HomeMy WebLinkAbout2664 Madison St; ; CB153670; PermitPrint Date: 11/09/2017
Job Address:
Permit Type:
Parcel No:
Valuation:
Occupancy Group:
# Dwelling Units:
Bedrooms:
Project Title:
2664 Madison St
BLDG-Residential
2031100102
$260,610.00
1
3.00
BEACHWALK AT MADISON
City of Carlsbad
1635 Faraday Av Carlsbad, CA 92008
Residential Permit
www.carlsbadca.gov
Work Class:
Lot#:
Reference #:
Construction Type:
Bathrooms:
Orig. Plan Check #:
Plan Check#:
Condo
DEV14037
SB
3.00
PC150056
Status:
Applied:
Issued:
Fina led:
Inspector:
Description: BEACHWALK: UNIT 2/PLAN B/ 1,594 SF LIVING/488 SF GARAGE/75 SF 2ND FLOOR DECK/117 SF 3RD FLOOR DECK
Owner: Co-Applicant:
Permit No: CB153670
Closed -Finaled
10/28/2015
12/19/2016
PYork
M R CARLSBAD 11 LLC VESTA PACIFIC DEVELOPMENT INC
BUILDING PERMIT FEE $2000+
BUILDING PLAN CHECK FEE (BLDG)
1818 1St Ave, 100
SAN DIEGO, CA 92101
ELECTRICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
GREEN BUILDING STANDARDS PLAN CHECK
MECHANICAL BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PLUMBING BLDG RESIDENTIAL NEW/ADDITION/REMODEL
PUBLIC FACILITIES FEES-outside CFO
SB1473 BUILDING STANDARDS FEE
SDCWA SYSTEM CAPACITY CHARGE 5/8" Displacement
SEWER CONNECTION FEE (General Capacity all areas)
STRONG MOTION-RESIDENTIAL
TRAFFIC IMPACT Residential Condo Outisde CFO
WATER METER FEE 5/8" Displacement
WATER SERVICE CONNECTION FEE 5/8" DISPLACEMENT (P)
WATER TREATMENT CAPACITY CHARGE 5/8" Displacement
Total Fees: $24,277.40 . Total Payments To Date: $24,277.40
1818 1St Ave, Suite 100
San Diego, CA 92101-2662
619-481-3830
Balance Due:
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
$0.00
$1,197.55
$671.62
$66.00
$166.00
$92.00
$182.00
$9,121.35
$11.00
$4,840.00
$899.00
$33.88
$2,584.00
$277.00
$4,013.00
$123.00
Permit Type: BLDG-Residential Application Date: 10/28/2015 Owner:
Work Class: Condo Issue Date: 12/19/2016 Subdivision:
Status. Closed -Finaled Expiration Date 12/11/2017 Address:
IVR Number: 710148
Scheduled
Date
Actual
Start Date Inspection Type Inspection No. Inspection Status Primary Inspector
11/09/2017 11/09/2017
November 09, 2017
BLDG-Final
Inspection
040051-2017
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
Checklist Item
BLDG-Building Deficiency
BLDG-Plumbing Final
BLDG-Mechanical Final
BLDG-Structural Final
BLDG-Electrical Final
Passed Paul Burnette
COMMErJTS
See CB153668 for common corrections
COMMENTS
See CB153668 for common corrections
M R CARLSBAD 11 LLC
2664 Madison St
Carlsbad. CA 92008
Reinspection
Passed
Yes
Yes
Yes
Yes
Yes
Passed
Yes
Yes
Yes
Yes
Yes
Complete
Complete
Page 4 of 4
PERMIT INSPECTION HISTQRY R~PORT (CB153670)
Permit Type: BLDG-Residential Application Date: 10/28/2015 Owner: M R CARLSBAD 11 LLC
Work Class: Condo Issue Date: 12/19/2016 Subdivision:
Status: Closed -Finaled Expiration Dato: 12/11/2017 Address. 2664 Madison St
Carlsbad, CA 92008
IVR Number: 710148
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
08/14/2017 08/14/2017 BLDG-Electric Meter 031545-2017 Passed Michael Collins Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency EMR emailed to SDGE Yes
Checklist tern COMMENTS Passed
BLDG-Building Deficiency EMR emailed to SDGE Yes
09/25/2017 09/25/2017 BLDG-Gas Meter 035684-2017 Passed Michael Collins Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency GMR emailed to SDGE Yes
Checklist Item COMMENTS Passed
BLDG-Building Deficiency GMR emailed to SDGE Yes
11/07/2017 11/07/2017 BLDG-Final 039823-2017 Failed Michael Collins Reinspection Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency See CB153668 for common corrections No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
Checklist Item COMMENTS Passed
BLDG-Building Deficiency See CB153668 for common corrections No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
11/08/2017 11/08/2017 BLDG-Final 040096-2017 Failed Michael Collins Reinspection Complete
Inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Not ready No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final No
November 09, 2017 Page 3 of 4
:,,
REPORT (CB153670)
Permit Typo: BLDG-Residential Application Dato: 10/28/2015 Owner: M R CARLSBAD 11 LLC
Work Class: Condo Issue Date 12/19/2016 Subdivision:
Status: Closed -Finaled Expiration Date: 12/11/2017 Address: 2664 Madison St
Carlsbad, CA 92008
IVR Number: 710148
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Reinspection Complete
Checklist Item COMMENTS Passed
BLDG-Building Defiaency No
BLDG-14 No
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout No
BLDG-34 Rough Electrical No
BLDG-44 No
Rough-Ducts-Dampers
06/08/2017 06/08/2017 BLDG-18 Exterior 025642-2017 Passed Paul York Complete
Lath/Drywall
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
06/09/2017 06/09/2017 BLDG-17 Interior 025829-2017 Passed Paul Burnette Complete
Lath/Drywall
Checklis Item COMMENTS P ssed
BLDG-Building Deficiency Yes
Checklis !terr COMMENTS P"lssed
BLDG-Building Deficiency Yes
BLDG-23 025830-2017 Passed Paul Burnette Complete
Gas/TesURepairs
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
06/12/2017 06/12/2017 BLDG-18 Exterior 025930-2017 Passed Michael Collins Complete
Lath/Drywall
Checklis Item COMMENTS Passed
BLDG-Building Deficiency Yes
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
08/03/2017 08/03/2017 BLDG-Electrlc Meter 030541-2017 Failed Paul Burnette Reinspection Complete
Release
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
November 09, 2017 Page 2 of 4
PERMIT INSPECTION HISTORY REPORT (CB153670)
Permit Type. BLDG-Residential Application Date: 10/28/2015 Owner: M R CARLSBAD 11 LLC
Work Class: Condo Issue Date: 12/19/2016 Subdivision:
Status: Closed -Finaled Expiration Dato: 12/11/2017 Address: 2664 Madison St
Carlsbad, CA 92008
IVR Number: 710148
---
Scheduled Actual
Date Start Date Inspection Type Inspection No. Inspection Status Primary Inspector Re inspection Complete
12/20/2016 12120/2016 BLDG-2 1 006290-2016 Passed Paul York Complete
Underground/Underf
loor Plumbing
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
Checkli t Item cm MENTS Passed
BLDG-Building Deficiency No
01/1812017 01/1812017 BLDG-11 009926-2017 Passed Paul York Complete
Foundation/Ftg/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
01126/2017 01/2612017 BLDG-11 011279-2017 Passed Paul York Complete
Foundation/Fig/Pier
s (Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
03/3012017 03130/2017 BLDG-15 018250-2017 Partial Pass Paul York Relnspection Incomplete
Roof/ReRoof (Patio)
Checklist Item COMMENTS Passed
BLDG-Bu1ld1ng Deficiency No
Checklist Item COMMENTS Passed
BLDG-Bu1ld1ng Deficiency No
05131/2017 05131/2017 BLDG-84 Rough 024889-2017 Passed Paul York Complete
Combo( 14,24,34,44)
Checklis Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-14 No
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout No
BLDG-34 Rough Electncal No
BLDG-44 No
Rough-Ducts-Dampers
November 09, 2017 Page 1 of 4
C8153670 2664 MADISON ST
BEACHWALK UtllT 2/PI...Atl 81 -·~~CORD COPY ~:~s:-~ INSPECTION RECORD 1 594 SF LIVltlG/488 SF GARAGE.f75 SF 2r ro FLC
DECK/117 SF 3RD FLOOR DECK y~
RESDMTL COt 100
Lot# VESTA PACIFIC DE'IELOPME•rr 'IIC. &!I INSPECTION RECORD CARD WITH APPROVED
PLANS MUST BE KEPT ON THE JOB
&!I CALL •EFORE l;JQ pm FOR NEXT WORK DAY INSPECTION
&!I FOR •UILDING INSPECTION CALL: 760-602-2725
OR GO TO: www,Car1sb9fkLgoy/ByHdjng AND CLICK ON
'1tequest ns o
DATE: /(7
Required l"rlor to Requesting Building Fln•I If Checked YES
CM&I IEnglneering Inspections)
Are Prevention
#12 IIEINFOICED STEEL
HI MASONIY PIE GIOUT
D uour O WALL DIAINS
#10 111.TPAIIElS
Ill POUi ffll,S
#11 COWMN F0011NGS
llC IUIFIAIIE a FLOOI a CEILING
#11 IOOFSNEATHING
#13 EXJ. SNEAI PAIIElS
Ill INSULA110N
#11 EXIDIOI IATH
H7 lll1EIIOI IA1H A D1YWAL1
#11 POOLEXCA/STEELIIOND/FENCE
76~44-8463
76CH38-3891
76o-602-4660
Allow 48 hoUIS
Call before 2 pm
AIIOW 48 hourS
Type of Inspection
131
#34
t33
#44 0 DUCT a Pl.fJIUM O Rff. PIPING
143 HEAT-AIR COND. $'YSTOIS
#49 ANAi. . : . .
181 UNDERGROUND (11,11,21,311
182 DRYWALL.EXT IATII, GAS TES (17,11,23)
183 ROOFSHEATING, EXT SHW (ll,15)
184 FUME IOUGH COMIO (14,24,34,44)
#85 T·Bar(l4,24,J4,441
A/S UNDEIGIOUND VISUAL
A/S UNDEIGIOUIID ffllO
A/S UNDEIGIOUIID R.11511
A/S OVDHEAD VISUAL
AJSFUIAL
F/AIOUGll-11
F/AFIIIAL
Section 5416. Health and Safaty Code, State of California
(a) Theo, .... be OOI 1e .. 1hao ---.. -20 _ M ____ at, conslruction job site. The water closet shall consist of a patented chernicaa IYPe loilet.
(b) For the f)Ulpose of this section the tenn COOSlructioo site shall mean 1he locatiora on which actual construction o1 a building is in progress.
(c) A Violation of this section shall constitute a misdemeanor.
All c:onstruction or wort{ for which a permit is required shall be subject to inspection and al sucti constnJction or wor1t
shall remain accessible and exposed for inspection purposes until approved by 1he inspector_ WCM1l shall not be done beyond the point indicated in each successive inspection without first obtaining 1he c1pprOva1 of the inslledor
ADDITIONAL NOTES
INSTALLATION CERTIFICATE CF-6R-ENV-Ol
Envelope -Insulation; Roofing; Fenestration (Page 1 of 3)
Site Address: I Enforcement Agency:
2664 MADISON STREET BLDG 2. CARLSBAD CA, 92008
I Permit Number:
If more than one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate
applicable to the portion of construction for which they are responsible; alternatively, the person with chief responsibility for construction shall
prepare and sign this certificate for the entire construction. All applicable Mandatory Measures with check boxes require to be checked to ensure
the mandatory measures have been met.
Description of Insulation
1. RAISED FLOOR
Material: Brand Name: ____________ _
Thickness (inches): Thermal Resistance (R-Value): ______ _
D § 150( d): Minimum R-13 insulation in raised wood-frame floor or equivalent U-factor.
2. SLAB FLOOR/PERIMETER
Material: _______________ _ Brand Name: ____________ _
Thickness (inches): __________ _ Thermal Resistance CR-Value): ______ _
Perimeter Insulation Depth (inches): ____ _
0 § 150(1): Water absorption rate for the insulation material alone without facings is no greater than O .3%; water vapor penneance
rate is no greater than 2.0 perm/inch and shall be protected from physical damage and UV light deterioration.
3. EXTERIOR WALL
a. Insulation Type (e.x. Batt, Loose Fill, Spray Foam)
Batt
b .. Insulation Type (e.x. Batt, Loose Fill, Spray Foam)
Brand: CertainTeed
Spray/Loose fill) Installed Actual Thickness
(inches): _____ _
a. Thermal Resistance (R-Value ): _R_-1_5 ____ _
b. Thermal Resistance (R-Value): ______ _
Spray/Loose fill)
Contractor's min installed weight/ft2 -~lb
Manufacturer's installed weight per square foot to achieve Thermal Resistance CR-Value)
D §150(c): Minimum R-13 insulation in wood-frame wall or equivalent U-factor.
Exterior :Foam Sheathing (rigid Insulation)
Material: ________ . _____ _ Brand Name: ____________ _
Thickness (inches) : __________ _ Thermal Resistance (R-Value) : ______ _
4. FOUNDATIONWALL
Material: ______________ _ Brand Name: ____________ _
Thickness (inches): _________ _ Thermal Resistance (R-Value): ______ _
5. CEILING
Batt or Blanket Type: Batt Brand Name: _C_e_rt_ai_n_Te_e_d __ =------
Loose Fill Type: Thermal Resistance (R-Value): _R_-3_0 ____ _
Spray Foam Type: Brand Name:------------
Installed Actual Thickness (inches): Contractor's min installed weight/fl2 lb
Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value):
D § 150(a): Minimum R-19 insulation in wood-frame ceiling or equivalent U-factor.
6. ATTIC ROOF INSULATION AND/OR ATTIC RADIANT BARRIER
Material: Brand Name:-------------
Material: Brand Name:-------------
Thickness (inches): Thermal Resistance (R-Value): ______ _
0 § 11 S(a): Insulation installed meets Standards for Insulating Material.
D § l 50(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16.
2008 Residential Compliance Forms August 2009
INSTALLATION CERTIFICATE CF-6R-ENV-01
Envelope -Insulation; Roofing; Fenestration (Page 2 of3)
Site Address: I Enforcement Agency:
2664 MADISON STREET BLDG 2. CARLSBAD CA, 92008
I Permit Number:
Description of Roofin2 Products
CRRC Product ID Manufacturer Product Roof Roof Product Initial Solar Aged Solar Thermal
Number1 Information Brand/Model Tvoe Area Slope Weight2 Reflectance Reflectance• Emittance
N/A 03
[JJ
03
1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at
ww.coolrooft.orglprod11ctslsearch.php
2. The weight in lbs per square feet of the roofing product being installed.
3. Check box if the Aged Reflectance is a calculated value using the equation below, footnote 4.
4. If the aged reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the initial reflectance value from the
directory and use the equation (0. 2+0. 7 (P,nitial -0.2) to obtain a calculated at!ed value.
,, tJ CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENT:
D The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempt from the above Cool
Roof criteria.
D Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 lb/ft' is exempted from the above Cool Roof
criteria.
To apply Liquid Field Applied Coatings, the coating must be applied with a minimum dry mil thickness of 20 mils across the entire roof surface and
meet minimum ver(ormance requirement'l listed in fl18(i)3 and Table 118-C. Select the aDD/icable coating
CJ Aluminum-Pigmented Asphalt Roof Coating I D Cement-Based Roof Coating I 1:J Other
./ CJ CRRC-1 Label Attached to CF-6R
(Note if no CRRC-1 label is available, this compliance method cannot be used and another method is required to meet compliance).
FENESTRATION/GLAZING
Product # Total Quantity Add. Exterior Comments/
Manufacturer/Brand Name U-Product of NFRC of Like Product Area Shading Dev. Location/ Special
Item (GROUP LIKE RODUCTS) factor1 SHGC1 Panes Certified1• 2 (Optional) ft2 or Overhang Features
I NIA
2
3
4
5
6
7.
8.
1. Use values from a fenestration product's NFRC Certified Label. For fenestration products without an NFRC label, use rhe default values .from Section I I 6, Table
116-A and I 16-B of the 2008 Energy Efficiency Standards.
2. NFRC Label Cern'/icates shall not be removed until the buildiw insoector has verified the efficiency. Enter Yes or No.
D §116(a)l: Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
D § l 16(a)2 and 3: Actual fenestration products installed are equivalent to or have a lower U-factor and/or a lower SHGC than that specified on
the Certificate of Compliance (Form CF-lR).
0 §l 16(a)4: Fenestration products (except field-fabricated windows) have a label listing the certified U-Factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration that meets the requirements of §10-11 l(a)
D § 117: Exterior doors and windows weather-stripped; all joints and penetrations caulked and sealed.
2008 Residential Compliance Forms August 2009
INSTALLATION CERTIFICATE CF-6R-ENV-01
Envelope -Insulation; Roofin2; Fenestration (Page 3 of3)
Site Address: I Enforcement Agency:
2678 MADISON STREET BLDG 1. CARLSBAD CA, 92008
I Permit Number:
DECLARATION ST A TEMENT
• I certify under penalty of perjury, under the laws of the State of California, the infonnation provided on this fonn is true and correct.
• I am eligible under Division 3 of the Business and Professions Code to accept responsibility for construction, or an authorized representative
of the person responsible for construction (responsible person).
• I certify that the installed features, materials, components, or manufactured devices identified on this certificate (the installation) confonns
to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcement
agency.
• I reviewed a copy of the Certificate of Compliance (CF-IR) form approved by the enforcement agency that identifies the specific
requirements for the installation. I certify that the requirements detailed on the CF-lR that apply to the installation have been met.
• I will ensure that a completed, signed copy of this Installation Certificate shall be posted, or made available with the building
permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a
signed copy of this Installation Certificate is required to be included with the documentation the builder provides to the building
owner at occupancy.
Company Name: (Installing Subcontractor or General Contractor or Builder/Owner)
Truteam of California
Responsible Person's Name:
Nicole Flores
CSLB License:
221517
2008 Residential Compliance Forms
Date Signed:
05/31/2017
Responsibl
August 2009