP
06/24/2005 84 Rough Combo NS PY
0612312005 16 Insulation NR TP WRONG LOT CALLED IN
06/1612005 84 Rough Combo NR PC WORKERS IN HOUSE
0610212005 13 Shear Panels/HD's AP TP
0512412005 15 Roof/Reroof AP TP
05/19/2005 15 Roof/Reroof NR TP
03/2212005 11 Fig/Foundation/Piers AP PC
03/2212005 12 Steel/Bond Beam AP PC
03/21/2005 11 Fig/Foundation/Piers NR BN NO S.I. REPORT
03/1812005 11 Fig/Foundation/Piers CA TP RESCHEDULE 3121
City of Carlsbad Bldg Inspection Request
For: 08/30/2005
Permit# CB050058 Inspector Assignment: TP
Title: WISTERIA-BRESSI-PLAN 2-PHASE 2
Description: 2468 SF,482 SF GAR
Type: RESDNTL Sub Type: SFD
Job Address: 2657 PARADISE RD
Suite: Lot 120
Location:
APPLICANT GREYSTONE HOMES
Owner: GREYSTONE HOMES INC
Remarks:
Total Time: Requested By:
Entered By:
CD Description Act Comment
19 Final Structural ~
29 Final Plumbing + 39 Final Electrical
49 Final Mechanical
~~ ;:'A /Y;1'lt If~ L
Associated PCRs/CVs
lns11ection Histo01
Date Description Act lnsp Comments
07/07/2005 82 Drywall/Ext Lath/Gas Test AP PC
06/30/2005 16 Insulation AP TP
06/27/2005 84 Rough Combo AP TP
06/24/2005 84 Rough Combo NS PY
06/23/2005 16 Insulation NA TP WRONG LOT CALLED IN
06/16/2005 84 Rough Combo NA PC WORKERS IN HOUSE
06/02/2005 13 Shear Panels/HD's AP TP
05/24/2005 15 Roof/Reroof AP TP
05/19/2005 15 Roof/Reroof NA TP
03/22/2005 11 Fig/Foundation/Piers AP PC
03/22/2005 12 Steel/Bond Beam AP PC
03/21/2005 11 Fig/Foundation/Piers NA BN NO 5.1. REPORT
03/18/2005 11 Fig/Foundation/Piers CA TP RESCHEDULE 3/21
03/09/2005 11 Ftg/Foundatlon/Piers WC TP
03/09/2005 12 Steel/Bond Beam WC TP
03/09/2005 21 Underground/Under Floor AP TP
---
CLINT
CHRISTINE
._;:. FOOTING OBSERVATION SUMMARY
Leighton and Associates, Inc.
A LEIGHTON GROUP COMPANY
?. .,? -·-?~ 7 Project Name: ~1 ~t+-D• _ Date:
Location:
Plan File No.: Permit No.: ---------_____ Unit/Phase/Lot(s): I/? I ~o ,I~ I l~t-'
Referenced Geotechnical Report(s):
ltT-t..~ 11,.eaz: 4£ 1?/JH •a"' ;:>4F ?tt#NAII, /t4f,1yo...rn,n.. 1~ n /--r-✓.r; 1:), -~, ,,,, v ,:..2..
, J '
('fr l--/(J(-j1 /'./!N(t ,A-;r-M".,,.✓, ~ho U-rli> 1 C,:-r-~ fn,,,.ll'f! , l~t~--Pr'--u~ ,t::n:t /('.l,J;,.,•,,.-A / /!0 '-k ~ 4
Observation Summary
Z:w 1-f Initials A representative of Leighton and Associates observed onsite soil conditions. Soil conditions at
.J ·,:, 1 0 r · Date the site are substantially in conformance with those assumed in the geotechnical report.
Zu ti Initials
.::t JI · cJfbate
A representative of Leighton and Associates observed and measured footing excavation
depth/width. Footing excavations extend to proper depth and bearing strata and are in general
conformance with recommendations of the geotechnical report.
~&~ __ Initials
~A~'/f __ Date
A representative of Leighton and Associates measured footing setback from slope face. The
setback was in general accordance with the recommendations of the geotechnical report.
kJH Initials
1-~1-{) r Date
Notes to Superintendent/Foreman
1. Footing excavations should be cleaned of loose debris and thoroughly moistened just prior to placing
concrete.
2. Based on expansion potential of underlying soils, presoaking of soil below slabs may be recommended.
Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an
extended period of time and the contractor should schedule accordingly.
3. In the event of a site change subsequent to our footing observation and prior to concrete placement (i.e.,
heavy rain, etc.), we should be contacted to perform additional site observations.
Note to Building inspector
1. Soil compaction test results, including depth of fill, relative compaction, bearing values, and soil
expansion index test results are contained in the As-Graded Geotechnical Report provided at the
completion of grading.
For LeigKf°on and Associates, Inc. {/ Date
CLIENT COPY
3930 R 1--05