Loading...
HomeMy WebLinkAbout2664 Madison St; ; CB153670; PermitPrint Date: 11/09/2017 Job Address: Permit Type: Parcel No: Valuation: Occupancy Group: # Dwelling Units: Bedrooms: Project Title: 2664 Madison St BLDG-Residential 2031100102 $260,610.00 1 3.00 BEACHWALK AT MADISON City of Carlsbad 1635 Faraday Av Carlsbad, CA 92008 Residential Permit www.carlsbadca.gov Work Class: Lot#: Reference #: Construction Type: Bathrooms: Orig. Plan Check #: Plan Check#: Condo DEV14037 SB 3.00 PC150056 Status: Applied: Issued: Fina led: Inspector: Description: BEACHWALK: UNIT 2/PLAN B/ 1,594 SF LIVING/488 SF GARAGE/75 SF 2ND FLOOR DECK/117 SF 3RD FLOOR DECK Owner: Co-Applicant: Permit No: CB153670 Closed -Finaled 10/28/2015 12/19/2016 PYork M R CARLSBAD 11 LLC VESTA PACIFIC DEVELOPMENT INC BUILDING PERMIT FEE $2000+ BUILDING PLAN CHECK FEE (BLDG) 1818 1St Ave, 100 SAN DIEGO, CA 92101 ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL GREEN BUILDING STANDARDS PLAN CHECK MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL PUBLIC FACILITIES FEES-outside CFO SB1473 BUILDING STANDARDS FEE SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement SEWER CONNECTION FEE (General Capacity all areas) STRONG MOTION-RESIDENTIAL TRAFFIC IMPACT Residential Condo Outisde CFO WATER METER FEE 5/8" Displacement WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P) WATER TREATMENT CAPACITY CHARGE 5/8" Displacement Total Fees: $24,277.40 . Total Payments To Date: $24,277.40 1818 1St Ave, Suite 100 San Diego, CA 92101-2662 619-481-3830 Balance Due: Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitation has previously otherwise expired. $0.00 $1,197.55 $671.62 $66.00 $166.00 $92.00 $182.00 $9,121.35 $11.00 $4,840.00 $899.00 $33.88 $2,584.00 $277.00 $4,013.00 $123.00 Permit Type: BLDG-Residential Application Date: 10/28/2015 Owner: Work Class: Condo Issue Date: 12/19/2016 Subdivision: Status. Closed -Finaled Expiration Date 12/11/2017 Address: IVR Number: 710148 Scheduled Date Actual Start Date Inspection Type Inspection No. Inspection Status Primary Inspector 11/09/2017 11/09/2017 November 09, 2017 BLDG-Final Inspection 040051-2017 Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Checklist Item BLDG-Building Deficiency BLDG-Plumbing Final BLDG-Mechanical Final BLDG-Structural Final BLDG-Electrical Final Passed Paul Burnette COMMErJTS See CB153668 for common corrections COMMENTS See CB153668 for common corrections M R CARLSBAD 11 LLC 2664 Madison St Carlsbad. CA 92008 Reinspection Passed Yes Yes Yes Yes Yes Passed Yes Yes Yes Yes Yes Complete Complete Page 4 of 4 PERMIT INSPECTION HISTQRY R~PORT (CB153670) Permit Type: BLDG-Residential Application Date: 10/28/2015 Owner: M R CARLSBAD 11 LLC Work Class: Condo Issue Date: 12/19/2016 Subdivision: Status: Closed -Finaled Expiration Dato: 12/11/2017 Address. 2664 Madison St Carlsbad, CA 92008 IVR Number: 710148 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete 08/14/2017 08/14/2017 BLDG-Electric Meter 031545-2017 Passed Michael Collins Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency EMR emailed to SDGE Yes Checklist tern COMMENTS Passed BLDG-Building Deficiency EMR emailed to SDGE Yes 09/25/2017 09/25/2017 BLDG-Gas Meter 035684-2017 Passed Michael Collins Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency GMR emailed to SDGE Yes Checklist Item COMMENTS Passed BLDG-Building Deficiency GMR emailed to SDGE Yes 11/07/2017 11/07/2017 BLDG-Final 039823-2017 Failed Michael Collins Reinspection Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency See CB153668 for common corrections No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No Checklist Item COMMENTS Passed BLDG-Building Deficiency See CB153668 for common corrections No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No 11/08/2017 11/08/2017 BLDG-Final 040096-2017 Failed Michael Collins Reinspection Complete Inspection Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No Checklist Item COMMENTS Passed BLDG-Building Deficiency Not ready No BLDG-Plumbing Final No BLDG-Mechanical Final No BLDG-Structural Final No BLDG-Electrical Final No November 09, 2017 Page 3 of 4 :,, REPORT (CB153670) Permit Typo: BLDG-Residential Application Dato: 10/28/2015 Owner: M R CARLSBAD 11 LLC Work Class: Condo Issue Date 12/19/2016 Subdivision: Status: Closed -Finaled Expiration Date: 12/11/2017 Address: 2664 Madison St Carlsbad, CA 92008 IVR Number: 710148 Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete Checklist Item COMMENTS Passed BLDG-Building Defiaency No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electrical No BLDG-44 No Rough-Ducts-Dampers 06/08/2017 06/08/2017 BLDG-18 Exterior 025642-2017 Passed Paul York Complete Lath/Drywall Checklist Item COMMENTS Passed BLDG-Building Deficiency No Checklist Item COMMENTS Passed BLDG-Building Deficiency No 06/09/2017 06/09/2017 BLDG-17 Interior 025829-2017 Passed Paul Burnette Complete Lath/Drywall Checklis Item COMMENTS P ssed BLDG-Building Deficiency Yes Checklis !terr COMMENTS P"lssed BLDG-Building Deficiency Yes BLDG-23 025830-2017 Passed Paul Burnette Complete Gas/TesURepairs Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 06/12/2017 06/12/2017 BLDG-18 Exterior 025930-2017 Passed Michael Collins Complete Lath/Drywall Checklis Item COMMENTS Passed BLDG-Building Deficiency Yes Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes 08/03/2017 08/03/2017 BLDG-Electrlc Meter 030541-2017 Failed Paul Burnette Reinspection Complete Release Checklist Item COMMENTS Passed BLDG-Building Deficiency No Checklist Item COMMENTS Passed BLDG-Building Deficiency No November 09, 2017 Page 2 of 4 PERMIT INSPECTION HISTORY REPORT (CB153670) Permit Type. BLDG-Residential Application Date: 10/28/2015 Owner: M R CARLSBAD 11 LLC Work Class: Condo Issue Date: 12/19/2016 Subdivision: Status: Closed -Finaled Expiration Dato: 12/11/2017 Address: 2664 Madison St Carlsbad, CA 92008 IVR Number: 710148 --- Scheduled Actual Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete 12/20/2016 12120/2016 BLDG-2 1 006290-2016 Passed Paul York Complete Underground/Underf loor Plumbing Checklist Item COMMENTS Passed BLDG-Building Deficiency No Checkli t Item cm MENTS Passed BLDG-Building Deficiency No 01/1812017 01/1812017 BLDG-11 009926-2017 Passed Paul York Complete Foundation/Ftg/Pier s (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency No Checklist Item COMMENTS Passed BLDG-Building Deficiency No 01126/2017 01/2612017 BLDG-11 011279-2017 Passed Paul York Complete Foundation/Fig/Pier s (Rebar) Checklist Item COMMENTS Passed BLDG-Building Deficiency No Checklist Item COMMENTS Passed BLDG-Building Deficiency No 03/3012017 03130/2017 BLDG-15 018250-2017 Partial Pass Paul York Relnspection Incomplete Roof/ReRoof (Patio) Checklist Item COMMENTS Passed BLDG-Bu1ld1ng Deficiency No Checklist Item COMMENTS Passed BLDG-Bu1ld1ng Deficiency No 05131/2017 05131/2017 BLDG-84 Rough 024889-2017 Passed Paul York Complete Combo( 14,24,34,44) Checklis Item COMMENTS Passed BLDG-Building Deficiency No BLDG-14 No Frame-Steel-Bolting-Welding (Decks) BLDG-24 Rough-Topout No BLDG-34 Rough Electncal No BLDG-44 No Rough-Ducts-Dampers November 09, 2017 Page 1 of 4 C8153670 2664 MADISON ST BEACHWALK UtllT 2/PI...Atl 81 -·~~CORD COPY ~:~s:-~ INSPECTION RECORD 1 594 SF LIVltlG/488 SF GARAGE.f75 SF 2r ro FLC DECK/117 SF 3RD FLOOR DECK y~ RESDMTL COt 100 Lot# VESTA PACIFIC DE'IELOPME•rr 'IIC. &!I INSPECTION RECORD CARD WITH APPROVED PLANS MUST BE KEPT ON THE JOB &!I CALL •EFORE l;JQ pm FOR NEXT WORK DAY INSPECTION &!I FOR •UILDING INSPECTION CALL: 760-602-2725 OR GO TO: www,Car1sb9fkLgoy/ByHdjng AND CLICK ON '1tequest ns o DATE: /(7 Required l"rlor to Requesting Building Fln•I If Checked YES CM&I IEnglneering Inspections) Are Prevention #12 IIEINFOICED STEEL HI MASONIY PIE GIOUT D uour O WALL DIAINS #10 111.TPAIIElS Ill POUi ffll,S #11 COWMN F0011NGS llC IUIFIAIIE a FLOOI a CEILING #11 IOOFSNEATHING #13 EXJ. SNEAI PAIIElS Ill INSULA110N #11 EXIDIOI IATH H7 lll1EIIOI IA1H A D1YWAL1 #11 POOLEXCA/STEELIIOND/FENCE 76~44-8463 76CH38-3891 76o-602-4660 Allow 48 hoUIS Call before 2 pm AIIOW 48 hourS Type of Inspection 131 #34 t33 #44 0 DUCT a Pl.fJIUM O Rff. PIPING 143 HEAT-AIR COND. $'YSTOIS #49 ANAi. . : . . 181 UNDERGROUND (11,11,21,311 182 DRYWALL.EXT IATII, GAS TES (17,11,23) 183 ROOFSHEATING, EXT SHW (ll,15) 184 FUME IOUGH COMIO (14,24,34,44) #85 T·Bar(l4,24,J4,441 A/S UNDEIGIOUND VISUAL A/S UNDEIGIOUIID ffllO A/S UNDEIGIOUIID R.11511 A/S OVDHEAD VISUAL AJSFUIAL F/AIOUGll-11 F/AFIIIAL Section 5416. Health and Safaty Code, State of California (a) Theo, .... be OOI 1e .. 1hao ---.. -20 _ M ____ at, conslruction job site. The water closet shall consist of a patented chernicaa IYPe loilet. (b) For the f)Ulpose of this section the tenn COOSlructioo site shall mean 1he locatiora on which actual construction o1 a building is in progress. (c) A Violation of this section shall constitute a misdemeanor. All c:onstruction or wort{ for which a permit is required shall be subject to inspection and al sucti constnJction or wor1t shall remain accessible and exposed for inspection purposes until approved by 1he inspector_ WCM1l shall not be done beyond the point indicated in each successive inspection without first obtaining 1he c1pprOva1 of the inslledor ADDITIONAL NOTES INSTALLATION CERTIFICATE CF-6R-ENV-Ol Envelope -Insulation; Roofing; Fenestration (Page 1 of 3) Site Address: I Enforcement Agency: 2664 MADISON STREET BLDG 2. CARLSBAD CA, 92008 I Permit Number: If more than one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate applicable to the portion of construction for which they are responsible; alternatively, the person with chief responsibility for construction shall prepare and sign this certificate for the entire construction. All applicable Mandatory Measures with check boxes require to be checked to ensure the mandatory measures have been met. Description of Insulation 1. RAISED FLOOR Material: Brand Name: ____________ _ Thickness (inches): Thermal Resistance (R-Value): ______ _ D § 150( d): Minimum R-13 insulation in raised wood-frame floor or equivalent U-factor. 2. SLAB FLOOR/PERIMETER Material: _______________ _ Brand Name: ____________ _ Thickness (inches): __________ _ Thermal Resistance CR-Value): ______ _ Perimeter Insulation Depth (inches): ____ _ 0 § 150(1): Water absorption rate for the insulation material alone without facings is no greater than O .3%; water vapor penneance rate is no greater than 2.0 perm/inch and shall be protected from physical damage and UV light deterioration. 3. EXTERIOR WALL a. Insulation Type (e.x. Batt, Loose Fill, Spray Foam) Batt b .. Insulation Type (e.x. Batt, Loose Fill, Spray Foam) Brand: CertainTeed Spray/Loose fill) Installed Actual Thickness (inches): _____ _ a. Thermal Resistance (R-Value ): _R_-1_5 ____ _ b. Thermal Resistance (R-Value): ______ _ Spray/Loose fill) Contractor's min installed weight/ft2 -~lb Manufacturer's installed weight per square foot to achieve Thermal Resistance CR-Value) D §150(c): Minimum R-13 insulation in wood-frame wall or equivalent U-factor. Exterior :Foam Sheathing (rigid Insulation) Material: ________ . _____ _ Brand Name: ____________ _ Thickness (inches) : __________ _ Thermal Resistance (R-Value) : ______ _ 4. FOUNDATIONWALL Material: ______________ _ Brand Name: ____________ _ Thickness (inches): _________ _ Thermal Resistance (R-Value): ______ _ 5. CEILING Batt or Blanket Type: Batt Brand Name: _C_e_rt_ai_n_Te_e_d __ =------ Loose Fill Type: Thermal Resistance (R-Value): _R_-3_0 ____ _ Spray Foam Type: Brand Name:------------ Installed Actual Thickness (inches): Contractor's min installed weight/fl2 lb Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value): D § 150(a): Minimum R-19 insulation in wood-frame ceiling or equivalent U-factor. 6. ATTIC ROOF INSULATION AND/OR ATTIC RADIANT BARRIER Material: Brand Name:------------- Material: Brand Name:------------- Thickness (inches): Thermal Resistance (R-Value): ______ _ 0 § 11 S(a): Insulation installed meets Standards for Insulating Material. D § l 50(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope -Insulation; Roofing; Fenestration (Page 2 of3) Site Address: I Enforcement Agency: 2664 MADISON STREET BLDG 2. CARLSBAD CA, 92008 I Permit Number: Description of Roofin2 Products CRRC Product ID Manufacturer Product Roof Roof Product Initial Solar Aged Solar Thermal Number1 Information Brand/Model Tvoe Area Slope Weight2 Reflectance Reflectance• Emittance N/A 03 [JJ 03 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at ww.coolrooft.orglprod11ctslsearch.php 2. The weight in lbs per square feet of the roofing product being installed. 3. Check box if the Aged Reflectance is a calculated value using the equation below, footnote 4. 4. If the aged reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the initial reflectance value from the directory and use the equation (0. 2+0. 7 (P,nitial -0.2) to obtain a calculated at!ed value. ,, tJ CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENT: D The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempt from the above Cool Roof criteria. D Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 lb/ft' is exempted from the above Cool Roof criteria. To apply Liquid Field Applied Coatings, the coating must be applied with a minimum dry mil thickness of 20 mils across the entire roof surface and meet minimum ver(ormance requirement'l listed in fl18(i)3 and Table 118-C. Select the aDD/icable coating CJ Aluminum-Pigmented Asphalt Roof Coating I D Cement-Based Roof Coating I 1:J Other ./ CJ CRRC-1 Label Attached to CF-6R (Note if no CRRC-1 label is available, this compliance method cannot be used and another method is required to meet compliance). FENESTRATION/GLAZING Product # Total Quantity Add. Exterior Comments/ Manufacturer/Brand Name U-Product of NFRC of Like Product Area Shading Dev. Location/ Special Item (GROUP LIKE RODUCTS) factor1 SHGC1 Panes Certified1• 2 (Optional) ft2 or Overhang Features I NIA 2 3 4 5 6 7. 8. 1. Use values from a fenestration product's NFRC Certified Label. For fenestration products without an NFRC label, use rhe default values .from Section I I 6, Table 116-A and I 16-B of the 2008 Energy Efficiency Standards. 2. NFRC Label Cern'/icates shall not be removed until the buildiw insoector has verified the efficiency. Enter Yes or No. D §116(a)l: Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. D § l 16(a)2 and 3: Actual fenestration products installed are equivalent to or have a lower U-factor and/or a lower SHGC than that specified on the Certificate of Compliance (Form CF-lR). 0 §l 16(a)4: Fenestration products (except field-fabricated windows) have a label listing the certified U-Factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration that meets the requirements of §10-11 l(a) D § 117: Exterior doors and windows weather-stripped; all joints and penetrations caulked and sealed. 2008 Residential Compliance Forms August 2009 INSTALLATION CERTIFICATE CF-6R-ENV-01 Envelope -Insulation; Roofin2; Fenestration (Page 3 of3) Site Address: I Enforcement Agency: 2678 MADISON STREET BLDG 1. CARLSBAD CA, 92008 I Permit Number: DECLARATION ST A TEMENT • I certify under penalty of perjury, under the laws of the State of California, the infonnation provided on this fonn is true and correct. • I am eligible under Division 3 of the Business and Professions Code to accept responsibility for construction, or an authorized representative of the person responsible for construction (responsible person). • I certify that the installed features, materials, components, or manufactured devices identified on this certificate (the installation) confonns to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcement agency. • I reviewed a copy of the Certificate of Compliance (CF-IR) form approved by the enforcement agency that identifies the specific requirements for the installation. I certify that the requirements detailed on the CF-lR that apply to the installation have been met. • I will ensure that a completed, signed copy of this Installation Certificate shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a signed copy of this Installation Certificate is required to be included with the documentation the builder provides to the building owner at occupancy. Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Truteam of California Responsible Person's Name: Nicole Flores CSLB License: 221517 2008 Residential Compliance Forms Date Signed: 05/31/2017 Responsibl August 2009